Top Banner
Group 4 Project 2013 Orientation 18.02.2013
30

Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Jan 18, 2016

Download

Documents

Myles Eaton
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

Orientation18.02.2013

Page 2: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

What is Group 4 project?

A collaborative,Inter – disciplinary project.

Page 3: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

How am I involved?

It is a requirement for IB and KIS diploma.

So it is mandatory.

Page 4: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

What do I do?

Recreate a real problem solving situation that could take place in the

real world.

Page 5: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

This sounds tough?

NO!The collaborative process is the most important element of this exercise.Collaborative process – How well I

work with others!!

TEAM WORK

Page 6: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

What does team work mean?

You will be working as a part of a team of a dozen students. You will be evaluated on

• How do you approach the project? Are you self motivated? Do you follow it through completion?• Do you collaborate and communicate with the group? Do you respect and integrate the view of other members of the group?• Do you show an awareness of your strengths and weaknesses?• Do you give thoughtful consideration to yours and peers’ learning?

Page 7: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

How do I go about?The steps to follow are:

1. Orientation2. Theme3. Planning4. Experimental work5. Final Group discussion6. Presentation7.Assessment

Page 8: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

What is orientation?1. OrientationDuring this process you are made

aware of the Group 4 project – the process and the evaluation.

Yes its happening now!

Page 9: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

What is the theme for 20thirteen?2. Theme:The theme for this year is:

Water

Page 10: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

What is the theme for 2013?2. Theme:

Water is a very wide theme and your teacher will help you get directed

to a specific area.

Page 11: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

What is Planning?3. Planning:1. The planning phase may involve a couple of sessions.2. Action plan must have - what is to be done? how is to be

done? Why is it to be done? AND Who has to do it? The progress must be recorded in a blog which should be accessible to the team members and the concern group teacher.3. The experiments must be clearly planned.4. Remember to video or photograph even the planning

session so that your final presentation shows all stages.

Page 12: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

Experiment?4. Experimental work:Group 4 project has to be experimental in nature. It is important to bear in mind that all experiments

must be completed in about 3 cycles.For all experiments risk evaluation must be done given

to the Lab technicians before the experiment. The form is available on KISNET-Science.

All requisites for the experiments or any field trip plans MUST be given to Mrs. Ruby or Mr. Shereef by 28th February, 2013.

Page 13: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

Whom should I ask for equipment?4. Experimental work:For Biology and Chemistry requirements: Ms. Ruby

For Physics & ICTrequirement: Mr. Shereef.

Page 14: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

How do I go about?5. Final Group discussion:Group 4 project culminates with a final group

discussion. During this time findings of all members are put together. Each student develops a ‘research paper’ which is to

be turned in to your subject teacher.The photographs/video recordings are put

together to make the final presentation.

Page 15: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

How do I go about?6. Presentation:The presentation should be of a maximum of 7

minutes. It may include a short speech, simulation, role play, a demo, video

clippings.The important issue is to convey your findings

clearly and effectively. NOT just loud music.Presentations decides awards.

Page 16: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

What are the criteria for presentation evaluation?6. Presentation:A. The presentation should represent collective work.B. The presentation should be scientifically sound.C. It should be interdisciplinary showing work being

done in all subject areas – Physics, Chemistry Biology & Computer.

D. It should be of a maximum of 7 minutes.E. Quality of presentation – audio and visual.

The presentation evaluation sheet is on KISNET.

Page 17: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

How do I go about?7.Assessment:

There are three parts of this:A. Self assessment: You will find a link on

the Science web page which will take you to the self assessment form. A self assessment form should be turned in to your supervisor at the end of Group 4 project.

Page 18: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

How do I go about?7.Assessment:

There are three parts of this:B. Assessment by your Teacher: As a part

of your semester grade you will develop a ‘research paper’. This has to be turned in to your subject teacher. (ex. A Chemistry student will have to turn in to his/her Chemistry Teacher.)

Page 19: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

How do I go about?7.Assessment:

There are three parts of this:C. Assessment by your supervisor: You

can also view this form on KISNET. Your supervisor will evaluate you on personal skills. This will become a part of your IB internal assessment.

