This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
i n d e x o f d r a w i n g s l o c a t i o n m a p
c o n s u l t a n t / c o n s t r u c t i o n m a n a g e m e n t t e a m l i s t
DRAWING LIST - ArchitecturalA001 GENERAL NOTES, ABBREVIATIONS, ANNOTATIONS
LEGENDS, & WALL TYPES
AD101.1 LEVEL 1 DEMOLITION PLANAD102.1 LEVEL 2 DEMOLITION PLAN
A100.2 BASEMENT PLAN - 2002A101.1 LEVEL 1 PLAN - 1968A101.2 LEVEL 1 PLAN - 2002A102.1 LEVEL 2 PLAN - 1968A102.2 LEVEL 2 PLAN - 2002A103.1 LEVEL 1 REFLECTED CEILING PLAN - 1968A104.1 LEVEL 2 REFLECTED CEILING PLAN - 1968A401 ENLARGED PLANS & REFLECTED CEILING PLANSA501 INTERIOR DETAILS & ELEVATIONS
DRAWING LIST - StructuralS101 GENERAL NOTES, DETAILS & FRAMING PLANSS201 FOUNDATION & FRAMING DETAILS
DRAWING LIST - MechanicalM-1 FIRST FLOOR MECHANICAL PLANM-2 SECOND FLOOR MECHANICAL PLAN
DRAWING LIST - ElectricalE-1 ELECTRICAL LEGEND AND DETAILSE-2 FIRST FLOOR ELECTRICAL DEMOLITION PLANE-3 SECOND FLOOR ELECTRICAL DEMOLITION PLANE-4 FIRST FLOOR ELECTRICAL PLANE-5 SECOND FLOOR ELECTRICAL PLAN
DRAWING LIST - PlumbingP-1 FIRST FLOOR PLUMBING PLANP-2 SECOND FLOOR PLUMBING PLAN
DRAWING LIST - General_ _ _ COVERSHEET
AREA OF RENOVATIONSTYPICAL BOTH FLOORS
ABBREVIATIONS LISTA ---------------------A/C AIR CONDITIONA/C UNIT AIR CONDITIONING UNITA/E ARCHITECT/ENGINEERAB ANCHOR BOLTABV ABOVEACC ACCESSIBLEACS DR ACCESS DOORACS PNL ACCESS PANELACT ACOUSTICAL CEILING TILEADA AMERICANS WITH DISABILITIES ACTADMIN ADMINISTRATIONAFC ABOVE FINISHED COUNTERAFF ABOVE FINISHED FLOORAFG ABOVE FINISHED GRADEAFS ABOVE FINISHED SLABAGGR AGGREGATEAHU AIR HANDLING UNITAIB AIR INFILTRATION BARRIERALT ALTERNATEALUM ALUMINUMANOD ANODIZEAPC ACOUSTICAL PANEL CEILINGAPPROX APPROXIMATEAR AS REQUIREDARCH ARCHITECTASC ABOVE SUSPENDED CEILINGASSY ASSEMBLYAVG AVERAGEAW ARCHITECTURAL WOODWORKAWP ACOUSTICAL WALL PANEL
E ---------------------EA EACHEF EACH FACEEIFS EXTERIOR INSULATION & FINISH SYSTEMEJ EXPANSION JOINTES EACH SIDEEL ELEVATIONELEV ELEVATORENTR ENTRANCEEPS EXPANDED POLYSTYRENE BOARDEQ EQUALEQUIP EQUIPMENTEST ESTIMATEDEXP EXPOSEDEXT EXTERIOREXT EXTINGUISHEREXT GR EXTERIOR GRADE
F ---------------------FA FIRE ALARMFAAP FIRE ALARM ANNUNCIATOR PANELFAS BD FASCIA BOARDFCO FLOOR CLEANOUTFD FLOOR DRAINFDTN FOUNDATIONFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER CABINETFF FINISH FACEFF EL FINISH FLOOR ELEVATIONFGL FIBERGLASSFHP FULL HEIGHT PARTITIONFIN FINISHFIN BS FINISH BOTH SIDESFIN FLR FINISH FLOORFIN GR FINISH GRADEFIXT FIXTUREFLDG FOLDINGFLEX FLEXIBLEFLG FLOORINGFLMT FLUSH MOUNTFLR FLOORFM FACTORY MUTUALFOC FACE OF CONCRETEFOM FACE OF MASONRYFRG FIBER REINFORCED GYPSUMFRMG FRAMINGFRP FIBERGLASS REINFORCED PLASTICFRTW FIRE RETARDANT TREATED WOODFSTNR FASTENERFT FEETFTG FOOTINGFWC FABRIC WALLCOVERING
