Top Banner
1 GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II) 2014-2017 PREPARED BY: DISTRICT PLANNING CO-ORDINATING UNIT (DPCU) November 2014
278

GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

Aug 14, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

1

GOVERNMENT OF GHANA

ELLEMBELLE DISTRICT ASSEMBLY

DRAFT

MEDIUM-TERM DEVELOPMENT PLAN

UNDER THE

GHANA-SHARED GROWTH DEVELOPMENT AGENDA

(GSGDA II) 2014-2017

PREPARED BY: DISTRICT PLANNING CO-ORDINATING UNIT (DPCU)

November 2014

Page 2: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

2

Table of Contents GOVERNMENT OF GHANA ................................................................................................................. 1

EXECUTIVE SUMMARY .................................................................................................................................. 8

INTRODUCTION ............................................................................................................................................. 8

METHODOLOGY ............................................................................................................................................ 9

SUMMARY OF KEY OBJECTIVES ................................................................................................................... 11

INDICATIVE BUDGET ................................................................................................................................... 13

EXPECTED OUTCOME OF THE 2014 – 2017 DMTDP ................................................................................... 13

PERFORMANCE REVIEW.............................................................................................................................. 15

THEMATIC AREA: INFRASTRUCTURE AND HUMAN SETTELMENT DEVELOPMENT .................................... 18

Thematic Area: Accelerated Agricultural Modernization and Sustainable Natural Resource Management

.................................................................................................................................................................... 20

Thematic Area: Transparent & Accountable Governance .......................................................................... 27

Thematic Area: Transparent & Accountable Governance .......................................................................... 31

Thematic Area: Oil and Gas Development .................................................................................................. 33

Expenditure Pattern .................................................................................................................................... 35

1.2 ANALYSIS OF PERFORMANCE REVIEW ........................................................................................... 37

1.2.1 Accelerated Agricultural Modernization and Sustainable Natural Resource Management .............. 38

1.2.2 Oil and Gas Development ........................................................................................................... 39

1.2.3 Enhancing Competitiveness of Ghana’s Private Sector .............................................................. 39

1.2.4 Infrastructure and Human Settlements ...................................................................................... 40

1.2.5 Human Development, Productivity and Employment ................................................................ 41

1.2.6 Transparent and Accountable Governance ................................................................................ 41

1.3 OTHER INTERVENTIONS .................................................................................................................... 42

1.3.1 Tandan Bamboo Biomass Project ............................................................................................... 42

1.3.2 Ghana Social Opportunities Project (GSOP) ............................................................................... 42

1.3.3 Social Protection & Vulnerability Aspect of GSOP ...................................................................... 43

1.4 Gaps / Challenges Identified in the Implementation of the DMTDP 2010-2013 ........................... 45

Lessons learnt during implementation of 2010 – 2013 DMTDP ................................................................. 46

SCORING SCALE ........................................................................................................................................... 47

1.6 SUMMARY OF KEY DEVELOPMENT PROBLEMS .............................................................................. 49

1.5 DISTRICT PROFILE /CURRENT SITUATION OF THE DISTRICT .......................................................... 50

1.5.1 Physical and Natural Environment .............................................................................................. 50

Page 3: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

3

1.5.2 Location and Size ........................................................................................................................ 50

1.5.3 Climate ....................................................................................................................................... 50

1.5.4 Relief and Drainage ............................................................................................................................ 51

1.5.5 Vegetation .......................................................................................................................................... 52

1.5.6 Soil Type ...................................................................................................................................... 52

1.5.7 Tourism ....................................................................................................................................... 53

1.5.6 Condition of the Natural Environment ....................................................................................... 53

1.5.7 Deforestation ............................................................................................................................. 54

1.5.8 Mining and Quarrying ................................................................................................................ 54

1.5.9 Bushfires and Soil Erosion ........................................................................................................... 54

1.5.10 CULTURE...................................................................................................................................... 55

1.5.10.1 Religion and Ethnicity ................................................................................................................ 55

1.1 Traditional Set-up ................................................................................................................................ 55

1.5.11 Culture and Festivals ................................................................................................................... 55

1.5.12 SPATIAL ANALYSIS / SETTLEMENT ................................................................................................... 56

Annex 2: Scalogram..................................................................................................................................... 57

1.5.13 Agriculture .................................................................................................................................. 58

1.5.13.1 Land ......................................................................................................................................... 58

1.5.13.2 Soils ......................................................................................................................................... 58

1.5.13.3 Cropping .................................................................................................................................. 58

1.5.13.4 Coconut Sector ........................................................................................................................ 58

1.5.13.5 Rubber ..................................................................................................................................... 59

1.5.13.6 Cocoa ....................................................................................................................................... 59

1.5.13.7 Poultry and Livestock Production ........................................................................................... 59

1.5.13.8 Fishing and Fish Farming ......................................................................................................... 60

1.5.13.8 Manufacturing Industry .......................................................................................................... 60

1.5.13.8 Energy ..................................................................................................................................... 60

1.5.13.9 Tourism ................................................................................................................................... 61

1.5.14 Transport Infrastructure ............................................................................................................. 63

1.5.15 Major Town and Facilities/Activities ........................................................................................... 64

1.6 Food Security.................................................................................................................................. 65

1.7 Governance ..................................................................................................................................... 65

DISTRICT DEPARTMENTAL ORGANOGRAM ................................................................................................ 67

Page 4: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

4

1.9 Composition of the District Assembly ............................................................................................. 68

1.11 District Sub – Structure ................................................................................................................... 68

1.12 Traditional Authority ....................................................................................................................... 69

1.13 Administration of Justice ................................................................................................................ 70

1.14 NGO/Civil Society ............................................................................................................................ 70

1.15 7PRIVATE SECTOR ............................................................................................................................. 71

5.8 Assembly Finance .................................................................................................................................. 71

Problems of Revenue Collection ................................................................................................................. 72

Expenditure Pattern .................................................................................................................................... 72

1.16 Local Economic Development ......................................................................................................... 73

1.17 ACCESSIBILITY TO SOCIAL SERVICES ................................................................................................. 73

Educational Characteristics ......................................................................................................................... 73

1.1.2 ENROLMENT by Gender (2013/2014) ............................................................................................. 75

1.1.3 TEACHER POPULATION: trained & untrained (2013/2013) ............................................................... 75

1.17 Youth and Sports ............................................................................................................................. 76

1.18 HEALTH SITUATION ......................................................................................................................... 78

1.18.1 Health Structure ....................................................................................................................... 78

1.18.2 MAIN PROBLEMS OF THE HEALTH SECTOR IN THE DISTRICT ..................................................... 80

1.18.3 KEY ACHIEVEMENTS .................................................................................................................... 80

1.18.4 OPD CASES .................................................................................................................................. 81

1.18.5 Health Financing ......................................................................................................................... 82

1.19 Water and Sanitation ...................................................................................................................... 83

1.19.1 Water Facilities ........................................................................................................................... 83

1.20 VULNERABILITY ANALYSIS ............................................................................................................... 85

1.21 HIV/AIDS .......................................................................................................................................... 86

1.22 GENDER ........................................................................................................................................... 87

1.23 INFORMATION AND COMMUNICATION TECHNOLOGY (ICT) ......................................................... 88

1.24 SECURITY ......................................................................................................................................... 88

1.25 DISASTER ......................................................................................................................................... 88

1.26 WATER SECURITY ............................................................................................................................ 89

1.27 MIGRATION (IMMIGRATION & EMIGRATION) ................................................................................ 89

2.0 CHAPTER TWO ..................................................................................................................................... 90

2.1 Prioritization of Development Issues ............................................................................................... 90

Page 5: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

5

OUTCOME OF COMMUNITY ENGAGEMENT FOR THE MTDP (2014-2017) ................................................ 90

AREA COUNCIL: NKROFUL ........................................................................................................................... 90

KIKAM AREACOUNCIL ................................................................................................................................. 92

ASASETRE AREA COUNCIL ........................................................................................................................... 93

AWIEBO-BASEKE AREA COUNCIL. ............................................................................................................... 94

ESIAMA AREA COUNCIL .............................................................................................................................. 96

AIYINASE AREA COUNCIL ............................................................................................................................ 98

ATUABO AREA COUNCIL ........................................................................................................................... 100

2.1.1 Prioritized development issues under the MTDPF 2014-2017 ...................................................... 102

2.2 POCC ANALYSIS ............................................................................................................................. 104

2.2.1 ENHANCING COMPETIVENESS IN GHANA’s PRIVATE SECTOR ..................................................... 104

2.2.2 ACCELERATED AGRICULTURE MODERNIZATION AND SUSTAINABLE NATURAL RESOURCE

MANAGEMENT.......................................................................................................................................... 108

2.2.3 Oil and Gas Development ......................................................................................................... 111

2.3.4 INFRASTRUCTURE AND HUMAN SETTLEMENTS DEVELOPMENT ............................................. 112

2.3.5 HUMAN DEVELOPMENT, PRODUCTIVITY AND EMPLOMENT ................................................... 115

2.3.5 TRANSPARENT AND ACCOUNTABLE GOVERNANCE ................................................................. 120

3.0 CHAPTER THREE ................................................................................................................................ 123

3.1 DEVELOPMENT GOAL, OBJECTIVES AND STRATEGIES ...................................................................... 123

DEVELOPMENT FOCUS .............................................................................................................................. 123

3.2 DISTRICT DEVELOPMENT GOAL........................................................................................................ 123

GSGDA II OBJECTIVES AND STRATEGIES ................................................................................................... 124

3.3 Formulation of Development Programmes .................................................................................. 134

3.4 CROSS CUTTING DEVELOPMENT PROGRAMMES ......................................................................... 141

3.5 LOCAL ECONOMIC DEVELOPMENT ............................................................................................... 141

3.6 Rural Enterprise Project (REP)....................................................................................................... 141

3.7 International Network for Bamboo and Rattan (IMBAR) ............................................................. 141

3.8 HIV/AIDS ............................................................................................. Error! Bookmark not defined.

3.9 CLIMATE CHANGE .................................................................................... Error! Bookmark not defined.

3.10 SOCIAL PROTECTION ..................................................................................................................... 141

3.11 ENVIRONMENT AND CLIMATE CHANGE ....................................................................................... 142

3.11.1 Ghana Wildlife Society .............................................................................................................. 142

3.11.2 ........................................................................................................................................................ 142

Page 6: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

6

Coastal Sustainable Landscapes Projects (CSLP) ....................................................................................... 143

3.11.3 GREEN ECONOMY ..................................................................................................................... 145

CHAPTER 4 ................................................................................................................................................ 147

PROGRAMME OF ACTION ......................................................................................................................... 147

4.0 THEMATIC AREA: Human Development, Productivity & Employment ......................................... 147

Education. ................................................................................................................................................. 147

4.1 THEMATIC AREA: Accelerated Agriculture Modernization And Sustainable Natural Resource

Management. ............................................................................................................................................ 162

Agriculture ................................................................................................................................................ 162

4.2 THEMATIC AREA: Human Development, Productivity & Employment ...................................... 168

HEALTH DIRECTORATE. ............................................................................................................................. 168

4.4 THEMATIC AREA: Transparent and Accountable Governance. ................................................... 174

Non-Formal Education Division. ............................................................................................................... 174

4.5 THEMATIC AREA: Transparent and Accountable Governance. ................................................. 175

Internal Audit ............................................................................................................................................ 175

National commission for civic education .................................................................................................. 177

GHANA POLICE SERVICE ............................................................................................................................ 178

4.6 THEMATIC AREA: Infrastructure and Human Settlement Development ................................. 180

Water And Sanitation................................................................................................................................ 180

4.7 THEMATIC AREA: Infrastructure and Human Settlement Development .................................. 181

Road Infrastructure ................................................................................................................................... 181

CHAPTER 5 ................................................................................................................................................ 183

5.0 ANNUAL ACTION PLAN FOR 2014 ................................................................................................. 183

5.1 ANNUAL ACTION PLAN 2015......................................................................................................... 199

5.4 ANNUAL ACTION PLAN FOR 2016 ................................................................................................. 218

5.5 ANNUAL ACTION PLAN FOR 2017 ................................................................................................. 237

5.6 INDICATIVE FINANCIAL PLAN 2014 – 2017 ................................................................................... 256

4.10.1 Financial Control Mechanism ....................................................................................................... 257

Sector Budget from 2014-2017 ................................................................................................................. 258

CHAPTER 6 ................................................................................................................................................ 270

MONITORING AND EVALUATION .............................................................................................................. 270

6.1 Monitoring and Evaluation Arrangements ................................................................................... 270

6.1.2 Monitoring Report .................................................................................................................... 270

Page 7: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

7

6.1.3 Monitoring Framework ............................................................................................................. 270

CHAPTER 7 ................................................................................................................................................ 273

COMMUNICATION STRATEGY ................................................................................................................... 273

7.1 Introduction ...................................................................................................................................... 273

7.2 Expected Roles/Responsibilities of stakeholders in the plan implementation .................................. 274

7.2.1 Ellembelle District Assembly ............................................................................................................ 275

7.2.2 Executive Committee ....................................................................................................................... 276

7.2.3 Sub-Committee ................................................................................................................................ 276

7.2.4 Decentralized Departments/Agencies ............................................................................................. 276

7.2.5 Chiefs, Opinion Leaders and Traditional Authorities ....................................................................... 276

7.2.6 Non-Governmental Organizations (NGOs)/ Development Partners ............................................... 276

7.2.7 Communities .................................................................................................................................... 277

7.3 Strategies for promoting dialogue/management of public expectations concerning services .......... 277

7.4 Conclusion ..................................................................................................................................... 278

Page 8: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

8

EXECUTIVE SUMMARY

INTRODUCTION The Ellembelle District Assembly (EDA) was created in December 2007 by L.I. 1918 and

inaugurated in February 2008. It was carved out of the then Nzema East District, now Nzema

East Municipal. The District has undergone the implementation of two (2) Medium Term

Development Plan namely GPRS II (2006 – 2009) and GSGDA I (2014-2017), of which the former

was an adopted plan from the erstwhile Nzema East District Assembly now a Municipality.

During the previous planning regime, the EDA strategized to leverage the implementation of

the GSGDA I within the context of the strategies, objectives, as well as overarching goal of the

Government’s Comprehensive National Medium Term Development Policy Framework (2010 –

2013), referred to as, the Ghana and Shared Growth Development Agenda (GSGDA 1).

Despite its few years in existence, the District managed and complemented the national efforts

of achieving a middle income status with interventions geared towards job creation and

increased household incomes as well as general living condition of the people. The priority

areas were improved road network, improved sanitation conditions, improved access to safe

water, enhanced social services especially health and education, improved financial support,

farm inputs for both crop farming and fishing, and Employment creation, sub-structure

development, improved literacy level, gender equality and HIV prevention as spelt out under

the seven thematic areas of Priority namely Ensuring and Sustaining macroeconomic stability,

Enhancing Competiveness in Ghana’s Private Sector, Accelerated agriculture modernization and

Sustainable Natural Resource Management, Oil and Gas Development, Infrastructure, Energy

and Human Settlement, Transparent and accountable governance and Human Development,

Productivity, productivity and Employment

Page 9: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

9

On the backdrop that the District was implementing its first MTDP, much as it tried to

improve the lives of the people through the implementation of the programmes and

projects in 2010-2013 DMTD Plans, it was confronted with a countless number of challenges

and constraints. Significant among these are inadequate and untimely release of

Government and Donor funds, limited Human Resources, low sub structures participation,

inadequate data for planning purposes, high cost of goods and services, inadequate internal

revenue among others.

Against this background, the District Assembly in consultation with its stakeholders has re-

aligned the strategies within the context of the Ghana Shared Growth and Development

Agenda (GSGDA 1) 2010-2013 to harness all facets of resources both internal and external

to implement programmes and projects with the view of complementing government’s

growth inducing policies and programmes under the following priorities and thematic areas:

1. Ensuring and Sustaining Macroeconomic Stability;

2. Enhancing Competitiveness of Ghana’s Private Sector;

3. Accelerated Agriculture Modernization and Sustainable Natural Resource Management;

4. Oil and Gas Development;

5. Infrastructure and Human Settlements;

6. Human Development, Productivity and Employment;

7. Transparent and Accountable Governance

In preparing this Medium Term Development Plan, the Ellembelle District in strict

adherence to the guidelines from the National Development Planning Commission (NDPC),

employed a series of planning workshops, meetings and community interface involving all

key stakeholders viz. community members, opinion leaders, Assembly members, NGOs,

DPCU members, political parties and the private sector. The draft plan was presented to the

General Assembly for popular debate and adoption in compliance with the NDPC guidelines.

METHODOLOGY A participatory process was used in preparing this plan. The processes were based on the

guidelines provided by the National Development Planning Commission in the preparation

of the 2014 – 2017 MTDPs. In the plan preparation process, the DPCU adopted a multi –

stage method used in plan preparation. These steps included:

Page 10: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

10

1. DPCU meetings to discuss the objectives of the plan and to inform members of their

respective roles in the preparation and compilation of the plan.

2. Collection of data on existing situation, problems and plans of the decentralized and

centralized departments in the district.

3. Collation of Departmental information on the performance for the 2010 – 2013 DMTDP

based on the GSGDA 1.

4. Collecting community perspectives on current needs, levels of household income and

expenditure and aspiration of the sub- districts through participatory process.

5. Data collation using secondary sources of Data in addition to Institutional Surveys and

Interviews with target populations, validation and analysis, which involved holding two

workshops at Nkroful, the District Capital

6. Preparation of the draft DMTDP (2014 – 20117) document for public hearing

7. Public hearing on both draft plan and development options (spatial plans) conducted at

Nkroful with key stakeholders like DPCU, Spatial Planning Committee (SPC) and other

key departmental heads.

8. Presentation of first Draft to the general Assembly.

9. Submission of Draft Plan to NDPC for comments and corrections

10. Finalization of the plan document after the public hearing and Public hearing for the

adoption of the Draft Plan

This plan document consists of seven (7) Chapters as contained in the NDPC guidelines and

proceeded by the executive summary. These include:

Chapter 1: Performance Review /Profile/Current Situation/Baseline

Chapter 2: Development Priorities

Chapter 3: Development Goals, Objectives and Strategies

Chapter4: Development Priorities

Chapter 5: District Annual Action Plans

Chapter6: Monitoring and Evaluation Arrangements

Chapter 7: Communication Strategies

Page 11: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

11

MISSION

The Ellembelle District Assembly exists to ensure the total development of the District

through effective management of resources in collaboration with Ministries, Department,

Agencies and Non-Governmental Organizations in order to improve the quality of life of the

people in the District.

VISON

The vision of Ellembelle District is to improve livelihood through Equitable Growth and

Sustainable development.

SUMMARY OF KEY OBJECTIVES - To improve access to quality social services in the District

- To harness environmental sustainability in development issues.

- To increase production and productivity in all sectors of the Local Economy

- To improve private sector participation in development.

- To enhance Institutional arrangement for sectoral collaboration on poverty

reduction.

- To encourage indigenous potential resource mobilization towards Local

Economic Development.

- To ensure local Content and local participation across the oil and gas value

chain.

Against the background of the overriding goal and the key objectives, the District

Medium Term Development Plan (2014 – 2017) took cognizance of not only the

deprived nature of the District especially the northern part but also the administrative

and personnel needs confronting the administration of the District. Following the

consultation and town hall meetings held at the community and the departmental

levels, the district was able to fashion out the developmental needs of the people in the

district based on major sectors of the District’s economy. This informs the District of the

scope and directions of the projects and programmes that fed into the 2014 – 2017

DMTDP. Therefore, the scope and direction of the projects and programmes as

identified by the Ellembelle District Assembly covers health, education, water and

Page 12: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

12

sanitation, Agriculture, roads, revenue mobilization and expenditure controls, gender

equality, ICT and HIV&AIDS prevention as well as programmes that will empower the

vulnerable and the disadvantaged in the District. Also, issues of climate change,

population, housing, electricity, telecommunication, tourism development and

establishment and strengthening the capacity of various departments and their staffs in

the district are well captured and planned for. These projects and programmes are

captured in the broad Composite of Programme of Action (page 146-180) which covers

the 4 – year planning period and stated under the thematic areas of the Medium Term

Development Policy Framework MTDPF 2014 – 2017). It is based on the prioritized set of

activities of the district and their respective cost. Annual Action plans are also provided

in details (page 181-252) and relate to the various activities, timeframe, output

indicators, annual budgets and implementation agencies.

IIId. SUMMARY OF DISTRICT STRATEGIES

To ensure the realization of the overall goal and objective, the District strategy shall

focus on the underlisted Areas:

- Facilitating support for equitable Human Resourced Development

- Increasing production and promoting sustainable livelihood

- Ensuring good governance

- Encouraging the active involvement of the Private Sector as a key-partner in the

development of the District.

- Ensuring gender equity

- Providing special programmes for the vulnerable and excluded

- Facilitating the provision of Basic Services and infrastructural development.

Also a comprehensive monitoring and evaluation plan has been developed to ensure

the effective and smooth implementation of the MTDP (2014 – 2014). By the

Monitoring and Evaluation Plan, the responsible actors are to track and assess the

action plan, the respective activities, the time frame, the personnel and materials

required and supplied and the financial flow and cost involved as well as the progress of

work and the technical details of the projects and programmes formulated in this plan.

Page 13: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

13

INDICATIVE BUDGET The total budget for the planned activities is estimated at GH₵56,679,754.00 for the 4 –

year period of the plan. The distribution is captured in the Composite Programme of

Action of the MTDP (2014 – 2017). The implementation of the plan is expected to be

funded predominantly through Governmental sources like the DACF, (including the

District Assembly) and Non- Governmental Organizations and Agencies within and

outside the district. Specific sources of funds for the implementation of the plan will

include Internal Generated Funds (IGF), District Assembly Common Fund (DACF) and

grants from Government of Ghana, NGOs, and other Development Partners (DPs) in

and outside the District.

EXPECTED OUTCOME OF THE 2014 – 2017 DMTDP All the projects and programmes of the MTDP (2014 – 2017) are planned and

formulated based on the overarching objective of the Ellembelle District Assembly.

Therefore the expected outcome of this plan will indicate:

Improved agricultural performance

Improved road conditions

Improved telecommunication facilities

Adequate employment opportunities for local people

Improved health delivery system

Improved educational performance

Increased and improved potable water supply

Reduced spread of HIV &AIDS

Enhanced and sustainable women participation in decision making at all levels

Improved environmental and sanitary conditions

Improved electricity coverage

Improved conditions of the vulnerable and the disadvantaged in the district

Effective population management

Increased internally generated revenue (IGR)

Ensured sound financial management

Strengthened institutional collaboration between the central administration

and the Decentralized departments of the District

Page 14: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

14

Improved judicial services delivery (rule of law adhered to)

Increased number of personnel and logistics of the District Assembly

In summary, it is expected that, the effective implementation and management of this

plan will result in poverty reduction, thereby leading to an increase in real income per

capita, greater awareness of gender equality, HIV&AIDS prevention, food security and

sustainable development as well as active community participation in the socio –

economic development of the district.

Page 15: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

15

PERFORMANCE REVIEW

1.0 THEMATIC AREA: INFRASTRUCTURE AND HUMAN SETTELMENT DEVELOPMENT

WATER & SANITATION

PROGRAMME/ACTIVITY LOCATION POLICY OBJECTIVE INDICATORS TARGET LEVEL OF ACHIEVEMENT REMARK

2010 2011 2012 2013

Training and formation of existing and old WATSANS respectively in 8 Communities

Aiyinasi, Asasetre, Nkroful/Teleku-Bokazo, Awiebo, Kikam, Asemko, Esiama, Tandan,

Accelerate the provision of affordable and safe water

Improved performance level of WATSANs

Existence of well-motivated WATSAN committees

Train 90% of WATSANs Committees

All WATSAN Committees were trained especially in project towns

Extension of Small Water System in neighboring communities of Beneficiary project towns.

A.B.Bokazo, Alabokazo,Anwia, Tandan,Akpandue

Accelerate the provision of affordable and safe water

All Neighboring Communities to be covered.

Only 30% of the beneficiary town did extension.

Construct new pipe systems for Highly populated areas

District Wide ,,, Mostly donor funded projects

Const. of Boreholes for communities within Aiyinasi North.

Selected Communities.

Ensure efficient Management of water resources

To cover all communities

Only 10% of the Communities were covered

Construction of 10 No. borehole for communities &

Selected Communities

,,, 100% coverage by end of

100% completed.

Page 16: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

16

Rehabilitation

planning period

Carry out mosquito control program.

District Wide Accelerate the provision and Improve Environmental Sanitation

Reduction in Sanitation related diseases.

Mosquitoes free district.

The activity is ongoing, hugely successful due to the support from AngloGold Company support during the later stage of the plan period.

Procure 5 refuse containers

Selected Communities

‘’ 100% 100% completed. But inadequate to supply the growing population

Identify suitable sites or the construction of the bays.

District wide ‘’ 80% coverage within the planning year

Carry out weekly stray animal arrest

District Wide ‘’ Largely unsuccessful due to financial commitment and weak bye laws.

Page 17: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

17

Construction of 16 Seater Aqua privy toilet

District Wide ‘’ 100% completed.

carry out spraying of sites

Selected Communities

Ongoing activity, need a lot of financial commitment

Organize education in schools on the need to keep public places clean

District Wide Ensure the development and implementation of health education as a component of all water and sanitation program

Educate communities on the need for clean environment

Selected Communities

,, Ongoing exercise.

Prepare IDs for those screened and passed fit.

District Wide ,, Routing activity. A lot of education still needed to make it successful.

Registration of all eating houses and owners

District wide ,, Not successful especially in the hinterland.

Intensive education and screening of food vendor

District Wide ,, Routine activity.

Auctioning of arrested animals

District Wide ,, Not successful. Weak bye-laws

Page 18: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

18

Inspection of existing slaughter houses to ascertain their state

Aiyinasi Ongoing, a routing activity.

Provide support for zoomlion service and activities

Nkroful 100% Statutory deduction

THEMATIC AREA: INFRASTRUCTURE AND HUMAN SETTELMENT DEVELOPMENT EDUCATION

PROGRAMME/ACTIVITY LOCATION POLICY OBJECTIVE INDICATORS TARGET LEVEL OF ACHIEVEMENT REMARK

2010 2011 2012 2013

Construction of 3-units classroom block.

Kumgbunli Adubriem Asomase Kwesikrom

Improve management of education service delivery

Improved learning conditions.

100% within planning period

100% completed. Inconsistency in the flow of funds.

Manufacturing of 300 dual school desk

Nkroful Increases students enrolment

100% 100% completed.

Construction of 3-unit classroom block with office, store and staff common room

Ankobra Akropong Adisekrom Esiama

100% 80% completed. Left with only Adisekrom

Construction of 1 No. 15 Unit office block.

Nkroful

100% 100% completed.

Page 19: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

19

Construction of 1 No. 4 Unit Classroom block, office and store room.

Kikam Meth. Lower Primary, Asemko D/A Primary School, Teleku-Bokazo D/A J.H.S , Nyaneba Model J.H.S Nkroful

Improve quality of teaching and learning

100% 50% completed. Poor resources flow.

Sponsor twenty (20) pupil teachers a year to become professional teachers

District Wide Improve teaching output.

50% Few teachers were sponsored. Not quite a lucrative venture.

Promote Science, Maths & English

District Wide Increase inclusive and equitable access to, and technology at all levels

100% within planning period.

Routine exercise by both DA and Education Directorate.

Provide for educational assistance

Selected schools 100% Routine exercise by both DA and Education Directorate.

Page 20: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

20

Thematic Area: Accelerated Agricultural Modernization and Sustainable Natural Resource Management AGRIC

ACTIVITY LOCATION POLICY OBJECTIVE INDICATORS TARGET LEVEL OF ACHIEVEMENT

REMARK

2010 2011 2012 2013

Conduct M&E Exercise District wide Improve Agricultural Productivity

Improved farming practices

70% 50% completed. Ongoing

Carry out 100 demons. On row planting for optimum yields for 5000 farmers by Dec.,2013

Selected farms Promote selected crop development for food security, export and industry

Increased farm produce.

100% 30% Farmers complained as being laborious and time wasting

Carryout 10 demons on improved practices to increase yields of vegetables by 2012.

Selected farms Improved institutional coordination for agricultural development

80% 40% High cost of fertilizers and other farm inputs hindered farmers interest

Carry out 30 demons on improved practices to increase yields of maize and cowpea

40 communities

100% 45% High cost of fertilizers and other farm inputs hindered farmers interest

Page 21: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

21

Conduct 500 AEAS Supervision

District wide 100% 38% High cost of fuel and few AEAs

Train 100 pig farmers on improved production and management skills by Sept, 2011

10 communities

Improved expertise of farmers

42% Farmers prefer the local breeds to the exotic ones since no proper care is given as they fend for themselves

Organize 150 Field day activities

District wide 48% Lack of resources to organize field days

Organize a 2 day workshops on marketing of exportable agricultural commodities for 50 producers annually

District wide Improved expertise on marketing

100% Lack of funds to complete the activity

Conduct post-harvest training

District wide 85%300 farmers were trained in post-harvest losses in maize and cassava

Implement Inland Valley Rice Project

Kumgbunli Increased rice produce

70% 50% Project at a standstill as the contractor abandoned the earth works

Vaccinate 1,600 poultry &2000 livestock

District wide 100% 47% Few veterinary staff at

Page 22: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

22

post

Train farmers associations

District wide 100% 62% 10 active FBOs are operating

Educate 500 cocoa farmers and Conduct disease surveillance

Selected farms 100% 85% Inputs from CODAPEC were used to train farmers

Treat 1500 clinical/Surgical cases

85% 46% Few veterinary staff

Conduct Training on Bee-keeping

Selected farms 50% Inadequate fnd to execute project

Train 20 management and field staff in ICT skills for effective extension delivery by June,2012

Menzezor 40% of total staff

Only two staff have been trained

Train 1 staff in socio-economic analysis for District Agric. Development Planning and Management

Menzezor 100% Not executed due to lack of funds

Train 1 staff on Market Information Collection

Menzezor 100%

Educate 10,000 people on public health in connection with H1N1 influenza annually

District wide 100% 65% Support was given by RADU

Page 23: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

23

Train 10 caterers on fortification of staples during processing and linkage to school feeding program

100% Lack of resources to organize the training

Train 200 producers, processors and marketers on post-harvest handling of perishable

100% 25%, inadequate resources.

HEALTH THEMATIC AREA: INFRASTRUCTURE AND HUMAN SETTELMENT DEVELOPMENT

THEMATIC AREA ACTIVITY LOCATION OBJECTIVS INDICATOR TARGET PERFORMANCE RATE/LEVEL OF IMPLEMENTATION

REMARKS

Human resource development, productivity and employment

Community education on prevention of malnutrition, malaria, tuberculosis, HIV/AIDS and other

District wide Intensify prevention and control of communicable diseases

Community sensitizations carried out in Aiyiansi, Asasetre, Kamgbunli, Esiama, Asanta

Mothers at CWC, ANC, OPD clients, Congregations and general public

100% Activities well patronized

Page 24: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

24

communicable diseases

Education on safe food practices

Ankobra FM Churches, clinics, markets places

Improve governance, strengthen efficiency and effectiveness in health service

2 FM education carried out on Ankobra FM, West end radio 4 education at market places at Eikwe, Aiyinasi, Esiama and Asasetre

Food vendors 100% Very effective

Formation of healthy life style clubs in schools

NASS Esiama SEC TEC

Improve access to quality maternal, neonatal, child and adolescent health

2 clubs formed Students 100% Clubs in active due to students turn overs. To be reformed

TOT for club leaders on regenerative health

Selected schools

Intensify prevention of and control of communicable and non – communicable diseases

Selected schools 20 Club leaders 0% Lack of funds

Human development, productivity and employment

Celebrate world AIDS day

Nkroful Intensify prevention and control of communicable diseases

No of World AIDS days celebrated in district

General public

50%

Inadequate funding

Provision care and support for

District wide Increase access financial

Number of PLWHAs

PLWA 10 Inadequate funding

Page 25: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

25

people living with HIV/AIDS

accessibility to health care to protect the poor

registered with NHIS

Institute health walks in district

Sub district capitals

Intensify prevention and control of communicable diseases

No of communities/ institutions engaged in monthly health walks instituted in the district

Workers, Students and individuals

20 Esiama, Asasetre, Aiyinasi, Adamus workers etc

Implement National health promotion programs(Child health promotion weeks, NIDs, Measles immunization etc)

Communities Increase access to quality health care

% of children under five reached

Children under five

80% Activities carried out annually

Orientation of health staff on HIRD

DHMT Improve governance and strengthen efficiency and effectiveness in health service delivery

No of health workers trained

50 100% Health workers trained

Human development, productivity and

Promote Maternal and child survival

Communities Improve access to quality maternal,

No of PROMISE stakeholders meetings held

8 100% 2 stakeholders meetings held annually

Page 26: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

26

employment Excellence (PROMISE)

neonatal, child and adolescent health services

in district

Implement adolescent health programs in schools and communities

Health facilities and senior high schools

Improve access to quality maternal, neonatal, child and adolescent health service

No of adolescent clubs formed

4 50% 2 adolescent clubs formed(NASS and Aiyinasi health center)

Strengthen disease control and surveillance

Communities and health facilities

Intensify prevention of communicable and non-communicable diseases

No of Community based surveillance volunteers trained

100 50% 50 Community based volunteers trained

Renovation of health centers and staff quaters

Aiyinasi, Aidoosuazo, Asasetre Esiama

Improve governance and strengthen efficiency and effectiveness in health care delivery

No of health centers and staff quarters renovated

3 health centers 5 staff quarters

70% Aidoosuazo H/Center and staff quarters fully renovated Esiama Health Center and staff quarters renovated, 1 staff quarters of Asasetre Health center renovated

Construction of OPD block and expansion of dispensary

Nkroful and Asasetre Health centers

Improve access to quality health service

No OPD block constructed

1 OPD block at Nkroful 1 dispensary renovated

50% OPD block of Nkroful Health Center almost completed.

Page 27: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

27

Thematic Area: Transparent & Accountable Governance.

CENTRAL ADMINISTRATION

ACTIVITY LOCATION POLICY OBJECTIVE INDICATORS TARGET LEVEL OF ACHIEVEMENT

REMARK

2010 2011 2012 2013

Completion of school blk for Eikwe physically challenged school.

Eikwe Encourage public private partnerships in socio-economic development.

Improved sector performance

100%

completio

n by mid-

June 2012

100% completed, handed over

Construction of Science Lab.

Asanta 100% 100% completed. Funded by ENI

Renovation of dispensary at Asasetre not started.

Sustain mobile health service in he district

Communities Improve access to quality health care

No of communities reached with mobile health service

At least 50 60% Most communities are not reached

Organize annual health fairs

Nkroful, Aiyinasi

Improve access to quality health service

No of health fairs organized in a year

1 100% Health fairs organized at Esiama and Ayinasi

Page 28: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

28

before

Fed. 2012

Foundation

Construction of ICT Center

Nkroful 100%

before

Nov. 2011

100% completed, and handed over

Construction of Doctors Quarters at Eikwe

Eikwe Improved sector performance

100%

completed

in 2011

100% completed. Handed over

Promote sport and culture

District Wide Effective implementation of the Local Government Act

Routine activity, but mostly hindered by inadequate fund

Construct staff quarters at Esiama Nursing Training

Esiama 100%

completio

n by end

of 2010

100% completed, handed over

Fencing of DCE’s Bungalow and construction of 1No. boys quarters

Nkroful 100%

completed

by end of

2010

Not executed.

Purchase of Vehicle (Pick-Up)

By end of

2012

Not executed. Due to Inadequate funds

Page 29: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

29

Construction of 1No. Market and lorry park at Esiama.

Esiama Increased revenue

By end of

2013

Not executed.

Construct Administration Blk.

Nkroful - ongoing

Construct Low cost buildings for junior staffs

Nkroful - ongoing

Support Human Resource Training

District Wide Strengthens institution to offer support to ensure social cohesion at all levels of society

Improved productivity

- Routine activity, Mostly hindered by resources flow.

