GREG URQUHART Table of Contents: Renderings . . . . . . . . . . . . . . . . . . . . . . 2 Design-Build . . . . . . . . . . . . . . . . . . . . . . . 7 Process . . . . . . . . . . . . . . . . . . . . . . . . 9 Drafting . . . . . . . . . . . . . . . . . . . . . . . . . 11 PORTFOLIO FOR ABBOT BROWN ARCHITECTS
15

greg urquhart - Dalhousie University · PoRtfolio foR ABBot BRoWN ARCHitECtS. ... darren Fransen. our challenge was to ... w s s v ng f LEE G ld tifi ti n T g s n s p s f P s 1,

Jul 17, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: greg urquhart - Dalhousie University · PoRtfolio foR ABBot BRoWN ARCHitECtS. ... darren Fransen. our challenge was to ... w s s v ng f LEE G ld tifi ti n T g s n s p s f P s 1,

greg urquhart

Table of Contents:

Renderings . . . . . . . . . . . . . . . . . . . . . . 2

Design-Build . . . . . . . . . . . . . . . . . . . . . . . 7

Process . . . . . . . . . . . . . . . . . . . . . . . . 9

Drafting . . . . . . . . . . . . . . . . . . . . . . . . . 11

PoRtfolio foR ABBot BRoWN ARCHitECtS

Page 2: greg urquhart - Dalhousie University · PoRtfolio foR ABBot BRoWN ARCHitECtS. ... darren Fransen. our challenge was to ... w s s v ng f LEE G ld tifi ti n T g s n s p s f P s 1,

Performing arts Centre

This project was part of an undergraduate studio that was dealing with developing a narrative. The idea behind the project came from the desire to enhance the processional experience between the public realm and the theatre, and to expose the inner workings of a theatre and artists’ studio.

instructor - Peter henryB3, Dalhousie university

PRoCESSioN tHRougH mASS AND voiD

rendering urquharT 2

Page 3: greg urquhart - Dalhousie University · PoRtfolio foR ABBot BRoWN ARCHitECtS. ... darren Fransen. our challenge was to ... w s s v ng f LEE G ld tifi ti n T g s n s p s f P s 1,

arTisTs’ sTudios

TheaTre

rendering urquharT 3

Page 4: greg urquhart - Dalhousie University · PoRtfolio foR ABBot BRoWN ARCHitECtS. ... darren Fransen. our challenge was to ... w s s v ng f LEE G ld tifi ti n T g s n s p s f P s 1,

rendering urquharT 4

Page 5: greg urquhart - Dalhousie University · PoRtfolio foR ABBot BRoWN ARCHitECtS. ... darren Fransen. our challenge was to ... w s s v ng f LEE G ld tifi ti n T g s n s p s f P s 1,

finnish Bath house

This project was part of an undergraduate studio that was dealing with systems integration. The program was to include a bath house that emphasized the heat - Cool - rest process. i separated the ephemeral bath house program from the urban program. The project then became an exercise in connecting these two opposing elements, and designing the ‘in-between’ spaces.

instructor - eugene PiezonckaB5, Dalhousie university

AN ExERCiSE iN RECoNCiliNg oPPoSitES

urquharT 5rendering

Page 6: greg urquhart - Dalhousie University · PoRtfolio foR ABBot BRoWN ARCHitECtS. ... darren Fransen. our challenge was to ... w s s v ng f LEE G ld tifi ti n T g s n s p s f P s 1,

rendering urquharT 6

Page 7: greg urquhart - Dalhousie University · PoRtfolio foR ABBot BRoWN ARCHitECtS. ... darren Fransen. our challenge was to ... w s s v ng f LEE G ld tifi ti n T g s n s p s f P s 1,

Design-BuilD Pavilion

This project was a Freelab project from the summer of 2017 situated at the Spryfield Community Garden. It was a joint project by Dalhousie university, united Way, and the Family resource institute, designed and built by graduate and undergraduate architecture students. The project was primarily designing and implementing a composting toilet on the site that would replace a chemical toilet that was existing.