H ---------------------HB HOSE BIBBHC HANDICAPPEDHD HAND DRYERHDPE HIGH DENSITY POLYETHYLENEHDW HARDWAREHDWD HARDWOODHM HOLLOW METALHMD HOLLOW METAL DOORHORIZ HORIZONTALHT HEIGHTHVAC HEATING, VENTILATION AND
AIR CONDITIONINGHYDR HYDRAULIC
I ---------------------IBC INTERNATIONAL BUILDING CODEID INSIDE DIAMETERINCL INCLUDE (ING)INSUL INSULATIONINT INTERIORILO IN LIEU OFINV INVERT
J ---------------------JAN JANITOR
K ---------------------KIT KITCHENKO KNOCK OUTKPD KEYPADKPL KICKPLATE
L ---------------------LAM LAMINATELAV LAVATORYLBS POUNDLDG LANDINGLF LINEAR FEET (FOOT)LH LEFT HANDLIN LINEARLKR LOCKERLOC LOCATIONLT LIGHTLVDR LOUVER DOORLVR LOUVER
T --------------------T TREADT&B TOP AND BOTTOMTBD TO BE DETERMINEDTD TRENCH DRAINTEL TELEPHONETEMP TEMPORARYTFF TOP OF FINISH FLOORT&G TONGUE AND GROOVETHK THICKNESSTK BD TACKBOARDTMPD GL TEMPERED GLASSTN TRUE NORTHTO TOP OFTOF TOP OF FOOTINGTOM TOP OF MASONRYTOP TOP OF PARAPETTOPO TOPOGRAPHYTOS TOP OF SLABTP TOILET PAPER DISPENSERTRANS TRANSPARENTTRTD TREATEDTV TELEVISION
U -----------------------UC UNDERCUTUNO UNLESS OTHERWISE NOTED
V -----------------------VB VAPOR BARRIERVFY VERIFYVIF VERIFY IN FIELDVERT VERICALVCT VINYL COMPOSITION TILEVWC VINYL WALL COVERING
W -----------------------W/ WITHW/O WITHOUTWBF WATER BOTTLE FILLERWC WATER CLOSETWD WOODWR WASTE RECEPTACLEWWF WELDED WIRE FABRIC
THE FOLLOWING TABLE OF ABBREVIATIONS IS FOR THE CONVENIENCE OF THE CONTRACTOR AND MAY NOT INCLUDE ALLABBREVIATIONS USED IN THE CONSTRUCTION DOCUMENTS. THE CONTRACTOR SHALL PROPTLY CONTACT THE ARCHITECT IFCLARIFICATIONS OR INTERPRETATION OF THESE OR ANY ABBREVIATIONS USED IN THE CONSTRUCTION DOCUMENTS IS REQUIRED.
ESTES & GALLUP CORP.P.O. BOX 240LYME, NH 03768T: (603) 795-4400
CONSTRUCTION MANAGER:
REVISION DATE COMMENTS
A
F C
G
A
D
E
F
I
B
H
DEMOLITION PLAN LEGEND
STRUCTURAL GRID LINE
GENERAL DEMOLITION PLAN NOTES:
PLAN ORIENTATION
EXISTING CONSTRUCTIONTO BE DEMOLISHED
EXISTING CONSTRUCTIONTO REMAIN
PLAN N
ORT H
DEMOLITION PLAN KEYNOTES:
EXISTING DOORTO REMAIN
EXISTING DOORTO BE DEMOLISHED
1. THIS PLAN DESCRIBES ARCHITECTURALDEMOLITION ONLY. SEE CONSULTANTDRAWINGS FOR ADDITIONAL DEMOLITIONSCOPE.
2. THE SCOPE OF DEMOLITION INCLUDES, BUT ISNOT LIMITED TO WORK DESCRIBED IN THECONSTRUCTION DOCUMENTS. THEDEMOLITION WORK SHALL INCLUDE ALL WORKREQUIRED FOR THE COMPLETION OF NEWCONSTRUCTION DESCRIBED IN THECONSTRUCTION DOCUMENTS AND THE LEGALDISPOSAL OF MATERIALS.