Rehabilitate Official vehicles

Nkroful Routine activity

Construction of 2-bedroom storey, semidetached quarters for staff

Nkroful 100%

completed

by end of

2010

80% completed.

Sensitize Community members on Negative effects of HIV/AIDS

District wide Reduced HIV/AIDS coverage

Conduct training on alternative sources of livelihood

Selected communities

Mainstream the concept of local economic development into planning at the District level

Page 30: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

30

Organize workshop for women groups on LED and how to access credit

Women groups

Enhanced living standard.

70% of

women

group to

benefit by

end of

plan

period

Few areas have been covered. Financial constraint.

Completion of 4-bedroom Guest house

Nkroful 100% by

end of

2010

100% completed

Maintenance of Street lights

District wide Improved productivity

Routing activity

Reshaping of (21Km) Akropong -Jica Bridge Feeder Roads.

Akropong 100%

completio

n by end

of 2012

100% completed

Rehabilitation of 5.8km road (GSOP)

First gate 100% completed and handed over.

Page 31: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

31

Thematic Area: Transparent & Accountable Governance.

Community Development/ Social Welfare

ACTIVITY LOCATION POLICY OBJECTIVE INDICATOR TARGET LEVEL OF ACHIEVEMENT

REMARK

2010 2011 2012 2013

Contribution and communal labor for the provision of services and teaching community women on the management of home and child

District Wide Facilitate equitable Access to good quality and affordable social services

Series of education programmes were conducted during the year under review eg. Teleku Bokazo, Menzezor & Baseke. However the exercise should be consistent.

Educate the communities on the ownership and the management of water project concept through WATSAN

Selected Communities

Considerable number of training has been conducted especially in beneficiary communities

Disseminate information and create a two way channel of communication between the people of the government so as to promote the

District Wide Strengthen institution to offer support to ensure social cohesion at all levels of society

30% out of the total communities targeted conducted. Adequate budget

Page 32: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

32

achievement of specific development of specific development target goals in the emerging oil era.

in needed to pursue the exercise

Alleviate vagrancy and criminality in the youth and liabilities of women in the district through the provision and transfer of employable skills towards self sufficiency

District Wide Soap making and pastries were conducted Aiyinasi. Other sources of employable skills should be explored.

Organize group meeting in all the 7 area Councils on women empowerment and capacity building

Selected Communities

Enhance women access to economic resources

Trainings were conducted at Nkroful within 2010-2013, extra resource needed

Educating selected groups in the 7 area councils on the management of income generating activity

Selected Communities

Organize site safety programs for 30 ‘Gallamsey’ operators

Nkroful

30 Galamsey operators were training within the period. Also about 250 galamsey workers benefitted from

Page 33: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

33

safety training.

Oil & Gas Activities

Thematic Area: Oil and Gas Development

ACTIVITY LOCATION POLICY OBJECTIVE INDICATORS TARGET LEVEL OF ACHIEVEMENT

REMARK

2010 2011 2012 2013

Organize regular meeting between stakeholders especially along coastal zone to discuss issues affecting them

Coastal Communities

Ensure the development of Oil and Gas Industry

Enhanced knowledge on Oil & Gas

80%

coverage by

end of 2013

40% completed.

Conduct education on Oil and Gas activities.

Selected Communities

Convert the opportunities offered by Oil and Gas industries to create decent jobs

Increased local participation in Oil & Gas industry.

100%

coverage by

end of plan

period

70% completed. Mostly done by Oil & Gas companies.

Set up Oil & Gas Sub-Committee for the District.

Nkroful Build the relevant capacity for the Oil and Gas industy.

‘’ By end of

2010

Page 34: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

34

1.1 Review of Assembly Finance

This section analyzes the revenue and expenditure pattern of the Assembly from 2011 –

2013. An examination of the sources of revenue indicates two main sources.

a) Internal Sources (own sources)

b) External Source

TABLE 1 Revenue Sources 2011 – 2013

Type 2011

Target

(GH₵)

2011 Actual

(GH₵)

% of

actu

al

2012

Target

(GH₵)

2012

Actual

(GH₵)

% of

actu

al

2013

Target

(GH₵)

2013

Actual

% of

actual

INTERNAL

Rate

-

5,135.26

1.4

7,450.00

48,983.36

5%

15,385.0

0

64,843.5

5

21%

Lands

-

139,627.30 39% 812,600 672,326.4

1

73% 801,400 41,160.0

0

13.1%

Fees and

Fines

- 53,920.04 15% 12,250.0

0

46,628.58 5.1% 16,250.0

0

40,456.3

0

13.1%

Licenses - 112,986.96 31% 110,115 104,804.8

2

11.4

%

97,450 162,341.

90

51.5%

Rent - 7,143.22 2% 36,870 6,701.54 1.0% 49,800. 6,443.80 2.0%

Investment - 25,360.00 7% - 82,984 9% 553,602 - -

Miscellaneo

us

-

15,626.00 4.3%

3,000.00

2,552.26

0.3% 3,000.00 - -

TOTAL - 359,798.78 100 982,285 918,352.3 100 1,506,80 315,243. 100%

Page 35: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

35

INTERNAL % 9 %% 7 5

External

Stool Lands

-

139,627.30

5.4%

812,600

672,326.4

1

19.3

%

801,400

41,160

9.3%

DACF - 2,111,754.9

5

81% 2,144,44

6.08

930,199.2

7

27% 1,704,31

3.92

41,160.0

0

9.3%

HIPC - 50,373.93 2% 50,000 292,978.1

6

8.4% 50,000 - -

Other

Grants (VIP

CBRDP)

-

302,234.30 12%

1,163,33

0

1,063,099

.37

31% 344,982 362,381.

38

81.1%

MRF - - - 500,000 519,103.6

1

15% 250,000 - -

TOTAL

EXTERNAL

2,603,990.4

8

100

%

4,670,37

6

3,477,706

.82

100

%

3,477,70

6.82

444,701.

38

100%

Reason for any deviation regarding achievements of set targets

Actions taken to remedy the situation during the period

Expenditure Pattern

The Expenditure of the district budget has been divided into recurrent and capital

Expenditure to conform to the conventional budget structure of the local government of

Ghana. The recurrent expenditure consists of personal emoluments, Travel and Transport

Page 36: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

36

Expenditures, General expenditure, maintenance, repairs and renewals as well as

miscellaneous. The capital expenditure consists of all expenditures made on Development

Projects and Programmes.

Table 2

EXPENDITURE HEAD 2011 % 2012 % 2013 %

Amount % Amount % Amount

Personnel

Emolument

226,169.10

18%

350,257.54

24%

107,938.26 10%

Travel and Transport 53,606.36 4.2% 38,524.64 3% 105,822.49 10%

General Expenditure 82,947.83 6.5% 100,505.51 7% 34,856.98 3%

Maintenance,

Repairs, and

Renewals

8,385.09

1%

3,578.50 0.2%

28,053.65 3%

Miscellaneous 104,240.66 8.2 79,842.91 5.4% 154,377.61 14.3%

Total Recurrent - - - - - -

Capital Development 801,928.60 63% 902,873.95 61.2% 651,029 60%

TOTAL EXPENDITURE 1,277,277.64

100% 1,475,583.05 100% 1,082,077.99 100%

Source: District Finance Department, 2013

Page 37: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

37

1.2 ANALYSIS OF PERFORMANCE REVIEW The Ellembelle District witnessed its first Medium Term Development Plan under the Ghana

Shared Growth Development Agenda after it was separated from the erstwhile Nzema East

District Assembly in 2008. Considerable number of programmes and projects were captured

with its corresponding activities with the aim to fast-track development in the entire

District.

There was a review exercise half way through the planned period and also for the annual

action plan phased out in the Plan. However this saw only a few changes in the entire plan.

New interventions came on board after the plan has been prepared which contributed

immensely towards development. All ongoing projects from previous plan were analyzed

and captured under the new development agenda to ensure harmonized development.

In order to make informed judgment about the performance of the District viz – a – viz the

state of development in the implementation of the projects and programmes set to

enhance the quality of life of the people in relation to the goal and objectives of the Ghana

Shared Growth Development Agenda (GSGDA 1), the Assembly through its District Planning

and Co-ordinating Unit (DPCU) reviewed the programmes and projects annually through the

use of the Annual Progress Reporting format in the Monitoring and Evaluation Guidelines.

However the human resource challenges faced during the planned period cannot grossed

over. Most of the department of the Assembly had not the full complement of staff

especially during the initial implementation stage.

The review revealed that, out of the eighty-nine (97) planned activities in the District

Medium Term Development Plan (DMTDP – 2010-2013), 35 were fully implemented, 26

partially implemented and the rest of 28 projects are still on- going at various levels of

completion. The delay was basically due to inadequate funds and other logistics.

The performance of the District under the GSGDA 1 thematic areas are analyzed below as

follows;

Page 38: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

38

1.2.1 Accelerated Agricultural Modernization and Sustainable Natural

Resource Management Under the Agricultural Sector there was increase in the yield of some staple crops, namely

Plantain, Maize, Rice, and Cocoyam, yam at a percentage of 10.0mt, 1.20, 1.5, 4.0, and 3.40

respectively for 2011. It also shut up in 2012 with 10.2mt, 1.25, 1.9, 4.2 3.40, 10, 5, 12, 2.5,

2, 0.10mt

Though there was increase it was not significant. This performance was mainly due to

irregular rainy pattern, global economic recession and low coverage of extension services.

Also must of the roads linking the forest zone to the other part of the District has poor

accessibility resulting extension services.

In the area livestock production namely Sheep, Goat, Pig, Poultry, Cattle the records stood

at, 8, 5, 8, 10, 2 for 2011. However all these products increased in 2012 without poultry, and

this was attributed to inadequate inputs supply (vaccines) to farmers.

The 2013 Annual Performance Report revealed that vegetable cultivation in the district was

generally low thus resources should be channeled into the sector for enhancement.

Also, the Fishing Industry which is among the main stays of the coastal communities saw a

drastic decline in stock from 0.14mt to 0.10mt in 2010 and 2011 respectively. This was

mainly attributed to Oil and Gas activities and bad fishing practices like light fishing.

On Sustainable Natural Resources Management, the District made some stride through the

support of development partners. The Amanzule Wetlands Conservation Area Project, Hen

Mpoanu and the CREMA project were project that contributed to sustaining the natural

resources in the District. The Hen Mpoanu Project contributed to the formation of

‘CEMACs’, committees form in coastal communities to protect biodiversity, the physical

environment and the Coast. Also the CREMAs were set up for the protection of nature

reserves in especially the forest zones. However not much has been done towards

evaluations of their operation so as to ascertain their effectiveness or otherwise.

It is however required that financial resource is pushed in the growth of Agric sector in the

area supply of farm inputs and capacity building. Also projects geared towards

environmental and resources sustainability should be regularly monitored and evaluated to

ensure value for money.

Page 39: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

39

1.2.2 Oil and Gas Development The discoveries of oil and gas in Ghana open up a collection of opportunities to stimulate

the pace of national development. Nonetheless, the potential for oil and gas to drive the

economy positively will only be realized if this emerging industry is fully integrated into the

local economy with all associated problems tackled.

The District plays a pivotal role in the emerging oil and gas industry, with the presence

Ghana Gas Company Ltd been at the pinnacle of several other facilities currently ongoing in

the District. The Atuabo Gas Project is at its conclusion stage. Other oil and gas companies

currently on board are Lornrho Ghana, Quantum Gas, ENI Foundation and others. Majority

of these companies are close to its completion stage. Economic activities have been on the

increase within the coastal communities. Accommodation rent has shot up due to the

increased population demand.

Though the industry has boosted economic activities in the District to some extent, the

corresponding problem cannot be overemphasized. The misery behind the cause of algae

bloom in the sea at some time in the year is yet to be uncovered; however local fisherfolks

attribute it to Offshore Oil & Gas production.

1.2.3 Enhancing Competitiveness of Ghana’s Private Sector Though Government continued to implement reforms aimed at improving the

Competitiveness of Ghana’s private sector, progress remains slow. It is considered as the

engine of growth for country’s development hence the government promoting Public

Private Partnership.

The Ellembelle District within the last three years has seen a major growth in this sector

notably is the service and industrial sector, with a percentage increase to 35% and 55%

respectively for 2012. The creation of the District after 2008 brought in its wake people

developed interest at the formal sector.

Also the industrial sector rose drastically due to the Oil and Gas find, and the existence

mining companies in the District. Considerable number of people especially the youth

moved to work in the companies during the constructional stage.

Page 40: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

40

The number of people into ‘galamsey mining’ increased in 2012, with majority of them

based in Nkroful and Teleku Bokazo. However the presence of these activities boosted

commercial activities in the Communities.

Hotel business has been on the ascendency since 2011, with majority of them been in

Nkroful and Esiama. About six (6) major were built during the plan (2010-2013). However

the general tourism industry still lacks the needed impetus to become a key revenue source

for the District, and there is the need to consider the untapped potential tourism source.

In the area of Micro, Small, and Medium Enterprise (MSME), the Business Advisory Centre

under the Rural Enterprise Project (REP) undertook training in soap making in Kumgbunli (27

females), Community training in bakery and confectionary in Aiyinasi (25 females), cassava

processing (1 male & 18 females), training in batik , tie & dye at Nkroful (29 females)

(2013 District BAC Report)

1.2.4 Infrastructure and Human Settlements Infrastructure provision has become very key in the economic growth and sustainable

poverty reduction in Ghana as it’s seeks to become a middle-income country.

Consequently, the Ellembelle District during the implementation of the GSGDA 1 had

priority attention towards expansion of existing social and economic production

infrastructure to ensure that services provided are reliable, affordable and efficient. The key

areas of policy focus for the medium-term are: transport infrastructure; energy and energy

supply to support industries and households; science, technology and innovation;

information and communication technology development; human settlements

development; water, environmental sanitation and hygiene.

On road infrastructure, with 87km target the district was able to achieve 34 km in 2013.

Road rehabilitation took place in communities like Akropong, Mantukwa, First-Gate and

Aiyinasi Nyamebekyere.

The Rural Electrification Project is currently ongoing with majority of its going into the

Northern part of the District though most of the communities are yet to be covered. In total

about 70% of the entire district is covered.

Page 41: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

41

Out of the 19 activities under environmental sanitation and water, 8 were completed, 7

were ongoing and 4 not implemented. Most of the toilet facilities were concentrated in the

coastal zone as a strategy to reduce indiscriminate defecation.

On Education, 12 projects were completed with the additional 5 ongoing (GETfund projects).

Resources are needed to complete all outstanding projects.

1.2.5 Human Development, Productivity and Employment Human Resource Development is a critical aspect of national development which aim at

growth and social equity

Human development indicators in areas such as education and skills acquisition, health,

employment, productivity, social protection, poverty reduction are indicative of major

socio-economic challenges to most developing countries.

To address spatial imbalances, the Ellembelle District has created an access road (partially)

linking the south with the Northern part of the district. However there is the need to

properly construct the road since it will easily link the cocoa producing communities to the

market centres.

On health Sector, out of the 16 activities, 7 were completed and 9 were ongoing. Among the

standout projects undertaking by the District during the plan period was the provision of a

mobile clinic and also the provision of CHPS Compounds in selected communities like

Asanta, Kwesikrom and Nyamebekyere (Aiyinasi)

In the area of social protection, the District benefited from the Bamboo Biomass Project in

Tandan and the Ghana Social Opportunities Project (GSOP) which serves as a source of

income for rural folks especially during farming off seasons.

1.2.6 Transparent and Accountable Governance The main goal of transparent and accountable governance is to strengthen government and

non-governmental bodies to participate in the national development process and

collaborate effectively to achieve national development goals and objectives. The

collaborative process is to ensure that public resources are managed efficiently towards

development.

Page 42: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

42

The Ellembelle District during the implementation of the GSGDA I put measures in place to

improve revenue generation. A revenue generation and management action plan was

developed to guide, however the sector saw a fluctuating growth during the period. This

was due to unrealized revenue target.

Series of social accountability fora were conducted during the planned period. Budget was

also set aside for self-help through which cement and roof sheets were supplied to

communities.

The Assembly didn’t do much in the area of sub-structure development. Currently most of

the Unit Committees and Area Councils are not functional, and it is largely due to resource

constraints.

1.3 OTHER INTERVENTIONS

1.3.1 Tandan Bamboo Biomass Project International Network for Bamboo and Rattan (IMBAR)is implementing a project ‘’Bamboo

as Sustainable Biomass Energy: Alternative for firewood and Charcoal Production in

Africa, a pro poor initiative which seeks to utilize the enormous bamboo endowment in the

community to produce charcoal and briquette as means of increasing the use of bamboo as

a source of energy for the poor in Ghana thereby providing a more sustainable,

environmentally friendly and economical option for firewood and wood charcoal.

Currently the project has been completed and handed over to the beneficiary community

but yet to be commissioned. The District Assembly is helping the community to develop a

sustainability plan. Other communities have liaised with IMBAR to ascertain the possibility

of extending the project to their catchment areas.

1.3.2 Ghana Social Opportunities Project (GSOP) Ghana Social Opportunities Project (GSOP) has the overall goal to support Ghana’s Social

Protection Strategy through:

Page 43: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

43

Developing a labor intensive public works program as a rural safety net instrument in

target districts across the country to increase cash income for the rural poor during

Agricultural off-season and

Supporting the Government’s Livelihood Empowerment against Poverty (LEAP)

program.

The Project has five components namely: 1) Rationalization of National Social Protection

Strategy

2) Labor Intensive Public Works (LIPW) 3) Support to the Livelihood Empowerment against

Poverty (LEAP) 4) Capacity Building: and Project Management & Coordination.

There are forty (40) districts plus one (1) MMDA benefiting from this intervention, which has

Five (5) years life span, and project cost of US$89.1million.

The Total allocation for the completion of the sub-project within the five years plan period

(October 2011- December 2015) is GHc517, 426.84 for Ellembelle District.

1.3.3 Social Protection & Vulnerability Aspect of GSOP The Government of Ghana has put in place a comprehensive National Social Protection

Strategy which recognizes that affects people in different ways. The NSPS represents the

government’s vision of creating an all-inclusive and Socially-empowered society through the

provision of sustainable mechanisms for the protection of persons living in situations of

extreme poverty and related vulnerability and exclusion. The objective of the Project is to

provide targeted rural poor households with access to employment and income earning

opportunities, in particular during seasonal labour demand shortfall through rehabilitation

and maintenance of public or community infrastructure.

The Ellembelle District been a beneficiary of the project drew a comprehensive program of

Action for the implementation of the project.

Table 3 Below are components of sub project within the District:

Page 44: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

44

COMPONENT NAME OF PROJECT AMOUNT (GH₵) STATUS

1.Social Infrastructure Construction 3-unit

Teachers quarters at

Akropong

137,000.00 100%

Completed and

handed over

2.Economic

Infrastructure

Rehabilitation of 5.8km

road at First gate juct –

First gate

332,900.00

3.Climate Change Establishment of Rubber

Plantation at Menzezor

141,670.60 14 hectares of

rubber has

been planted

Page 45: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

45

1.4 Gaps / Challenges Identified in the Implementation of the

DMTDP 2010-2013 The implementation of the DMTDP 2010 – 2013 was confronted with several challenges.

The major ones included

Inadequate resources particularly funds – local and external resources

affected the implementation of key projects.

Delays in release of funds affected projects completion periods.

Lack of residential accommodation for the core staff including heads of

departments,

Non –availability of some key departments, public sector organizations and

service providers in the district.

High illiteracy rate among the people of the district which affected

dissemination of information, adoption of modern technology, particularly

farmers, etc.

Inadequate capacity of the staff to effectively implement the programmes of

the Assembly and the entire District.

Inadequate logistics and equipment for the staff to support the

implementation of the programmes.

High cost of M&E exercises due to undue delays in project completion

periods.

Inadequate credit facilities for local entrepreneurs.

Poor accessibility to project sites due to bad nature of roads in the district

affected proper M&E exercise.

Low income among the people and the people poor attitude towards

payment of taxes affected revenue generation in the district.

Low participation of sub-structure.

lack of adequate office space for the Central Administration and the

Decentralized Departments,

Implementation of projects outside the Plan

Absence reliable and accurate data

Poor development of Tourism sector

Page 46: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

46

Inadequate Knowledge on Oil & Gas Sector

Lessons learnt during implementation of 2010 – 2013 DMTDP Some key lessons/ experiences were learnt during the implementation of the 2010 –

2013 DMTDP. Notably among them include the following:

Internally Generated Revenue is very critical to the over operation of the

District Assembly

Poor / inadequate basic infrastructure facilities e.g. roads, accommodation

telephone, etc badly affected the smooth implementation of the plan.

Involvement or participation of communities, Private Sector, NGOs, Donors,

Decentralized Departments and other stakeholders will enhance the

implementation process

Effective collaboration/ partnership between DA and agencies, Donors,

NGOs, CBOs, and other stakeholders in services provision contributed to

development

Low commitment/apathy among community stakeholders negatively

affected project implementation.

Targets set for certain projects were too high and unattainable during the

plan period.

The multiplier effects of some projects during the plan period were not great.

Regular M&E of projects was crucial in the successful implementation of the

plan.

Execution of project outside the Plan affected the Budget negatively.

Page 47: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

47

SCORING SCALE

DEFINITION SCORE MEANING

Storing

relationship

2 A strong harmony of community

needs and aspirations and identified

key development problem.

Weak

relationship

1 A weak harmony of community

needs and aspirations and identified

key development issues.

No relationship 0 Calls for review of the community

needs and aspirations to identify

real problems.

These scores were added together and divided by the number of community needs and

aspirations to obtain the average score. Where the score is very high, it indicates that there

is strong harmony of community needs and aspirations and identified key development

gaps/problems/issues.

A low score indicate weak harmony while a zero score calls for review of the community

needs and aspirations, if possible, to identify real problem to be addressed.

Detailed steps towards prioritization have been attached to the annexes.

Page 48: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

48

After analyzing the Data from the communities and conducting public for a, the following

Community Needs and Aspirations, linked to the gaps from review of previous

performances, were derived

Improvement in Education Sector

Improvement and Accessibility of Road Network

Provision of Proper Health Care

Provision of Farming Inputs and Lands

Improvement in Income Generating Activities

Provision of Potable Water

Ensuring Proper Sanitation (Solid & Liquid waste)

Provision of Drains

Extension of Electricity

Provision /Rehabilitation of Office Accommodation for Central Administration and

Lower Structures (Area Councils)

Provision of Security

Improvement in Rural Housing Conditions

Security Provision

Provision of Logistics for Monitoring & Evaluation of district Projects and

Programmes

Accessibility to Credit Facilities

Improvement in Tourism Development

Enforce of District Bye-Laws

Sensitization on Oil and Gas Issues

Page 49: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

49

1.6 SUMMARY OF KEY DEVELOPMENT PROBLEMS Planning being basically a problem solving activity cannot be undertaken without

appreciation of the prevailing development problems and priorities of the target population.

Thus the underlisted are summary of development problems identified:

Inadequate Educational Infrastructure

Poor Road Condition

Poor Health Care Delivery

Inadequate Land and Farming Inputs

Inadequate Potable Water Coverage

Poor Environmental Sanitation

Poor Internal Revenue Generation

Low Electricity Coverage

High Illiteracy Rate

High HIV/AIDS prevalence Rate

Inadequate Credit Facilities

Inadequate Office and Residential Accommodation

Inadequate Logistics for Monitoring of Projects and Programmes

Under-developed Tourism Potentials

High Incidence of Lawlessness

Inadequate Knowledge on socio-economic importance of Oil and Gas Issues

Low Production Level

Page 50: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

50

1.5 DISTRICT PROFILE /CURRENT SITUATION OF THE DISTRICT

1.5.1 Physical and Natural Environment The physical and natural environments are essential elements of the factors for determining

socio – economic development of the district. This stems from the fact that, apart from

being potential resources, they also serve as ingredients within which all development

activities take place. The factors that need critical analysis and their implication for

development in the district under physical and natural environment include location and

size, climate, vegetation, relief and drainage, soil and geology and minerals.

1.5.2 Location and Size The Ellembelle District being one of the Twenty two (22) Districts in the Western Region of

Ghana is located on the southern part of the region between longitudes 2º05’ W and 2º35’

W and latitude 4º40N and 5º20N.

The District shares boundaries with the Jomoro District to the West, Wassa Amenfi West

District to the North, Nzema East Municipal to the South – East, Tarkwa – Nsuaem Municipal

to the East and a 70 km stretch of sandy beaches to the south. It covers a total area of

about 1,468 Square kilometers, which constitutes about 9.8% Percent of the total land mass

of the Western Region.

The District has one constituency, the Ellembelle Constituency with a total of Seven (7) Area

Councils and 31 Electoral Areas.

1.5.3 Climate The District lies within the wet semi-equatorial climatic zone of the West African Sub-

region. The area experiences an all – year round rainfall with the highest or maximum

monthly mean of rainfall occurring around May and June.

Mean Annual rainfall figures ranges from 26.8mm to 42.6mm. The average temperature

in the District is about 29.40C with variation in mean monthly ranging between 40C to

50C throughout the year as shown in the table for 2008 and 2008 below:

Page 51: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

51

The high rainfall pattern and the long periods of the rainfall has resulted in the presence

of many rivers like Ankobra and Mufre in the District which can, using the right

technology, easily be harnessed to provide potable water and water transport the

communities.

They can also be a good source of Inland fishing as well as for irrigation farming in order

to provide employment and improve the nutritional status of the people.

The District records high relative humidity figures ranging from 27.6% to 26.6% between

May and June and 27.3% to 27.9 during the rest of the year.

The climate of the District is suitable for the cultivation of various crops both food and

cash. However the influence of the short dry spell (harmattan) has damaging effects on

the environment and farm outputs. The heavy and prolonged rains associated with this

type of climate adversely affect cocoa harvest especially drying of the beans and

aggravate the black pod diseases that attack cocoa. In addition, all the un-tarred roads

become almost immotorable during the rainy season. The effects of this on the economy

of the district are obvious.

1.5.4 Relief and Drainage The District is endowed with a number of rivers and streams, the most important of

which is the Ankobra River with its major tributaries like the Ahama and Nwini rivers.

Others like the Ankansa and Draw River and its Tributaries drain the Northern side and

act as a boundary between the District and Wassa Amenfi, Amanzule River in the south –

western area, and some numerous minor rivers and streams which do not exceed 150m

above sea level flow throughout the year. The streams and rivers exhibit a dendritic

pattern, which forms the Ankobra basin. The relief and drainage system favour the

development of fish farming and cultivation of valley bottom rice, sugarcane and dry

season vegetables. The presence of larger Rivers like the Ankobra has induced

commercial fish farming in communities along the Ankobra basin. Due to the relatively

low level of drainage in the district, construction such as road is relatively less expensive

and easier.

Page 52: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

52

1.5.5 Vegetation The vegetation of the District is made up of the moist semi-deciduous rain forest in the

northern part of the District, but turns into secondary forest as one move southwards

mainly due to human activities like tree felling and farming. There is about 70km

coastline which is mainly of savanna vegetation. The District has several timber species

and other non-timber forest products like rattan, bamboo, among others. It also

abounds in game and wildlife all of which offer opportunities for resources extraction

and entrepreneurial development.

There are also three forest reserves in the District. These are Shelter Forest Reserve,

Draw River Forest Reserve (the largest and located at the Northern half of the District)

and the Ndumfri Forest Reserve located in the North Eastern end of the District.

However the existence of some nature conservation areas and biodiversity restricted

areas like the Ankasa Conservation Area and the Draw River at the Northern part of the

District. The Community Resource Management Area (CREMA) concept, by Wild Life

Division of the Forestry Commission is an initiative which will help curtail the

unsustainable usage of natural resources

The district has a rich diversity of fauna and flora, which has the potential of turning the

district into a major tourist destination in the country in particular and the globe in

general, if the needed tourist infrastructure such as good roads, hotels, restaurants and

communication facilities are made available. There is therefore a great potential to

generate huge revenue from tourism in the district using the forest resources and for

this reason; the District Assembly should be supported and encouraged to develop the

tourism industry into an investment attraction as an appropriate alternative revenue

earner.

1.5.6 Soil Type The soil in the District is mainly of the ferric acrisols and dysric fluvisols type. The

ferric acrisols type of soil constitute about 98% of the entire land of the district, as

such supports the cultivation of a wide range or variety of crops including cocoa,

coffee, coconuts, oil palm, plantain and cassava. Due to this characteristic, the

Page 53: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

53

district has a comparative advantage in agriculture especially in the area of agro –

processing and plantations.

1.5.7 Tourism The District is endowed with a huge potential for Tourism development. There are

numerous tourist attractions that, if properly developed and packaged, could attract

a lot of tourists to the District. These include Historical sites like, the first President’s

(Dr. Kwame Nkrumah) birth place and original burial tomb at Nkroful, 70kms of

sandy Beaches that boarder the south of the District, the navigable Ankobra River

that links the northern and southern parts of the District through river transport, the

Wetlands and the famous Kundum Festival celebrated by all the Chiefs and people of

the District. The presence of developed beaches like Ankobra Beach Resort serves as

tourist destination which helps boost economic activities.

The Assembly must be supported to identify and facilitate the development of these

potentials through Public Private Partnerships (PPP). This would create employment

and enhance revenue generation in the District. It will also open up the district to

investment in the hospitality industry leading to the creation of various employment

opportunities. The recent emergence of the Oil and Gas in the Western coast of

Ghana and the Operation of mining companies such as the Adamus Resource Limited

has great potentials for the development of hospitality facilities (hotels) and beach

resorts in the coastal belt communities especially in Esiama, Asanda and Bobrama.

This will greatly give a boost to economic activities. The strengthening of security is

also fundamental since the development of the hospitality industry will come with its

ramifications such as crimes in the form of theft and arm robbery.

1.5.6 Condition of the Natural Environment The natural environment in the district is confronted with various challenges some of

which are very devastating as their impact on the natural environment also causes

food insecurity and exacerbating poverty in the district. The major factors that

Page 54: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

54

negatively impact on the natural environmental condition include Deforestation,

Mining and Quarrying, Bushfires, Soil Erosion and Natural Disasters.

1.5.7 Deforestation The Ellembelle District is endowed with large tracts of forest and economic trees.

However, the District is suffering from high incidence of deforestation due to the

high exploitation of the timber for logs and lumber by registered companies and

illegal chainsaw operators. Their activities contribute significantly to the extent of

deforestation in the district. Unchecked farming practices including cocoa farming

slash and burns among others have also compounded the situation through

encroachment on the virgin forest and forest reserves.

1.5.8 Mining and Quarrying Due to the high mineral deposit in the district, a lot of mining companies are coming

into the district to mine. Galamsey activities are also dominant in the District which

is conducted in a haphazard or uncoordinated manner. The activities of these mining

companies and the galamsey operators are causing serious destruction to the

environment and the vegetative cover. This therefore poses threat to animal, plant

and human life in the District. With the help of the central government the galamsey

menace has been put under control. So far with the collaboration and assistance of

the district assembly, a small scale mining company has been licensed to operate

within the district. This development will create employment for the youth hence

reducing unemployment in the district whiles increasing the revenue of the district.

1.5.9 Bushfires and Soil Erosion The traditional method of farming, which involves the slash and burn, coupled with

indiscriminate burning of bush by unscrupulous people during the short dry season

(harmattan) exist in the district. The resultant effects of these activities are depletion

of soil nutrients and low agricultural production among farmers in the district.

Page 55: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

55

1.5.10 CULTURE

1.5.10.1 Religion and Ethnicity In terms of Religion, Christians constitute about 79 % of the population with Moslems

having 8%, Traditionalists3.0 % and others 10%. The predominant Ethnic grouping is Akan

89%, Ga Adangbe 3%, Ewe 4% and Mole-Dagbani 4%. The District is dominated by two main

local groups within the following corresponding dominant Areas.

Table 4

1.1 Traditional Set-up

ETHNIC GROUP DOMINANT AREA

Akonu Nkroful

Nzema Atuabo

The District has one Paramountcy, The Eastern Nzema Traditional Council, situated at

Atuabo

All the Traditional Councils, in the three (3) Districts of Nzema East, Ellembelle, Jomoro,

constitute the Nzema Manle Council (District House of Chiefs).

1.5.11 Culture and Festivals One significant feature in the District is the traditional festival of Kundum which is

celebrated in all the communities of the District between August and October each year. It

is important to note that during the celebration of the festival, a large number of people

from far and near troop into town. During the season, general economic activities

(especially buying and selling) are boosted. However, the economic boom comes with its

own social and environmental impacts on the district.

The major language spoken all over the District is Nzema with other dialects like Evalue and

Gwira, Fanti and Twi also widely spoke

Page 56: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

56

1.5.12 SPATIAL ANALYSIS / SETTLEMENT.

Various settlements have spread through the entire district. Larger portion of the

population is concentrated in the forest zone of the District. Considerable part of the District

which is mostly occupied by cocoa farmers (Northern Aiyinasi) is not accessible. These

developments normally compel farmers to sell their produce to other neighboring districts

to the detriment of the District’s Internally Generated Fund (IGF). The District is sparsely

populated. However, the population is not evenly distributed; only a few settlements such

as Aiyinasi, Esiama, Asasetre, Asanta etc. have the bulk of the population. Teleku-Bokazo

and Nkroful are gradually becoming overpopulated due to the emergence of mining

activities. This is as a result of concentration of certain amenities like electricity

In Ellembelle District, there are specific settlements of which are classified as Urban namely

Aiyinasi, Asasetre and Esiama. This is based on settlement with the population of 5,000

people as minimum. Esiama and Aiyinasi especially have the potential to grow into bigger

towns due the emergence of new economic and commercial activities. The location of these

communities along the Takoradi-Cote D’Ivoire makes them good prospects for increased

economic activities.

Page 57: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

57

Annex 2: Scalogram Services

Settlements

Po

pu

lati

on

Kin

der

gar

ten

Pri

mar

y

JHS

SH

SV

ov

/Tec

h

CH

PS

/Cli

nic

Hea

lth C

entr

e

Ho

spit

al

Dru

g S

tore

Bo

reho

le

Pip

e S

yst

em/S

TW

S

KV

IP/V

IP

Pu

bli

c W

C

Ref

use

Bay

/S

kip

Con

tain

er

Ele

ctri

city

Tel

epho

ne/

Mobil

e

P:o

st O

ffic

e

Ru

ral

Ban

k

Po

lice

Sta

tion

Fir

e S

tati

on

Ag

ric

Ext.

Cou

rt

Mar

ket

Dis

tric

t A

dm

in

Are

a C

ou

nci

l

To

tal

No

. o

f

Fu

nct

itio

ns

%o

f F

un

ctio

ns

To

tal

Cen

trali

ty

Lev

el o

f

Hie

rarc

hy

Weight 1 2 3 4 2 3 5 1 3 4 1 1 2 4 2 1 3 2 2 2 4 4 5 4 Nkroful 4,043 X X X X X X X X X X X X X X X X X X X X X 21 88 1,564.

5

1

Teleku-Bokazo 4229 X X X X X X X X X X X 11 46 154.9 4 Anwia 1846 X X X X X X X X 8 33 59.6 5 Salman 2436 X X X X X X X X X X X 9 38 148.4 4 Aluku 904 X X X X X X X X X 9 38 36 5 Esiama 8,681 X X X X X X X X X X X X X X X X X X 18 75 531.2 2 Kumbunli 3,168 X X X X X X X X X X X X 11 46 308.6 3 Azuleloanu 1,346 X X X X X X X X 8 33 112.6 5 Ampain 1590 X X X X X X X X 8 33 59.6 5 A.B.Bokazo 1,407 X X X X X X X X X 9 38 59.6 5 Alabokazo 1,030 X X X X X X 6 29 44.5 5 Apkandue 1,131 X X X X X X X X X 9 38 119.6 5 Edwakpole 779 X X X X X X X X X 6 25 92.9 5 Awiebo 3,846 X X X X X X X X X X X X X 13 54 293.2 3 Baseke 3,097 X X X X X X X X X 9 33 92.9 5 Asasetre 4,763 X X X X X X X X X X X X X 13 54 272.2 3 Tandan 2,248 X X X X X X X X 8 33 59.6 5 Bomoakpole 1,219 X X X X X X X 8 33 77.8 5 Aiyinasi 10,585 X X X X X X X X X X X X X X X X 18 75 397.5 2 Menzezor 2, 221 X X X X X X X X X X X 11 46 252.9 3 Akoto 998 X X X X X X X X X 9 38 92.9 5 Kikam 3,839 X X X X X X X X X X X 10 42 216.9 4 Asanta 3, 753 X X X X X X X X X X X 11 46 219.9 4 Ankobra 1,758 X X X X X X X X 8 33 59.6 5 Atuabo 1,785 X X X X X X X X X X X X 10 42 250.2 4 Eikwe 2,349 X X X X X X X X X X X X X 11 46 655.2 3 Ngalekyi 1,247 X X X X X X X X 6 25 88.9 5 Krisan 1,098 X X X X X X X X X 8 33 92.9 5 Baku 1,019 X X X X X X X X X 6 25 92.9 5 Comm. With Serv. 30 29 27 6 5 5 1 24 30 12 26 4 7 30 30 3 3 3 1 2 1 12 1 7 Weight 100 100 10

0

10

0

10

0

10

0

100 10

0

10

0

10

0

10

0

10

0

10

0

10

0

10

0

10

0

10

0

10

0

10

0

10

0

10

0

10

0 10

0

10

0

Weighted

Centrality

3.3 7 11.