instructor - John Pecefreelab 2017, Dalhousie university

BRiNgiNg tHE DEtAil to lifE

deTail arTiCulaTion urquharT 7

Page 8: greg urquhart - Dalhousie University · PoRtfolio foR ABBot BRoWN ARCHitECtS. ... darren Fransen. our challenge was to ... w s s v ng f LEE G ld tifi ti n T g s n s p s f P s 1,

deTail arTiCulaTion urquharT 8

Page 9: greg urquhart - Dalhousie University · PoRtfolio foR ABBot BRoWN ARCHitECtS. ... darren Fransen. our challenge was to ... w s s v ng f LEE G ld tifi ti n T g s n s p s f P s 1,

quinPool elementary sChool

This project was part of a Public architecture studio, where we were tasked with designing a school to go on the site of the old st. Patrick’s school on quinpool and Windsor. This was a group project, and i worked with a fellow classmate, darren Fransen. our challenge was to continue the urban fabric without taking away the park that the site has become. This became an exercise in process development.

mentor - Diogo Burnaym1 2017, Dalhousie university

REtHiNkiNg tHE PuBliC yARD tHRougH foRm fiNDiNg

ProCess develoPmenT urquharT 9

Page 10: greg urquhart - Dalhousie University · PoRtfolio foR ABBot BRoWN ARCHitECtS. ... darren Fransen. our challenge was to ... w s s v ng f LEE G ld tifi ti n T g s n s p s f P s 1,

ProCess develoPmenT urquharT 10

Page 11: greg urquhart - Dalhousie University · PoRtfolio foR ABBot BRoWN ARCHitECtS. ... darren Fransen. our challenge was to ... w s s v ng f LEE G ld tifi ti n T g s n s p s f P s 1,

green gaBles visitor Centre

This project was a competition won by the firm I worked at for the first work term, root architecture inc. my role for the project was helping with design development, reviewing specifications, drafting, and partici-pating in design charettes. drawings used with permission.

mentor - Kendall taylorroot architecture inc, Dartmouth, ns

lEARNiNg ABout tHE ARCHitECt’S RolE

draFTing

Gg Uq

SHELL: T�� ����

RR s n f , n dwnwn Plnd S wnwn s sn vlztin n qly f xpn s ps y Mny n sps nd sblsns pnng nd lng gwng nd f “ft” pds Sn I ws lvng n Hlfx, I d pls f kng fy vy dy In s wlk bwn Aldny nl nd ffi, I ld n ny f nds I ndd d dy, v ff, nd g vy plsn bbsp Ts xpn ss p wnwn vy wll; s nvnn ls-kn nyny w wd vy f sps, w ppl vy fndly nd n fd v sl nvstin w y n s

FRAME: T�� ����

R n ws fndd n vy pn pnpl f dng g ng wl y v n d s Mny gntins v fd dffn bttls Tdy, l ng s s R A s nnvtiv dsgns wll b vlsting nd sptfl f nvnn, s ny gntins y ln f nd njy wk On f ’s n pjs s Gn Gbls Vs Cn n PEI, w s svng f LEE Gld tifitin T gs n s ps f Ps 1, n xpnsn f n xsting bn s F s pj, I ws skd w vwng nd ting Al dwngs T gvnn s s CA sndds, nd s I d ln nssy fntins f sftw I ws sng s s sndds ld b I ls pk n dsgn wksps sndng j bldng n s, nw Vs Cn ng wksp, I ws gvn n s nsg n l dsgn pnpls nd wy n g s n s pln f pj I wkd w dffn lns n vyng lvls f gvnn, s wll s dd s psntin f ll lns nd nslns b pntil dsgn ly Mny f pns I sd bng sd n s pln f s, nd I lk fwd sng finsd pd

