ENVIRONMENTAL IMPACT ASSESSMENT REPORT
& ENVIRONMENTAL MANAGEMENT PLAN
OF
GODREJ AGROVET LIMITED
LOCATED AT
Plot Nos: E-24, E-24 (Part) and E-23/1, MIDC, Lote Parshuram, Taluka: Khed, District: Ratnagiri, Maharashtra State
FOR
EXPANSION OF EXISTING HERBICIDES/
FUNGICIDES/PGRS MANUFACTURING UNIT
Proposal for
ENVIRONMENTAL CLEARANCE Industry falls under 5 (b) ‘A’ Category as per the EIA Notification, 2006
Period: January 2018 - Till date Task: Selecting ambient air monitoring sites based on IMD data, Review of the meteorological data, Process emissions and AAQ data, suggesting air pollution control measures.
2 WP P.S.N.Murthy
Period: January 2018 - Till date Task: Identification of water monitoring sites, estimating water requirement, Suggesting Recycling of water, waste water treatment methods & disposal schemes.
3 SHW* P.S.N.Murthy
Period: January 2018 - Till date Task: Inventorization of Hazardous waste, Solid wastes, etc., suggesting treatment options viz., landfill,
Period: January 2018 - Till date Task: Generating primary SE data, livestock inventory and impacts, conducted focused group discussions, taken public opinion on the project. Identified villages wise amenities and needs.
5 EB G. Raja Reddy
Period: January 2018 - Till date Task: Collected secondary data from forest/ agricultural/ fisheries department, generation of primary flora and fauna data from study area & core area, ground truthing for ecological assessment, development of status report, suggested species for greenbelt development.
6 HG E. V. Naresh Kumar
Period: March 2018 - Till date Task: Measurement of ground water levels from the existing wells present in and around project site, observation of surface water bodies, establishing groundwater flow direction and its gradient and evaluation of rainfall data and suggesting suitable depth for secured land fill base, and identification of development of monitoring wells.
7 GEO E. V. Naresh Kumar
Period: March 2018 - Till date Task: Observations made towards the Identification of country rock, development of porosity, thickness and extent of weathered formations, area seismicity and evaluation of soil permeability for suggesting suitable civil structures.
8 AQ P. Praveen Kumar
Period: January 2018 - Till date Task: Meteorological & Air Pollution dispersion studies, suggesting environmental management plan for air pollution control measures
DECLARATION OF ASSOCIATION IN THE EIA 3
S. No.
Functional areas
Name of the expert/s
Involvement (period and task**) Signature
9 NV Yarlagadda V. Prasad
Period: January 2018 - Till date Task: Monitoring of noise / vibration levels using instrument, processing and analysis of Data for suggesting suitable noise mitigating measures
10 LU Dr. Y. Rama Mohan
Period: March 2018 - Till date Task: Collection of GPS readings from the project site and prepared layout, preparation of TOPO map through SOI 1:50,000 scale TOPO sheet. Collections of ground through data from the field. Preparation of LU map through Satellite imagery, SOI, Google map & Ground through data.
11 RH P.S.N.Murthy
Period: January 2018 - Till date Task: Identification of Hazards and Hazardous substances from process & warehouse, storage tanks. Risks and consequence analysis using software and lethality damages, DMP and EPP for onsite & offsite were provided
S. No. Functional Areas Name of the FAAs Involvement
Period Signature
1 AP & AQ Y. Prathyusha January 2018 - Till date
2 LU G. Sandeep January 2018 - Till date
DECLARATION OF ASSOCIATION IN THE EIA 4
S. No. Functional
Areas
Name of the Team
Members
Involvement
Period Signature
1 SC G. Raja Reddy January 2018 – Till date
2 RH Y. Prathyusha January 2018 - Till date
Declaration by the Head of the accredited consultant organization/ authorized person I, Yarlagadda V. Prasad, hereby, confirm that the above mentioned experts prepared
the EIA of Godrej Agrovet Ltd at Plot No. – E-24, E-24 (Part) and E-23/1, MIDC Lote
Parshuram, Taluka: Khed, District: Ratnagiri, Maharashtra state. I also confirm that the
consultant organization shall be fully accountable for any mis-leading information
mentioned in this statement.
Signature:
Name: Yarlagadda V. Prasad
Designation: Managing Director
Name of the EIA consultant organization: Rightsource Industrial Solutions Pvt. Ltd.
This has reference to the proposal submitted in the Ministry of Environment, Forest
and Climate Change to prescribe the Terms of Reference (TOR) for undertaking detailed EIA
study for the purpose of obtaining Environmental Clearance in accordance with the provisions of
the EIA Notification, 2006. For this purpose, the proponent had submitted online information in the
prescribed format (Form-1 ) along with a Pre-feasibility Report. The details of the proposal are
given below:
1. Proposal No.: IA/MH/IND2/71936/2017
2. Name of the Proposal:
Expansion of Manufacturing capacity of
Herbicides/Fungicides/Plant Growth Regulators
(PGRs) from 635.125 MT/A to 1006.25 MT/A
3. Category of the Proposal: Industrial Projects - 2
4. Project/Activity applied for: 5(b) Pesticides industry and pesticide specific
intermediates (excluding formulations)
5. Date of submission for TOR: 29 Dec 2017
In this regard, under the provisions of the EIA Notification 2006 as amended, the Standard TOR
for the purpose of preparing environment impact assessment report and environment
management plan for obtaining prior environment clearance is prescribed with public consultation
as follows:
STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE
5(b): STANDARD TERMS OF REFERENCE FOR CONDUCTINGENVIRONMENT IMPACT ASSESSMENT STUDY FOR PESTICIDESINDUSTRY AND PESTICIDE SPECIFIC INTERMEDIATES(EXCLUDING FORMULATIONS)AND INFORMATION TO BEINCLUDED IN EIA/EMP REPORT
A. STANDARD TERMS OF REFERENCE
1) Executive Summary
2) Introduction
i. Details of the EIA Consultant including NABET accreditation
ii. Information about the project proponent
iii. Importance and benefits of the project
3) Project Description
i. Cost of project and time of completion.
ii. Products with capacities for the proposed project.
iii. If expansion project, details of existing products with capacities and whether adequate landis available for expansion, reference of earlier EC if any.
iv. List of raw materials required and their source along with mode of transportation.
v. Other chemicals and materials required with quantities and storage capacities
vi. Details of Emission, effluents, hazardous waste generation and their management.
vii. Requirement of water, power, with source of supply, status of approval, water balance diagram,man-power requirement (regular and contract)
viii. Process description along with major equipments and machineries, process flow sheet(quantative) from raw material to products to be provided
ix. Hazard identification and details of proposed safety systems.
x. Expansion/modernization proposals:
a. Copy of all the Environmental Clearance(s) including Amendments thereto obtained forthe project from MOEF/SEIAA shall be attached as an Annexure. A certified copy of thelatest Monitoring Report of the Regional Office of the Ministry of Environment and Forestsas per circular dated 30th May, 2012 on the status of compliance of conditions stipulatedin all the existing environmental clearances including Amendments shall be provided. Inaddition, status of compliance of Consent to Operate for the ongoing Iexisting operationof the project from SPCB shall be attached with the EIA-EMP report.
STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FORPROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE
b. In case the existing project has not obtained environmental clearance, reasons for nottaking EC under the provisions of the EIA Notification 1994 and/or EIA Notification2006 shall be provided. Copies of Consent to Establish/No Objection Certificate andConsent to Operate (in case of units operating prior to EIA Notification 2006, CTE andCTO of FY 2005-2006) obtained from the SPCB shall be submitted. Further, compliancereport to the conditions of consents from the SPCB shall be submitted.
4) Site Details
i. Location of the project site covering village, Taluka/Tehsil, District and State, Justificationfor selecting the site, whether other sites were considered.
ii. A toposheet of the study area of radius of 10km and site location on 1:50,000/1:25,000 scaleon an A3/A2 sheet. (including all eco-sensitive areas and environmentally sensitive places)
iii. Details w.r.t. option analysis for selection of site
iv. Co-ordinates (lat-long) of all four corners of the site.
v. Google map-Earth downloaded of the project site.
vi. Layout maps indicating existing unit as well as proposed unit indicating storage area, plantarea, greenbelt area, utilities etc. If located within an Industrial area/Estate/Complex, layoutof Industrial Area indicating location of unit within the Industrial area/Estate.
vii. Photographs of the proposed and existing (if applicable) plant site. If existing, showphotographs of plantation/greenbelt, in particular.
viii. Landuse break-up of total land of the project site (identified and acquired), government/private - agricultural, forest, wasteland, water bodies, settlements, etc shall be included. (notrequired for industrial area)
ix. A list of major industries with name and type within study area (10km radius) shall beincorporated. Land use details of the study area
x. Geological features and Geo-hydrological status of the study area shall be included.
xi. Details of Drainage of the project upto 5km radius of study area. If the site is within 1 kmradius of any major river, peak and lean season river discharge as well as flood occurrencefrequency based on peak rainfall data of the past 30 years. Details of Flood Level of theproject site and maximum Flood Level of the river shall also be provided. (mega green fieldprojects)
xii. Status of acquisition of land. If acquisition is not complete, stage of the acquisition processand expected time of complete possession of the land.
xiii. R&R details in respect of land in line with state Government policy
5) Forest and wildlife related issues (if applicable):
i. Permission and approval for the use of forest land (forestry clearance), if any, andrecommendations of the State Forest Department. (if applicable)
STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE
ii. Landuse map based on High resolution satellite imagery (GPS) of the proposed site delineatingthe forestland (in case of projects involving forest land more than 40 ha)
iii. Status of Application submitted for obtaining the stage I forestry clearance along with lateststatus shall be submitted.
iv. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves,Migratory Corridors of Wild Animals, the project proponent shall submit the map dulyauthenticated by Chief Wildlife Warden showing these features vis-à-vis the project locationand the recommendations or comments of the Chief Wildlife Warden-thereon
v. Wildlife Conservation Plan duly authenticated by the Chief Wildlife Warden of the StateGovernment for conservation of Schedule I fauna, if any exists in the study area
vi. Copy of application submitted for clearance under the Wildlife (Protection) Act, 1972, to theStanding Committee of the National Board for Wildlife.
6) Environmental Status
i. Determination of atmospheric inversion level at the project site and site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and directionand rainfall.
ii. AAQ data (except monsoon) at 8 locations for PM10, PM2.5, SO2, NOX, CO and otherparameters relevant to the project shall be collected. The monitoring stations shall be basedCPCB guidelines and take into account the pre-dominant wind direction, population zoneand sensitive receptors including reserved forests.
iii. Raw data of all AAQ measurement for 12 weeks of all stations as per frequency given in theNAQQM Notification of Nov. 2009 along with - min., max., average and 98% values foreach of the AAQ parameters from data of all AAQ stations should be provided as an annexureto the EIA Report.
iv. Surface water quality of nearby River (100m upstream and downstream of discharge point)and other surface drains at eight locations as per CPCB/MoEF&CC guidelines.
v. Whether the site falls near to polluted stretch of river identified by the CPCB/MoEF&CC, ifyes give details.
vi. Ground water monitoring at minimum at 8 locations shall be included.
vii. Noise levels monitoring at 8 locations within the study area.
viii. Soil Characteristic as per CPCB guidelines.
ix. Traffic study of the area, type of vehicles, frequency of vehicles for transportation of materials,additional traffic due to proposed project, parking arrangement etc.
x. Detailed description of flora and fauna (terrestrial and aquatic) existing in the study areashall be given with special reference to rare, endemic and endangered species. If Schedule-I fauna are found within the study area, a Wildlife Conservation Plan shall be prepared andfurnished.
xi. Socio-economic status of the study area.
STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FORPROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE
7) Impact and Environment Management Plan
i. Assessment of ground level concentration of pollutants from the stack emission based onsite-specific meteorological features. In case the project is located on a hilly terrain, theAQIP Modelling shall be done using inputs of the specific terrain characteristics fordetermining the potential impacts of the project on the AAQ. Cumulative impact of all sourcesof emissions (including transportation) on the AAQ of the area shall be assessed. Details ofthe model used and the input data used for modelling shall also be provided. The air qualitycontours shall be plotted on a location map showing the location of project site, habitationnearby, sensitive receptors, if any.
ii. Water Quality modelling - in case of discharge in water body
iii. Impact of the transport of the raw materials and end products on the surrounding environmentshall be assessed and provided. In this regard, options for transport of raw materials andfinished products and wastes (large quantities) by rail or rail-cum road transport or conveyor-cum-rail transport shall be examined.
iv. A note on treatment of wastewater from different plant operations, extent recycled and reusedfor different purposes shall be included. Complete scheme of effluent treatment. Characteristicsof untreated and treated effluent to meet the prescribed standards of discharge under E(P)Rules.
v. Details of stack emission and action plan for control of emissions to meet standards.
vi. Measures for fugitive emission control
vii. Details of hazardous waste generation and their storage, utilization and management. Copiesof MOU regarding utilization of solid and hazardous waste in cement plant shall also beincluded. EMP shall include the concept of waste-minimization, recycle/reuse/recovertechniques, Energy conservation, and natural resource conservation.
viii. Proper utilization of fly ash shall be ensured as per Fly Ash Notification, 2009. A detailedplan of action shall be provided.
ix. Action plan for the green belt development plan in 33 % area i.e. land with not less than1,500 trees per ha. Giving details of species, width of plantation, planning schedule etc. shallbe included. The green belt shall be around the project boundary and a scheme for greeningof the roads used for the project shall also be incorporated.
x. Action plan for rainwater harvesting measures at plant site shall be submitted to harvestrainwater from the roof tops and storm water drains to recharge the ground water and also touse for the various activities at the project site to conserve fresh water and reduce the waterrequirement from other sources.
xi. Total capital cost and recurring cost/annum for environmental pollution control measuresshall be included.
xii. Action plan for post-project environmental monitoring shall be submitted.
STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE
xiii. Onsite and Offsite Disaster (natural and Man-made) Preparedness and Emergency ManagementPlan including Risk Assessment and damage control. Disaster management plan should belinked with District Disaster Management Plan.
8) Occupational health
i. Plan and fund allocation to ensure the occupational health & safety of all contract and casualworkers
ii. Details of exposure specific health status evaluation of worker. If the workers' health is beingevaluated by pre designed format, chest x rays, Audiometry, Spirometry, Vision testing (Far& Near vision, colour vision and any other ocular defect) ECG, during pre placement andperiodical examinations give the details of the same. Details regarding last month analyzeddata of above mentioned parameters as per age, sex, duration of exposure and departmentwise.
iii. Details of existing Occupational & Safety Hazards. What are the exposure levels of hazardsand whether they are within Permissible Exposure level (PEL). If these are not within PEL,what measures the company has adopted to keep them within PEL so that health of the workerscan be preserved,
iv. Annual report of heath status of workers with special reference to Occupational Health andSafety.
9) Corporate Environment Policy
i. Does the company have a well laid down Environment Policy approved by its Board ofDirectors? If so, it may be detailed in the EIA report.
ii. Does the Environment Policy prescribe for standard operating process / procedures to bringinto focus any infringement / deviation / violation of the environmental or forest norms /conditions? If so, it may be detailed in the EIA.
iii. What is the hierarchical system or Administrative order of the company to deal with theenvironmental issues and for ensuring compliance with the environmental clearanceconditions? Details of this system may be given.
iv. Does the company have system of reporting of non compliances / violations of environmentalnorms to the Board of Directors of the company and / or shareholders or stakeholders atlarge? This reporting mechanism shall be detailed in the EIA report
10) Details regarding infrastructure facilities such as sanitation, fuel, restroom etc. to be provided to thelabour force during construction as well as to the casual workers including truck drivers duringoperation phase.
11) Enterprise Social Commitment (ESC)
i. Adequate funds (at least 2.5 % of the project cost) shall be earmarked towards the EnterpriseSocial Commitment based on Public Hearing issues and item-wise details along with time
STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FORPROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE
bound action plan shall be included. Socio-economic development activities need to beelaborated upon.
12) Any litigation pending against the project and/or any direction/order passed by any Court of Lawagainst the project, if so, details thereof shall also be included. Has the unit received any noticeunder the Section 5 of Environment (Protection) Act, 1986 or relevant Sections of Air and WaterActs? If so, details thereof and compliance/ATR to the notice(s) and present status of the case.
13) 'A tabular chart with index for point wise compliance of above TOR.
B. SPECIFIC TERMS OF REFERENCE FOR EIASTUDIES FOR PESTICIDESINDUSTRY AND PESTICIDE SPECIFIC INTERMEDIATES (EXCLUDINGFORMULATIONS)
1. Commitment that no banned pesticides will be manufactured.
2. Detailsonsolvents to be used,measuresfor solventrecovery and for emissions control.
3. Details of process emissions from the proposed unit and its arrangement to control.
4. Ambient air quality data should include VOC, other process- specific pollutants* like NH3*,chlorine*, HCl*, HBr*, H2S*, HF*, CS2 etc., (*-as applicable)
5. Work zone monitoring arrangements for hazardous chemicals.
6. Detailed effluent treatment scheme including ssegregation for units adopting 'Zero' liquid discharge.
7. Action plan for odour control to be submitted.
8. A copy of the Memorandum of Understanding signed with cement manufacturers indicating clearlythat they co-process organic solid/hazardous waste generated.
9. Authorization/Membership for the disposal of liquid effluent in CETP and solid/hazardous waste inTSDF, if any.
10. Material Safety Data Sheet for all the Chemicals are being used/will be used.
11. Authorization/Membership for the disposal of solid/hazardous waste in TSDF.
12. Details of incinerator if to be installed.
13. Risk assessment for storage and handling of hazardous chemicals/solvents. Action plan for handling& safety system to be incorporated.
14. Arrangements for ensuring health and safety of workers engaged in handling of toxic materials.
***
TOR COMPLIANCE
TOR Compliance Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd Page I
ToR COMPLIANCE
S. No Standard Terms of Reference Chapters Page Nos. 1. Executive Summary Enclosed in EIA Report 2. Introduction
1. Details of the EIA Consultant including NABET accreditation Enclosed as Enclosure – VII
2. Information about the project proponent Chapter - I 2 3. Importance and benefits of the project Chapter - VIII 275-277
3 Project Description
I. 1. Cost of project and time of completion Chapter - I Chapter - II
3 15-16
II. 2. Products with capacities for the proposed project. Chapter - II 15
III.
3. If expansion project, details of existing products with capacities and whether adequate land is available for expansion, reference of earlier EC if any.
Earlier EC copy is enclosed as Enclosure – II
IV. 4. List of raw materials required and their source along with mode of transportation. Chapter - II 69-74
V. 5. Other chemicals and materials required with quantities and storage capacities. Chapter - VII 217
VI 6. Details of Emission, effluents, hazardous waste generating and their management Chapter - X 438-451
VII.
7. Requirement of water, power, with source of supply, status of approval, water balance diagram, man-power requirement (regular and contract)
Chapter - II Chapter - VIII
63-64 275
VIII.
8. Process description along with major equipments and machineries, process flow sheet (quantities) from raw material to products to be provided.
Chapter - II 16-60
IX. 9. Hazard identification and details of proposed safety systems. Chapter - VII 207-216
X.
X. Expansion/modernization proposals a. Copy of all Environmental Clearance (s) including Amendments thereto obtained for the project from MOEF/SEIAA shall be attached as an Annexure. A certified copy of the latest Monitoring report of the Regional Office of the Ministry of Environment and Forests as per circular dated 30th May, 2012 on the status of compliance of conditions stipulated in all the existing environmental clearances including Amendments shall be provided In addition, status of compliance of consent to operate for
Earlier EC copy & its compliance are enclosed as
Enclosure – II & III
TOR Compliance Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd Page II
S. No Standard Terms of Reference Chapters Page Nos. the ongoing existing operation of the project from SPCB shall be attached with the EIA-EMP report.
d. In case the existing project has not obtainedenvironmental clearance, reasons for not taking EC under the provisions of the EIA Notification 2006 shall be provided. Copies of Consent to Establish /No Objection Certificate and Consent to Operate (in case of units operating prior to EIA Notification 2006, CTE and CTO of FY 2005-2006) obtained from the SPCB shall be submitted. Further, compliance report to the conditions of consents from the SPCB shall be submitted
The unit is having valid CTO vide consent No: Format 1.0/AST/RO-KP/Amalgamation/CC-1808000689, Dated 16.08.2018 and copy of CTO and its compliance are enclosed as Enclosure - IV
4
Site Details i. Location of the project site covering village,
Taluka /Tehsil, District and State, Justification for selecting the site, whether other sites were considered.
ii. A toposheet of the study area of radius of 10 KMs and site location on 1:50,000/1:25,000 scale on an A3/A2 sheet. (including all eco-sensitive areas and environmentally sensitive places)
iii. Details w.r.t. option analysis for selection of site
iv. Co-ordinates (lat-long) of all four corners of the site.
v. Google map –Earth downloaded of the project site
vi. Layout maps indicating existing unit as well as proposed unit indicating storage area, plant area, greenbelt area, utilities etc. If located within an Industrial area/Estate /Complex, layout of Industrial Area indicating location of unit within the Industrial area/Estate.
vii. Photographs of the proposed and existing (if
Chapter - II Chapter - V
Chapter - II
Plant already exists in IDA & no need of alternative site analysis.
Chapter - II
Chapter - II
Chapter - II
Chapter - II
10-11 184-185
13
-
13
11
14
12
TOR Compliance Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd Page III
S. No Standard Terms of Reference Chapters Page Nos. applicable) plant site. If existing, show photographs of plantation /greenbelt, in particular.
viii. Land use break up of total land of the project site (identified and acquired), government/ private-agricultural, forest, wasteland, water bodies, settlement, etc shall be included. (not required for industrial area)
ix. A list of major industries with name and type within study area (10 Km radius) shall be incorporated. Land use details of the study area
x. Geological features and Geo-hydrological status of the study area shall be included.
xi. Details of Drainage of the project up to 5 km radius of study area. If the site is within 1 km radius of any major river, peak and lean season river discharge as well as flood occurrence frequency based on peak rainfall data of thee past 30 years, Details of Flood Level of the project site and maximum Flood level of the river shall also be provided. (mega green field projects)
xii. xiii. Status of acquisition of land. If acquisition is not
complete, stage of the acquisition process and expected time of complete possession of the land.
xiv. R&R details in respect of land in line with state Government policy.
