Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007 FY 2006 Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of Work Level Number Funds AL AAL AK Akutan GA 006 129,355 Conduct Airport Master Plan Study [(Phase 5, Complete EA)] Aniak P 008 57,706 Conduct Airport Master Plan Study [Erosion Study Phase II Aniak Master Plan] Barter Island LRRS CS 003 927,772 Update Airport Master Plan Study [(Phase 2, Environmental)] 004 1,894,960 Rehabilitate Runway [(Maintenance)] - 06/24 Bethel P 015 5,701,583 Construct Apron Clark Bay SPB (Prop GA Hollis replacement) 001 2,475,596 Construct Seaplane Base Coffman Cove GA 002 1,437,164 Construct Seaplane Base Fairbanks International P 032 21,738,658 Construct Apron [(Construction)], Construct Apron [(Multi-yeared in 2006)], Install Juneau International P 047 1,000,000 Taxiway Lighting [(Centerline for Alpha & Bravo)], Rehabilitate Runway - 01R/19L Expand Terminal Building [(Planning & Design)] Kenai Municipal P 035 8,432,329 Improve Seaplane Base [extend & widen waterlane (phase 1)], Improve Seaplane Base [extend & widen waterlane (phase 2a)], Rehabilitate Runway [(Phase 2)] - Ketchikan International P 015 259,570 01L/19R, Rehabilitate Runway [RSA, provide standard(Phase 2)] - 01L/19R, Rehabilitate Runway [Rehabilitate runway lighting] - 01L/19R Install Emergency Generator 016 24,158,613 Rehabilitate Runway [(Extend RSA, Phase 1)] - 11/29, Rehabilitate Runway - 11/29 King Salmon P 009 7,489,430 Extend Runway Safety Area [Phase 1] - 11/29 Lake Hood P 011 2,891,416 Construct Apron [Phase 2 (06 EP + 05 Carryover)], Construct Apron [Phase 2 (MY - Reimbursement)] Manokotak (Proposed GA) 001 8,311,638 Construct New Airport [Phase 1 (Construct Embankments)] Matanuska-Susitna Borough Planning 001 673,858 Conduct Metropolitan System Plan Study McGrath CS 004 1,571,036 Construct Sand and Chemical Storage Building 005 6,574,950 Construct Apron, Construct Runway - Plan-1 Merle K (Mudhole) Smith P 010 4,346,424 Construct Runway Safety Area [(Install EMAS, Phase 2)] - 09/27 Merrill Field P 040 551,000 Acquire Snow Removal Equipment 041 1,727,100 Rehabilitate Apron [phase 1 (block 5)], Security Enhancements [(RSAT Recommendations, Phase 2)] Nanwalek / Port Graham Regional (Proposed GA) 001 500,000 Conduct Airport Master Plan Study New Stuyahok (Proposed GA) 003 5,387,450 Construct New Airport [Phase 3], Construct Snow Removal Equipment Building Newtok GA 003 104,000 Conduct Airport Master Plan Study [(Collection of Wind Data)] Nome P 014 1,481,187 Construct Aircraft Rescue & Fire Fighting Building [(Phase 2)], Construct Snow Selection Criteria Year: 2006 Page 1 of 93
93
Embed
Grants Awarded by FY · Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007 FY 2006 Region ADO State Worksite Service Grant Seq Level Number AL AAL AK 014 015 Palmer
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
AL AAL AK Akutan GA 006 129,355 Conduct Airport Master Plan Study [(Phase 5, Complete EA)]
Aniak P 008 57,706 Conduct Airport Master Plan Study [Erosion Study Phase II Aniak Master Plan]
Barter Island LRRS CS 003 927,772 Update Airport Master Plan Study [(Phase 2, Environmental)]
Construct Taxiway [Runway end Turnarounds], Install Runway Vertical/VisualGuidance System - 11/29, Rehabilitate Runway Lighting - 11/29Conduct Miscellaneous Study [BCA], Update Airport Master Plan Study
Conduct Noise Compatibility Plan Study [Update Contours]
Moritz Memorial GA 004 275,172 Expand Apron [phase two]
Ness City Municipal GA 002 68,782 Construct Runway [Environmental Assessment] - Plan-1
New 002 32,490 Conduct Environmental Study
New Century Aircenter R 020 547,747 Rehabilitate Taxiway Lighting [Rehab Taxiway Lighting A, F, and H]
Newton-City-County R 020 629,101 Rehabilitate Apron [APRON REHAB CONSTRUCTION]
Norton Municipal GA 001 77,661 Improve Access Road [Design], Rehabilitate Taxiway [Design Only]
Ottawa Municipal GA 008 803,723 Install Runway Vertical/Visual Guidance System - 17/35, Rehabilitate Apron [Construction]
Philip Billard Municipal GA 012 740,752 Rehabilitate Runway - 18/36
Pratt Industrial GA 009 285,000 Acquire Land For Approaches, Acquire Land For Approaches
Renner Field /Goodland Municipal/ GA 013 212,425 Install Miscellaneous NAVAIDS [Supplemental wind cones], Rehabilitate Runway 12/30
Russell Municipal GA 005 796,364 Rehabilitate Apron
Scott City Municipal GA 007 326,374 Extend Taxiway [Extend Taxiway to North Turnaround Pad], Rehabilitate Runway
Shalz Field GA 007 181,143 [Crackfill Rehab of RW 17-35] - 17/35 Rehabilitate Apron [Crackseal apron], Rehabilitate Runway [Joint seal and slab replacement]
Selection Criteria Year: 2006
Page 7 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
CE ACE KS Smith Center Municipal
Stanton County Municipal
State of Kansas
Strother Field
Syracuse-Hamilton County Municipal
Tri-City
Ulysses
Wichita Mid-Continent
CE
State Total:
ACE MO Columbia Regional
Joplin Regional
Kansas City International
Lambert-St Louis International
Missouri State Block Grant Program
Springfield-Branson Regional
FY 2006
Service Grant Seq Level Number
GA 003
GA 005
004
GA 012
GA 004
GA 003
GA 008
P 050
051
052
61 Grants
P 024
025
P 024
P 048
049
050
051
052
P 096
098
099
100
101
027
030
031
P 031
AIP Federal Funds
101,478
246,991
232,750
256,025
1,121,632
2,203,418
694,867
122,894
262,828
99,343
22,538,616
81,368
69,732
3,395,000
2,778,347
2,250,000
141,047
3,240,745
4,463,462
374,817
15,837,519
1,811,620
9,809,128
3,525,000
17,000,377
734,300
3,572,787
10,654,443
Report Date 03/13/2007
Brief Description Of Work
Rehabilitate Runway [Slurry Seal Pavements] - 17/35
Acquire Land for Development
Conduct State System Plan Study
Rehabilitate Runway
Construct Runway [Pave Runway] - Plan-1
Rehabilitate Runway - 17/35
Construct Taxiway [Construction - Phase 1]
Update Miscellaneous Study [Pavement Condition Inventory]
Install Airport Beacons
Construct Terminal Building [Phase 1a Terminal Environmental Assessment]
Rehabilitate Apron [GA apron]
Acquire Snow Removal Equipment
Construct Terminal Building
Rehabilitate Apron [reimbursement]
Acquire Snow Removal Equipment
Acquire Land for Noise Compatibility within 65 - 69 DNL
Rehabilitate Taxiway
Construct Deicing Containment Facility
Conduct Airport Master Plan Study [ALP update with narrative report]
Construct Runway - Plan-1
Acquire Land for Noise Compatibility within 70 - 74 DNL [W-1W expansion land]
Non primary development projects in state block grant program, Non primary development projects in state block grant program Non primary development projects in state block grant program
Non primary development projects in state block grant program
Construct Terminal Building [phase 3]
Selection Criteria Year: 2006
Page 8 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
CE ACE MO State of Missouri 004 170,000 Update State System Plan Study
State Total: 18 Grants 79,909,692
CE ACE NE Albion Municipal GA 006 47,785 Update Airport Master Plan Study
Alliance Municipal GA 011 269,586 Install Airfield Guidance Signs, Install Perimeter Fencing, Rehabilitate Apron, Rehabilitate Taxiway
Alma Municipal GA 002 152,714 Construct Utilities
Beatrice Municipal GA 010 102,125 Acquire Snow Removal Equipment
Brenner Field GA 006 187,340 Construct Snow Removal Equipment Building
Brewster Field GA 005 102,600 Acquire Snow Removal Equipment
Broken Bow Municipal GA 004 472,789 Construct Building, Update Airport Master Plan Study
Cambridge Municipal GA 004 45,600 Update Airport Master Plan Study
Central City Municipal - Larry Reineke Field GA 002 1,166,287 Extend Runway - 15/33, Rehabilitate Apron, Widen Taxiway
Central Nebraska Regional CS 028 178,634 Update Airport Master Plan Study
Chadron Municipal GA 008 200,000 Improve Runway Safety Area - 02/20, Install Guidance Signs
Cozad Municipal GA 003 510,000 Extend Runway [Extend runway (Phase 2)] - 13/31
Cram Field GA 003 533,259 Rehabilitate Apron, Rehabilitate Taxiway
Creighton Municipal GA 003 28,500 Acquire Miscellaneous Land
Crete Municipal GA 006 341,240 Acquire Miscellaneous Land
Curtis Municipal GA 002 194,449 Install Miscellaneous NAVAIDS, Install Runway Lighting - 12/30
Eppley Airfield P 044 2,175,000 Improve Runway Safety Area - 18/36
Evelyn Sharp Field GA 003 131,100 Extend Runway [Land for Runway Phase I] - 13/31, Update Airport Master Plan
Fairbury Municipal GA 006 263,568Study Construct Taxiway, Construct Utilities, Rehabilitate Parking Lot
Garden County GA 003 109,543 Improve Fuel Farm, Install Taxiway Lighting [Phase 1]
Gordon Municipal GA 003 320,000 Construct Building [Hangar], Rehabilitate Runway - 04/22
Grant Municipal GA 003 139,500 Acquire Snow Removal Equipment
004 514,987 Construct Building, Construct Building
Hebron Municipal GA 004 47,500 Update Airport Master Plan Study
Imperial Municipal GA 005 145,514 Install Taxiway Lighting
Selection Criteria Year: 2006
Page 9 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
CE ACE NE 006 50,350 Update Airport Master Plan Study
Jim Kelly Field GA 008 207,993 Construct Terminal Building [Construct Terminal area (Phase 2)], Construct Terminal
Robert J. Miller Air Park GA 015 850,000 Rehabilitate Apron [Construction- Phase II]
Sussex R 006 633,363 Rehabilitate Runway Lighting [Construction] - 03/21
Teterboro R 033 13,150,000 Improve Runway Safety Area [Construction] - 06/24
034 301,966 Noise Mitigation Measures for Public Buildings [Soundproofing of St Francis]
035 1,667,558 Noise Mitigation Measures for Public Buildings [Noise Compatibility Project - School Soundproofing Program - Soundproofing Memorial School - Phase IV - South Hackensack, N.J]
Albany International P 084 240,798 VALE Vehicle [VALE Program - Clean Fuel/American Fuel Fleet Conversion - Phase 1I]
087 3,176,166 Improve Airport Drainage [Runway 1/19 Drainage Improvements], Rehabilitate Apron [Terminal Apron and General Aviation Apron Rehabilitation], Rehabilitate Apron [Terminal Apron and General Aviation Apron Rehabilitation]
Selection Criteria Year: 2006
Page 15 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
EA NYC NY
Buffalo Airfield
Buffalo Niagara International
Buffalo-Lancaster
Canandaigua
Cattaraugus County-Olean
Chautauqua County/Dunkirk
