Greenhouse Construction Bunker Hill Agriculture Department 2012-13.

Jan 18, 2018

Download

Documents

Marylou Booker

Cost of Construction Materials Greenhouse $26, Architect $ 3, Footing and Walkways $ 1, Benches $ 2, Fans $ Electrical $ Irrigation $ Miscellaneous $ Total $34,679.00
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript

Greenhouse Construction Bunker Hill Agriculture Department Size 30 feet by 60 feet and 16 feet at the apex Jaderloon House Number Flats the house can contain is 1000 flats and 380 hanging baskets Cost of Construction Materials Greenhouse $26, Architect $ 3, Footing and Walkways $ 1, Benches $ 2, Fans $ Electrical $ Irrigation $ Miscellaneous $ Total $34,679.00 Man Hours in Construction All Agriculture classes ( 81 students) participated in the construction of the new greenhouse. Total number of student hours involved in the greenhouse construction was: 1625 man hours. Total Cost of Man per hour was $19,500.00 Total Cost of Greenhouse Materials $34, Labor $19, Total Opportunity Cost $54,159.00 Donors and Grants Catawba County Farm Bureau $10,000 NC FFA Improvement Grant $ 5,000 Tobacco Trust Fund Bunker Hill FFA $ 2,000 Catawba County CTE Dept. $17,674 Total $34,679 Thank you! from all the agriculture students and staff of BHHS Without your contribution this project would not have been possible!