Grid Initiatives for e-Science virtual communities in Europe and Latin America WP4 - NGI / LGI Infrastructure Services STATUS REPORT.

Mar 27, 2015

Download

Documents

Jacob McGuire
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Grid Initiatives for e-Science virtual communities in Europe and Latin America  WP4 - NGI / LGI Infrastructure Services STATUS REPORT.

Grid Initiatives for e-Science virtual communities in Europe and Latin America

www.gisela-grid.eu

WP4 - NGI / LGI Infrastructure Services

STATUS REPORT

Ramon Diacovo (WP4 Manager)UFRJ (Brazil)

First Year Project ReviewBrussels, 15.09.2011

Page 2: Grid Initiatives for e-Science virtual communities in Europe and Latin America  WP4 - NGI / LGI Infrastructure Services STATUS REPORT.

www.gisela-grid.eu GISELA - First year Project Review - Brussels - 15/09/2011 2

Outline

•Work Package Objectives

•WP4 numbers

•Success Thresholds

•Future plans and conclusions

Page 3: Grid Initiatives for e-Science virtual communities in Europe and Latin America  WP4 - NGI / LGI Infrastructure Services STATUS REPORT.

www.gisela-grid.eu GISELA - First year Project Review - Brussels - 15/09/2011 3

Objectives

•WP4 involvement on GISELA objectives

- 1. “Ensure the sustainability of the EU-LA e-Infrastructure”

• 1.1. “Establish a powerful e-Infrastructure facility built on the EELA-2 legacy”

•Implement the catchall Grid Support Centre (GSC)

•Implement a Grid Operations Centre (GOC)

•Setup and operate the e-Infrastructure following the best practices recommended by EGI

Page 4: Grid Initiatives for e-Science virtual communities in Europe and Latin America  WP4 - NGI / LGI Infrastructure Services STATUS REPORT.

www.gisela-grid.eu GISELA - First year Project Review - Brussels - 15/09/2011 4

Objectives - catchall GSC

•Handles site integration and support for countries with no NGI in place via ROC IGALC (http://www.igalc.org/)

•Operates the prod.vo.eu-eela.eu VO- Every site on the e-Infrastructure has it configured

- Monitoring system

- Ticket submitting and following-up

- Compliance with WP3 requests on specific support

•Handles operations of IGALC sites

Page 5: Grid Initiatives for e-Science virtual communities in Europe and Latin America  WP4 - NGI / LGI Infrastructure Services STATUS REPORT.

www.gisela-grid.eu GISELA - First year Project Review - Brussels - 15/09/2011 5

Objectives - GOCs

•Handle site integration and support within the countries (Colombia and Mexico)

•Handle operations of sites within their countries (via ROC_LA in Colombia and Mexico)

- Colombian sites soon to be moved to its NGI

- Mexican GOC is acting as a seed for a future NGI

Page 6: Grid Initiatives for e-Science virtual communities in Europe and Latin America  WP4 - NGI / LGI Infrastructure Services STATUS REPORT.

www.gisela-grid.eu GISELA - First year Project Review - Brussels - 15/09/2011 6

Objectives - e-Infrastructure setup

•The EGI GISELA* Resource Provider MoU

- enables common procedures

- grants GISELA access to EGI tools

- promotes GISELA as an EGI certified Infrastructure provider

•The GSC ensures that

- Availability metrics are enforced

- Ticket resolution times are minimised

- GISELA profits from the already in place EGI proceduressigned by UFRJ on behalf of the GISELA consortium*

Page 7: Grid Initiatives for e-Science virtual communities in Europe and Latin America  WP4 - NGI / LGI Infrastructure Services STATUS REPORT.

www.gisela-grid.eu GISELA - First year Project Review - Brussels - 15/09/2011 8

WP4 Numbers

•Cumulative GISELA contribution per site (normalised CPU hours)

Page 8: Grid Initiatives for e-Science virtual communities in Europe and Latin America  WP4 - NGI / LGI Infrastructure Services STATUS REPORT.