Chautauqua County/Jamestown
Columbia County
Corning-Painted Post
Cortland County-Chase Field
Dansville Municipal
Dutchess County
Elizabeth Field
FY 2006
Service Grant Seq Level Number
088
089
090
R 015
016
P 061
062
R 011
014
R 020
021
GA 010
GA 033
034
P 033
034
GA 022
023
GA 007
008
GA 013
GA 015
GA 024
GA 012
013
AIP Federal Funds
1,651,065
309,700
900,000
218,841
133,779
816,891
1,194,565
81,651
148,590
215,506
95,566
612,437
1,346,435
166,757
12,483,000
864,500
693,500
124,612
708,920
102,361
156,100
830,000
747,650
88,350
80,750
Report Date 03/13/2007
Brief Description Of Work
Acquire Land For Approaches [Runway 19 RPZ Property Acquisitions]
Improve Terminal Building [Terminal Checkpoint Mezzanine Improvements (Construction)] Noise Mitigation Measures [FAR Part 150 Noise Compatibility Program - Engine Maintenance Ground Run-Up Enclosure (Land Acquisition)] Acquire Snow Removal Equipment, Install Runway Vertical/Visual Guidance System - 06/24 Acquire Land For Approaches, Remove Obstructions
Construct Deicing Containment Facility [Innovative Glycol Treatment and Water Quality Improvement Program] Noise Mitigation Measures for Residences within 75 DNL [Home Surveys and Sample Home Procurements] Construct Taxiway [Design]
Conduct Environmental Study [Environmental Assessment for 5 year Master Plan projects] Acquire Land For Approaches
Remove Obstructions [Phase II-Tree Removal]
Construct Snow Removal Equipment Building
Rehabilitate Taxiway
Construct Snow Removal Equipment Building
Improve Runway Safety Area [Phase 2] - 07/25
Acquire Aircraft Rescue & Fire Fighting Vehicle, Conduct Miscellaneous Study [Wildlife], Security Enhancements [Design] Improve Runway Safety Area [Construction] - 03/21
Rehabilitate Runway [Design] - 03/21
Construct Taxiway [Construct portion of parallel taxiway and apron]
Install Weather Reporting Equipment [Relocate ASOS from UCA to RME],Rehabilitate Building [Control Tower (Bldg. 504) Construction], Rehabilitate Building[Hangar/Offices(Bldg. 100) - Phase I Construction], Rehabilitate Snow RemovalEquipment Building [(Bldg. 220) Construction]Improve Building [Roof Replacement-Bldg. 100; Modifications to Bldg. 220-NewDoors; Demolition of Building 150]Acquire Aircraft Rescue & Fire Fighting Vehicle
Remove Obstructions [Obstruction Study]
Acquire Land For Approaches [Runway 35-Phase II]
Install Weather Reporting Equipment [Installation of AWOS (Design Only)]
Rehabilitate Taxiway, Update Airport Master Plan Study
Acquire Snow Removal Equipment
Noise Mitigation Measures for Public Buildings [Soundproofing of Lawrence SchoolNo.2, Inwood, N.Y. - Phase II]Rehabilitate Runway Lighting [Rehabilitate Runway 4R Pier Structure for ApproachLighting System - Phase I] - 04R/22LSecurity Enhancements [Phase II]
Noise Mitigation Measures for Public Buildings [Soundproofing of PS 195 Q - PhaseV $440,310]Improve Access Road
Improve Runway Safety Area - 13R/31L
Noise Mitigation Measures for Public Buildings [Noise Compatibility Project - SchoolSoundproofing Program - Soundproofing IH 198Q, Averne, - Phase V]
Selection Criteria Year: 2006
Page 17 of 93
Grants Awarded by FY FAA - Office Of Airports
FY 2006
Region ADO State Worksite Service Grant Seq Level Number
EA NYC NY Joseph Y Resnick GA 019
020
021
Kingston-Ulster R 014
La Guardia P 108
110
114
116
117
118
119
Lake Placid GA 024
025
026
Le Roy R 015
016
Long Island MacArthur P 066
067
069
070
Lt Warren Eaton GA 022
Malone-Dufort GA 018
019
Massena International-Richards Field CS 033
035
AIP FederalFunds
156,418
310,163
94,525
416,352
885,716
907,906
4,525,524
21,819,237
1,026,689
2,509,217
3,700,000
736,963
21,850
76,950
99,092
107,472
501,931
405,608
517,684
4,276,922
36,100
459,800
29,450
190,000
650,000
Report Date 03/13/2007
Brief Description Of Work
Install Runway Vertical/Visual Guidance System [REILS and PAPIS(incl.Obstructions Removal) - Design and Construction] - 04/22Construct Snow Removal Equipment Building [Design and Construction]
Noise Mitigation Measures for Public Buildings [Soundproofing School No.5 Bronx]
Noise Mitigation Measures for Public Buildings [Soundproofing PS146 Bronx-PhaseVII]Noise Mitigation Measures for Public Buildings [Soundproofing of St. AnselmSchool, Bronx - Phase III]Noise Mitigation Measures for Public Buildings [Soundproofing of John Bowne Sr.High School]Rehabilitate Runway [Runway Decks 13/31 and 04/22- Phase V] - 13/31
Improve Access Road [East End Roadway Improvements - Phase II]
Improve Access Road [Rehabilitate Grand Central Parkway Flyover]
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
EA NYC NY 036 266,000 Construct Terminal Building [Demolish Old Terminal Building (Design Only)], Install Miscellaneous NAVAIDS [Relocate FAA Facilities]
Oneonta Municipal GA 011 105,580 Construct Taxiway [Partial Parallel T/W Connecting R/W 6 End with Terminal Apron; Partial Relocation and Expansion of the Terminal Apron; and Relocation/Realignment
Orange County GA 032 162,921of the Airport Entrance Road - Eng. Design Only] Acquire Snow Removal Equipment [Plow]
Penn Yan GA 021 212,990 Acquire Land For Approaches, Acquire Land for Development
Perry-Warsaw GA 020 665,000 Remove Obstructions [Construction]
Plattsburgh International GA 014 3,275,000 Construct Building [FBO Facility], Construct Building [GA Hangars/Shelters - Phase I], Construct Fuel Farm [MAP] [Fuel Facility], Construct Utilities [MAP] [Proprietary
Potsdam Municipal/Damon Field/ GA 020 78,850Fire Loop] Construct Apron [Apron & Taxilane - Phase II & III (Design Only)]
Randall R 021 129,510 Construct Snow Removal Equipment Building
Republic R 031 450,000 Construct Taxiway [Relocate Taxiway B - Engineering Design Only]
Saratoga County GA 022 894,020 Remove Obstructions [Off-Airport Obstruction Removal]
Schenectady County R 035 66,245 Improve Airport Drainage [EA & Preliminary Design]
036 5,294,350 Rehabilitate Taxiway [Taxiways A, B & D (Construction)]
037 332,500 Construct Service Road [ARFF Access Road]
Schroon Lake GA 006 250,439 Construct Apron [Aircraft Parking Aprons]
Noise Mitigation Measures for Public Buildings [School Sound Insulation - St. Roseof Lima and Nate Perry Elementary]Improve Runway Safety Area [R/W 33 Safety Area Improvements] - 15/33
Rehabilitate Apron [Apron Sealcoating], Rehabilitate Taxiway [Crack Sealing onTaxiway]Update Airport Master Plan Study
Acquire Snow Removal Equipment
Remove Obstructions [Study]
Acquire Aircraft Rescue & Fire Fighting Vehicle [Replacement]
Rehabilitate Taxiway [T/W "A" - Design]
Install Emergency Generator [Acquire and Install Electrical Emergency Generator]
Construct Runway [1/11] - Plan-1
Update Metropolitan System Plan Study [Ground Access Element Update], Update
Page 20 of 93
Grants Awarded by FY FAA - Office Of Airports
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Level Number Funds
EA WAS DC
State Total:
EA WAS MD Baltimore/Washington International Thurgood Marshal
P
Bay Bridge
Carroll County Regional/Jack B Poage Field
GA
R
Easton/Newnam Field GA
Frederick Municipal R
Garrett County GA
Greater Cumberland Regional GA
Hagerstown Regional-Richard A Henson Field P
Montgomery County Airpark
Ocean City Municipal
Salisbury-Ocean City Wicomico Regional
R
GA
P
EA WAS
State Total:
VA
State of Maryland
Accomack County GA
Selection Criteria Year: 2006
005
2 Grants
077
016
023
028
029
030
026
027
010
014
035
036
037
013
016
029
031
032
033
001
20 Grants
011
37,215,286
14,012,849
398,050
136,333
262,390
300,485
753,255
29,703
150,000
5,715,510
377,767
6,000,000
2,391,289
289,085
521,691
129,627
2,147,739
456,922
6,681,660
446,372
490,476
41,691,203
272,936
Report Date 03/13/2007
Brief Description Of Work
Metropolitan System Plan Study [Update Ground Access Forecast]
Rehabilitate Apron [piers d & e construction phase 1], Rehabilitate Apron [piers d &e construction phase 2], Rehabilitate Taxiway [taxiways b, n, r, a, p constructionphase 1]Extend Taxiway [Final Design]
Install Miscellaneous NAVAIDS [4 Box PAPI]
Rehabilitate Runway [Design Only] - 04/22
Remove Obstructions [Acquire Land and Design, Rwy 4,22 & 33]
Robertson Field GA 004 249,735 Construct Snow Removal Equipment Building
Rolla Municipal GA 005 295,015 Acquire Snow Removal Equipment, Construct Fuel Farm, Rehabilitate Runway 14/32
Rugby Municipal GA 007 139,645 Construct Fuel Farm, Rehabilitate Runway - 12/30
Sloulin Field International CS 025 904,310 Acquire Snow Removal Equipment, Conduct Environmental Study, Construct Snow
Stanley Municipal GA 005 143,294Removal Equipment Building, Install Miscellaneous NAVAIDS Construct Building, Construct Fuel Farm, Construct Taxiway, Rehabilitate Airport Beacons, Rehabilitate Runway - 09/27, Update Airport Master Plan Study
State of North Dakota 005 220,000 Update Miscellaneous Study
Washburn Municipal GA 006 93,765 Conduct Environmental Study
007 73,040 Update Airport Master Plan Study
Watford City Municipal GA 007 119,224 Construct Fuel Farm, Improve Building, Install Runway Vertical/Visual Guidance System - 12/30, Rehabilitate Runway - 12/30
State Total: 48 Grants 19,226,601
GL BIS SD Aberdeen Regional P 026 2,156,393 Acquire Snow Removal Equipment, Conduct Airport Master Plan Study, Construct
Belle Fourche Municipal GA 007 73,625Snow Removal Equipment Building, Rehabilitate Taxiway, Security Enhancements Rehabilitate Apron, Rehabilitate Runway - 14/32, Rehabilitate Taxiway
Bison Municipal GA 005 1,638,750 Install Runway Lighting - 11/29, Rehabilitate Apron, Rehabilitate Runway - 11/29, Rehabilitate Taxiway
Bob Wiley Field GA 007 90,250 Acquire Land For Approaches, Construct Building [Plans & specs]
Britton Municipal GA 006 46,550 Rehabilitate Access Road [Plans and Specifications], Rehabilitate Apron [Plans and
Brookings Regional GA 018 340,000specifications] Conduct Environmental Study [Environmental Assessment (Phase 1 - Site selection/Alternatives)], Rehabilitate Taxiway Lighting
019 650,000 Rehabilitate Runway - 12/30
Cheyenne Eagle Butte GA 004 38,950 Construct Building [Plans and specifications]
Clark County GA 004 31,350 Construct Taxiway
Faulkton Municipal GA 004 679,250 Construct Apron, Construct Taxiway, Install Perimeter Fencing
Gettysburg Municipal GA 006 213,750 Install Perimeter Fencing