Chapter - II
Chapter - I
Chapter - III
Plant already exists in IDA
The existing unit is an area of 10742 Sq. m, so R&R is applicable
9
4
85
TOR Compliance Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd Page IV
S. No Standard Terms of Reference Chapters Page Nos.
5
Forest and wildlife related issues (if applicable)
i. i. Permission and approval for the use of forest land (forestry clearance), if any, and recommendations of the State Forest Department (if applicable) ii. Land use map base on High resolution satellite imagery (GPS) of the proposed site delineating the forestland (in case of projects involving forest land more than 40 ha) iii. Status of Application submitted for obtaining the stage I forestry clearance along with latest status shall be submitted. iv. The projects to be located within 10 Km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by chief wildlife warden showing these features vis-à-vis the project location and the recommendations or comments of the Chief Wildlife Warden –there on. v. Wildlife Conservation plan duly authenticated by the chief wildlife warden of the state government for conservation of schedule 1 fauna, if any exists in the study area. vi. Copy of application submitted for clearance under the wildlife (Protection) Act, 1972, to be standing committee of the national board for wildlife.
The project area is non- forest land. Land use map based on satellite imaginary of the proposed site is presented in chapter - III, Page no: 130-131 Not applicable There are no National parks, Sanctuaries, Biosphere Reserves, Migratory corridors of Wild Animals, within the 10 Km buffer zone Not Applicable Not Applicable
6 Environmental Status i. i) Determination of atmospheric inversion level
at the project site and site-specific micro-
meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall.
Prepared By Rightsource Industrial Solutions Pvt. Ltd Page V
S. No Standard Terms of Reference Chapters Page Nos. ii) AAQ data (except monsoon) at 8 locations for PM10, PM2.5, SO2, NOX, CO and other parameters relevant to the project shall be collected. The monitoring stations shall be based CPCB guidelines and take into account the pre-dominant wind direction, population zone and sensitive receptors including reserved forests.
ii. iii) Raw data of all AAQ measurement for 12 weeks of al stations as per frequency given in the NAQQM Notification of Nov, 2009 along with –min., max., average and 98% values for each of the AAQ parameters from data of all AAQ stations should be provided as an annexure to the EIA Report.
iii. iv. iv) Surface water quality of nearby River (100m
upstream and downstream of discharge point and other surface drains at eight locations as per CPCB / MoEF&CC guidelines. v) Whether the site falls near to polluted stretch of river identified by the CPCB/MoEF&CC, if yes give details. vi) Ground water monitoring at minimum at 8 locations shall be included vii) Noise levels monitoring at 8 locations within the study area. viii) Soil characteristic as per CPCB guidelines. ix) Traffic study of the area, type of vehicles, frequency of vehicles for transportation of materials, additional traffic due to proposed project, parking arrangement etc. x) Detailed description of flora and fauna (terrestrial and aquatic) existing in the study area shall be given with special reference to rare, endemic and endangered species. If Schedule-I fauna are found within the study area, a wildlife conservation plan shall be
Chapter - III
Chapter - III
Chapter - III
Not Applicable
Chapter - III
Chapter - III
Chapter - III
Chapter - III
Chapter - III
91-92
94-98
103-104
103-104
111-112
119-120
115-116
132-150
TOR Compliance Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd Page VI
S. No Standard Terms of Reference Chapters Page Nos. prepared and furnished. xi) Socio-economic status of the study area.
Chapter - III
150-154
7 Impact and Environment Management Plan i. i) Assessment of ground level concentration of
pollutants from the stack emission based on site –specific meteorological features. In case the project is located on a hilly terrain, the AQIP Modelling shall be done using inputs of the specific terrain characteristics for determining the potential impacts of the project on the AAQ. Cumulative impact of all sources of emissions (including transportation) on the AAQ of the area shall be assessed. Details of the model used and the input data used for modeling shall also be provided. The air quality contours shall be plotted on a location map showing the location of project site, habitation nearby, sensitive receptors, if any.
ii. iii. ii) Water Quality modeling –in case of discharge
in water body iii) Impact of the transport of the raw materials and end products on the surrounding environment hall be assessed and provided. In this regard, options for transport of raw materials and finished products and wastes (large quantities) by rail or rail-cum road transport or conveyor- cum –rail transport shall be examined. iv) A note on treatment of wastewater from different plant operations, extent recycled and reused for different purposes shall be included. Complete scheme of effluent treatment, Characteristics of untreated and treated effluent to meet the prescribed standards of discharge under E (P) Rules. v) Details of stack emission and action plan for control of emissions to meet standards vi) Measures for fugitive emission control
Chapter - IV
The unit will proposed for ZLD system
Chapter - X
Chapter - X
Chapter - X
Chapter - X
168-173
283
284-293
307-308
304-307
TOR Compliance Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd Page VII
S. No Standard Terms of Reference Chapters Page Nos. vii) Details of hazardous waste generation and their storage, utilization and management. Copies of MOU regarding utilization of solid and hazardous waste in cement plant shall also be included. EMP shall include the concept of waste – minimization, recycle/reuse/ recover techniques, Energy conservation, and natural resource conservation. viii) Proper utilization of fly ash shall be ensured as per fly ash notification, 2009. A detailed plan of action shall be provided. ix) Acton plan for the green belt development plan in 33% area i.e. land with not less than 1,500 trees per ha. Giving details of species, width of plantation, planning schedule etc. shall be included. The green belt shall be around the project boundary and a scheme for greening of the roads used for the project shall also be incorporated. x) Action plan for rainwater harvesting measures at plant site shall be submitted to harvest rainwater from the roof tops and storm water drains to recharge the ground water and also to use for the various activities at the project site to conserve fresh water and reduce the water requirement from other sources. xi) Total capital cost and recurring cost /annum for environmental pollution control measures shall be included. xii) Action plan for post –project environment monitoring shall be submitted. xiii) Onsite and offsite Disaster (natural and Man –made) Preparedness and Emergency Management Plan including Risk Assessment and damage control. Disaster management plan should be linked with District Disaster Management Plan.
Chapter - X
-
Chapter - X
Chapter - X
Chapter - X
Chapter - VI Chapter - X
Chapter - VII
309-310
-
299-300
310-311
312
191-194 300-302
255-274
8 Occupational health i. Plan and fund allocation to ensure the Chapter - VII 251-255
TOR Compliance Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd Page VIII
S. No Standard Terms of Reference Chapters Page Nos. occupational health & safety of all contract and casual workers.
ii. Details of exposure specific health status evaluation of workers’ health is being evaluated by pre designed format, chest x rays, Audiometry, Spirometry, Vision testing (Far & Near vision, colour vision and any other ocular defect) EGG, during pre placement and periodical examinations give the details of the same details regarding last month analyzed data of above mentioned parameters as per age, sex, duration of exposure and department wise. Details of existing Occupational & safety Hazards. What are the exposure levels of hazards and whether they are within permissible Exposure level (PEL) If these are not within PEL, what measures the company has adopted to keep them within PEL so that health of the workers. Can be preserved, Annual report of heath status of workers with special reference to Occupational Health and safety.
9
Corporate Environment Policy i. Does the company have a well laid down Environment Policy approved by its Board of Directors? If so, it may be detailed in the EIA report. ii. Does the Environment Policy prescribe for standard operation process / procedures to bring into focus any infringement / deviation / violation of the environmental or forest norms/ conditions? If so, it may be detailed in the EIA. iii. What is the hierarchical system or Administrative order of the company to deal with the environmental issues and for ensuring compliance with the environmental clearance conditions? Details of this system may be given iv. Does the company have system of reporting of non compliance /violations of environmental norms to the Board of Directors of the company and / or shareholders or stakeholders at large? This reporting mechanism shall be detailed in the EIA report.
Chapter -VI - - -
186-188 - - -
TOR Compliance Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd Page IX
S. No Standard Terms of Reference Chapters Page Nos.
10
Details regarding infrastructure facilities such as sanitation, fuel, restroom etc. to be provided to the labour force during construction as well as to the casual workers including truck drivers during operation phase.
The unit will provide all the facilities for construction labour during construction and as well as the casual workers including truck drivers during operation phase
11
Enterprise Social Commitment (ESC) 1. Adequate funds (at least 2.5% of the project
cost) shall be earmarked towards the Enterprise social commitment based on public hearing issues and item –wise details along with time bound action plan shall be included socio-economic development activities need to be elaborated upon.
Chapter - VIII 276
12
Any litigation pending against the project and / or any direction/ order passed by any Court or law against the project, if so, details thereof shall also be included. Has the unit received any notice under the section 5 of environment (protection) Act 1986 or relevant sections of air and water acts? If so, details thereof and compliance /ATR to the notice (s) and present status of the case.
No Litigations against project
13 A tabular chart with index for point wise compliance of above TOR.
Enclosed along with EIA & EMP Report
A Specific ToR
1 Commitment that no banned pesticides will be manufactured
We commit that, no banned pesticides will be manufactured.
2 Details on solvents to be used, measures for solvent recovery and for emissions control Chapter - X 304-307
3 Details of process emissions from the proposed unit and its arrangement to control. Chapter - X 303-304
4
Ambient air quality data should include VOC, other process- specific pollutants* like NH3*, chlorine*, HCl*, HBr*, H2S*, HF*, CS2 etc., (*-as applicable)
Chapter - III 97-98
5 Work zone monitoring arrangements for hazardous chemicals Chapter - VII 230-232
6 Detailed effluent treatment scheme including segregation for units adopting 'Zero' liquid discharge
Chapter - X 284-293
7 Action plan for odour control to be submitted Chapter - IV 174-176
TOR Compliance Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd Page X
S. No Standard Terms of Reference Chapters Page Nos.
8
A copy of the Memorandum of Understanding signed with cement manufacturers indicating clearly that they co-process organic solid/hazardous waste generated.
Yet to take MOU with Cement Industries
9 Authorization/Membership for the disposal of liquid effluent in CETP and solid/hazardous waste in TSDF, if any.
Membership for the disposal of Solid/ hazardous waste in TSDF – Taloja is attached as Enclosure - VI
10 Material safety data sheet for all the chemicals are being used/ will be used.
MSDS for all the chemicals will be used and kept in plant for reference.
11 Authorization/ Membership for the disposal of solid/hazardous waste in TSDF
Membership for the disposal of Solid/ hazardous waste in TSDF – Taloja is attached as Enclosure - VI
12 Details of incinerator if to be installed No proposal for installation of Incinerator
13 Risk assessment for storage and hazardous chemicals/solvents, Action plan for handling & safety system to be incorporated.
Chapter - VII 230-232
14 Arrangements for ensuring health and safety of workers engaged in handling of toxic materials. Chapter - VII 251-255
LIST OF CONTENTS [INDEX]
Index of EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd
LIST OF CONTENTS
CHAPTER - I INTRODUCTION
S. No Description Page No 1.1 Purpose of the Project 1 1.2 Identification of project & Project proponent 1
1.2.1 Identification of Project 1 1.2.2 About the Promoters 2 1.3 Objective of the Study 2 1.4 Brief Description of the Project 2
1.4.1 Nature of the Project 2 1.4.2 Size of the Project 3 1.4.3 Location of the Project 3 1.4.4 Project and its Importance to the Country & Region. 4 1.5 Scope of Study. 5
S. No Description Page No 2.1 Type of the project 8 2.2 Need For The Project 8 2.3 Location 8 2.4 Size and Magnitude of Operation 15 2.5 Proposed schedule for approval and implementation 15-16 2.6 Technology and process description 16
2.6.1 Manufacturing process of the Products 16-60 2.7 Pollution Load 60
2.8 Description of Process Emissions and its mitigation measures 62
2.9 Proposed Water Consumption Details 63 2.10 Expected Waste Water Generation Details 64 2.11 Waste Water Characteristics 66 2.12 Hazardous & Solid Waste Generation Details 66 2.13 Power(Energy) requirement 67 2.14 Utilities 68 2.15 Proposed Emission Details 68 2.16 List Of The Raw Materials Product Wise 69-74
2.18 Environmental aspects, impacts and mitigation measures of proposed industry 74-76
2.19 Assessment of new & untested technology for risk of technological failure 77
Index of EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd
CHAPTER - III DESCRIPTION OF THE ENVIRONMENT
S. No Description Page No 3.0 Introduction 78 3.1 Study Area 78
3.1.2 Study Period 78 3.2 Geological & Hydro geological Environment 78-79
3.2.3.1 Hard Rock Areas 81 3.2.3.1.1 Deccan Trap Basalt 81 3.2.3.1.2 Laterite 81 3.2.3.2 Soft Rock Areas 82
3.2.3.2.1 Beach Sand/Alluvium 82 3.2.4 Ground water Conditions 82 3.2.5 Drainage Pattern of Study Area 82-83 3.2.6 Drainage Map 83-84 3.3 Micrometeorology And Climate 86-87 3.4 Air Environment 90-91
3.4.1 National Ambient Air Quality Standards (NAAQS) 93-94 3.4.2 Ambient Air Quality Data (AAQ) 98-100 3.5 Water Environment 102
3.5.1 Methodology For Water Quality Monitoring 102 3.6 Noise Environment 110
3.6.1 Noise Monitoring Stations 110 3.6.2 Traffic Study 113-114 3.7 Soil Environment 117 3.8 Environmental Conditions at Industry 121
3.8.1 Ambient Air Monitoring 121 3.8.2 Work zone Air Quality 121-122 3.8.3 Stack Monitoring 122 3.8.4 Work zone Noise Monitoring 123 3.8.5 Industrial Effluent Results 123 3.9 Land Use Pattern 124
3.9.1 Data Used 124 3.9.2 Land use / Land Cover Map 125
3.9.2.1 Basic concepts of land use 125-126 3.9.2.2 Methodology for land use / land cover mapping 126-128
3.10 Ecology And Biodiversity Studies 132 3.10.1 Introduction 132 3.10.2 Objectives of the ecological studies 134 3.10.3 Survey- Methodology 135 3.10.4 Assessment of flora 135-136
3.10.4.1 Human Settlements 136 3.10.4.2 Agricultural Fields 136 3.10.4.3 Water Bodies 137-138 3.10.4.4 Natural Vegetation 138 3.10.4.5 Species diversity index and species richness of plant 142-143
Index of EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd
S. No Description Page No population
3.10.5 Faunal Study 144-145
3.10.5.1 Species diversity index and species richness of bird population 148
3.10.6 Observations of existing GAVL activities on Biodiversity 149 3.10.6.1 General 149 3.10.6.2 Noise 149 3.10.6.3 Soil/ Land 149 3.10.6.4 Water 149-150 3.10.6.5 Air 150
3.11 Socio Economic Study 150 3.11.1 Database 150-151 3.11.2 Methodology 152-153 3.11.3 Demographic Structure of the Study Area 153
3.11.3.1 Population 153 3.11.3.2 Sex Ratio 153 3.11.3.3 Child Population 153 3.11.3.4 Castes vise distribution of population 153 3.11.3.5 Literacy 153 3.11.4 Infrastructure facilities and amenities 153
3.11.4.1 Education 153 3.11.4.2 Medical/Primary Health Care 154 3.11.4.3 Drinking Water 154 3.11.5 Occupation Pattern 154 3.11.6 CSR Activities carried by Godrej Agrovet Limited 155 3.11.7 Awareness and Opinion of the People 155
3.11.7.1 Opinion of the Residents 156 3.11.7.2 Benefits of Project Expansion 156
CHAPTER - IV ANTICIPATED ENVIRONMENTAL IMPACTS
& MITIGATION MEASURES
S. No Description Page No 4.1 Introduction 157
4.2 Investigated Environmental Impacts Due To Proposed Project 157-158
4.3 Construction Phase 158 4.3.1 Impact on Land Use 158 4.3.2 Impact on Land / Soil Environment 158 4.3.3 Impact on Topography 158 4.3.4 Impact on Air Environment 159 4.3.5 Impact on Water Environment 159 4.3.6 Impact on Noise Levels 160 4.3.7 Impact on Ecology 160 4.3.8 Impact on Socio-Economic Environment 160 4.4 Mitigative measures of impacts during construction phase 161 4.5 Prediction of Impacts During Operational Phase 164
Index of EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd
S. No Description Page No 4.6 Air Environment 164
4.6.1 Source of Air Pollution 164 4.6.2 Prediction of Impacts on Air Environment 166-167 4.7 Water Environment 176-177 4.8 Noise Environment 178 4.9 Land/Soil Environment 178-180 4.10 Impact of Hazardous Waste 180 4.11 Impacts on Ecology 181-182 4.12 Impacts on Socio- Economy 182-183 4.13 Impacts on Hydrology and Geology 183
CHAPTER - V ANALYSIS OF ALTERNATIVES
(TECHNOLOGY & SITE)
S. No Description Page No
5.0 Analysis Of Alternatives 184 5.1 Site Selection Criteria 184 5.2 Selection Of Process Technology 185
CHAPTER - VI ENVIRONMENTAL MONITORING PROGRAM
S. No Description Page No 6.1 Introduction 186 6.2 Environmental Management System 186-187 6.3 Environmental Management Cell Responsibilities 187-188 6.4 Environmental Monitoring and Reporting Procedure 189
6.4.1 Objectives of Monitoring 189-190
6.4.2 Monitoring Schedule for Construction and Operation Phases. 190
6.5 Location of Monitoring Stations 194 6.6 Monitoring and Data Analysis 194
6.6.1 Air Quality Monitoring and Data Analysis 194
6.6.2 Water and Waste Water Quality Monitoring and Data Analysis. 195
6.6.3 Noise Levels 196 6.6.4 Soil Quality 196 6.7 Reporting Schedule of the Monitoring Data 196 6.8 Environmental Laboratory 197
6.8.1 Air Quality and Meteorology 197 6.9 Occupational Safety and Health aspects 197
CHAPTER -VII ADDITIONAL STUDIES, RISK ASSESSMENT
& DISASTER MANAGEMENT REPORT
S. No Description Page No 7.1.1 Scope of this Study 198 7.1.2 Methodology 198-202
Index of EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd
7.2 Risk Assessment and Damage Control 202 7.2.1 Objectives of Risk Assessment 202-203 7.2.2 Identification of Hazards 203-206 7.3 Potential Hazards of solvents and chemicals 218-229
7.4 Safe practices [handling, storage, transportation and unloading of chemicals] 230
7.4.1 Measures to avoid Evaporation 230 7.4.2 Safety Systems 230 7.4.3 Transportation /unloading 230-231 7.4.4 Spill Control 231-232 7.4.5 Effect and Consequence Analysis 232 7.5 Inventory 232 7.6 Loss of Containment 232-234 7.7 Damage Criteria 234-237 7.8 Damages to human life due to heat radiation 237-238 7.9 Maximum credible loss accident scenarios 238-250 7.10 Hazard Identification and Risk Assessment 251-255
7.11 Disaster Preparedness and Emergency Management Plan 255-256
7.11.4.1 Action by informer 257 7.11.4.2 Employees of other departments 257 7.11.4.3 Safety officer 257-258
7.11.4.3.1 Incident controller 258-259 7.11.4.3.2 Site main controller 259-260 7.11.4.3.3 Action By Emergency Team 260-261 7.11.4.3.4 Technical staff / Department heads 261 7.11.4.3.5 Personnel/HR & Administration 261-262 7.11.4.3.6 Communication officer 262 7.11.4.3.7 Engineering services 263 7.11.4.3.8 Security personnel 263-264 7.11.4.3.9 First- Aid team 264-265 7.11.4.3.10 Driver 265 7.11.4.3.11 Electrician 265 7.11.4.3.12 Utility operator 265 7.11.4.3.13 Action by HR officer 265 7.11.4.3.14 After controlling the Emergency 265-266 7.11.4.3.15 References 266 7.11.4.3.16 Abbreviations 266-267
7.12 Disaster Management Plan 267-274
Index of EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd
CHAPTER - VIII PROJECT BENEFITS
S. No Description Page No 8.1 Employment Potential 275 8.2 Corporate Social Responsibility (CSR) 275 8.3 Direct revenue earning to the National and State exchequer 277 8.4 Improvements in the Physical Infrastructure 277 8.5 Improvements in the Social Infrastructure 277 8.6 Other Tangible Benefits 277
CHAPTER - IX ENVIRONMENTAL COST BENEFIT ANALYSIS
S. No Description Page No 9.1 Cost benefit analysis 278
CHAPTER - X ENVIRONMENTAL MANAGEMENT PLAN
S. No Description Page No 10.1 Introduction 279 10.2 Pre-Project Environmental Management Plan 281