A. DEMOLISH PLUMBING FIXTURES.B. DEMOLISH EXISTING CASEWORK.C. TRENCH SLAB AS REQUIRED FOR NEW
PLUMBING WORK.D. SALVAGE DOORS & DOOR HARDWARE FOR
POTENTIAL REUSE AT NEW DOOR LOCATIONS.E. EXISTING STRUCTURAL COLUMNS TO REMAIN.F. SALVAGE CABINETS.G. SALVAGE FAUCETS.H. SALVAGE EXISTING 2'x4' DROP-IN LIGHTS.I. SALVAGE EXISTING 6"X4' SEALED SURFACE
LIGHTS
SHEET NUMBER:
PROJECT NO: DATE:
DRAWING TITLE:
ISSUED:
PROJECT:
KEY PLAN:
CONSULTANTS / DESIGN TEAM:
THE CARRIAGE HOUSE6 SOUTH PARK STREETLEBANON, NH 03766
ESTES & GALLUP CORP.P.O. BOX 240LYME, NH 03768T: (603) 795-4400
CONSTRUCTION MANAGER:
Scale: 3/32" = 1'-0"01 LEVEL 1 DEMOLITION PLAN - 1968
2002 ADDITION 1968 BUILDING
REVISION DATE COMMENTS
A
D
E
G
F
I
H
B
DEMOLITION PLAN LEGEND
STRUCTURAL GRID LINE
GENERAL DEMOLITION PLAN NOTES:
PLAN ORIENTATION
EXISTING CONSTRUCTIONTO BE DEMOLISHED
EXISTING CONSTRUCTIONTO REMAIN
PLAN N
ORT H
DEMOLITION PLAN KEYNOTES:
EXISTING DOORTO REMAIN
EXISTING DOORTO BE DEMOLISHED
1. THIS PLAN DESCRIBES ARCHITECTURALDEMOLITION ONLY. SEE CONSULTANTDRAWINGS FOR ADDITIONAL DEMOLITIONSCOPE.
2. THE SCOPE OF DEMOLITION INCLUDES, BUT ISNOT LIMITED TO WORK DESCRIBED IN THECONSTRUCTION DOCUMENTS. THEDEMOLITION WORK SHALL INCLUDE ALL WORKREQUIRED FOR THE COMPLETION OF NEWCONSTRUCTION DESCRIBED IN THECONSTRUCTION DOCUMENTS AND THE LEGALDISPOSAL OF MATERIALS.
A. DEMOLISH PLUMBING FIXTURES.B. DEMOLISH EXISTING CASEWORK.C. TRENCH SLAB AS REQUIRED FOR NEW
PLUMBING WORK.D. SALVAGE DOORS & DOOR HARDWARE FOR
POTENTIAL REUSE AT NEW DOOR LOCATIONS.E. EXISTING STRUCTURAL COLUMNS TO REMAIN.F. SALVAGE CABINETS.G. SALVAGE FAUCETS.H. SALVAGE EXISTING 2'x4' DROP-IN LIGHTS.I. SALVAGE EXISTING 6"X4' SEALED SURFACE
LIGHTS
SHEET NUMBER:
PROJECT NO: DATE:
DRAWING TITLE:
ISSUED:
PROJECT:
KEY PLAN:
CONSULTANTS / DESIGN TEAM:
THE CARRIAGE HOUSE6 SOUTH PARK STREETLEBANON, NH 03766
1. ALL DIMENSIONS ARE TO FACE OF STUD ORFACE OF MASONRY, U.O.N. OPENINGS IN WALLSWITHOUT FRAMES ARE TO FACE OF STUD ORMASONRY, U.O.N. DIMENSIONS AT EXISTINGWALLS ARE TO EXISTING FINISH FACE, U.O.N.
2. ALL ANGLED WALLS ARE 45º, U.O.N.3. REFER TO CODE PLAN FOR EXTENT OF RATED
ENCLOSURES AND FIRE/SMOKEPROOFING.4. THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ALL DIMENSIONS PRIOR TOCOMMENCEMENT OF CONSTRUCTION. ANYDISCREPANCY BETWEEN CONSTRUCTIONDOCUMENTS AND FIELD CONDITIONS IS TO BEPROMPTLY COMMUNICATED TO ARCHITECT FORCLARIFICATION.