Selection Criteria Year: 2006
Page 25 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
GL BIS SD Gregory Municipal, Flynn Field GA 005 128,250 Construct Snow Removal Equipment Building
Harding County GA 003 59,850 Rehabilitate Runway [design] - 12/30
Harold Davidson Field GA 005 180,500 Construct Fuel Farm, Install Weather Reporting Equipment, Rehabilitate Runway [Design] - 12/30
Hoven Municipal GA 004 223,250 Construct Terminal Building, Install Miscellaneous NAVAIDS, Install Runway Lighting - 13/31
Huron Regional GA 022 180,000 Acquire Safety Equipment, Expand Terminal Building
Joe Foss Field P 035 2,122,995 Rehabilitate Access Road, Rehabilitate Apron, Rehabilitate Runway Lighting [Plans and specifications] - 03/21, Rehabilitate Taxiway, Update Airport Master Plan Study
Lemmon Municipal GA 007 361,000 Construct Runway - Plan-1
Milbank Municipal GA 008 123,500 Acquire Snow Removal Equipment, Construct Fuel Farm, Install Miscellaneous
Miller Municipal GA 004 166,250NAVAIDS, Install Weather Reporting Equipment Construct Snow Removal Equipment Building, Rehabilitate Parking Lot
Mission Sioux GA 006 85,500 Construct Snow Removal Equipment Building
Mitchell Municipal GA 021 570,000 Rehabilitate Taxiway
Mobridge Municipal GA 007 31,350 Construct Fuel Farm
Murdo Municipal GA 004 43,700 Rehabilitate Runway [Plans and specifications] - 14/32
New 001 121,490 Construct New Airport [Environmental Assessment]
Onida Municipal GA 006 1,710,000 Extend Runway [Construction] - 13/31, Extend Runway [Relocate Power Line] -
Parkston Municipal GA 004 37,30013/31 Construct Snow Removal Equipment Building
Philip GA 004 522,500 Improve Access Road, Install Perimeter Fencing, Rehabilitate Apron
Pierre Regional P 021 242,915 Acquire Snow Removal Equipment [snow plow], Install Runway Vertical/Visual
Pine Ridge GA 008 66,500Guidance System - 07/25, Update Airport Master Plan Study Construct Snow Removal Equipment Building
Rapid City Regional P 033 304,000 Update Airport Master Plan Study
Redfield Municipal GA 004 75,050 Conduct Airport Master Plan Study
Sisseton Municipal GA 006 152,000 Construct Snow Removal Equipment Building
State of South Dakota 004 123,500 Update State System Plan Study
The Sigurd Anderson GA 003 76,000 Construct Snow Removal Equipment Building
Various Locations in South Dakota 010 237,500 Acquire Snow Removal Equipment (Marv Skie-Lincoln County; Parkston Municipal; The Sigurd Anderson)
Butler County Regional R 017 880,185 Acquire Land For Approaches, Construct Taxiway [2006], Construct Taxiway [2007], Rehabilitate Apron, Remove Obstructions
Cambridge Municipal GA 005 346,115 Improve Runway Safety Area [2007] - 04/22, Improve Runway Safety Area - 04/22
Carl R Keller Field GA 022 1,316,460 Acquire Snow Removal Equipment, Rehabilitate Runway - 09/27
Cincinnati West GA 005 226,297 Acquire Land For Approaches
Acquire Land For Approaches, Acquire Miscellaneous Land [Grant 0406]
Acquire Miscellaneous Land [Grant 0506], Update Airport Master Plan Study
Acquire Land For Approaches, Extend Runway [2006] - 10/28, Extend Runway[2007] - 10/28Acquire Miscellaneous Land, Extend Runway - 08/26
Acquire Easement For Approaches, Acquire Land For Approaches, Acquire LandFor Approaches, Acquire Land for Development, Conduct Miscellaneous Study,Rehabilitate TaxiwayConstruct Apron, Extend Runway - 09/27, Update Airport Master Plan Study
Marion Municipal GA 017 300,000 Acquire Land For Approaches, Construct Taxiway, Improve Airport Drainage, Improve Runway Safety Area [2006] - 07/25, Improve Runway Safety Area [2007]
Medina Municipal R 008 168,677- 07/25 Improve Airport Drainage, Remove Obstructions
Ohio University Snyder Field GA 011 813,725 Construct Snow Removal Equipment Building, Improve Airport Drainage, Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System - 07/25, Install Weather Reporting Equipment
Perry County GA 005 300,000 Acquire Land for Development, Improve Runway Safety Area [2006] - 08/26, Improve Runway Safety Area [2007] - 08/26, Rehabilitate Runway [2006] - 08/26, Rehabilitate Runway [2007] - 08/26
Pike County GA 004 173,543 Install Runway Vertical/Visual Guidance System [[2006]] - 07/25, Install Runway Vertical/Visual Guidance System [[2007]] - 07/25
Port Bucyrus-Crawford County GA 003 181,388 Install Weather Reporting Equipment
Port Columbus International P 061 1,471,871 Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate Taxiway
Union County GA 014 175,395 Construct Building, Environmental Mitigation, Environmental Mitigation
Van Wert County GA 008 236,028 Rehabilitate Apron
Vinton County GA 004 147,930 Acquire Land for Development [reimbursement], Construct Taxiway, Expand Terminal Building, Improve Runway Safety Area - 09/27, Rehabilitate Apron, Rehabilitate Runway - 09/27, Remove Obstructions
Wadsworth Municipal GA 008 38,000 Install Runway Lighting - 02/20
Wayne County GA 014 399,460 Construct Terminal Building [2006], Construct Terminal Building [2007]
015 132,400 Construct Terminal Building
Wood County GA 016 167,945 Conduct Environmental Study, Construct Building
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
GL MSP MN Redwood Falls Municipal GA 005 33,250 Update Airport Master Plan Study [Update Airport Layout Plan]
Richard B Helgeson GA 005 314,492 Construct Service Road, Construct Taxiway
Rochester International P 022 1,223,600 Acquire Safety Equipment
023 2,647,137 Expand Snow Removal Equipment Building
Roseau Municipal/Rudy Billberg Field GA 004 497,415 Improve Airport Drainage, Rehabilitate Runway - 16/34, Rehabilitate Taxiway
Silver Bay Municipal GA 003 221,682 Rehabilitate Taxiway
Sky Harbor GA 004 466,848 Acquire Snow Removal Equipment, Conduct Environmental Study, Rehabilitate Runway - 14/32, Rehabilitate Seaplane Base
South St Paul Municipal-Richard E Fleming Field R 010 1,765,385 Acquire Land for Development, Construct Service Road, Construct Taxiway, Install Perimeter Fencing, Rehabilitate Taxiway
Southwest Minnesota Regional Marshall/Ryan Field
GA 007 4,926,026 Extend Runway [Extend runway to 7200' - Phase 2] - 12/30
St James Municipal GA 005 62,700 Conduct Airport Master Plan Study, Rehabilitate Runway - 15/33
St Paul Downtown Holman Field R 014 2,716,698 Improve Runway Safety Area - 13/31, Improve Runway Safety Area - 14/32
St. Cloud Regional P 017 67,070 Acquire Land for Development [environmental assessment]
Todd Field GA 004 89,544 Improve Airport Miscellaneous Improvements, Install Perimeter Fencing
Tower Municipal GA 002 97,371 Rehabilitate Apron, Rehabilitate Runway - 08/26, Rehabilitate Taxiway, Remove Obstructions, Update Airport Master Plan Study
Tracy Municipal GA 005 86,450 Install Perimeter Fencing, Rehabilitate Runway - 11/29, Rehabilitate Taxiway
Warroad International-Swede Carlson Field GA 007 213,906 Construct Snow Removal Equipment Building
Wheaton Municipal GA 003 28,500 Rehabilitate Runway - 16/34
Willmar Municipal 007 88,625 Expand Apron
Winsted Municipal GA 001 166,089 Extend Taxiway, Improve Access Road, Rehabilitate Parking Lot, Update Airport Master Plan Study
Worthington Municipal GA 007 1,882,045 Rehabilitate Taxiway [2007], Rehabilitate Taxiway
State Total: 71 Grants 63,615,025
GL MSP WI Austin Straubel International P 035 2,436,235 Acquire Land For Approaches, Improve Runway Safety Area - 18/36
Central Wisconsin P 035 806,075 Conduct Airport Master Plan Study, Rehabilitate Runway - 17/35
Chippewa Valley Regional P 026 760,000 Conduct Miscellaneous Study, Rehabilitate Apron
Rehabilitate Apron [2007], Rehabilitate Apron, Rehabilitate Service Road
Extend Taxiway
Acquire Land for Development, Acquire Snow Removal Equipment, Construct Taxiway [environmental assessment] Construct Apron, Construct Taxiway, Extend Runway - 15/33, Rehabilitate Runway - 15/33 Non primary development projects in state block grant program
Non primary development projects in state block grant program
Non primary development projects in state block grant program
Non primary development projects in state block grant program
Rehabilitate Taxiway
Conduct Miscellaneous Study
Noise Mitigation Measures for Residences within 65 - 69 DNL [plan]
Construct Apron
Construct Runway Safety Area [design/permits] - 05/23
076 15,000,000 Acquire Land for Noise Compatibility within 70 - 74 DNL
077 643,160 Construct Terminal Building
078 1,076,756 Conduct Environmental Study
016CS 72,477 Remove Obstructions
11 Grants 25,653,884
Page 42 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
NE ANE VT Burlington International
Fair Haven Municipal
Franklin County State
Rutland State
State of Vermont
Various Locations in Vermont
Report Total:
Region Total:
ADO Total:
State Total:
NM DEN CO Aspen-Pitkin County/Sardy Field
Blake Field
Centennial
Central Colorado Regional
City of Colorado Springs Municipal
Selection Criteria Year: 2006
FY 2006
Service Level
Grant Seq Number
P 060
062
GA
GA
063
064
065
003
005
CS 023
024
025
003
002
003
13 Grants
101 Grants
1002 Grants
2059 Grants
P 033
GA 006
R 030
031
032
GA 010
P 041
AIP Federal Funds
148,200
2,435,800
401,641
1,500,240
138,700
145,635
130,236
199,107
565,226
411,331
131,575
414,076
173,420
6,795,187
130,589,142
130,589,142
3,539,103,886
11,000,000
450,000
4,550,000
305,000
1,500,000
306,838
15,286,040
Report Date 03/13/2007
Brief Description Of Work
Conduct Noise Compatibility Plan Study
Construct Apron [PH II South End Development], Construct Apron [PH II South End Development], Construct Taxiway [Phase I - South End Development] Environmental Mitigation
Acquire Land for Noise Compatibility within 65 - 69 DNL
Rehabilitate Runway - 15/33
Conduct Environmental Study
Construct Runway Safety Area - 01/19, Install Runway Vertical/Visual Guidance System - 01/19 Groove Runway [sensors] - 01/19
Construct Apron
Construct Snow Removal Equipment Building
Update Miscellaneous Study
Acquire Snow Removal Equipment (Hartness State (Springfield); Morrisville-Stowe State; Rutland State; William H. Morse State) Rehabilitate Runway (Hartness State (Springfield) - 11/29; Middlebury State 01/19; Rutland State - 01/19), Rehabilitate Runway Lighting (William H. Morse State - 13/31)
Rehabilitate Runway - 15/33