1

67 60 60 500 4.2 10 33.

3

4 25 29 13 7 33.

3

10

0

67 20

0

10

0

40

0

33.

3 50

0

57

Page 58: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

58

1.5.13 Agriculture It is estimated that over 65% of the economically active population are engaged in

agriculture (including fishing) and agro-processing.

1.5.13.1 Land Most parts of the land in the district are undulating, therefore very unsuitable for

mechanized farming (use of tractors for land preparation). Share – cropping (Abusa) is the

common land tenure system.

1.5.13.2 Soils These are acidic and low in nutrient due to high leaching. Leaching is the result of the high

rainfall in the District. This makes it very difficult to cultivate some staple crops and

vegetables.

1.5.13.3 Cropping The average farm size is estimated at 4 hectares. Slash and burn is the common practice of

land preparation in the district. The major tree crops grown are coconut oil palm, rubber

and cocoa with cassava and plantain being the major food crops. Vegetables such as garden

eggs, pepper and tomatoes are also cultivated among other crops. Rice cultivation is

currently very low and is grown in some low-lying areas like Asanta, Kikam, and Kamgbunli.

Food crops such as cassava, maize, rice, cocoyam and plantain are grown extensively both

for subsistence and for cash. However, due to the absence of any efficient processing and

storage facilities, post-harvest losses are high and farmers income very low.

1.5.13.4 Coconut Sector Coconut is grown extensively in the district especially in the southern part. It is processed

into coconut oil and exported mainly to Accra, Kumasi, Tarkwa and Obuasi, and also farmers

export some of the produce called ‘Copra’ to nearby countries like Nigeria. In recent years,

the lethal yellowing disease of coconut locally called Cape St. Paul’s Wilt Disease (CSPWD)

has devastated about half of the coconut plantations along the southeastern coast of the

district. This has seriously affected the economic livelihood of the people in these areas,

Page 59: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

59

leading to low incomes and increased unemployment. The dwindling production base of

the local coconut industry has also adversely affected the internal revenue base of the

Assembly.

Replanting of hybrid coconut seedlings for farmers in the district started in the year 2000.

So far estimated acres of farms have been replanted. However the report from farmers

suggest that its resistance it not strong to withstand the spread of the disease.

1.5.13.5 Rubber Rubber plantation is the new farming sector which is most people is resulting into. Due to

the presence of Ghana Rubber Estate Limited most farmers are able to learn technologies

which improve their outputs through the Out-grower Project. This development has given

some hope to farmers whose coconuts have been perished by the dreaded Cape & Paul

Disease.

1.5.13.6 Cocoa Cocoa is grown mostly in the northern part of the district, which is a forest area. This has

over the past years attracted in influx of cocoa farmers into these parts of the district. Crop

yield per acre for cocoa in these areas are comparatively lower. It is estimated that there

are over 70,000 acres of land under cocoa plantation in the district.

Capside infestation and the Black Pod disease are major problems of this crop. Productivity

has also been affected by lack of information on soil suitability. Efforts and new measures

have been put in place, especially the spraying of the farms, help improve the yield and

price of cocoa.

1.5.13.7 Poultry and Livestock Production Local poultry, especially chicken is reared throughout the district in almost every home.

However the local chicken population remains low because of annual outbreaks of

Newcastle Disease that results in high mortality among these birds. Commercial poultry

keeping is only undertaken by a handful of entrepreneurs whose major problem is marking

of their produce.

Page 60: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

60

Pig production is the most popular livestock activity in the district, apart from sheep and

goat, especially among the youth and women. The availability of by-product from coconut

oil processing as a major cheap source of feed for pigs is the reason for their high population

in the district. In spite of the immense potential on piggery, farmers still use traditional

methods of husbandry and therefore cannot improve production to earn more income.

Intermittently the deadly swine-flu disease hit considerable number of flock and causes a

great loss to farmers. Pig production would be vigorously promoted to create alternative

employment opportunities through introduction of improved husbandry, processing and

marketing to improve farmers’ earnings.

1.5.13.8 Fishing and Fish Farming The District ranks among the major contributors in the area of marine fishing in the country.

Fishermen are located in communities like Ankobra, Asanta, Esiama and the whole of the

Atuabo Area Council. Though this venture is major source of income in the district, it is still

bedeviled by crude and outmoded method of operations like ‘Light fishing’ and the use of

harmful chemical have hindered the growth of the industry. In recent times the fishermen

has complained about dwindling level of fish-catch and attributed to Oil and Gas activities.

There is the need for revive this industry strongly through laid down measure to which will

ensure sustainable marine fishing, and also fisherfolks should embark on aqua-culture to

supplement the marine stock hence improve their income.

1.5.13.8 Manufacturing Industry The District though has experience some upward change in the area of industrialization,

same cannot be said in the aspect of manufacturing. The few manufacturing is still executed

through crude method and on a very small scale. Coconut Oil and Cassava dough

productions exist in communities like Asasetre, Tandan and Adubrim which helps to boost

the revenue generation base of these communities. However the industry is challenged

both logistically and financially and there is the urgent need of injecting the requisite

support into the industry to enhance local economic growth.

1.5.13.8 Energy The main sources of energy for domestic, commercial and industrial needs are electricity,

fuel-wood, charcoal (including bamboo, kerosene, and LPG). About 70% of the entire district

Page 61: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

61

is connected to the national grid, with Majority of the Communities in the Northern part of

the district are yet to be connected. This situation has affected operation of basic services

like health care with facilities resulting to solar panels as an alternative.

1.5.13.9 Tourism Like most of the Coastal District in the western Region, tourism is a key source of revenue

generation. The Kundum festival is celebrated among all the Nzema’s to remember their

heritage. Traditional dance and other activities are performed during the celebration.

Page 62: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

62

Kwame Nkrumah Mausoleum represents the original birth place and other historical

monuments of the First President of Ghana. Also the Bakanta Estuary has a nice scenery

which is been developed boat riding navigation. It forms part of the Greater Amanzure of

which series biodiversity studies has been conducted. Apart from fishing transportation the

Ankobra River has not been fully tapped.

Also the Gas Processing Plant at Atuabo is the first of its kind in the Country hence could be

a destination for educational tours and excursion.

Page 63: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

63

1.5.14 Transport Infrastructure Majority of the road network that links the subdistricts to the District capital are tarred.

While the road network in the northern part of the district, that is, the New Aiyinase

Subdistrict is bad and unmotorable throughout the year and becoming more deplorable

especially during the rainy season. The roads that link the communities to the subdistricts

are also mostly untarred with some of them being bad and hard to reach hence creating

transportation problems for farmers.

The main means of transportation is by road and few communities along the Ankobra River

are accessed by boat. In total, the District has 233km of trunk road of which 66.1km are

tarred representing 28%, whilst 167.6 km is graveled or feeder road representing 72%. This

is hugely inadequate and affects development negatively.

The Assembly however has created an access road to link the North and Southern part of

the district but require the Feeder Roads Department to complete it. The absence of bridges

and culverts along some feeder roads also render some of the major food producing areas

inaccessible. There is therefore the urgent need to link up these areas to the marketing

centres through the provision of bridges and culverts.

Page 64: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

64

1.5.15 Major Town and Facilities/Activities The District comprise of eighty- seven (85) communities. Few of these communities has

majority of the population and key infrastructural facilities.

Table 5: Major town and Facilities

Major Towns Main Facilities/Activities

Aiyinasi Market, Banks, Sachet water producers, Marine Police,

Esiama Banks, Market, Gas Transmission Terminal, Schools, Fishing, Hotels

Nkroful District Capital, Mining, Dr. Kwame Nkrumah’s birth place,

Kikam Fishing, Trading, Recreational centres

Atuabo Fishing, Gas Processing Plant

Teleku-Bokazo Mining, Trading, Market

Page 65: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

65

The existence of these facilities enhances the general growth and development of the entire

district.

1.6 Food Security About 65% of the populations in the District are farmers (fish and crop farmers). In previous

years prices for food staff and other commodities were cheaper as compared to many

towns and cities. In recent times the mining activities and the oil and gas explorations have

changed situations over the past years. The above activities have affected farm lands

coupled with high influx of immigrants into the district; demand tends to outweigh supply

hence price hike in food especially fish and general consumables. Crop farming is done

throughout the year in places like Adubrim, Asomase and Akropong. The Assembly generate

considerable amount of revenue from market tolls from places like Aiyinasi and Asasetre.

1.7 Governance Administrative and Institutional Arrangements for Local Governance and

Management of Resources

The Structure of the District Assembly

The various legal frameworks for Local development in Ghana include, the Civil Service Law,

1993 (PNDC Law 327), the National Development Planning (System) Law, 1994 (Acts 480),

the Local Government Law, 1993 (Act 462) and the Local Government Service Act 656. All of

these legal enactments place the District Assembly in the center to reinforce the

government’s decentralization process and participatory development.

Thus the Assembly, by law is the highest administrative and political body in the District. It

is composed of 45 members of which two-thirds are elected while the remaining is

appointed. The one Member of Parliament is ex-officio member.

The Ellembelle District has an executive committee made up of chairmen and secretaries of

all sub committees and key heads of departments. They formulate and execute policies of

the Assembly. The District Chief Executive represents the Central Government and chairs

the committee. It operates through the following sub-committees of the Assembly

1) Finance and Administration Sub-Committee

2) Social Service Sub-Committee

Page 66: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

66

3) Development Planning Sub-Committee

4) Works Sub-Committee

5) Justice and Security Sub-Committee

6) Health and Sanitation Sub-Committee

The sub-committees principally deliberate on specific issues and make commendations to

the Executive Committee. The Executive Committee in turn presents them to the Assembly

for ratification and adoption.

The Executive Committee co-ordinate plans and programmes of sub-committees and

oversees the smooth operation of the administration. It also has the power to recommend

the appointment or replacement of officials in the District. The District Assembly as

authority is responsible for the overall development of the District. There is a District

Planning Coordinating Unit, which provides Advisory services to the Executive Committee in

its planning functions.

Area Councils and Unit Committees are pivotal in local level development as they ferry the

Assembly and local community and act as the supreme points of development at the local

levels. There are seven (7) area councilsl.

The District Chief Executive heads the office of the District Assembly. There are 11

Decentralized Departments under the Office of the Assembly. The activities of these

Departments are coordinated by the District Co-ordinating Director.

Page 67: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

67

DISTRICT DEPARTMENTAL ORGANOGRAM

DCE

Internal Audit

DCD

DPCU (DPO = Secretary)

Social Sector Infrastructure Sector

Financial Sector Environmental Sector Economic Sector

Education, Youth &

Sports Dept.

SW & CD

Dept.

District Health Dept.

Works Dept.

Physical Planning

Dept.

Trade, Industry & Tourism

Dept.

Agric Dept.

Disaster Prevention

Dept.

Natural Resources

Conservation

Treasury Revenue Mobilization

Education Section

Sports Section

SW Section

CD Section

DMOH Section

R. Birth & Death

Section

Building section

(Works & R. Housing)

Water Section

Feeder Roads

Section

T&CP Section

P&G Section

Coop Section

Industry Section

Fire Section

NADMO Section

Refugee Section

Game &

Wildlife Section

Forestry Section

Animal Health and Production

Section

Crop Services Section

Agric Extension

Section

Agric Engineering

Section

Fisheries Section

Youth Section

Basic Education

Unit

Non-Formal

Education Unit

Library section

Finance Dept.

Levies

Internal Disaster

Environ Health

Central Administration Dept.

Records

Page 68: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

68

1.9 Composition of the District Assembly The Ellembelle District Assembly in consonance with the Local Government Act 1993 (Act

462) is composed of the District Chief Executive who is appointed by Government and

approved by 2/3 majority of the members of the Assembly, the one member of Parliament

from the one constituency of the District Assembly members. 54 Members both elected

and appointees form the General Assembly, of which 12 are appointed by government in

consultation with the Traditional Authority and other interest groups. The Presiding

Member is elected by 2/3 majority of all the members of the Assembly. There are 7 Area

Councils in all.

The adequacy of skilled Personnel and Logistics for the Decentralized Departments will have

serious repercussion on the Assembly’s capacity to implement, monitor and evaluate the

MTDP and undertake further participatory development planning. With the recent

increased in personnel for the DPCU, its work has seen some effectiveness, however,

logistics and resources must be provided for efficient operation.

1.11 District Sub – Structure There are seven (7) Area Councils under the Assembly, which are functioning effectively.

Out of all the Unit committees, less than a quarter are operational. Although, the Assembly

recruited and staffed all the Area Councils, its inability to pay their remuneration had

resulted in vacation of post and low morale among staff of the Area Councils. The lack of

Logistics and suitable offices has also resulted in low performance of the councils. Lack of

motivation on the part of Unit Committee members had led to loss of interest in the work of

the committees. Both Assembly members and the sub-structures play very crucial roles at

all levels of legislation and planning. As prescribed under Act 462 and L.I. 1589, the

functions of the Assembly through the Area Councils and Unit Committees make these sub-

structures pivotal links between the Assembly and the grassroots. However, the seeming

apathy at the sub-structure level has broken the chain of plan implementation making it

difficult to mobilize local persons for development. Capacity of the substructure is also not

up to task.

Page 69: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

69

The Assembly should build their capacities to enable them collect and collate the views and

aspirations of the people they represent from interventions. This would ensure community

participation as an integral part of the planning process.

1.12 Traditional Authority The Ellembelle District has one paramountcy under the Nzema Manle Traditional Council

with its headquarters at Esiama. Under this paramountcy are Divisional Chiefs and below

them are Odikros. These Traditional Authorities command the respect of large numbers of

their people and communities particularly in the rural areas. They are dedicated to the

development of their traditional areas and the education and enlightenment of their

people. They have a part to play in facilitating government policies and mobilizing their

Page 70: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

70

people for development, of particular importance is the role of the traditional authorities in

support of the vulnerable and excluded. This offers positive contribution to economic and

social transformation.

Traditional Authority can therefore be regarded as part of the decentralization process. The

District Assembly would therefore strengthen its partnership with Traditional Authority to

provide a mechanism for consultation and co-operation.

Although Traditional Authority plays a very important role in the development of the

District, the existence of one paramountcy within the Ellembelle District alone poses a big

challenge for consensus building. The presence of numerous chieftaincy disputes and land

litigations have adversely affected the pace of the District’s development. Efforts would be

made to minimize these disputes and promote consensus building.

1.13 Administration of Justice The District has a magistrate court with a magistrate in attendance. There are three (3)

Police Stations with the headquarters at Esiama. The Commission for Human Rights and

Administrative Justice (CHRAJ) adjudicates on human rights infringements whereas the

Public Relations and Complaints Units under the Chairmanship of the Presiding Member of

the District Assembly hears complaints against Assembly members and Public Officers in the

performance of their duties. The magistrate court currently has no permanent

accommodation which affects it duties. The assembly has initiated the process to construct

a court complex to foster administration of justice.

The institutions especially CHRAJ need to be strengthened and resourced to protect the

rights of the people and ensure justice and accountability. The District needs a permanent

structure well-resourced to accommodate the magistrate court. This will go a long way to

facilitate justice.

1.14 NGO/Civil Society Civil Society plays a very important role in the development of Ellembelle District.

Participation by other stakeholders is manifested at the levels of information sharing,

consultation, collaboration and empowerment. To ensure public ownership of the

Assembly’s development agenda, it is necessary that avenues be created for stakeholders

Page 71: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

71

and other parties with contributions to get involved in the whole process. This is the

effective way to generate true sustainability and public support for the development

process.

The District Assembly has instituted channels for consultations with stakeholders at the

District, Area Council and Community levels. These include Public fora and information

dissemination and Public education by I.S.D and NCCE. A number of initiatives have been

undertaken to promote participation of other stakeholders especially NGO’s, CBO’s, and the

Private Sector in the development process of the district.

1.15 7PRIVATE SECTOR The Private Sector is not well developed in the district. It is predominantly micro and small-

scale Processors, Artisans and Service Providers. Although the District has enormous

potential for tourism and agro-industry, the lack of Infrastructure and basic utilities

increases cost of doing business. There is no platform for public-private interface

Public-Private Partnership needs to be promoted. The Assembly would create the necessary

enabling environment for the growth of the private sector. Inadequate logistics and poor

accessibility have cut off a significant number of people in the district from active

participation in governance and access to information.

There is therefore an urgent need for a mass communication network e.g. F.M. with wide

coverage to facilitate information dissemination and public education in the district in order

to reach a wider section of the people especially the unreached deprived communities. The

Assembly’s has made useful strides to make the planning process participatory to promote

transparency in the Assembly decisions and ensure accountability from both public and

private sectors. More collaboration, consultation and information sharing would be

promoted with Traditional Authority, Civil Society of Ellembelle District as well as the

Western Regional Network of NGO’s (WERENGO) and other relevant private sector

organizations

5.8 Assembly Finance

Internal Sources (own sources)

External Source

Page 72: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

72

2011 2012 2013 TOTAL

DACF 2,239,676.78 886,981.61 1,108,177.82 4,234,836.21

IGF 359,798.78 881,915.02 315,245.55 1,556,959.35

HIPC FUNDS 40,311.00 292,978.16 - 333,289.3

GOG GRANTS 161,858.05 - 227,878.3 389,736.35

DONOR GRANTS

302,234.30 457,592.27 636,378.38 1,396,204.95

TOTAL REVENUE

3,103,878.91 2,519,467.06 2,287,580.05 7,910,926.02

Source: District Assembly Annual Trial Balance (2012-2013)

Internal revenues are those collected by the Assembly using its own Revenue Collectors and

existing collection machinery. External sources on the other hand are mostly grants from

Central Governments, Royalties, and other External Agencies like NGO’s and Donor Agencies

like the World Bank, IDA, JICA, EU, DFID etc. The trend, typical of most Assemblies in the

country, depicts the over reliance of the Ellembelle District on the DACF as the main source

of revenue and funding of development projects and other programmes.

Problems of Revenue Collection The major problems confronting revenue collections in the district include:

Inadequate skilled personnel

Lack of logistics especially transportation to revenue collection centers

Poor supervision and monitoring of revenue collectors

Inefficient revenue collection systems

Inadequate motivation for revenue staff.

Expenditure Pattern The Expenditure of the district budget has been divided into recurrent and capital

Expenditure to conform to the conventional budget structure of the local government of

Ghana. The recurrent expenditure consists of personal emoluments, Travel and Transport

Expenditures, General expenditure, maintenance, repairs and renewals as well as

Page 73: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

73

miscellaneous. The capital expenditure consists of all expenditures made on Development

Projects and Programmes.

Challenges

A whole lot of deductions are made of funds sent thus making disbursement very

difficult as funds become inadequate to disburse according to the prepared.

Lack of flexibility in the usage of DACF affects disbursement

NOTE: A table depicting a summary of expenditure within the plan period has been

captured at performance review stage.

1.16 Local Economic Development The District in terms of Local Economic Development performed fairly during the

implementation of the GSGDA I. The Assembly in its efforts of encourage local initiative

through the transfer of skills has trained some community members in Kumgbunli, Eikwe

and Nkroful in batik making, beads making and soap making.

Also IMBAR has undertaken a bamboo development project ‘Bamboo as biomass for

charcoal production, for Tandan Community. This initiative in the long would improve the

living standard of the beneficiary community and its adjourning communities.

However, some development potentials likes presence of Wetland, Forest Reserves, Rivers,

vast bamboo resource and cultural practices like Kundum festival can be developed as

tourist destination which would generate income for the local economy.

Also coconut producers should be trained on the various uses of Coconut husk, doormat,

interior designs etc. through the Business Advisory Center (BAC). These initiatives would

help generate employment.

1.17 ACCESSIBILITY TO SOCIAL SERVICES

Educational Characteristics Educational Facilities and Enrolment Levels (2013/2014)

Table 6 Education Facility

Page 74: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

74

NO. FACILITY NO. IN DISTRICT

1 Pre-school 108

2 Primary school 96

3 JHS 68

4 SHS 5

5 Technical/Vocational 2

6 Special school (Eikwe) 1

Source: GES, Ellembelle Directorate, 2013

The chart above depicts a considerable number of facilities at the Primary and JHS level that

is 34% and 24% respectively. However it reduces drastically to 2% at the SHS level. This

situation has contributed to the low human resource base of the District, therefore the need

for conscious effort to increase facilities at the higher levels especially at SHS.

39%

34%

24%

2% 1% 0%

BREAKDOWN OF EDUCATIONAL FACILITIES

Pre-school Primary school JHS

SHS Technical/Vocational Special school (Eikwe)

Page 75: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

75

1.1.2 ENROLMENT by Gender (2013/2014) NO CATEGORY OF SCHOOL ENROLMENT

BOYS GIRLS TOTAL

1 Pre-school 4004 3993 7997

2 Primary 8564 7986 16550

3 JHS 3024 2754 5778

1.1.3 TEACHER POPULATION: trained & untrained (2013/2013)

CATEGORY OF

SCHOOL

TRAINED TEACHERS UNTRAINED

NO MALE FEMALE TOTAL MALE FEMALE TOTAL

1 Pre-school 2 47 49 18 179 197

2 Primary 287 62 349 277 128 405

3 JHS 200 25 225 159 18 177

TOTAL 489 134 623 454 325 779

It is worthy of note that majority of Teachers in the District are untrained. Of the total

number of 1402 teachers teaching at all levels in the District, only 44.44% (623) are trained.

56.56% (779) are untrained. Those trained and untrained for primary are 349 and 405.

Junior High School, 225 and 177 for trained and untrained respectively.

This situation does not auger well for the development of education in the District and

conscious efforts must be made to address underlying cause of the problem in order to

attract qualified teachers to the district.

Page 76: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

76

1.17 Youth and Sports With a dynamic youthful population of about 62%, there is the urgent need for the District

to create a conducive and enabling environment for the youth to channel their energies and

not dissipate it in wasteful ventures.

Sports development has been identified as a major tool for recreation and well-being as well

as economic development. The District has a number of Football and Volley ball teams but

woefully lacks basic sports infrastructure. There is virtually no standard football field as well

as facilities for other sports like basketball, volley ball, badminton, table tennis among

others. These need to be addressed in collaboration with the private sector to promote

sports. The District Assembly would have to facilitate development of sports to promote

employment and tourism and enhance health and also as a tool for and JSS in particular

might portray the picture that teachers are underutilized in the District. It again goes to

buttress the earlier fact that school participation rate is low in the District,

Below is the educational map of Ellembelle District

Page 77: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

77

Page 78: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

78

1.18 HEALTH SITUATION HEALTH FACILITIES AND DISTRIBUTION

The District has the following Health Facilities

Hospitals - 1

Health Centers - 4

Clinic - 8

CHPS Compound - 11

Health Training Institutions - 2

Total - 26

1.18.1 Health Structure Health facilities in the district according to location, ownership and officer in charge

No Facility Location Ownership Personnel In

Charge

1 St. Martin de Porres

Hospital

Eikwe Catholic Church(CHAG) Medical Doctor

2 Aiyinasi Health Centre Aiyinasi Ghana Health Service Principal Medical

Assistant

3 Esiama Health Centre Esiama Ghana Health Service Deputy chief

Medical Assistant.

4 Nkroful Health Centre Nkroful Ghana health service Principal

Midwifery officer

5 Asasetre Health Centre Asasetre Ghana Health Service Senior Midwife

6 AlhajiNuhu CHPS

Compound

Kamgbunli Ghana Health Service Community health

Officer

7 Aidoosuazo CHPS

compound

Aidoosuazo Ghana Health Service Community Health

Officer

8 Kwesikrom CHPS

compound

Kwesikrom Ghana Health Service Community Health

Officer

9 Asomase CHPS compound Asomase Ghana Health S CHO

Page 79: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

79

10 Adom Clinic Awiebo Private Principal Nursing

Officer

11 A.B. Bokazo community

clinic

A.B. Bokazo Private Principal Nursing

Officer

12 Nana Benie Memorial

Clinic

Menzezor Private Medical Doctor

13 Refugee Clinic Krisan Refugee

Camp

UNHCR Nurse

14 Word Alive Community

Health Nursing School

Esiama Ministry Of Health Deputy Director of

Health service

15 Health Assistant Training

School

Asenda Seven Day Adventist

Church

Principal Nursing

Officer

16 Ellembelle Mobile clinic Esiama Ghana Health Service Medical Assistant

17 NASS School Clinic Nkroful Ghana Health Service CHN

18 Ananekrom CHPS Ananekrom Ghana Health Service CHO

19 AwulaeBlay II CHPS Atuabo Ghana Health Service CHO

20 Asanta CHPS Asanta Ghana Health Service CHO

21 Salman CHPS Salman Ghana Health Service CHO

22 Refugee Clinic Ampain

Refugee Camp

UNHCR Nurse

23 WARA Clinic Adamus Site West Africa Resource

Associate (WARA)

Nurse

24 Akropong CHPS Akropong Ghana Health Service CHN

25 Nyamebekyere CHPS Nyamebekyere Ghana Health Service CHN

26 Sanzuley CHPS Sanzuley Ghana Health Service CHN

Page 80: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

80

1.18.2 MAIN PROBLEMS OF THE HEALTH SECTOR IN THE

DISTRICT

The key problems of the health sector in the district include the following

1. Poor access to communities in the northern part of the district as a result of

inaccessible road network making some communities hard to reach.

2. Aged vehicle which needs major repairs.

3. Inadequate residential accommodation for DHA staff.

4. No permanent administrative block for the directorate.

5. Inadequacy of basic equipment in some facilities.

1.18.3 KEY ACHIEVEMENTS

The activities undertaken contributed significantly in achieving the following:

• The district managed to train 10 Maternal Health Volunteers in Esiama Sub district

and they are providing FP services in Cycle beads.

• The district also recorded a Significant increase in ANC 4th visits and average visit in

the year as against that of the previous years

• Implementation of IRS for malaria control with the support of AGA mal in progress

• There has also been relative improvement in NHIS coverage among patients in the

district during the period.

• Opening of three new CHPS compound during the period.

• A strong collaboration with the District Assembly resulted in a new DHMT block

provided by the Assembly, though very congested with associate problem of flooding

during heavy rains.

• Two motorbikes have been procured for New Aiyinase sub district.

• The frequently broken down refrigerator at Esiama have also been repaired during

the year.

• Construction of OPD block at Nkroful Health Centre by the Chief and the people of

Nkroful.

Page 81: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

81

1.18.4 OPD CASES.

Malaria continues to remain the number one cause of outpatient morbidity. It accounted

for 37% out of the total new cases 360721 recorded by all the facilities in the district in the

year 2013.

It is always the number one cause of OPD attendance in all the health facilities and among

all age groups due to poor sanitation and frequent rainfall. It also accounts for most of the

admissions and deaths especially among children at the only hospital in the district, St

Martin de Pores at Eikwe.

Ten Top diseases of OPD attendants for 2013

No Conditions Number Percentage

1 Malaria 132984 37.0

2 Acute Respiratory Infections 45085 12.0

3 Rheu. & Other Joint Pains 22831 6

4 Skin Diseases & Ulcer 22444 6

5 Diarrhea Diseases 19222 5

6 Intestinal Worms 12710 4

7 Gynaecological conditions 10735 3

8 Anaemia 6220 2

9 Acute UTI 4714 1

10 Acute Eye Infection 3873 1

ALL OTHER DISEASES 79903 22

TOTAL 360721 100

Source: GHS, Nkroful

Page 82: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

82

1.18.5 Health Financing With the introduction of the Mutual Health Insurance Scheme in all Districts throughout the

Country, Medical Services are affordable to the majority of the people in the District. This is

reflected in the attendance rate at most Medical Facilities in the District which has improved

tremendously. For example Eikwe Hospital recorded Average daily OPD Attendance 320

patients in 2013 which shows an improvement over the 2012 figure of 258. Still a greater

number of people, especially those in the Rural Areas, continue to rely on alternative Health

Care Systems or delayed till the situation gets complicated. This is evidenced by the trend

of Malaria, a preventable and curable disease always topping not only the cause of

morbidity and admissions but also deaths.

Graph depicting NHIS coverage among OPD attendance (2011-2013

The poor drainage coupled with excessive rainfall and other human practices have resulted

in extensive erosion and flooding within the built environment. Communities would be

encouraged to undertake erosion prevention activities like tree planting, landscaping and

the de-silting of drains. The Assembly would also explore innovative low cost appropriate

technologies for housing delivery and pilot these through a Rural Housing Scheme.

Below is the map of Health facilities coverage in the District.

71

66

69

63

64

65

66

67

68

69

70

71

72

2011 2012 2013

Page 83: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

83

1.19 Water and Sanitation

1.19.1 Water Facilities The water situation in the District has seen some improvement over the years with an

increase in the number of facilities and coverage.

At the end of the plan period the District aim at providing Small Town Water systems for

communities like Asanda and Ankobra and borehole facilities for all communities at the

Aiyinasi North (2014 - 2017).The current water overage is……. With these facilities made up

of 22 pipe systems, 134 boreholes, and 8 hand-dug wells, and 79 kvip, 1,040 vips and 369

Page 84: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

84

WCs. The details of these facilities are depicted in the matrix in the tables below. This gives

a through picture of the current coverage of the population which then assisted in the

selecting the communities that need specific water facilities in the district.

Existing Water & Sanitation Facilities in the District.

AREA COUNCIL No. OF BOREHOLE

No of HAND DUG-WELL

No. of PIPE SYSTEM

Asasetre 17 1 5

Atuabo 23 3 6

Kikam 16 - 2

Esiama 16 - 1

Nkroful 27 4 2

Aiyinasi 18 - 3

Awiebo 17 - 3

TOTAL 134 8 22

Page 85: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

85

1.20 VULNERABILITY ANALYSIS Vulnerability Analysis is the process of assessing the ability of an individual or group to

withstand shocks or manage risks, the probability of becoming poor or poorer. This could

come as a result of the following factors- political, social, environment, economic, or

physical.

The continuous migration of the economic class to Takoradi, Tarkwa and Cote D’voire is a

trend which should be curtailed. Also due to the seasonal nature of fishing activities at the

coast compel people to travel to cocoa producing area to engage in economic activities.

The fast growing of the social class system also contribute to the fast migration trend in the

District. Social problems such as child labour, child trafficking, Streetism and disability occur

Page 86: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

86

as a result of the abuse. Child poverty is also rife in the district. Child neglect due to single

parenting, divorce or both is also common. Most often than not resulting in social vices

such as theft, drug abuses, teenage pregnancy among several others are on the rise. This

has serious implications for the district development, since its future productive capacity is

at risk. The district will forge cutting edge social interventions to address the menace. In

recent times the economy of the district is threaten by increased cost of living due to influx

of foreigners and national alike in to the district resulting from the gold mining as well as the

oil and gas exploration.

1.21 HIV/AIDS The table below illustrates the current trend of HIV/AIDS cases diagnosed at the St Martin

de Porres Hospital at Eikwe 2012 to 2013 and confirmed at the Regional Public Health

Reference Laboratory. H

HIV/AIDS CASES recorded at Jan-Dec. 2013

Category No. Tested No. Positive Percentage Positive

PATIENTS 1965 472 24

Blood Donors 2043 123 6

VCT 12 0 0

PMTCT 2071 63 3

Total 6091 658 10.8

The HIV/AIDS Prevalence rate of 10.8% among hospital attendants and 0.76% for the entire

district shows an improvement over the previous years. It is however worth noting that

these are only the reported cases at the Hospitals. With the limited access to medical

facilities coupled with the high illiteracy rate and the fear of stigmatization, the real

magnitude of the problem may be under estimated.

Page 87: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

87

The plight of the District is worsened by its close proximity to La Cote D’ Ivoire, a high

prevalence area, and the regular interactions between their peoples. The seasonal influx of

migrant fishermen and farm Labourers into the District further compounds issues.

Efforts at addressing the problem have so far been limited to publicity campaigns, fora,

seminars to sensitize various target groups on responsible behavior and safe sex. The

District has a District Population Advocacy Team which undertakes advocacy on Population

and Development issues including HIV/AIDS. There is also a District Aids Committee under

the District Response Initiative which co-ordinates HIV/AIDS Programmes and activities in

the District. The activities of NGOs like Ransom Foundation and End-Time Restoration

Ministry, Life Relief Foundation have improved HIV/AIDS awareness through Voluntary and

Counseling Test. (VCT)

Lack of funding for HIV/AIDS Programmes in the District has constrained efforts at

addressing the challenge. Nonetheless, as the problem has now assumed the dimension of

a development issue, the District would solicit for assistance from its Development Partners

and other Agencies in confronting the issue. Advantage would also be taken of the

establishment of the GARFUND to provide additional funding to combat the HIV/AIDS

menace in the District.

1.22 GENDER The District has its most economically active population been the youth, both male and

female who are not discriminated upon in terms of various roles and responsibilities.

Both women and men have equal opportunities in relation to working at within the formal

sector. However people acquire employment opportunities based on their expertise.

Holistic approaches of community participation (old, young, male & female) are deployed as

part of development processes.

Few numbers of women (both old and young) earn their living through petty trader at

‘galamsey sites’. Traditionally women plays significant role in governance system with some

communities having Queen mothers as part of their governance system. It is also important

to acknowledge the fact that there no enough women representation in the General

Assembly of the district assembly.

Page 88: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

88

1.23 INFORMATION AND COMMUNICATION TECHNOLOGY (ICT) ICT until recent times were is in a very poor state. The recent inclusion of ICT in schools that

is Junior High School and Senior High School has improved. The sprung up of internet cafes

and computer schools has boosted peoples interest in information technology.

Esiama and Aiyinasi are two larger communities who are benefiting from government

commercial ICT Centre. The Aiyinasi Community Information Centre (CIC) is a UNDP Funded

facility which students in the District benefits from. Nkroful has also benefited from an ICT

project. Eikwe and Ngalekyi have not also be left out.

With the emergence ‘white-color’ jobs like mining and recently Oil companies’ activities is,

most people are ready to upgrade their knowledge in Information Technology.

However about 70% of the total population does not have access to Computer, with

majority of these people living in the forest areas.

The extension of electricity to the most of communities would propel people to invest in

Information and Communication Technology (ICT) thus improving IT knowledge in the long-

run

1.24 SECURITY Until 2014, the Ellembelle district was under Nzema East district when it comes to security

(Police). It is obvious that with the emergence of oil and gas activities and gold mining in the

district, the tendency for increased criminal activities cannot be overemphasized. Social

vices such as theft, teenage pregnancy, drug trade among several others are on the rise. It

is against this backdrop that the district fought for its own police command. The District

currently has a police command, headquartered at Esiama. This development has helped

curtail or reduced crime and criminal activities which hither to was on the ascendency.

Conducive environment has been created for investment as well as protection of lives and

property. The assembly is has also initiated a move to get a fire station, immigration and

other security agencies into the district.

1.25 DISASTER The assembly is located in a forest area hence it records almost all year round rainfall. This

situation causes occasional flooding especially at the peak of the raining season between

Page 89: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

89

April and July. During this season there are economic downturns since farmers especially are

unable to access their farms and fishing activities also slow down. It is important to mention

that the district has NADMO officials who are the point of call in disaster situations.

