GreenPlan GreenPlan GreenPlan GreenPlan- - -IT: Supporting RAA IT: Supporting RAA IT: Supporting RAA IT: Supporting RAA in the Bay Area in the Bay Area in the Bay Area in the Bay Area Lester McKee, Jing Wu, Pete Kauhanen, Jennifer Hunt, and Tony Hale San Francisco Estuary Institute Integrating Reasonable Assurance Analysis and Stormwater/Green Infrastructure Plans Water Board, Room 1 (2 nd floor) September 23, 9am – 4 pm
35
Embed
GreenPlan-IT: Supporting RAA in the Bay Area · PDF fileGreenPlan-IT: Supporting RAA in the Bay Area Lester McKee, Jing Wu, Pete Kauhanen, Jennifer Hunt, and Tony Hale San Francisco
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
GreenPlanGreenPlanGreenPlanGreenPlan----IT: Supporting RAAIT: Supporting RAAIT: Supporting RAAIT: Supporting RAAin the Bay Areain the Bay Areain the Bay Areain the Bay Area
Lester McKee, Jing Wu, Pete Kauhanen, Jennifer Hunt, and Tony HaleSan Francisco Estuary Institute
Integrating Reasonable Assurance Analysis and Stormwater/Green Infrastructure Plans
Water Board, Room 1 (2nd floor) September 23, 9am – 4 pm
San Francisco Estuary Partnership(SFEP)
Jennifer Krebs
Josh Bradt
Watearth Jennifer Walker
City Partners San Mateo
San Jose
GreenPlanGreenPlanGreenPlanGreenPlan----IT Funding and TeamIT Funding and TeamIT Funding and TeamIT Funding and TeamSan Francisco Estuary Institute (SFEI)
Jing Wu Pete Kauhanen Jen Hunt Lester McKee Dave Senn Tony Hale
Step 1: Determine types of GreenStep 1: Determine types of GreenStep 1: Determine types of GreenStep 1: Determine types of GreenInfrastructure of InterestInfrastructure of InterestInfrastructure of InterestInfrastructure of Interest
What goes into the Model?What goes into the Model?What goes into the Model?What goes into the Model?
Model Calibration for GuadalupeModel Calibration for GuadalupeModel Calibration for GuadalupeModel Calibration for GuadalupeRiver at Hwy 101 in San JoseRiver at Hwy 101 in San JoseRiver at Hwy 101 in San JoseRiver at Hwy 101 in San Jose
Excellent calibration for both flow timing and magnitude
What comes out of the model?What comes out of the model?What comes out of the model?What comes out of the model?
ID critical runoff &pollutant source areas
Set stage for GreenInfrastructure cost-performanceoptimization
Ready for ReasonableAssurance Analysis Excellent spatial
calibration (3-4 foldvariability)
Thousands of PossibleSites….
But what are the mostcost-effective GreenInfrastructurecombinations?
Optimization Focus AreaOptimization Focus AreaOptimization Focus AreaOptimization Focus Area
Green Infrastructure Attributes Green Infrastructure area Soil porosity Water filtration rate etc.
Green Infrastructure Costs Design Construction Operation & Maintenance
What goes into the OptimizationWhat goes into the OptimizationWhat goes into the OptimizationWhat goes into the OptimizationTool?Tool?Tool?Tool?
Model the DesignModel the DesignModel the DesignModel the Design StormStormStormStorm2 year2 year2 year2 year ---- 24 hour24 hour24 hour24 hour
What is the relative cost toWhat is the relative cost toWhat is the relative cost toWhat is the relative cost toimplement Green Infrastructure?implement Green Infrastructure?implement Green Infrastructure?implement Green Infrastructure?
Cost (Million $)Flow
orlo
adre
duct
ion
(%ba
selin
e)
Most cost efficient
Least costefficient
44% peak flow reduction
44% peak flow reduction 5.5 million gals of additional recharge
Step 5:Step 5:Step 5:Step 5: IdentifyIdentifyIdentifyIdentify prioritypriorityprioritypriority locationslocationslocationslocations“Putting the pieces together”“Putting the pieces together”“Putting the pieces together”“Putting the pieces together”
Overlay optimization andsite ranking output
Combine with otherinformation Private partnerships or
funding opportunities Community needs Existing flooding or pollution
sources Infrastructure age and
condition Capital improvement plans
LID tracker:LID tracker:LID tracker:LID tracker: PlannedPlannedPlannedPlanned and Prospectiveand Prospectiveand Prospectiveand ProspectiveWorkWorkWorkWork
LID tracker GIS Databasepiloted with one partnercity
Creation of data entryforms
Interactive map forplacement and display ofLID locations
Basic LID effectivenessreports
http://greenplanit.sfei.org/
Toolkit User manual Toolkit requirements Demonstration report
San Mateo Countywide WaterPollution Prevention Program
September 23, 2015
Issues to Consider Integration and timing with Stormwater
Resource Plans Scale• GI plans at local level• Load reduction at regional/county level• What scale to identify and prioritize projects• Tension between local plans, long-term
“greening,” and cost-effective load reduction Assumptions are critical• Results can have significant financial
implications
Issues to Consider Public vs Private• How do we consistently estimate future
new/redevelopment• Need to model private for load reduction,
but doesn’t seem like we need to ID sites Data• Just using available data or figuring out
what is really useful and generating it How do the outputs really help
municipal planning?
Green Streets Need agreement on treatment sizing Consider streets as units, intersection to
intersection, split on centerline Catch basins as nodes, map tributary area
within street units Identify required treatment per unit Optimize based on combinations of units Link to pavement maintenance programs Underdrain questions Tracking more meaningful if done by street