Construct Taxiway [Partial Parallel Taxiway]
Rehabilitate Runway - 17L/35R
Conduct Noise Compatibility Plan Study, Update Airport Master Plan Study
State of Colorado 005 235,740 Update State System Plan Study
Steamboat Springs/Bob Adams Field GA 015 150,000 Conduct Airport Master Plan Study
Sterling Municipal GA 009 322,938 Acquire Land For Approaches
Stevens Field GA 016 227,500 Construct Taxiway [-Parcels 15 (6.9 acres) -Parcel 17 (6.2 Acres)]
Selection Criteria Year: 2006
Page 44 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NM DEN CO 017 80,000 Conduct Airport Master Plan Study
Telluride Regional P 021 4,088,933 Improve Runway Safety Area [(Design Only)] - 09/27
Walker Field P 031 1,390,328 Acquire Snow Removal Equipment, Construct Apron [(Phase I)]
032 200,000 Update Airport Master Plan Study [Airport Layout Plan]
State Total: 40 Grants 85,175,840
NM DEN UT Brigham City GA 017 8,000,000 Improve Runway Safety Area [Construction, Phase II (Rehabilitate/Strengthen Runway, SA Grading C/D II)] - 16/34
Cal Black Memorial GA 010 155,455 Install Miscellaneous NAVAIDS, Rehabilitate Runway - 01/19
Canyonlands Field CS 017 2,800,000 Improve Runway Safety Area [Construction, Sch I] - 03/21
Carbon County GA 012 195,121 Construct Taxiway [Design Only]
Cedar City Regional CS 018 568,723 Acquire Aircraft Rescue & Fire Fighting Vehicle [Index B]
Duchesne Municipal GA 004 158,688 Install Runway Vertical/Visual Guidance System - 17/35, Rehabilitate Runway Lighting [Phase II, Electrical Vault] - 17/35
Escalante Municipal
Green River Municipal
GA
GA
004
007
367,820
513,250
Acquire Easement For Approaches [(Easements E1-E4)], Acquire Land For Approaches [(Parcels 13-26)] Construct Taxiway [Construction, (Phase I)]
Heber City Municipal - Russ McDonald Field GA 019 884,309 Construct Taxiway
020 2,200,000 Construct Taxiway
Logan-Cache GA 017 706,168 Construct Taxiway
Milford Municipal/Ben and Judy Briscoe Field GA 009 303,811 Install Runway Lighting - 16/34
Monticello Municipal Airport 001 360,000 Construct New Airport [Acquire Land]
Nephi Municipal GA 009 1,823,848 Construct Runway [(Phase V, Construct North Partial Parallel Taxiway)] - 16/34
New 006 1,157,437 Conduct Miscellaneous Study
007 17,202,476 Construct New Airport [Acquire Land]
Ogden-Hinckley R 029 127,575 Update Airport Master Plan Study
Provo Municipal GA 025 582,103 Extend Taxiway [Construction, Phase II]
026 1,525,100 Rehabilitate Apron
Richfield Municipal GA 008 125,000 Acquire Land For Approaches
Salt Lake City International P 082 3,193,192 Rehabilitate Taxiway
South Big Horn County GA 012 165,000 Improve Runway Safety Area [Acquire Land] - 15/33
Selection Criteria Year: 2006
Page 46 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
NM DEN WY Worland Municipal GA 016 2,548,961 Construct Runway [Construction, Sch II] - 10/28
Yellowstone Regional P 020 662,524 Construct Terminal Building [Design (Phase I), Site Utilities/Drainage], Modify Terminal Building
State Total: 23 Grants 18,134,372
ADO Total: 90 Grants 149,384,992
NM HLN MT Baker Municipal GA 010 140,453 Acquire Snow Removal Equipment
Bert Mooney P 034 451,422 Conduct Miscellaneous Study [Pavement Condition Index (PCI) Survey], Construct Apron [general aviation], Construct Taxiway [hangar access]
035 415,824 Update Airport Master Plan Study
Big Sandy GA 003 250,000 Acquire Snow Removal Equipment, Conduct Environmental Study [Cultural Resource Survey], Construct Snow Removal Equipment Building
Billings Logan International P 030 3,760,566 Improve Service Road [runway incursion prevention road], Rehabilitate Apron [Phase 2], Rehabilitate Runway [,including runway and taxiway edge lights]
Bowman Field GA 008 97,644 Rehabilitate Runway [including runway 16/34, taxiways, and apron (maintenance)] - 04/22
Choteau GA 005 177,502 Construct Fuel Farm
Circle Town County GA 003 612,000 Acquire Land For Approaches [Tract 7], Rehabilitate Runway [Phase 1 - grading
Cut Bank Municipal GA 007 342,000and drainage] - 12/30 Acquire Snow Removal Equipment, Rehabilitate Runway [and 5/23 (Phase 1 Design
Dawson Community GA 007 294,310and Testing)] - 13/31 Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Acquire Snow Removal Equipment, Improve Aircraft Rescue & Fire Fighting Building, Rehabilitate Runway
Deer Lodge-City-County GA 006 920,055[Phase I - design] - 12/30 Extend Runway [Phase II - paving and lighting] - 12/30, Rehabilitate Apron,
Edgar G Obie GA 008 1,164,610Rehabilitate Runway - 12/30, Rehabilitate Runway Lighting - 12/30 Rehabilitate Runway [including partial parallel taxiway and apron (Phase III -
Ekalaka GA 004 162,395paving)] - 08/26 Install Miscellaneous NAVAIDS [relocate lighted windcone and segmented circle],
Ennis - Big Sky GA 008 174,836Install Weather Reporting Equipment Acquire Snow Removal Equipment, Install Weather Reporting Equipment
Fort Benton GA 005 83,125 Acquire Snow Removal Equipment
Selection Criteria Year: 2006
Page 47 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NM HLN MT Frank Wiley Field GA 008 284,090 Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Miscellaneous NAVAIDS [supplemental windcones on runways 4 and 12], Install Runway Vertical/Visual Guidance System [runway end identifier lights (REILs) on runways 12 and 22] 04/22
Gallatin Field P 031 552,000 Acquire Land For Approaches
Glacier Park International P 032 893,709 Acquire Land For Approaches, Acquire Snow Removal Equipment, Update Airport Master Plan Study
Great Falls International P 035 8,587,138 Install Instrument Approach Aid - 03/21
Helena Regional P 032 459,401 Modify Access Road [construct turning lane], Modify Terminal Building [acquire
L M Clayton GA 005 374,737passenger loading bridge] Expand Terminal Building, Install Airfield Guidance Signs [distance remaining signs], Install Runway Vertical/Visual Guidance System [runway end identifier lights runway 29] - 11/29
Lewistown Municipal GA 010 510,000 Construct Taxiway, Improve Snow Removal Equipment Building, Install Perimeter Fencing, Rehabilitate Apron, Rehabilitate Taxiway
Liberty County GA 004 170,000 Acquire Snow Removal Equipment, Conduct Environmental Study [Cultural
Missoula International P 040 3,309,845Resource Survey], Construct Snow Removal Equipment Building Expand Aircraft Rescue & Fire Fighting Building, Improve Airport Miscellaneous Improvements [grade object free area/runway safety area transition], Rehabilitate
New 002 373,160Apron, Remove Obstructions Construct New Airport [Phase II - Acquire Land and Design Engineering]
Plains GA 005 2,700,000 Construct Apron, Construct Runway [Phase II - including grading, paving, runway and taxiway lighting, signs, windcone, segmented circle, and PAPI] - 12/30,
Ravalli County GA 007 170,433Construct Taxiway, Install Perimeter Fencing, Install Weather Reporting Equipment Acquire Snow Removal Equipment
Roundup GA 006 126,000 Install Weather Reporting Equipment
Shelby GA 008 164,000 Acquire Snow Removal Equipment
Sidney-Richland Municipal P 014 1,543,457 Rehabilitate Apron [terminal and general aviation]
State of Montana 005 127,479 Conduct State System Plan Study
Stevensville GA 005 493,884 Acquire Snow Removal Equipment, Construct Snow Removal Equipment Building, Update Airport Master Plan Study
Tillitt Field GA 005 182,616 Acquire Snow Removal Equipment, Install Miscellaneous NAVAIDS
Townsend GA 006 109,075 Acquire Land For Approaches
Selection Criteria Year: 2006
Page 48 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
NM HLN MT Twin Bridges GA 007 380,099 Extend Runway [Phase I - Relocate County Road] - 17/35, Install Weather Reporting Equipment
Wheatland County at Harlowton GA 003 167,000 Install Weather Reporting Equipment, Rehabilitate Runway [taxiways, and apron (maintenance)] - 08/26, Update Airport Master Plan Study
Othello Municipal GA 003 480,225Master Plan Study Install Perimeter Fencing [partial], Install Runway Lighting [pilot controlled lighting] 07/25, Rehabilitate Taxiway, Remove Obstructions [remove Runway 7-25 line of sight obstruction]
Pierce County - Thun Field GA 010 2,419,163 Construct Taxiway, Install Weather Reporting Equipment, Remove Obstructions [West side trees]
003 8,809,627 Construct New Airport [Grading and drainage]
GA 018 2,000,000 Improve Runway Safety Area [Acquire land for RSA improvement] - 13/31
019 500,000 Acquire Land for Development [Hunting Prop Acq Phase 1]
R 017 400,551 Conduct Environmental Study [EA for hangar areas B & C], Construct Taxiway [Phase 1 - Design]
GA 005 121,470 Install Miscellaneous NAVAIDS [Wind Cone], Rehabilitate Airport Beacons, Rehabilitate Runway Lighting [Replace MIRL and MITL] - 17/35
P 041 680,932 Improve Runway Safety Area [Relocate Localizer] - 18/36
P 026 3,463,483 Widen Taxiway [Construction - Phase I of II]
002 500,000 Update State System Plan Study
GA 011 135,500 Construct Taxiway [construct t-hangar taxiway (design only)], Rehabilitate Apron, Update Airport Master Plan Study [Update ALP]
P 022 461,299 Expand Apron [Commercial Ramp Expan - Design], Groove Runway - 17/35, Rehabilitate Taxiway [Design], Update Airport Master Plan Study [Master Plan Update]
Selection Criteria Year: 2006
Page 54 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite
SO ATL GA Various Locations in Georgia
Washington-Wilkes County
Winder-Barrow
Wright AAF (Fort Stewart)
State Total:
SO ATL NC Albert J Ellis
Asheville Regional
Service Grant Seq AIP Federal Level Number Funds
006 16,302,082
GA 004 204,000
GA 015 350,000
GA 003 250,000
35 Grants 90,871,020
P 026 174,800
P 031 1,093,870
Brief Description Of Work