5. REPAINT ALL PAINTED SURFACES IN 1968PORTION OF BUILDING WITH 1 COAT OFPAINT. REPAINTING MATERIALS TO BEPROVIDED BY OWNER, INSTALLED BYCONTRACTOR. REWAX ALL EXISTING ANDNEW VCT FLOORING IN 1968 PORTION OFBUILDING AT COMPLETION OF WORK.
NEW DOOR AND FRAME
EXISTING DOOR TO REMAIN
PLAN N
ORT H
2HR RATED PARTITIONOR FIRE WALL
1HR RATED PARTITION
A
C
OC
WFS
FP
= PATCH AND REPAIR HOLE IN DECKING OR WALL
= SEAL GAPS AROUND CONDUITS, PIPES, OR COLUMNS
= SEAL OPEN CHASE BETWEEN FLOORS
= ADD MINERAL WOOL IN DECK FLUTES & FIRESTOPPING AT TOP OF WALL
= PROVIDE SPRAY APPLIED FIRE PROOFING AT EXPOSED STEEL
B = SEAL AROUND DUCT PENETRATION
FIRE STOPPING KEYNOTE LEGEND:
• KEYNOTE TAGS REFER TO GENERAL AREA OFREQUIRED WORK, NOT QUANITY OFCONDITIONS.
• KEYNOTES ON PLAN DESCRIBE GENERALCONDITIONS OF REQUIRED FIRESTOPPING WORK.FULL SCOPE MUST BE DETERMINED BY CMTHROUGH FIELD SURVEY.
0001
0007
0003
00040005
0006
0008
0009
0002
0012
0013
C
A
C
B
C
C
B
C
A
CA
C
C NUMEROUS ATCEILING DECK
C
SHEET NUMBER:
PROJECT NO: DATE:
DRAWING TITLE:
ISSUED:
PROJECT:
KEY PLAN:
CONSULTANTS / DESIGN TEAM:
THE CARRIAGE HOUSE6 SOUTH PARK STREETLEBANON, NH 03766
1. ALL DIMENSIONS ARE TO FACE OF STUD ORFACE OF MASONRY, U.O.N. OPENINGS IN WALLSWITHOUT FRAMES ARE TO FACE OF STUD ORMASONRY, U.O.N. DIMENSIONS AT EXISTINGWALLS ARE TO EXISTING FINISH FACE, U.O.N.
2. ALL ANGLED WALLS ARE 45º, U.O.N.3. REFER TO CODE PLAN FOR EXTENT OF RATED
ENCLOSURES AND FIRE/SMOKEPROOFING.4. THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ALL DIMENSIONS PRIOR TOCOMMENCEMENT OF CONSTRUCTION. ANYDISCREPANCY BETWEEN CONSTRUCTIONDOCUMENTS AND FIELD CONDITIONS IS TO BEPROMPTLY COMMUNICATED TO ARCHITECT FORCLARIFICATION.
5. REPAINT ALL PAINTED SURFACES IN 1968PORTION OF BUILDING WITH 1 COAT OFPAINT. REPAINTING MATERIALS TO BEPROVIDED BY OWNER, INSTALLED BYCONTRACTOR. REWAX ALL EXISTING ANDNEW VCT FLOORING IN 1968 PORTION OFBUILDING AT COMPLETION OF WORK.