1.26 WATER SECURITY Access to potable water has improved drastically over the years. Most people in the

southern part of the district have unfettered access to water. There are a lot of small town

water systems in the district as well as boreholes. With the exception of the Nkroful water

which is of poor quality due to high iron content, almost all other water sources are

acceptable and of high quality. Notwithstanding this, the northern part of the district faces

serious challenges when it comes to potable due to inaccessible roads, which hinder drilling

vehicles to reach that part of the district. This development affects the health of the

residents of the northern part of the district with occasional OPD cases of water borne

disease. Generally speaking the district is about 90% covered in terms of potable water

access. This situation has help eradicate all curtail water borne disease in the district and

has improved the economic and social lives of the people.

1.27 MIGRATION (IMMIGRATION & EMIGRATION) The district in recent times has seen an increase in population due to influx of large number

of people. The strategic location of the district coupled with its richness in mineral deposits

has seen large number of foreigners and nationals move in to settle. At the peak of this

population increase was the era of the ‘Galamsey’ (illegal mining) activities which also saw

the population of the district doubled. There are also large portions of the people who are

settled in the neighboring Cote D’Ivoire who come home occasionally, especially during

festive occasions.

Page 90: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

90

2.0 CHAPTER TWO

2.1 Prioritization of Development Issues The preparation of the District Medium Term Development Plan makes it vital to have a

group of some of the development gaps of the district for the issues to be addressed.

The Chapter Two highlights the harmonization of community needs and aspirations as

captured in the planning guidelines (GSGDA II 2014-2017) with identified development gaps

in the performance review of the GSGDA I The output therefore would be would be linking

of priorities to the thematic areas of the GSGDA II 2014-2017 MTDPF.

The District Development Priorities were selected taken into consideration the District

limited financial and human resource as well as the Plan Implementation Period

The selection was done through a stakeholder consultation guided by the following criteria

in the guidelines for the preparation of the DMTDP under the GSGDA II (2010-2013)

Impact on a large proportion of the citizens especially the poor and the vulnerable.

Significant linkage effect on meeting basic human needs/rights.

Significant multiplier effect on the local economy.

Spatial location.

Opportunity for promotion of cross-cutting issues.

OUTCOME OF COMMUNITY ENGAGEMENT FOR THE MTDP (2014-

2017)

AREA COUNCIL: NKROFUL EDUCATION.

S/NO ISSUE LOCATION/COMMUNITY

1. Construction of drainage facility at the entrance of cluster of schools at Tema

Nkroful

2. Need to create aware on the need for vocational education.

Nkroful

3. Provision of library facilities for basic school at Nkroful Nkroful

4. Provision of science laboratories for basic schools at Nkroful

Nkroful

5. Provision of teachers quarters at Nkroful Nkroful

Page 91: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

91

6. Construction of additional school block for Salman. The existing school is overcrowded.

Salman

7. Construction of SHS for Salman and its environs Salman

8. Salman community library has not books hence the need to stock the library with learning materials

Salman

9. Construction of KG and Primary block at Obengkrom. Students trek long distance to attend school at Salman

Obengkrom

10. Construction of Primary and JHS at Aluku Aluku

HEALTH

1. Provision of antenatal and maternity services for Salman electoral areas. Surrounding communities in Salman electoral areas have no access to such service. Women in labour have to be carried on motorbikes to access maternity services at Salman.

Obengkrom, Aluku, Angagyale, Angloga success, Tombusolo, Nsiah-Krom

2. There is the need to provide Traditional Birth Attendant (TBA) in communities around Salman.

Obengkrom, Aluku, Angagyale, Angloga success, Tombusolo, Nsiah-Krom

3. Salman Health Center needs additional staff (nurses) Salman

4. Intensify education on preventable diseases Nkroful

ROAD INFRASTRUCTURE

1. Construction of road (access routes) for all communities within Salman electoral area. The major problem within these communities is access and these affect all other activities.

Obengkrom, Aluku, Angagyale, Angloga success, Tombusolo, Nsiah-Krom

2. Rehabilitation of Salman-Teleku Bokazo road Salman

3. Rehabilitation of Nkroful town roads Nkroful

AGRICULTURE

1. Supply of agro chemical for farmers within Salman electoral area. Farmers to have no access agro-chemical and this affect their productivity.

Salman, Obengkrom, Aluku, Angagyale, Angloga success, Tombusolo, Nsiah-Krom

2. Intensify education of farmers on improved systems of farming

Nkroful

3. Steps must be taken to help salvage the red maize specie which faces extinction in the district.

Nkroful

4. Need to encourage the youth to go into farming. Nkroful

WATER & SANITATION.

1. Refuse management/disposal is a big challenge to the community. There are no refuse collection containers as well as a final disposal site.

Salman

2. The communities in Salman electoral area have no access to potable water

Obengkrom, Aluku, Angagyale, Angloga success, Tombusolo, Nsiah-

Page 92: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

92

Krom

3. Provision of additional refuse containers at Nkroful Nkroful

4. Measures must be taken to build communal spirit to deal with sanitation.

Nkroful

5. Construction of drainage system in Nkroful community

Nkroful

6. The Nkroful water quality should be improved upon Nkroful

SOCIO-ECONOMIC

1. Teenage pregnancy is on the ascendancy. Most children of school going age get pregnant and the laws do not deal with such culprits.

Salman

2. The Salman community market has been abandoned since its construction. The assembly should assist in its commissioning or opening.

Salman

3. Construction of a community library for Nkroful Nkroful

4. Construction of a community centre at Nkroful Nkroful

5. Involvement of community in planning and celebration of founders’ day (Osagyefo Day)

Nkroful

6. Provision of a modern market centre for Nkroful Nkroful

7. Opening of Ghana Commercial Bank branch at Nkroful Nkroful

KIKAM AREACOUNCIL.

EDUCATION. (PRIROITY 1)

1. Rehabilitation of catholic JHS/KG at Asanta and SDA Primary school

Asanta

2. Completion of computer laboratory at catholic school. Asanta

3. Rehabilitation of Bobrama KG block Bobrama

4. Provision of furniture (desk) for all schools Bobrama, Asanta , Ankobra

5. Renovation of Ankobra primary school Ankobra

6. Rehabilitation of Asemko primary school Asemko

7. Completion of community library for Asemko Asemko

8. Construction of storm drain from SDA school to Methodist school

Kikam

HEALTH (PRIORITY 2)

1. Provision of pavilion for Asanta CHPS Asanta

2. Construction of nurses staff quarters Asanta

3. Rehabilitation of existing structure to be used as CHPS compound

Kikam

AGRICULTURE (PRIORITY 3)

1. Revamping of Aiyinase and Esiama oil mills Esiama, Aiyinase

2. Supply of improved and resistant coconut seedlings District wide

3. DA should be proactive in solving coastal/ fishing problems. Involvement of key stakeholders to solve problems.

District wide

4. Supply of farm inputs for poultry farmers District wide

5. Provision of agro-chemicals for farmers district wide

Page 93: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

93

6. Streamlining of premix fuel supply

WATER AND SANITATION. (PRIRORITY 5)

1 Construction of sea defense along the Esiama-Ankobra beaches

Esiama, Ankobra, Bobrama, Asanta

2. Construction of toilet facility an Ankobra Ankobra

ROAD INFRASTRUCTURE (PRIRORITY 6)

1. Construction of culvert along the main road Asanta, Ankobra, Bobrama

2. Construction of speed ramps/Passover at Asanta Asanta

3. Reshaping of Asanta north/extension of road ASANTA

SOCIO-ECONOMIC (PRIORITY 4)

1 Education on teenage pregnancy Asanta, Bobrama, Ankobra

2 Provision of vocational and technical training education especially for school drop outs.

Bobrama. Ankobra, Asanta

3. Provision of alternative sources of livelihood. Bobrama, Asanta, Ankobra

4. Construction of market shed for Asemko community Asemko

5. Construction of town roads Kikam

ASASETRE AREA COUNCIL

EDUCATION.

1 Extension of school feeding programme to cover all communities with the Asasetre area council.

Asasetre area council.

2 Construction of teacher quarters at Adubrim Adubrim

3 Completion of Adubrim school (GETFUND) project for Primary, JHS and KG

Adubrim

4 Institute school feeding programme at Ngabawie Ngabawie

5 Construction of school block at Ngabawie Ngabawie

6 Construction of teachers quarters for Mempeasem Mempeasem

7 Institute incentives for teachers at Adubrim Adubrim

8 Revamping the ICT center at Asasetre Asasetre

9 Supply of teaching and learning materials for school within the area council

Asasetre area council.

ROAD INFRASTRUCTURE

1. Construction of road from Aiyinase to Beposo Aiyinase, Beposo

2. Construction of access road at Ngabawie, Ayawora and Mempeasem

Mempeasem, Ngabawie, Ayawora.

WATER AND SANITATION

1. Provision of boreholes for all communities Asasetre electoral area

2. Construction of toilet for other communities. Mempeasem, Ngabawie, Ayawora

3. Provision of potable water for Mempeasem, Ayawora and Ngabawie

Page 94: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

94

4. Construction of toilet facility for Adubrim and other communities

Adubrim electoral area

5. Public education on the need to observe proper sanitation especially among food vendors

District wide

5. Stray animals should be arrested Adubrim electoral area.

AGRICULTURE

1. Supply of agro-chemicals (fertilizers, weedicides, pesticides etc)

Adubrim electoral area

2. Capacity building on improved farming systems Adubrim electoral area

3. Construction of bridge on Nreni river

SOCIO-ECONOMIC

1. Extension of electricity to New Sanfo New Sanfo

2. The need to intensify education on teenage pregnancy Asasetre electoral area

3. Construction of market shed

4 Extension of electricity coverage to Adubrim zone Adubrim and environs

AWIEBO-BASEKE AREA COUNCIL.

EDUCATION (PRIORITY 2)

S/NO. ISSUES LOCATION/COMMUNITY

1. Provision of additional KG and primary block and renovation of existing one at Baseke

Baseke

2. Construction of Methodist JHS block at Awiebo. Awiebo

3. Renovation of Roman Catholic Primary school at Awiebo

Awiebo

4. Construction of teachers quarters at Awiebo Awiebo

5. Construction of Bungalow and security wall at BOKASS

Awiebo

6. Completion of classroom block at BOKASS Awiebo

7. Completion of Awiebo Roman Catholic KG block Awiebo

8. Construction of new school block for Mantukwa Bibianiha and Domeabra

Mantukwa Bibianiha and Domeabra

9. Construction of JHS block for Baseke Baseke

10. Construction of teachers quarters for communities Mantukwa, Ebi and Awiebo

11. Construction of library for Baseke and Awiebo Awiebo, Baseke

12. Construction of school block for KG and Primary school at Edwakpole

Edwakpole

13. Completion of KG block at Akpandue and renovation of primary school

Akpandue

14. Construction of teachers quarters for A.B Bokazo and toilet facilities for school

A.B Bokazo

15. Construction of ICT facility for A.B Bokazo A.B Bokazo

16. Construction of JHS, teachers quarters and toilet facilities at Alla Bokazo

Alla Bokazo

HEALTH (PRIORITY 3)

1. Construction of CHPS for Mantukwa electoral area Mantukwa , Domeabra

Page 95: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

95

and Domeabra

2. Construction of health facilities in communities Baseke, Awiebo, Ebi

3. Upgrade CHPS compounds to health centers Awiebo, A.B Bokazo

WATER AND SANITATION (PRIORITY 4)

1. Supply of refuse containers for Awiebo and Baseke Baseke, Awiebo

2. Construction of toilet facility and construction of additional two at Baseke

Baseke

3. Construction of toilet facility at Ekenyamzo and Awiebo junction

Ekenyamzo, Awiebo junction.

4. Construction of borehole at Ekenyamzo Ekenyamzo

5. Provision of potable water (hand dug well at Mantukwa

Mantukwa

6. Provision of hand-washing basin for Awiebo zone Awiebo electoral area.

7. Provision of potable water at Edwakpole Edwakpole

8. Provision of toilet facility at Alla Bokazo Alla Bokazo

9. Create environment for toilet and water privatization.

District wide

10. Provision of storm drains at Edwakpole Edwakpole

ROAD (PRIORITY 1)

1. Construction of access road from Ebi junction to Mactrime

Ebi , Mactrime

2. Construction of road from Fist-Gate-Domeabra-Bibianiha-Sanfo

First Gate, Domeabra, Sanfo

3. Construction of bridge at Mantukwa Mantukwa

4. Construction for farm tracks

5. Reshaping of A.B Bokazo electoral area roads A.B Bokazo

6. Provision of drainage for A.B Bokazo A.B Bokazo

AGRICULTURE (PRIORITY 5)

1. Agric extension services for Awiebo zone Awiebo

2. Streamlining the supply of fertilizer

3. Create easy access to farm inputs and agro-chemicals

4. Farm tracks for A.B Bokazo A.B Bokazo

5. Mass spraying exercise not ongoing at Awiebo area council

SOCIO-ECONOMIC (PRIRORITY 6)

1. Construction of communication center at Awiebo Awiebo

2. Completion of night market at Awiebo Awiebo

3. Provision of bus at Melewu Melewu

4. Construction of market at Baseke Baseke

5. Construction of market shed at Bibianiha Bibianiha

Page 96: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

96

ESIAMA AREA COUNCIL

EDUCATION (PRIORITY 1)

S/NO. ISSUES LOCATION/COMMUNITY

1. Provision of additional block for Kamgbunli KG, teaching and learning materials and furniture

Kamgbunli

2. Renovation of Kamgbunli Islamic Primary school and construction of additional block for ‘C’

Kamgbunli

3. Provision of borehole for Kamgbunli cluster of schools Kamgbunli

4. Construction of additional classroom for school ‘B’ Kamgbunli

5. Construction of toilet facility for Primary ‘B’ and JHS ‘B’

Kamgbunli

6. Provision of canteen for cluster of schools Kamgbunli

7. Provision of computer laboratory library block for cluster of schools

Kamgbunli

8. School electrification Kamgbunli

9. Extension of playing field for cluster of schools Kamgbunli

10. Construction of assembly hall for Kamgbunli SHS Kamgbunli

11. Provision of additional staff accommodation for staff of SHS

Kamgbunli

12. Provision of duty or administrative vehicle for SHS Kamgbunli

13. Provision of boy and girls hostels for SHS Kamgbunli

14. Construction of Library block for SHS Kamgbunli

15. Revamp existing school part for SHS Kamgbunli

16. Provision of access road for SHS and entire community roads

Kamgbunli

17. All schools in the Esiama community should be fenced. Most of the schools have become a hub for criminal activities (drug trade).

Esiama

18. Creation of access bridges to link the cluster of schools at Mozukro

Esiama

19. Construction of staff quarters for teachers at Esiama especially Esiama Sec. Tech. SHS and Azulenoanu

Esiama, Azulenoanu

20. Provision of potable water for schools at Azulenoanu Azulenoanu

22. School feeding programme is conducted under unhygienic conditions. Students share common eatries and bowls

Esiama

23. School electrification exercise Esiama electoral area

24. Provision of libraries for schools in the Esiama electoral area

Esiama, Azulenoanu

HEALTH (PRIORITY 4)

1. Upgrade existing CHPS to health center Kamgbunli

2. Provision of staff quarters for health workers Kamgbunli

3. Upgrade Esiama health centre Esiama

4. Construction of a permanent facility for Azulenoanu CHPS compound. The current structure is rented

Azulenoanu

WATER AND SANITATION (PRIORITY 5)

1. Supply of refuse containers Kamgbunli. Azulenoanu

Page 97: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

97

2. Construction of drains within town Kamgbunli

3. Provision of toilet facilities for Kamgbunli Kamgbunli

4. Construction of additional toilet facility at Esiamakpole

Esiama

5. Timely and regular cutting of refuse Esiama

6. Provision of dustbin at Esiama placed at vantage points

Esiama

7. Construction of toilet facility at Azulenoanu Azulenoanu

8. Poor drainage system at Esiama Esiama

AGRICULTURE (PRIORITY 2)

1. Revamp Kamgbunli rice irrigation project Kamgbunli

2. Create ready market for farm produce especially tomatoes

Kamgbunli

3. Provision of technical expertise for aqua-culture and credit facilities for framers

Kamgbunli

4. Provision for aqua-culture-oil and gas companies should assist fisher folks to acquire skills in alternative sources of livelihood

Esiama, Azulenoanu

5. Revamp Esiama oil mill Esiama

6. Agriculture diversification Esiama, Azulenoanu

7. Research should be done in the area of coconut extinction (coconut disease) to ascertain a solution.

Esiama, Azulenoanu

ROAD INFRASTRUCTURE (PRIORITY 3)

1. Reshaping of Kamgbunli new site road Kamgbunli

2. Reshaping of Kamgbunli town roads Kamgbunli

3. Second phase of Esiama town roads should be completed

Esiama

4. Building should be streamlined to avoid encroachment on streets and roads at Esiama new site.

Esiama

SOCIO-ECONOMIC (PRIORITY 6)

1. Construction of public library Kamgbunli

2. Construction of market shed at Kamgbunli Kamgbunli

3. Provision of community center for Kamgbunli Kamgbunli

4. Esiama market is not used Esiama

7. Rising cost of living as a result of gold mining and oil and gas activities

Esiama

8. Increased in social vices (drug trade along the Esiama beaches, theft etc)

Esiama

9. The need to construct fire service station in the district.

Esiama

Page 98: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

98

AIYINASE AREA COUNCIL.

EDUACTION (PRIOTITY 2)

S/NO. ISSUES LOCATION/COMMUNITY

1. Construction of school block for Kwasikrom (KG, Primary and JHS)

Kwasikrom

2. Construction of teachers quarters for Kwasikrom Kwasikrom

3. Provision of furniture for Kwasikrom schools (desk) Kwasikrom

4. Supply of trained. This Kwasikrom school is understaffed

Kwasikrom

5. Construction of KG block for Asomase Asomase

6. Construction of school block for Sendaso Sendaso

7. Inadequate teachers at Bonsukrom and Asomase Bonsukrom, Asomase

8. Construction of staff quarters for Aiyinase North Schools

Aiyinase North

9. Extent coverage of School feeding programme to Aiyinase North

Aiyinase North

10. Construction of teachers quarters Akoto, Alloakpoke, Awiaso

11. Rehabilitation of Aiyinase Catholic Primary School Block

Aiyinase

12. Provision of JHS Block for Aiyinase Catholic School. Aiyinase

13. Completion of Aiyinase Methodist KG started by PTA

Aiyinase

14. Provision of trained teachers for Aiyinase Catholic school

Aiyinase

15. Provision of teachers quarters for Aiyinase community

Aiyinase

16 Construction of KG block and teachers quarters at Fiasolo

Fiasolo

17 Constriction of teachers quarters and KG block at Kanokware

Kanokware

18 Construction of teachers quarters and completion of teachers quarters at Nyamebekyere

Nyamebekyere

19 Completion of KG block at New Sanfo New Sanfo

20 Construction of KG and Primary blocks at Atababo Atababo

HEALTH (PRIORITY 3)

1. Expansion of Kwasikrom CHPS compound. Kwasikrom

2 Supply of drug and other hospital equipments to Kwasikrom CHPS

Kwasikrom

3 Construction of CHPS at Werekokrom Werekokrom

4. Supply of mid-wife for Kwasikrom CHPS and general staff. The CHPS is under staffed

Kwasikrom

5. Construction of CHPS at Sendaso Sendaso

6. Expansion of Asomase CHPS Asomase

7. Provision of mid-wives for asomase CHPS compound Asomase

8. Construction of CHPS Akoto, Alloakpoke, Awiaso

9. Upgrading of facilities at Aiyinase Health Centre (laboratory, standby generator, Ambulance etc)

Aiyinase

Page 99: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

99

10. Provision of means of transport for Nyamebekyere CHPS

Nyamebekyere

11. Completion of existing CHPS at Nyamebekyere Nyamebekyere

ROAD INFRASTRUCTURE (PRIORITY 1)

1. All roads networks at Aiyinase North are in deplorable condition and virtually immotorable. This affects all aspects of their life. In short accessibility is single most important. When this problem is resolved, it will have rippling effects on all sectors.

Aiyinase North

2. Rehabilitation of Aiyinase-Ayawora Road Aiyinase

3. Rehabilitation of Akoto-Alloakpoke road Akoto-Alloakpoke

4. Rehabilitation of Awiaso road Awiaso

5. Rehabilitation of Fiasolo road Fiasolo

WATER AND SANITATION (PRIORITY 4)

1. Rehabilitation of non-functioning boreholes and poor quality of ground water

Aiyinase north

2. Construction of additional boreholes at Kwasikrom

3. No clean drinking water at Asomase and its surrounding communities. In the interim hand dug well could be provided due to poor road network making it difficult for drilling machines to access the area

Asomase

3. Construction of toilet facility at Awiaso Awiaso

4. Extension of existing water facilities to Aiyinase New site

Aiyinase

AGRICULTURE (PRIORITY 6)

1. Post-harvest losses due mainly to poor road network and non-existing storage facilities

Aiyinase North Communities

2. Supply of farm inputs( agro-chemicals cutlasses, protective wears etc) to farmers

Aiyinase North

3. Agric extension services Aiyinase North

4. Supply of improved cocoa seedlings Aiyinase North

5. Credit support for farmers Aiyinase North

6. Rehabilitation of roads Alloakpoke, Awiaso, Akoto

SOCIO-ECONOMIC (PRIORITY 5)

1. Construction of community centre for Kwasikrom and Asomase

Kwasikrom, Asomase

2. Construction of market shed for Kwasikrom and Asomase

Asomase, Kwasikrom

3. Completion of electrification project at Kwasikrom Kwasikrom

4. Extent telecommunication coverage to Aiyinase North

Aiyinase North

5. Provision of police Station for Aiyinase North Aiyinase North

6. Teenage pregnancy is on the rise at Aiyinase North Aiyinase North

7. Extension of electricity to Alloakpoke Alloakpoke

8. Upgrading of existing market Aiyinase

9. Extension of electricity to new sites Aiyinase

Page 100: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

100

ATUABO AREA COUNCIL

EDUACTION (PRIOTITY 2)

S/NO. ISSUES LOCATION/COMMUNITY

1. Provision of trained teachers for Eikwe schools as well as the provision of ancillary facilities (toilet/urinal). There are inadequate teachers and this affect teaching and learning.

Eikwe

2. The Eikwe community JHS block’s roof has been ripped off, hence the need to provide roofing sheet for re-roofing.

Eikwe

3. Provision of accommodation (staff quarters) for teachers within the catchment area.

Eikwe electoral area

4. Construction of JHS block for New Bakanta. New Bakanta

5. Construction of Nursery block for Sanzule-Krisan Primary school.

Krisan, Sanzule

6. Provision of primary and KG block for Ngalekpole Ngalekpole.

7. Institution of a scholarship scheme for communities within the oil and gas catchment zone

Atuabo electoral area.

8. Construction of primary school for Atuabo. Atuabo

9. Provision of KG block for Asemdasuazo Asemdasuazo

10. Construction of teachers quarters for Asemdasuazo Asemdasuazo

11. Construction of additional KG block for Atuabo Atuabo

HEALTH (PRIORITY 5)

1. The need to train community based health volunteers on the provision of first aid in emergency cases.

Eikwe electoral area

2. Construction of a mortuary block for the St. Martins de Porres Hospital

Eikwe

3. Expansion of Atuabo CHPS compound to health centre

Atuabo

4. Construction of nurses’ quarters at Atuabo Atuabo.

WATER & SANITATION. (PRIORITY 2)

1. Provision of waste containers and the construction of a final disposal site. The existing disposal site is full and the assembly should assist to refill with lancrete.

Eikwe

2. There are inadequate potable water at New Bakanta, Sanzule, Old Bakanta and Krisan.

Krisan, New Bakanta, Old Bakanta, Sanzule and Krisan

3. Construction of additional toilet facility at Ngalekpole Ngalekpole

4. There is the need to clean the beaches along the coast whiles establishing Sanitation Inspectors.

District wide

5. Asemdasuazo needs additional toilet facility Asemdasuazo

6. Provision of refuse collection containers. Atuabo, Asemdasuazo

AGRICUTURE. (PRIORITY 4)

1. Unapproved method of fishing (light fishing) is District wide

Page 101: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

101

affecting catch.

2. Provision for aqua-culture. Fisher folks should be trained and given support to go into fish rearing.

Eikwe electoral area

3. Farmers have no access to credit facilities District wide

4. Agriculture produce preservation is a big challenge. The need for storage facility

Eikwe

5. Farmers have no access to agric extension services District wide.

6. Supply of agro-chemical and farm inputs to farmers Atuabo

7. Train farmers on alternative sources of livelihood District wide

SOCIO-ECONIMIC (PRIORITY 3)

1. There is the need to enhance vocational training in the district

Eikwe

2. Eikwe community needs market sheds Eikwe

3. Electricity coverage should be extended to areas without electricity.

Atuabo electoral area.

ROAD INFRASTRUCTURE (PRIORITY 6)

1. The need to train drivers and commuters of roads on road safety

Eikwe

2. Proper drainage systems should be constructed for communities along the road from A.B Bokazo to Atuabo

Eikwe electoral area

3. Construction of town roads for Eikwe and Atuabo Eikwe, Atuabo

4. Rehabilitation of Atuabo-Asemdasuazo road. Asemdasuazo

Page 102: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

102

Below are the thematic areas of GSGDA 1) 2010-2013 and the harmonized district development

issues.

2.1.1 Prioritized development issues under the MTDPF 2014-2017

No. Thematic areas of MTDPF

2010-2013

Prioritized development issues

1. Infrastructure and Human

Settlements.

Poor road condition

Inadequate Potable water coverage

Inadequate planning layout and lack

of education on land issues

Low electricity Coverage

2. Accelerated agriculture

modernization and sustainable

Natural Resource Management.

Inadequate capital and Farming

inputs

Poor development of fishing Industry

Negative impact of Algae bloom on

Sea fishing

Inadequate Agro-processing Industry

3. Enhancing Competitiveness in

Ghana’s private sector

Under-developed Tourism potentials

Low production level

Inadequate Credit facility

Page 103: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

103

4. Human Development, Productivity

and Employment.

Poor infrastructural base( Education &

Health)

Poor Environmental Sanitation

Poor Housing Condition

Inadequate Office and Residential

accommodation

High HIV/AIDS prevalence rate

High incidence of malaria

Inadequate teachers at basic school

level

5. Transparent and Accountable

Governance.

High illiteracy rate

High incidence of lawlessness

Inadequate Logistics for Monitoring of

projects and Programmes

Low participation of sub-structures

Poor Internal Revenue Generation

6. Oil and Gas Development Inadequate Knowledge on socio-

economic importance of Oil and Gas

Inadequate local involvement in Oil &

Gas Industry

Page 104: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

104

2.2 POCC ANALYSIS

2.2.1 ENHANCING COMPETIVENESS IN GHANA’s PRIVATE SECTOR

PIRORITIZED

DEVELOPMENT

ISSUE

POTENTIALS OPPORTUNITIES CONSTRAINTS CHALLENGES

Underdeveloped

tourism

potentials

Presence of

hotels and

resorts in the

District Eg. Kikam

Beach Beach

Resort.

Influx of private

developers into the

District.

Support from

Ghana Tourist

Board.

Hotels in

neighboring

Districts

Existence of a

tourism

development

Inadequate funds

and logistics (DA)

Inadequate

infrastructure. Eg

Roads, electricity.

Un updated tourism

development plan.

Tourism potentials

Low private

sector interest to

invest.

Inadequate funds

from central

government to

support tourism

development.

Page 105: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

105

plan eg. SNV. not well marketed.

Conclusion: Underdeveloped tourism potentials can be solved. Existing tourism development plan should be updated and marketed well

and, presence of hotels would help improve the situation, while low private sector interest to invest in tourism and inadequate

infrastructure could be tackled through support of Ghana Tourism Board and private developers respectively.

Low Production

Level

Presence of

increasing

economic

activities in the

communities e.g.

Esiama and

Aiyinasi due to

Mining activities

Increasing

number of

interventions

due Oil and Gas

eg.ICFG &

Amanzule

Project will help

boost fishing

Absence of

Comprehensive

Local Economic (LED)

Development Plan.

Inadequate

commitment

from central

government

toward LED.

Page 106: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

106

stock

Conclusion: Low Production Level can be solved. Inadequate commitment from central government towards LED would be tackled by

interventions due to Oil and Gas, while absence LED Development Plan can be solved by increasing economic activities in communities.

Poor Internal Revenue

Generation

Increasing

number of

economic

activities in

larger

communities

Availability of

ratable

properties and

services

Existence of

Intervention to

improve revenue

generation e.g.

LOGODEP

Existence of DDF

as a source of

supplementary

Fund.

Inadequate number and

Capacity of Revenue

Collectors

Apathy and unwillingness of

communities members to

pay rates

Declining coconut industry

High

unemployment

rate

Page 107: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

107

Conclusion: Poor Internal Revenue Generation can be solved. High unemployment rate would be curtailed by increasing economic

activities in larger communities, and inadequate number and capacity of revenue collectors would be solved by the existence of

intervention to improve revenue generation.

Inadequate

Credit Facilities

Possibility of

more financial

institutions

locating to the

district due to oil

and mining

activities

Presence of Rural

Banks and other

financial

institution

Availability

financial support

for the

formation of co-

operatives from

GOG and Donor

agencies

Inadequate interest

in banking

Inadequate GOG

funds towards

the development

of banking

industry

Conclusion: Inadequate Credit Facilities can be solved. Inadequate interest in banking is constraint which can be solved by the possible

sprung up of financial institution due to Oil & Gas, and inadequate GOG funds toward development of banking Industry can be curtailed

Page 108: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

108

by availability support for the formation of co-operatives as an opportunity.

2.2.2 ACCELERATED AGRICULTURE MODERNIZATION AND SUSTAINABLE NATURAL RESOURCE MANAGEMENT

PRIORITIZED

DEVELOPMENT

ISSUE

POTENTIALS OPPORTUNITIES CONSTRAINTS CHALLENGES

Inadequate

land farming

inputs

Presence of Agric

Department in

the District.

Formation of

farmer’s

cooperatives to

access existing

support

programmes.

Central

government

interventions

(Eg. Cocoa

spraying

programmes.)

Government

subsidies on

farming inputs

Eg. Fertilizer.

Non availability of

ready markets due to

poor road network.

Inadequate funds at

the Assembly level.

Low income levels of

farmers.

Inadequate

extension officers.

Inadequate funds

from central

government.

Page 109: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

109

Conclusion: Inadequate land farming inputs can be tackled. Inadequate fund from Central gov’t would be solved through Subsidies of

farm inputs from Central gov’t and intervention like Cocoa Spraying Programmes, while low income levels of farmers and inadequate

extension officers would be tackled by the presence of Agric.Dept, and formation of farmers’ cooperatives in accessing support

programme.

Poor

development

of fishing

industry

Presence of Agric

Department in

the District.

Inland fishing

development due

to enough water

bodies.eg

Influx of NGOs

into the district

(Eg. Coastal

Resources

Center and

Friends of the

Nation) to

support the

industry.

Absence of fisheries

department.

Ineffective fishing

policies.

Conclusion: Poor development of fishing industry. Ineffective fishing policies and absence Fisheries Dept. would be solved be the

presence of development partners eg. Coastal Resource Centre would solve the problem of Poor development of fishing Industry.

Negative

impact of algae

bloom on sea

fishing

Existing of

research

institutions.

Inadequate funds

and logistics.

Lack of technical

capacity to handle

Inaction on the

part of

government.

Page 110: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

110

situation.

Conclusion: Negative impact of algae bloom on sea fishing, would need a lot of commitment from the gov’t since the District does not

have any potential to curtail the situation, however has the existence of research institutes as opportunities. Lack of technical capacity

and inaction on the part of government, thus the need for muti-sectoral commitment.

Inadequate Agro-

Based Industry

Availability of

Land for the

construction of

industry

Presence Land

Use Map

Central

Government

intervention

Availability of

development

partners eg.

USAID.

Inadequate Funds

from Central

Government

Inadequate Fund

from Central

Government

Conclusion: Inadequate Agro-Based Industry can be solved. Presence of Land Use Map and availability of development partners can help

can help curtail the challenge of government’s problem of inadequate Fund, there improving Agro-Based Industry.

Page 111: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

111

2.2.3 Oil and Gas Development

PRIORITIZED

DEVELOPMENT

ISSUE

POTENTIALS OPPORTUNITIES CONSTRAINTS CHALLENGES

Inadequate

Knowledge on socio-

economic importance

of Oil and Gas

Constituting of Oil and

Gas Sub-committee to

deliberate on issues

Intervention from

NGO’s to educate

populace on the Socio-

economic impact of Oil

and Gas e.g. FoN.

Over expectation of local

people on Oil and Gas

benefit

Inadequate Training

Institution for Oil & Gas

Development.

Conclusion: Poor Knowledge on Oil and Gas can be solved. Constraints like over expectation of locals on Oil & Gas can be solved by the

Constitution of Oil & Gas Committees, while inadequate Training Institution can be tackled by intervention from NGOs to educate

locals on impact of Oil & Gas.

Inadequate local

involvement in Oil &

Gas Industry

Existence of Oil and Gas

facilities in the District.

Eg Ghana Gas Comp.

Ltd.

Availability of local

expertise

Willingness of

government to

improve Oil & Gas

industry

Existence Oil & Gas

Educational

Institutions

Inadequate educational

background of local people

to tap into Oil industries

Inadequate Funds for

Capacity building

Exercise from Oil & Gas

Companies.

Page 112: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

112

Conclusion: Inadequate local involvement in Oil and Gas Industry. Inadequate educational background of local people would be solved

by the existence Oil & Gas Educational Institutions, while inadequate funds for capacity building exercise on Oil & Gas would be solved

by government’s willingness to improve Oil & Gas.

2.3.4 INFRASTRUCTURE AND HUMAN SETTLEMENTS DEVELOPMENT

PIRORITIZED

DEVELOPMENT

ISSUE

POTENTIALS OPPORTUNITIES CONSTRAINTS CHALLENGES

Poor road

condition

Presence of

Feeder Roads

Dept. in the

District

Acquisition of

grader by the DA.

Central

government

interventions.

Supplementary

resources from

dev’t partners.

Presence of heavy

duty trucks can affect

roads.

High rainfall affects

roads.

Inadequate funds

and logistics.

Inadequate funds

and logistics.(

Central

government)

Conclusion: Poor Road Conditions can be curtailed partially since substantial potentials and opportunities exist. The challenges can be

addressed through lobbying, and with the status of newly created district. Constraint can be tackled by constructing drains along roads,

and also revenue from road charges and presence of grader can be used to dress bad road.

Inadequate Ability to expand Support from Increase in Revenues for

Page 113: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

113

potable water

coverage

existing EU and

IDA (CWSA) water

facilities.

High rainfall

pattern good for

rainwater

harvesting.

Existence of

reliable water

bodies.

Existence of

WATSAN&WSDB

development

partners (Eg.EU)

in the provision

of potable water

population as a result

of mining and oil

activities might put

pressure on existing

water facilities.

Reluctance of

communities to pay

user charges that can

be used for

expansion of water

facilities.

expansion might

be used for other

purposes. (Eg. As

contract fees.)

Conclusion: Inadequate potable water coverage can be solved by the presence of the District potentials. Increased pressure on existing

water facilities and non-payment of user charges by communities can be curtailed through expansion of both EU & IDA Small Town

Water System s and Sensitization of communities through WATSANs and WSDBs.

Page 114: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

114

Inadequate

planning layout

and lack of

education on

land issues

Presence of Town

and Country

Planning

Department.

Introduction of

Spatial Planning

and Land scaping

by LOGODEP

Commitment of Gov’t

through Existence of

Intervention.eg. LAP.

Inadequate funds

and logistics

Inadequate

personnel.

Absence of planning

schemes.

Failure to apply for

building permit.

(Developers)

Absence of Assembly

bye – law.

Poor or

ineffective land

policies.