ELEMENT: T�� ����������

R s vy sll fi, lng js 3 ppl w yslf nldd Ts pvdd n ppny xpn ny sps f wkng n fi v s pd Ts nldd CA dwng, fil ngn, sp dwng nd spfitin vw nd psn, npl dsgn nd dsgn dvlpn, dl dwng, nd nsln nd ln ltinsp bldng Wkng n s sn I wnssd fis-nd ln ltinsps bng dvlpd, nd w dl w nslns dd n lgn w y dsgn vls Sn fi ws s sll, vyn ws lwys bsy, s I d ln ny f sks ln Wl vvyn ws wllng nsw ny qstins, lnng s sklls n y wn lpd dvlp py f pbl slvng nd ntitiv-kng I dd n v bf sting I ws ls bl dvlp gd ltinsp w y -wks n psnl lvl, w ws dd by b ’lk n Fdy ftnns, nd tings sd f wk-wk

urquharT 11

Page 12: greg urquhart - Dalhousie University · PoRtfolio foR ABBot BRoWN ARCHitECtS. ... darren Fransen. our challenge was to ... w s s v ng f LEE G ld tifi ti n T g s n s p s f P s 1,

6r@195UP

D104

THRESHINGAREA

DN

7r@

200

D103

MULTI-PURPOSEROOM

D102

3600

4000

4000

4000

4000

3607

2000

0

400

STOR.

B.F.

GA

RB

AG

E A

ND

RE

CY

CLI

NG

1829

NEW WALKWAY

3607

D101

CAFE

D105

D106CASH

D107GIFT SHOP

5820

7206

DN

1829

D108STAIR

D107A

D107B

D107C

D105

D101

D10

7

FIN. FLR.14.95

FIN. FLR.14.95

FIN. FLR.13.79

D10

8A

FIN. FLR.12.26

1549

7737

IW2 IW2

IW1

FIBER REINFORCEDPANEL

PB PB

PB PB

IW2IW2

IW3WALL TYPE IW3 TO BE BUILTUNDER THE EXISTINGRAISED FLOOR.REMOVE SUB FLOOR AS REQUIREDTO INSTALL WALL AND REINSTATE.

IW2

190

EW2

EW2

EW3

EW3

PERGOLA ABOVE

RAMP AND STAIRS.SEE LANDSCAPINGFOR DETAILS

3265

R.O

.36

65 R

.O.

3665

R.O

.36

65 R

.O.

3665

R.O

.

3272 R.O.

913

R.O

.

MODIFY DUCT LOCATION.INFILL FLOORWITH 19mm PLYWOODON WOOD BLOCKINGWHERE DUCTSREMOVED

REMOVE HARDWOOD LEDGETO INSTALL NEW DIFFUSERS

AND REPLACE TOMATCH EXISTING DASHED LINE

REPRESENTS THEEXTENT OF NEW BASE

WHERE DUCTS PASS ABOVETHE STAIRWELL PROVIDE 2LAYERS OF TYPE 'C' 16mmGYP BOARD ON 38x89mm WOODSTUDS. EXTEND ENCLOSURE TOGRID LINE D

LINE OF BULKHEAD ABOVE

HATCH REPRESENTSNEW FLOOR INFILL

1A11A03

2A11A03

3A11A03

4A11A03

5A11A03

6A11A03

7A11A03

8A11A03

9A11A03

IW4

D108B

EW3

W2

W2

W2

PB - PUSH BUTTONFOR BARRIERFREE ACCESS

ROUGH OPENINGIS FOR W1A ABOVE

HATCH REFERS TONEW WALLS AND COLUMNS

EQ EQ

RWL - RAINWATERLEADER

RWL - RAINWATERLEADER

RWL - RAINWATERLEADER

RA

MP

200x200mm TYPICALSEE STRUCTURAL

5A03A03

7A03A03 6

A03A03

1220 FLOOR TO BE RECONSTRUCTED

SIM

ILA

R

AA03A08

AA03A08

CA03A09

BA03A09

BA03A09

DA03A12

DA03A12

EA03A12

EA03A12

CA03A09

IW4

IW4

IW4

MOP SINK

THESE DETAILS ARETAKEN ABOVE THROUGHCLERESTOREY WINDOWSEE ELEVATION A06

685 81

3 965

600

838

460

457

610x914mmMIRROR

SOAP DISPENSER

PAINT

GRAB BAR

100mmRUBBERBASE

SUPPORTBRACKET

PAINT

PAINT

GRABBAR

100mmRUBBERBASE

PAPERTOWEL

POST FORMEDPLASTIC LAMINATEVANITY

100mmRUBBER

BASE

300 900

600

PAPERTOWEL

D105 230

200 230

1200

WHEELCHAIRCLEARANCE

1000

FLOOR PLAN

NORTH ELEVATION 5A03 A03

EAST ELEVATION 6A03 A03

WEST ELEVATION 7A03 A03

1A03A06

2A03A06

3A03A07

4A03A07 1

A03 A03

#A# A#

LEGEND:

ELEVATION NUMBER, FROM PAGE, FOUND ON

SECTION NUMBER, FROM PAGE, FOUND ON

DETAIL NUMBER, FROM PAGE, FOUND ON

#A# A#

#A# A#

INTERIOR WALL TYPES

IW1

· 19x140mm TxG ROUGH CUT PINE· 13mm GYPSUM BOARD-PAINTED· 38x89mm WOOD STUDS @ 400mm O.C.· SOUND ATTENUATION BLANKET· 13mm GYPSUM BOARD-PAINTED

IW2

· 16 mm GYPSUM BOARD-PAINTED· 38x89 mm WOOD STUDS @ 400mm O.C.· SOUND ATTENUATION BLANKET· 16 MM GYPSUM BOARD-PAINTED NOTE: AT STAIR WELL D108

USE TYPE 'X' GYPSUM BOARD TO SEPARATE THE STAIR FROMTHE DUCT SHAFT.

IW3

· 16mm GYPSUM BOARD-PAINTED - TWO LAYERS· 38x89 mm WOOD STUDS @ 400mm O.C. STAGGERED ON

38x140mm TOP AND BOTTOM PLATES· SOUND ATTENUATION BLANKET· 16mm GYPSUM BOARD-PAINTED - TWO LAYERS· ACOUSTIC SEALANT TOP AND BOTTOM, BOTH SIDES AND ALL

PENETRATIONS

IW4

· 13mm GYPSUM BOARD· 38x89mm WOOD STUDS @ 400mm O.C.· WALL TO CONTINUE TO 2400mm A.F.F.

IW5

SHAFT WALL DESIGN AS PER SPECIFICATION SECTION 09 21 16· 19mm GYPSUM BOARD· 102mm C-H METAL STUDS @ 600mm O.C.· 75mm MINERAL WOOL· 25mm GYPSUM PANELS.· WALL TO BE INSTALLED AS SHOWN ON A09.

EXTERIOR WALL TYPES

EW1

· 13mm GYPSUM BOARD· 38x89mm O.C. LEAVE 25mm BETWEEN STUD AND FOUNDATION

WALL· PROVIDE SILL GASKETS· R.S.I. 3.5 CLOSED CELL FOAM INSULATION· FOUNDATION WALL· WATERPROOFING· 38mm RIGID INSULATION· 13mm PROTECTION BOARD

EW2

· EASTERN WHITE CEDAR SHINGLES· DRAINAGE PLAIN· AIR-BARRIER· SIP-STRUCTURAL INSULATED PANEL· VAPOUR RETARDER INTEGRAL WITH PANEL· 19x89mm STRAPPING· 19x140mm BOARDS

EW3

· EASTERN WHITE CEDAR SHINGLES· DRAINAGE PLAIN· AIR BARRIER· SHEATHING· 38x140mm PRESSURE TREATED WOOD STUDS @ 400mm O.C.

0 99% SUBMISSION

1

2 ISSUED FOR TENDER

100% SUBMISSION

draFTing urquharT 12

Page 13: greg urquhart - Dalhousie University · PoRtfolio foR ABBot BRoWN ARCHitECtS. ... darren Fransen. our challenge was to ... w s s v ng f LEE G ld tifi ti n T g s n s p s f P s 1,

EXTERIOR WALL TYPE NO.2A03

13mm GYPSUM BOARD ON38x89mm WOOD BLOCKING@ 400mm O.C.

LINE OFCONCRETESLAB

LINE OF WALLCAP ABOVE

EXTERIOR WALLTYPE NO.2SEE A03

6mm SPACING

.

.

.

EXTERIOR WALL TYPE NO.3SEE A03

.