NEW DOOR AND FRAME
EXISTING DOOR TO REMAIN
PLAN N
ORT H
2HR RATED PARTITIONOR FIRE WALL
1HR RATED PARTITION
OC
C
OC
C
C
B
OC
OC
OC
OC
OC
A
C
C
OC
OC
OCA
OC
C
C
C
C
C
C
C
OC
OCOC
OC
C
A
A40102
SIM
A40103
SIM
A40101
SIM
A: 986 SF
CORRIDOR1120
A: 1193 SF
CAFETERIA1121
A: 61 SF
MEDICATIONSTORAGE
1173
A: 19 SF
O2 STORAGE1174
A: 338 SF
BATHING ROOM1175
A: 194 SF
OFFICE1177
A: 178 SF
EXISTING STAIR1107
A: 33 SF
EXISTING LAV1148
1175A 1173A
1174A07
A501
OC
C
OC
C C
OC
C
OC
TYP
/01
A10 1
.2/
01A1
0 1.2
1108
1109 1110
1111
1112
1113 1114
1115
1116
1117 1118
1119
1161
11231122
1153
1154
11241125 1127
1128
1129
1130 1131
1132
1133
11341135
1136
1137
11381140
1139
1141
1142
1143
1144
1144
1146
1147
11491150
1151
1152
1157
11581159
1160
1162
11631164
1165
1166
1167
1168
1169
1170
A: 194 SF
OFFICE1171
1178
1179
118011811182
1183
1184
1185
A: 750 SF
P.T.1186
C
A
C A
A
C
OC
WFS
FP
= PATCH AND REPAIR HOLE IN DECKING OR WALL
= SEAL GAPS AROUND CONDUITS, PIPES, OR COLUMNS
= SEAL OPEN CHASE BETWEEN FLOORS
= ADD MINERAL WOOL IN DECK FLUTES & FIRESTOPPING AT TOP OF WALL
= PROVIDE SPRAY APPLIED FIRE PROOFING AT EXPOSED STEEL
B = SEAL AROUND DUCT PENETRATION
FIRE STOPPING KEYNOTE LEGEND:
• KEYNOTE TAGS REFER TO GENERAL AREA OFREQUIRED WORK, NOT QUANITY OFCONDITIONS.
• KEYNOTES ON PLAN DESCRIBE GENERALCONDITIONS OF REQUIRED FIRESTOPPING WORK.FULL SCOPE MUST BE DETERMINED BY CMTHROUGH FIELD SURVEY.
SHEET NUMBER:
PROJECT NO: DATE:
DRAWING TITLE:
ISSUED:
PROJECT:
KEY PLAN:
CONSULTANTS / DESIGN TEAM:
THE CARRIAGE HOUSE6 SOUTH PARK STREETLEBANON, NH 03766
1. ALL DIMENSIONS ARE TO FACE OF STUD ORFACE OF MASONRY, U.O.N. OPENINGS IN WALLSWITHOUT FRAMES ARE TO FACE OF STUD ORMASONRY, U.O.N. DIMENSIONS AT EXISTINGWALLS ARE TO EXISTING FINISH FACE, U.O.N.
2. ALL ANGLED WALLS ARE 45º, U.O.N.3. REFER TO CODE PLAN FOR EXTENT OF RATED
ENCLOSURES AND FIRE/SMOKEPROOFING.4. THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ALL DIMENSIONS PRIOR TOCOMMENCEMENT OF CONSTRUCTION. ANYDISCREPANCY BETWEEN CONSTRUCTIONDOCUMENTS AND FIELD CONDITIONS IS TO BEPROMPTLY COMMUNICATED TO ARCHITECT FORCLARIFICATION.
5. REPAINT ALL PAINTED SURFACES IN 1968PORTION OF BUILDING WITH 1 COAT OFPAINT. REPAINTING MATERIALS TO BEPROVIDED BY OWNER, INSTALLED BYCONTRACTOR. REWAX ALL EXISTING ANDNEW VCT FLOORING IN 1968 PORTION OFBUILDING AT COMPLETION OF WORK.
NEW DOOR AND FRAME
EXISTING DOOR TO REMAIN
PLAN N
ORT H
2HR RATED PARTITIONOR FIRE WALL
1HR RATED PARTITION
SHEET NUMBER:
PROJECT NO: DATE:
DRAWING TITLE:
ISSUED:
PROJECT:
KEY PLAN:
CONSULTANTS / DESIGN TEAM:
THE CARRIAGE HOUSE6 SOUTH PARK STREETLEBANON, NH 03766
1. ALL DIMENSIONS ARE TO FACE OF STUD ORFACE OF MASONRY, U.O.N. OPENINGS IN WALLSWITHOUT FRAMES ARE TO FACE OF STUD ORMASONRY, U.O.N. DIMENSIONS AT EXISTINGWALLS ARE TO EXISTING FINISH FACE, U.O.N.
2. ALL ANGLED WALLS ARE 45º, U.O.N.3. REFER TO CODE PLAN FOR EXTENT OF RATED
ENCLOSURES AND FIRE/SMOKEPROOFING.4. THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ALL DIMENSIONS PRIOR TOCOMMENCEMENT OF CONSTRUCTION. ANYDISCREPANCY BETWEEN CONSTRUCTIONDOCUMENTS AND FIELD CONDITIONS IS TO BEPROMPTLY COMMUNICATED TO ARCHITECT FORCLARIFICATION.