Conclusion: Inadequate planning layout and lack of education on land issues can be partially minimize. The Absence of planning

schemes and

Failure to apply for building permit. (Developers) would be solve by Introduction of Spatial Planning and Landscaping by LOGODEP and

the existence of Town & Country Dept, and Poor or ineffective land policies can be solved by government commitment towards

implementation of intervention.

However there is the need for other opportunities to curtail problem fully.

Low electricity

coverage

Presence of ECG

in the district

Central

Government

support

Inadequate funds

and logistics.(DA)

Inadequate funds

and

logistics.(Central

Page 115: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

115

Self-help projects. programmes (Eg.

Rural

Electrification

project)

government)

Conclusion: Low electricity coverage would be solved through the existence ECG and Central government support for Rural Electricity

Project

2.3.5 HUMAN DEVELOPMENT, PRODUCTIVITY AND EMPLOMENT

PRIORITIZED

DEVELOPMENT

ISSUE

POTENTIALS OPPORTUNITIES CONSTRAINTS CHALLENGES

Poor

infrastructural

base (Education

& Health)

Presence of

mining and oil

companies.

Central government

support programmes.

(Eg. Schools under trees

programme)

Inadequate

funds.

Lack of support

from traditional

authorities.

Lack of support

from community

members and

local authorities.

Inadequate

funds from

central

government.

Conclusion: Poor infrastructural base (Education & Health) can be solved. Inadequate funds from Central government is a challenge

Page 116: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

116

which can be solved by support from central government like GETfund Schools under Trees initiative, and Constraints like Inadequate

funds and lack of support from local communities can be solved by presence of mining companies.

Poor

Environmental

Sanitation

Presence of

Env. Health

Office and

officers

Presence of

mining and oil

companies

Support of

traditional

authorities

Enactment and

enforcement of

DA bye – law

Influx of NGOs to

support sanitation

Development partners

and private sector

ready to invest in

sanitation

Central governments

support for

sanitation(Governments

Dev. Policy)

Low communal

spirit

Inadequate funds

and logistics

Low level

education on

sanitation

Inadequate

personnel

Absence of

Assembly bye –

law

Apathy on the

part of

community

members.

Inadequate

funds and

logistics

Lack of political

will

Inadequate

data on

sanitation

Conclusion: Poor Environmental Sanitation can be solved. Absence of Assembly bye – law Apathy on the part of community members

and inadequate personnel can be tackled by enactment and enforcement of DA Bye-laws and presence of Environmental Health Office,

Page 117: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

117

while Lack of political will and inadequate Funds and Logistics can be solved by Central Government support for sanitation (Sanitation

Policy)

Poor housing

condition

Abundant local

materials

Support from Central

Government (Housing

schemes Eg. STX)

Low levels of

income.

Poor national

housing policy.

Conclusion: Poor housing condition can be solved. Low levels of income and Poor national housing policy can be curtailed by Potential

like abundant local materials and challenges like support from Central Government (Housing Schemes eg. (STX)

Inadequate

office &

residential

accommodation

Availability of

land for

construction.

Support from

oil and mining

companies.

Increase in IGF.

Possible government

interventions.

Inadequate

funds.

Lack of

provision for

newly created

districts.

Page 118: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

118

Conclusion: Inadequate office & residential accommodation can be solved. Lack of provision for newly created districts is a challenge

which can be tackled by opportunity presence of government intervention, while inadequate funds can be solved by potential like

support from Oil and Mining Companies.

High HIV / AIDS

prevalence

rate.

Presence of

district Health

Admin.

Existence of

District Aids

Committee

(DAC)

Support from Ghana

Aids commission.

Presence of NGOs in the

district.

Ignorance of Local

people of on the health

and Socio-economic

effect of HIV/AIDS.

Influx of people

into the district

due to mining

activities.

Low levels of

education.

Inadequate funds

from DAs to

combat HIV/AIDS.

Inadequate donor

support.

Conclusion: High HIV / AIDS prevalence rate can be solved. Influx of people into the district due to mining activities and Low levels of

education can be solved by the presence of District Health Administration and the existence of District Aids Committee (DAC)

Page 119: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

119

High incidence

of malaria

Presence of

District Health

Administration

and

Environmental

Health Unit

Support from

local authorities

Presence of

mining

company

Influx of Health related

NGOs into the District

Other government

interventions

Existence of

Marshy and

Wetlands.

Low level of

education.

Inadequate funds

and logistics.

Poor sanitation

conditions.

Inadequate

infrastructure.

Inadequate Heath

Training Institution.

Conclusion: High incidence of malaria can be solved. Inadequate Heath Training Institution can be solved by Influx of Health related

NGOs into the District, while constraints like low level of education and poor sanitation conditions can be solved by Presence of District

Health Administration and Environmental Health Unit and support from local authorities.

Inadequate

teachers at

basic school

level

District

scholarship

schemes.

Central government

support programmes

(Eg.NYEP Education

module

Inadequate funds

to provide

enough

infrastructures at

the basic Sch.

level.

Page 120: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

120

Conclusion: Inadequate teachers at basic school level can be solved. Inadequate funds to provide enough infrastructures at the basic

Sch. Level are a constraint which can be solved by potential like District Scholarship Scheme.

2.3.5 TRANSPARENT AND ACCOUNTABLE GOVERNANCE

PRIORITIZED

DEVELOPMENT

ISSUE

POTENTIALS OPPORTUNITIES CONSTRAINTS CHALLENGES

High illiteracy

rate

Presence of

District Education

Directorate.

District

scholarship

Schemes for both

teacher trainees

and students.

Government

support

programmes (Eg.

Schools under

trees project)

Inadequate funds.

Unwillingness of

parents to support

wards in school.

Inadequate trained

teachers.

Inadequate

classroom blocks

Inadequate funds

from central

government.

Conclusion: High illiteracy rate can be solved. Inadequate funds from central government is a challenge which can be solved by

programmes like schools Under Trees by GETfund, while Unwillingness of parents to support wards in school can be curtailed by

potential like District scholarship

Schemes for both teacher trainees and students.

Page 121: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

121

High incidence

of lawlessness

Presence of NCCE

for education at

various levels eg.

Radio programs.

Presence of basic

structures for

the police

Support from

other central

government

interventions

(Eg. CBRDP

training on

Social

Accountability)

Inadequate police

personnel

Inadequate

infrastructure

Inadequate funds

and logistics

Inadequate funds

and logistics for

capacity building

from Gov’t

Inadequate

personnel

Conclusion: High incidence of lawlessness can be solved. Inadequate police personnel and inadequate funds and logistics can be solved

by presence of NCCE and presence of presence of existing police structures, while Inadequate funds and logistics for capacity building

from Gov’t can be tackled by interventions like CBRDP eg. Social Accountability training.

Inadequate

logistics for

monitoring of

projects and

programmes

Financial

commitment

toward

monitoring and

evaluation

through Annual

Budgeting

Existence of

interventions like DDF

and LOGODEP to help

build DAs Capacity for

Revenue generation.

Inadequate IGF to

support recurrent

expenditures

including M&E

Skewness of

DACF towards

other sectors to

the detriment of

M&E

Conclusion: Inadequate logistics for monitoring of projects and programmes can be solved. Challenge like skewed nature of DACF

towards other sectors would be tackled by existence of DDF and LOGODEP would help build capacity to improve revenue generation.

Page 122: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

122

Low

participation of

sub - structures

Presence of NCCE

in the district for

education

Support of local

authorities

Policy change in

the constitution

of the sub-

structures

Lack of motivation

Apathy on the part of

elected members

Large numbers of

elected members

Lack of logistical

support

Conclusion: Low participation of sub – structures can be solved. Apathy on the part of elected members and lack of motivation can be

tackled by presence of NCCE in the District, and large numbers of elected members would be solved by policy changed in sub-structures

formation.

Page 123: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

123

3.0 CHAPTER THREE

3.1 DEVELOPMENT GOAL, OBJECTIVES AND STRATEGIES

DEVELOPMENT FOCUS The Development Focus of the Ellembelle District Assembly based on analysis of the

community aspirations, departmental plans, and NGO’s and development partners’ visions

is to ensure that all the inhabitants of the District have the following:

1) Bridging development gap between well-endowed communities and deprived ones.

2) Security from crime and other social unrest

3) Access to basic social services such as Health, Education, Potable water and clean

environment.

4) Empowerment of local people in environmental sustainability

5) Adequate incentives to improve production

3.2 DISTRICT DEVELOPMENT GOAL Based upon the problems, needs, potentials, opportunities, constraints and priorities

identified, the overall Goal of the Ellembelle District in line with the thematic areas of the

MTDPF 2010-2013 and the National Goal is: To co-ordinate social services and

environmental sustainability, improve security and develop accessibility to production

areas and strengthen local institution for equitable growth and sustainable development.

Page 124: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

124

GSGDA II OBJECTIVES AND STRATEGIES

THEMATIC AREA OBJECTIVES STRATEGIES

Infrastructure and

Human Settlements

Development

Create and sustain an efficient and effective transport system that meets user needs

Establish Ghana as a transportation hub for the West African sub-region

Improve accessibility to key centres of population, production and tourism

Introduce an integrated truck staging and management systems

Prioritize the maintenance of existing road infrastructure to reduce vehicle operating costs (VOC) and future rehabilitation costs

Improve accessibility to key centres of population, production and tourism

Improve and develop the physical infrastructure across all modes for transport

Introduce an integrated truck staging and management systems

Accelerate the provision of adequate, safe and affordable water

Improve management of water resources

Support relevant state agencies, MMDAs and local communities to undertake reforestation programmes for the protection of water sheds)

Identify and assess ground water resources to enhance water availability

Facilitate on-going institutional, technological and legal reforms in support of land use planning

Strengthen the human andinstitutional capacities for effective land use planning

Integrate land use planning into the Medium-Term Development Plans at all levels

Implement relevant planning models, simplified operational procedures and planning standards for land use

Page 125: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

125

Accelerate the enactment of coherent legal framework for land-use planning

Provide adequate, reliable and affordable energy to meet the national needs and for export

Promote the conversion of waste to energy

Expand power generation capacity

Increase access to energy by the poor and vulnerable

Improve efficiency in power generation, transmission and distribution

Improve management of water resources

Ensure the development and implementation of health and hygiene education as a component of all water and sanitation programmes

Accelerate the provision of improved environmental sanitation facilities

Adopt a sector-wide approach to water and environmental sanitation delivery

Incorporate hygiene education in all water and sanitation delivery programmes

Support Public-Private Partnership in solid waste management.

Provide modern toilet and sanitary facilities in all basic schools.

Scale-up the Community Led Total Sanitation (CLTS) for the

Review, gazette and enforce MMDAs bye-laws on sanitation

Promote behavioral change (hand washing with soap, household water treatment and safe storage, safe excreta disposal) to curtail open defecation in communities

Page 126: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

126

Increase access to adequate,

safe, secure and affordable

shelter

Improve and accelerate

housing delivery in the rural

areas

Accelerate the implementation of the national housing policy

Provide support for private sector involvement in the delivery of rental housing

Promote the transformation of the rural economy to encourage the growth of quality settlements

Encourage the MMDAs to use a portion of their Common Fund to embark on the construction of social housing units

Accelerated Agriculture

modernization and

Sustainable Natural

Resource Management.

Promote Agriculture

Mechanization.

Improve science, technology

and innovation application

Strengthen collaboration with the private sector to build capacity to manufacture appropriate agriculture machinery, tools, and other equipment locally

Apply appropriate agriculture research and technology to introduce economies of scale in agriculture production

Enhance fish production and

productivity

Promote the collection of scientific and socio-economic data for fisheries management

Improve existing fishing land site and develop related infrastructure for storage, processing and exports.

Page 127: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

127

Establish and strengthen co-management mechanisms with local communities for fisheries resource management

Enhance fish production and productivity

Ensure compliance with maximum allowable fish catches to promote resource regeneration

Strengthen monitoring controls and surveillance systems and ensure compliance with laws and regulations on fisheries resources

Increased Agric. Competitiveness and enhanced integration into domestic and international markets.

Strengthen collaboration between public and private sector institutions to promote agro processing.

Develop effective post-harvest management strategies, particularly storage facilities, at individual and community levels.

Enhancing

Competitiveness in

Ghana’s private Sector

Diversify and expand the tourism industry for economic development

Promote sustainable tourism to preserve historical, cultural and natural heritage

Strengthen collaboration and coordination among key stakeholders to develop the tourism sector

Encourage the expansion of tourist event attractions

Promote Public Private Partnerships for investment in the sector

Ensure tourism planning

Page 128: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

128

in District Development plans to promote tourism development

Improve efficiency and competitiveness of MSMEs

Facilitate the provision of

training and business

development services

Support the promotion of

cost effective technology

to remove value chain

constraints

Provide opportunities for

MSMEs to participate in

all Public Private

Partnerships (PPPs) and

local content

arrangements

Develop a financial sector which is

more efficient and responsive to

private sector needs

Deepen and expand the scope of financial services, products and payment Systems

Expand the space for private sector investment and participation

Human Development Productivity and Employment.

Improve quality of teaching and learning.

Increase inclusive and equitable access to, and participation in education at all levels

Ensure adequate supply of teaching and learning materials

Bridge the gender gap and access to education at all levels

Remove the physical, financial and social barriers and constraints to access to education at all levels

Improve management of education service delivery

Page 129: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

129

Improve management of education service delivery

Strengthen capacity for education management

Ensure efficient development, deployment and supervision of teachers

Develop and implement health sector response to the national decentralization program

Improve efficiency in governance and management of the health system

Enhance national capacity for the attainment of the health related MDGs and sustain the gains

Strengthen capacity for Monitoring and Evaluation in the health sector

Scale-up the implementation of national malaria, TB, HIV/AIDs control strategic plans

Accelerate the implementation of the Millennium Acceleration Framework (MAF)

Intensify and sustain Expanded Programme on Immunizations (EPI)

Ensure the reduction of new HIV and AIDS/STIs infections, especially among the vulnerable groups

Improve HIV and AIDS/STIs case management

Develop and implement a programme to deepen public awareness and management of STIs

Establish sustainable financing arrangement for the delivery of HIV and AIDS/STIs services

Ensure the implementation of the GAC resource mobilization

Page 130: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

130

strategy

Bridge the equity gaps in

geographical access to health

services

Strengthen the district and sub-district health systems as the bed-rock of the

national primary health care strategy

Accelerate implementation of CHPS strategy in under-served areas

Increase coverage of NHIS especially for the poor

Formulate and implement health sector capital investment policy and plan

Promote the teaching and learning of science, mathematics and technology at all level

Expand infrastructure and facilities in tertiary institutions to absorb the increasing number of qualified students

Adopt clear policy for tertiary education

Review policies to meet

emerging demands in

education at all levels

especially at the tertiary

level

Expand infrastructure and

facilities in tertiary

institutions to absorb the

increasing number of

qualified students

Transparent and

Accountable

Governance.

Improve the capacity of security agencies to provide internal security for human

Sensitize the public on the existing legislative provisions including

Page 131: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

131

safe and protection sanctions and the dangers of drug use and small arms

Monitor private sector involvement in the provision of internal security

Ensure strict compliance of immigration laws

Ensure effective implementation of the decentralization policy and programmes

Implement the National Decentralization Action Plan Review and consolidate legislation on local governance

Ensure effective implementation of the decentralisation policy and programmes

Review and implement the National Decentralization policy and Strategic plan

Promote Public Private Partnerships (PPPs) arrangements for infrastructural development for the newly created districts and ILGS

Enforce compliance of LI. 1967

Improve fiscal revenue mobilization and Management.

Develop the capacity of MMDAs towards effective revenue mobilization.

Formulate a comprehensive and clearly articulated policy framework to provide effective sources of revenue mobilization and financial management

Review District Demarcations

Page 132: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

132

Strengthen mechanisms for accountability

Ensure efficient internal revenue generation and transparency in local resource management.

Develop an intergovernmental fiscal framework (IGFF).

Strengthen collection and dissemination of information on major investment expenditure items including contracts to the public and other stakeholders

Develop a financial management guidelines and manuals

Oil and Gas Development

Ensure accelerated and integrated development of the oil and gas industry

Strengthen institutional capacity of national agencies to take leadership role in managing Ghana’s oil and gas resources

Expand the national oil and gas upstream, midstream and downstream infrastructure in collaboration with the private sector within the PPP framework

Ensure local content and local

participation across the oil and gas

value chain

Leverage the opportunities offered by

the oil and gas industry to create

decent jobs

Expand and strengthen the capacity of Ghanaians for

participation in all segments of the oil and gas industry

Ensure effective implementation of the local content policy as it relates to employment in

Page 133: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

133

the oil and gas industry

Ensure that companies comply with regulations in labour recruitment

Page 134: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

134

3.3 Formulation of Development Programmes

1.

THEMATIC AREA ISSUES ACTIVITIES

Infrastructure and Human Settlements Development

Poor road condition

Construct access road and rehabilitate all existing roads

Reshape all new site & town road

Construct Access Bridges

Construct Farm tracks

Inadequate Potable

water

Expand potable water coverage

Train all WSMTs & WATSANs

Construct Small Town Water System in larger town

Prepare DWSP

Inadequate planning

layout and lack of

education on land

issues

Conduct education on physical development on local FM Stations

Organize monthly radio show on renewal of development permits

Form land Management task force

Task ECG to conscientize people by using sinages.

Validate data on existing facilities and

Page 135: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

135

Low electricity

coverage.

embark on expansion.

Conduct survey and education on the

importance of energy saving appliance

Poor Environmental Sanitation.

Construct modern final waste disposal site for effective waste management

Construct Toilet and other sanitation facilities eg. Aqua privy

Construct proper drainage system

Inform communities on the healthy environment through Local FMs

Provide final disposal sites for liquid and solid waste.

Supply refuse containers for larger communities.

Increase and improve capacities of Sanitation Department

Poor Housing

Condition

Train Commt. members on modern building technology

Sensitize commt.members radio talk shows every quarter.

Prosecute haphazard developers through fines.

Page 136: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

136

Inadequate office and

Residential

accommodation

Budget for official accommodation

Rehabilitate existing office and residential accommodation

2 Accelerated

Agriculture

modernization and

Sustainable Natural

Resource

Management.

Inadequate capital and

farming inputs

Poor development of

fishing Industry eg.

landing site & storage

facilities

Facilitate the supply of agro-chemical and farm inputs to farmers

Disseminate information via radio (F.M) station to educate farmers on new technologies and social agricultural issues quarterly every year

Carry out diseases surveillance and monitoring visits quarterly

Train Officials of Fisheries department and

other key stakeholder on data collection.

Lobby fisheries commission to upgrade

land.

Train 100 fishermen on improved culture

on fisheries technology by 2016.

Negative impact of Algae bloom sea fishing

Educate fisherfols on the modern method of fishing and aqua culture

Educate farmers on aqua culture/fish rearing

Set by-laws to curtail unlawful fishing

Low agro based industry

Educate 50 farmers and farmer groups on safe use and handling of agro-chemicals

Provide f agric. extension services

Train farmers on alternative sources of livelihood.

Organize Farmer Day Annually

Page 137: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

137

3 Enhancing Competitiveness in Ghana’s private Sector

Under-developed tourism potentials

Form Tourism Steering Committee

Carry out Education on the importance of the formation of association.

Include tourism in cultural activites through concensus build

Set Budget for tourism related activities.

Review Tourism Development Plan

Low production Level

Educate local entrepreneurs modern ways to grow businesses

Conscientize SMEs to adopt LED initiatives e.g. beads and soap making

Promote training of Business management e.g. SNV Netherlands Development Org.

Low availability of credit facility for entrepreneurship

Training companies in acquisition of loans from Micro finance schemes

Conscientize local entrepreneurs on

modern trend of business

4 Human Development Productivity and Employment.

Poor infrastructural base (Education & Health)

Provide teaching and learning materials especially science for basic schools

Subsidize the supply of learning materials

Conduct regular school inspection and disseminate report

Provide Scholarship package for brilliant

but needy students

Page 138: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

138

Establish time table for student to attend Community Information Center

Extend school feeding programme to cover all communities.

Construct standard CHPS compounds.

Provide basic service delivery equipment to health facilities.

Establishment of national ambulance service in district.

Registration of aged and other vulnerable on NHIS.

Provide antenatal and maternity services for communities.

Provide accommodation for health workers

High HIV/AIDS

prevalent rate

Implement National TB, HIV/AIDS and malaria programs.

Sensitization of communities on common endemic disease (TB, Malaria, HIV/AIDs etc).

Monitor and evaluate activities of NGOs handling AIDS activities

Embark on community advocacy programmes on HIV/AIDS.

High Incidence of

Malaria

Organize routine immunization programs

Identify and train community of based surveillance volunteers.

Embark on malaria prevention talk show

Promote the use of treated nets.

Monitor monthly morbidity and mortality analysis of malaria

Page 139: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

139

High Illiteracy rate Conduct training for pre-school (KG) teachers

Provide incentive package for teachers in deprived areas

Provide learning material for basic schools.

Renovate and construct additional school blocks

Construct additional blocks for rural school

Ensure full participation of SMCs in school management

5. Transparent and Accountable Governance.

High Incidence of

Lawlessness

Apply for Information van from Information ministry

Form complaint c’ttee at various communities

Review existing bye-laws and Gazette

Charge community members non-participation in communal labour.

Supply security agencies with the requisite logistics

Inadequate logistics for Monitoring of projects and programmes

Furnish decentralized department with office equipment

Build capacity of DA staff and sub structures

Introduce incentive packages for staff

Low participation of sub-structures

Provide in-service training and refresher courses for area councils and unit committees

Construct an office each for seven Area Councils

Introduce the local people to the advantages of LED.

Poor Internal Revenue Generation

Implement revenue management action

Page 140: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

140

Revalue properties in the District

Train zonal revenue officers in area councils.

Institute a task force team to monitor activities of retailer

Construct and rehabilitate roads linking farming areas to the south.

Inadequate credit facility

Collate all socio economic data and list of businesses

Train local entrepreneurs in business proposal writing.

Facilitate the formation of entrepreneurial association eg. Garages and Pig farmers association.

Intensify revenue and financial management training.

6. Oil and Gas Development

Inadequate Knowledge on socio-economic importance of Oil and Gas

Sensitize local populace on the socio-economic importance of Oil and Gas

Organize regular meeting between stakeholders especially along coastal zones to discuss issues affect them.

Inadequate Local involvement in Oil & Gas Industry

Organize public fora for communities.

Lobby Oil & Gas Companies to increase Scholarship scheme for local students.

Page 141: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

141

3.4 CROSS CUTTING DEVELOPMENT PROGRAMMES

3.5 LOCAL ECONOMIC DEVELOPMENT The National Decentralization Policy 2011-2015 defines local economic development (LED) as ‘ the

process by which local government, local businesses and other actors joins forces and resource to

enter into new partnership agreements with each other or other stakeholders to create new jobs and

stimulate economic activity in municipalities, towns and villages. (Cited in Mainstreaming Gender at

the Sub-National Government level, 2012).

3.6 Rural Enterprise Project (REP) The Ellembelle District however in its effort to promote LED has continuously promoted gainfully

employment skill through the Rural Enterprise Project (REP). Annual Workplan has been developed to

roll on programme like soap making, Batik & tie-dye, bead making etc., to the rural parts of the District

to improve living standard.

3.7 International Network for Bamboo and Rattan (IMBAR) IMBAR has executed a project dubbed ’Bamboo as Sustainable Biomass Energy: Alternative for

firewood and Charcoal Production in Tandan Community, a pro poor initiative which seeks to utilize

the enormous bamboo endowment in the community to produce charcoal and briquette as means of

increasing the use of bamboo as a source of energy for the poor in Ghana thereby providing a more

sustainable, environmentally friendly and economical option for firewood and wood charcoal.

The Assembly has developed a consultative workplan to expand the current level of production.

Quarterly meetings will be held to review and improve the performance of the facility.

3.10 SOCIAL PROTECTION Ghana Social Opportunities Project (GSOP)

Ghana Social Opportunities Project (GSOP) has the overall goal to support Ghana’s Social Protection

Strategy through:

Page 142: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

142

Developing a labor intensive public works program as a rural safety net instrument in target

districts across the country to increase cash income for the rural poor during Agricultural off-

season and

Supporting the Government’s Livelihood Empowerment against Poverty (LEAP) program.

The objective of the Project is to provide targeted rural poor households with access to employment

and income earning opportunities, in particular during seasonal labour demand shortfall through

rehabilitation and maintenance of public or community infrastructure.

The Ellembelle District has executed the Construction of 3-Unit Teachers at Akropong and

Rehabilitated 5.8 km road from First Gate Junct. – First Gate, whilst the Establishment of 30 hectares

rubber plantation (Climate Change) is ongoing.

Currently the District has selected two (2) sub projects that are ‘Rehabilitation of degraded land and

Rehabilitation of 3.4 km road’.

3.11 ENVIRONMENT AND CLIMATE CHANGE

3.11.1 Ghana Wildlife Society

Environment and biodiversity issues are increasingly becoming key as far as Climate Change is concern.

The impact of climate change affects ecosystems in a variety of ways. It does not only affects

ecosystems and species directly; it also interacts with other human stressors such as development and

industrial footprints. At the global level, human activities have caused and will continue to cause loss

of biodiversity through land-use and land-cover change; soil, air and water pollution and forest

degradation.

The Ellembelle District is endowed with significant and unique environmental features which include

high forests such as Shelter forest reserve, Draw River Forest Reserve, Ndumfri forest reserve; coastal

wetlands such as Amanzule wetlands which is an Important Birds and Biodiversity Area based on

Birdlife International’s criteria; and sandy beaches and marine biodiversity.

Page 143: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

143

Despite the benefits obtained from these unique ecosystems, population growth and associated

uncoordinated developments as well as threats of the environmental footprints of mining, the

emerging Oil and Gas industry and climate change may comprise the sustainability of these resources.

Considering the critical nature of the above assertion, the Wildlife Society of Ghana is implementing a

project in Ellembelle District dubbed “Enhance the knowledge and awareness of the ecological

importance of the Amanzule wetland catchment area, and the associated livelihoods” under the ‘STAR

Ghana’ pooled fund initiative. The project seeks to strengthen environmental awareness amongst

local stakeholders and equip them with skills to monitor and detect changes in ecologically sensitive

areas, increase knowledge on how to engage environmental compliance enforcement agencies and

development proponents during Environmental Impact Assessment (EIA) process as well as strengthen

available structures for effective communication and feedback.

The project has mapped ecologically sensitive sites in the Amanzule area and it is using a community

based ecological monitoring approach to implement a simple but robust biodiversity monitoring

protocol that has been developed using the Important Birds and Biodiversity Areas global monitoring

framework to enhance local level environmental monitoring in the district.

3.11.2

Coastal Sustainable Landscapes Projects (CSLP) The above project is USAID sponsored is focused on climate change mitigation and adaption. The

objective is to strengthen capacity for low emission development through improved coastal forest

landscape management.

The projects have several interventions which among others are; the implementation of agroforestry

and forestry practices, Short and medium term livelihood improvement activities like

Bee-keeping expansion

Increased Vegetable Production

Woodlots for Charcoal Production

Also assistance with management of greening areas as designated in spatial plans by Town and

Country Planning Units. Establishment of trees in open areas and schools to promote urban greeneries.

Page 144: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

144

Other intervention are Community Management of coastal zone and wetlands area (restore/replant

degraded mangroves sites, working with community based natural resource management groups eg.

CREMAs) and facilitation of the establishment of Village Savings and Loans Association VSLA (to help

promote local livelihood activities)

Initial Beneficiary Communities in the District

District Community Initial Intervention

Ellembelle Ayawora, Adubrim, Fiasolo &

Sendu

Agrofoestry, Bee keeping, VSLA

Page 145: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

145

3.11.3 GREEN ECONOMY

SUB SECTOR RECOMMENDED POLICY SOCIO ECONOMIC BENEFIT ENVIRONMENTAL BENEFITS

Coastal Issue Replanting of Mangroves

tress and other coastal

plant to avoid depletion

Ecosystem research and

development

Improved food security through protection of water bodies

Decline in Green House emission.

Expansion in total coastal forest.

Increase in water availability in the long term.

Road

Bye-law to regulate cutting of virgin land

Establish national road data

Enhance nature conservation

Improve economic activities

Reduced GHG emission

Improve ecosystem.

Illegal Mining

Sustainable management of natural resources

Law to regulate illegal mining.

Increase revenue

Increase job opportunities

Ensures environmental sustainability in the long run.

Reduced GHG emission

Waste

Waste minimization

Waste-to-energy

Creation of jobs

Increased access to bio-energy

• Reduced GHG emission

Fishing

Regulate fishing activities

Fish stock regeneration and increase in availability

Increase employment in the long run

Increased resource base

Increased fish stock regeneration

Page 146: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

146

through aquaculture

Oil & Gas

Enforce local content in industry.

Guidelines for usage of oil & gas revenue.

Increase employment

Increase revenue

Eco-tourism

Ensure Sustainable forest management (SFM) and expansion of forest

Regeneration of nature reserves

Increase revenue

Creation of jobs

Ensures environmental sustainability in the long run.

Improve ecosystem.

Reduced GHG emission

Transportation

Electricity

• Laws to ensure efficient

energy sources and

technologies

• Increased employment

opportunities in the long-

term

• Enhances the creation of

indirect jobs

• Speeds up universal access

to modern energy services

Reduced GHG emission

Cocoa

• Intensification of the use of

organic fertiliser,

• Agricultural research and

development

• Enhance post-harvesting

technologies

• Increased in employment in

the long term

• Improvement in nutrition

and food security

• Improved soil quality

• Enhanced biological

diversity within the soil

• Decline in GHG

emissions

Page 147: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

147

CHAPTER 4

PROGRAMME OF ACTION.

4.0 THEMATIC AREA: Human Development, Productivity & Employment

Education. ACTIVITIES LOCATION TIME FRAME INDICATIVE

BUDGET (GH₵)

OUPUT INDICATOR

S

SOURCES OF FUNDING IMPLEMENTING DEPARTMENT OF THE

DA

2014 2015 2016 2017 IGF GOG DONOR LEAD COLLABORATING

Organize sensitization in communities

District Wide

20,001.50 Sensitization organized.

IGF GOG GES DA

Provide material support to needy pupils in schools

All School

13,002.00 Material support provided

IGF GES MOE

Rehabilitate KG school block

Selected area

1,466,000 KG school rehabilitated

GoG DA, Works Dept.

GES

Construction of 3-Unit KG block with ancillary facilities

Selected area

1,980,400 Three –Unit KG block constructed

DACF GETFUND

DA, Works Dept.

Build 6- unit Primary School Buildings &

Selected area

200,000 Six - unit primary school built

GOG DA, Works Dept.

MOE

Page 148: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

148

Accessories

Construction of 3-unit JHS block with ancillary facilities

Selected area

500,000 Three –Unit JHS block constructed

GOG DA, Works Dept.

MOE

Completion of 6-unit classroom block

Selected area

- 300,000 Six-Unit bock constructed

DACF DA, Works Dept.

MOE

Provide facilities for water harvesting in schools (tanks)

Selected schools

20,000 Facilities for water harvesting provided

DACF DA

Organize health talk in schools and communities

District wide

10,000 Health talk organized

GOG MOH GES

Provide gender friendly sanitary facilities in schools

Selected schools

300,000 Gender friendly sanitary facilities provided

GOG DA GES

Formation of girls clubs in schools

10,000 Girls clubs formed

GOG MOE

Provide guidance and counseling services in JHS

District wide

10,000 Guidance and counseling service provided

GOG MOE GES

Organize literacy and Arts

District wide

20,000 Literacy and art

GOG MOE GES

Page 149: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

149

competition in upper primary

competition organized

Undertake BECAS, SEA & NEA

District wide

25,000 BECAS,SEA &NEA undertaken

GOG MOE GES

Organize INSET for teachers professional development

District wide

IGF MOE GES

Provide teaching and learning materials especially science for basic schools

District wide

400,000 Teaching and learning materials provided

GOG MOE GES

Organize mock examination for JHS students

District wide

200,000 Mock examination organized

IGF MOE GES

Conduct training for pre-school (KG) teachers

District wide

30,000 Training conducted

DACF

GES MOE

Provides material support to trained teachers on UTDBE

District wide

20,000 Material support provided

IGF GOG MOE GES

Implement best teacher award scheme

District wide

Best teacher award scheme implemented

GETFUND

MOE GES

Page 150: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

150

Provide incentive package for teachers in deprived areas

Selected areas

50,000 Incentive package provided

GETFUND

MOE GES

Conduct regular school inspection and disseminate report

District wide

40,000 Regular school inspection conducted

GOG MOE GES

Ensure full participation of SMCs in school management

District wide

30,000 Participation of SMCs ensured

GETFUND

GES MOE

Conduct programme to educate and disseminate information in areas in the value of education and community involvement.

Selected areas

5,000 Programme to educate and disseminate information conducted

DACF

DA MOE

Encourage the use of gender clubs and promote the use of role models within school communities

District wide

10,000 Use of gender clubs and use of role models encouraged

GETFUND

DA MOE

Support girls in life skills support programmes

District wide

30,000 Girls in life skills supported

GETFUND

DA MOE

Provides INSET for Selected 10,000 INSET for IGF DA GES

Page 151: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

151

professional development in science, mathematics and technical in schools

schools professional development in science, mathematics and technical in schools provided

Provide office building

Selected Dept.

200,000 Office building provided

GOG DA

Conduct regular inspection and ensure proper functioning of SMCs and PTAs

District wide

40,000 Regular inspection conducted

GOG MOE GES

Monitor government interventions

District wide

30,000 Government interventions monitored

GOG DA GES

Train statistics officers in information management

District 10,000 Statistics officers trained

GOG DA GES

Organize sensitization programmes

District wide

40,000 Sensitization programmes organized

IGF DA MOE

Page 152: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

152

Construction of Primary School Block

Aluku 200,000.00 School Block constructed

GoG DA, Works Dept.

MOE

Construction of KG and Primary block.

Obeng-krom

200,000.00 KG and Primary block constructed

GoG DA, Works Dept.

GES,MOE

Construction of Community SHS.

Salman 1,000,000.00

Community SHS constructed

GOG DA, Works Dept.

MOE

Construction of additional school block.

Salman 250,000.00 Additional school block constructed

GOG DA, Works Dept.

GES

Stocking of Salman community library

Salman 100,000.00 Community library stocked

IGF GOG Donor DA, Works Dept.

GES

Construction of drainage facility at the entrance of cluster of schools at Tema.

Nkroful 250,000.00 Drainage facility constructed

IGF GOG DA, Works Dept.

Dept. of Feeder roads

Roofing of dilapidated school blks.

District Wide

8,000.00 Eikwe community JHS roofed

IGF DA, Works Dept.

GES

Provision of accommodation (staff quarters) for

Eikwe Sanzule, Krisan

500,000.00 Accommodation (staff quarters)

GOG GES DA, Works Dept.

Page 153: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

153

teachers. for teachers provided

Construction of JHS block

New Bakanta

200,000.00 JHS block constructed

GoG GES DA, Works Dept.

Construction of Nursery block for Sanzule-Krisan Primary school.

Sanzule-Krisan

100,000.00 Nursery block constructed

GOG GES DA, Works Dept.

Construction of primary school block for Ngalekpole

Ngalekpole

200,000.00 Primary school block constructed

GoG DA, Works Dept.

MOE

Institution of a scholarship scheme for communities within the oil and gas catchment zone.

District wide

2,000,000.00

Scholarship scheme for communities instituted

IGF Donor DA, Works Dept.

m

Construct primary school

Atuabo 250,000.00 Primary school block constructed

GOG DA, Works Dept.

MOE

Construction of KG block for Asemdasuazo

Asemdasuazo

100,000.00 KG block constructed

GOG DA, Works Dept.

MOE

Construction of teachers’ quarters

Asemdasuazo

200,000.00 Teachers’ quarters

GOG DA, Works

MOE

Page 154: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

154

at b Asemdasuazo constructed

Dept.

Construction of KG block and teachers quarters at Fiasolo

Fiasolo 400,000.00 KG block and teachers quarters constructed

GoG DA, Works Dept.

MOE

Construction of teachers quarters and KG block at Kanokware

Kanokware

400,000.00 Teachers quarters and KG block constructed

GoG DA, Works Dept.