10.2.1 Site Preparation 281 10.2.2 Sanitation 81 10.2.3 Noise 281 10.2.4 Construction Equipment And Waste 281 10.2.5 Site Security 281
10.3 Environmental Management During Operation after Expansion 281
10.3.1 Air Quality 281-282 10.3.1.1 Air Pollution Control / Management 282-283 10.3.2 Noise Pollution 283 10.3.3 Water Quality 284-285
10.3.3.1 Details of ZLD system 289 10.3.3.2 The technical details of the systems are as follows 290 10.3.3.3 MEE plant configuration 290 10.3.3.4 Process description (Part - A) 290 10.3.3.5 Process description (Part - B) 291-292 10.3.3.6 Process description (Part - C) 292
2.14 Solid waste generation per day Product wise 67 2.15 Details Of Utilities 68 2.16 Stack Emission details of Boilers 68-69 2.17 Stack Emission Details for Thermic Fluid Heater 69 2.18 Stack Emission details of proposed DG Set 69
CHAPTER - III DESCRIPTION OF THE ENVIRONMENT
Table No Description Page No
3.1 Showing drainage density based criteria by smith and strahler 83
3.2 Showing drainage density based criteria proposed by Long Bein 83
3.3 Showing Drainage Density Based Criteria Proposed by Horton 83
3.4 Frequency distribution wind directions and wind speed 88
3.5 Comparison Of Primary Data (Project Site) With Secondary Data (IMD Data) 89
3.6 IMD Data (Ratnagiri - IMD Station) 90 3.7 Ambient air quality sampling locations 91 3.8 National ambient air quality standards 93 3.9 Ambient Air Quality Results For PM10 94
3.10 Ambient Air Quality Results For PM2.5 94 3.11 Ambient Air Quality Results For SO2 95 3.12 Ambient Air Quality Results For NOx 96 3.13 Ambient Air Quality Results For CO 96 3.14 Ambient Air Quality Results For NH3 97 3.15 Ambient Air Quality Results For NMHC 98 3.16 AAQ Monitoring Results Of Summer Season 101 3.17 Ground water and Surface sampling locations 103 3.18 Ground water quality in the study area 105-106 3.19 Surface water quality the study area 107-108 3.20 Noise monitoring locations 111 3.21 Ambient noise levels within study area 113
Index of EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd
3.22 Traffic Study 115-116 3.23 Soil sampling locations 117 3.24 Soil sampling analysis results 119 3.25 Standard Soil Classification 120-121 3.26 Ambient Air Quality Monitoring Results At Project Site 121 3.27 Workzone Monitoring At Project Site 122 3.28 Stack Monitoring Results At Project Site 122 3.29 Workzone Noise Monitoring Results At Project Site 123 3.30 Analysis Results Of Effluent At Effluent Treatment Plant 123-124 3.31 Showing the Details of Sources & the Maps Prepared 124 3.32 Showing the Topographic Maps 124 3.33 Satellite Data of National Remote Sensing Center 124 3.34 Land Use / Land Cover Statistics of the Study Area 129 3.35 Herbs Vegetation 138-139 3.36 Shrubs Vegetation 139 3.37 Trees Vegetation 139-141 3.38 Climbers Vegetation 141 3.39 Epiphyte and Fern Vegetation 142 3.40 Sites Studied for Plants and Bird Indices 142
3.41 Shannon Weiner Index and Species Richness of Plant Population in Study Area 143
3.42 Category Wise Index of Total Area 144 3.43 List of Fauna Observed in the Study Area 145-147
3.44 No. of Scheduled Species observed during the Study as per the Wildlife Protection Act, 1972 148
3.45 Shannon Weiner Index and Species Richness Study of Bird Population in Study Area 149
3.46 List of villages located within 10 km radius of the study area 151 3.47 Occupational Structure of the study area 154 3.48 CSR Activities by Godrej Agrovet Limited 155
CHAPTER - IV ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES Table No Description Page No
4.1 Summary – Identification Of Impacts During Construction Phase of Expansion 160-161
4.2 Mitigation Measures During Construction Phase of Expansion 161-164
4.3 Stack Emission Details of Boilers 165 4.4 Stack Emission Details For Existing Thermic Fluid Heater 165 4.5 Stack Emission Details of Existing DG Set 165
4.6 Predicted 24-Hourly Short Term Incremental Concentrations 168
4.7 Resultant Concentrations Due to Incremental GLC's 168 4.8 Process Emission details and Treatment Method 174 4.9 Details of Hazardous Waste Generation & Disposal Method 181
Index of EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd
CHAPTER - V ANALYSIS OF ALTERNATIVES (TECHNOLOGY & SITE)
Table No Description Page No 5.1 Site Description 184
CHAPTER - VI ENVIRONMENTAL MONITORING PROGRAM
Table No Description Page No
6.1 Post Project Environmental Monitoring schedule details 191
6.2 Environmental Monitoring Plan during Operation Phase 191-194
6.3 Details of Post Project Monitoring Locations 194 CHAPTER -VII ADDITIONAL STUDIES, RISK ASSESSMENT & DISASTER MANAGEMENT REPORT
Table No Description Page No 7.1 Type Of Hazardous Events 199
7.2 Thermal Radiation Intensity And Exposure Time-Damage Criteria For People 200
7.3 Damage due to overpressures 200
7.4 Area Wise Identified Hazards, Precautions Proposed With Mitigation Measures 207-216
7.5 Details Of Chemicals & Solvents 217 7.6 LD50 Values Of Products 217-218 7.7 Severity Categories And Criteria 234
7.8 Heat Flux Intensity And Exposure Time-Damage Criteria For People 237
7.9 Damage Due To Overpressures 238 7.10 Hazard Identification And Risk Assessment 251-253
CHAPTER - X ENVIRONMENTAL MANAGEMENT PLAN
Table No Description Page No 10.1 List of Plants identified for Greenbelt 299-300 10.2 The details of Post Project Monitoring Program 301-302 10.3 Proposed Water consumption details 303 10.4 Stack Emission Details of Boilers 307 10.5 Stack Emission Details for Thermic Fluid Heater 308 10.6 Stack Emission Details of DG set 308 10.7 Effluent generation details 308 10.8 HTDs & LTDs effluent details 308-309 10.9 Hazardous waste generation, disposal Details 309
10.10 Available rain water (annual)for Harvesting 311 10.11 Proposed Budget for Environmental Management plan 312
Index of EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd
LIST OF FIGURES
CHAPTER - II PROJECT DESCRIPTION
Figure No Description Page No 2.1 Location map 10 2.3 Google Earth Map Showing Godrej Agrovet Ltd 11 2.4 Latest photographs of Proposed site 12 2.5 Topo map showing 10 km radius 13 2.6 Site plan details 14
CHAPTER - III DESCRIPTION OF THE ENVIRONMENT
Figure No Description Page No 3.1 Showing Drainage Map Of The Project Study Area 85 3.2 Windrose Diagram Period: March 2018 – May 2018 89 3.3 Ambient Air Quality Sampling Locations Map 92 3.4 Showing Ambient Air Quality Results For PM10 94 3.5 Showing Ambient Air Quality Results For PM2.5 95 3.6 Showing Ambient Air Quality Results For SO2 95 3.7 Showing Ambient Air Quality Results For NOx 96 3.8 Showing Ambient Air Quality Results For CO 97 3.9 Showing Ambient Air Quality Results For NH3 97 3.10 Showing Ambient Air Quality Results For NMHC 98 3.11 Ground & Surface Water Sampling Locations Map 104 3.12 Noise Sampling Locations Map 112 3.13 Soil Sampling Locations Map 118 3.14 Pie Diagram Showing Land Use The In Study Area 129 3.15 Satellite Image Of The Study Area 130 3.16 Land Use / Land Cover Map Of The Study Area 131
3.17 Map showing Talukas of Ratnagiri District and Study area (Red circle) 134
3.18 Forest area in Ratnagiri District 134
3.19 Google Earth Imagery of the Sites selected for Ecology and Biodiversity studies 143
3.20 Flow Chart of Methodology 152
CHAPTER - IV ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
Figure No Description Page No 4.1 Short term 24 hourly incremental GLCs of PM10 170 4.2 Short term 24 hourly incremental GLCs of PM2.5 171 4.3 Short term 24 hourly incremental GLCs of SO2 172 4.4 Short term 24 hourly incremental GLCs of NOx 173
CHAPTER - VI ENVIRONMENTAL MONITORING PROGRAM
Figure No Description Page No
6.1 Organisational Structure of Environment Health & Safety 189
Index of EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd
CHAPTER - X ENVIRONMENTAL MANAGEMENT PLAN
Figure No Description Page No
10.1 Flow chart of EMP 280
10.2 Schematic diagram of Proposed waste water treatment – ZLD System 286
10.3 Flow chart for effluent treatment HTDS 287 10.4 Flow chart for effluent treatment LTDS 288 10.5 Flow chart for effluent treatment 289 10.6 Schematic diagram of MEE system 293
10.7 Schematic diagram Emissions Control Scrubbing System 304
10.8 Roof water harvesting Structure 311 10.9 5 R concept 315
LIST OF ENCLOSURES
S. No Description Enclosure No 1 Industrial Government Order Enclosure – I 2 EC Copy & Name change letter from M/s Bahar
Agrochem & Feeds Pvt. Ltd. to Godrej Agrovet Limited Enclosure – II
3 EC Certified Compliance Enclosure – III 4 CTO & CTO Compliance Enclosure – IV 5 Commitment Letter that no banned Pesticides will be
manufactured. Enclosure – V
6 Membership letter from Mumbai Waste Management Limited to disposal of Solid/Hazardous waste
Enclosure – VI
7 Annual Report of the Health Status of Employees Enclosure – VII 8 NABET Certificate Enclosure – VIII
EXECUTIVE SUMMARY OF EIA REPORT
EXECUTIVE SUMMARY
OF
EIA REPORT OF
GODREJ AGROVET LIMITED
For
Expansion of Existing Herbicides/Fungicides/PGRs Manufacturing Unit
Executive Summary of EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Page 1
1. INTRODUCTION
Godrej Agrovet Limited (GAVL) is proposed to expansion of existing
Herbicides/Fungicides/PGRs manufacturing unit located at Plot Nos: E-24, E-24
(Part) and E-23/1, MIDC, Lote Parshuram, Taluka: Khed, District: Ratnagiri,
Maharashtra State.
The proposed expansion project cost is about Rs. 10 Crores, which includes
construction of the buildings, equipment, machinery and greenbelt development.
As per the Office Memorandum issued by Ministry of Environment, Forest and
Climate Change, Government of India vide No. J-11011/321/2016-IA-II (I), dt. 27th
April, 2018 noted as Public hearing is exemption for the unit “if it is located in a
Notified Industrial Area established prior to 14th September, 2006.” The proposed
expansion project is falls under Maharashtra Industrial Development Corporation
(MIDC), Lote Parshuram notified by Govt. of Maharashtra State. Hence, the unit is
exemption of Public Consultation.
The project proposal was granted with Standard Terms of Reference vide No: J-
11011/231/2003-IA-II (I) dated: 31.01.2018, to carryout EIA Study with exemption of
public hearing. Based on granted ToR we have carried out the baseline monitoring
during the period of March to May – 2018 and EIA Report was prepared.
1.1. PROJECT DESCRIPTION
The salient features of the unit are furnished below.
TABLE 1: SALIENT FEATURES OF THE PROJECT
Project location Details
Latitude & Longitude Latitude: 17º 36’ 26” N Longitude: 73º 29’ 28” E
Climatic Conditions
Annual Max Temp is 37.3 0C Annual Min Temp is 15.1 0C Normal Annual Rainfall is 3118.1 mm (Source: IMD Climatalogical Normals (Ratnagiri), 1981 - 2010)
Land acquired for the plant 10742 Sq. m Nature of Land MIDC - Lote Parshuram Nearest Habitation Kharatwadi Village – 0.42 km (ENE) Nearest Town Khed – 18 km (N)
National Highway National Highway No. 66 – 0.65 km (WSW) (Mumbai – Goa Road)
Railway station Chiplun Railway Station – 7 km (SE)
Executive Summary of EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Page 2
2.0 PROCESS DESCRIPTION
The manufacturing process of proposed expansion of various Herbicides/
Fungicides/ PGRs products consists of chemical synthesis extending to stages of
processing involving different type of chemical reactions. Total proposed
manufacturing capacity will be 1006.025 TPM (Given in Table 2). The unit will take
adequate control measures for storage and handling of Raw materials and cylinders
4 Cooling Towers 1 x 300 TR, 1 x 100 TR & 1 x 50 TR ---
5 Electricity supply from MSEDCL --- 400 KVA
6 Power supply from Solar Panels --- 115 KW/ Day
Fuel Consumption Details 7 Furnace oil 1000 Kg/ Day 1000 Kg/ Day 8 Diesel (LDO) for TFH 288 Kg/ Day --- 9 Diesel (HSD) 400 Liters/ Day ---
Executive Summary of EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Page 5
TABLE 7: STACK EMISSION DETAILS OF BOILERS
Particulars Units 0.6 TPH Boiler (Existing)
0.6 TPH Boiler (Proposed)
Type of Fuel -- Furnace Oil Furnace Oil Fuel Consumption Kg/ Day 1000 1000 Ash Content % 0.1 0.1 Sulphur Content % 4.5 4.5 Nitrogen Content % 0.15 0.15 No. of Stacks No. 1 1 Height of the stack m 21 21 Diameter of the stack m 0.25 0.25 Flue Gas Temperature oC 200 200 Flue Gas Velocity m/s 16 16 Emission Rate Details Particular Matter as PM gm/sec 0.0093 0.0093 Sulphur dioxide as SO2 gm/sec 0.833 0.833 Oxide of Nitrogen as NO2 gm/sec 0.046 0.046
TABLE 8: STACK EMISSION DETAILS FOR THERMIC FLUID HEATER
Particulars Units Thermic fluid heater (Existing)
Thermo Fluid Heater Capacity Kcal/hr. 1,00,000 Type of Fuel -- LDO Fuel Consumption per Day Kg/ Day 288 Diameter m 0.3 Stack Temperature oC 120 Stack Height m 18 Emission of PM mg/Nm3 70 Emission of SO2 mg/Nm3 35 Emission of NOx mg/Nm3 50
TABLE 9: STACK EMISSION DETAILS OF DG SET
Capacity in KVA
Emission of PM in mg/Nm3
Emission of SO2 in mg/Nm3
Emission of NOx
in mg/Nm3
Stack dia. in m
Flue Gas Temp. in
OC
Stack Height in m
Flue gas Velocity in m/sec.
200 KVA 50 70 75 0.2 160 9.0 15
E) Pollution Control Equipment:
The existing 0.6 TPH boiler has stack height of 21 mtrs and proposed 0.6 TPH boiler
will provide stack height of 21 mtrs. The approximate flue gas exit velocity of 16 m/s
ensures proper dispersion of the flue gas into atmosphere. This design will ensure
the ground level concentration of the pollutants to comply with the ambient air quality
standards. DG Set Stack emission controlled by providing adequate stack height to
disperse into atmosphere and maintain the air pollutants within the limits prescribed
by CPCB.
Executive Summary of EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Page 6
3. BASELINE ENVIRONMENTAL STATUS
3.1 Study Area Included In Environmental Setting
Studies were carried out in about 10 km radius area from the site with respect to
meteorology, flora, fauna, land and socio-economies of the area. Further sampling
and analysis of air quality, water quality, noise level and soil quality were carried out.
The air quality, water quality, noise level and soil quality in the study area is
evaluated based on this physical sampling and analysis.
The base line data were monitored during the study period of March to May, 2018.
The study team conducted site surveys and field experiments for gathering the
information on air quality, water quality, noise quality and soil quality.
3.2 CLIMATE OF THE STUDY AREA
A. Temperature
During the study period the minimum and maximum temperatures were recorded as
17.3 ⁰C and 38.1 °C respectively.
B. Relative Humidity
During study period at project site during study period, the relative humidity was
recorded as 66 %.
C. Wind Pattern during Study Period
Dispersion of different air pollutants released into the atmosphere has significant
impacts on neighborhood air environment. The dispersion/dilution of the released
pollutant over a large area will result in considerable reduction of the concentration of
a pollutant. The dispersion in turn depends on the weather conditions like the wind
Ground water samples collected was analyzed as per the Standard methods and
the water quality of the study area is found within the permissible limits of IS: 10500
- 2012
3.6 NOISE ENVIRONMENT
Noise monitoring was carried out at nine locations during the period of March to
May, 2018.
Daytime Noise Levels (Lday)
Industrial Zone: The day time noise level at the Project site was found in the range
of 68.2 - 69.7 dB (A), which is well below the permissible limit of 75 dB (A).
Residential Zone: The daytime noise levels in all the residential locations were
observed to be in the range of 45.7 dB (A) to 52.3 dB (A). The noise levels at all the
locations were below the permissible limit of 55 dB (A).
Night time Noise Levels (Lnight)
Industrial Zone: The night time noise level in the Project site was observed in the
range of 62.7 – 64.2 dB (A), which is well below the permissible limit of 70 dB (A).
Residential Zone: The night time noise levels in all the residential locations were
observed to be in the range of 39.7 dB (A) to 48.3 dB (A). The noise levels at four
Executive Summary of EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Page 11
locations were below the permissible limit of 45 dB (A) and the remaining three
locations are above the permissible limit of 45 dB (A) in night time.
TABLE 12: NOISE LEVELS OF THE STUDY AREA
S. No
Name of the
Location
Category of Area/zone
Day Time
in Leq dB (A)
CPCB Standard Day Time
Night Time
in Leq dB (A)
CPCB Standard
Night time
1. Near Main Gate Industrial 69.7 75 dB (A) 64.2 70 dB (A) 2. Near ETP Industrial 68.2 75 dB (A) 62.7 70 dB (A) 3. Awashi Residential 51.4 55 dB (A) 47.6 45 dB (A) 4. Dhakarwadi Residential 48.4 55 dB (A) 42.6 45 dB (A) 5. Bhelsai Residential 48.3 55 dB (A) 42.8 45 dB (A) 6. Lote Residential 52.3 55 dB (A) 48.3 45 dB (A) 7. Dhamandevi Residential 47.5 55 dB (A) 39.7 45 dB (A) 8. Ghanekhunt Residential 45.7 55 dB (A) 39.8 45 dB (A) 9. Asagani Residential 51.9 55 dB (A) 45.3 45 dB (A)
3.7 SOIL ENVIRONMENT
Based on the baseline data, the soil results were found to be normal.
3.8 LAND USE/ LAND COVER OF THE STUDY AREA
Land use / Land cover map is prepared by visual interpretation of high-resolution
satellite data (Satellite Imagery Acquisition: 19-Jan-2018) and with the help of
Survey of India Topographic maps on 1: 50,000 scale. One season data is used for
the delineation of different units. The units are confirmed by the ground truth/field
visits.
TABLE 13: LAND USE / LAND COVER OF THE STUDY AREA
S. No LAND USE Area in Sq. km
Area in Percentage (%)
1 Built Up Land 16.956 5.4 2 Water Bodies 24.492 7.8 3 Crop Land 30.144 9.6 4 Waste Lands 21.666 6.9 5 Others 220.742 70.3
Total 314 100 3.9 DEMOGRAPHIC AND SOCIO-ECONOMIC PROFILE
According to the 2011 census, there are 32,298 households consisting
1,35,803 persons in the study area. It is found that each household consists of
4.2 persons.
Executive Summary of EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Page 12
Census 2001 recorded a sex ratio of 1,034 females per 1,000 males in the
study area. This is lower compared to district average 1,136 but higher
compared to state average 922. In 2011 census sex ratio in study area has
higher females than males from both district & state average 1122 & 929
respectively
The literacy rate for the study area is estimated as 80%, as compared to 74%
and 73% literate population of Ratnagiri district and Maharashtra state
respectively. The literacy rate for males is much higher than females. 85% of
the males are literate while female literates are 76%.
All the villages in the study area are electrified – both for Domestic purpose and
common facilities like Street lights, Public water pumping, etc. and also are provided
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - I Page 4
TABLE 1.2: PROJECT LOCATION AND COMPLIANCE OF SITE
1.4.4 PROJECT AND ITS IMPORTANCE TO THE COUNTRY & REGION
Godrej Agrovet Limited (GAVL) is a Brownfield project intended to expand their
manufacturing unit of Herbicides/Fungicides/ PGRs.
Availability of the well-connected road and railway network for easy transportation of
the construction equipments and materials, Raw materials and finished products.
Easy availability of skilled and unskilled labor for construction of Plant and its
operation.
Project location Details
Latitude & Longitude Latitude: 17º 36’ 26” N Longitude: 73º 29’ 28” E
Climatic Conditions
Annual Max Temp is 37.3 0C Annual Min Temp is 15.1 0C Normal Annual Rainfall is 3118.1 mm (Source: IMD Climatalogical Normals (Ratnagiri), 1981 - 2010)
Land acquired for the plant 10742 Sq.m Nature of Land MIDC Lote Parshuram Nearest Habitation Kharatwadi Village – 0.42 km (ENE) Nearest Town Khed – 18 km (N)
National Highway National Highway No. 66 – 0.65 km (WSW) (Mumbai – Goa Road)
Railway station Chiplun Railway Station – 7 km (SE) Airport Ratnagiri Airport – 67 km (SSW)
Major Industries near the plant site
Gharda Chemicals Ltd. Sandvik Asia Private Limited A.B. Mauri Pvt. Ltd. Hindustan Unilever Ltd Excel Industries Ltd Kansai Nerolac Ltd Rallis India Ltd. SI Group India Ltd. Vinati Organics Limited Deepak Novochem Ltd. Aimco Pesticides Ltd Dow Agro Sciences Deepak Chemtex Ltd
National Parks None within 10 km radius Wild life sanctuary None within 10 km radius Historical Places None within 10 km radius
Water Bodies within 10 km radius Vashishti River – 4.15 km (SW) Dabhil - Lake water- 4.00 km (N)
Reserve Forest within 10 km radius None within 10 Km radius
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - I Page 5
The Indian pesticides market was worth INR 181 Billion in 2017. The market is
further projected to reach INR 292.9 Billion by 2023, at a CAGR of 8.3% during
2018-2023.
Pesticides are substances or a mixture of substances intended for preventing,
destroying, repelling or mitigating any pest. Pesticides represent the last input in an
agricultural operation and are applied for preventing the spoilage of crops from pests
such as insects, fungi, weeds, etc., thereby increasing the agricultural productivity.
The significance of pesticides has been rising over the last few decades catalyzed by
the requirement to enhance the overall agricultural production and the need to
safeguard adequate food availability for the continuously growing population in the
country. In India, pests and diseases, on an average eat away around 20-25% of the
total food produced.
