Top Banner
Technical Service Bulletin: Boiler Pump Inspection Models: Bosch Greenstar Combi, Bosch Greenstar Data subject to change without notice | Printed in the USA | BTC 436002109 B | 10.2013 Bosch Thermotechnology Corp. Bosch Thermotechnology Corp. 50 Wentworth Avenue Londonderry, NH 03053 Tel: 1-800-283-3787 Fax: 1-603-965-7581 www.bosch-climate.us Introduction All of the boilers within the Bosch Greenstar series have an internal boiler pump. During the commissioning of the boiler it is recommended to check that the internal rotor of the pump is free to rotate. Before lling the boiler with water Upon commissioning and before lling the boiler with water, remove the stainless steel vent from the front of the pump. This will allow access to the top of the internal rotor. Using a small at blade screwdriver, gently turn the internal rotor to ensure it spins freely. Replace the stainless steel vent cap on the front of pump when nished. To purge air from the circulating pump once the boiler is lled with system water, undo the vent cap slowly until a small amount of water is released from the pump. The vent cap will not need to be removed completely. Once the circulating pump has been purged of air, tighten the vent cap. The remainder of the commissioning procedure as stated in the Installation Manual can now be completed. Figure 1
1

GREENSTAR Boiler pump inspection bulletin - bosch · PDF fileDuring the commissioning of the boiler it is ... The remainder of the commissioning procedure ......

Mar 29, 2018

Download

Documents

lamquynh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: GREENSTAR Boiler pump inspection bulletin - bosch · PDF fileDuring the commissioning of the boiler it is ... The remainder of the commissioning procedure ... GREENSTAR_Boiler_pump_inspection_bulletin.indd

Technical Service Bulletin:

Boiler Pump InspectionModels: Bosch Greenstar Combi, Bosch Greenstar

Data subject to change without notice | Printed in the USA | BTC 436002109 B | 10.2013 Bosch Thermotechnology Corp.

Bosch Thermotechnology Corp.50 Wentworth AvenueLondonderry, NH 03053

Tel: 1-800-283-3787Fax: 1-603-965-7581 www.bosch-climate.us

Introduction

All of the boilers within the Bosch Greenstar series have an internal boiler pump. During the commissioning of the boiler it is recommended to check that the internal rotor of the pump is free to rotate.

Before fi lling the boiler with water

Upon commissioning and before fi lling the boiler with water, remove the stainless steel vent from the front of the pump. This will allow access to the top of the internal rotor. Using a small fl at blade screwdriver, gently turn the internal rotor to ensure it spins freely. Replace the stainless steel vent cap on the front of pump when fi nished.

To purge air from the circulating pump once the boiler is fi lled with system water, undo the vent cap slowly until a small amount of water is released from the pump. The vent cap will not need to be removed completely. Once the circulating pump has been purged of air, tighten the vent cap. The remainder of the commissioning procedure as stated in the Installation Manual can now be completed.