Acquire Land For Approaches (Gilmer County; Thomasville Regional; TurnerCounty; Wrens Memorial), Acquire Land for Development (Newnan CowetaCounty; Perry-Houston County), Acquire Miscellaneous Land (Blairsville), ConductEnvironmental Study (Homerville), Construct Apron (Cartersville; Dawson Municipal;Kaolin Field), Construct Building (Bacon County; Crisp County-Cordele; SoutherField; Thomaston-Upson County; Thomson-McDuffie County; Waycross-WareCounty), Construct Fuel Farm (Gilmer County), Construct Runway (Cochran - Plan1), Construct Taxiway (Burke County; Dalton Municipal; Donalsonville Municipal;Elbert County-Patz Field; Habersham County; Swinton Smith Field at ReidsvilleMunicipal; Sylvester; Vidalia Regional; W H 'Bud' Barron), Environmental Mitigation(Cook County), Expand Apron (Clayton County - Tara Field; Pickens County; Tom B.David Field), Extend Runway (Berrien County - 10/28; Brantley County - 01/19;Franklin County - 08/26; Greene County Regional - 06/24; Hazlehurst - 14/32;Jackson County - 16/34; La Grange-Callaway - 13/31; Madison Municipal - 14/32;Metter Municipal - 10/28; Moultrie Municipal - 04/22; Polk County Airport- CorneliusMoore Field - 10/28; Quitman Brooks County - 09/27), Extend Runway Safety Area(Telfair-Wheeler - 03/21), Improve Runway Safety Area (Claxton-Evans County 09/27), Install Perimeter Fencing (Bacon County; Baxley Municipal; Butler Municipal;Claxton-Evans County; Douglas Municipal; Emanuel County; Heart of GeorgiaRegional; Henry Tift Myers; Homerville; Louisville Municipal; Moultrie Municipal;Plantation Airpark; Polk County Airport- Cornelius Moore Field; Richard B Russell;West Georgia Regional - O V Gray Field), Rehabilitate Apron (Baldwin County),Rehabilitate Runway (Cairo-Grady County - 12/30; Dr. C P Savage Sr. - 18/36;Harris County - 09/27; Jekyll Island - 18/36; Jesup-Wayne County; Millen - 17/35),Rehabilitate Taxiway (Decatur County Industrial Air Park; Harris County; Richard BRussell; Statesboro-Bulloch County), Remove Obstructions (Camilla-MitchellCounty; Covington Municipal; Monroe-Walton County), Update Airport Master PlanStudy (Cuthbert-Randolph; Statesboro-Bulloch County)Construct Taxiway [partial parallel taxiway east]
Acquire Aircraft Rescue & Fire Fighting Vehicle, Modify Terminal Building
Selection Criteria Year: 2006
Page 55 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO ATL NC Charlotte/Douglas International P 054 9,506,664 Construct Aircraft Rescue & Fire Fighting Building, Construct Runway [Phase VII, Master Plan Land Acquisition] - 18L/36R
Craven County Regional P 026 922,169 Acquire Land For Approaches [Runway 13-31 Runway Protection Zone], Extend Taxiway [Taxiway L], Improve Airport Drainage [design & permitting], Rehabilitate
Fayetteville Regional/Grannis Field P 031 1,127,409Runway - 04/22 Construct Aircraft Rescue & Fire Fighting Training Facility [training facility]
Hickory Regional GA 021 286,826 Conduct Miscellaneous Study [Pavement Study (Taxiway A and B)], Install
North Carolina State Block Grant Program 031 18,819,968Guidance Signs Non primary development projects in state block grant program - GA
Piedmont Triad International P 047 12,237,916 Construct Runway [Construct Runway 5L-23R and associated taxiways; Construct connector taxiway "F"; Extend taxiway "K"; Acquire Land, Phase V] Plan-1
SO ATL SC Aiken Municipal GA 010 644,332 Rehabilitate Apron [Construction]
Allendale County GA 010 168,033 Install Taxiway Lighting
Berkeley County GA 014 83,410 Extend Taxiway [Design and Environmental Mitigation]
Charleston AFB/International P 027 201,313 Improve Access Road [Design]
Columbia Metropolitan P 030 3,425,571 Rehabilitate Apron [Design and Construction], Rehabilitate Taxiway
031 366,700 Rehabilitate Taxiway [Taxiway U Rehab - Phase III]
Columbia Owens Downtown R 009 150,000 Construct Terminal Building [Phase III, Construction]
Corporate GA 008 236,550 Construct Fuel Farm
Darlington County Jetport GA 007 92,245 Expand Apron [Design], Rehabilitate Runway - 05/23
Donaldson Center GA 015 42,989 Update Airport Master Plan Study
Grand Strand GA 012 152,383 Remove Obstructions [Phase I]
Selection Criteria Year: 2006
Page 56 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO ATL SC Greenville Downtown GA 014 800,738 Rehabilitate Apron
Greenville Spartanburg International P 038 3,344,078 Conduct Environmental Study [Storm Water Pollution Prevention Phase], Construct Access Road [Interstate-85 Interchange, Phase III (final phase)], Rehabilitate Aircraft Rescue & Fire Fighting Building [fuel storage rehabilitation], Rehabilitate Apron [Air carrier apron], Rehabilitate Runway Lighting [Airfield Electrical Vault Regulator Replacement and Generator Upgrade] - 04/22, Rehabilitate Terminal Building [Roof Replacement (20,241 square feet)]
Greenwood County GA 008 39,511 Construct Building
Hartsville Regional GA 009 118,152 Install Perimeter Fencing [Phase 1]
Hilton Head P 026 305,643 Acquire Land for Development [Phase 4 through 8], Conduct Environmental Study [Stormwater Pollution Prevention Plans], Conduct Miscellaneous Study [Wildlife
Lancaster County-Mc Whirter Field GA 010 763,860Assessment Study] Rehabilitate Apron [Design and Construction]
Lee County GA 004 184,557 Extend Runway - 05/23
Lowcountry Regional GA 008 142,073 Construct Taxiway [Design, Surveying, Testing]
Marlboro County Jetport - H.E. Avent Field GA 007 178,954 Construct Taxiway [Taxiway Design (To Hangars)], Install Taxiway Lighting, Remove Obstructions
Myrtle Beach International P 036 3,703,190 Construct Terminal Building [Design + Construction]
037 4,000,000 Construct Apron [Terminal Apron and Taxiway]
Newberry County GA 004 609,701 Construct Runway [Design (Runway and Stub Connectors) and Land Acquisition (Approximately 32 acres)] - 4/22
Ridgeland GA 005 169,100 Improve Runway Safety Area [Environmental Assessment for Runway Safety Area Imrpovements and Obstruction Removal] - 03/21, Rehabilitate Runway [Design] - 03/21
Santee Cooper Regional GA 004 60,000 Update Airport Master Plan Study [ALP Update]
Spartanburg Downtown Memorial GA 012 877,729 Install Perimeter Fencing, Remove Obstructions
State of South Carolina 004 350,000 Conduct State System Plan Study
Summerville GA 010 756,932 Rehabilitate Runway - 06/24
Twin City GA 001 333,310 Acquire Land For Approaches [Acquire Land in RPZ and remove obstructions, Phase I and II]
Various Locations in South Carolina 009 732,411 Acquire Aircraft Rescue & Fire Fighting Vehicle
010 100,000 Install Weather Reporting Equipment
Selection Criteria Year: 2006
Page 57 of 93
Grants Awarded by FY FAA - Office Of Airports
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
SO ATL SC Williamsburg Regional 008GA 870,836
Woodward Field 014GA 80,000
State Total: 34 Grants 24,234,301
ADO Total: 82 Grants 175,790,673
SO JAN AL Andalusia-Opp 010GA 150,000
Anniston Metropolitan 021GA 1,050,000
Auburn-Opelika Robert G. Pitts 018GA 831,704
019 716,100
Bay Minette Municipal 006GA 497,145
Bibb County 003GA 147,673
Birmingham International 062P 9,500,000
063 4,200,000
Blackwell Field 007GA 2,701,649
Brewton Municipal 004GA 113,522
Camden Municipal 001GA 30,789
Carl Folsom 002GA 147,305
Dauphin Island 001GA 200,000
002 602,326
Dothan Regional 026P 1,091,550
Enterprise Municipal 013GA 342,576
Folsom Field 014GA 42,750
Report Date 03/13/2007
Brief Description Of Work
Construct Taxiway [Multiyear], Construct Taxiway [Partial Parallel for Runway14/32 and to Hangar Development]Construct Taxiway [Extend Parallel Taxiway - Phase I (Design Only)]
Construct Building [Construct 60' x 60' box hangar], Construct Fuel Farm [100 LLfuel system.]Extend Runway Safety Area - 23
Construct Apron, Construct Taxiway [Phase 1]
Construct Apron [Phase 2 (site prep)]
Construct Building [Phase -2 Construct Hangar Unit], Construct Taxiway [Constructaccess taxiways to T-hangars]Acquire Land For Approaches
Acquire Land for Noise Compatibility within 65 - 69 DNL
Security Enhancements
Construct Taxiway [Light and signage for taxiway], Extend Runway [Pave andlight] - 12/30, Rehabilitate Runway [Overlay old section of runway] - 12/30Improve Terminal Building [Improve terminal Bldg (600 SF, ADA restroom, etc)],Install Weather Reporting EquipmentRehabilitate Runway Lighting - 18/36, Remove Obstructions [Clearing of 20:1approaches.], Update Airport Master Plan StudyAcquire Land For Approaches [Conduct Environmental Site Assessment andsurvey for Runway 1/19 Protection Zone Phase 2 (tracts 4 and 5)], RemoveObstructionsRehabilitate Runway [Design for repair and replace bulkhead around runway.Hurricane damage.] - 12/30Rehabilitate Runway [Construct repairs of bulkhead damaged by hurricane Katrina]- 12/30 Improve Runway Safety Area [Acquire Land (move RPZ south for RW36 extension)] - 18/36, Improve Runway Safety Area [Plans & Specifications for extend, mark and light RW36 and parallel taxiway and rehab runway.] - 18/36 Install Perimeter Fencing [Perimeter Fence]
Conduct Miscellaneous Study
Selection Criteria Year: 2006
Page 58 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
SO JAN AL Franklin Field GA 002 496,596 Rehabilitate Apron, Rehabilitate Runway - 14/32
Gadsden Municipal GA 007 600,000 Conduct Airport Master Plan Study, Install Runway Vertical/Visual Guidance
Geneva Municipal GA 002 262,983System - 06/24, Rehabilitate Taxiway Acquire Land For Approaches [Tract 4]
George Downer GA 004 403,413 Acquire Land For Approaches
Gragg-Wade Field GA 004 920,355 Acquire Land For Approaches
Guntersville Municipal - Joe Starnes Field GA 009 300,000 Acquire Land for Development
Huntsville International-Carl T Jones Field P 048 2,038,000 Construct Taxiway, Security Enhancements
050 5,000,000Rehabilitate Runway - 18L/36R, Security Enhancements Acquire Land for Development
Isbell Field GA 013 118,423 Install Perimeter Fencing, Install Runway Vertical/Visual Guidance System - 04/22
Lanett Municipal GA 003 542,203 Rehabilitate Runway - 08/26
Lawrence County GA 005 45,600 Conduct Airport Master Plan Study [update ALP, update ACIP], Rehabilitate Apron
MacCrenshaw Memorial GA 006 485,133 Construct Building [Access Taxiway for 8-Unit T-hangar], Construct Building [Construct 8-Unit T-Hangar]
Madison County Executive GA 018 1,260,000 Construct Apron, Construct Building
Marion County-Rankin Fite GA 006 749,416 Construct Terminal Building
Merkel Field Sylacauga Municipal GA 012 553,913 Improve Runway Safety Area
Middleton Field GA 004 397,575 Extend Runway [Acquire Tract 1, land for Runway 01 extension and protection zone.] - 01/19, Extend Runway [Acquire Tract 2, runway visibility zone for extended runway.] - 01/19
Mobile Downtown R 017 23,603 Install Perimeter Fencing [repair fence damaged by Katrina.]
Mobile Regional P 037 115,719 Rehabilitate Access Road [Replace damaged roadway signage.]