1.5 SCOPE OF THE STUDY
1.5.1 ENVIRONMENTAL IMPACT ASSESSMENT
To assess the impact of the project on Land use, Ambient Air Quality, Water Quality,
To prepare Environmental Management Plan (EMP) for mitigating adverse impacts
due to proposed expansion project.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - I Page 6
Collection and testing of water sources and soil.
To prepare environmental monitoring plan for operational phase.
Greenbelt development.
1.5.2 SOCIO-ECONOMIC ASSESSMENT
This Study Report covers Population, Gender Ratio, Rural & Semi-Urban Demographic
Distribution, Literacy Rate and Social Amenities available in the study Area like, Transport,
Sanitation, Drinking Water, Medical & Health Facilities, Employment Rate and other
Developmental Indices of Villages falling within the 10 Km radius of the Proposed Project
site.
1.5.3 REGULATORY FRAMEWORK
The MoEF&CC, CPCB and SPCBs together form the regulatory and administrative core of
the sector. Legislation for environmental protection in India for chemical industry is mainly
EIA Notification- 2006, Water (Prevention & Control of Pollution) Act -1974, Air (Prevention
& Control of Pollution) Act, 1981, Water (Prevention and Control of Pollution) Cess Act,
1977 Hazardous Waste (Management, Handling and Transboundary Movement) Rules,
2016, amended time to time etc are major Act/rules/notification applicable to industry.
1.5.4 REGULATORY SCOPING
Obtaining Consent for Establishment & Consent for Operation from State
Pollution Control Board.
1.6 LEGAL POLICY AND INSTITUTIONAL FRAMEWORKS
The principal environmental regulatory authority is the Ministry of Environment, Forest and
Climatic Change (MoEF&CC), New Delhi which formulates environmental policies and
accords environmental clearances for different projects. Table 1.3 highlights the relevant
environmental legislations applicable to this project.
TABLE 1.3: APPLICABILITY OF LEGAL POLICIES TO THE PROJECT
S. No Legal frame work coordinating
authority Objectives of the policy Applicability to the project
Environmental Legality
1 Water (Prevention and Control of pollution) Act, 1974
SPCB
Prohibits the discharge of pollutants into water bodies beyond a given standard, and lays down penalties for non-compliance
Applicable
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - I Page 7
S. No Legal frame work coordinating
authority Objectives of the policy Applicability to the project
2 Air (Prevention and Control of Pollution) Act, 1981
SPCB Provides means for the control and abatement of air pollution. Applicable
3 The Air (Prevention and Control of Pollution) Rules, 1982
SPCB
Defined the procedures for conducting meetings of the boards, the powers of the presiding officers, decision-making etc
Applicable
4 Public Liability Insurance Act, 1991
Director of Factories
An act to provide for public liability insurance for the purpose of providing immediate relief to the persons affected by accident occurring while handling any hazardous substance and for matters connected herewith or incidental thereto
Applicable
5
Environment (Protection) Act, 1986 (EPA) followed by amendment in May 1994 (Schedule-I)
(MoEF&CC)
Ensure that appropriate measures are taken to conserve and protect the Environment before commencement of operations.
Under its ambit, 32 types of industries are liable to opt for Environmental clearance from MoEF&CC by providing adequate EIA report
Applicable
7 The Environment (Protection) Rules, 1986
CPCB Lay down the procedures for setting standards of emission or discharge of environmental pollutants
Applicable
8
The Hazardous Wastes management (Management and Handling) Rules, 1989 and amended in 2016
SPCB
Procedure for inventory, control, handling and disposal of hazardous waste. Provide for setting up of disposal sites/landfill sites design, operation and closure
Applicable
9 Solid Waste Management Rules, 2016
SPCB Procedure for management and handling of solid wastes Applicable
10
Batteries (Management and Handling) Amendment Rules, 2010
SPCB To ensure that the used batteries are collected back as per the schedule against new batteries
Applicable
11 E- Waste (Management Rules), 2016 SPCB
Procedure to recovery/and/or reuse of useful material from waste electrical and electronic equipment
Applicable
PROJECT DESCRIPTION
CHAPTER -II
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - II Page 8
CHAPTER - II
PROJECT DESCRIPTION
2.1 TYPE OF THE PROJECT
Godrej Agrovet Ltd. is proposed to expand its manufacturing capacity of various
Herbicides/ Fungicides/ PGRs products from 635.125 MT/A to 1006.025 MT/A at
Methanol 1000.00 Toluene recovery 285.00 Toluene 300.00 Toluene loss 6.00 Generated water 5.40 Zink cupper vanadium
Catalyst recovery 5.00
Organic residue Process residue-16.34 Distillation residue-39 (Methanol -30, Toluene-9 )
55.34
Total 1426.74 Total 1426.74
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - II Page 22
FORCHLORFENURON Process description:
Stage-1:
Step-A:
Phenyl Iso cyanate reacts with 2-Chloro-4-aminopyridine in presence of
Dichloromethane to give Step-A product.
Step-B:
Step-A product purified with Acetone to give Step-B product.
Step-C:
Step-B product purified with Chloroform and Water to give Forchlorfenuron.
Route of synthesis: Stage-1: Step-A:
Phenyl isocyanate
N
C
O
2-Chloro-4-aminopyridine
N
NH2
Cl+
Dichloro-methane
C7H5NO
119.12
C5H5ClN2
128.56
NH
NH
O N
Cl
C12H10ClN3O
247.68
Crude Forchlorfenuron
Step-B:
NH
NH
O N
Cl
C12H10ClN3O
247.68
Crude Forchlorfenuron
Acetone
NH
NH
O N
Cl
C12H10ClN3O
247.68
Crude Forchlorfenuron
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - II Page 23
Step-C:
NH
NH
O N
Cl
C12H10ClN3O
247.68
Crude Forchlorfenuron
NH
NH
O N
Cl
C12H10ClN3O
247.68
Forchlorfenuron
Chloroform
Water
Flow Chart:
Phenyl Iso cyanate2-Chloro-4-aminopyridineDichloromethaneAcetoneChloroformWater
Dichloromethane recoveryAcetone recoveryEffluent water
Forchlorfenuron
Stage-1
Material Balance: Material balance of Forchlorfenuron
Stage-1 Batch Size: 200Kg
Name of the input Quantity in Kg
Name of the out put Quantity in Kg
Phenyl Iso cyanate 115.00 Forchlorfenuron 200.00 2-Chloro-4-aminopyridine 124.11 Dichloromethane
recovery 238.00
Dichloromethane 250.00 Dichloromethane loss 5.00 Acetone 100.00 Acetone recovery 95.00 Chloroform 100.00 Acetone loss 2.00 Water 120.00 Chloroform recovery 95.00 Chloroform loss 2.00 Effluent water
Water-120, Acetone-2
122.00
Organic residue Process residue-39.11 Distillation residue-11 (Dichloromethane-7, Acetone-1, Chloroform-3)
50.11
Total 809.11 Total 809.11
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - II Page 24
Process description: Stage-1: 2, 6-Dichloro benzo nitrile reacts with Sodium sulfide and Hydrochloric acid in presence of N-methyl pyrrolidine to give 2-mercapto-6-Chlorobenzonitrile.
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - II Page 38
Material balance of Homobrassinolide Stage-8
Batch Size: 25.0 Kg Name of the input Quantity
in Kg Name of the out put Quantity
In Kg Stage-7 30.00 Homobrassinolide 25.00 Methanol 200.00 Methanol Recovery 190.00 Potassium carbonate 25.00 Methanol loss 4.00 Chloroform 125.00 Chloroform Recovery 119.00 Water 200.00 Chloroform loss 2.50 Effluent water
Ethylene dichloride 500.00 Ethylene dichloride loss 10.00 In organic solid waste
(Sodium chloride-46.99) 46.99
Organic residue Process residue-14.20 Distillation residue-15 (Ethylene dichloride -15)
29.20
Total 641.19 Total 641.19
Material balance of Thiophanate Methyl Stage-2
Batch Size: 100Kg Name of the input Quantity
in Kg Name of the out put Quantity
in Kg Stage-2 80.00 Thiophanate Methyl 100.00 O-phenylene di amide 36.92 Dichloro methane
recovery 285.00
Dichloro methane 300.00 Dichloro methane loss 6.00 Organic residue
Process residue-16.92 Distillation residue-9 (Dichloro methane -9)
25.92
Total 416.92 Total 416.92
TRIFLOXYSTORBIN
Process Description: Stage-1:
Step-A:
3-Trifluoro methyl acetophenone reacts with Hydroxylamine hydrochloride in presence of Ethanol to give Step-A as product.
Step-B:
Step-B product reacts with Sodium hydroxide in presence of Dichloroethane and Tetra butyl ammonium bromide to give stage-1 as product.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - II Page 47
Stage-2:
Step-A:
2-Methyl phenyl (oxo) acetic acid reacts with N-Bromo succinamide and methanol in presence of methanol to give Step-A as product.
Step-B:
Step-A product reacts with (2-Bromomethyl-pheyl-)-oxo-acetic acid methyl ester to give stage-2 as product.
Stage-3:
Step-A:
Stage-2 product reacts with O-Methyl-hydroxylamine Hydrochloride in presence of Acetonitrile, Methyl isobutyl ketone, Potassium carbonate to give Step-A as product.
Step-B:
Step-A product is purified with water to give Trifloxystorbin.
Route of Synthesis:
Stage-1:
Step-A:
3-Trifluoro methyl acetophenone
+
O
CH3
CF3
C9H7F3O
188.15
Hydroxyl amine hydrochloride
NH2
HOH
Cl
ClH4NO
69.49
F3CN
CH3
OH
C9H8F3NO
203.16
1-(3-Trifluoromethyl-phenyl)-ethanone oxime
Ethanol
+ H2O
18.02
HCl
36.46
+
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - II Page 48
Process 3.98 1.41 5.39 HTDS: HTDS effluent sent to MEE system followed by ETP. LTDS: LTDS effluent treated in ETP – RO Plant. RO Rejects to MEE System and RO permeate to reuse, Condensate from MEE to reuse and MEE residue to ATFD.
Washings 0.00 3.00 3.00
Boiler Blow down 0.00 0.70 0.70 Cooling towers Bleed off 0.00 3.50 3.50
Scrubbing System 2.00 0.00 2.00
Domestic 0.00 3.50 3.50
Total 5.98 12.11 18.09
The present effluent quantity is 18.09 KLD, out of which 3.50 KLD is domestic
effluent. The effluent is segregated into low TDS and high TDS streams. Low TDS
stream and domestic effluent is treated in ETP. The existing ETP shall be upgraded
by installing MEE to treat high TDS Stream and RO rejects.
Total 42291.66 1409.72 984.80 239.52 2.13 POWER (ENERGY) REQUIREMENT
Power requirement of proposed project will be made available through Maharashtra
State Electricity Distribution Company Limited [MSEDCL]. The total power
requirement of project will be 400 KVA.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – II Page 68
2.14 UTILITIES
TABLE 2.15: DETAILS OF UTILITIES
2.15 PROPOSED EMISSION DETAILS
For generation of Steam, the industry will use 0.6 TPH Furnace Oil fired boiler and
proposed to install 0.6 TPH Furnace Oil fired boiler. The total fuel requirement is
2000 Kg/Day will be met from local authorized sources.
The unit has existing 200 KVA DG set for usage during the power failures and
proposed to install solar panels with 115 KW/Day capacities for power generation.
TABLE 2.16: STACK EMISSION DETAILS OF BOILERS
Particulars Units 0.6 TPH Boiler (Existing)
0.6 TPH Boiler (Proposed)
Type of Fuel -- Furnace Oil Furnace Oil Fuel Consumption Kg/ Day 1000 1000 Ash Content % 0.1 0.1 Sulphur Content % 4.5 4.5 Nitrogen Content % 0.15 0.15 No. of Stacks No. 1 1 Height of the stack m 21 21 Diameter of the stack m 0.25 0.25 Flue Gas Temperature oC 200 200 Flue Gas Velocity m/s 16 16 Emission Rate Details Particular Matter as PM gm/sec 0.0093 0.0093 Sulphur dioxide as SO2 gm/sec 0.833 0.833
4 Cooling Towers 1 x 300 TR, 1 x 100 TR & 1 x 50 TR ---
5 Electricity supply from MSEDCL --- 400 KVA
6 Power supply from Solar Panels --- 115 KW/ Day
Fuel Consumption Details 7 Furnace oil 1000 Kg/ Day 1000 Kg/ Day 8 Diesel (LDO) for TFH 288 Kg/ Day --- 9 Diesel (HSD) 400 Liters/ Day ---
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – II Page 69
Particulars Units 0.6 TPH Boiler (Existing)
0.6 TPH Boiler (Proposed)
Oxide of Nitrogen as NO2 gm/sec 0.046 0.046
TABLE 2.17: STACK EMISSION DETAILS FOR THERMIC FLUID HEATER
Particulars Units Thermic fluid heater (Existing)
Thermo Fluid Heater Capacity Kcal/hr. 1,00,000 Type of Fuel -- LDO Fuel Consumption per Day Kg/ Day 288 Diameter m 0.3 Stack Temperature oC 120 Stack Height m 18 Emission of PM mg/Nm3 70 Emission of SO2 mg/Nm3 35 Emission of NOx mg/Nm3 50
TABLE 2.18: STACK EMISSION DETAILS OF EXISTING DG SET
Capacity in KVA
Emission of PM in mg/Nm3
Emission of SO2 in mg/Nm3
Emission of NOx
in mg/Nm3
Stack dia. in m
Flue Gas Temp. in
OC
Stack Height in m
Flue gas Velocity in m/sec.
200 KVA 50 70 75 0.2 160 9.0 15 2.16 LIST OF THE RAW MATERIALS - PRODUCT WISE
TABLE 3.5: COMPARISON OF PRIMARY DATA (PROJECT SITE) WITH
SECONDARY DATA (IMD DATA) Month Parameter Primary Data Secondary Data March
Predominant wind direction
W, WNW & NW NW, W & N April WNW, W & NW NW, W & N May WNW, W & NW NW, W & N
IMD DATA
30 years meteorological data for the period of 1981 to 2010 is collected from nearby
IMD station (Ratnagiri) for Wind speed (kmph), Wind direction (0 to 3600), Ambient
Temperature (0C), Relative humidity (%), Rainfall (mm) and Mixing height (m)
collected from ATLAS.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 90
TABLE 3.6: IMD DATA (RATNAGIRI - IMD STATION)
Month
Temperature (0C)
Relative Humidity, (%) Wind
Speed (kmph)
Monthly Avg.
Rainfall (mm)
Predominant Wind
Direction coming from Max Min Max Min
January 34.9 15.6 63 55 6.9 0.3 NW, E & N February 36.1 16.0 64 57 7.5 0.1 NW, N & E March 36.1 18.6 71 63 7.7 0.3 NW, W & N April 34.9 21.8 72 66 8.4 2.1 NW, W & N May 34.7 23.7 73 68 8.8 43.8 NW, W & N June 33.7 22.3 86 81 8.7 869.5 W, SW & NW July 30.6 22.4 89 85 9.6 972.5 W, SW & NW August 30.1 22.7 90 86 8.9 723.3 W, NW & SW September 31.9 22.3 89 81 6.4 364.9 W, NW & SW October 35.7 20.8 78 72 6.1 123.6 NW, W & N November 35.6 18.9 60 61 6.8 17.0 NW, E & SE December 34.9 16.6 56 55 7.1 0.8 E, NW & SE (Source: IMD data collected from Ratnagiri for 1981 to 2010 (30 years))
3.4 AIR ENVIRONMENT
The ambient air quality with respect to the study area of 10 km radius around the
plant site forms the baseline information. The various sources of air pollution in the
region are industrial, traffic and rural activities. This will also be useful for assessing
the conformity to standards of the ambient air quality during the plant operation. The
study area represents mostly rural environment.
The baseline status of the ambient air quality has been assessed through a
scientifically designed ambient air quality monitoring network. The design of
monitoring network in the air quality surveillance programme has been based on the
following considerations:
Meteorological conditions on synoptic scale.
Topography of the study area.
Representation of plant site.
Influence of the existing sources (if any) are to be kept at minimum.
Inclusion of major distinct villages to collect the baseline status.
Representation of down wind direction.
Representation of upwind direction.
Representation of cross sectional distribution in the down wind direction.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 91
The ambient air quality monitoring was carried out in accordance with National
Ambient Air Quality Standards (NAAQS) of CPCB. Ambient Air Quality Monitoring
(AAQM) was carried out at nine locations for 2 days per week for 12 weeks during
study period and the locations are shown in Figure 3.4. The locations of the different
stations with respect to its distance and direction from project site are shown in
Table 3.7.
TABLE 3.7: AMBIENT AIR QUALITY SAMPLING LOCATIONS
Code Name of Sampling Location Distance (km) w.r.t Project
Direction w.r.t Project
A1 Near Main Gate -- -- A2 Near ETP -- -- A3 Awashi 1.43 NE
A4 Dhakarwadi 2.56 NE A5 Bhelsai 4.47 East A6 Lote 3.10 SE A7 Dhamandevi 2.67 SSE
A8 Ghanekhunt 1.11 West
A9 Asagani 1.48 NW The monitoring was carried out for a three month period (March to May, 2018) at a
frequency of twice a week at each station adopting a continuous 24- hour schedule.
The following parameters were monitored in the study area:
Particulate Matter (PM10)
Particulate Matter (PM2.5)
Sulphur Dioxide (SO2)
Oxides of Nitrogen (NOx)
Carbon Monoxide (CO)
Ammonia (NH3)
Volitail Organic Compounds (VOC)
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 92
FIGURE 3.3: AMBIENT AIR QUALITY SAMPLING LOCATIONS MAP
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 93
3.4.1. National Ambient Air Quality Standards (NAAQS)
National Ambient Air Quality Standards, 2009 for the notified Industrial, Residential,
Rural and Other Areas as well as Sensitive Areas are presented in table below. The
state has not promulgated separate Ambient Air Quality Standards.
TABLE 3.8: NATIONAL AMBIENT AIR QUALITY STANDARDS
S. No Pollutant
Time Weighted Average
Concentration in Ambient Air
Methods of measurement
Industrial Area
Residential, Rural &
other Areas
Ecologically sensitive area
(Notified by Central Govt)
1 Sulphur Dioxide (SO2) µg/m3
Annual * 50 20 -Improved West and Gaeke method -Ultraviolet fluorescence
24 hours** 80 80
2 Oxides of Nitrogen as NO2 µg/m3
Annual * 40 30 -Modified Jocob and Hochheise(NaArsenite ) -Chemiluminescence
Annual * 0.50 0.50 -AAS/ICP method for sampling on EPM 2000 or Equivalent Filter paper -ED -XRF using Teflon filter paper
24 hours** 1.0 1.0
7 Carbon Monooxide mg/m3
8 hours** 02 02 -Non Dispersive Infra Red (NDIR) spectroscopy 1 hour ** 04 04
8 Ammonia (NH3) µg/m3
Annual * 100 100 -Chemiluminescence -Indo-Phenol Blue method
24 hours** 400 400
9 Benzene µg/m3 Annual * 05 05
-GC based continuous analyzer - Adsorption & desorption followed by GC analysis
10 Benzo(a) pyrene (BaP)- Particulate Phase only ng/m3
Annual * 01 01 -Solvent extraction followed by GC/HPLC extraction
11 Arsenic ng/m3 Annual * 06 06
AAS/ICP method for sampling on EPM2000 OR Equivalent Filter paper
12 Nickel ng/m3 Annual * 20 20
-AAS/ICP method for sampling on EPM2000 OR Equivalent Filter paper
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 94
G.S.No.826 (E) dated 16th November, 2009. Vide letter no. F. No. Q-15017/43/2007-CPW. *Average Arithmetic mean of minimum 104 measurements in a year taken for a week 24 hourly at uniform interval. **24 hourly/8 hourly values should meet 98 percent of the time in a year.
TABLE 3.9: AMBIENT AIR QUALITY RESULTS FOR PM10
Location Name Minimum Maximum Average 98th Percentile
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 102
3.5 WATER ENVIRONMENT
Water sampling and subsequent analysis were carried out to determine both the
groundwater and surface water quality of the study area.
Selected water quality parameters of ground water resources and surface water
resources within 10 km radius of the study area has been studied for assessing the
quality of water.
3.5.1 Methodology for Water Quality Monitoring
Ground water sources and surface water sources covering 10 km radial distance
were examined for physico-chemical, heavy metals and bacteriological parameters
in order to assess the effect of industrial and other activities on ground water and
surface water. The samples were analyzed as per the procedures specified in
'Standard Methods for the Examination of Water and Wastewater' published by
American Public Health Association (APHA).
Samples for chemical analysis were collected in polyethylene carboys. Samples for
bacteriological analysis were collected in sterilized glass bottles. Selected
physicochemical and bacteriological parameters have been analyzed for projecting
the existing water quality status in the study area. Parameters like pH and
temperature were analyzed at the time of sample collection.