MOE

Completion of teachers quarters at Nyamebekyere

Nyamebekyere

200,000.00 Teachers quarters completed

IGF GOG DA, Works Dept.

MOE

Construction of additional teachers’ quarters.

Nyamebekyere

250,000.00 Additional teachers’ quarters constructed.

GoG DA, Works Dept.

MOE

Construction of KG block at New Sanfo

Sanfo 100,000.00 KG block constructed

GoG DA, Works Dept.

MOE

Extension of school feeding programme to cover all communities with the Asasetre area council.

Asasetre Area Council

50,000.00 School feeding programme extended

GOG MOE GES

Page 155: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

155

Construction of teacher quarters at Adubrim.

Adubrim 200,000.00 Teachers quarters constructed

GoG MOE DA, Works Dept.

Construction of school block at Ngabawie

Ngabawie 250,000.00 School block constructed

GOG MOE GES

Construction of teachers quarters for Mempeasem.

Mempeasem

250,000.00 Teachers quarters constructed

GoG MOE GES

Institute incentives for teachers at Adubrim

Adubrim 250000.00 IGF Donor DA GES

Revamping the ICT center at Asasetre

Asasetre 200,000.00 ICT center revamped

IGF Donor DA, Works Dept.

GES

Supply of teaching and learning materials for school.

Asasetre 2000,000.00 Teaching and learning materials supplied

IGF GOG Donor DA, Works Dept.

GES

Rehabilitation of catholic JHS/KG at Asanta and SDA Primary school.

Asanta 200,000.00 Catholic JHS/KG rehabilitated

GoG DA, Works Dept.

GES

Completion of computer laboratory at catholic school.

Asanta 100,000.00 Computer laboratory completed

GoG DA, Works Dept.

GES

Page 156: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

156

Rehabilitation of Bobrama KG block

Bobrama 100,000.00 KG block rehabilitated

GoG DA, Works Dept.

GES

Provision of furniture (desk) for all schools.

Bobrama, Asanta , Ankobra

50,000.00 Furniture provided

GoG DA, Works Dept.

GES

Renovation of Ankobra primary school

Ankobra 100,000.00 Ankobra primary school renovated

GoG DA, Works Dept.

GES

Rehabilitation of Asemko primary school

Asemko 100,000.00 Primary school rehabilitated

GoG DA, Works Dept.

GES

Completion of community library for Asemko.

Asemko 150,000.00 Community library completed

GoG DA, Works Dept.

GES

Provision of additional KG and primary block and renovation of existing one at Baseke.

Baseke 900,000.00 Additional KG and primary block provided and renovated respectively

GoG MOE DA, Works Dept.

Construction of school block for Awiebo Methodist JHS

Awiebo 200,000.00 School block constructed

GoG MOE GES

Renovation of Roman Catholic

Awiebo 100,000.00 Roman Catholic

GoG MOE DA, Works Dept.

Page 157: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

157

Primary school at Awiebo.

Primary school renovated

Construction of teachers quarters at Awiebo

Awiebo 200,000.00 Teachers quarters

GoG MOE DA, Works Dept.

Construction of Bungalow and security wall at BOKASS.

Awiebo 400,000.00 Bungalow and security wall constructed

GoG MOE DA, Works Dept.

Completion of classroom block at BOKASS.

Awiebo 150,000.00 Classroom block completed

GoG MOE DA, Works Dept.

Completion of Awiebo Roman Catholic KG block.

Awiebo 150,000.00 KG block constructed

GoG MOE DA, Works Dept.

Construction of new school block for Mantukwa Bibianiha and Domeabra

Mantukwa Bibianiha and Domeabra

600,000.00 School block constructed

GoG MOE DA, Works Dept.

Construction of JHS block for Baseke

Baseke 250,00.00 JHS block constructed

GoG

Construction of teachers quarters for communities

Mantukwa Ebi and Awiebo

750,00.00 Teachers quarters constructed

GoG MOE DA, Works Dept.

Construction of library for Baseke

Awiebo 600,000.00 Library constructe

GoG MOE DA, Works Dept.

Page 158: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

158

and Awiebo d

Construction of school block for KG and Primary schools at Edwakpole

Edwakpole

50,000.00 School block constructed

GoG MOE DA, Works Dept.

Construction of teachers quarters for A.B Bokazo

A.B Bokazo

250,000.00 Teachers quarters constructed

GoG MOE DA, Works Dept.

Construction of toilet facilities for schools at A.B Bokazo

A.B Bokazo

500,000.00 Toilet facilities constructed

GoG MOE DA, Works Dept.

Construction of ICT facility for A.B Bokazo

A.B Bokazo

300,000.00 ICT facility constructed

GoG MOE DA, Works Dept.

Construction of JHS Block at Alla Bokazo.

Alla Bokazo

JAN

250,000.00 JHS block constructed

GoG MOE DA, Works Dept.

Construction of teachers’ quarters at Alla Bokazo

Alla Bokazo

250,000.00 Teachers quarters constructed

GoG MOE DA, Works Dept.

Construction of toilet facility for school at Alla Bokazo

Alla Bokazo

500,000.00 Toilet facility constructed

GoG MOE DA, Works Dept.

Provision of additional block for Kamgbunli KG, teaching and

Kamgbunli Additional block for Kamgbunli KG,

GoG GES DA, Works Dept.

Page 159: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

159

learning materials and furniture.

teaching and learning materials and furniture provided.

Renovation of Kamgbunli Islamic Primary school and construction of additional block for ‘C’.

Kamgbunli 150,000.00 Kamgbunli Islamic Primary school renovated and additional block constructed

GoG MOE DA, Works Dept.

Provision of borehole for Kamgbunli cluster of schools

Kamgbunli 150,000.00 Borehole provided

GoG MOE DA, Works Dept.

Construction of toilet facility for Primary ‘B’ and JHS ‘B’

Kamgbunli 90,000.00 Toilet facility constructed

GoG MOE DA, Works Dept.

Provision of canteen for cluster of schools

Kamgbunli 8,000.00 canteen for cluster of schools provided

GoG MOE DA, Works Dept.

Provision of computer laboratory library

Kamgbunli 250,000.00 Computer laboratory library

GoG MOE DA, Works Dept.

Page 160: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

160

block for cluster of schools

block provided

Construction of assembly hall for Kamgbunli SHS.

Kamgbunli 100,000.00 Assembly hall constructed

GoG MOE DA, Works Dept.

Provision of additional staff accommodation for staff of SHS.

Kamgbunli 200,000.00 Additional staff accommodation provided

GoG MOE DA, Works Dept.

Provision of duty or administrative vehicle for SHS.

Kamgbunli 80,000.00 Duty or Administrative vehicle provided

GoG MOE DA, Works Dept.

Provision of boy and girls hostels for SHS.

Kamgbunli 100,000.00 Boys and Girls hostels provided

GoG MOE DA, Works Dept.

Construction of Library block for SHS.

Kamgbunli 150,000.00 Library block constructed

GoG MOE DA, Works Dept.

Construction of school block for Kwasikrom (KG, Primary and JHS)

Kwasikrom

1,000,000.00

School block constructed

GoG MOE DA, Works Dept.

Construction of teachers quarters at Kwasikrom

Kwasikrom

250000.00 Teachers quarters constructed

GoG MOE GES,DA, Works Dept.

Provision of Kwasikro 10,000.00 Furniture IGF GoG GES DA

Page 161: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

161

furniture for Kwasikrom schools (desk)

m provided

Supply of teachers for Kwasikrom

Kwasikrom

5,000.00 Teachers supplied

GoG GES MOE

Construction of KG block for Asomase

Asomase 1,00,000.00 KG block constructed

GoG MOE GES,DA, Works Dept.

Construction of school block for Sendaso

Sendaso 200,000.00 School block constructed

GoG MOE GES,DA, Works Dept.

Supply of teachers to Bonsukrom and Asomase communities

Bonsukrom and Asomase

5,000.00 Teachers supplied

GoG MOE GES,DA, Works Dept.

Construction of staff quarters for Aiyinase North Schools.

Aiyinase North

500,000.00 Staff quarters constructed

GoG MOE GES,DA, Works Dept.

Extent coverage of School feeding programme to Aiyinase North.

Aiyinase North

50,000.00 Coverage of school feeding programme extended

GoG MOE GES,DA, Works Dept.

Construction of teachers quarters

Akoto, Alloakpoke, Awiaso

750,000.00 Teachers quarters constructed

GoG MOE, DA, Works Dept. ,GES

Page 162: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

162

4.1 THEMATIC AREA: Accelerated Agriculture Modernization And Sustainable Natural Resource Management.

Agriculture ACTIVITY LOCATION TIME FRAME INDICATIVE

BUDGET (GH₵)

INDICATOR SOURCES OF FUNDING IMPLEMENTING DEPARTMENT OF THE DA

2014 2015 2016 2017

Conduct 4000 farmers/farmer group visits by December annually by 10 AEAS

District wide

7,200.00 4000 farmers/farmers group conducted

IGF GoG Agric. Dept.

DA

Conduct 250 field days for 500 farmers and FBOs annually

District wide

5,000.00 250 field days for 500 farmers conducted

IGF GOG Agric.Dept.

DA

Conduct 500 supervisory visits by four (4) supervisors to backstop AEAS annually

District wide

5,760.00 500 supervisory visits conducted

IGF GOG Agric.Dept

DA

Treat 1000 clinical/surgical cases involving pigs, cattle sheep, goats by December

District wide

2,000.00 1000 clinical/surgical cases combated

IGF GOG Agric.Dept

DA

Page 163: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

163

De-worm 20000 poultry and 200 livestock annually

District wide

1,000.00 20000 poultry and 200 livestock de-wormed

IGF GOG Agric.Dept

DA

Conduct ante/post mortem examination on slaughtered animals annually

District wide

1,000.00 Ante/post-mortem examination conducted

IGF GOG Agric.Dept

DA

Vaccinate 20000 poultry and 300 livestock and pets against rabies and other zoonotic diseases

District wide

2,000.00 20000 poultry and300 livestock vaccinated

IGF GOG Agric.Dept

DA

Carry out diseases surveillance and monitoring visits quarterly

District wide

500.00 Diseases surveillance and monitoring executed

IGF GOG Agric.Dept

DA

Organize two days’ workshop each for 40 farmers on beekeeping, snail rearing and mushroom production by December 2015

Nkroful 3,700.00 Two days’ workshop organized

IGF GOG Donor Agric.Dept

DA

Assist 10 FBO District 4,000.00 10 FBO IGF GOG MoFA DA

Page 164: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

164

with leadership training on credit management

wide with leadership training on credit management assisted

Disseminate information via radio (F.M) station to educate farmers on new technologies and social agricultural issues quarterly every year

Esiama & Ankobra

800.00 Information via radio(F.M) disserminated

IGF MoFA

Organize 3 educational talks via radio on the effect of child labour in agriculture

Esiama 300.00 3 educational talks organized

IGF MoFA Dept of co-operative & social welfare

Hold two (2) days planning sessions with stakeholders annually

Aiyinase 7,000.00 Two days planning sessions performed

IGF GOG MoFA RADU/CSIR

Organize 2-days workshop for 60 pigs farmers on bio security measures to contain African Swine Fever in

Baku, Ngalekyi Ngalekpole Anokyi

3,000.00 Two days workshop organized

IGF GOG MoFA RADU

Page 165: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

165

four (4) communities

Organize one (1) district farmers’ day celebration annually

Various 50,000.00 One district farmers day celebration organized

IGF GOG DONOR Agric.Dept

DA

Service one official car monthly

office 10,000.00 One official car serviced

IGF Agric.Dept

DA

Educate 50 farmers and farmer groups on safe use and handling of agro-chemicals

Aiyinase 1,500.00 50 farmers and farmer groups educated

Agric.Dept

RADU

Procure 5 motorbikes for official use by

Office 15,000.00 Five motorbikes procured

GOG Agric.Dept

DA

Procure one (1) set of stationery for office use annually

Office 2000.00 One set of stationery procured

IGF Agric.Dept

DA

Running cost of official vehicle annually

office 14,400.00 Cost of official vehicle operated

IGF Agric.Dept

DA

Facilitate the supply of agro-chemical and farm inputs to farmers

District wide

10,000 Supply of agro-chemical and farm

IGF GOG Agric.Dept

DA

Page 166: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

166

inputs to farmers facilitated

Educate farmers on aqua culture/fish rearing

District wide

7,000 Farmers on aqua culture/fish rearing educated

IGF GOG Agric.Dept

DA

Train farmers on alternative sources of livelihood.

District wide

8,000 Farmers on alternative sources of livelihood trained.

IGF GOG Agric.Dept

DA

Revamp Aiyinase and Esiama oil mill

Esiama, Aiyinase

20,000 Aiyinase and Esiama oil mill revamped

IGF GoG Agric.Dept

DA, MOFA

Provision of agric extension services

District wide

10,000 Agric. extension services provided

GoG MoFA DA, Agric dept

Revamping of Kamgbunli rice irrigation project

Kamgbunli 50,000 Kamgbunli rice irrigation project revamped

IGF GoG Agric.Dept

DA

Encouraging agric diversification

District wide

5,000 Agric. Diversification encouraged

IGF GoG Donor Agric.Dept

DA

Conducting District 30,000 Research IGF GoG Donor Agric.D DA

Page 167: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

167

research into the cocoa diseases

wide into the cocoa diseases conducted

ept

Supply of improved cocoa seedlings

Aiyinase north

40,000 Improved cocoa seedlings supplied

IGF Agric.Dept

DA

Page 168: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

168

4.2 THEMATIC AREA: Human Development, Productivity & Employment

HEALTH DIRECTORATE. ACTIVITY LOCATION TIME FRAME INDICATIVE

BUDGET (GH₵)

INDICATOR SOURCES OF FUNDING IMPLEMENTING DEPARTMENT OF THE DA

2014 2015 2016 2017 IGF GoG DONOR

Construction of standardized CHPS compounds.

Kwesikrom Basake Aluku Anwia

1000,000.00 4 standardized CHPS compounds constructed

GoG Donors GHS DA, Works Dept.

Procurement of motorbikes to CHPS compounds.

All CHPS Zones

1000,000.00 Motorbikes procured for service delivery

IGF GoG Donor GHS MOH, DA

Procurement of essential service delivery equipment for CHPS.

All CHPS compounds.

All CHPS compounds provided essential equipment.

IGF GoG Donor GHS MOH, DA

Procure a robust 4 WD vehicle for mobile health care.

District 120,000.00 Mobile health services expanded to rural remote

GoG Donor GHS DA, MOH

Page 169: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

169

communities.

Liaise with Adamus to release structure for mental health and eye care

Teleku Bokazo

200,000.00 Specialized health care established in the district.

IGF Donor GHS DA

Training of Assembly members, CHMCs and CHVs in new CHPS concept.

All CHPS/Electoral zones.

10,000.00 No of Assembly members, CHMCs and CHVs trained

IGF Donor GHS DA

Training of sub district health teams in health system management including CHPS.

Sub district management teams.

8,000.00 No of sub district health management teams trained.

IGF Donor GHS DA

Formation and training of Sub district health management committees.

Stakeholders at sub district levels.

10,000.00 No of sub district health committees formed; trained and functional.

IGF GoG Donor GHS DA

Provide quality motorbikes to CHPS compounds for service delivery.

CHPS zones.

300,000.00 No of CHPS compounds with quality motorbikes

IGF GoG Donor GHS MOH, DA

Provide basic All service 100,000.00 No of IGF GoG Donor GHS MOH, DA

Page 170: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

170

service delivery equipment to health facilities.

delivery facilities.

facilities with adequate basic service delivery equipment.

Organize blood donation campaigns

Schools and communities.

15,000.00 No of blood donation campaigns in a year.

IGF Donor GHS MOH, DA

Construction of mother’s hostel.

Eikwe 45,000 No of mother’s hostel constructed.

IGF Donor GHS MOH, DA,

Establishment of national ambulance service in district.

Esiama/Aiyinasi.

50,000.00 No of ambulance.

IGF GHS MOH, DA

Identify and train community of based surveillance volunteers.

All communities in the district.

20,000.00 No of community based volunteers identified and trained.

IGF GHS MOH, DA

Organize routine immunization programs

All outreach points.

DEC.

15,000.00 IGF GoG GHS MOH, DA

Page 171: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

171

Implement special national health promotion programs (NIDs, Measles immunization, MDDs, Bed net Distribution etc.).

All communities

20,000.00 No of children immunized.

IGF GoG GHS MOH, DA

Sensitization of communities on common endemic disease (TB, Malaria, HIV/AIDs etc).

All communities

20,000.00 No of people reached per program

IGF GoG Donor GHS MOH, DA

Conduct half yearly health screenings

Esiama, Nkroful, Aiyinasi Eikwe

2,000.00 No of screening activities carried out in a year.

IGF GHS MOH, DA

Implement National TB, HIV/AIDS and malaria programs.

All communities

10,000.00 % of cases detected and effectively managed.

GoG Donors GHS MOH, DA

Sensitization of communities on household latrines and safe environmental health practices.

All communities.

5,000.00 No of community sensitizations carried out.

IGF GoG GHS MOH, DA

Train service providers in

All GHS Facilities

10,000.00 Increase in IGF

IGF GHS MOH, DA

Page 172: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

172

financial management.

generation by facilities.

Institute internal claims vetting and management at the DHMT

District wide

10,000.00 Reduction in NHIS claims deductions

GoG Donor GHS MOH, DA

Institute internal facility auditing mechanism

Facilities 15,000.000 Reduction in financial mismanagement.

IGF GoG GHS MOH, DA

Registration of aged and other vulnerable on NHIS.

District wide

50,000.00 No of vulnerable registered under NHIS.

IGF GoG GHS MOH, DA

Renovation of staff bungalow.

Aiyinasi health Center.

30,000.00 No of health centers upgraded to polyclinic in the district.

IGF Works Dept.

GHS, DA

Paint staff quarters.

Asasetre Health Center

3,000.00 No of nurses quarters painted

IGF Works Dept.

GHS

Complete of abandoned structure for maternity

Esiama Health Center

20,000.00 Completed structure being used for

GoG Donor Works Dept.

GHS, DA, MOH,

Page 173: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

173

services. maternity services.

Construct toilet facility

Asasetre Health Center.

25,000.00 Toilet facility constructed

IGF GoG Donor Works Dept.

GHS, DA, MOH,

Provide antenatal and maternity services for communities.

District wide

100,000.00 IGF Donor GHS DA, MOH

Provide accommodation for health workers

District wide

600,000.00 Accommodation provided

IGF GoG Donor GHS DA, MOH

Upgrade CHPS to health centers

District wide

200,000.00 Centers upgraded

IGF GoG Donor GHS DA, MOH

Construct additional CHPS zones

Selected Commt

500,000.00 CHPS Constructed

GoG Donor GHS DA, MOH, Works Dept.

Page 174: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

174

4.4 THEMATIC AREA: Transparent and Accountable Governance.

Non-Formal Education Division. ACTIVITY LOCATION TIME FRAME INDICATIVE

BUDGET (GH₵)

INDICATOR SOURCES OF FUNDING IMPLEMENTING DEPARTMENT OF THE DA

2014 2015 2016 2017 IGF GoG DONOR LEAD COLLAB.

Consult with district opinion leaders

District wide

5,000.00 Stake holders participation

IGF GoG Donor Non-Formal Edt. Unit

DA, NCCE

Conduct Land identification towards Construction of fish ponds

District wide

100,000.00 Fish ponds constructed

IGF Donor Non-Formal Edt. Unit

T&CPD, Works Dept.

Stock fish pond with fingerlings

District wide

5,000.00 Fish pond stocked

IGF Donors Non-Formal Edt. Unit

Agric. Dept.

Cultivate rice. Selected Commt

10,000.00 Rice cultivated

GoG Donor Non-Formal Edt. Unit

Agric. unit

Page 175: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

175

4.5 THEMATIC AREA: Transparent and Accountable Governance.

Internal Audit ACTIVITY LOCATION TIME FRAME INDICATIVE

BUDGET (GH₵)

INCATOR SOURCES OF FUNDING IMPLEMENTING DEPARTMENT OF THE DA

2014 2015 2016 2017 IGF GoG Donor LEAD COLLAB.

Conduct Revenue and cash management

Nkroful n 3,000.00 Revenue and Cash managed

IGF Internal Audit Unit

DA, Finance Unit, Budget Unit

Implement Procurement management

Nkroful 2,000.00 Procurement activities managed

IGF Internal Audit Unit

Procurement Unit

Conduct special investigation

District Wide

3,000.00 Investigation conducted

IGF Internal Audit Unit

DISEC,

Conduct Stores and transport management

District wide

1,500.00 Stores and transport managed

IGF Internal Audit Unit

Transport Unit, Stores

Institute Pay roll management

District wide

2,000.00 Payroll management instituted

IGF Internal Audit Unit

DA, Finance Unit, Budget Unit

Institute Liability management

District wide

1,000.00 Liability managed

IGF Internal Audit Unit

Conduct Follow-up District 2,000.00 Follow ups IGF Internal DA, Finance

Page 176: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

176

on audit recommendation

wide conducted Audit Unit

Unit

Institute Fixed asset management

District wide

1,000.00 Fix asset manage

IGF Internal Audit Unit

Estate Unit

Conduct IA external training

Nkroful 2,000.00 Training conducted

IGF Donors Internal Audit Unit

DA

Institute External audit liaison

Nkroful 1,000.00 External Audit liaison instituted

IGF Audit Unit

DA

Conduct Corporate governance

District wide

3,000.00 IGF Donors Internal Audit Unit

HR Dept.

Implement Accounting systems

Nkroful 1,000.00 Accounting systems implemented

IGF GoG Donors Internal Audit Unit

DA, Finance Unit

Institute Operational management reporting

Nkroful 1,500.00 Operational management reporting instituted

IGF GoG Internal Audit Unit

DA

Introduce Pre-payment vouching

District wide

Pre-payment vouching introduce

IGF Internal Audit Unit

Finance Unit

Introduce Budget cycle

District wide

Internal Audit Unit

Budget Unit

Page 177: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

177

Sanitation District wide

National commission for civic education

Activities

Location Time frame Indicative budget(GH₵)

Output indicator Source of funding Implementing department of the DA

2014 2015 2016 2017 IGF GOG DONORS

LEAD

COLLABORATING

Sensitization on district level education

District wide

1,500.00 To increase the number of Assembly women from 5 to 10

GOG NCCE

EC,DA

Training of the newly elected Assembly/ unit committee members

Two area councils

3,000.00 To improve their performance in revenue mobilization

GOG NCCE

DA

Citizenship week celebration

District wide

1,600.00 To inculcate a civic culture

GOG NCCE

GES

Education on revenue mobilization(Duties of a

District wide

1,600.00 To raise awareness of citizens tax obligation and improve revenue

GOG NCCE

DA

Page 178: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

178

citizen) mobilization

Education and pre-marital sex among teenagers in the district

All basic schools

2,500.00 Reduce the of teenage pregnancies and number of sexual engagement

GOG NCCE

GES

Education on Ebola Pandemic and Cholera outbreak

District wide

1,600.00 Improve awareness on Ebola Pandemic and Cholera Outbreak

GOG NCCE

EC, POLITICAL PARTIES, DA, GES ECT.

Improving sanitation conditions in the district

District wide

1,600.00 Improve sanitation to eradicate cholera

GOG NCCE

GHS, ENVIRONMENTAL HEALTH, DA, GES ECT.

GHANA POLICE SERVICE

ACTIVITIES LOCATION TIME FRAME INDICATIVE BUDGET(GH₵)

OUPUT INDICATORS

SOURCE OF FUNDING IMPLEMENTING DEPARTMENT OF DA

2014 2015 2016 2017 IGF GOG DONORS

LEAD COLLABORATING

Provide accommodation for 30

District police headquart

45,000.00 Accommodation for 30 personnel

GOG DA DA-WKS DEPT.

Page 179: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

179

personnel ers Esiama

Provide 2 vehicles for patrols and official work

District police headquarters Esiama

70,000.00 2 vehicles for patrols and official work

GOG DA DA-WKS DEPT

Provide office equipment;2 printers and 1 photocopier

District police headquarters Esiama

20,000.00 Office equipment;2 printers and 1 photocopier

GOG DA DA-WKS DEPT

Provide accommodation for 3 personnel

District police headquarters Esiama

30,000.00 Accommodation for 3 personnel

GOG DA DA-WKS DEPT

Provide logistics and medical equipment

District police headquarters Esiama

40,000.00 Logistics and medical equipment

GOG DA DA-WKS DEPT

Page 180: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

180

4.6 THEMATIC AREA: Infrastructure and Human Settlement Development

Water and Sanitation

ACTIVITY

LOCATION TIME FRAME INDICATIVE BUDGET

(GH₵)

INDICATOR SOURCES OF FUNDING IMPLEMENTING DEPARTMENT OF THE DA

2014 2015 2016 2017

IGF GoG Donor LEAD COLLAB.

Construction of modern final waste disposal site for effective waste management

District Wide

200,000.00 Waste management site constructed

IGF Donor Env. Health, DWST

DA

Expand potable water coverage

District wide

80,000.00 Potable water coverage expanded

GoG Donor DWST, Works Dept.

DA

Provide waste containers

Selected Commts.

200,000.00 Waste containers provided

IGF GoG Env. Health, Zoomlion

DA

Construct toilet facilities. (Aqua privy)

District wide

700,000.00 Aqua privy constructed

IGF GoG Env. Health, works Dept.

DA

Construct toilet facilities. (W/Cs)

District wide

800,000.00 W/Cs constructed

IGF GoG Env. Health, works Dept.

DA

Page 181: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

181

Construct proper drainage systems

Kamgbunli, Esiama, Eikwe, Aiyinasi

50,000.00 IGF GoG Donor Works dept.

DA

Train all WSMTs & WATSANs

District Wide

50,000.00 WSMs & WATSANs trained

GoG Donors DWST DA

Prepare a new DWSP

Nkroful 7,000.00 DWSP prepared

IGF Donors DWST DA, CWSA

Construct Small Town Water System in larger town

Asanta, Ankobra

Water system

GoG Donors CWSA DWST, DA

4.7 THEMATIC AREA: Infrastructure and Human Settlement Development

Road Infrastructure ACTIVITY LOCATION TIME FRAME INDICATIVE

BUDGET (GH₵)

OUTPUT INDICATOR

SOURCES OF FUNDING IMPLEMENTING DEPARTMENT OF THE DA

2014 2015 2016 2017 IGF GoG DONOR LEAD COLLAB.

Construct access road and rehabilitate all existing roads

Aiyinase North

1,000,000.00

Aiyinsi North roads rehabilitated.

IGF Donor Feeder Road Dept.

DA

Construct access road for all communities.

Salman electoral area

800,000.00 Access roads constructe

GoG Donors Feeder Road Dept.

DA

Page 182: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

182

d

Rehabilitate Access Road

Akoto-Alloakpoke, Ayawora, Awiaso, Fiasolo

1,000,000 Roads rehabilitated

GoG Donors Feeder Road Dept.

DA

Reshape all new site & town road

District Wide

700,000.00 All road reshaped

IGF GoG Donors Feeder Road Dept.

DA

Construct access Bridge

Mantukwa

400,000.00 Bridge Constructed

IGF GoG Feeder Road Dept.

DA

Construct farm tracks

District Wide

Page 183: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

183

CHAPTER 5

5.0 ANNUAL ACTION PLAN FOR 2014 ACTIVIVITIES LOCATION OUTPUT

INDICATOR TIME SCHUDULE ANNUAL BUDGET

IMPLEMENTING AGENCIES

1st 2nd 3rd 4th Local External Lead Collaborating

Organize sensitization in communities

District wide

Sensitization organized

10,000 10,00150

GES DA

Provide material support to needy pupils in schools

All school Material support provided

13,002.00

MOE GES.

Renovation of Kamgbunli Islamic Primary school and construction of additional block for ‘C’.

Kamgbunli

Kamgbunli Islamic Primary school renovated and additional block constructed

150,000.00

MOE DA, Works Dept.

Provision of borehole for Kamgbunli cluster of schools

Kamgbunli

Borehole provided

150,000.00

MOE DA, Works Dept.

Construction of additional teachers’ quarters.

Nyamebekyere

Additional teachers’ quarters constructed

250,000.00

DA, Works Dept.

MOE

Completion of Awiebo Classroom block 150,000. MOE DA, Works

Page 184: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

184

classroom block at BOKASS.

completed

00

Dept.

Construction of additional classroom for school ‘B’.

Kamgbunli

Additional classroom constructed

150,000.00

MOE DA, Works Dept.

Provision of furniture for Kwasikrom schools (desk)

Kwasikrom

Furniture provided

5,000.00

5,000.00 GES DA

Supply of teachers for Kwasikrom

Kwasikrom

Teachers supplied

5,000.00 GES MOE

Construction of KG block for Asomase

Asomase

KG block constructed

1,00,000.00

MOE GES, DA, Works Dept.

Supply of teachers to Bonsukrom and Asomase communities

Bonsukrom and

Asomase

Teachers supplied

5,000.00

MOE GES, DA, Works Dept.

Construction of teachers quarters for A.B Bokazo

A.B Bokazo

Teachers quarters constructed

250,000.00

MOE DA, Works Dept.

Completion of KG block at Akpandue and renovation of

Akpandue

KG block and primary school completed and

350,000.00

MOE DA, Works Dept.

Page 185: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

185

primary school.

renovated respectively

Encourage the use of gender clubs and promote the use of role models within school communities

District wide

Use of gender clubs and use of role models encouraged

10,000

DA MOE

Conduct programme to educate and disseminate information in areas in the value of education and community involvement.

Selected areas

Programme to educate and disseminate information conducted

5,000

DA MOE

Ensure full participation of SMCs in school

District wide

Participation for SMCs ensured

30,000 GES MOE

Conduct 4000 farmers/farmer group visits by December annually by 10 AEAS

District wide

4000 farmers/farmers group conducted

3,600.00

3,600.00 Agric. Dept.

DA

Conduct 500 supervisory visits by four (4) supervisors to backstop AEAS annually

District wide

500 supervisory visits conducted

2880.00

2880.00 Agric.Dept

DA

Page 186: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

186

Training of sub district health teams in health system management including CHPS.

Sub district management teams

No of sub district health management teams trained.

4,000.00

4,000.00 GHS DA.

Provide basic service delivery equipment to health facilities

All service delivery facilities

Basic service delivery health facilities provided

50,000.00

50,000.00

GHS MOH,DA

Conduct Revenue and cash management

Nkroful

Revenue and Cash managed

1,000.00

2,000.00 Internal Audit Unit

DA, Finance Unit, Budget Unit

Implement Procurement

Nkroful

Procurement implemented

2,000.00

Internal Audit Unit

Procurement unit

Consult with district opinion leaders

District wide

Stake holders participation

2,000.00

3,000.00 Non-Formal Edt. Unit

DA, NCCE

Expand potable water coverage

District wide

Potable water coverage expanded

80,000.00

DWST, Work

DA

Page 187: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

187

s Dept.

Provide waste containers

Selected Commts.

Waste containers provided

50,000.00

150,000.00

Env. Health, Zoomlion

DA

Reshape all new site & town road

District Wide

All road reshaped

300,000.00

400,000.00

Feeder Road Dept

DA

Construction of toilet facility for Primary ‘B’ and JHS ‘B’

Kamgbunli

Toilet facility constructed

90,000.00

MOE

DA, Works Dept.

Provision of canteen for cluster of schools

Kamgbunli canteen for cluster of schools provided

8,000.00

MOE DA, Works Dept

Provision of computer laboratory library block for cluster of schools

Kamgbunli Computer laboratory library block provided

250,000.00

MOE DA, Works Dept

Completion of community library for Asemko.

Asemko

Community library completed

150,000.00

DA, Works Dept.

GES

Provision of furniture (desk) for all schools

Bobrama, Asanta , Ankobra

Furniture provided

50,000.00

DA, Works

GES

Page 188: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

188

Dept.

Completion of computer laboratory at catholic school.

Asanta

Computer laboratory completed

100,000.00

DA, Works Dept

GES

Institute incentives for teachers at Adubrim

Adubrim

Incentives for teachers instituted

100,000.00

150,000.00

DA GES

Construction of additional KG block for Atuabo

Atuabo

Additional KG block constructed

100,000.00

DA, Works Dept.

MOE

Roofing of Eikwe community JHS

Eikwe

Eikwe community JHS roofed

8,000.00

DA, Works Dept

GES

Provision of accommodation (staff quarters) for teachers

Eikwe Sanzule, Krisan

Accommodation (staff quarters) for teachers provided

500,000.00

GES DA, Works Dept

Construction of Primary School Block

Aluku

School Block constructed

200,000.00

DA, Works Dept.

MOE

Monitor government interventions

District wide

Government interventions monitored

30,000

DA GES

Page 189: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

189

Organize INSET for four frontline Deputy/A.Ds and management

District

INSET for four frontline Deputy/A.Ds and management organized

30,000

DA GES

District inspection and ensure proper functioning of SMCs and PTAs

District wide

Regular inspection conducted

40,000

MOE GES

Conduct regular school inspection and disseminate report

District wide

Regular school inspection conducted

40,000

MOE GES

Provide incentive package for teachers in deprived areas

Selected areas

Incentive package provided

50,000

MOE GES

Conduct training for pre-school (KG) teachers

District wide

Training conducted

30,000

GES MOE

Organize mock examination for JHS students

District wide

Mock examination organized

200,000

MOE GES

Provide teaching and District Teaching and 400,000 MOE GES

Page 190: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

190

learning materials especially science for basic schools

wide

learning materials provided

Organize INSET for teachers professional

District wide

INSET for teachers professional organized

50,000 MOE GES

Organize literacy and Arts competition in upper primary

District wide

Guidance and counseling service provided

10,000

MOE GES

Formation of girls clubs in schools

District wide

Girls clubs formed

10,000

MOE GES

Organize health talk in schools and communities

District wide

Health talk organized

10,000

MOH GES

Rehabilitate KG school block

Selected areas

KG school rehabilitated

1,466,000

DA, Works Dept.

GES

Treat 1000 clinical/surgical cases involving pigs, cattle sheep, goats by December

District wide

1000 clinical/surgical cases combated

1,000.00

1,000.00 Agric.Dept

DA

Page 191: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

191

De-worm 20000 poultry and 200 livestock annually

District wide

20000 poultry and 200 livestock

500.00 500.00 Agric.Dept

DA

Conduct ante/post mortem examination on slaughtered animals annually

District wide

Ante/post-mortem examination conducted

500.00 500.00 Agric.Dept

DA

Vaccinate 20000 poultry and 300 livestock and pets against rabies and other zoonotic diseases

District wide

20000 poultry and300 livestock vaccinated

1000.00

1000.00 Agric.Dept

DA

Carry out diseases surveillance and monitoring visits quarterly

District wide

Diseases surveillance and monitoring executed

250.00 250.00 Agric.Dept

DA

Organize two days’ workshop each for 40 farmers on beekeeping, snail rearing and mushroom production by December 2015

Nkroful

Two days’ workshop organized

2000.00

1700.00 Agric.Dep

DA

Disseminate information via radio (F.M) station to

Esiama & Ankobra

Information via radio(F.M) disseminated

800.00 MoFA

DA

Page 192: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

192

educate farmers on new technologies and social agricultural issues quarterly every year

Hold two (2) days planning sessions with stakeholders annually

Aiyinase

Two days planning sessions performed

3500.00

3500.00 MoFA

RADU/CSIR

Organize 2-days workshop for 60 pigs farmers on bio security measures to contain African Swine Fever in four (4) communities

Baku, Ngalekyi Ngalekpole Anokyi

Two days’ workshop organized

1500.00

1500.00 MoFA

RADU

Organize one (1) district farmers’ day celebration annually

Various

One district farmers day celebration organized

20,000.00

30,000.00

Agric.Dept

DA

Service one official car monthly

office

One official car serviced

10,000.00

RADU

DA

Educate 50 farmers and farmer groups on safe use and handling

Aiyinase

50 farmers and farmer groups educated

1,500.00

Agric.Dept

RADU

Page 193: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

193

of agro-chemicals

Procure one (1) set of stationery for office use annually

Office

One set of stationery procured

2000.00

Agric.Dept

DA

Running cost of official vehicle annually

office

Cost of official vehicle operated

14,400.00

Agric.Dept

DA

Facilitate the supply of agro-chemical and farm inputs to farmers

District wide

Supply of agro-chemical and farm inputs to farmers facilitated

5,000.00

5,000.00 Agric.Dept

DA

Educate farmers on aqua culture/fish rearing

District wide

Farmers on aqua culture/fish rearing educated

3,500.00

3,500.00 Agric.Dept

DA

Provision of agric extension services

District wide

Agric. extension services provided

10,000

MoFA

DA, Agric dept

Conducting research into the cocoa diseases

District wide

Research into the cocoa diseases conducted

5,000 25,000 Agric.Dept

DA

Supply of improved Aiyinase Improved cocoa 40,000 Agric. DA

Page 194: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

194

cocoa seedlings

north

seedlings supplied

Dept

Organize blood donation campaigns

Schools and communities

No of blood donation campaigns in a year

7,500.00

7,500.00 GHS MOH,DA

Identify and train community of based surveillance volunteers

All communities in the district.