5. REPAINT ALL PAINTED SURFACES IN 1968PORTION OF BUILDING WITH 1 COAT OFPAINT. REPAINTING MATERIALS TO BEPROVIDED BY OWNER, INSTALLED BYCONTRACTOR. REWAX ALL EXISTING ANDNEW VCT FLOORING IN 1968 PORTION OFBUILDING AT COMPLETION OF WORK.
NEW DOOR AND FRAME
EXISTING DOOR TO REMAIN
PLAN N
ORT H
2HR RATED PARTITIONOR FIRE WALL
1HR RATED PARTITION
C
A A
C
A
A
A
A
C
A
A
OC
OC
OC
C B
B
B
B
BC
C
C
C
A40101
SIM
A40103
SIM
A: 1274 SF
CAFETERIA2103
A: 997 SF
CORRIDOR2102
07A501
OC
OC
OC
OC
C
OC
OC
CAD
C
C
OC
OCOC
C C
OC
C
OC
OCA
C
AAAAAA
C
A
OC
C
A
A
A
A A
A
TYP
/01
A10 2
.2/
01A1
0 2.2
2089
2090
2091 2092
2093
2094
2095 2096
2097
2098 2099
2100 2101
2106
2125
2105
2108
2107 2109
2110
2111
2112
2113
2114
2115
2116
2117
2118
2104
2122
2123
2124
2126
21272128
2129
2130
2131
2132
2133
2134
2135A: 338 SF
BATHING ROOM2140
A: 59 SF
MEDICATIONSTORAGE
2137
2141
2142
2143
214421452146
2147
2148
2149
OC
A
A
WFS
WFS
A
C
OC
WFS
FP
= PATCH AND REPAIR HOLE IN DECKING OR WALL
= SEAL GAPS AROUND CONDUITS, PIPES, OR COLUMNS
= SEAL OPEN CHASE BETWEEN FLOORS
= ADD MINERAL WOOL IN DECK FLUTES & FIRESTOPPING AT TOP OF WALL
= PROVIDE SPRAY APPLIED FIRE PROOFING AT EXPOSED STEEL
B = SEAL AROUND DUCT PENETRATION
FIRE STOPPING KEYNOTE LEGEND:
• KEYNOTE TAGS REFER TO GENERAL AREA OFREQUIRED WORK, NOT QUANITY OFCONDITIONS.
• KEYNOTES ON PLAN DESCRIBE GENERALCONDITIONS OF REQUIRED FIRESTOPPING WORK.FULL SCOPE MUST BE DETERMINED BY CMTHROUGH FIELD SURVEY.
SHEET NUMBER:
PROJECT NO: DATE:
DRAWING TITLE:
ISSUED:
PROJECT:
KEY PLAN:
CONSULTANTS / DESIGN TEAM:
THE CARRIAGE HOUSE6 SOUTH PARK STREETLEBANON, NH 03766
1. ALL DIMENSIONS ARE TO FACE OF STUD ORFACE OF MASONRY, U.O.N. OPENINGS IN WALLSWITHOUT FRAMES ARE TO FACE OF STUD ORMASONRY, U.O.N. DIMENSIONS AT EXISTINGWALLS ARE TO EXISTING FINISH FACE, U.O.N.
2. ALL ANGLED WALLS ARE 45º, U.O.N.3. REFER TO CODE PLAN FOR EXTENT OF RATED
ENCLOSURES AND FIRE/SMOKEPROOFING.4. THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ALL DIMENSIONS PRIOR TOCOMMENCEMENT OF CONSTRUCTION. ANYDISCREPANCY BETWEEN CONSTRUCTIONDOCUMENTS AND FIELD CONDITIONS IS TO BEPROMPTLY COMMUNICATED TO ARCHITECT FORCLARIFICATION.
5. REPAINT ALL PAINTED SURFACES IN 1968PORTION OF BUILDING WITH 1 COAT OFPAINT. REPAINTING MATERIALS TO BEPROVIDED BY OWNER, INSTALLED BYCONTRACTOR. REWAX ALL EXISTING ANDNEW VCT FLOORING IN 1968 PORTION OFBUILDING AT COMPLETION OF WORK.