The details of surface and ground water sampling locations are given in Table 3.17
and sampling locations of ground water quality and surface quality monitoring are
shown in Figure 3.12. The physico - chemical characteristics of the ground water
samples and surface water samples are presented in the Tables 3.18 & 3.19.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 103
TABLE 3.17: GROUND AND SURFACE WATER SAMPLING LOCATIONS
Code Name of Sampling Location Distance (Km) w.r.t Project
Direction w.r.t Project
Ground Water Sampling Locations GW1 Asagani 1.48 NW GW2 Anjani 7.97 WNW GW3 Avashi 1.43 NE GW4 Dhakarwadi 2.56 NE GW5 Bhelsai 4.47 East GW6 Lote 3.10 SE GW7 Ambadas 6.50 SE GW8 Ghanekhunt 1.11 West
Surface Water Sampling Locations SW1 Near Pedhe 6.8 SSE SW2 Near Karjikar Mohalla 5.8 South SW3 Near Matwadi 4.11 SSW SW4 Near Chougale Mohalla 8.05 SW SW5 Dabhil - Lake water 4.00 NNW SW6 Near Ayani Bhoiwadi 7.14 West SW7 Near Hodarpad 9.45 WSW SW8 Lake near Dhameli Kond 7.73 SSW
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 104
FIGURE 3.11: GROUND AND SURFACE WATER SAMPLING LOCATIONS MAP
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 105
TABLE 3.18: GROUND WATER QUALITY IN THE STUDY AREA
S. No. Parameter Unit GW-1 GW-2 GW-3 GW-4 GW-5 GW-6 GW-7 GW-8
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 116
The highest peak observed during 9 am to 10 am (worst Scenario) PCU/hr 1530 Total width of the Road in meters (Arterial Road) 24 Carrying capacity of the road (the road is 4 lane Divided 2 way road) As per IRC:106-1990 (PCU’s per hour) 3600 Existing V/C Ratio 0.43
LOS=Level of Service (Existing) V/C LOS Performance
0.0-0.2 A Excellent 0.2-0.4 B Very Good 0.4-0.6 C Good 0.6-0.8 D Fair/Average 0.8-1.0 E Poor
1.0 & above F Very Poor Note: *As per IRC Guidelines 1990
The traffic survey was carried out on the NH-66 (Mumbai to Goa Road) which is 0.67 Km (WSW) to the Project site. The details of
the vehicles movement recorded. From the study it is observed that there is no major impact on traffic due to the proposed project.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 117
3.7 SOIL ENVIRONMENT
The present study on soil quality establishes the baseline characteristics in the study
area surrounding the project site. The study has been addressed with the following
objectives.
To determine the base line characteristics
To determine the soil characteristics of plant site and surrounding areas with
in 10 km radius.
To determine the impact of industrialization/urbanization on soil
characteristics
To determine the impacts on soils from agricultural productivity point of view.
The soil samples were collected during study period. Sampling Locations are
detailed in Table 3.23. and Figure 3.14. The analysis results are given in Table
3.24. Details of Standard Soil Classification are given in Table 3.25.
The homogenized soil samples collected at different locations were packed in a
polyethylene plastic bag and sealed. The sealed samples were sent to laboratory for
analysis. The important physical, chemical parameter concentrations were
determined from all samples.
TABLE 3.23: SOIL SAMPLING LOCATIONS
Code Name of Sampling Location Distance (km) w.r.t Project
Direction w.r.t Project
S1 Asagani 1.48 NW S2 Anjani 7.97 WNW S3 Avashi 1.43 NE S4 Dhakarwadi 2.56 NE S5 Bhelsai 4.47 East S6 Lote 3.10 SE S7 Ambadas 6.50 SE S8 Ghanekhunt 1.11 West
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 118
FIGURE 3.13: SOIL SAMPLING LOCATIONS MAP
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 119
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 123
The stack monitoring results are well within the prescribed limits given by MPCB.
The air pollution at project site has less impact in environment and the provided air
pollution control technologies are sufficient.
3.8.4 Workzone Noise Monitoring
Workzone Noise monitoring was also carried out to know the impact on environment
due to project activities. The results are presented in the below Table 3.29.
TABLE 3.29: WORKZONE NOISE MONITORING RESULTS AT PROJECT SITE
S. No Monitoring location
Day time dB(A) Leq
CPCB Standard Day Time
dB (A)
Night time dB(A) Leq
CPCB Standard
Night Time dB(A)
1. Near main gate 68.2 75 59.5 70 2. Near ETP side 66.5 75 58.3 70 3. Near store room 61.3 75 57.1 70 4. Near main plant 71.4 75 66.8 70 5. Near Py acid plant 66.2 75 65.3 70 6. D.G. Set (door closed) 71.9 75 69.1 70 7. Near utility area 73.2 75 67.0 70
8. Outside fire hydrant pump room 74.7 75 66.4 70
The above results at all the locations are well within the permissible limits provided
by the CPCB for the Industrial Area. Thus, the workzone noise levels are safe and
has less impact on workzone persons.
3.8.5 Industrial Effluent Results
The waste water from the ETP was collected and analysis was carried out in the
months of March to May, 2018 in order to understand the efficiency of the present
effluent treatment system as well as to understand the characteristics of the waste
water. The analysis results for waste water are given in the below Table 3.30.
TABLE 3.30: ANALYSIS RESULTS OF EFFLUENT AT EFFLUENT TREATMENT
PLANT
S. No Parameter Unit Inlet Outlet Consented Standards
3.10.4.5 Species diversity index and species richness of plant population:
Biodiversity refers to the number and variety of organisms within a particular area. It is
always used as a measure of the health of biological system. Species diversity is a
characteristic unique to the community level of biological organization. Higher species
diversity is generally thought to indicate a more complex and healthier community
because a greater variety of species allows for more species interactions, hence greater
system stability and indicates good environmental conditions. Species richness is the
number of different species present in an area. The more species present in a sample
area the „richer‟ the area.
TABLE 3.40: SITES STUDIED FOR PLANTS AND BIRD INDICES
Site No. Zone Village Latitude Longitude Site 1
Within 5 Km
radius (Core)
Near Project Site 17°36'13.81"N 73°29'43.96"E Site 2 Near Chirani Warchiwadi 17°36'3.01"N 73°31'15.60"E Site 3 Near Ganwalwadi 17°38'6.04"N 73°30'28.83"E Site 4 Near Asgani 17°37'30.48"N 73°27'39.73"E Site 5 Near Matwadi 17°34'47.96"N 73°28'21.46"E Site 6
Above 5 Km
radius (Buffer)
Near Ambadas 17°33'59.58"N 73°32'32.43"E Site 7 Near Kulwandi 17°40'5.42"N 73°31'11.22"E Site 8 Near Dabhil 17°39'22.95"N 73°27'38.10"E Site 9 Near Anjani 17°37'20.56"N 73°24'53.90"E
Site 10 Near Dhamandevi Mohalla 17°33'19.62"N 73°28'21.95"E
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 143
FIGURE 3.19: Google Earth Imagery of the Sites Selected for Ecology and Biodiversity studies
In the present study “Shannon – Weiner Index” and “species richness” is calculated for
the natural vegetation occurring in the study area. The study area was divided in to grids
of 1 sq. km. The stratified random sampling method was adopted for the study. The
herbs, shrubs and trees were studied by quadrant method. One quadrant taken for
study was of 100 m x 100 m. The 5 grids from the core zone and 5 grids from the buffer
zone were studied.
TABLE 3.41: SHANNON WEINER INDEX AND SPECIES RICHNESS OF PLANT
9 Black Naped Hare Lepus nigricollis IV 10 Barking Deer Muntiacus muntjak III 11 House mouse Mus musculus 12 Leopard Panthera pardus I 13 Little Indian Bat Pipistrellus coromandra 14 Common Languor Presbytis entellus II 15 Rat Rattus sp. IV 16 House shrew Suncus murinus 17 Pig Sus cristatus 18 Indian Wild Boar Sus scrofa III
Reptiles
1 Green Whip- Snake Ahaetulla nasuta IV 2 Common Krait Bungarus caeruleus 3 Common Calotes Calotes calotes 4 Wild Lizard Calotes rouxii 5 Common Garden
Lizard Calotes versicolor
6 Marsh Crocodile Crocodilus palustris I 7 Russell Viper Daboia russelli 8 Saw-Scaled Viper Echis carinatus IV 9 Common Skink Mabuya carinata
10 Common Cobra Naja naja I
Birds
1 Indian Shikra Accipiter badius 2 Jungle Myna Acridotheres fuscus IV 3 Common Myna Acridotheres tristis IV 4 Common Iora Aegithina tiphia 5 White Breasted
Water hen Amaurornis phoenicurus
6 Asian Open bill Anastomus oscitans IV
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 146
Stork 7 Paddy field Pipit Anthus rufulus IV 8 Common swift Apus apus 9 House Swift Apus nipalensis
10 Large Egret Ardea alba IV 11 Grey Heron Ardea cinerea IV 12 Pond Heron Ardeola grayii IV 13 Ashy wood swallow Artamus fuscus 14 Cattle Egret Bubulcus ibis IV 15 Greater Coco Centropus sinensis IV 16 Lesser Pied
Kingfisher Ceryle rudis IV
17 Purple Sunbird Cinnyris asiaticus IV 18 Pied Crested
Cockoo Clamator jacobinus IV
19 Blue rock pigeon Columba livia 20 Oriental Magpie
Robin Copsychus saularis
21 Jungle Crow Corvus macrorhynchos V 22 House Crow Corvus splendens V 23 Rain Quail Coturnix coromandelica IV 24 Indian Cuckoo Cuculus micropterus IV 25 Rufous Treepie Dendrocitta vagabunda 26 Black Drongo Dicrurus adsimilis IV 27 White bellied
Drongo Dicrurus caerulescens IV
28 Golden backed Woodpecker
Dinopium benghalense IV
29 Little Egret Egretta garzetta IV 30 Asian Koel Eudynamys scolopacea 31 Painted Partridge Francolinus pictus IV 32 Crested Lark Galerida cristata IV 33 Orange Headed
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 147
43 Chestnut headed Bee Eater
Merops leschenaulti
44 Green Bee Eater Merops orientalis 45 Little Cormorant Microcarbo niger IV 46 Black Kite Milvus migrans 47 Yellow Wagtail Motacilla flava 48 White browed
Wagtail Motacilla
maderaspatensis
49 Purple rumped Sunbird
Nectarinia zeyonica IV
50 Changeable Hawk Eagle
Nisaetus cirrhatus
51 Black Crowned Night Heron
Nycticorax nycticorax IV
52 Black headed Oriole Oriolus larvatus IV 53 Golden Oriole Oriolus oriolus IV 54 Tailor Bird Orthotomus sutorius 55 Sparrow Passer domesticus 56 Common Peafowl Pavo cristatus I 57 Jungle Bush Quail Perdicula asiatica IV 58 Painted Bush Quail Perdicula erythrorhyncha IV 59 Small Minivet Pericrocotus
cinnamomeus IV
60 Long tailed Minivet Pericrocotus ethologus IV 61 Sirkeer Malkoha Phaenicophaeus
leschenaultii
62 Greater Cormorant Phalacrocorax carbo IV 63 Alexandrine
Parakeet Psittacula eupatria IV
64 Rose ringed Parakeet
Psittacula krameri IV
65 Red Vented Bulbul Pycnonotus cafer IV 66 Red wiskerd bulbul Pycnonotus jocosus IV 67 Indian Robin Saxicoloides fulicata 68 Spotted Dove Spilopelia chinensis IV 69 Common Wood
Shrike Tephrodornis pondicerianus
70 Jungle Babbler Turdoides striatus IV 71 Red Wattle Lapwing Vanellus indicus
10. 2.79 29 3.10.6 Observations of existing GAVL activities on Biodiversity
3.10.6.1 General
Godrej Agrovet Limited, Lote site involves broadly transportation of raw material and
work force to the site, operation of boilers, Thermic fluid heater, D.G. set, process
reactors, pollution control and other utility equipment, storage of goods, maintenance,
etc. Observation of existing activity on biodiversity are given in the below.
3.10.6.2 Noise
Various activities at site (as mentioned above) leads to generation of noise at site;
however, unit is in MIDC & surrounding area have other noise sources, covers noise
level from existing activities. Thus the existing Godrej Agrovet Ltd. activities have
insignificant adverse impact on fauna due to noise.
3.10.6.3 Soil/ Land Waste generated is collected, segregated and stored at designated places. Godrej
Agrovet Ltd. is used to dispose hazardous wastes to authorized waste management
facility at Taloja. Therefore, no chances of barring accidental spillage of waste during
handling/ transportation, which would contribute to the contamination/ pollution/
deterioration of surrounding land.
3.10.6.4 Water Waste water generated during various operations is segregated based on High TDS,
High COD and Low TDS low COD. The Low TDS and low COD stream in treated in the
existing ETP and the treated effluent is sent to the CETP, Lote Parshuram for further
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 150
treatment. The high TDS and high COD stream is treated in Distillation vessel and the
residue is sent to the CHWSTDF, Taloja for disposal.
In order to reduce the effluent generation, the industry proposes to concentrate the
effluents in Multiple Effect Evaporator (MEE) and concentrated effluents shall be dried
by Agitating Thin Film Dryer (ATFG) and the dried solids are disposed along with
Hazardous waste.
3.10.6.5 Air
Emissions from various processes, burning of fuel generates gaseous pollutants which
are passed through air pollution control system and release to environment through
stacks. Gaseous and particulate matter emission from stacks and other process related
sources contribute to Background particulate SO2 & NOx levels. During study, it was
noted that, with existing level of ambient air quality in study area is within prescribed
limit.
Above observations suggests healthy ecosystem and Godrej Agrovet Ltd. or nearby
industrial activities poses insignificant adverse impact on the flora & fauna in
surrounding & this condition will be sustained by efficient working of suitable pollution
control equipment, and maintaining adequate green belt around the site.
3.11 Socio Economic Study
The socio-economic setting of an area is an important indicator to understand the
present status of that region. Therefore the study of socio-economic condition is very
much important and included in several studies. In Environmental Impact Assessment
(EIA) projects the socio-economic study is having prime importance. In this section the
detail study is carried about the economic development as well as social condition of the
residents within 10 km radius from the site of project.
3.11.1 Database
The data is considered as a back bone in the decision making process. In socio-
economic study the primary and secondary data sources are having vital importance. In
this study both primary and secondary datasets are used. The primary data is collected
from intensive field work and the secondary data is collected from various available
sources. The sampling technique is adopted for section of sample villages as well as
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 151
sample respondents. The purposive random sampling method is best suitable hence it
is applied for this study. The villages around 10 km radius from the proposed industry
are considered as a study area. There are total 66 villages in the circumference, out of
which 41 villages comes under Khed Tehsil, whereas 25 villages are in the Chiplun
Tehsil. out of that 16 are considered in this study. The data is collected from various
respondents from the society i.e. farmers, teachers, business persons, labors, etc. It is
necessary to conduct the personal field visit and observation of socio-economic
condition of each sample village. The personal observations are helpful to understand
the actual condition of the residents and their lifestyle. Several visits are made to the
study area and discussion is made with at all possible layers from the village like
households, hospitals, educational institutes, etc. A systematic questionnaire is
prepared and data is collected by question and answer method. The prepared
questionnaire has focusing on various aspects such as demographic status, educational
condition, employment, housing, facilities, economic condition and other related
aspects. Also the structured informal interviews are conducted to get the opinion and
awareness about the project. The census data is collected from census department in
the form of published reports. At the same time socio-economic review report is also
utilized as a data source. The Gazettee district resource handbook and several official
websites are used in this study.
TABLE 3.46: LIST OF VILLAGES LOCATED WITHIN 10 KM RADIUS OF THE
STUDY AREA S. No. Village Name Direction from Project Site Approx. Distance (Km)
1 Lote North 1 2 Ghanekhunt West 2 3 Songaon South-West 2 4 Chirani Varchiwadi East 3 5 Avashi North 3 6 Dhamandevi South 3 7 Kotavali West 4 8 Asgani North -West 5 9 Bhelsai East 5 10 PedheParshuram South 5 11 Sheldi North-East 6 12 Ketki South-East 6 13 Kaluste South 6.4 14 Hedwadi North-East 7 15 Kalambaste South-East 9 16 Shiral South 9.8
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 152
3.11.2 Methodology
FIGURE 3.20: FLOW CHART OF METHODOLOGY
The methodology adopted for this study is given in above flow chart; the task is initiated
with the systematic planning. The task is divided into various levels i.e. preparation of
questionnaire, sampling, field observations, data collection, analysis, etc. The
respondents were asked for their awareness/opinion about the project and also of their
opinion about the impacts of the project which is an important aspect of socio-economic
environment, viz. job opportunities, education, health care, transportation facility and
economic status.
The collected data is systematically arranged using computer application and
quantification is made. Using graphical representation the derived results are discussed.
Some of the salient observations recorded during survey in the study area:
Most of the population is engaged in agriculture & few are engaged in other
activities.
The accessibility is made through roads. Vashisti River is being used for
navigation by local people.
The buses are available for all villages. But it is noticed that people are having
their own vehicles for travelling.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 153
Electricity is available for all villages for all purposes.
3.11.3 Demographic Structure of the Study Area
Demographic structure of the study area was studied in terms of selected parameters
such as households, population, sex ratio, scheduled caste, scheduled tribes, literacy
etc. Summarized information of study area is shown below
3.11.3.1 Population
According to the 2011 census, there are 32298 households consisting 135803 persons
in the study area. It is found that each household consists of 4.2 persons.
3.11.3.2 Sex Ratio
Census 2001 recorded a sex ratio of 1034 females per 1000 males in the study area.
This is lower compared to district average 1136 but higher compared to state average
922. In 2011 census sex ratio in study area has higher females than males from both
district & state average 1122 & 929 respectively 3.11.3.3 Child Population
The child population 0 - 6 years account for about 10% of the total population.
3.11.3.4 Castes vise distribution of population
The ST population, (779 persons -0.6%) is lower than the SC population, (5407persons
- 4.0 %).
3.11.3.5 Literacy
The literacy rate for the study area is estimated as 80%, as compared to 74% and 73%
literate population of Ratnagiri district and Maharashtra state respectively. The literacy
rate for males is much higher than females. 85% of the males are literate while female
literates are 76%.
3.11.4 Infrastructure facilities and amenities
3.11.4.1 Education
The availability of education facility in urban as well as in entire rural portion is good.
Almost all the villages have an education facility in the form of primary school followed
by middle schools, secondary schools & higher secondary educational facility.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 154
3.11.4.2 Medical/Primary Health Care
Medical facility is quiet good in urban area i.e. Chiplun town & in rural area it is mainly
available in form primary health centers/ sub centers, registered medical practitioners
and community health workers as well as pharmacy shops. Primary health center and
sub-centers are adding medical facility in the rural area. Primary health centers are
found in Lote & Kapare village. Hospitals are operating in 4 villages i.e. Lote,
Dhamandevi, Lavel and Gunade
3.11.4.3 Drinking Water
Water supply in the rural and the urban area of the region is through wells, tap water,
hand pumps, tube well and river, rarely by canal and spring.
3.11.5 Occupation Pattern
TABLE 3.47: OCCUPATIONAL STRUCTURE OF THE STUDY AREA
Workers Details 2011 2001 Change
in % Number % Number %
Worker Population 51220 47705 -- Work participation Rate 37.72 36.90 0.82 Types of Workers Main Worker 44360 32.66 40368 31.23 1.43 Marginal Worker 6860 5.05 7337 5.68 -0.63 Non Workers 84583 62.28 81565 63.10 -0.82 Economic Category wise break up of Main Worker Cultivators 10851 24.46 12897 31.95 -7.49 Agricultural Labourers 4534 10.22 2025 5.02 5.2 Household industry workers 1383 3.12 679 1.68 1.44 Other Workers 27592 62.20 24767 61.35 0.85 Economic Category wise break up of Marginal Worker Cultivators 2173 31.68 2730 37.21 -5.53 Agricultural Labourers 1596 23.27 1823 24.85 -1.58 Household industry workers 316 4.61 293 3.99 0.62
Other Workers 2775 40.45 2491 33.95 6.5 Source: Primary Census Abstract CD 2011 Thane District, Maharashtra State
From the above table it can be seen that, there is a marginal increase in the work
participation rate from 37.72% in 2001 to 39.90 in 2011. The slight increase is being
observed in the main worker population i.e. from 31.23% in 2001 to 32.66% in 2011.
There is decrease in the population of marginal workers and non marginal workers by
0.63% and 0.82% respectively.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 155
3.11.6 CSR Activities carried by Godrej Agrovet Limited
Employment opportunities are generated to local people and strengthening the financial
condition of the industry. The products are import substitution and savings in foreign
exchange. Industry has earmarked 1.0 % of the total project cost for Corporate Social
Responsibility (CSR) activities. Details of CSR activities undertaken so far are given as
under:
TABLE 3.48: CSR ACTIVITIES BY GODREJ AGROVET LIMITED
S. No CSR Activity Amount Spent in Rupees
Financial Year 2016-17
1 Study material distributed to students of ZP School, Lote-Gavthan (Compass box, Plastic scale etc) Approx 70 beneficiaries
7,054
2. Volunteer Day celebrated at ZP School, Adarsh Shala, Lote-Gavthan 4,997
3. Streetlights, Housekeeping, Signboards at PHC Lote 90,372
4. Window slidings, Grills to B windows of two classrooms + Tiles fixing work to flooring of corridor and staircase at Nutan Vidyalaya, Lote
1,95,045
Total Amount spent during the Financial Year 2016-17 2,97,468 Financial Year 2017-18
1. Handover complete Laboratory to ZP school, Matwadi, Songaon 1,60,000
2. Volunteer Day celebrated at ZP School, Matwadi, Songaon 10,000
Total Amount spent during the Financial Year 2017-18 1,70,000
3.11.7 Awareness and Opinion of the People
Villagers expressed a positive attitude towards development of industrial sector by
expecting that local unemployed youth will get employment at skilled & semi-skilled
work. Also, adequate e precautions should be taken towards pollution & implemented so
that it should not occur & deteriorate the quality of natural environment which have an
adverse impact on health & crops etc.
Respondents also feel that vocational training institutions should be established,
medical facilities should be upgraded by periodically organizing health check-up camps
and opening more health institutions like PHS or hospital etc.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – III Page 156
3.11.7.1 Opinion of the Residents:
During survey the respondent told that at present and in the past also there are no major
issues from the industry side. In fact it is helping them by many ways. However they
have given some suggestions like:
Factory surroundings should be pollution free even after expansion.
The groundwater source should not get affected due to any
leakages/spillages/discharge of effluents.
The waste water should be recycled and reused for gardening purposes or other
industrial activities.