EXTERIOR WALL NO.2SEE A03

WROUGHT-IRON HINGE

25x152mm

25mm DRESSED BOARDS MOUNTED ON 25mm HORIZONTAL AND DIAGONAL BRACING25mm RIGID INSULATION25mm DRESSED BOARDS

PINE TRIM

SEALANT

13mm GYPSUM BOARD ON 38x89mm WOODSTUDS @ 400mm O.C. SCREW TOP PLATEOF WALL TO HORIZONTAL TIMBER FRAMEABOVE. DO NOT FASTEN TO COLUMNS.

6mm SPACING

REFER TO DETAIL 703 11

LINE OF FOUNDATION

202

.

.

38x140mmCORNER TRIM BOARDS

EXTERIOR WALL NO.2SEE A03

13mm GYPSUM BOARD ON38x89mm WOODSTUDS @ 400mm O.C. SCREWTOP PLATEOF WALL TO HORIZONTALTIMBER FRAMEABOVE. DO NOT FASTEN TOCOLUMNS.

6mm SPACING

102

102140

140

.

EXTERIOR WALL NO.2SEE A03

TAPEABLE 'L' MOLDING.TYPICAL DETAIL THROUGHOUT

13mm GYPSUM BOARD ON 38x89mm WOODSTUDS @ 400mm O.C. SCREW TOP PLATEOF WALL TO HORIZONTAL TIMBER FRAMEABOVE. DO NOT FASTEN TO COLUMNS.

ALUMINUM-CLAD WINDOW

REFER TO DETAIL 703 11

PERGOLA ABOVE

167 3564 R.O.mm

LINE OF FOUNDATIONBELOW24

2

.

38x140mmCORNER TRIM BOARDS

ALUMINUM-CLAD WINDOW

EXTERIOR WALL NO.2SEE A03

PERGOLA ABOVE

167

3665

R.O

.

3564mm R.O.

REFER TO DETAIL 703 11

.

268

19mm BOARDS

VAPOUR RETARDERINTEGRAL WITH STRUCTURALINSULATED PANEL

ALUMINUM-CLADBI-FOLD DOOR

EXTERIOR WALL NO.2SEE A03

'BACK' SEAL SHINGLES

38x89mm WOOD TRIM

SEALANT AND BACKER ROD

ALUMINUM-CLAD WINDOW

WRAP AIR BARRIER AROUNDEND OF PANEL AND SEAL TOSHEATHING WITH TAPE

25x66mm STRAPPING

PROVIDE CHANNEL IN COLUMNSFOR ELECTRICAL SERVICESWHERE REQUIRED.INFILL WITH 19mm PINE TOMATCH TIMBER FRAME.CO-ORDINATE WITHELECTRICAL

167

3665

mm

R.O

.

.

50

100 100

EXTERIOR WALL NO.2SEE A03

EXISTING 75x150mm

ALUMINUM-CLAD WINDOW

REFER TO DETAIL 703 11

19mm PINE TRIM ON19x89mm STRAPPING

EXISTING SHEATHING

EXISTING WALL

38x38mm PRESSURETREATED BLOCKING

SEALANT

INTERIOR WALL TYPE NO.3SEE A03

REMOVE EXISTING SHINGLES ASREQUIRED TO INSTALL NEW WALL.REPAIR EXISTING SHINGLES TOMATCH EXISTING.

400

3665

mm

R.O

.16

7

INTERIOR WALL TYPE NO.2SEE A03

.

167

3265

mm

R.O

.

EDGE OF WINDOWOPENING BELOW

LINE OF BARN DOORTRACK ENCLOSURE BELOW

19mm PINE TRIMON 19mm STRAPPING

102

ALUMINUM-CLAD WINDOW

REFER TO DETAIL 703 11

EXTERIOR WALL NO.2SEE A03

.

13mm GYPSUM BOARD ON38x89mm WOOD BLOCKING@ 400mm O.C.

38x38mm PRESSURETREATED BLOCKING

REMOVE EXISTING SHINGLESAS REQUIRED TO INSTALLNEW WALL. REPAIR EXISTINGSHINGLES TO MATCH EXISTING.

13mm GYPSUM BOARDOVER OVER EXISTINGSHEATHING.

EXISTING SHEATHING

INTERIOR WALL TYPE NO.3SEE A03

EXISTING WALL

400

.

.

