GRI South SG Meeting 15 November 2013
14

GRI South SG Meeting 15 November 2013. 15/11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…

Apr 01, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: GRI South SG Meeting 15 November 2013. 15/11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…

GRI South SG Meeting15 November 2013

Page 2: GRI South SG Meeting 15 November 2013. 15/11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…

15/11/2013 | Chart 2

After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…

Application of the uniform-price auction

algorithm

First DA auctions

1 Apr 2013

Registration start for shippers in order to

prepare April 1st

Registration start

20 Feb 2013

Platform go-live step by step. From idea to launch in less than a year.

Application of the ascending-clock auction

algorithm

First monthly auctions

15 Apr 2013

Application of the ascending-clock auction

algorithm

First yearly auctions

6 May 2013

Page 3: GRI South SG Meeting 15 November 2013. 15/11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…

15/11/2013 | Chart 3

PRISMA has implemented almost all of the NC CAM requirements. Two years ahead of time.

Capacity products- Bundled products between hubs- Unbundled products- Products as defined in the CAM Network code- Firm & Interruptible

All products available on one platform: PRISMA European Capacity Platform

Allocation – Auction mechanisms as described in the NC CAM

• Uniform price auction: day-ahead products• Ascending clock algorithm: monthly, quarterly and yearly products

The platform can also handle regional specificities, ensuring that European TSOs comply with their national regulation until NC CAM comes into force.

www.prisma-capacity.eu

Page 4: GRI South SG Meeting 15 November 2013. 15/11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…

15/11/2013 | Chart 4

Beyond the future European requirements, PRISMA also provides additional services to TSOs and Shippers…

Centralised shipper and user registration on the platform

First-come-first-served booking at domestic points

Surrender of capacity

Conversion of interruptible into firm capacity

Multiple kinds of firm capacity, multiple interruptible levels

Competing capacity

1:n bundling

Credit limit check

Booking assignment to balancing groups and portfolios

Automated interface to deal capturing systems of shippers

Comfort functions for automated bidding

With a high number of state-of-the-art functionalities, the PRISMA platform provides an advanced way to fulfil the EU requirements.

Page 5: GRI South SG Meeting 15 November 2013. 15/11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…

15/11/2013 | Chart 5

PRISMA has already reached significant acceptance and utilization in the market.

297 shippers with more than 900 users are using the platform to book transport capacity across European borders.

More than 28,000 auctions have taken place since the platform start

PRISMA held a public consultation on the platform functionalities and new GT&Cs. The public consultation ended on 16 September 2013 and an evaluation is currently being prepared.

Page 6: GRI South SG Meeting 15 November 2013. 15/11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…

15/11/2013 | Chart 6

Since PRISMA’s start, platform operations have been secure & stable with a large number of auctions taking place…

Capacity Auction Results:

Yearly Capacity (243 auctions):- Offered: 571.3 GWh/h- Allocated: 172.2 GWh/h

Quarterly Capacity (364 auctions):- Offered: 932.4 GWh/h- Allocated: 21.0 GWh/h

Month-Ahead Capacity (587 auctions):- Offered: 1,474.6 GWh/h- Allocated: 37.9 GWh/h

Day-Ahead Capacity (26,883 auctions):- Offered: 53,563.1 GWh/h- Allocated: 1,328.0 GWh/h

Page 7: GRI South SG Meeting 15 November 2013. 15/11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…

15/11/2013 | Chart 7

Number of Bundled Auctions that Ended with a Surcharge

Since the start of the PRISMA platform in April 2013, 63 out of 5,454 bundled auctions ended with a surcharge.

3

1

453

1

1Oberkappel

Eynatten

Lasów

Medelsheim/Obergailbach

Zelzate

Blaregnies/Taisnières

X Number of concluded auctions with a surcharge X Xentry exit

Page 8: GRI South SG Meeting 15 November 2013. 15/11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…

15/11/2013 | Chart 8

Number of Unbundled Auctions that Ended with a Surcharge

Since the start of the PRISMA platform in April 2013, 29 out of 22,614 unbundled auctions ended with a surcharge.

1

1

13

3

11

32

1

Oberkappel

Arnoldstein

Drohne

EmdenEllund

Oude Statenzijl

Medelsheim

Überackern

Wallbach

X Number of auctions with a surcharge (entry) X Number of auctions with a surcharge (exit)

3

Page 9: GRI South SG Meeting 15 November 2013. 15/11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…

15/11/2013 | Chart 9

Offered and allocated yearly capacities

13/14 14/15 15/16 16/17 17/18 18/19 19/20 20/21 21/22 22/23 23/24 24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/320

20

40

60

80

100

120

140

160

180

6.94

4.41

2.71

1.59

1.59

1.59

1.59

1.59

1.59

1.64

16.5

4

16.5

4

16.4

9

16.4

9

16.4

9

16.4

9

16.4

9

16.4

9

14.9

5

offered allocated

Gas Year

Cap

acit

y in

GW

h/h

Page 10: GRI South SG Meeting 15 November 2013. 15/11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…

15/11/2013 | Chart 10

Nota: Cumulative Quaterly auctions (27/05/13, 29/05/2013, 04/06/2013)

Offered and allocated quarterly capacities

Q1 Q2 Q3 Q40

50

100

150

200

Offered AllocatedG

Wh

/h

Page 11: GRI South SG Meeting 15 November 2013. 15/11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…

15/11/2013 | Chart 11

Offered and allocated month ahead capacities

Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-130

50

100

150

200

250 2

.64

3.7

2

3.9

2

5.1

3

6.9

4

4.6

2

3.7

1

9.8

0

offered allocated

GW

h/h

Page 12: GRI South SG Meeting 15 November 2013. 15/11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…

15/11/2013 | Chart 12

Offered and allocated day ahead capacities

1 2 3 4 5 6 70.00

1,000.00

2,000.00

3,000.00

4,000.00

5,000.00

6,000.00

7,000.00

8,000.00

9,000.00

10,000.00

allocated capacities

offered

GW

h/h

Page 13: GRI South SG Meeting 15 November 2013. 15/11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…

15/11/2013 | Chart 13

In the following months PRISMA will provide further features to connected TSOs and Shippers…

Integrated secondary functionality on the platform

Secondary functionality to be launched in January

2014

Multi-currency trading

Launch of multi-currency currently foreseen for 2014

Within-Day

Launch of within-day is foreseen

While ensuring stable operations of the PRISMA platform, PRISMA also continues the further platform development to fulfil both European and TSO individual

requirements.

Page 14: GRI South SG Meeting 15 November 2013. 15/11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…

15/11/2013 | Chart 14

Country / TSO(s) currently discussing with PRISMA to become involved in PRISMA as shareholder and/ or using the platform for a pilot project

Country / TSO(s) already part of PRISMA

Pilot Project

Our view

From Jan. 2014, National Grid (UK),

Gaslink (Ireland) & TIGF (France) will

become PRISMA shareholders We foresee that in 2014 and 2015

several further EU countries / TSOs

will join PRISMA as shareholders Some TSOs may start auctioning

capacity via pilot projects

Current discussion with TSOs