Villagers also expect the company should take initiative against water scarcity problem
and other activities such as tree plantation, development of Irrigation facility,
Construction of dam at river, construction & maintenance of drainage line, vocational
training programs, bus facility, medical facility, internal roads within village,
implementation of Agriculture department schemes, library, Garbage bins, and Power
supply, etc.
3.11.7.2 Benefits of Project Expansion
The main purpose of capacity expansion is to fulfill the Demand supply gap. The
products manufactured by the industry are very useful in the agricultural fields. Farmers
are extensively using the products manufactured by the GAVL in order to protect the
crops from diseases, thus the damage to the crops can be totally eliminated. Since it is
an indigenous product, the cost would be low to protect crops to the farmers.
The industry will provide employment opportunities to the nearby villagers. It would also
help the socioeconomic conditions of the surrounding villages as there will be certain
amount allotted for corporate social responsibility.
ANTICIPATED ENVIRONMENTAL IMPACTS
& MITIGATION MEASURES
CHAPTER -IV
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – IV Page 157
CHAPTER - IV
ANTICIPATED ENIVORNMENTAL IMPACTS
& MITIGATION MEASURES
4.1 INTRODUCTION
Environment and development should be considered as mutually Complementary,
interdependent and an instrument of reinforcing the quality of life. Environmental
Impact Assessment (EIA) is the important aspect of overall environmental
management strategy and an important tool for sustainable development. It identifies
major impacts of Industrial and associated activities on environment and provides
guideline to prepare the necessary control measure termed as Environmental
Management Plan (EMP).
The identified impacts for various components of environment viz., Air, Noise, Water,
Land, Socio-Economy, etc. are presented herewith. EIA is an activity or an attempt
to identify, predict, evaluate and communicate the likely environmental impacts of the
activity/project on the environment.
Based on results [Baseline Data] of prediction and evaluation, pollution abatement
and control measures in order to mitigate the adverse impacts on the environment
are delineated in an Environmental Management Plan
The proposed project is likely to create impact on the environment in two distinct
phases:
During the construction phase of expansion, which may be temporary and
short term; and
During the operation phase that would have long-term effects.
4.2. INVESTIGATED ENVIRONMENTAL IMPACTS DUE TO PROPSED
EXPANSION PROJECT
The environmental impact assessment is accomplished by identification and
prediction of impacts and their assessment. Potential impacts of proposed project on
various environmental attributes given below are predicted;
Air environment
Water resources and quality
Noise levels
Land use
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – IV Page 158
Soil quality
Solid waste
Terrestrial and aquatic ecology
Demography and socio-economics.
Hydrology & Geology
4.3. CONSTRUCTION PHASE
During the construction phase of expansion, the activities which are likely to
contribute to impact on various environmental components which are temporary in
nature are construction of various structures of Herbicides/ Fungicides/ PGRs
activities, lying of internal roads, erection of equipment etc.
The construction activities will be confined within the project area of 10742 Sq. m.
The environmental impacts and management plan during construction phase are
detailed below.
4.3.1 IMPACT ON LAND USE
It is an existing plant, now the expansion of the project will be in the existing area of
10742 Sq. m.
No major changes in land use pattern due to the expansion project activities.
4.3.2 IMPACT ON SOIL ENVIRONMENT
The activities of expansion will be confined within the site premises. During
construction works, top soil generated from various activities like excavation etc. will
be stored and preserved to use it during restoration period as far as possible.
The construction activities will result in loss of topsoil and earthen material to some
extent in the plant premises. However, it is proposed to use the soil and earthen
material in greenbelt development.
No solid or hazardous waste will be generated during construction phase of
expansion, thus no impact on soil environment is likely.
4.3.3 IMPACT ON TOPOGRAPHY
There is no additional stress expected due to this expansion activity on topography
as it is an existing unit. Construction of buildings and facilities during construction
phase of expansion, excavated soil will be restored to its original shape. Thus the
impact is insignificant.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – IV Page 159
4.3.4 IMPACT ON AIR ENVIRONMENT
The sources of air emissions during construction phase of expansion will be due to
emissions from vehicles used for transportation of men and materials and emission
from construction equipment. These activities are likely to result in emission of SO2,
NO2, CO2 and Particulate matter. However, the quantity of these will be very
negligible and that too only for a very short period. Hence no adverse impact on air
quality is likely to occur.
4.3.5 IMPACT ON WATER ENVIRONMENT
No surface water body is located in the vicinity of the project site; hence project
related impact on water environment would mainly be limited to the groundwater
resources. The potential impacts during construction phase of expansion are
assessed based on the various activities.
● Improper disposal of construction debris may lead to off-site contamination of
water resources.
● Unaccounted disposal of domestic wastewater from temporary labour camps.
● Spillage of oil and grease from the vehicle maintenance activity and wastewater
stream generated from activities, such as vehicles washing and maintenance.
Site Workshop:
The repair and maintenance of equipment/ vehicles at site would generate waste
containing oil and grease. The wastewater stream would also be generated from
vehicle washing. The impact can be mitigated to a great extent by installing oil and
grease traps during construction phase.
Construction wastes and management:
Construction waste of electrical installation, painting and flooring may create
significant impact. This type of waste would be stock piled and disposed off to
authorized vendor.
The contamination of groundwater might occur due to the irrational disposal of liquid
wastes. The overall impact on water environment during construction phase of
expansion is likely to be short term and insignificant. There seems no impact on the
water environment of the study area.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – IV Page 160
4.3.6 IMPACT ON NOISE LEVELS
Noise will be generated due to traffic for loading and unloading, fabrication and
handling of equipment and materials are likely to cause an increase in the ambient
noise levels. The areas affected are those close to the site. However, the noise will
be temporary and will be restricted mostly to daytime.
4.3.7 IMPACT ON ECOLOGY
The proposed expansion project will not involve removal of any vegetation from the
soil and loosening of the topsoil generally causes soil erosion as it is. However, such
impacts will be confined to the project site and will be minimized through paving and
water sprinkling. However, 33.24 % of greenbelt will be developed in the plant site.
There will no major adverse impacts are envisaged on ecological environment due to
project activities.
4.3.8 IMPACT ON SOCIO-ECONOMIC ENVIRONMENT
Due to proposed expansion, there will be no major negative impact on socio
economic environment. The project will require a workforce of 45 persons during
plant operations after expansion. Thus industrial activity will boost up the commercial
and economical status of the locality to some extent. And, the overall impacts on
socio-economic environment due to the proposed project are positive in nature and
accrue to the community on the long-terms basis.
TABLE 4.1: SUMMARY – IDENTIFICATION OF IMPACTS DURING CONSTRUCTION PHASE OF EXPANSION
S. No
Components Aspect Potential Impacts
1 Topography & Geology
None No significant adverse Impacts
2 Soil Topsoil removal and
erosion. Minor negative impact
3 Landuse & Aesthetics
Land development Positive impact
4 Water Quality
Surface runoff from project site
Oil/ fuel and waste spills
Improper debris disposal
Discharge of sewage
Short term, but no significant negative impact
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – IV Page 161
from labour camp.
5 Ambient Air Quality
Dust emissions from excavation, material handling and other construction activities at site.
Short term minor negative impact inside the site premises. No negative impact outside the site.
6 Noise Noise generated from construction activities, operation of construction equipment and traffic.
Short term minor negative impact near noise generation sources inside premises. No significant impact on ambient noise levels at sensitive receptors.
7 Ecology Flora and Fauna
Habitat disturbance during construction activity.
Short term minor negative impact
8 Socio – economy
Increased job opportunity. Economy related to semiskilled expected to boom.
Short term positive impact by employment generation
9 Traffic Pattern
Haul Truck movement and possibility of traffic congestion outside site on Sector Road
Minor negative impact
10 Solid Waste Waste will be generated from construction activities
Proper disposal plan will be implemented. No adverse impact
4.4. MITIGATIVE MEASURES OF IMPACTS DURING CONSTRUCTION PHASE
DURING EXPANSION
Mitigative measures of identified impacts during construction phase are listed in
tabular form.
TABLE 4.2: MITIGATION MEASURES DURING CONSTRUCTION PHASE OF
EXPANSION
S. No
Components Impacts Mitigative Measures
1 Topography & Geology
No significant adverse Impacts
Minor construction will be carried out within the site premises; therefore no change will occur in land use pattern as well as there will not be any significant Topographical change. However, temporary change in top layer of soil will be occurred but the construction activity will help in fixation of soil thereby reducing the soil erosion
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – IV Page 162
S. No
Components Impacts Mitigative Measures
2
Land/Soil Short term minor negative impact due to change in top layer of soil
The topsoil generated during construction shall be preserved and reused for plantations
Greenbelt development will have significant impact in reduction of the soil erosion
3 Ambient Air Quality
Sort term negative impacts because of dust emission due to earthwork, transportation & construction
The emissions will be temporary and confined within plant site boundary. It is not expected to contribute significantly to the ambient air quality
However, the unit will take following measures for control of dust emissions: Use of plastic cover sheet while
transporting construction material atsite
Storage of sand and other suchdispersible material by covering withtarpaulin sheet
Storage of sand and other suchdispersible material by covering withtarpaulin sheet
Keeping minimum inventory/stock ofsand and other such dispersiblematerial at site
The heights, from which materialswill be dropped, will be the minimumpractical height to limit fugitive dustgeneration.
Use of water sprinkling system atsite for dust suppression
During high wind condition, construction activities will berestricted, so that minimum flow ofdust particle takes place.
Greenbelt development will be started from the construction phase
4 Water Quality
Short term, but no significant negative impact
Water requirement for constructionphase will be very minor and forshort period and that will be fulfilledby MIDC water source Thus, therewill not be any significant impact onwater environment
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – IV Page 163
S. No
Components Impacts Mitigative Measures
The wastewater generation will befrom the domestic activities.Domestic effluent will be disposed ofthrough septic tank into soak pit.
Measures will be implemented toprevent seepage of liquid materialsinto ground where it couldcontaminate groundwater and soil.
Fence will be constructed around thesite to trap sediments whilst allowingthe water to flow through.
All mud & dirt deposited on the roadsfrom the construction activities willbe cleaned.
5 Noise
Short term negative impact due to increase in noise level by earthwork, transportation & construction activities
The noise generated fromconstruction machinery will be keptlow by keeping the moving partsserviced and properly lubricated.
The construction activity will becarried out during day time only.
Vehicular movement carryingmaterials will be avoided during nighttime.
The vehicles will be regularlymaintained and optimum use of thesame will be made.
Adequate PPE’s (ear plugs, earmuffs helmet, mask etc) will beprovided to the workers
Greenbelt development will havesignificant impact in reduction of thenoise
6 Ecology & Biodiversity (Flora and Fauna)
Short term minor negative impact but, long term positive impact due to green belt development
The felling of trees will be kept atminimum.
Adequate Greenbelt will be developed.
7 Socio - economy
Short term positive impact by employment generation
Temporary employment will begenerated due to constructionactivities and related services liketransportation of constructionmaterials, mechanical erections etc.[10 Workers]
8 Traffic Pattern Minor negative impact
Water sprinkling on roads for dustsuppression
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – IV Page 164
S. No
Components Impacts Mitigative Measures
9 Solid Waste No adverse impact
Waste will be generated from construction activities Proper disposal plan will be implemented.
4.5. PREDICTION OF IMPACTS DURING OPERATIONAL PHASE OF
EXPANSION
This phase of the project is important because it generates long-term impacts as the
production starts.
The following activities related to the operational phase will have varying impacts on
the environment and are considered for impact assessment:
Air environment
Water resources and quality
Noise levels
Land use
Soil quality
Solid waste
Terrestrial and aquatic ecology
Demography and socio-economics.
Hydrology & Geology
4.6 AIR ENVIRONMENT
The impacts on air quality from project depend on various factors like design
capacity, configuration, process technology, raw material, fuel to be used, air
pollution control measures, operation and maintenance. Apart from the above, other
activities associated with transportation of fuel, raw materials and finished products,
storage facilities and material handling within the plant premises may also contribute
to air pollution.
4.6.1 Source of Air Pollution
The operational phase activities are expected to have long - term impacts on the air
quality. The main sources from project are detailed below.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – IV Page 165
A. Flue gas Emissions
Boilers and DG set are the two main sources of emissions from the plant. The
industry will use 0.6 TPH Furnace Oil fired boiler and proposed to install 0.6 TPH
Furnace Oil fired boiler. A 200 KVA DG Set will be kept as standby power during
power failures.
PM, SO2 and NOx are the main air pollutants generated from the boilers and DG set.
The emissions from the boiler stacks and DG Set Stack are given in Table 4.3, 4.4 &
4.5.
TABLE 4.3: STACK EMISSION DETAILS OF BOILERS
Particulars Units 0.6 TPH Boiler (Existing)
0.6 TPH Boiler (Proposed)
Type of Fuel -- Furnace Oil Furnace Oil Fuel Consumption Kg/ Day 1000 1000 Ash Content % 0.1 0.1 Sulphur Content % 4.5 4.5 Nitrogen Content % 0.15 0.15 No. of Stacks No 1 1 Height of the stack m 21 21 Diameter of the stack M 0.25 0.25 Flue Gas Temperature oC 200 200 Flue Gas Velocity m/s 16 16 Emission Rate Details Particular Matter as PM gm/sec 0.0093 0.0093 Sulphur dioxide as SO2 gm/sec 0.833 0.833
Oxide of Nitrogen as NO2 gm/sec 0.046 0.046
TABLE 4.4: STACK EMISSION DETAILS FOR EXISTING THERMIC FLUID HEATER
Particulars Units Thermic Fluid Heater Thermo Fluid Heater Capacity Kcal/hr. 1,00,000 Type of Fuel -- LDO Fuel Consumption per Day Kg/ Day 288 Diameter m 0.3 Stack Temperature oC 120 Stack Height m 18 Emission of PM mg/Nm3 70 Emission of SO2 mg/Nm3 35 Emission of NOx mg/Nm3 50
TABLE 4.5: STACK EMISSION DETAILS OF EXISTING DG SET
Capacity in KVA
Emission of PM in mg/Nm3
Emission of SO2 in mg/Nm3
Emission of NOx
in mg/Nm3
Stack dia. in m
Flue Gas Temp. in
OC
Stack Height in m
Flue gas Velocity in m/sec.
200 KVA 50 70 75 0.2 160 9.0 15
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – IV Page 166
B. Process Emissions
The Predicted Process emissions are
CO2 [Carbon dioxide] – Pollutant
HCl [Hydrochloric acid] - Pollutant
NH3 [Ammonia] – Pollutant
H2 [Hydrogen] - Non Pollutant
SO2 [Sulphur dioxide] – Pollutant
O2 [Oxygen] - Non Pollutant
HBr [Hydrogen Bromide] - Pollutant
The above mentioned emissions will liberate from the manufacturing process of
proposed products. The process emissions are based on reactants quantity and
chemical reactions between them in relation with desired product output.
C. Fugitive emission
The main sources of fugitive emissions from project are
Storage & Handling of raw materials
Storage & Handling of Solvents.
During reaction period
During Product filtrations & Finished operations
The raw materials will be stored in PP bags, Fibre drums and HDPE drums in
elevated flat from under the roof. Bulk quantities will be stored in storage tanks with
vent condensers to avoid the fugitive emissions. Solvents are handled in closed loop
system thereby reducing the losses in the form of evaporation.
4.6.2 Prediction of Impacts on Air Environment
The objective of dispersion modeling is to predict the ground level concentration
during the operation of plant and its impact on ambient air quality of the area.
Air quality assessment is done by integrating the measurement techniques and
modeling tools. The air modeling tools are routinely used in the environmental impact
assessments, risk analysis, emergency planning, and source apportionment studies.
Recent strategies for air pollution control in industries have largely neglected the
emission reduction measures which are the prime polluting sources. To accomplish
this, various air dispersion models have been developed and used worldwide so far
for different applications under different scenarios. The Gaussian plume model is a
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – IV Page 167
standard approach for studying the transport of pollutants due to turbulent diffusion
and advection by the wind. Applications of such models have been made mandatory.
In this study, the AERMOD (the American Meteorological Society/Environmental
Protection Agency Regulatory Model Improvement Committee’s Dispersion Model,
Gaussian dispersion model is selected to predict the ground level concentrations
(GLC’s) of Particulate Matter (PM) µg/m3, Sulphur dioxide (SO2) µg/m3 and Nitrogen
dioxide (NO2) µg/m3 from point source emissions will be investigated in the study
area.
Methodology
Prediction of GLC values are made by using AERMOD software approved by U.S.
Environmental Protection Agency (USEPA) and has adopted it as its regulatory
model since 2005. In point source emissions, the stacks are subjected to plume rise
which again is dependent on force of buoyancy and momentum. The higher is the
plume rise or stack, the lesser will be ground level concentrations (GLC’s).The
emissions when released into the atmosphere are subjected to transportation,
dispersion, transformation, and fall out and wash out and finally reach the ground
level at a particular distance and concentrations. The relationship between the
source of emissions and its magnitude with the ground level concentrations (GLC’s)
at receptor points is governed by air dispersion models which take into the account
by the source strength, plume rise, atmospheric stability, mixing height, wind
velocity, terrain and other meteorological conditions. The comparison between the
predicted and field sampled downwind concentrations for PM10, PM2.5, SO2 & NO2
(µg/m3) will be carried out in this study to predict the average downwind ground level
concentrations (GLC’s)
Data Used for Computation
Stack emissions data have been used for prediction of short-term incremental GLC
values of PM10, PM2.5, SO2 & NO2 using the meteorological data collected at site
during the March to May – 2018. Details of the data used for computations are given
below:
Source Characteristics/Release Characteristics
The details of estimated stack emissions load are given in Table 4.3.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – IV Page 168
Meteorological Data
The meteorological data recorded continuously during the month of March to May -
2018, on hourly basis. AERMOD model requires hourly surface data values for wind
speed, wind direction, temperature, relative humidity and cloud cover. Both data files
for the surface and profile files were then used to generate the meteorological file
required by the AERMOD dispersion model using the AERMET meteorological pre-
processor. This AERMET has three stages to process the data. The first stage
extracts meteorological data and assesses data quality through a series of quality
assessment checks. The second stage merges all data available for 24-hour periods
and writes these data together in a single intermediate file. The third and final stage
reads the merged meteorological data and estimates the necessary boundary layer
parameters for dispersion calculations by AERMOD.
Dispersion Modeling Results
The 24 hourly average ground level concentration (GLC) values from plant have
been computed for PM10, PM2.5, SO2 & NO2 considering topographical features
around the plant and applicable stability classes. The maximum 24 hourly average
GLC values for PM10, PM2.5, SO2 & NO2 from plant are given in Table 4.6 & Table
4.7. Corresponding isopleths plotted are shown in Figure 4.1 to Figure 4.4 for PM10,
PM2.5, SO2 & NO2.
TABLE 4.6: PREDICTED 24-HOURLY SHORT TERM INCREMENTAL CONCENTRATIONS
Season Maximum Incremental GLCs (μg/m3) Distance
(km) Direction PM10 PM2.5 SO2 NO2
March to May, 2018
0.021 0.012 1.62 0.235 1.0 ESE & E
TABLE 4.7: RESULTANT CONCENTRATIONS DUE TO INCREMENTAL GLCs
Latitude & Longitude Latitude: 17º 36’ 26” N Longitude: 73º 29’ 28” E
Climatic Conditions
Annual Max Temp is 37.3 0C Annual Min Temp is 15.1 0C Normal Annual Rainfall is 3118.1 mm (Source: IMD Climatalogical Normals (Ratnagiri), 1981 - 2010)
Land acquired for the plant 10742 Sq.m Nature of Land MIDC Lote Parshuram Nearest Habitation Kharatwadi Village – 0.42 km (ENE) Nearest Town Khed – 18 km (N)
National Highway National Highway No. 66 – 0.65 km (WSW) (Mumbai – Goa Road)
Railway station Chiplun Railway Station – 7 km (SE) Airport Ratnagiri Airport – 67 km (SSW) Water Bodies within 10 km radius Vashishti River – 4.15 km (SW) Reserve Forest within 10 km radius None
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - V Page 185
The proposed project site is identified based on the following considerations:
The existing land of proposed expansion Project is 10742 Sq. m, topographically
the area is generally plain, with gentle slope.
The area is not covered by any notified forests.
Proximity of National Highways and railways stations, for transport of raw
materials and manufactured products.
Availability of infrastructure facilities.
Well connected road networks.
The location of the site have distinct advantages such as accessibility to Road, Rail,
Electricity, MIDC water supply and other facilities which are adequate for the proposed
expansion project and hence, no alternate sites were considered.
5.2. SELECTION OF PROCESS TECHNOLOGY
Proposed to manufacture different types of Pesticides.
All the products will be manufactured on a batch basis.
The products are categorized on similarity in process.
Pesticides substances typically consist of structurally complex compounds which
are manufactured via a series of intermediate steps and reactions under precise
process conditions.
The Pesticides are manufactured by:
Chemical synthesis;
Isolation / recovery from natural sources; and /or
Combination of above.
In the proposed expansion project, resource availability may limit the range of
alternatives in a particular context. Herbicides/Fungicides/PGRs will be manufactured
using proven technology; hence no alternative technology has been analyzed thus, no
new or untested technology will be used.
ENVIRONMENTAL MONITORING PROGRAM
CHAPTER -VI
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – VI Page 186
CHAPTER – VI
ENVIRONMENTAL MONITORING PROGRAM
6.1 INTRODUCTION
Regular monitoring of environmental parameters is of immense importance to assess
the status of environment during plant in operation. With the knowledge of baseline
conditions, the monitoring programme will serve as an indicator for any deterioration in
environmental quality due to operation of the expansion project, to enable taking up
suitable mitigative steps in time to safeguard the environment. Monitoring is as
important as that of control of pollution since efficiency of control measures can only be
determined by monitoring.
The baseline study is carried out for post monsoon season. Hence, post project
monitoring programme of the environmental parameters is essential to take into account
the changes in the environmental quality to ascertain the following:
State of Pollution within the plant site and in its vicinity.