www.gisela-grid.eu GISELA - First year Project Review - Brussels - 15/09/2011 9

WP4 Numbers

•Contribution breakdown at M11

LALAEUEU

Page 9: Grid Initiatives for e-Science virtual communities in Europe and Latin America  WP4 - NGI / LGI Infrastructure Services STATUS REPORT.

www.gisela-grid.eu GISELA - First year Project Review - Brussels - 15/09/2011 10

WP4 Numbers

•Ticket resolution time distribution

- 114 total tickets

- more than 50% solved in 3 days or less

- more than 75% solved in 7 days or less

- Average resolution time: 5 days

Average resolution time

Page 10: Grid Initiatives for e-Science virtual communities in Europe and Latin America  WP4 - NGI / LGI Infrastructure Services STATUS REPORT.

www.gisela-grid.eu GISELA - First year Project Review - Brussels - 15/09/2011 11

WP4 Numbers

•CPU cores integration

Year 1 Year 2

Pledge

Page 11: Grid Initiatives for e-Science virtual communities in Europe and Latin America  WP4 - NGI / LGI Infrastructure Services STATUS REPORT.

www.gisela-grid.eu GISELA - First year Project Review - Brussels - 15/09/2011 12

WP4 Numbers

•“Extra” resources for the prod.vo.eu-eela.eu VO

Page 12: Grid Initiatives for e-Science virtual communities in Europe and Latin America  WP4 - NGI / LGI Infrastructure Services STATUS REPORT.

www.gisela-grid.eu GISELA - First year Project Review - Brussels - 15/09/2011 13

WP4 Numbers

•e-Infrastructure availability

Page 13: Grid Initiatives for e-Science virtual communities in Europe and Latin America  WP4 - NGI / LGI Infrastructure Services STATUS REPORT.

www.gisela-grid.eu GISELA - First year Project Review - Brussels - 15/09/2011 14

Outline

•Work Package Objectives

•WP4 numbers

•Success Thresholds

•Future plans and conclusions

Page 14: Grid Initiatives for e-Science virtual communities in Europe and Latin America  WP4 - NGI / LGI Infrastructure Services STATUS REPORT.

www.gisela-grid.eu GISELA - First year Project Review - Brussels - 15/09/2011 15

Success Thresholds

Quality Metric Year 1 Status

Number of implemented GSC

1 1

Number of implemented GOCs

≥1 2

Number of cores integrated >2000 1794

Average ticket resolution time

≤3 weeks

<1 week

Average Resource Centre availability

≥60% 87%

Page 15: Grid Initiatives for e-Science virtual communities in Europe and Latin America  WP4 - NGI / LGI Infrastructure Services STATUS REPORT.

www.gisela-grid.eu GISELA - First year Project Review - Brussels - 15/09/2011 16

Outline

•Work Package Objectives

•WP4 numbers

•Success Thresholds

•Future plans and conclusions

Page 16: Grid Initiatives for e-Science virtual communities in Europe and Latin America  WP4 - NGI / LGI Infrastructure Services STATUS REPORT.

www.gisela-grid.eu GISELA - First year Project Review - Brussels - 15/09/2011 17

Plans for the second year

•Keep integrating the resources as they are made available

•Deploy the third GOC - current candidates are Argentina and Brazil

•Assist the handover to CLARA in March, 2012

•Maintain quality support to WP3 specific community requests

•Help to increase the average availability to meet Year 2 thresholds

Page 17: Grid Initiatives for e-Science virtual communities in Europe and Latin America  WP4 - NGI / LGI Infrastructure Services STATUS REPORT.

www.gisela-grid.eu GISELA - First year Project Review - Brussels - 15/09/2011 18

Conclusions

•GSC and GOCs - working as intended

•Operations - working as intended

•Resources integration - slower than foreseen, but still moving

- Non-partner sites supply the missing resources from the consortium