GREEN MILL RUN GREENWAY/BIKEWAY - PHASE 2 EXTENSION FROM EVANS PARK TO CHARLES BOULEVARD CITIZEN’S INFORMATIONAL WORKSHOP MAY 30, 2012 PROPOSED 10’ HIGH- VISIBILITY CROSSWALK WITH REFUGE ISLAND ON ARLINGTON BOULEVARD REMOVE EXISTING CROSSWALK REMOVE EXISTING CROSSWALK 500 YEAR FLOODPLAIN 500 YEAR FLOODPLAIN 100 YEAR FLOODPLAIN 100 YEAR FLOODPLAIN FEMA FLOODPLAIN FEMA FLOODPLAIN CSX RAILROAD PROPOSED 10’ HIGH-VISIBILTY CROSSWALK ON EVANS STREET WITH PEDESTRIAN AMENITIES PROPOSED 8’ ASPHALT MULTI-USE PATH PROPOSED 10’ WIDE BOARDWALK PROPOSED TRAIL HEAD AT CANTERBURY PROPOSED 8’ ASPHALT MULTI-USE PATH CONNECTION GREEN MILL RUN END PROJECT CSX RAILROAD EVANS STREET CLIFTON STREET PIRATE’S PLACE APARTMENTS EAST CAROLINA UNIVERSITY EVANS PARK ARLINGTON BOULEVARD PROPOSED 10’ CROSSWALK ACROSS SCHOOL DRIVEWAY REMOVE EXISTING 5’ CONCRETE SIDEWALK AND REPLACE WITH 2’ GRASS VERGE AND 10’ WIDE ASPHALT PATH BEGIN PROJECT J.H. ROSE HIGH SCHOOL CONSTRUCT 10’ ASPHALT MULTI-USE PATH WITH 2’ GRASS VERGE AT EXISTING BACK OF CURB ALONG EVANS STREET SULGRAVE ROAD CANTERBURY ROAD CHARLES BOULEVARD FICKLEN DRIVE PROPOSED 10’ WIDE PEDESTRIAN BRIDGE PROPOSED 10’ WIDE BOARDWALK PROPOSED 10’ ASPHALT MULTI-USE PATH WITH 2’ GRAVEL SHOLDER GREEN MILL RUN GREENWAY, PHASE 1 EAST CAROLINA UNIVERSITY CHALLENGE COURSE TIE INTO EXISTING PATH EAST CAROLINA UNIVERSITY ATHLETIC FIELDS MULTI-USE PATH TYPICAL SECTION 0 100 200 400 N