Generate data for predictive or corrective purpose in respect of pollution.
Examine the efficiency of air pollution control system adopted at the site.
To assess environmental impacts.
Monitoring will be carried out at the site as per the norms of CPCB.
Environmental Monitoring Programme will be conducted for various environmental
components as per conditions stipulated in Environmental Clearance Letter issued by
MoEF&CC & Consent to Operate issued by SPCB. Six monthly compliance reports will
be submitted on regular basis, to MoEF&CC, Regional Office, Mumbai on 1st of June &
1st of December. Quarterly compliance Report for conditions stipulated in Consent to
Operate will be submitted to SPCB on regular basis.
6.2 ENVIRONMENTAL MANAGEMENT SYSTEM
In order to maintain the environmental quality within the standards, regular monitoring of
various environmental components is necessary. The company will establish full-
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – VI Page 187
fledged environmental management cell (EMC) reporting directly to Plant Manager for
environmental monitoring and control. The EMC team will takes care of pollution
monitoring aspects and implementation of control measures.
A group of qualified and efficient engineers with technicians is deputed for maintenance,
up keeping and monitoring the pollution control equipment, to keep them in working at
the best of their efficiencies. For effective and consistent functioning of the plant, the
EMS at the site will be strengthened further with the following:
Environmental management cell covering EHS (Environment, Health & Safety)
team
Environmental Monitoring
Personnel Training
Regular Environmental Audits and Corrective Action Plan
Documentation – Standard operating procedures, Environmental Management
It is necessary to have a permanent organizational set up charged with the task of
ensuring its effective implementation of mitigation measures and to conduct
environmental monitoring. The major duties and responsibilities of Environmental
Management Cell will be as under:
To implement the Environmental Management Plan (EMP)
To ensure regulatory compliance with all relevant rules and regulations
To ensure regular operation and maintenance of pollution control devices
To minimize environmental impacts of operations by strict adherence to the EMP
To initiate environmental monitoring as per approved schedule
Review and interpretation of monitored results and corrective measures with
reference to prescribed standards
Maintain documentation of good environmental practices and applicable
environmental laws for ready reference.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – VI Page 188
Maintain environment related records.
Coordination with regulatory agencies, external consultants, monitoring
laboratories.
Organising meetings of the Environmental Management Committee and
reporting to the committee.
To improve the capacity building of the Environment Department, as a part of the
management, a separate division will be created under the leadership of Plant Manager,
who is assisted by EHS - Manager will be working for day to day operation of
environmental management systems with documentation, procedures & Compliances.
All executives/Supervisors and workmen/Helpers will be responsible for the operations.
The Organizational Structure of Environmental Health and Safety is presented in Fig.
6.1.
Any non-compliances/violations of serious nature will be addressed by the Plant general
manager in consultation with the directly involved officials and will report to the Board of
Directors of the company. The primary focus is to comply with the regulations and work
out on action taken report to be placed before the Board of Directors. Similarly a
preventive action for non-recurrence of such violations/non-compliances will also be
worked out and strict monitoring will be done by the Management for implementation of
the same
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – VI Page 189
FIGURE 6.1: ORGANISATIONAL STRUCTURE OF ENVIRONMENT HEALTH & SAFETY
6.4 ENVIRONMENTAL MONITORING AND REPORTING PROCEDURE
Monitoring may take the form of direct measurement and recording of quantitative
information, such as concentrations of discharges, emissions and wastes, for
measurement against corporate or statutory standards, consent limits or targets. It may
also require measurement of ambient environmental quality in the vicinity of a site using
ecological/biological, physical and chemical indicators. Monitoring may include
socioeconomic interaction, through local liaison activities or even assessment of
complaints. Monitoring will also be required to meet compliance with statutory and
corporate requirements. Finally, monitoring results will provide the basis for auditing.
6.4.1. OBJECTIVES OF MONITORING
The objectives of environmental post-project monitoring are to
Verify effectiveness of planning decisions
Measure effectiveness of operational procedures
Confirm statutory and corporate compliance and
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – VI Page 190
Identify unexpected changes.
6.4.2. MONITORING SCHEDULE FOR CONSTRUCTION AND OPERATION PHASES
Environmental monitoring schedules of Godrej Agrovet Limited (GAVL) are prepared
covering various phases of project advancement, such as construction and operation
phases.
Construction Phase
The proposed project envisages setting up of buildings and machinery, establishment of
production and storage facilities. The construction activities are expected to last for
about one year. As there are no major construction activities for the plant, simple and
generic environmental monitoring measures that need to be undertaken during project
construction stage.
Operation Phase
During operation stage of the project, air emissions from process areas, Boilers and DG
set. Full-fledged Effluent treatment plant with ZLD Scheme operates for water recovery
and reuse, hazardous and nonhazardous waste generation is envisaged. The following
attributes which meet regular monitoring based on the environmental setting and nature
of project activities are listed below:
Source emissions and ambient air quality.
Work zone monitoring for VOCs/ solvents in air.
Groundwater levels and ground water quality in bore wells.
Raw and ETP effluent quality.
Hazardous and solid waste characterization (process hazardous waste, ash,
ETP sludge, used and waste oils).
Soil quality.
Noise levels (equipment and machinery noise levels, occupational exposures
and ambient noise levels) and
Ecological preservation and afforestation.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – VI Page 191
Monitoring Schedule: Details of the Post Project Environmental Monitoring schedule,
which will be undertaken for various environmental components, are detailed below:
TABLE 6.1: POST PROJECT ENVIRONMENTAL MONITORING SCHEDULE DETAILS
Sl. No. Description Frequency of Monitoring 1 Ambient Air Quality at Plant site Once in a month 2 Water Quality Monthly Basis 3 Noise Level Monitoring Monthly Basis 4 Soil Quality Once in six months
Methodology Adopted: Post project monitoring will be carried out as per conditions
stipulated in Environmental Clearance Letter issued by MoEF&CC, Consent order
issued by concerned State PCB as well as according to CPCB guidelines. The plant site
is considered as core zone and the area lying within 10 km radius from the plant site is
considered to be the buffer zone. In the Buffer zone slight impact may be observed and
that too is occasional.
TABLE 6.2: ENVIRONMENTAL MONITORING PLAN DURING OPERATION PHASE
S. No Potential Impact Action to be Followed
Parameters for Monitoring
Frequency of Monitoring
1 Air Emissions
Stack emissions from process stacks to be optimized and monitored
Process emissions (HCl, SO2, NH3, as applicable)
Monthly with recommended methods of CPCB
Stack emissions from Boilers, DG sets to be monitored
Emissions (PM, SO2, HC, NOx)
Monthly with recommended methods of CPCB
Ambient air quality within the plant premises of the proposed expansion unit and nearby habitations to be monitored. Exhaust from vehicles to be minimized by use of fuel efficient vehicles and well
Ambient air quality will conform to the standards for NAAQ parameters (MoEF circular dated 16-11- 2009) and HCl, Cl2 and HC Vehicle logs to be maintained
Online continuous AAQ one station and Monthly in Industry and nearby habitants with recommended methods of CPCB.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – VI Page 192
S. No Potential Impact Action to be Followed
Parameters for Monitoring
Frequency of Monitoring
maintained vehicles having PUC certificate. Vehicle trips to be minimized to the extent possible
Vehicle logs Daily records
2 Noise Levels
Noise generated from operation of boiler/cooling towers to be optimized and monitored (3 locations within plant and 2 locations outside plant) Noise generated from operation of DG sets to be optimized and monitored
ETP performance will be monitored for raw and treated effluent characteristics for reuse of treated effluent. Basic parameters like pH, TSS, TDS, COD, Oil & grease
Daily with internal lab and monthly from authorized lab
In-house ETP treated Effluents reuse in Cooling Towers
pH, TDS, COD and Temperature etc.
Daily monitoring at In- house Laboratory for treated effluent
4 Drainage and
effluent Management
Ensure drainage system and specific design measures are
Visual inspection of drainage and records thereof
Daily
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – VI Page 193
S. No Potential Impact Action to be Followed
Parameters for Monitoring
Frequency of Monitoring
working effectively.
5 Water Quality
Surface and Groundwater quality surrounding plant site
Comprehensive monitoring as per BIS 10500-2012.
Quarterly
6 Work zone air quality
Contaminants such as VOCs to be reduced by providing adequate ventilation
Indoor monitoring of VOCs.
On Daily Basis
7 Hazardous / Solid Waste Management
Implement waste management plan that identifies and characterizes every waste arising associated with proposed activities and which identifies the procedures for collection, handling & disposal of each waste arising.
Records of solid waste generation, storage and disposal
Regular Basis during operation phase
8 Soil quality
3 locations within plant site, solid waste storage area, near production block and ETP area
Physico-chemical parameters and Heavy metals.
On regular basis (Once in six Months)
9 Occupational Health
Employees and migrant labour health check -up
All relevant parameters including HIV
Once in a Year
Comprehensive Pre-employment medical check up for all employees.
Medical examination will be done for all the employees once in a year.
Tie up with local hospitals and Govt. health monitoring system will be engaged during emergency.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – VI Page 194
S. No Potential Impact Action to be Followed
Parameters for Monitoring
Frequency of Monitoring
Dispensary and ESI facility will be provided to all workers as applicable.
All safety gears will be provided to workers and care will be taken by Environmental Management Cell (EMC) that these are used properly by them. All safety norms will be followed.
6.5 LOCATION OF MONITORING STATIONS
Location of the monitoring stations will be selected on the basis of prevailing micro –
meteorological conditions of the area like; Wind direction & wind speed, Relative
Humidity, Temperature. Post project air quality monitoring will be carried out at plant site
and 2 locations (one each in upwind and downwind direction) to asses ambient air
quality of the area. Major surface water body lies within 10 km area of plant site and
ground water quality monitoring will be carried out. Regular monitoring of noise will be
done to control noise levels at plant site. Soil quality will be tested of the plant site area
regularly to keep check on any leakage in storing hazardous waste. Locations for the
post project monitoring will be as under:
TABLE 6.3: DETAILS OF POST PROJECT MONITORING LOCATIONS
S. No. Description Location of Monitoring
1 Ambient Air Quality Plant site, Villages in upwind & downwind direction (with Max. Ground level concentration) from the plant site
2 Noise Level Monitoring Plant Boundary, High Noise generating areas within the plant boundary
3 Water Quality From Nearby Surface water Source and Ground Water Source
4 Soil Quality At plant Site and Nearby area 6.6 MONITORING AND DATA ANALYSIS
6.6.1. AIR QUALITY MONITORING AND DATA ANALYSIS
Stack Monitoring: The emissions from all the stacks will be monitored for exit gas
temperature, velocity and pollutant concentrations. Any deviation from the design
criteria will be thoroughly examined and appropriate correction will be initiated. Air
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – VI Page 195
blowers will be checked for any drop in exit gas velocity. The monitoring will be done by
authorised laboratory and test result will be submitted to the SPCB.
Work Zone Monitoring: The concentration of air borne pollutants in the
workspace/work zone environment will be monitored periodically. If concentrations
higher than threshold limits are observed, the source of fugitive emissions will be
identified and necessary measures taken. In addition, industry will continue to monitor
the VOC in all process & storage areas on regular basis. In case, the levels are high,
suitable measures as detailed in EMP will be implemented.
Ambient Air Quality Monitoring: The concentrations of PM10, PM2.5, SO2, NOX, NH3,
CO and HC in the ambient air will be monitored at regular intervals. In case of any
excess concentration in the ambient air quality due to the proposed production
enhancement, proponent will take necessary action and follow the air pollution control
measures. Greenbelt will further be developed for minimising dust propagation. The
ambient air quality data will be transferred and processed in a centralised computer
facility equipped with required software. Trend and statistical analysis will be carried out
as per the CPCB guidelines.
6.6.2. WATER AND WASTEWATER QUALITY MONITORING AND DATA ANALYSIS
To ensure a strict control over the water consumption, flow meters will be installed for
existing and proposed facilities for all major inlets in expansion. All leakages will be
identified and rectified. In addition, periodic water audits will be conducted to explore
possibility of water conservation.
Industry will analyse the basic parameters and the procedures prescribed in "Standard
Methods for Examination of Water and Wastewater" prepared and published jointly by
American Public Health Association (APHA), American Water Works Association
(AWWA) will be followed for all the parameters of monitoring. As per the CPCB
guidelines, industry will be installed the online sensors in the treated effluent for pH,
Conductivity and DO with night vision cameras.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – VI Page 196
Surface and Groundwater Monitoring: The monitoring of Surface and groundwater is
the most important tool to know the variations from the baseline study. This is
indispensable as it provides detection of the presence of waste constituents in ground
water in case of leachate migration. In this project, chances are very less for leachate
as the total effluent is segregated and is sent to ETP – ZLD and the treated effluent will
be reused in cooling tower. The water samples from the nearby surface water bodies
and bore wells will be analysed for relevant parameters as per monitoring program.
Records of analysis will be documented.
Monitoring of Waste water Streams: All the segregated wastewater streams will be
regularly measured for physic - chemical, nutrient and demand parameters. The
monitoring will be carried out from stream wise raw wastewater, raw and treated effluent
characteristics of ETPs before recycling to utilities. These data will be documented and
compared against the design performance values of ETPs for necessary corrective
action.
The ETP will be operated and maintained by existing & additional skilled and dedicated
personnel. Daily log sheets for no. of hours of the ETP operation, chemicals, electrical
and steam consumption; effluent monitored parameters with their results, etc. will
continue to be maintained.
6.6.3. NOISE LEVELS
Noise levels in the work zone environment such as boiler house, cooling tower area,
and DG house will be monitored. The frequency will be once in a month in the work
zone. Audiometric tests will be conducted periodically for the employees working close
to the high noise sources.
6.6.4. SOIL QUALITY
Soil quality will be tested for the parameters given in schedule for every six months.
6.7 REPORTING SCHEDULES OF THE MONITORING DATA
It is proposed that voluntary reporting of environmental performance with reference to
the EMP will be undertaken. The environmental monitoring department will co-ordinate
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – VI Page 197
all monitoring programmes at site and data thus generated will be regularly furnished to
the State regulatory agency. The frequency of reporting will be on monthly basis to the
local state PCB officials and six monthly reports to Regional Office of MoEF&CC. The
Environmental Audit reports will be prepared for the entire year of operations and will be
regularly submitted to regulatory authorities in Form V Environmental Statement.
6.8 ENVIRONMENTAL LABORATORY
Environmental laboratory will be well-equipped analytical instruments and consumable
items for monitoring of environmental parameters at the site. Alternatively, monitoring
will be continued to be outsourced to a recognized/approved laboratory. The equipment
and consumable items will be made available at the site for environmental monitoring.
The sampling is done as per the standard procedures laid down by IS: 2488. The
equipment’s will be in the Environmental Laboratory are Heating Mantle, Digital
conductivity meter, Digital pH Meter, COD Digestion Apparatus, BOD Incubator, Hot air
oven, Muffle Furnace, Thermometer, Microprocessor based conductivity meter,
Microprocessor based pH Stat Analyzer, Electronic Balance, HOT Plate, Mechanical
Balance, Hand Held DO meter, Hand Held Turbidity meter, Magnetic Stirrer and
consumables, chemicals and Glassware.
6.8.1. AIR QUALITY AND METEOROLOGY
Proposed: Manual AAQ monitoring stations – 3 Nos., on monthly basis third party
monitoring will be done by NABL / MoEF & CC authorised laboratory and the test report
will be verified for any deviation in air quality standards for corrective action and the test
reports will be submitted to the respective SPCB.
6.9 OCCUPATIONAL SAFETY AND HEALTH ASPECTS
All the preventive and corrective actions of environmental impacts to protect the health
of all the employees from any possible occupational health problems, the periodical
medical and health checkups of all the employees will be done to assess the any
occupational health problems.
ADDITIONAL STUDIES
CHAPTER -VII
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 198
CHAPTER – VII
ADDITIONAL STUDIES
[Risk Assessment & Disaster Management] M/s. Godrej Agrovet Limited will execute the proposed project expansion activity at their
existing premises located at Plot Nos.: E-24, E-24 (Part) and E-23/1, MIDC Lote Parshuram,
Taluka: Khed, District: Ratnagiri, Maharashtra, India. Now, since the unit has been located in
Notified MIDC area, as per the OM No. J-11011/321/2016-IA-II(I) dated 27th April 2018 public
hearing is exempted for the industries which are located in industrial estate or parks notified
prior to 14.09.2006 i.e. the EIA Notification 2006 coming into force.
RISK ASSESSMENT
The risk assessment process is intended to identify existing and probable hazards in all
operations and work environment, to quantify the hazards and to access the risk levels of
those hazards in order to prioritize those that need an immediate attention.
7.1.1 SCOPE OF THIS STUDY
The QRA (Quantitative Risk Assessment) study has been conducted considering the Terms of
References (TORs) given for Environment Clearance (EC) by SEAC Committee, GoI, New
Delhi.
The study has been carried out with a view to comply TOR points with respect to Risk
assessment
7.1.2 Methodology
The following parameters are considered to prepare Quantitative Risk Assessment.
Discussions were held with Plant officials on proposed individual safety systems of plant
operations.
Hazard Identification exercise in coordination with plant officials was conducted taking into
consideration the proposed storage of Hazardous Chemicals/ Solvents, operating parameters
and proposed safety systems.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 199
Containment failure scenarios related to flammable chemicals & hazardous chemicals have
been considered for Risk Assessment and consequences in detail. Thus, this study is mainly
oriented towards acute risks rather than chronic risks.
Discussions were held with Plant officials on various Hazards in connection with the plant
operations & their Risks and proposed individual safety systems for plant operations.
Hazard Identification
The project description, and other project related data provided by the client have been
comprehensively reviewed to identify the hazardous operations. Also the information on the
hazardous properties (MSDS) of all the chemicals handled at the site has been reviewed to
identify the hazards associated with the same. Storage of some of the raw material at the site
can lead to uncontrolled release of hazardous material causing hazard. On the basis of this,
the important hazards that can lead to accident in the proposed expansion project are
tabulated below.
TABLE 7.1: TYPE OF HAZARDOUS EVENTS
Type of event Description Explosion A release of large amount of energy that form a blast wave
Pool Fire
Pool fire is a turbulent diffusion fire burning above a horizontal pool of
vaporizing hydrocarbon fuel, where the fuel has zero or low initial
momentum
Spill Release
Loss of containment‘. Release of flammable liquid to the surroundings
from unit‘s own Storage containers causing (potential) pollution or risk
of explosion or formation of Toxic vapor cloud
Flammable area
Vapor Cloud
Explosion
Explosion resulting from vapor clouds formed from flashing liquids
Hazard and Damage Assessment
Toxic and flammable substances released from sources of storage as a result of failures or
catastrophes, can cause losses in the surrounding area in the form of:
Toxic gas dispersion, resulting in toxic levels in ambient air,
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 200
Puddle /pool Fires resulting in a heat wave (radiation), or
Explosions (Vapor Cloud Explosions) resulting in blast waves (overpressure).
Consequences of Fire/Heat Wave
The effect of thermal radiation on people is mainly a function of intensity of radiation and
exposure time. The effect is expressed in term of the probability of death and different degree
of burn. The consequence effects studied to assess the impact of the events on the receptors
are given in the table below.
TABLE 7.2: THERMAL RADIATION INTENSITY AND EXPOSURE TIME-DAMAGE CRITERIA FOR PEOPLE
Thermal Radiation Intensity (KW/m2) Type of Damage
1.6 No harm for long exposures. 4 to 5 Pain for 20 seconds exposure; first degree burn 9.5 Second degree burn after 20 Seconds
10 to 15 Potentially lethal with in 1 minute. 25 Significant injury in 10 seconds; 100 % lethality in 1 minute.
35 to 37.5 1 % lethality in 10 seconds. Consequences of Overpressure
The effects of the shock wave vary depending on the characteristics of the material, the
quantity involved and the degree of confinement of the vapor cloud. The pressure of the shock
wave decreases rapidly with the increase in distance from the source of the explosion. The
overpressure damage is discussed in table below.
TABLE 7.3: DAMAGE DUE TO OVERPRESSURES
PEAK OVERPRESSURE DAMAGE TYPE
0.83 bar Total destruction
0.30 bar Heavy damage
0.10 bar Moderate damage
0.03 bar Significant damage
0.01 bar Minor damage
The effect of exposure to toxic substance depends upon the duration of exposure and the
concentration of the toxic substance. Short-term exposures to high concentration give Acute
Effects while long term exposures to low concentrations result in Chronic Effects.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 201
Only acute effects are considered under hazard analysis, since they are likely credible
Hydrogen peroxide which may leads to Air pollution, Water pollution and Soil pollution
The exposure to hazards depends upon the concentration of hazard, Frequency and duration.
The exposure to hazard could be controlled by reducing either the concentration of hazard,
frequency or duration.
After a critical analysis of the chemicals propose to use, stored and for products to
manufacture a defined safe operating procedures will be in place with safety and mitigation
measures to overcome the hazards.
The exposure to the hazard could be controlled by implementing the following:
Engineering controls at the source
Environmental controls that remove the hazard from the environment
Inspection of solvents transfers pipelines conveying lines once in a month.
Earthing to all storage tanks and providing jumpers to transfer pipelines to have continuity of
earthing.
All the process reactors will have temperature control and pressure control system for process
as well as suitable Rupture disc followed by a safety valve to avoid explosion due to excess
pressure.
Details of Process emissions and treatment (Neutralization) methods:
During production of Pyrithiobac sodium, Ammonia and Sulfur dioxide gases will be
released. 6.29 kgs of Ammonia gas and 20.99 Kgs of Sulfur dioxide gas will be released as
process emissions.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 205
The released process emission Ammonia gas from reactor will be sent to double stage
scrubber to scrub ammonia gas with chilled water to convert into 30% Ammonium hydroxide
solution.