038 2,382,780 Acquire Land for Development [Phase 2, South RPZ], Construct Service Road [Phase 2 of infield service road (design only)], Rehabilitate Terminal Building [Phase 1 Lightning protection, Install air handlers, Replace check-in baggage conveyors, Install terminal seating, Design exit stairwell relocation.], Security Enhancements
039 1,622,400
[Security Improvement at culvert; security vehicles], Update Airport Master Plan Study [Update ALP] Acquire Land for Noise Compatibility within 65 - 69 DNL [Phase 1 of acquire easements], Acquire Land for Noise Compatibility within 65 - 69 DNL
Fletcher Field GA 012 135,318 Acquire Land for Development
G. V. Montgomery GA 003 455,127 Improve Runway Safety Area [Acquire land for south safety area.] - 16/34,
George M Bryan GA 011 1,034,090
Improve Runway Safety Area [Grade safety area to meet standard.] - 16/34, Rehabilitate Apron, Rehabilitate Runway, Rehabilitate Taxiway Extend Taxiway, Rehabilitate Taxiway
Golden Triangle Regional P 037 754,953 Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Acquire Equipment, Acquire Handicap Passenger Lift Device, Modify Terminal Building, Rehabilitate
038 767,600Access Road, Rehabilitate Apron, Rehabilitate Taxiway, Security Enhancements Acquire Land for Development
Greenwood-Leflore GA 011 608,143 Extend Taxiway, Install Taxiway Lighting
Grenada Municipal GA 006 130,000 Improve Runway Safety Area - 13/31
Gulfport-Biloxi International P 055 4,650,000 Construct Building [Develop plans and specifications for GA area work.], Construct Building [Develop plans and specifications for cargo facility construction.], Construct Building [Develop plans and specifications for public areas of rental car facility.], Rehabilitate Runway Lighting [Develop plans & specs for airside repair
056 2,569,199
and rehabilitation work.] - 14/32, Rehabilitate Terminal Building [Develop plans and specifications for terminal area repair and rehabilitation.] Rehabilitate Terminal Building [Phase 1 of terminal area drainage.], Rehabilitate
057 4,750,000Terminal Building [Terminal Area Lighting] Acquire Easement for Noise Compatibility within 65 - 69 DNL [Phase 2 of acquire easements], Noise Mitigation Measures for Residences within 65 - 69 DNL [Sound insulation Phase 2]
058 6,009,700 Conduct Miscellaneous Study [Conduct underground drainage study.], Conduct Miscellaneous Study [Terminal Apron & Gate Study], Expand Terminal Building [Terminal Expansion - (Expansion Design and Install Gate 3 Jet Bridge)], Widen Taxiway [Phase 1 of widen and overlay taxiway C.]
059 63,069,758 Construct Building [Construction phase for air cargo facility replacement.],
Selection Criteria Year: 2006
Page 61 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO JAN MS 059 Construct Building [Construction phase for general aviation area work.], Construct Building [Construction phase for public areas of rental car facility.], Improve Terminal Building, Install Guidance Signs [Replace damaged guidnace signs], Rehabilitate Apron, Rehabilitate Terminal Building [Construction phase of terminal
Hardy-Anders Field Natchez-Adams County GA 016 105,512
area repair and rehabilitation.], Rehabilitate Terminal Building [Phase 2 of terminal area drainage], Remove Obstructions [demolition] Acquire Equipment, Install Miscellaneous NAVAIDS, Update Airport Master Plan
Hattiesburg-Laurel Regional P 026 191,755Study Rehabilitate Building [Repair hangars damaged by Hurricane Katrina], Rehabilitate
027 602,300Terminal Building [Repair Hurricane damage not covered by insurance.] Construct Access Road [Phase II], Improve Terminal Building [Payoff sewage
Hesler-Noble Field GA 003 600,000treatment plant], Improve Terminal Building [Terminal Building Renovation - Phase II] Rehabilitate Terminal Building
Holly Springs-Marshall County GA 008 153,275 Remove Obstructions
Houston Municipal GA 007 169,962 Improve Terminal Building, Install Runway Vertical/Visual Guidance System - 03/21
Indianola Municipal GA 008 142,623 Improve Airport Drainage [Drainage improvements]
Iuka GA 004 510,292 Widen Runway - 18/36
Jackson-Evers International P 038 700,000 Security Enhancements
John Bell Williams GA 011 3,213,355 Extend Runway [Extend Taxiway A] - 12/30, Extend Runway [Install MIRL, REILs, &
Thigpen Field GA 005 561,925A,B,C,D lighting system], Rehabilitate Taxiway Lighting [Replace taxiway signage] Rehabilitate Runway
Tishomingo County GA 007 146,683 Acquire Land for Development, Improve Access Road
Trent Lott International GA 020 207,921 Acquire Equipment [Replace terminal parking lot light destroyed by Hurricane Katrina.], Install Miscellaneous NAVAIDS [Replace damaged windcone], Rehabilitate Building [Repair hangars damaged by Katrina], Rehabilitate Building [Repair hurricane damage to new Air Traffic Control Tower], Rehabilitate Terminal Building
Tunica Municipal GA 008 499,184Master Plan Study [Update airport layout plan] Acquire Aircraft Rescue & Fire Fighting Vehicle
Waynesboro Municipal GA 004 42,750 Construct Building [Design for Hangars, Phase 1], Construct Fuel Farm [Engineering for Fuel Farm], Construct Terminal Building [Design for new terminal]
Winona-Montgomery County GA 005 202,415 Install Perimeter Fencing
Yazoo County GA 007 342,368 Install Perimeter Fencing, Rehabilitate Runway
State Total: 64 Grants 108,701,921
ADO Total: 119 Grants 159,824,297
SO MEM KY Ashland Regional GA 007 49,039 Update Airport Master Plan Study
Selection Criteria Year: 2006
Page 63 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO MEM KY Barkley Regional P 028 692,231 Improve Runway Safety Area - 04/22
029 740,871 Rehabilitate Apron
Big Sandy Regional GA 008 237,556 Install Perimeter Fencing
Blue Grass P 038 3,487,026 Expand Terminal Building [Expand Number of Gates on Concourse B]
039 6,550,300 Rehabilitate Runway, Widen Taxiway [Phase 2 of Taxiway Widening and Rehabilitation]
Bowling Green-Warren County Regional GA 018 1,168,309 Construct Runway Safety Area [Land Acquisition] - 03/21
Bowman Field R 016 1,709,449 Construct Taxiway
Breckinridge County GA 002 25,000 Acquire Land for Development, Improve Runway Safety Area - 09/27
Cincinnati/Northern Kentucky International P 052 19,314,459 Construct Runway [FY 2006 Scheduled Payment]
053 5,644,650 Noise Mitigation Measures for Public Buildings
Madison GA 009 165,923 Install Weather Reporting Equipment
Madisonville Municipal GA 013 100,482 Acquire Emergency Generator
Marion-Crittenden County GA 006 300,000 Construct Building
Mayfield Graves County GA 008 303,054 Construct Building
Selection Criteria Year: 2006
Page 64 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO MEM KY McCreary County GA 005 151,237 Install Miscellaneous NAVAIDS, Install Runway Lighting - 04/22
Middlesboro-Bell County GA 008 150,000 Expand Apron, Improve Airport Drainage, Install Perimeter Fencing
Morehead - Roean County 001 3,628,955 Construct New Airport
002 1,183,225 Construct New Airport [Completion to 5,500 feet]
Muhlenberg County GA 003 25,000 Acquire Land For Approaches [Phase 1 preliminary cost including appraisals.]
New 006 4,720,578 Construct New Airport
Ohio County GA 005 138,476 Construct Building
Owensboro-Daviess County CS 033 500,052 Extend Runway - 18/36
034 2,265,000 Extend Runway - 18/36
Pike County-Hatcher Field GA 008 429,464 Install Perimeter Fencing, Install Perimeter Fencing
Samuels Field GA 009 375,363 Construct Building [Multi-Year Grant]
Somerset-Pulaski County-J.T. Wilson Field GA 014 2,497,518 Conduct Environmental Study, Construct Taxiway
Stuart Powell Field GA 012 93,222 Install Miscellaneous NAVAIDS, Install Perimeter Fencing, Update Airport Master Plan Study
Sturgis Municipal GA 007 283,292 Construct Fuel Farm
Taylor County GA 011 476,028 Construct Building
Tompkinsville-Monroe County GA 003 300,000 Construct Building
Tucker-Guthrie Memorial GA 005 400,000 Construct Building
Wendell H Ford GA 010 43,383 Update Airport Master Plan Study
Williamsburg-Whitley County GA 009 73,218 Construct Utilities
State Total: 47 Grants 85,282,574
SO MEM TN Lovell Field P 038 2,099,900 Install Runway Vertical/Visual Guidance System - Plan-1, Rehabilitate Runway [Rehab RW 15-33 (associated Taxiway D from RW 2-20 to RW 33 threshold)]
039 1,339,526
15/33, Rehabilitate Runway [Rehab RW 15-33 from RW 2-20 to threshold of RW 33 (Phase 3)] - 15/33 Construct Apron [Design Portion of West GA Development], Rehabilitate Taxiway,
040 478,098Update Airport Master Plan Study Construct Apron
McGhee Tyson P 051 2,620,575 Construct Apron [Discretionary grant to fund unfunded portion of West GA Apron Project in multi-year AIP #50]
Selection Criteria Year: 2006
Page 65 of 93
Grants Awarded by FY FAA - Office Of Airports
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
SO MEM TN McKellar-Sipes Regional 017CS 862,800
Memphis International 068P 5,878,000
069 20,366,583
070 18,291,890
Nashville International 077P 5,434,850
078 4,079,151
079 1,306,513
Tennessee State Block Grant Program 026 14,031,106
Tri-Cities Regional TN/VA 043P 1,523,040
044 948,771
State Total: 14 Grants 79,260,803
ADO Total: 61 Grants 164,543,377
SO ORL FL Airglades 003GA 1,993,215
Albert Whitted 014R 178,600
015 786,550
Apalachicola Municipal 003GA 856,617
Avon Park Executive 013GA 1,488,538
Bartow Municipal 021GA 1,170,804
Bob Sikes 018GA 449,093
Boca Raton 010R 3,053,000
Cecil Field 008R 1,945,712
009 1,443,251
Charlotte County 021GA 198,274
Craig Municipal 017R 150,000
Report Date 03/13/2007
Brief Description Of Work
Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Service Road
Rehabilitate Runway [FY 2006 Scheduled Payment]
Acquire Snow Removal Equipment, Construct Taxiway [TWY Victor Reim.], ImproveService Road, Improve Terminal Building [Phase 1- Design Intermodal Facility],Rehabilitate Taxiway [TWY November Rehabilitation], Widen TaxiwayImprove Access Road, Improve Access Road
Extend Runway Safety Area - 02L/20R, Extend Runway Safety Area - 02R/20L
Marianna Municipal GA 006 138,349 Rehabilitate Apron [(Terminal)]
Melbourne International P 030 4,184,012 Construct Apron, Construct Service Road [Construct Service Road (Other)], Install
Merritt Island GA 015 196,175Taxiway Lighting, Rehabilitate Taxiway [Rehabilitate Taxiway Q] Conduct Airport Master Plan Study [airport master plan and airport layout plan
Miami International P 052 7,550,000update] Construct Runway [Construct Runway 8/26 (now Runway 8L/26R)] - Plan-1
053 8,720,307 Rehabilitate Apron
Naples Municipal CS 024 1,444,230 Acquire Emergency Generator, Install Airport Beacons, Install Miscellaneous NAVAIDS [Acquire and Install Omnidirectional Approach Lighting System (ODALS)],
025 2,727,993Install Perimeter Fencing, Rehabilitate Terminal Building [Roofing] Construct Service Road [Emergency Road Around Runway 23, Design and Construct], Construct Taxiway [Realign Taxiway B/apron expansion, Design Phase 1 (including topo survey)], Construct Taxiway [South Quadrant Taxiways]
Okeechobee County GA 014 240,920 Acquire Emergency Generator [Acquire and Install Emergency Generators]
Orlando International P 092 5,620,000 Construct Runway - 17L/35R
093 2,000,000 Construct Taxiway [LOI 9 of 10]
094 4,466,203 Rehabilitate Terminal Building
Orlando Sanford International P 050 7,869,732 Expand Apron [east terminal apron (design and construction)], Expand Terminal Building, Rehabilitate Runway Lighting - 18/36
051 2,705,182 Acquire Easement for Noise Compatibility within 65 - 69 DNL [effects 30 homes/75 persons]
Ormond Beach Municipal R 011 121,744 Construct Heliport/Helipad [design phase], Install Runway Vertical/Visual Guidance System [REILS - Runway 8, 26, 35, Design] - 08/26, Rehabilitate Runway [RW 17/35 Rehab PH1 (Pre-Design)] - 17/35, Update Airport Master Plan Study
Selection Criteria Year: 2006
Page 68 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SO ORL FL Page Field GA 014 3,000,000 Construct Taxiway [(Taxiway D)], Extend Taxiway [(Taxiway C)]
Palatka Municipal - Lt. Kay Larkin Field GA 014 1,140,680 Improve Airport Drainage, Install Airfield Guidance Signs [Install Airfield Guidance
Palm Beach County Park R 006 171,399Signs], Install Runway Lighting - 17/35, Install Taxiway Lighting Install Weather Reporting Equipment
Palm Beach International P 045 3,266,542 Improve Terminal Building [skylight damaged from Hurrican Wilma, fall 2005], Improve Terminal Building [wall panels, Concourse CB, damaged from Hurricane
046 2,827,967Wilma, fall 2005], Improve Terminal Building Conduct Miscellaneous Study [Benefit-Cost-Analysis], Extend Runway [Extend Runway - PH1 (EIS)] - 09R/27L, Update Miscellaneous Study [Stormwater Master
Panama City-Bay County International P 037 906,303Plan] Conduct Environmental Study [Phase 6]
Peter Prince Field GA 009 201,902 Install Miscellaneous NAVAIDS [segmented circle and wind cone], Install Runway Vertical/Visual Guidance System [runway end identification lights] - 18/36,
Quincy Municipal GA 003 86,166Rehabilitate Runway [mark] - 18/36 Extend Runway [Conduct EA] - 14/32
Sarasota/Bradenton International P 039 570,000 Update Airport Master Plan Study
040 7,965,566 Rehabilitate Runway - 14/32, Rehabilitate Service Road [relocate and widen
Southwest Florida International P 039 4,000,000perimeter road] Construct Apron
Space Coast Regional GA
040
018
2,291,049
999,960
Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Apron, Construct Terminal Building [Construct New Terminal Building] Rehabilitate Apron [Rehabilitate Apron]
St Augustine R 021 4,407,868 Construct Apron [Construct Apron], Construct Taxiway
St Lucie County International GA 026 48,450 Conduct Airport Master Plan Study [update]
Suwannee County GA 006 760,000 Rehabilitate Runway [Rehabilitate Runway 7/25] - 07/25
Tallahassee Regional P 031 1,417,432 Security Enhancements
Tampa International P 046 3,127,614 Construct Taxiway [Construct High Speed Taxiway (Phase 2 Design and Construct) and Extend Taxiway A (Phase 2 Design and Construct)], Rehabilitate Taxiway [W, Phase 2 (from Runway 26L to Taxiway J Connector)]
047 4,500,000 Construct Taxiway [Construct New Taxiway D between Runway 9-27 and Taxiway J (Phase II - Construction)], Construct Taxiway [Relocate Taxiway E.