Page 20: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

Give me the dates?Important dates

Orientation: 18th February, 2013.Planning: From 19th February to 27th February, 2013.

Requisites to Lab tech: 28th March, 2013.Project development: 29th Feb to 25th March 2013.

Finalization of project: 8th to 15th April, 2013.Power point/video to Mr. Shereef: 15th April, 2013

Presentation: 19th April, 2013 @ 7.00 pm.Research paper and self assessment due: 30th April,

2013.

Page 21: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

Which software should I use?The SOFTWARE policy

All presentations must be compatible with Office 2010.Video on VLC.

Page 22: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

Oooookay give my group?

Each group has a teacher – to guide you.And a student leader who has to take charge of:

Calling meetingsDeciding on a topic

Distributing assignmentsGetting team members to collaborate

Keeping the goal(s) in focusAnd keep your mentor informed.

Page 23: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

Group 11. Pradhan, Tika – Leader 2. Purkayastha, Siddharth

3. Malik, Simon 4. Dey, Ayon

5. Chaudhary, Ria 6. Chitalia, Tanay 7. Jindal, Riya 8. Khatri, Kaanchi 9. Wangchu, Ngawang10. Shantanu

11. Nirav Sahani

12. Sadasivam Ganash, Varun Krisana

Page 24: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

Group 2

1.Chittoor Krishna Reddy, Sai Mahathi-Leader

2. Madhavarapu, Manohar3. Yitzin, Sonam4. Sahni, Nirav 5. Sangekar, Vidhit 6. Graham, Rebecca

7. Kwon, Do Hee 8. Prerna

9. Rangdrol, Yosel 10. Euchukanonchai, Klod11. Nanda, Viraj12. Tabitha Immanuel (computer)

Page 25: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013Group 3

1. Gautam, Divya – Leader2. Rajasekar, Sophia 3. Mishra, Swapnil 4. Kim, Chung Won5. Sandra Mogan, Nandhini 6. Sangsakul, Patcharapong 7. Sherpa, Sonam8. Rao, Nikhil 9. Sivakasiulaganathan, Jegannarayanan10. Chotrani, Mervin

11. Smanyanorraseth, Chanon

12. Sarthak Patel (computer)

Page 26: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

Group 41. Bhattacharya, Afrin - Leader2. Sah, Karuna 3. Renthlei, Rinngheta 4. Ruenruedeepanya, Krit 5. Suryawanshi, Rahi 6. Iyer, Ananyah 7. Garg, Jaisha 8. Jarg, Aamer 9. Kedia, Aditi 10. Karma

11. Swapnil Mishra

12. Choden, Tshering

Page 27: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013Group 5

1. Mehra, Sanaya - Leader2. Damodaran, Ansh

3. Edackatt, Jerry

4. Ganeshan, Banu 5. Chawla, Aditya

6. John, Isabella 7. Kressmann, Charlotte

8. Sumariwalla, Daraius

9. Ramalingam, Rajesvaran

10. Browne, Christophe

11. Gim, Chris

12. Nitsato Zhimomi (computer)

Page 28: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

Group 61. Shirai, Risa – Leader2. Sarthak Patel 3. Mondal, Arijit 4. Menon, Anuradha 5. Lalnunmawia, John 6. Verma, Rohan 7. Siraj, Ayman8. Patel, Mrunal 9. Park, Changwon 10. Nannan, Godwin

11. Shin, Jamie

12. Kanishth Raghani (computer)

Page 29: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

Group 71. Passi, Rhea - Leader2. Singh, Kirath 3. Sharma, Siddharth 4. Rymbai, Lydia

5. Suna, Joy 6. Khatiwada, Parth

7. Joseph, Rohan 8. Nagarajan, Bharath Kumar

9. Oh, JaeEun 10. Joshua, Abishek

11. Malik, Alaiqa 12. Loo, Sheng Yin

Page 30: Group 4 Project 2013 What is Group 4 project? A collaborative, Inter – disciplinary project.

Group 4 Project 2013

The last bit for the day !

Spend 5 minutes with your Mentor and the group Leader to decide on the date, time and venue of the planning meeting.

All documents are available in KISNET Departments Science Common Resource links Group 4.

All the best.

Let the star in you shine.