No of community based volunteers identified

20,000.00

GHS MOH,DA

Sensitization of communities on common endemic disease (TB, Malaria, HIV/AIDs etc).

All communities

No of people reached per program

5,000.00

15,000.00

GHS MOH,DA

Conduct half yearly health screenings

Esiama, Nkroful, Aiyinasi Eikwe

No of screening activities carried out in a year

2,000.00

GHS MOH,DA

Implement National TB, HIV/AIDS and malaria programs.

All communities

% of cases detected and effectively managed.

5,000.00

5,000.00 GHS MOH,DA

Institute internal claims vetting and management at the DHMT

District wide

Reduction in NHIS claims deductions

5,000.00

5,000.00 GHS MOH,DA

Page 195: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

195

Institute internal facility auditing mechanism

Facilities

Reduction in financial mismanagement.

7,500.00

7,500.00 GHS MOH,DA

Provide antenatal and maternity services for communities

District wide

antenatal and maternity service provided

50,000.00

50,000.00

GHS DA,MOH

Construct additional CHPS zones

Selected Commt

CHPS Constructed

500,000.00

GHS DA, MOH, Works Dept

Conduct special investigation

District Wide

Stores and transport managed

1,500.00

Internal Audit Unit

Transport Unit, Stores

Institute Pay roll management

District wide

Payroll management instituted

2,000.00

Internal Audit Unit

DA, Finance Unit, Budget Unit

Institute Liability management

District wide

Liability managed

1,000.00

Internal Audit Unit

DA, Finance Unit, Budget Unit

Conduct Follow-up on District Follow ups 2,000.0 Inter DA,

Page 196: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

196

audit recommendation

wide

conducted

0

nal Audit Unit

Finance Unit

Institute Fixed asset management

District wide

Fix asset managed

1,000.00

Internal Audit Unit

Estate Unit

Conduct IA external training

Nkroful

Training conducted

1,000.00

1,000.00 Internal Audit Unit

DA

Institute External audit liaison

Nkroful

External Audit liaison instituted

1,000.00

Audit Unit

DA

Conduct Corporate governance

District wide

Corporate governance conducted

1,500.00

1,500.00 Internal Audit Unit

HR Dept.

Institute Operational management reporting

Nkroful

Operational management reporting instituted

1,000.00

500.00 Internal Audit Unit

DA

Introduce Pre-payment vouching

District wide

Pre-payment vouching introduce

10,000.00

Internal Audit Unit

Finance Unit

Page 197: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

197

Introduce Budget cycle

District wide

Budget cycle introduced

5,000.00

Internal Audit Unit

Budget Unit

Construct toilet facilities. (Aqua privy

District wide

Aqua privy constructed

350,000.00

350,000.00

Env. Health, works Dept.

DA

Construct toilet facilities. (W/Cs)

District wide

W/Cs constructed

400,000.00

400,000.00

Env. Health, works Dept.

DA

Train all WSMTs & WATSANs

District Wide

WSMs & WATSANs trained

50,000.00

DWST

DA

Sensitization on district level education

District wide

To increase the number of Assembly women from 5 to 10

1,500.00 NCCE EC,DA

Citizenship week celebration

District wide

To inculcate a civic culture

1,600.00 NCCE DA

Education on revenue mobilization(Duties of a citizen)

District wide

To raise awareness of citizens tax obligation and improve revenue

1,600.00 NCCE DA

Page 198: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

198

mobilization

Education and pre-marital sex among teenagers in the district

All basic schools

Reduce the of teenage pregnancies and number of sexual engagement

2,500.00 NCCE GES

Education on Ebola Pandemic and Cholera outbreak

District wide

Improve awareness on Ebola Pandemic and Cholera Outbreak

1,600.00 NCCE EC, POLITICAL PARTIES, DA, GES ECT.

Improving sanitation conditions in the district

District wide

Improve sanitation to eradicate cholera

1,600.00 NCCE GHS, ENVIRONMENTAL HEALTH, DA, GES ECT.

Provide accommodation for 3 personnel

District police headquarters Esiama

Accommodation for 3 personnel provided

30,000.00

DA DA-WKS DEPT

Page 199: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

199

5.1 ANNUAL ACTION PLAN 2015

Activities Location Output indicators

Time frame Annual budget Implementing agencies

1st 2nd 3rd 4th Local External Lead Collaborating

Construction of teachers quarters at Kwasikrom

Kwasikrom

Teachers quarters constructed

250000.00

MOE

DA, Works Dept. ,GES

Construction of school block for Kwasikrom

Kwasikrom

School block constructed

1,000,000.00

MOE

DA, Works Dept

Construction of staff quarters for Aiyinase North Schools.

Aiyinase North

Staff quarters constructed

500,000.00

MOE

GES, DA, Works Dept.

Construction of school block for Sendaso

Sendaso

School block constructed

200,000.00

MOE

GES,DA, Works Dept

Renovation of Roman Catholic Primary school at Awiebo.

Awiebo

Roman Catholic Primary school renovated

100,000.00

MOE

DA, Works Dept.

Construction of toilet facilities for schools at A.B Bokazo

A.B Bokazo

Toilet facilities constructed

500,000.00

MOE

DA, Works Dept.

Page 200: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

200

Construction of JHS block for Baseke

Baseke

JHS block constructed

250,00.00

MOE

DA, Works Dept

Construction of ICT facility for A.B Bokazo

A.B Bokazo

ICT facility constructed

300,000.00

MOE DA, Works Dept

Construction of JHS Block at Alla Bokazo

Alla Bokazo

JHS block constructed

250,000.00

MOE DA, Works Dept

Construction of teachers’ quarters at Alla Bokazo

Alla Bokazo

Teachers quarters constructed

250,000.00

MOE DA, Works Dept

Construction of toilet facility for school at Alla Bokazo

Alla Bokazo

Toilet facility constructed

500,000.00

MOE DA, Works Dept

Provision of additional block for Kamgbunli KG, teaching and learning materials and furniture.

Kamgbunli

Additional block for Kamgbunli KG, teaching and learning materials and furniture provided

200,000.00

GES DA, Works Dept

Provision of boy and girls hostels for SHS

Kamgbunli

Boys and Girls hostels provided

100,000.00

MOE DA, Works Dept

Construction of Library block for SHS

Kamgbunli

Library block constructed

150,000.00

MOE DA, Works Dept

Page 201: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

201

Provision of access road for SHS and entire community roads

Kamgbunli

Access road provided

300,000.00

MOE DA, Works Dept

Construction of school block for Kwasikrom

Kwasikrom

School block constructed

1,000,000.00

MOE DA, Works Dept

Supply of teaching and learning materials for school.

Asasetre

Teaching and learning materials supplied

200,000.00

DA, Works Dept

GES

Institute incentives for teachers at Adubrim

Adubrim

incentives for teachers instituted

150,000.00

100,000.00

DA GES

Completion of Adubrim school (GETFUND) project for Primary, JHS and KG.

Adubrim

Adubrim school project completed

50,000.00

MOE GES

Construction of KG block at New Sanfo

Sanfo

KG block constructed

100,000.00

DA, Works Dept

MOE

Construction of teachers quarters and KG block at Kanokware

Kanokware

Teachers quarters and KG block constructed

400,000.00

DA, Works Dept

MOE

Page 202: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

202

Institution of a scholarship scheme for communities within the oil and gas catchment zone.

District wide

Scholarship scheme for communities instituted

1,000,000.00

1,000,000.00

DA

MOE

Stocking of Salman community library

Salman

Community library stocked

100,000.00

150,000.00

DA GES

Organize sensitization programmes

District wide

Sensitization programmes organized

40,000

DA MOE

Train statistics officers in information management

District

Statistics officers trained

10,000

DA GES

Monitor government interventions

District wide

Government interventions monitored

30,000

DA GES

Conduct regular inspection and ensure proper functioning of SMCs and PTAs

District wide

Regular inspection conducted

40,000

MOE GES

Provides science consumables

Selected schools

Science consumables provided

20,000

DA MOE

Page 203: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

203

Ensure full participation of SMCs in school

District wide

Participation of SMCs ensured

30,000

GES MOE

Conduct regular school inspection and disseminate report

District wide

Regular school inspection conducted

40,000

MOE GES

Provide incentive package for teachers in deprived areas

Selected areas

Incentive package provided

50,000

MOE GES

Conduct training for pre-school (KG) teachers

District wide

Training conducted

30,000

GES MOE

Organize mock examination for JHS students

District wide

Mock examination organized

200,000

MOE GES

Organize INSET for teachers professional

District wide

INSET for teachers organized

10,000.00

MOE GES

Organize literacy and Arts competition in upper primary

District wide

Literacy and art competition organized

20,000

MOE GES

Provide guidance and counseling services in JHS

District wide

Guidance and counseling service provided

10,000

MOE GES

Page 204: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

204

Provide gender friendly sanitary facilities in schools

Selected schools

Gender friendly sanitary facilities provided

300,000

DA GES

Organize health talk in schools and communities

District wide

Health talk organized

10,000

MOH GES

Provide material support to needy pupils in schools

All School

Material support provided

13,002.00

GES MOE

Organize sensitization in communities

Sensitization organized

10,0150.00

10,00.00 GES DA

Conduct 4000 farmers/farmer group visits by December annually by 10 AEAS

District wide

4000 farmers/farmers group conducted

3,000.00

4,200.00 Agric. Dept

DA

Conduct 250 field days for 500 farmers and FBOs annually

District wide

250 field days for 500 farmers conducted

2,500.00

2,500.00 Agric. Dept.

DA

Conduct 500 supervisory visits by four (4) supervisors to backstop AEAS

District wide

500 supervisory visits conducted

3,000.00

2,760.00 Agric. Dept.

DA

Page 205: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

205

annually

Treat 1000 clinical/surgical cases involving pigs, cattle sheep, goats by December

District wide

1000 clinical/surgical cases combated

1000.00

1000.00 Agric. Dept.

DA

De-worm 20000 poultry and 200 livestock annually

District wide

20000 poultry

and 200 livestock

de-wormed

500.00 5000.00 Agric. Dept.

DA.

Conduct ante/post mortem examination on slaughtered animals annually

District wide

Ante/post-mortem examination conducted

500.00 500.00 Agric. Dept.

DA

Vaccinate 20000 poultry and 300 livestock and pets against rabies and other zoonotic diseases

District wide

20000 poultry and300 livestock vaccinated

1,000.00

1,000.00 Agric. Dept.

DA

Carry out diseases surveillance and monitoring visits quarterly

District wide

Diseases surveillance and monitoring executed

250.00 250.00 Agric. Dept.

DA

Page 206: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

206

Assist 10 FBO with leadership training on credit management

District wide

10 FBO with leadership training on credit management assisted

2,000.00

2,000.00 MoFA

DA

Disseminate information via radio (F.M) station to educate farmers on new technologies and social agricultural issues quarterly every yea

Esiama & Ankobra

Information via radio(F.M) disseminated

800.00 MoFA

DA

Hold two (2) days planning sessions with stakeholders annually

Aiyinase

Two days planning sessions performed

3,500.00

3,500.00 MoFA

RADU/CSIR

Organize one (1) district farmers’ day celebration annually

Various location

One district farmers day celebration organized

20,000.00

30,000.00

Agric. Dept.

DA

Service one official car monthly

office

One official car serviced

10,000.00

Agric. Dept.

DA

Procure one (1) set of stationery for

Office

One set of stationery

2000.00

Agric. Dept.

DA

Page 207: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

207

office use annually

procured

Running cost of official vehicle annually

office

Cost of official vehicle operated

14,400.00

Agric. Dept.

DA

Facilitate the supply of agro-chemical and farm inputs to farmers

District wide

Supply of agro-chemical and farm inputs to farmers facilitated

5,000.00

5,000.00 Agric. Dept.

DA

Train farmers on alternative sources of livelihood.

District wide

Farmers on alternative sources of livelihood trained

4,000.00

4,000.00 Agric. Dept.

DA

Provision of agric extension services

District wide

Agric. extension services provided

10,000

MoFA

DA, Agric dept

Encouraging agric diversification

District wide

Agric. Diversification encouraged

2,000.00

3,000.00 Agric. Dept.

DA

Conducting research into the cocoa diseases

District wide

Research into the cocoa diseases conducted

10,000.00

20,000.00

Agric. Dept.

DA

Supply of improved cocoa

Aiyinase north

Improved cocoa seedlings

40,000

Agric. Dept.

DA

Page 208: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

208

seedlings

supplied

Construction of standardized CHPS compounds

Kwesikrom Basake Aluku Anwia

4 standardized CHPS compounds constructed

1000,000.00

GHS DA, Works Dept.

Procurement of motorbikes to CHPS compounds

All CHPS Zones

Motorbikes procured for service delivery

300,000.00

700,000.00

GHS MOH,DA

Procurement of essential service delivery equipment for CHPS.

All CHPS compounds

All CHPS compounds provided essential equipment

30,000.00

70,000.00

GHS MOH,DA

Liaise with Adamus to release structure for mental health and eye care

Teleku Bokazo

Specialized health care established in the district.

100,000.00

100,000.00

GHS DA

Training of Assembly members, CHMCs and CHVs in new CHPS concept.

All CHPS/Electoral zones

No of Assembly members, CHMCs and CHVs trained

5,000.00

5,000.00 GHS DA

Training of sub district health teams in health system management including CHPS.

Sub district management teams

No of sub district health management teams trained

4,000.00

4,000.00 GHS DA

Page 209: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

209

Formation and training of Sub district health management committees

Stakeholders at sub district levels

No of sub district health committees formed; trained and functional

3,000.00

7,000.00 GHS DA

Provide quality motorbikes to CHPS Compounds for service delivery.

CHPS zones

No of CHPS compounds with quality motorbikes compounds with quality motorbikes

100,000.00

200,000.00

GHS MOH,DA

Provide basic service delivery equipment to health facilities.

All service delivery facilities.

No of facilities with adequate basic service delivery equipment.

30,000.00

70,000.00

GHS

MOH, DA

Organize blood donation campaigns

Schools and communities.

No of blood donation campaigns in a year.

10,000.00

5,000.00 GHS

MOH, DA

Establishment of national ambulance service in district.

Esiama/Aiyinasi.

No of ambulance.

50,000.00

GHS

MOH, DA

Page 210: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

210

Identify and train community of based surveillance volunteers

All communities in the district.

No of community based volunteers identified and trained.

20,000.00

GHS

MOH, DA

Organize routine immunization programs

All outreach points.

Routine immunization organized

10,000.00

5000,00.00

GHS

MOH, DA

Implement special national health promotion programs (NIDs, Measles immunization, MDDs, Bed net Distribution etc.).

All communities

No of children immunized.

10,000.00

10,00.00 GHS

MOH, DA

Sensitization of communities on common endemic disease (TB, Malaria, HIV/AIDs etc).

All communities

No of people reached per program

5,000.00

15,000.00

GHS

MOH, DA

Conduct half yearly health screenings

Esiama, Nkroful, Aiyinasi Eikwe

No of screening activities carried out in a year.

2,000.00

GHS

MOH, DA

Implement National TB, HIV/AIDS and

All communities

% of cases detected and

10,000.00

GHS MOH, DA

Page 211: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

211

malaria programs.

effectively

Sensitization of communities on household latrines and safe environmental health practices

All communities.

No of community sensitizations carried out.

2,000.00

3,000.00 GHS MOH, DA

Train service providers in financial management

All GHS Facilities

Increase in IGF generation by facilities

10,000.00

GHS MOH, DA

Institute internal claims vetting and management at the DHMT

District wide

Reduction in NHIS claims deductions

10,000.00

GHS MOH, DA

Institute internal facility auditing mechanism

Facilities

Reduction in financial mismanagement

8,000.00

7,000.00 GHS MOH, DA

Paint staff quarters

Asasetre Health Center

No of nurses quarters painted

3,000.00

Works Dept.

GHS

Construct toilet facility

Asasetre Health Center.

Toilet facility constructed

10,000.00

15,000.00

Works Dept

GHS, DA, MOH

Provide antenatal and maternity

District wide

Antenatal and maternity

70,000.00

30,000.00

GHS DA, MOH

Page 212: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

212

services for communities

services provided

Provide accommodation for health workers

District wide

Accommodation provided

200,000.00

400,000.00

GHS DA, MOH

Upgrade CHPS to health centers

District wide

Centers upgraded

50,000.00

150,000,00

GHS DA, MOH

Construct additional CHPS zones

Selected Commt

CHPS Constructed

500,000.00

GHS DA, MOH, Works Dept

Consult with district opinion leaders

District wide

Stake holders participation

2,000.00

3,000.00 Non-Formal Edt. Unit

DA, NCCE

Cultivate rice.

Selected Commt

Rice cultivated

10,000.00

Non-Formal Edt. Unit

Agric. unit

Conduct Revenue and cash management

Nkroful

Revenue and Cash managed

3,000.00

Internal Audit Unit

DA, Finance Unit, Budget Unit

Implement Procurement

Nkroful

Procurement activities

2,000.00

Internal Audit

Procurement unit

Page 213: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

213

management

managed

Unit

Conduct special investigation

District Wide

Investigation conducted

3,000.00

Internal Audit Unit

DISEC,

Conduct Stores and transport management

District wide

Stores and transport managed

1,500.00

Internal Audit Unit

Transport Unit, Stores

Institute Pay roll management

District wide

Payroll management instituted

2,000.00

Internal Audit Unit

DA, Finance Unit, Budget Unit

Institute Liability management

District wide

Liability managed

1,000.00

Internal Audit Unit

DA, Finance Unit, Budget Unit

Conduct Follow-up on audit recommendation

District wide

Follow ups conducted

2,000.00

Internal Audit Unit

DA, Finance Unit

Institute Fixed asset management

District wide

Fix asset manage

1,000.00

Internal Audit Unit

Estate Unit

Page 214: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

214

Conduct IA external training

Nkroful

Training conducted

2,000.00

Internal Audit Unit

DA

Institute External audit liaison

Nkroful

External Audit liaison instituted

1,000.00

Internal Audit Unit

DA

Conduct Corporate governance

District wide

Corporate governance conducted

3,000.00

Internal Audit unit

HR Dept.

Implement Accounting systems

Nkroful

Accounting systems implemented

300.00 700.00 Internal Audit Unit

DA, Finance Unit

Institute Operational management reporting

Nkroful

Operational management reporting instituted

500.00 1,000.00 Internal Audit Unit

DA

Introduce Pre-payment vouching

District wide

Pre-payment vouching introduce

1,000.00

Internal Audit Unit

Finance Unit

Introduce Budget cycle

District wide

Budget cycle introduced

1,000.00

Internal Audit Unit

Budget Unit

Expand potable water coverage

District wide

Potable water coverage

80,000.00

DWST, Works

DA

Page 215: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

215

expanded

Dept

Provide waste containers

Selected Commts

Waste containers provided

100,000.00

100,000.00

Env. Health, Zoomlion

DA

Construct toilet facilities. (Aqua privy)

District wide

Aqua privy constructed

350,000.00

350,000.00

Env. Health, works Dept

DA

Construct toilet facilities. (W/Cs)

District wide

W/Cs constructed

400,000.00

400,000.00

Env. Health, works Dept

DA

Construct proper drainage systems

Kamgbunli, Esiama, Eikwe, Aiyinasi

Proper drainage systems constructed

20,000.00

30,000.00

Works dept

DA

Train all WSMTs & WATSANs

District Wide

WSMs & WATSANs trained

50,000.00

DWST

DA

Prepare a new DWSP

Nkroful

DWSP prepared

5,000.00

2,000.00 DWST

DA, CWSA

Construct access road and the rehabilitate all existing roads

Aiyinase North

Aiyinsi North roads rehabilitated

500,000.00

500,000.00

Feeder Road Dept

DA

Rehabilitate Access Road

Akoto-Alloakpoke, Ayawora, Awiaso, Fiasolo

Roads rehabilitated

1,000,000

Feeder Road Dept

DA

Page 216: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

216

Reshape all new site & town road

District Wide

All road reshaped

300,000.00

400,000.00

Feeder Road Dept

DA

Construct access Bridge

Mantukwa

Bridge Constructed

200,000.00

200,000.00

Feeder Road Dept

DA

Sensitization on district level education

District wide To increase the number of Assembly women from 5 to 10

1,500.00 NCCE EC,DA

Training of the newly elected Assembly/ unit committee members

Two area councils To improve their performance in revenue mobilization

3,000.00 NCCE DA

Citizenship week celebration

District wide To inculcate a civic culture

1,600.00 NCCE GES

Education on revenue mobilization(Duties of a citizen)

District wide To raise awareness of citizens tax obligation and improve revenue mobilization

1,600.00 NCCE DA

Education and pre-marital sex among teenagers in the district

All basic schools Reduce the of teenage pregnancies and number of sexual engagement

2,500.00 NCCE GES

Education on Ebola Pandemic and

District wide Improve awareness on

1,600.00 NCCE EC, POLITICAL

Page 217: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

217

Cholera outbreak Ebola Pandemic and Cholera Outbreak

PARTIES, DA, GES ECT.

Improving sanitation conditions in the district

District wide Improve sanitation to eradicate cholera

1,600.00 NCCE GHS, ENVIRONMENTAL HEALTH, DA, GES ECT.

Provide office equipment;2 printers and 1 photocopier

District police headquarters Esiama

Office equipment;2 printers and 1 photocopier provided

20,000.00

DA DA-WKS DEPT

Provide logistics and medical equipment

District police headquarters Esiama

Logistics and medical equipment provided

40,000.00

DA DA-WKS DEPT

Page 218: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

218

5.4 ANNUAL ACTION PLAN FOR 2016

ACTIVITIES

LOCATION

OUTPUT INDICATORS

TIME FRAME ANNUAL BUDGET IMPLEMENTING AGENCIES

1st 2nd 3rd 4th Local External Lead Collaborating

Organize sensitization in communities

District Wide

Sensitization organized

10,000.00

10,0150.00

GES DA

Provide material support to needy pupils in schools

All School

Material support provided

13,002.00

GES MOE

Construction of 3-Unit KG block with ancillary facilities

Selected area

Three –Unit KG block constructed

1,980,400

DA, Works Dept.

GES

Completion of 6-unit classroom block

Selected area

Six-Unit bock constructed

300,000

DA, Works Dept.

MOE

Organize health talk in schools and communities

District wide

Health talk organized

10,000

MOH GES

Provide guidance and counseling services in JHS

District wide

Guidance and counseling service provided

10,000

MOE GES

Organize literacy and Arts competition in upper primary

District wide

Literacy and art competition organized

20,000

MOE GES

Page 219: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

219

Organize INSET for teachers professional development

District wide

INSET for teachers professional development organized

10,000.00

MOE GES

Organize mock examination for JHS students

District wide

Mock examination organized

200,000

MOE GES

Conduct training for pre-school (KG) teachers

District wide

Training conducted

30,000

GES MOE

Provide incentive package for teachers in deprived areas

Selected areas

Incentive package provided

50,000

MOE GES

Conduct regular school inspection and disseminate report

District wide

Regular school inspection conducted

40,000

MOE GES

Ensure full participation of SMCs in school management

District wide

Participation of SMCs ensured

30,000

GES MOE

Provides INSET for professional development in

Selected schools

INSET for professional development in

10,000

DA GES

Page 220: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

220

science, mathematics and technical in schools

science, mathematics and technical in schools provided

Conduct regular inspection and ensure proper functioning of SMCs and PTAs

District wide

Regular inspection conducted

40,000

MOE GES

Monitor government interventions

District wide

Government interventions monitored

30,000

DA GES

Procure office stationery

Selected Dept.

Office stationery procured

50,000

DA GES

Construction of Community SHS

Salman

Community SHS constructed

1,000,000.00

DA, Works Dept

MOE

Construction of drainage facility at the entrance of cluster of schools at Tema.

Nkroful

Drainage facility constructed

150,000.00

100,000.00

DA, Works Dept

Dept. of Feeder roads

Construction of Nursery block for Sanzule-Krisan

Sanzule-Krisan

Nursery block constructed

100,000.00

GES DA, Works Dept.

Page 221: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

221

Primary school

Construction primary school block for Atuabo

Atuabo

Primary school block constructed

250,000.00

DA, Works Dept

MOE

Construction of teachers’ quarters at b Asemdasuazo

Asemdasuazo

Teachers’ quarters constructed

200,000.00

DA, Works Dept

MOE

Extension of school feeding programme to cover all communities with the Asasetre area council

Asasetre Area Council

School feeding programme extended

50,000.00

MOE GES

Construction of school block at Ngabawie

Ngabawie

School block constructed

250,000.00

MOE GES

Institute incentives for teachers at Adubrim

Adubrim

Incentives for teachers instituted

150,000.00

100,000.00

DA GES

Revamping the ICT center at Asasetre

Asasetre

ICT center revamped

150,000.00

50,000.00 DA, Works Dept.

GES

Rehabilitation of Bobrama KG block

Bobrama

KG block rehabilitated

100,000.00

DA, Works Dept.

GES

Page 222: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

222

Renovation of Ankobra primary school

Ankobra

Ankobra primary school

100,000.00

DA, Works Dept.

GES

Construction of storm drain from SDA school to Methodist school

Asemko

Storm drain constructed

100,00.00

DA, Works Dept

GES

Provision of additional KG and primary block and renovation of existing one at Baseke

Baseke

Additional KG and primary block provided and renovated respectively

900,000.00

MOE DA, Works Dept

School electrification

Kamgbunli

School electrification provided

10,000.00

MOE DA, Works Dept.

Extension of playing field for cluster of schools

Kamgbunli

Playing field extended

5,000.00

MOE DA, Works Dept.

Construction of assembly hall for Kamgbunli SHS.

Kamgbunli

Assembly hall constructed

100,000.00

MOE DA, Works Dept

Provision of additional staff

Kamgbunli

Additional staff accommodation

200,000.00

MOE DA, Works Dept

Page 223: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

223

accommodation for staff of SHS.

provided

Provision of duty or administrative vehicle for SHS.

Kamgbunli

Duty or Administrative vehicle provided

80,000.00

MOE DA, Works Dept.

Extent coverage of School feeding programme to Aiyinase North.

Aiyinase North

Coverage of school feeding programme extended

50,000.00

MOE GES,DA, Works Dept

Conduct 4000 farmers/farmer group visits by December annually by 10 AEAS

District wide

4000 farmers/farmers group conducted

3,700.00 3,500.00 Agric. Dept.

DA

Conduct 250 field days for 500 farmers and FBOs annually

District wide

250 field days for 500 farmers conducted

2,500.00 2,500.00 Agric. Dept

DA

Conduct 500 supervisory visits by four (4) supervisors to backstop AEAS annually

District wide

500 supervisory visits conducted

3,000.00 2,760.00 Agric. Dept

DA

Treat 1000 clinical/surgical cases involving pigs, cattle sheep, goats by

District wide

1000 clinical/surgical cases combated

1,000.00 1,000.00 Agric. Dept.

DA

Page 224: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

224

December

De-worm 20000 poultry and 200 livestock annually

District wide

20000 poultry and 200 livestock de-wormed

500.00 500.00 Agric. Dept.

DA

Conduct ante/post mortem examination on slaughtered animals annually

District wide

Ante/post-mortem examination conducted

500.00 500.00 Agric. Dept.

DA

Vaccinate 20000 poultry and 300 livestock and pets against rabies and other zoonotic diseases

District wide

20000 poultry and300 livestock vaccinated

1000.00 1000.00 Agric. Dept.

DA

Carry out diseases surveillance and monitoring visits quarterly

District wide

Diseases surveillance and monitoring executed

250.00 250.00 Agric. Dept.

DA

Disseminate information

via radio (F.M) station to educate

farmers on new technologies and

Esiama & Ankobra

Information via radio(F.M) disseminated

800.00 MoFA

DA

Page 225: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

225

social agricultural issues quarterly

every year

Organize 3 educational talks via radio on the effect of child labour in agriculture

Esiama

3 educational talks organized

300.00 MoFA

Dept of co-operative & social welfare

Hold two (2) days planning sessions with stakeholders annually

Aiyinase

Two days planning sessions performed

3,500.00 3,500.00 MoFA

Organize one (1) district farmers’ day celebration annually

Various

One district farmers day celebration organized

20,000.00

30,000.00 Agric. Dept.

DA

Service one official car monthly

office

One official car serviced

10,000.00

Agric. Dept.

DA

Procure one (1) set of stationery for office use annually

Office

One set of stationery procured

2000.00

Agric. Dept.

DA

Running cost of official vehicle annually

office

Cost of official vehicle operated

14,400.00

Agric. Dept.

DA

Facilitate the supply District wide Supply of agro- 5,000.00 5,000.00 Agric. DA

Page 226: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

226

of agro-chemical and farm inputs to farmers

chemical and farm inputs to farmers facilitated

Dept.

Educate farmers on aqua culture/fish rearing

District wide

Farmers on aqua culture/fish rearing educated

3,500.00 3,500,00 Agric. Dept.

DA

Provision of agric extension services

District wide

Agric. extension services provided

10,000

MoFA

DA, Agric. Dept.

Revamping of Kamgbunli rice

irrigation project

Kamgbunli

Kamgbunli rice irrigation project revamped

25,000.00

25,000.00 Agric. Dept.

DA

Conducting research into the cocoa diseases

District wide

Research into the cocoa diseases conducted

10,000.00

20,000.00 Agric. Dept.

DA

Supply of improved cocoa seedlings

Aiyinase north

Improved cocoa seedlings supplied

40,000

Agric. Dept.

DA

Construction of standardized CHPS compounds

Kwesikrom Basake Aluku Anwia

4 standardized CHPS compounds constructed

1000,000.00

GHS DA, Works Dept

Procurement of All CHPS Zones Motorbikes 300,000. 700,000.0 GHS MOH,DA

Page 227: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

227

motorbikes to CHPS compounds

procured for service delivery

00 0

Procurement of essential service delivery equipment for CHPS

All CHPS compounds

All CHPS compounds provided essential equipment

10,000.00

20,000.00 GHS MOH,DA

Procure a robust 4 WD vehicle for mobile health care

District

Mobile health services expanded to rural remote communities

120,000.00

GHS DA,MOH

Training of Assembly members, CHMCs and CHVs in new CHPS concept.

All CHPS/Electoral zones

No of Assembly members, CHMCs and CHVs trained

5,000.00 5,000.00 GHS DA

Training of sub district health teams in health system management including CHPS

Sub district management teams

No of sub district health management teams trained.

4,000.00 4,000.00 GHS DA

Provide quality motorbikes to CHPS compounds for service delivery

CHPS zones.

No of CHPS compounds with quality motorbikes

100,000.00

200,000.00

GHS MOH,DA

Page 228: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

228

Provide basic service delivery equipment to health facilities

All service delivery facilities.

No of facilities with adequate basic service delivery equipment

30,000.00

70,000.00 GHS MOH,DA

Organize blood donation campaigns

Schools and communities.

No of blood donation campaigns in a year

500.OO 1,000.00 GHS MOH,DA

Construction of mother’s hostel

Eikwe

No of mother’s hostel constructed

20,000.00

25,000.00 GHS MOH,DA

Identify and train community of based surveillance volunteers

All communities in the district.

. No of community based volunteers identified and trained

20,000.00

GHS MOH,DA

Organize routine immunization programs

All outreach points

Routine immunization organized

7,500.00 7,500.00 GHS MOH,DA

Implement special national health promotion programs

All communities

No of children immunized

10,000.00

10,000.00 GHS MOH,DA

Page 229: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

229

(NIDs, Measles immunization, MDDs, Bed net Distribution etc.).

Sensitization of communities on common endemic disease (TB, Malaria, HIV/AIDs etc).

All communities

No of people reached per program

10,000.00

10,000.00 GHS MOH,DA

Conduct half yearly health screenings

Esiama, Nkroful, Aiyinasi Eikwe

No of screening activities carried out in a year

2,000.00

GHS MOH,DA

Implement National TB, HIV/AIDS and malaria programs

All communities

% of cases detected and effectively managed

10,000.00

GHS MOH,DA

Sensitization of communities on household latrines and safe environmental health practices

All communities.

No of community sensitizations carried out.

2,500.00 2,500.00 GHS MOH,DA

Train service providers in financial management

All GHS Facilities

Increase in IGF generation by facilities

10,000.00

GHS MOH,DA

Page 230: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

230

Institute internal facility auditing mechanism

Facilities

Reduction in financial mismanagement

7,500.00 7,500.00 GHS MOH,DA

Registration of aged and other

vulnerable on NHIS

District wide

No of vulnerable registered under NHIS.

25,000.00

25,000.00 GHS MOH,DA

Renovation of staff bungalow

Aiyinasi health Center

No of health centers upgraded to polyclinic in the district

30,000.00

Works Dept.

GHS,DA

Paint staff quarters

Asasetre Health Center

No of nurses quarters painted

3,000.00

Works Dept.

GHS

Complete of abandoned structure for maternity services.

Esiama Health Center

Completed structure being used for maternity services

20,000.00

Works Dept.

GHS,DA,MOH

Provide antenatal and maternity services for communities

District wide

Antenatal and maternity services provided

50,000.00

50,000.00 GHS DA,MOH

Provide accommodation for health workers

District wide

Accommodation provided

200,000.00

400,000.00

GHS DA,MOH

Page 231: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

231

Upgrade CHPS to health centers

District wide

Centers upgraded

1000,000.00

1000,000.00

GHS DA,MOH

Construct additional CHPS zones

Selected Commt

CHPS Constructed

500,000.00

GHS DA, MOH, Works Dept

Consult with district opinion leaders

District wide

Stake holders participation

2,500.00 2,500.00 Non-Formal Edt. Unit

DA,NCCE

Conduct Land identification towards Construction of fish ponds

District wide

Fish ponds constructed

50,000.00

50,000.00 Non-Formal Edt. Unit

T&CPD, Works Dept.

Stock fish pond with fingerlings

District wide

Fish pond stocked

2,500.00 2,500.00 Non-Formal Edt. Unit

Agric. Dept.

Cultivate rice.

Selected Commt

Rice cultivated

10,000.00

Non-Formal Edt. Unit

Agric. unit

Conduct Revenue and cash management

Nkroful

Revenue and Cash managed

3,000.00 Internal Audit Unit

DA, Finance Unit, Budget Unit

Implement Procurement management

Nkroful

Procurement activities managed

2,000.00

Internal Audit Unit

Procurement unit

Page 232: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

232

Conduct special investigation

District Wide

Investigation conducted

3,000.00

Internal Audit Unit

DISEC

Conduct Stores and transport management

District wide

Stores and transport managed

1,500.00

Internal Audit Unit

Transport Unit, Stores

Institute Pay roll management

District wide

Payroll management instituted

2,000.00

Internal Audit Unit

DA, Finance Unit, Budget Unit

Institute Liability management

District wide

Liability managed

1,000.00

Internal Audit Unit

DA, Finance Unit, Budget Unit

Conduct Follow-up on audit recommendation

District wide

Follow ups conducted

2,000.00

Internal Audit Unit

DA, Finance Unit

Institute Fixed asset management

District wide

Fix asset manage

1,000.00

Internal Audit Unit

Estate Unit

Conduct IA external training

Nkroful

Training conducted

1,000.00 1,000.00 Internal Audit Unit

DA

Institute External audit liaison

Nkroful

External Audit liaison instituted

1,000.00

Audit Unit

DA

Page 233: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

233

Conduct Corporate governance

District wide

Corporate governance conducted

2,000.00 1,000.00 Internal Audit Unit

HR Dept.