1A03 A11

PLAN DETAIL 4A03 A11

PLAN DETAIL 7A03 A11

PLAN DETAIL

2A03 A11

PLAN DETAIL

3A03 A11

PLAN DETAIL 6A03 A11

PLAN DETAIL 9A03 A11

PLAN DETAIL

5A03 A11

PLAN DETAIL 8A03 A11

PLAN DETAIL

0 99% SUBMISSION

1

2 ISSUED FOR TENDER

100% SUBMISSION

draFTing urquharT 13

Page 14: greg urquhart - Dalhousie University · PoRtfolio foR ABBot BRoWN ARCHitECtS. ... darren Fransen. our challenge was to ... w s s v ng f LEE G ld tifi ti n T g s n s p s f P s 1,

NEW ADDITIONEXISTING BARN

G F E D C B A

TO BEAM 19.149m

17.420m

FINISH FLOOR 14.950m

W1A W1 W1 W1

W2W2

NEW WOODSHINGLESON EXISITNGBARN

NEW WOOD SHINGLES 19x140 TRIM BOARDS

19x100 TRIM BOARDS - PAINTED

EXPOSED TIMBER FRAME

ALUMINUM CLADBI-FOLD DOORS

BARRIER FREE RAMPSEE LANDSCAPEDRAWINGS

ALUMINUM CLADBI-FOLD DOORS2 SLIDING BARN DOORS

19x140mm T+G FINISHED PINEDOOR WITH 19x140mmDIAGONAL AND HORIZONTALBRACING

NEW STAIRSSEE LANDSCAPEDRAWINGS

ALUMINUM CLADWINDOW

BARN DOORGUIDE PROTECTIONSEE DETAIL 2/A10

2470

1729

EXISTING WOODSHINGLES TOREMAIN

D107C D107B

AA06 A08

THIS LINEINDICATES DEPTHOF CEMENTBOARDPROTECTION ONINSULATION

PLAN DETAILS 8,9 ONA11 ARE TAKENTHROUGH THISWINDOW

NEW ADDITION EXISTING BARN

A B C D E F G

19.149m

17.420m

14.950m

TO BEAM

FINISH FLOOR

12.260m TO SLAB

NEW WOODSHINGLESON EXISTINGBARN

EXISTING WINDOW

INFILL TO BE:· WOOD SHINGLES TO

MATCH EXISTING· AIR BARRIER· SHEATHING· 38x140 WOOD STUDS

@ 400 O.C.

EXISTING CUPOLA

WOOD SHINGLES 19x140 TRIM BOARDS

2470

1729

2522

EXISTING WOODSHINGLES TOREMAIN

EXISTING WOODSHINGLES TOREMAIN

WOOD SHINGLES

AA06 A08

19x140mmWOOD TRIM

19x140mmWOOD TRIM

D108BD107A

38x240mm PRESSURETREATED CAP.SLOPED 13mm TOEXTERIOR

EXISTING TRIMTO REMAIN

HANDRAIL IN STAIRWELL WITH300 mm HORIZONTALEXTENSIONS TOP AND BOTTOM

NEW WOODSHINGLESON EXISTINGBARN

THIS LINEINDICATES DEPTHOF CEMENTBOARDPROTECTION ONINSULATION

1A06 A10

1A03 A06

EAST ELEVATION

2A03 A06

WEST ELEVATION

WINDOW TYPE LEGEND:

W1A - 829x3265mm

W1 - 829x3665mm

W2 - 2740x3665mm

W3 - 828x3564mm

W4 - 2740x3564mm

#A# A#

LEGEND:

ELEVATION NUMBER, FROM PAGE, FOUND ON

SECTION NUMBER, FROM PAGE, FOUND ON

DETAIL NUMBER, FROM PAGE, FOUND ON

#A# A#

#A# A#

0 99% SUBMISSION

1

2 ISSUED FOR TENDER

100% SUBMISSION

draFTing urquharT 14

Page 15: greg urquhart - Dalhousie University · PoRtfolio foR ABBot BRoWN ARCHitECtS. ... darren Fransen. our challenge was to ... w s s v ng f LEE G ld tifi ti n T g s n s p s f P s 1,

greg urquharttHANk you foR youR CoNSiDERAtioN

[email protected](506)977-1146