AVOIDED POST CONSTRUCTION LANDFILL Multi-coloured dustbins/different garbage chut have been provided to building occupants to ensure segregation of waste at source. Dedicated, segregated and hygienic storage space in the project site to store different w before treatment /recycling. Contractual tie-ups with waste recyclers for saf recycling for recyclable wastes like metal, paper, plastic, glass etc. GRIHA criteria : 22 DEEPIKA VERMA (15001506003) M. Arch. (2015-17), 2nd Sem, Department of Architechture, Deenbandhu ChhotuRam University of