Institute Operational management reporting

Nkroful

Operational management reporting instituted

750.00 750.00 Internal Audit Unit

DA

Introduce Pre-payment vouching

District wide

Pre-payment vouching introduce

1,000.00 Internal Audit Unit

Finance Unit

Introduce Budget cycle

District wide

Budget cycle introcuced

1,000.00 Internal Audit Unit

Budget Unit

Construction of modern final waste disposal site for effective waste management

District Wide

Waste management site constructed

100,000.00

100,000.00

Env. Health, DWST

DA

Expand potable water coverage

District wide

Potable water coverage expanded

80,000.00

DWST, Works Dept.

DA

Provide waste containers

Selected Commts

Waste containers provided

100,000.00

100,000.00

Env. Health, Zoomlion

DA

Page 234: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

234

Construct toilet facilities.(Aqua privy)

District wide

Aqua privy constructed

350,000.00

350,000.00

Env. Health, works Dept

DA

Construct toilet facilities. (W/Cs)

District wide

W/Cs constructed

400,000.00

400,000.00

Env. Health, works Dept

DA

Construct proper drainage systems

Kamgbunli, Esiama, Eikwe, Aiyinasi

Proper drainage systems constructed

20,000.00

30,000.00 Works dept.

DA

Train all WSMTs & WATSANs

District Wide

WSMs & WATSANs trained

50,000.00

DWST

DA

Construct Small Town Water System in larger town

Asanta, Ankobra

Water system constructed

200,000.00

CWSA

DWST, DA

Construct access road for all communities

Salman electoral area

Access roads constructed

800,000.00

Feeder Road Dept.

DA

Rehabilitate Access Road

Akoto-Alloakpoke,

Ayawora, Awiaso, Fiasolo

Roads rehabilitated

1,000,000

Feeder Road Dept.

DA

Page 235: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

235

Reshape all new site & town road

District Wide

All road reshaped

300,000.00

400,000.00

Feeder Road Dept.

DA

Training of the newly elected Assembly/ unit committee members

Two area councils

To increase the number of Assembly women from 5 to 10

1,500.00 NCCE

EC,DA

Citizenship week celebration

District wide To inculcate a civic culture

1,600.00 NCCE GES

Education on revenue mobilization(Duties of a citizen)

District wide To raise awareness of citizens tax obligation and improve revenue mobilization

1,600.00 NCCE DA

Education and pre-marital sex among teenagers in the district

All basic schools

Reduce the of teenage pregnancies and number of sexual engagement

2,500.00 NCCE DA

Education on Ebola Pandemic and Cholera outbreak

District wide Improve awareness on Ebola Pandemic and Cholera Outbreak

1,600.00 NCCE EC, POLITICAL PARTIES, DA, GES ECT.

Improving sanitation conditions in the district

District wide Improve sanitation to eradicate cholera

1,600.00 NCCE GHS, ENVIRONMENTAL HEALTH, DA, GES ECT.

Provide District police Accommodation 45,000.00 DA DA-WKS DEPT

Page 236: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

236

accommodation for 30 personnel

headquarters Esiama

for 30 personnel provided

Page 237: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

237

5.5 ANNUAL ACTION PLAN FOR 2017

ACTIVITIES LOCATION OUTPUT INDICATOR

TIME FRAME ANNUAL BUDGET IMPLEMENTING AGENCIES

1st 2nd 3rd 4th Local External Lead Collaborating

Organize sensitization in communities

District Wide

Sensitization organized

10,000.00 10,0150.00 GES DA

Provide material support to needy pupils in schools

All School

Material support provided

13,002.00

GES MOE

Build 6- unit Primary School Buildings & Accessories

Selected area

Six - unit primary school built

200,000

DA, Works Dept.

MOE

Construction of 3-unit JHS block with ancillary facilities

Selected area

Three –Unit JHS block constructed

500,000

DA, Works Dept.

MOE

Provide facilities for water

Selected schools

Facilities for water harvesting

20,000

DA GES

Page 238: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

238

harvesting in schools (tanks)

provided

Organize health talk in schools and communities

District wide

Health talk organized

10,000

MOH GES

Provide guidance and counseling services in JHS

District wide

Guidance and counseling service provided

10,000

MOE GES

Organize literacy and Arts competition in upper primary

District wide

Literacy and art competition organized

20,000

MOE GES

Undertake BECAS, SEA & NEA

District wide

BECAS,SEA &NEA undertaken

25,000

MOE GES

Organize INSET for teachers professional development

District wide

INSET for teachers organized

10,000.00 MOE GES

Provide teaching and learning materials especially science for basic

District wide

Teaching and learning materials provided

400,000

MOE GES

Page 239: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

239

schools

Organize mock examination for JHS students

District wide

Mock examination organized

200,000

MOE GES

Conduct training for pre-school (KG)

teachers

District wide

Training conducted

30,000

GES MOE

Provides material support to trained teachers on UTDBE

District wide

Material support provided

10,000.00 10,000.00 MOE GES

Provide incentive package for teachers in deprived areas

Selected areas

Incentive package provided

50,000

MOE GES

Conduct regular school inspection and disseminate report

District wide

Regular school inspection conducted

40,000

MOE GES

Ensure full participation of SMCs in school management

District wide

Participation of SMCs ensured

30,000

GES MOE

Support girls in life skills support Programmes

District wide

Girls in life skills supported

30,000

GES MOE

Page 240: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

240

Conduct regular inspection and ensure proper

functioning of SMCs and PTAs

District wide

Regular inspection conducted

40,000

MOE GES

Monitor government interventions

District wide

Government interventions monitored

30,000

DA GES

Provide office equipment

Selected Dept.

Office equipment’s provided

5,000

DA GES

Organize sensitization programmes

District wide

Sensitization programmes organized

40,000

DA MOE

Construction of KG and Primary block.

Obeng-krom

KG and Primary block constructed

200,000.00

DA, Works Dept.

GES,MOE

Construction of additional school block

Salman

Additional school block constructed

250,000.00

DA, Works Dept.

GES

Construction of JHS New JHS block 200,000.00 GES DA, Works

Page 241: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

241

block for New Bakanta

Bakanta

constructed

Dept.

Construction of primary school block for Ngalekpole

Ngalekpole

Primary school block constructed

200,000.00

DA, Works Dept.

MOE

Construction of KG block for Asemdasuazo

Asemdasuazo

KG block constructed

100,000.00

DA, Works Dept.

MOE

Construction of KG block and teachers quarters at Fiasolo

Fiasolo

KG block and teachers quarters constructed

400,000.00

DA, Works Dept

MOE

completion of teachers quarters at Nyamebekyere

Nyamebekyere

Teachers quarters completed

100,000.00 100,000.00 DA, Works Dept.

MOE

Extension of school feeding programme to cover all communities with the Asasetre area council

Asasetre Area Council

School feeding programme extended

50,000.00

MOE GES

Construction of teacher quarters at

Adubrim

Adubrim

Teachers quarters constructed

200,000.00

MOE DA, Works Dept.

Construction of Mempease Teachers 250,000.00 MOE GES

Page 242: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

242

teachers quarters for Mempeasem

m

quarters constructed

Institute incentives for teachers at Adubrim

Adubrim

Incentives for teachers instituted

150,000.00 100,000.00 DA GES

Rehabilitation of catholic JHS/KG at Asanta and SDA Primary school

Asanta

Catholic JHS/KG rehabilitated

200,000.00

DA, Works Dept.

GES

Rehabilitation of Asemko primary school

Asemko

Primary school rehabilitated

100,000.00

DA, Works Dept.

GES

Construction of school block for

Awiebo Methodist JHS

Awiebo

School block constructed

200,000.00

MOE GES

Construction of teachers quarters at Awiebo

Awiebo

Teachers quarters constructed

200,000.00

MOE DA, Works Dept.

Construction of Bungalow and security wall at

BOKASS

Awiebo

Bungalow and security wall constructed

400,000.00

MOE DA, Works Dept.

Completion of Awiebo KG block 150,000.00 MOE DA, Works

Page 243: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

243

Awiebo Roman Catholic KG block.

constructed

Dept.

Construction of new school block for

Mantukwa Bibianiha and Domeabra

Mantukwa Bibianiha and Domeabra

School block constructed

600,000.00

MOE DA, Works Dept.

Construction of teachers quarters for communities

Mantukwa Ebi and Awiebo

Teachers quarters constructed

750,00.00

MOE DA, Works Dept.

Construction of library for Baseke and Awiebo

Awiebo

Library constructed

600,000.00

MOE DA, Works Dept.

Construction of school block for KG and Primary schools at Edwakpole

Edwakpole

School block constructed

50,000.00

MOE DA, Works Dept.

Construction of teachers quarters

Akoto, Alloakpoke, Awiaso

Teachers quarters constructed

750,000.00

MOE DA, Works Dept. ,GES

Conduct 4000 farmers/farmer group visits by December annually by 10 AEAS

District wide

4000 farmers/farmers group conducted

3,200.00 4,000.00 Agric.Dept.

DA

Conduct 250 field District 250 field 2,500.00 2,500.00 Agric. DA

Page 244: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

244

days for 500 farmers and FBOs annually

wide

days for 500 farmers conducted

Dept.

Conduct 500 supervisory visits by four (4) supervisors to backstop AEAS annually

District wide

500 supervisory visits conducted

3,000.00 2,700.00 Agric. Dep.

DA

Treat 1000 clinical/surgical cases involving pigs, cattle sheep, goats by December

District wide

1000 clinical/surgical cases combated

1,000.00 1,000.00 Agric. Dept.

DA

De-worm 20000 poultry and 200 livestock annually

District wide

20000 poultry and 200 livestock de-wormed

500.00 500.00 Agric. Dept.

DA

Conduct ante/post mortem examination on slaughtered animals annually

District wide

Ante/post-mortem examination conducted

500.00 500.00 Agric. Dept.

DA

Vaccinate 20000 poultry and 300 livestock and pets

District wide

20000 poultry and300

1,000.00 1,000.00 Agric. Dept.

DA

Page 245: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

245

against rabies and other zoonotic diseases

livestock vaccinated

Carry out diseases surveillance and monitoring visits

quarterly

District wide

Diseases surveillance and monitoring executed

250.00 250.00 Agric. Dept.

DA

Disseminate information

via radio (F.M) station to educate

farmers on new technologies and social agricultural issues quarterly

every year

Esiama & Ankobra

Information via radio(F.M) disseminated

800.00 Agric. Dept.

DA

Hold two (2) days planning sessions with stakeholders annually

Aiyinase

Two days planning sessions performed

3,500.00 3,500.00 MoFA

RADU/CSIR

Organize one (1) district farmers’ day celebration annually

Various

One district farmers day celebration organized

20,000.00 30,000.00 Agric. Dept.

DA

Service one official office One official 10,000.00 Agric. DA

Page 246: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

246

car monthly

car serviced

Dept.

Procure 5 motorbikes for official use by

Office

Five motorbikes procured

15,000.00

Agric. Dept.

DA

Procure one (1) set of stationery for office use annually

Office

One set of stationery procured

2000.00

Agric. Dept.

DA

Running cost of official vehicle annually

office

Cost of official vehicle operated

14,400.00

Agric. Dept.

DA

Facilitate the supply of agro-chemical and farm inputs to farmers

District wide

Supply of agro-chemical and farm inputs to farmers facilitated

5,000.00 5,000.00 Agric. Dept.

DA

Train farmers on alternative sources of livelihood.

District wide

Farmers on alternative sources of livelihood trained.

4,000.00 4,000.00 Agric. Dept.

DA

Revamp Aiyinase and Esiama oil mill

Esiama, Aiyinase

Aiyinase and Esiama oil mill

10,000.00 10,000.00 Agric. Dept.

DA

Page 247: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

247

revamped

Provision of agric extension services

District wide

Agric. extension services provided

10,000

MoFA

DA, Agric. dept.

Encouraging agric diversification

Agric. Diversification encouraged

Agric. Diversification encouraged

2,500.00 2,500.00 Agric. Dept.

DA

Conducting research into the cocoa diseases

District wide

Research into the cocoa diseases conducted

10,000.00 20,000.00 Agric. Dept.

DA

Supply of improved cocoa seedlings

Aiyinase north

Improved cocoa seedlings supplied

40,000

Agric. Dept.

DA

Construction of standardized CHPS compounds

Kwesikrom Basake Aluku Anwia

4 standardized CHPS compounds constructed

1000,000.00

GHS DA, Works Dept.

Procurement of All CHPS Motorbikes 400,000.00 600,000.00 GHS MOH,DA

Page 248: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

248

motorbikes to CHPS compounds

Zones

procured for service delivery

Procurement of essential service delivery equipment for CHPS

All CHPS compounds

All CHPS compounds provided essential equipment

100,000.00 100,000.00 GHS MOH,DA

Training of sub district health teams in health system management including CHPS

Sub district management teams

No of sub district health management teams trained.

4,000.00 4,000.00 GHS DA

Provide quality motorbikes to CHPS Compounds for service delivery.

CHPS zones.

No of CHPS compounds with quality motorbikes

100,000.00 200,000.00 GHS MOH,DA

Provide basic service delivery equipment to health facilities

All service delivery facilities

No of facilities with adequate basic service delivery equipment

400,000.00 600,000.00 GHS MOH,DA

Page 249: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

249

Organize blood donation campaigns

Schools and communities.

No of blood donation campaigns in a year.

10,000.00 5,000.00 GHS MOH,DA

Identify and train community of based surveillance volunteers.

All communities in the district.

No of community based volunteers identified and trained

20,000.00

GHS MOH,DA

Organize routine immunization programs

All outreach points

Routine immunization programs organized

7,500.00 7,500.00 GHS MOH,DA

Implement special national health promotion programs (NIDs, Measles immunization, MDDs, Bed net Distribution etc.).

All communities

No of children immunized

10,000.00 10,000.00 GHS MOH,DA

Sensitization of communities on common endemic disease (TB, Malaria, HIV/AIDs etc).

All communities

No of people reached per program

10,000.00 10,000.00 MOH,DA

Conduct half Esiama, No of 2,000.00 GHS MOH,DA

Page 250: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

250

yearly health screenings

Nkroful, Aiyinasi Eikwe

screening activities carried out in a year

Implement National TB, HIV/AIDS and malaria programs

All communities

% of cases detected and effectively managed

10,000.00

GHS MOH,DA

Registration of aged and other vulnerable on NHIS.

District wide

No of vulnerable registered under NHIS.

25,000.00 25,000.00 GHS MOH,DA

Paint staff quarters

Asasetre Health Center

No of nurses quarters painted

3,000.00

Works Dept.

GHS

Provide antenatal and maternity services for communities.

District wide

Antenatal and maternity services provided

60,000.00 40,000.00 GHS DA,MOH

Construct a mortuary.

Eikwe

Mortuary constructed

100,000.00 200,000.00 GHS DA,MOH

Upgrade CHPS to health centers

District wide

Centers upgraded

100,000.00 100,000.00 GHS DA,MOH

Page 251: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

251

Construct additional CHPS zones

Selected Commt

CHPS Constructed

500,000.00

GHS DA, MOH, Works Dept.

Consult with district opinion leaders

District wide

Stake holders participation

2,500.00 2,500.00 Non-Formal Edt. Unit

DA,NCCE

Stock fish pond with fingerlings

District wide

Fish pond stocked

2,500.00 2,500.00 Non-Formal Edt. Unit

Agric. Dept.

Conduct Revenue and cash management

Nkroful

Revenue and Cash managed

3,000.00 Internal Audit Unit

DA, Finance Unit, Budget Unit

Implement Procurement management

Nkroful

Procurement activities managed

2,000.00 Internal Audit Unit

Procurement unit

Conduct special investigation

District Wide

Investigation conducted

3,000.00

Internal Audit Unit

DISEC,

Conduct Stores and transport management

District wide

Stores and transport managed

1,500.00

Internal Audit Unit

Transport Unit, Stores

Page 252: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

252

Institute Pay roll management

District wide

Payroll management instituted

2,000.00

Internal Audit Unit

DA, Finance Unit, Budget Unit

Institute Liability management

District wide

Liability managed

1,000.00

Internal Audit Unit

DA, Finance Unit, Budget Unit

Conduct Follow-up on audit recommendation

District wide

Follow ups conducted

1,000.00

1,000.00 Internal Audit Unit

DA, Finance Unit

Institute Fixed asset management

District wide

Fix asset manage

1,000.00

Internal Audit Unit

Estate Unit

Conduct IA external training

Nkroful

External Audit liaison instituted

1,000.00

Internal Audit Unit

DA

Institute External audit liaison

Nkroful

External Audit liaison instituted

1,000.00

Audit Unit

DA

Conduct Corporate governance

District wide

Corporate governance conducted

1,500.00 1,500.00 Internal Audit Unit

HR Dept.

Institute Nkroful Operational 1,000.00 500.00 Internal DA

Page 253: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

253

Operational management reporting

management reporting instituted

Audit Unit

Introduce Pre-payment vouching

District wide

Pre-payment vouching introduce

1,000.00 Internal Audit Unit

Finance Unit

Introduce Budget cycle

District wide

Budget cycle introduced

1,000.00 Internal Audit Unit

Budget Unit

Construction of modern final waste disposal site for effective waste management

District Wide

Waste management site constructed

100,000.00 100,000.00 Env. Health, DWST

DA

Expand potable water coverage

District wide

Potable water coverage expanded

80,000.00

DWST, Works Dept

DA

Provide waste containers

Selected Commts

Waste containers provided

100,000.00 100,000.00 Env. Health, Zoomlion

DA

Construct toilet facilities. (Aqua privy)

District wide

Aqua privy constructed

350,000.00 350,000.00 Env. Health, works Dept.

DA

Page 254: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

254

Construct toilet facilities. (W/Cs)

District wide

W/Cs constructed

400,000.00 400,000.00 Env. Health, works Dept

DA

Train all WSMTs & WATSANs

District Wide

WSMs & WATSANs trained

50,000.00

DWST

DA

Reshape all new site & town road

District Wide

All road reshaped

300,000.00 400,000.00 Feeder Road Dept.

DA

Citizenship week celebration

District wide

To inculcate a civic culture

1,600.00 NCCE GES

Education on revenue mobilization(Duties of a citizen)

District wide

To raise awareness of citizens tax obligation and improve revenue mobilization

1,600.00 NCCE DA

Education and pre-marital sex among teenagers in the district

All basic schools

Reduce the of teenage pregnancies and number of sexual engagement

2,500.00 NCCE GES

Education on Ebola Pandemic and

District wide

Improve awareness

1,600.00 NCCE EC, POLITICAL

Page 255: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

255

Cholera outbreak on Ebola Pandemic and Cholera Outbreak

PARTIES, DA, GES ECT.

Improving sanitation conditions in the district

District wide

Improve sanitation to eradicate cholera

1,600.00 NCCE

GHS, ENVIRONMENTAL HEALTH, DA, GES ECT.

Provide 2 vehicles for patrols and official work

District police headquarters Esiama

2 vehicles for patrols and official work provided

70,000.00 DA DA-WKS DEPT

Page 256: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

256

5.6 INDICATIVE FINANCIAL PLAN 2014 – 2017

The Strategic Plans and Programmes well phased out by the District Planning Co-ordination

Unit (DPCU) within the Four (4) years plan period to alleviate poverty would not be realized

without planning on resource mobilization both locally and externally to implement the

MTDP.

The indicative financial plan entails strategies to adopt to mobilize financial resource through

revenue generation within the District, from Central Government and other donor support.

The strategies for the revenue generation are listed below:

Undertake Revaluation Exercise for immovable properties in the District

Introduce a composite billing system that incorporates basic rate and special levy for

development.

Intensify Pay your levy campaign using information vans and information centers

Engage the service of local consultants in household property mobilization

Sanction developers who build without permit

Gazette fee fixing annually

Intensify building inspection for timely identification of defaulters

Revamp the District Revenue task force to assist Area Councils in revenue collection

Build market sheds and stalls in major market centers of the district

The activities to be implemented are clearly spelled out in the Proramme of Action (PoA)

and also .It indicate the activities, location, time frame ,output Indicators, local and

external source of budget and implementing agency.

Page 257: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

257

4.10.1 Financial Control Mechanism

Comprehensive financial control mechanisms have been put in place to efficient usage of

funds, and avoid misapplication and misappropriation of fund, thus ensure sustainable

development. This will help win the trust of donor agencies.

Revenue:

Money should be daily into the Assembly’s account after collection

Value books are manage by the District Finance Officer

All relevant income generating bodies of the Assembly should have GCR

Stock Register for the issuing of the Value Books to the Revenue Superintendent.

Supervision of revenue collector by internal auditor

Socio-economic data for revenue collection should be made available to the Revenue

Superintendent

Payment:

Trial Balance and Monthly Reconciliation statement to be submitted to relevant offices

All Memos for expenditure should be endorsed by the District Co-ordinating Director.

Payment vouchers are to be pre-auditored before cheques are issued

Payment Vouchers are prepared based on the Budget Line.

All cheques are counter signed by the District Finance Officer (DFOs) and District Co-

ordinating Director (DCD).

Financial reports are prepared and submitted to Regional Co-ordinating Council, Controller

and Accountant General and Ministry of Local Government and Rural Development

Signed checques are registered before issue to payee.

Proper Books of accounts are kept and all transactions are recorded dairy

Page 258: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

258

Sector Budget from 2014-2017 The expenditure for implementation of programmes, activities and projects in the

Thematic Areas is presented below.

2014

EDUCATION

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

3,873,000.00 9,000.00 782,002.3334 391,001.1667

TOTAL=5,055003.5

HEALTH DIRECTORATE

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

330,000.00 40,000.00 230,000.00 60,000.00 100,000.00 40,000.00

TOTAL=800,000.00

AGRICULTURE

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

2,000.00 43,480.00 139,480.00 27,900.00

TOTAL=212,860.00

Page 259: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

259

NON-FORMAL EDUCATION

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

2,000.00 1,500.00 1,500.00

TOTAL=5,000.00

NATIONAL COMMISSION FOR CIVIC DEDUCATION

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

10,400.00

TOTAL=10,400.00

INTERNAL AUDIT

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECT

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

1,000.00 24,000.00 2,000.00

TOTAL=27,000.00

Page 260: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

260

GHANA POLICE SERVICE

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

30,000.00

TOTAL=30,000.00

WATER AND SANITATION

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

930,000.00 850,000.00 30,000.00 20,000.00

TOTAL=1,830,000.00

ROAD INFRASTRUCTURE

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

350,000.00 250,000.00 100,000.00

TOTAL=700,000.00

Page 261: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

261

2015

AGRICULTURE

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

2,000.00 91,830.00 91,830.00 30,000.00

TOTAL=215,660.00

HEALTH DIRECTORATE

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

1,764,000.00 1,714,000.00 800,000.00 198,000.00 190,000.00 100,000.00

TOTAL=4,766,000.00

EDUCATION

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

5,150,000.00 1,737,667.833 1,737,667.833 1,737,667.833

TOTAL=10,363,003.5

Page 262: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

262

NON-FORMAL EDUCATION

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

6,000.00 4,000.00 2,000.00 1,500.00 1,500.00

TOTAL=15,000.00

INTERNAL AUDIT

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECT

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

2,500.00 20,000.00 2,500.00

TOTAL=25,000.00

NATIONAL COMMISSION FOR CIVIC EDUCATION

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECT

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

13,400.00

TOTAL=13,400.00

Page 263: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

263

GHANA POLICE SERVICE

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECT

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

60,000.00

TOTAL=60,000.00

WATER AND SANITATION

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

830,000.00 600,000.00 400,000.00 30,000.00 4,000.00 23,000.00

TOTAL=1,887,000.00

ROAD INFRASTRUCTURE

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

1,150,000.00 1,150,000.00 800,000.00

TOTAL=3,100,000.00

Page 264: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

264

2016

EDUCATION

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

1,700,000.00 1,300,000.00 930,000.00 463,003.5 300,000.00

TOTAL=4,693,003.5

AGRICULTURE

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

106,980.00 76,980.00 20,000.00 27,000.00 25,000.00

TOTAL=255,960.00

HEALTH DIRECTORATE

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

1,759,000.00 1,759,000.00 1,000,000.00 80,000.00 70,000.00 50,000.00

TOTAL=4,718,000.00

Page 265: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

265

NON-FORMAL EDUCATION

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

5,000.00 60,000.00 50,000.00 2,000.00 1,500.00 1,500.00

TOTAL=120,000.00

INTERNAL AUDIT

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

3,000.00 20,000.00 4,000.00

TOTAL=27,000.00

NATIONAL COMMISSION FOR CIVIC EDUCATION

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

11,900.00

TOTAL=11,900.00

GHANA POLICE SERVICE

SOURCE OF FUND

Page 266: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

266

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

45,000.00

TOTAL=45,000.00

WATER AND SANITATION

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

1,000,000.00 1,000,000.00 130,000.00 30,000.00 20,000.00

TOTAL=2,180,000.00

ROAD INFRASTRUCTURE

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

1,200,000.00 400,000.00 900,000.00

TOTAL=2,500,000.00

Page 267: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

267

2017

EDUCATION

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

3,000,000.00 3,000,000.00 770,000.00 800,000.00 318,003.5 150,000.00

T0TAL=8,038,003.5

AGRICULTURE

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

50,000.00 35,000.00 100,000.00 55,830.00 55,830.00

TOTAL=296,660.00

HEALTH DIRECTORATE

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

1,000,000.00 2,000,000.00 703,000.00 70,000.000 50,000.00 40,000.00

TOTAL=3,863,000.00

Page 268: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

268

NON-FORMAL EDUCATION

SOURCE OF FUNDING

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

2,500.00 2,500.00 2,000.00 1,500.00 1,500.00

TOTAL=10,000.00

INTERNAL AUDIT

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

4,000.00 20,000.00 3,000.00

TOTAL=27,000.00

NATIONAL COMMISSION FOR CIVIC EDUCATION

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

8,900.00

TOTAL=8,900.00

Page 269: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

269

GHANA POLICE SERVICE

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

70,000.00

TOTAL=70,000.00

WATER AND SANITATION

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

980,000.00 700,000.00 300,000.00 30,000.00 20,000.00

TOTAL=2,030,000.00

ROAD INFRASTRUCTURE

SOURCE OF FUND

PHYSICAL PROJECTS NON-PHYSICAL PROJECTS

DACF IGF DDF/OTHER

DONORS

DACF IGF DDF/OTHER

DONORS

250,000.00 250,000.00 200,000.00

T0TAL=700,000.00

GRAND TOTAL = GH₵56,679,754.00

Page 270: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

270

CHAPTER 6

MONITORING AND EVALUATION

6.1 Monitoring and Evaluation Arrangements The monitoring and Evaluation will be done by the District Assembly through the District Planning and

Coordinating Unit – DPCU and Sectoral Departments as indicated in the Annual Action Plan.

Unforeseen changes in the Socio-Economic and Government Policies will affect the Plan. As a result

there is the need for continuous monitoring and evaluation to enable the necessary adjustment and

revision to be done.

6.1.2 Monitoring Report Monitoring starts with the implementation of the projects. It is aimed at making sure that the Project

progresses according to laid down procedures, Bill of Quantities, and scheduled as well as maintaining

high quality standards. The District Monitoring Team will be responsible for the overall supervision of

the Programmes and Projects in the Annual Plan.

A monitoring record will be kept during the implementation, which will form the basis of writing

monthly monitoring report to the District Chief Executive and also to correct mistakes.

6.1.3 Monitoring Framework The Monitoring Framework outlines the mechanisms and indicators for the monitoring of the

development programmes and projects and this is shown in the table below:

Page 271: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

271

MONITORING FRAMEWORK

WHEN RESPONSIBILITY TOOLS INDICATORS RESULTS FEEDBACK

Daily DPO/Engineer Observation

Project visits

Project Reports

Interviews

Performance

output-quality

and quantity

Inputs – quality

and quantity (Bill

of Quantities

Designs/

Drawings

Time

Identify problems,

defects and constraints

inhibiting work and

progress and is

packaged in a

monitoring Report

Solutions and

measures to

solve problems

defects and

constraints

provided

Weekly DPO/Engineer

DCD/DCE

“ “ Identify problems,

defects and constraints

inhibiting work and

progress and is

packaged in a

monitoring report

Solutions and

measures to

solve problems

defects and

constraints

provided

Monthly District Monitoring

Team

Works Sub-

Committee

DCD/DCE

Identify problems,

defects and constraints

inhibiting work and

progress and is

packaged in a

monitoring Report

Solutions and

measures to

solve problems

defects and

constraints

provided

Quarterly District Monitoring

Team

Identify problems,

defects and constraints

inhibiting work

progress and this is

Solutions and

measures to

solve problems

defects and

Page 272: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

272

Works Sub

Committee

DPCU

DCE/DCD

packaged in a

monitoring report

constraints are

provided

Page 273: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

273

CHAPTER 7

COMMUNICATION STRATEGY

7.1 Introduction This chapter deals with how to disseminate the content of the Ellembelle District Medium

Term Development Plans (DMTDP). It also discusses the expected responsibilities of

stakeholders and other principal action agents as well as all the collaborating agencies in the

implementation of the District plans. Strategies for promoting dialogue to generate feedback

from the public regarding the provision of socio-economic infrastructure and related services

are also discussed.

Dissemination of DMTDP and Annual Progress Report of Implementation

To solicit for support for funding, logistic, and human resources for effective implementation

of the DMTDP, the Assembly will disseminate the plans to all stakeholders at the following

levels:

District Assembly Level

The development goal, objectives, and strategies stated in the medium term development

plans would be known to all Assembly Members, decentralised departments and agencies as

well as the staff of the Assembly for implementation.

Town/ Area Council/ Unit Committee Level

All stakeholders at the Area Council and Unit Committee levels, specifically the leaders need

to be enlightened on the content of the 2014-2017 medium term development plans to

enable them carry the message to their people. This will be done through the following:

1. The chiefs, community based/youth associations, market-women, non-

governmental organizations, the GPRTU, and other members of the private

Page 274: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

274

sector about their roles/responsibilities and benefits to themselves and the

entire society at large.

2. Durbars, seminars, community workshops etc. would be organized on the plans

to sensitized all stakeholders

3. Investment opportunities in the district would be promoted to enable the

private sector and development partners to be attracted to the plan

Regional and National Organizations/Institutions

It is important to disseminate the plans beyond the borders of the district so as to serve as a

means of informing the public/private institutions, and the general public on the potentials

that exist in the district. This approach will also serve as a means of soliciting for financial and

material supports for the plan implementation. This will also involve the members of

parliament in the district.

International Organizations

The District Assembly would also promote the plans through workshops and seminars to

attract financial agencies in addressing people’s need. The plans would be summarized into

brochures and leaflets whilst a Website is also created for the wider international community.

7.2 Expected Roles/Responsibilities of stakeholders in the plan

implementation The role of all key stakeholders in the implementation on the plans is very important. Hence,

the anticipated role that each stakeholder will play is highlighted as follows:

Page 275: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

275

7.2.1 Ellembelle District Assembly The decentralization policy coupled with the Local Government Act 462 designates District

Assemblies as planning Authorities and not responsible for the preparation/ formulation of

plans but also their implementation, monitoring and evaluation. This implies that the

Ellembelle District Assembly in collaboration with departments and agencies as well as other

non-governmental organizations are responsible for the day to day running of the district and

the assessment of projects after implementation. To, implement these projects/programmes;

it is necessary that the district assembly mobilizes funds both from within and outside the

district. The Local revenue base needs to be fully assessed and restructured to give the

assembly a sound financial footing for projects implementation.

The District Assembly is charged with the overall responsibility for the process of

implementation, monitoring and evaluation of the development projects/programmes. This

role can best be performed by tapping the available human and technical resources of the

Expanded District Planning Co-ordinating Unit, Departments and Agencies, Sub-Committees,

Executive Committee, NGOs and development partners

The technical skills of the assembly/departments/agencies need to be tapped for the

performance of the following functions:

Generation and provision of funds for implementation of programmes/projects

Setting up of terms of reference and framework for co-ordination and collaboration

among institutions involved in the implementation of the development plans

Identification and due response to implementation issues such as legal, administrative

and traditional bottlenecks

Identification and invitation/attraction of potentials investors in the district

Periodic revision of plan implementation, procedure and effective adjustments in the

response to the changing circumstances

Page 276: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

276

7.2.2 Executive Committee The Executives Committee would have to play the leading role of informing the Assembly

members about the content of the plans, status of projects implementation and problems

being encountered during the implementation to enable the electorates understand issues

7.2.3 Sub-Committee The various sub-committees need to be strengthened with the requisite personnel; skills

knowledge and experience to enable the members participate actively in the implementation

of the development plans.

7.2.4 Decentralized Departments/Agencies There are major actors in the process of implementation, monitoring and evaluation. The

departments/agencies will provide technical guidance and facilitate the implementation of

desirable projects/programmes.

7.2.5 Chiefs, Opinion Leaders and Traditional Authorities The chiefs, Opinion Leaders and Traditional Authorities and owners need to be part of the

process of the plan implementation to enable them have informed decisions on their

responsibilities in implementing the programmes/projects designed in the plan

7.2.6 Non-Governmental Organizations (NGOs)/ Development Partners The District is mindful of the crucial roles played by Non-Governmental Organizations in

support of various projects/programmes in the district. The role of NGOs and other

development partners has been very crucial for the successful implementation of planned

programmes/projects. It is hoped that the development partners will bite into the plan to

enhance the overall development of the district.

Page 277: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

277

7.2.7 Communities Communities offer a lot of support starting from project identification, design and

implementation, monitoring and evaluation. They also play important roles by providing

counterpart funds towards projects implementation. This is to enhance the principle of

community ownership and management for sustainability. In this direction, communities

provide labour, land, local expertise, counterpart funds, etc for projects implementation.

It is hoped that communities would continue to offer their best through project identification,

implementation, and evaluation for sustainability.

7.3 Strategies for promoting dialogue/management of public

expectations concerning services The District Assembly has adopted several strategies for promoting dialogue and eliciting

information from the public regarding the implementation of planned programmes and

projects in the plan. Stakeholders meetings would be held periodically at the Town/Area

Council level to update the people on progress of work.

Also, the Assembly would hold meeting with identified civil society organisation, Artisans,

Religious Groups, etc to discuss the implementation of the plan and receive feedback.

The District Assembly would to a large extent involve the people in the monitoring and

evaluation of programmes and projects to quickly respond to the concern and expectation of

the people during the implementation of the plan. Progress reports on plan implementation

would be discussed at sub-committee meetings and quarterly review meetings would also be

held to address people’s concern in the process of implementation. Furthermore, the Public

Relations and Complaint Committee of the Assembly would provide a platform for the hearing

of issues regarding the implementation of the programmes/projects in the District.

Page 278: GOVERNMENT OF GHANA...2016/04/16  · GOVERNMENT OF GHANA ELLEMBELLE DISTRICT ASSEMBLY DRAFT MEDIUM-TERM DEVELOPMENT PLAN UNDER THE GHANA-SHARED GROWTH DEVELOPMENT AGENDA (GSGDA II)

278

7.4 Conclusion The consultative participatory nature of the plan preparation process will mean that all

relevant stakeholders and development partners will be very keen and show commitment in

the implementation of the plan. The document should be seen as the Manifesto, all

stakeholders should ensure that all planned strategies or interventions are strictly

implemented. This will help improve the quality of lives of the people by ensuring wealth

creation and improving the living standards of the people in the District.

To achieve the set objectives of the MTDP of Ellembelle District, adequate resources must be

mobilized both internally and externally to fund the planned activities between 2014 – 2017.

The SEA tools reveal the importance of mainstreaming environmental issues in the DMDTP.

This will afford the District to achieve sustainable development.

Lastly, it is expected that funds would be released on timely bases to support planned

activities in order to achieve the objectives set in the DMTDP, 2014 – 2017 for Ellembelle

District Assembly.