NEW DOOR AND FRAME
EXISTING DOOR TO REMAIN
PLAN N
ORT H
2HR RATED PARTITIONOR FIRE WALL
1HR RATED PARTITION
SHEET NUMBER:
PROJECT NO: DATE:
DRAWING TITLE:
ISSUED:
PROJECT:
KEY PLAN:
CONSULTANTS / DESIGN TEAM:
THE CARRIAGE HOUSE6 SOUTH PARK STREETLEBANON, NH 03766
1. ALL DIMENSIONS ARE TO FACE OF STUD ORFACE OF MASONRY, U.O.N. OPENINGS IN WALLSWITHOUT FRAMES ARE TO FACE OF STUD ORMASONRY, U.O.N. DIMENSIONS AT EXISTINGWALLS ARE TO EXISTING FINISH FACE, U.O.N.
2. ALL ANGLED WALLS ARE 45º, U.O.N.3. REFER TO CODE PLAN FOR EXTENT OF RATED
ENCLOSURES AND FIRE/SMOKEPROOFING.4. THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ALL DIMENSIONS PRIOR TOCOMMENCEMENT OF CONSTRUCTION. ANYDISCREPANCY BETWEEN CONSTRUCTIONDOCUMENTS AND FIELD CONDITIONS IS TO BEPROMPTLY COMMUNICATED TO ARCHITECT FORCLARIFICATION.
5. REPAINT ALL PAINTED SURFACES IN 1968PORTION OF BUILDING WITH 1 COAT OFPAINT. REPAINTING MATERIALS TO BEPROVIDED BY OWNER, INSTALLED BYCONTRACTOR. REWAX ALL EXISTING ANDNEW VCT FLOORING IN 1968 PORTION OFBUILDING AT COMPLETION OF WORK.
NEW DOOR AND FRAME
EXISTING DOOR TO REMAIN
PLAN N
ORT H
2HR RATED PARTITIONOR FIRE WALL
1HR RATED PARTITION
A: 194 SF
OFFICE1177
F1 - B0 - W1 - C0
EXISTING CLOSET TO REMAIN
M4-I
A: 338 SF
BATHING ROOM1175
A: 19 SF
O2 STORAGE1174
A: 61 SF
MEDICATIONSTORAGE
1173
C38' - 0" A.F.F.
C28' - 0" A.F.F.
C28' - 0" A.F.F.
C2
8' - 0" A.F.F.
A: ?
??
C17' - 10" A.F.F.
C1
7' - 10" A.F.F.
NEW CEILING MOUNTEDCURTAIN TRACK SYSTEMAVE, SEE RCP'S C1
7' - 6" A.F.F.REFLECTED CEILING PLAN LEGEND:
2x4 ACOUSTICCEILING TILE, SEE FINISHLEGEND FOR TYPE
2x2 DROP-INLIGHT FIXTURE
RECESSED CAN FIXTURE
2x4 DROP-INLIGHT FIXTURE
LOUVER/GRILLE, SEE M DWGS
1x4 SURFACE MOUNTEDLIGHT FIXTURE
HEI
GH
T, S
EE S
CH
ED.
SEE SCHED.
WIDTH
HEI
GH
T, S
EE S
CH
ED.
SEE SCHED.
WIDTH
6"6"
8"3'
- 6"
MAX
FLUSH1/4" = 1'-0"
F HALF GLASS1/4" = 1'-0"
G
` TYPE S-2GLAZING
FRAME TYPE F21/4" = 1'-0"
F2
HEI
GH
T, S
EE S
CH
ED.
SEE SCHED.
WIDTH
4"
2" 2"
HM FRAME
SHEET NUMBER:
PROJECT NO: DATE:
DRAWING TITLE:
ISSUED:
PROJECT:
KEY PLAN:
CONSULTANTS / DESIGN TEAM:
THE CARRIAGE HOUSE6 SOUTH PARK STREETLEBANON, NH 03766
P:\14-229 Grafton County Nursing\_Drawings\Architecture\4 - CD\2014-09-22 Base Files for WV\14-229GraftonCountyNursingHome_Central_zbrock-banwellllogo(grayscale)-1711576.tif
P:\14-229 Grafton County Nursing\_Drawings\Architecture\4 - CD\2014-09-22 Base Files for WV\14-229GraftonCountyNursingHome_Central_zbrock-banwellllogo(grayscale)-1711576.tif