The Florida Keys Marathon GA 022 1,397,799 between Runway 9-27 and Taxiway J (Phase II - Construction)] Acquire Emergency Generator [Replace], Construct Apron [East General Aviation
Update Airport Master Plan Study [and Terminal Area Plan]
Acquire Land for Noise Compatibility within 65 - 69 DNL [Land Acquisition in the 65DNL]Conduct Miscellaneous Study [Conduct Runway 12/30 Runway ProtectionZone/Runway Safety Area Study], Conduct Miscellaneous Study [airport propertymap and evaluate Runway 12/30 runway safety area and runway protection zonealternatives]
Improve Runway Safety Area - 09/27, Install Emergency Generator, InstallGuidance Signs, Install Runway Vertical/Visual Guidance System [PAPI on Runway9] - 09/27, Rehabilitate Taxiway [A Portion - 500 ft. x 35 ft.]Improve Runway Safety Area - 09/27
Conduct Miscellaneous Study [utility master plan, Phase III], Rehabilitate RunwayLighting [Reconstruct Runway 8/26 Lights (HIRL)(includes new electrical vault)] 08/26, Security EnhancementsImprove Runway Safety Area - 12/30, Install Emergency Generator
Improve Runway Safety Area [8 end only] - 08/26, Install Airfield Guidance Signs[All reimbursement and force account]
Improve Terminal Building [install new baggage claim conveyor], SecurityEnhancementsSecurity Enhancements
Selection Criteria Year: 2006
Page 70 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
ADO Total:
Report Total:
Region Total:
91 Grants
1579 Grants
2059 Grants
179,315,633
3,539,103,886
679,473,980
SW AROK AR Adams Field P 061 585,002 Acquire Aircraft Rescue & Fire Fighting Vehicle [Replace ARFF Vehicle No. 2]
062 3,000,000 Noise Mitigation Measures for Residences within 65 - 69 DNL
063 1,476,084 Extend Runway [Phase III, Extend Runway 18 Design] - 18/36, Improve Airport Drainage [West of RW 4R/22L], Rehabilitate Apron [Replace Approximately 30
Almyra Municipal GA 003 385,961Concrete Slabs] Rehabilitate Apron
Bentonville Municipal/Louise M Thaden Field
Billy Free Municipal
GA
GA
006
003
665,691
160,455
Acquire Safety Equipment [Install perimter fence (barbed wire)], Construct Taxiway [Construct west side GA access taxiway] Acquire Land For Approaches, Construct Taxiway [Phase 1-Acquire Land and
Boone County CS 015 1,362,526Design Only] Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate Apron [Phase 1 GA Apron Rehab], Rehabilitate Runway Lighting [Rehabilitate RWY LGTG is requirement of 139 Inspection] - 18/36
Calico Rock-Izard County GA 003 54,898 Construct Taxiway [Phase 1 - Design Only]
Carlisle Municipal GA 006 315,843 Improve Runway Safety Area - 18/36, Rehabilitate Taxiway
Carroll County GA 007 243,163 Conduct Airport Master Plan Study [AMP Update & Approach Procedure Survey], Rehabilitate Apron [Rehabilitate hangar apron]
Clarendon Municipal GA 002 73,162 Construct Runway [Phase 1 - Land Acquisition] - Plan-1
Clarksville Municipal GA 006 234,128 Construct Apron
Clinton Municipal GA 005 41,305 Widen Runway [Design only 2006] - 13/31, Widen Taxiway [Design only 2006]
Corning Municipal GA 010 149,808 Construct Apron
De Witt Municipal GA 003 481,470 Construct Apron
Drake Field GA 035 278,456 Construct Apron [Phase II: Construct West Side GA Apron]
Frank Federer Memorial GA 002 367,740 Conduct Airport Master Plan Study, Extend Taxiway
Grider Field GA 009 267,086 Construct Taxiway
H L Hopkins-Fordyce Municipal GA 003 622,275 Rehabilitate Runway [Phase II - Overlay and Widen Runway to 60', Relocate Runway Lights and Construct Turn Arounds] - 04/22
J Lynn Helms Sevier County GA 006 140,917 Rehabilitate Runway - 08/26, Update Airport Master Plan Study
Selection Criteria Year: 2006
Page 71 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SW AROK AR Jonesboro Municipal CS 014 1,458,322 Rehabilitate Runway Lighting - 05/23
Magnolia Municipal GA 008 892,907 Extend Runway [400' x 100', Extend Parallel Taxiway & Relocate Utilities] - 18/36
Malvern Municipal GA 001 141,170 Remove Obstructions [Acquire Land for Obstruction Relocation]
Manila Municipal GA 005 244,854 Rehabilitate Runway Lighting [Includes REILS and MITL] - 18/36
Marianna/Lee County-Steve Edwards Field GA 002 532,748 Extend Taxiway
Marked Tree Municipal GA 004 205,345 Rehabilitate Apron
Mena Intermountain Municipal GA 013 107,697 Conduct Miscellaneous Study [Study Runway Pavement Geometry in Vicinity of the Intersection of RW 9 and RW 35], Rehabilitate Runway [Remark Runway 9/27] -
Monticello Municipal/Ellis Field GA 008 231,80709/27 Install Airfield Guidance Signs [Hold Signs], Rehabilitate Runway [Seal Runway
New Saline County 001 1,315,175
3/21 and Remark] - 03/21, Update Miscellaneous Study [ALP With Action Plan Narrative] Construct New Airport [Phase 5- access road and terminal area improvements]
North Little Rock Municipal R 018 234,095 Construct Taxiway [Phase II - RW 5]
Northwest Arkansas Regional P 026 745,373 Acquire Aircraft Rescue & Fire Fighting Vehicle
Cordell Municipal GA 001 93,290 Rehabilitate Runway [Design] - 17/35
Cushing Municipal GA 008 161,500 Improve Access Road -
David Jay Perry GA 004 625,316 Construct Taxiway, Install Airport Beacons - -, Rehabilitate Runway - 17/35
Davis Field GA 006 436,782 Rehabilitate Taxiway Lighting
Eaker Field GA 005 719,872 Construct Taxiway [Relocate hangar, reconstruct terminal apron, and construct
El Reno Regional GA 007 245,416hangar access apron] Rehabilitate Apron [Seal Cracks, Seal Coat and Mark] - -, Rehabilitate Taxiway
Elk City Municipal GA 008 235,125 [Crack Seal, Asphalt Rejuvinate and Mark (parallel and connector TWs)] Acquire Miscellaneous Land [Phase 2 land reimbursement]
Selection Criteria Year: 2006
Page 73 of 93
Grants Awarded by FY FAA - Office Of Airports
Region ADO State Worksite
SW AROK OK Enid Woodring Regional
Eufaula Municipal
Fountainhead Lodge Airpark
Frederick Municipal
Grove Municipal
Guthrie Municipal
Halliburton Field
Lake Murray State Park
Lawton-Fort Sill Regional
Lindsay Municipal
Madill Municipal
Miami Municipal
Mooreland Municipal
Okemah Municipal
Pauls Valley Municipal
Perry Municipal
Richard Lloyd Jones Jr
Robert S Kerr
Sallisaw Municipal
Scott Field
Shawnee Regional
Stan Stamper Municipal
State of Oklahoma
FY 2006
Service Grant SeqLevel Number
GA 018
GA 004
GA 004
GA 005
GA 011
GA 008
GA 007
GA 003
P 022
GA 002
GA 002
GA 011
GA 001
001
GA 005
GA 005
R 016
GA 008
GA 007
GA 002
GA 011
GA 007
006
AIP Federal Funds
2,902,660
355,560
29,165
289,931
235,600
150,000
74,994
23,180
864,500
230,392
93,100
185,250
600,000
405,696
428,907
19,746
3,009,866
806,590
300,000
578,689
100,000
721,620
179,011
Report Date 03/13/2007
Brief Description Of Work
Rehabilitate Runway - 17/35
Rehabilitate Runway - 17/35, Rehabilitate Taxiway
Install Airport Beacons [Install Airport Beacon (Design Only)], Install Runway Lighting [Install Runway Lighting (DESIGN ONLY)] - 18/36, Rehabilitate Runway [Displace threshold (Design Only)] - 18/36, Remove Obstructions [Remove Obstructions (Design Only)] - Improve Airport Drainage [Adjacent & Parallel to RW 12/30], Install Runway Vertical/Visual Guidance System - 17R/35L, Rehabilitate Apron Acquire Land for Development [57.75 acres on westside]
Thomas Municipal GA 004 41,800 Widen Runway [Design only - Runway Widen] - 17/35
Tulsa International P 053 2,762,399 Acquire Aircraft Rescue & Fire Fighting Vehicle, Rehabilitate Terminal Building [Replace Six Inbound Baggage Conveyor Systems]
057
058
7,000,000
4,132,805
Noise Mitigation Measures for Residences within 65 - 69 DNL [Noise mitigation (continued)] Extend Runway [Extend Taxiway Echo (1200 feet from TW DD to TW F)] - 08/26
Vinita Municipal GA 005 93,570 Conduct Miscellaneous Study [to Develop CIP, ALP update, surveys, geotechnical testing, hazard zoning ordinance]
West Woodward GA 004 498,930 Rehabilitate Apron
005 1,077,040 Rehabilitate Taxiway
Wilburton Municipal GA 003 493,461 Rehabilitate Runway - 17/35
Wiley Post R 015 475,000 Install Taxiway Lighting, Rehabilitate Apron, Rehabilitate Runway - 17R/35L,
Will Rogers World P 053 5,734,200Rehabilitate Taxiway Acquire Snow Removal Equipment [2 Brooms Replace.], Improve Runway Safety
William R. Pogue Municipal GA 012 137,574Area [Construct Rwy 13/31 Safety Area Improvement.] - 13/31, Widen Taxiway Rehabilitate Taxiway [TW Alpha Crack Seal & Sealcoat]
State Total: 56 Grants 45,498,983
ADO Total: 105 Grants 78,339,438
SW LANM LA Abbeville Chris Crusta Memorial GA 012 165,277 Improve Runway Safety Area [Tree Removal (east side of runway) and Grading of Safety Area (Phase II)] - 15/33
Acadiana Regional GA 011 150,000 Install Perimeter Fencing, Update Airport Master Plan Study
Alexandria International P 032 5,197,025 Construct Terminal Building [Phase XI]
033 450,000 Rehabilitate Taxiway [1/2 of Taxiway E]
Allen Parish GA 008 970,303 Construct Taxiway
Baton Rouge Metropolitan, Ryan Field P 071 1,410,000 Extend Runway - 04L/22R, Improve Runway Safety Area [Acquisition of Hobgood Property.] - 04L/22R
Selection Criteria Year: 2006
Page 75 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
SW LANM LA 072 5,962,046 Expand Apron [Engineering and Phase I Construction], Improve Runway Safety Area [Acquisition of Conway Trucking ($1.677M); Design for Plank and Blount Road
