19

Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

Dec 20, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

Group 2 – Progress Report

2/23/09

Page 2: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

Purpose (Justin)

• Talk about progress the past week• Fabrication of shaft• Shaft exercise• Lessons learned• Getting ahead of schedule

Page 3: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

Gantt Chart (Justin)

• (Switch to Excel)

Page 4: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

Stiffness Calculation (Corey)

I d4

64

I area moment of inertia of a circle (m4 )

d diameter (m)

K 3EI

L3

K lateral bending stiffness (N/m)

E Young' s Modulus (Pa)

I Area Moment of Inertia

LLength

Keq 1

K1

1

K2

1

K3

1

K4

1

Keq equilibrim stiffness for springs in parallel

K1-4 stiffness of individual sections

Page 5: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

Spindle Shaft Dimensions (Corey)

Page 6: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

Stiffness Calculation (Corey)

Length (in) Length (m) Diameter (in) Diameter (m)Area Moment

of InertiaK's

1 0.0254 0.5 0.0127 1.27698E-09 4.68E+07

4 0.1016 1.05 0.02667 2.48349E-08 1.42E+07

0.87 0.022098 0.89 0.022606 1.28193E-08 7.13E+08

0.63 0.016002 0.591 0.0150114 2.49261E-09 3.65E+08

           

YoungsModulus (Pa)

  Keq (N/m)

 

Keq(N/mE-6)  

2.00E+11   10426059.6   10.4260596  

Keq=10.426 N/μm

Page 7: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

Pre-process Plan (Yi Fei)

• Face-off right most face• Drill live center • Rough cut section A, B, C, and then D• Finish cut section A, B, C, and then D• Cut part to length, take part out

D C B A

Page 8: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

Process Plan (Yi Fei)

• Face-off right most face• Drill live center• Turn down whole length to 1.07” diameter• Rough cut and finish cut section C, B, and then

A• Take part out, cut to length, turn part around• Rough cut and finish cut section D

D C B A

Page 9: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

Manufacturing (Mark)

• Details

Page 10: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

Manufacturing (Mark)

Page 11: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

Manufacturing (Mark)

Page 12: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

Test Cut Results (Corey)Cantilevered Cuts Diameter (mm)

Mean (mm)1 27.732 27.88

27.913 27.714 27.74    5 27.76    6 28.03

Std Dev7 28.068 28.06

0.169 28.1410 27.99    

       Free End Cuts Diameter (mm)

Mean (mm)1 27.732 27.56

27.6853 27.744 27.71

Std Dev      

0.08Exposed Length (mm) 138.11

•The measured diameters were greater than the target diameter

•The largest diameters were measured from the cantilevered cuts

•~.003 error in touching off tool

•Free end cuts were performed last

Initial Diamter (mm) 28.575Target Diameter (mm) 27.305

Page 13: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

Fabricated Shaft (Corey)

Page 14: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

(Non) Systematic Errors (John)

Page 15: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

CTE=12.2 µm/m-°C

∆L~1 µm

From Manufacturing Engineering and Technology - Kilpakjian

Nonsystematic Errors - Thermal

Page 16: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

Non-Systematic Errors: Vibration

• Rotating machinery may excite natural frequencies of lathe, tool, or shaft.

→ Be sure work-piece is centered→ Hold shaft with both chuck and live-center→ Hold shaft as close to cutting zone as possible

Page 17: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

Systematic Errors: Tool slip or work-piece slip

• Cutting forces may cause the tool or work-piece to shift because both are held with friction forces only.

• Cause a shift in mean results

→Use moderate feed-rates and depths of cut (accuracy more important than time for this operation)

http://www.sabanciuniv.edu/mdbf/mechatronics/eng/Arastirmalar/Projeler/images/clip_image008.jpg

Cutting forces on order of 250N-1000N

Page 18: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

Systematic Errors: Tool Wear

• Any tool wear will result in oversized dimensions• Not enough cutting done to be a large factor of error

→Check tool-zeroing often

Taylor-Tool Life Expectancy Eqation: V_c*T^n = C

Page 19: Group 2 – Progress Report 2/23/09. Purpose (Justin) Talk about progress the past week Fabrication of shaft Shaft exercise Lessons learned Getting ahead.

Concerns

• Will the current shaft work?• Making sure the second shaft gets

manufactured ‘properly’