Green the Green • Annually-funded CIP project started in 2016 • Project Goals • to provide shade along the river • To improve riparian corridor • To improve visual aesthetic of City • Pilot project – 2 privately-owned sites that score medium, high or critical on Green River Sun Map totaling 1,200 LF
9
Embed
Green the Green - Govlink · Green the Green • Annually-funded CIP project started in 2016 • Project Goals • to provide shade along the river • To improve riparian corridor
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Green the Green
• Annually-funded CIP project started in 2016
• Project Goals• to provide shade along the river• To improve riparian corridor• To improve visual aesthetic of City
• Pilot project – 2 privately-owned sites that score medium, high or critical on Green River Sun Map totaling 1,200 LF
JSH Properties1st Site
JSH PropertiesFunded through WRIA 9/CWM grants Re-Green the Green I & II + City of Tukwila
High & Medium need on Green River Sun Map
Mostly blackberry, ivy, some knotweed
JSH Properties
JSH Properties
• City contracted KCD for outreach/design• 500 LF/17,000 SF• Zone 1: willow + shrub stakes• Zone 2: steepest - willow + shrub stakes; less steep - trees +
shrubs• Zone 3: shrubs + groundcovers• Landowner agreements in progress• 2018 site preparation/planting• 2019 planting/maintenance• 2020 maintenance• 2021 -2028 long-term maintenance•
NC Machinery/Harnish Group
2nd Site
Funded through WRIA 9/CWM grants Re-Green the Green I & II + City of Tukwila