C E 'Rusty' Williams GA 005 258,132Relocation ($869k)] - 04L/22R Improve Airport Drainage
Chennault International GA 005 129,434 Construct Building [Phase I - Engineering]
DeQuincy Industrial Airpark GA 011 519,175 Rehabilitate Runway - 15/33
False River Regional
George R Carr Memorial Air Field
GA
GA
012
013
738,629
862,125
Acquire Easement For Approaches, Acquire Land For Approaches, Construct Building [Two hangar complexs] Improve Runway Safety Area [1/3 Precast Piles and East Side Retaining Wall]
Harry P Williams Memorial GA 010 910,38718/36 Improve Airport Drainage [Phase I]
Homer Municipal GA 003 234,859 Rehabilitate Runway - 12/30
Houma-Terrebonne GA 021 2,994,800 Rehabilitate Taxiway [Phase II Construction], Rehabilitate Taxiway [TW B, E, and H]
Jennings GA 010 438,671 Install Runway Lighting - 13/31, Update Airport Master Plan Study
John H Hooks Jr Memorial GA 009 423,954 Rehabilitate Apron
Jonesboro GA 003 280,857 Remove Obstructions
Jonesville GA 001 400,000 Rehabilitate Runway [$500K LA DOTD funds] - 06/24
Lafayette Regional P 031 3,222,750 Rehabilitate Taxiway [phase 2 of reconstruct Taxiway Bravo east of 4/22],
Lake Charles Regional P 031 1,000,000Rehabilitate Taxiway [phase 3 and last of reconstruct Taxiway Bravo east of 4/22] Construct Aircraft Rescue & Fire Fighting Building
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
SW LANM LA Monroe Regional P 022 2,069,592 Rehabilitate Runway Lighting [Phase II Airfield Lighting Rehab.] - 14/32
023 3,865,702 Rehabilitate Runway - 04/22
New Orleans Regional Planning Commission 001 350,000 Conduct Metropolitan System Plan Study
Ruston Regional GA 012 80,897 Conduct Airport Master Plan Study
Shreveport Downtown R 014 146,530 Rehabilitate Taxiway [Taxiway F - Engineering only]
Shreveport Regional P 039 5,123,669 Expand Service Road [Expand Perimeter Road], Install Guidance Signs, Rehabilitate Runway Lighting - 05/23, Rehabilitate Taxiway [Taxiways B & C], Rehabilitate Taxiway Lighting [Taxiways B & E]
South Lafourche GA 008 672,750 Extend Runway [Phase II of Construction - Airfield Lighting and Vault] - 18/36
Southland Field GA 010 95,857 Rehabilitate Runway [sealcoat runway and taxiways] - 15/33
St John the Baptist Parish
St. Tammany Regional
GA
GA
012
005
511,737
375,250
Construct Taxiway [Phase II - Construction], Construct Taxiway [Phase II Construction] Extend Runway [Acquire Land (~70 Acres)] - 18/36
State of Louisiana 001 285,000 Conduct State System Plan Study
Union Parish GA 007 372,933 Construct Taxiway
Various Locations in Louisiana 004 4,380,000 Improve Airport Miscellaneous Improvements (Abbeville Chris Crusta Memorial; Acadiana Regional; Allen Parish; Beauregard Regional; Chennault International; Concordia Parish; DeQuincy Industrial Airpark; Esler Regional; George R Carr Memorial Air Field; Hammond Northshore Regional; Harry P Williams Memorial; Houma-Terrebonne; Le Gros Memorial; Leesville; Louisiana Regional; Natchitoches Regional; Slidell; South Lafourche; Southland Field; St John the Baptist Parish; St. Tammany Regional; The Red River; Vicksburg Tallulah Regional)
Las Cruces International GA 018 847,505Improve Snow Removal Equipment Building [provide utilities to new building] Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Airfield Guidance Signs
Las Vegas Municipal GA 009 389,585 Install Runway Lighting - 02/20, Install Runway Vertical/Visual Guidance System 14/32
Lea County Regional GA 015 319,676 Improve Terminal Building
Lordsburg Municipal GA 006 106,229 Extend Runway [project revised to engineering only] - 12/30, Install Perimeter
Los Alamos GA 002 140,000Fencing Rehabilitate Runway Lighting - 09/27
Moriarty GA 007 337,955 Rehabilitate Runway - 08/26, Rehabilitate Taxiway
Portales Municipal GA 012 301,651 Conduct Environmental Study, Modify Access Road
Proposed - GA 004 1,554,263 Construct New Airport [Pave]
Roswell International Air Center CS 017 764,627 Acquire Aircraft Rescue & Fire Fighting Vehicle [ARFF 139 recommendation],
Santa Fe Municipal P 024 535,028Improve Terminal Building [Terminal ADA improvements Phase 1 design only] Acquire Aircraft Rescue & Fire Fighting Vehicle
State of New Mexico
Taos Regional GA
004
016
115,425
167,456
Conduct Airport Master Plan Study (Angel Fire; Aztec Municipal), Update Airport Master Plan Study (Las Cruces International) Install Perimeter Fencing, Install Runway Vertical/Visual Guidance System [Relocate
Truth Or Consequences Municipal GA 009 52,535 PLASI] - 04/22, Rehabilitate Taxiway Rehabilitate Apron [Design], Rehabilitate Taxiway [Phase I Design Only], Rehabilitate Taxiway [Phase I Design Only]
Selection Criteria Year: 2006
Page 78 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite
State Total:
ADO Total:
SW TEX TX Abilene Regional
Austin-Bergstrom International
Brownsville/South Padre Island International
Corpus Christi International
Dallas Love Field
Dallas/Fort Worth International
East Texas Regional
P
Service Level
30 Grants
73 Grants
030
Grant Seq Number
P
031
035
036
P
P
030
031
038
P
P
030
078
079
080
P 025
AIP FederalFunds
24,336,622
96,933,322
2,000,000
2,255,076
3,500,000
2,812,500
320,602
1,000,000
9,356,300
8,100,000
5,692,000
24,918,468
7,104,882
5,705,250
Brief Description Of Work
Improve Terminal Building [Phase 4, Construction], Improve Terminal Building [Phase 4, Construction], Rehabilitate Apron [Rehabilitate Air Carrier Apron, Area C, Phase I (Design)], Rehabilitate Apron [Rehabilitate Air Carrier, Area B, Phase I (Design)], Rehabilitate Apron [Rehabilitate General Aviation Apron/Taxilane, Area A, Phase I (Design)], Rehabilitate Apron [Rehabilitate General Aviation Apron/Taxilane, Area B, Phase I (Design)] Rehabilitate Apron [Rehabilitate Air Carrier Apron, Area A], Rehabilitate Runway Lighting [Rehabilitate Runway 17L/35R Lighting System, Phase I (Design)] - 17L/35R Acquire Land for Noise Compatibility within 65 - 69 DNL [Acquire Land]
Acquire Interactive Training System [Acquire Interactive Training System], Rehabilitate Runway Lighting [Rehabilitate Airfield Runway Lighting System] 17R/35L, Security Enhancements [Security System Upgrade, Phase 1 (Design)], Update Airport Master Plan Study [Update Airport Master Phasing Plan, Level 1] Conduct Noise Compatibility Plan Study
Acquire Aircraft Deicing Equipment, Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Acquire Emergency Generator, Acquire Safety Equipment, Construct Building Update State System Plan Study
036 21,440,544 Non primary development projects in state block grant program
037 20,514,755 Non primary development projects in state block grant program
040 10,587,750 Non primary development projects in state block grant program
P
P
043
020
040
4,880,600
3,629,573
3,243,474
Non primary development projects in state block grant program, Non primary development projects in state block grant program Construct Service Road [Construct east perimeter road (Phase 2).], Improve Runway Safety Area [RSA improvement study.] - 04/22, Improve Terminal Building [Acquire jet bridges], Rehabilitate Apron [Rehabilitate apron.] Rehabilitate Taxiway
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Grant Seq AIP Federal Brief Description Of WorkLevel Number Funds
WP LAX AZ Falcon Field R 014 1,139,396 Improve Runway Safety Area - 04R/22L, Install Perimeter Fencing [Phase I]
015 170,000 Update Airport Master Plan Study
Flagstaff Pulliam P 028 218,500 Conduct Environmental Study
029 500,000 Construct Service Road [Phase II]
030 10,483,414 Extend Runway [Phase I] - 03/21
Gila Bend Municipal GA 011 242,471 Install Apron Lighting, Install Runway Vertical/Visual Guidance System - 04/22
Grand Canyon National Park P 020 1,765,877 Acquire Aircraft Rescue & Fire Fighting Vehicle, Construct Apron [Holding Position], Improve Airport Drainage [Runway 03/21 Safety Area]
Grand Canyon West P 005 6,402,822 Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Construct Runway [Relocate Runway] - 17/35
006 1,808,310 Construct Runway - 17/35
H.A. Clark Memorial Field GA 019 150,000 Conduct Environmental Study [Land Acquisition]
Noise Mitigation Measures for Residences within 65 - 69 DNL
Conduct Noise Compatibility Plan Study [Part 150]
Update Miscellaneous Study
Construct Runway Safety Area - 07/25, Construct Taxiway
Conduct Environmental Study [EA for Runway 12/30 runway extension], Expand Terminal Building [Terminal expansion, Phase 2] Construct Taxiway [Taxilanes], Install Perimeter Fencing
Construct Fuel Farm [MAP] [Phase III]
Rehabilitate Apron, Rehabilitate Taxiway
Rehabilitate Runway - 12/30, Rehabilitate Taxiway
Expand Terminal Building [Expand Terminal Building - Phase I Construction], Expand Terminal Building [Expand Terminal Building - Phase II Construction]
Selection Criteria Year: 2006
Page 87 of 93
Grants Awarded by FY FAA - Office Of Airports Report Date 03/13/2007
FY 2006
Region ADO State Worksite Service Level
Grant Seq Number
AIP Federal Funds
Brief Description Of Work
WP SFO CA Auburn Municipal GA 009 300,000 Construct Access Road [Phase II], Construct Taxiway [Phase II]
Buchanan Field R 016 1,157,500 Acquire Aircraft Rescue & Fire Fighting Vehicle [Acquire 1,500 gallon ARFF vehicle