The scrubber will be fitted with Ammonia gas detector to monitor any un scrubbed gases
escaping from scrubber. At any point of time the Ammonia presence in the vent gases will not
be more than 25 ppm.
The released process emission Sulfur dioxide gas from reactor will be sent to double stage
scrubber to scrub the gas with 10% sodium hydroxide solution to convert into Sodium sulfite
salt. The scrubber will be fitted with online PH meter to check continuously the PH of Scrubbing
solution. When solution pH reaches to 8 the scrubbing solution will be changed.
The scrubber will be fitted with Sulfur dioxide gas detector to monitor any un scrubbed gases
escaping from the scrubber. At any point of time the Sulfur dioxide presence in the vent gases
will not be more than 5 ppm
During production of Homobrassinolide, HCl and Sulfur dioxide gases will be released.
2.66 kgs of HCl gas and 4.46 kgs of Sulfur dioxide gas will be released as process emissions.
The released process emission HCl gas from reactor will be sent to double stage scrubber to
scrub HCl gas with chilled water to convert into 10% Hydrochloric acid.
The scrubber will be fitted with HCl gas detector to monitor the any un-scrubbed gases
escaping from scrubber. At any point of time the HCl gas presence in the vent gases will not
be more than 35 mg/m3
The released process emission Sulfur dioxide gas from reactor will be sent to double stage
scrubber to scrub the gas with 10% sodium hydroxide solution to convert into Sodium sulfite
salt. The scrubber will be fitted with online PH meter to check continuously the pH of Scrubbing
solution. When solution pH reaches to 8.0 the scrubbing solution will be changed.
The scrubber will be fitted with Sulfur dioxide gas detector to monitor any un-scrubbed gases
escaping from the scrubber. At any point of time the Sulfur dioxide presence in the vent gases
will not be more than 5 ppm.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 206
During production of Metribuzin Technical, HBr gas and HCl gases will be released.
71.37 kgs of HBr gas and 94.63 kgs of HCl gas will be released as process emissions.
The released process emission HBr gas from reactor will be sent to double stage scrubber to
scrub the gas with 10% sodium hydroxide solution to convert into Sodium bromide salt.
The scrubber will be fitted with HBr gas detector to monitor the any un-scrubbed gases
escaping from scrubber. At any point of time the HBr gas presence in the vent gases will not
be more than 5 mg/m3
The released process emission HCl gas from reactor will be sent to double stage scrubber to
scrub HCl gas with chilled water to convert into 10% Hydrochloric acid.
The scrubber will be fitted with HCl gas detector to monitor the any un-scrubbed gases
escaping from scrubber. At any point of time the HCl gas presence in the vent gases will not
be more than 35 mg/m3
During production of Quizalofop-p-ethyl, HCl gas will be released.
18.78 kgs of HCl gas will be released as process emission.
The released process emission HCl gas from reactor will be sent to double stage scrubber to
scrub HCl gas with chilled water to convert into 10% Hydrochloric acid.
During production of Trifloxystrobin Technical, HCl gas will be released.
44.25 kgs of HCl gas will be released as process emission.
The released process emission HCl gas from reactor will be sent to double stage scrubber to
scrub HCl gas with chilled water to convert into 10% Hydrochloric acid.
The scrubber will be fitted with HCl gas detector to monitor the any un-scrubbed gases
escaping from scrubber. At any point of time the HCl gas presence in the vent gases will not
be more than 35 mg/m3
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 207
TABLE 7.4: AREA WISE IDENTIFIED HAZARDS, PRECAUTIONS PROPOSED WITH MITIGATION MEASURES
S. No. AREA IDENTIFIED
HAZARD
SEVERITY & NO. OF PERSONS EXPOSED
PRECAUTIONS PROPOSED MITIGATION MEASURES
1]
Raw Material Storage area
Spillage of chemicals
Low to medium & 4 persons
1. Approved layout as per legal requirements.
2. Flame proof electrical fittings will be installed
3. Chemicals will be stored in safe Containers with secondary containment to prevent spillages.
4. Storage quantity is limited 5. Storage area will be well
ventilated by a forced air ventilation system.
6. Material will be accessed only by authorized personnel using mechanized systems
7. Double door entry to ensure a clean atmosphere.
8. Showers will be provided for decontamination.
9. Personnel will be provided with full body protection suits and nose masks to prevent exposure to chemicals.
10. Fire hydrant system with hydrant points with hose reels and nozzles will be installed to mitigate fire hazards
1. Area will be cordoned off. 2. Information will be passed to
Emergency control center is informed.
3. Information will be given to the declarer of emergency on the scale of Leakage.
4. Emergency Response teams will be kept on alert for swift response.
5. All hot works being carried out in the surrounding areas will be stopped
6. Personnel working in the area will be evacuated.
7. Spilled powders will be collected using vacuum cleaners.
8. The spillage will be cleared and the area is made fit work
9. In case of liquid chemical spillage, the container will be shifted from ware house to the outside for arresting the leakage and transferring the contents to another vessel depends on situation.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 208
S. No. AREA IDENTIFIED
HAZARD
SEVERITY & NO. OF PERSONS EXPOSED
PRECAUTIONS PROPOSED MITIGATION MEASURES
11. Fire extinguishers will be deployed adequately
12. Periodical occupational health checks will be done to personnel working in the area to Access health effects, if any.
13. Liquid chemicals such as HCl, Ethyl acetate, THF, Acetic acid, and Thionyl chloride, Hydrogen peroxide, sulfuric acid will be stored in dedicated area.
Solid chemicals such as, Sodium hydroxide, Potassium hydroxide, potassium carbonate will be stored in dedicated area. Solid and liquid chemicals will not be stored in the same area.
The area where leakage is occurred will be neutralized if necessary and cleaned. The warehouse will have good ventilation so as to minimize the concentration of respective chemical in the working area.
2]
Solvents drums Storage area
Fire, Flammable area of vapor cloud
Medium to High & 2 persons
1. Storage facility will be provided in isolated area to have natural ventilation
2. Flameproof electrical fittings are provided in storage area to prevent any fire hazard.
3. No electrical gadgets or items capable of generating static electric charges will be permitted in the area.
1. Area will be cordoned off. 2. No Hot work will be carried out in
the vicinity to prevent accidental spread of fire.
3. Personnel working in the area will be evacuated
4. Emergency control center will be informed
5. Information will be given to the declarer of emergency on the
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 209
S. No. AREA IDENTIFIED
HAZARD
SEVERITY & NO. OF PERSONS EXPOSED
PRECAUTIONS PROPOSED MITIGATION MEASURES
4. Personnel will be trained about Do‘s & Don‘ts during emergency.
5. No heat sources will be permitted near the Facility.
6. Hot work will be controlled through a work permit system
7. Adequate size collection pit will be provided for containment in case of leakage of solvent.
8. The solvents will be handled by trained and authorized personnel.
9. Mechanical foam type & DCP fire extinguishers are provided at solvent drum storage area as per chief controller of explosives directions.
10. Fire hydrant system with hose reels are provided in the solvents storage area.
11. Hydrocarbon detectors will be provided in the Solvents drums storage area.
scale of Leakage of solvent, Fire. 6. Emergency Response teams will
be kept on alert for swift response.
7. The leakage will be cleared and the area is made fit work
8. In case leakage is found, the contents will be transferred to a in to HDPE drums.
3]
Production Block-Process Reactors
Oxidation/Hydroxylation/Mesylation
Low to medium & 8 persons
1. Flame proof electrical fittings will be installed
2. Jacket chilling/cooling water supply to avoid high
1. Area will be cordoned off. 2. Power supply will be cut off to
the area to prevent accidental fire.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 210
S. No. AREA IDENTIFIED
HAZARD
SEVERITY & NO. OF PERSONS EXPOSED
PRECAUTIONS PROPOSED MITIGATION MEASURES
exothermic reaction/ Fire
temperature in reactor 3. Material will be stored at
production blocks in safe containers for batch charging with secondary containment to prevent Spillages.
4. Earthing and bonding will be carried out for all reactor vessels and pipelines
5. Nitrogen lines will be provided to reaction vessel to create inert atmosphere inside the reactor to avoid fire and explosion
6. Work permit system will be implemented for hazard assessment in case of any hot work / work at elevated places.
7. Manufacturing area will be ventilated by a Forced air ventilation system to prevent formation of flammable mixture.
8. Fire hydrant system with hydrant points with hose reels and nozzles will be installed to mitigate fire hazards
9. Fire extinguishers are deployed adequately
3. All hot work carried out in the vicinity will be stopped.
4. Emergency control center will be informed.
5. Information will be given to the declarer of emergency on the scale of spillage / fire/Toxic gas release
6. Emergency Response teams will be kept on alert for swift response.
7. Personnel working in the area will be evacuated.
8. Scrubber will be kept in operating condition with caustic scrubbing solution
9. Fire hydrant system will be put in use.
10. If situation beyond control information will be given to Inspector of factories, police, fire department for their assistance.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 211
S. No. AREA IDENTIFIED
HAZARD
SEVERITY & NO. OF PERSONS EXPOSED
PRECAUTIONS PROPOSED MITIGATION MEASURES
Production block
Ammonia Toxic gas release during production of Pyrithiobac sodium
10 persons
10. Eye wash fountain / Body shower are provided for decontamination at each floor.
11. Limit switches will be provided for centrifuges for safe operation.
12. Nitrogen purging will be arranged for each Centrifuge to prevent formation of explosive flammable mixture.
13. Each reactor will be connected to a scrubber to neutralize or decrease the pressure in case sudden rise in pressure.
Ammonia detector will be installed in the production block with alarm. When Ammonia concentration reaches in the air 25 ppm, immediately alarm will activate.
1. Scrubber will be kept in
operating condition with chilled water circulation during transfer of the material.
2. Emergency Response teams will be kept on alert for swift response
3. Area will be cordoned off. 4. Emergency control center will
be informed
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 212
S. No. AREA IDENTIFIED
HAZARD
SEVERITY & NO. OF PERSONS EXPOSED
PRECAUTIONS PROPOSED MITIGATION MEASURES
5. Information will be given to the declarer of emergency on the scale of Leakage.
6. Neighboring industries and statutory authorities will be informed in case situation is severe.
4] Boiler House
Fire/ Explosion
Low to medium & 2 persons
1. All requirements specified under Boiler Act will be followed
2. All electrical fittings will be of flame proof Type.
3. Entry will be restricted only to trained and authorized personnel to work in the area.
4. Fire extinguishers are positioned at different locations in case of any Emergencies.
5. No material storage will be permitted in the Area.
6. Auto level controller for Water and high temperature alarms will be provided.
7. Water hardness will be checked on shift wise.
8. Area will be well ventilated and illuminated for safe working.
9. 24 x 7 manning of the area is
1. Shutting down the plant, declaring the emergency.
2. Electrical supply will be isolated. 3. Type of emergency will be
informed to the emergency declarer/ central authority.
4. Emergency response teams will be kept on alert for swift action.
5. Movement of personnel and vehicles will be prohibited. Adequate no. of Fire hydrant system will be put in use.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 213
S. No. AREA IDENTIFIED
HAZARD
SEVERITY & NO. OF PERSONS EXPOSED
PRECAUTIONS PROPOSED MITIGATION MEASURES
done for monitoring of operation.
10. All maintenance /repair works will be carried out after issuing work permits and under constant supervision of experts.
11. Periodical cleaning of soot in furnace to prevent formation of explosive mixtures.
12. Checking of boiler internals as per given schedule to prevent Accidents.
13. Signage‘s will be displayed to
inform personnel about the hazards present in the area
5] Diesel Generator
Noise & Fire Low & 1 person
1. Noise abatement through modular acoustic paneling of D. G. set
2. Secondary containment is done to prevent Diesel leakage from day tanks.
3. Adequate no. of fire extinguishers is kept to handle emergency.
4. Entry access to the area will be only for Authorized personnel.
1. Information will be given to Emergency control center.
2. Power supply will be cut off to the storage area to prevent accidental fire.
3. All hot work around the area will be stopped and the area will be cordoned off
4. The concerned maintenance personnel will be carried repairs to mitigate the leakages.
5. Emergency Response Team will
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 214
S. No. AREA IDENTIFIED
HAZARD
SEVERITY & NO. OF PERSONS EXPOSED
PRECAUTIONS PROPOSED MITIGATION MEASURES
be kept on alert for swift response.
6. Periodical occupational health checks will be done to personnel working in the area to assess exposure to noise.
6]
Electrical sub -station
Electric shock / fire
Low to Medium & 2 persons
1. Layout confirm to legal requirements as per Indian Electrical Rules.
2. Entry will be restricted to licensed and authorized personnel only.
3. Earthing is provided for leakage of stray currents.
4. Electronic mimic panels are installed for fault indication at the entry of the sub-station.
5. Insulating rubber mats confirming to IS: 15652- 2006 will be provided in front of all electrical panel boards.
6. Periodical inspection and maintenance will be carried out to ensure good health of the equipment.
7. CO2 / DCP fire extinguishers are deployed to handle emergency fires
1. Information will be given to Emergency control center.
2. Power supply will be cut off from incoming source.
3. Electricity supply company will be alerted for cut off power supply in case of major risks
4. All hot work around the area will be stopped and the area is cordoned off.
5. The concerned maintenance personnel will be carried repairs to restore normalcy.
6. Emergency Response Team will be kept on alert for swift response
7] Hazardous waste
Fire/Leakage
Low to Medium &
1. Storage shed will be at an isolated location.
1. Information will be given to Emergency control center.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 215
S. No. AREA IDENTIFIED
HAZARD
SEVERITY & NO. OF PERSONS EXPOSED
PRECAUTIONS PROPOSED MITIGATION MEASURES
storage shed
1 Person
2. Conditions specified in hazardous waste Authorization issued by SPCB will be implemented.
3. Compatible wastes will be stored in separate enclosures
4. Layout provides adequate ventilation and illumination
5. Secondary containment provided to prevent leakages / spillages
6. Storage quantity will be limited. 7. Periodical disposal of
accumulated waste will be sent to authorize landfills.
8. Flame proof electrical fittings will be installed to prevent fire / explosion hazards
9. Eye wash / body shower will be provided for decontamination in case of spillage on body parts.
10. PPE box will be equipped with gum boots, splash proof safety goggles, aprons for use during handling of chemicals.
11. Access to the area will be restricted to authorize personnel
2. Power supply will be cut off from incoming source.
3. All hot work around the area will be stopped and the area is cordoned off
4. The concerned maintenance personnel will be carried repairs to restore normalcy
5. Fire hydrant system will be put in use
6. Emergency Response Team will be kept on alert for swift response.
7. Support of external agencies will be sought in case situation poses major risks and is not controllable by in-house infrastructure
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 216
S. No. AREA IDENTIFIED
HAZARD
SEVERITY & NO. OF PERSONS EXPOSED
PRECAUTIONS PROPOSED MITIGATION MEASURES
only. 12. Fire hydrant point with hose
reels are provided for fire mitigation
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 217
Acetone: It is a clear, volatile, flammable liquid. Vapors may form explosive mixtures with air.
Vapors are heavier than air and may travel along the ground to some distance source of
ignition and flash back.
On combustion may emit toxic fumes of carbon monoxide and CO2.
This product causes irritation of eyes, skin, and mucous membranes in case of contact. It will
cause lung damage if swallowed. Do not breathe vapors.
Use foam, carbon dioxide or dry chemical. Suppress vapors/mists with a water spray jet.
In case of spillage soak up with inert absorbent material such as sand, silica gel, saw dust. Do
not use sparking tools. Do not allow product to enter sewer or waterways.
Store in a well-ventilated place to effectively remove and prevent buildup of any vapors or
mists generated from handling of this product.
While handling wear impervious gloves and anti-static protective clothing. For leak, spills, or
other emergency, use full protective equipment.
Boiling Point: 56.2°C
Flash Point: -20°C
Flammable Limits: LOWER: 2.6% UPPER: 12.8%
Toluene: It is a clear, volatile, flammable liquid. Vapors may form explosive mixtures with air.
Vapors are heavier than air and may travel along the ground to some distance source of
ignition and flash back. Keep away from heat. Keep away from sources of ignition. Ground all
equipment containing material. Do not ingest. Do not breathe gas/fumes/ vapor/spray. Wear
suitable protective clothing. In case of insufficient ventilation wear suitable respiratory. On
combustion may emit toxic fumes of carbon monoxide and CO2.
This product causes irritation of eyes, skin, and mucous membranes in case of contact. It will
cause lung damage if swallowed. Do not breathe vapors.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 219
Use foam, carbon dioxide or dry chemical. Suppress vapors/mists with a water spray jet. If
ingested, seek medical advice immediately and show the container or the label. Avoid contact
with skin and eyes.
Storage: Store in a segregated and approved area. Keep container in a cool, well-ventilated
area. Keep container tightly closed and sealed until ready for use. Avoid all possible sources of
ignition (spark or flame).
Toluene forms explosive reaction with concentrated nitric acid, sulfuric acid + nitric.
Boiling Point: 110.6 °C
Flash Point: 4.4 °C
Flammable Limits: LOWER: 1.1% UPPER: 7.1%
Methanol: Extremely flammable and vapor may form ignitable vapor air mixtures in storage
tanks or other containers. Ignition and busing can release carbon monoxide, carbon dioxide
and non combustible hydrocarbons (Smoke).
Inhalation can Cause dizziness, head ache and nausea, kidney and liver disorder.
Use foam, carbon dioxide or dry chemical. Suppress vapors/mists with a water spray jet.
In case of spillage soak up with inert absorbent material such as sand, silica gel, saw dust. Do
not use sparking tools. Do not allow product to enter sewer or waterways.
Store in a well-ventilated place to effectively remove and prevent buildup of any vapors or
mists generated from handling of this product.
While handling wear impervious gloves and anti-static protective clothing. For leak, spills, or
other emergency, use full protective equipment.
Boiling Point: 64.7 °C
Flash Point: 12°C
Flammable Limits: LOWER: 6% UPPER: 36%
Hydrochloric acid:
Water Reaction
An aqueous solution. Dilution may generate heat. Fumes in air.
Fire Hazard
Special Hazards of Combustion Products: Toxic and irritating vapors are generated when
heated.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 220
Health Hazard
Inhalation of fumes results in coughing and choking sensation, and irritation of nose and lungs.
Liquid causes burns.
Reactivity Profile
Hydrochloric Acid is an aqueous solution of hydrogen chloride, an acidic gas. Reacts
exothermically with organic bases (amines, amides) and inorganic bases (oxides and
hydroxides of metals).
Reacts exothermically with carbonates (including limestone and building materials containing
limestone) and hydrogen carbonates to generate carbon dioxide.
Reacts with sulfides, carbides, borides, and phosphates to generate toxic or flammable gases.
Reacts with many metals (including aluminum, zinc, calcium, magnesium, iron, tin and all of
the alkali metals) to generate flammable hydrogen gas.
Protective Clothing:
Skin: If chemical is in solution, wear appropriate personal protective clothing to prevent skin
contact and to prevent skin from becoming frozen from contact with the liquid or from contact
with vessels containing the liquid.
Eyes: Wear appropriate eye protection to prevent eye contact with the liquid that could result in
burns or tissue damage from frostbite.
Wash skin: If the chemical is in solution, the worker should immediately wash the skin when it
becomes contaminated.
Remove: If chemical is in solution, work clothing that becomes wet or significantly
contaminated should be removed and replaced.
Provide: Eyewash fountains should be provided (when chemical is in solution) in areas where
there is any possibility that workers could be exposed to the substance; this is irrespective of
the recommendation involving the wearing of eye protection. Facilities for quickly drenching the
body should be provided (when chemical is in solution) within the immediate work area for
emergency use where there is a possibility of exposure. It is intended that these facilities
provide a sufficient quantity or flow of water to quickly remove the substance from anybody
areas likely to be exposed.
Quick drench facilities and/or eyewash fountains should be provided within the immediate work
area for emergency use where there is any possibility of exposure to liquids that are extremely
cold or rapidly evaporating.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 221
Sulfuric acid: Water Reaction
Reaction with water is negligible unless acid strength is above 70% then heat from hydrolysis
is extreme, may cause severe burns
Fire Hazard
It is highly reactive and capable of igniting finely-divided combustible materials on contact.
When heated, it emits highly toxic fumes. Avoid heat; water and organic materials. Sulfuric
acid is explosive or incompatible with an enormous array of substances. It can undergo violent
chemical change at elevated temperatures and pressure. It may react violently with water.
Health Hazard:
Corrosive to all body tissues. Inhalation of vapor may cause serious lung damage. Contact
with eyes may result in total loss of vision. Skin contact may produce severe necrosis.
Fatal amount for adult: between 1 teaspoonful and one-half ounce of the concentrated
chemical. Chronic exposure may cause tracheobronchitis, stomatitis, conjunctivitis, and
gastritis. Those with chronic respiratory, gastrointestinal, or nervous diseases and any eye and
skin diseases are at greater risk.
Protective Clothing:
Skin: Wear appropriate personal protective clothing to prevent skin contact.
Eyes: Wear appropriate eye protection to prevent eye contact.
Wash skin: The worker should immediately wash the skin when it becomes contaminated.
Remove: Work clothing that becomes wet or significantly contaminated should be removed
and replaced. Provide: Eyewash fountains should be provided in areas where there is any
possibility that workers could be exposed to the substance; this is irrespective of the
recommendation involving the wearing of eye protection.
Facilities for quickly drenching the body should be provided within the immediate work area for
emergency use where there is a possibility of exposure.
It is intended that these facilities provide a sufficient quantity or flow of water to quickly remove
the substance from anybody areas likely to be exposed.
Thionyl chloride:
A colorless to yellow fuming liquid with a suffocating pungent odor. A lachrymator. Highly
corrosive and toxic.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 222
Long-term inhalation of low concentrations or short-term inhalation of high concentrations has
adverse health effects.
Emits dense corrosive fumes in moist air. Violently reacts with water to liberate hydrochloric
acid and sulfur dioxide. Based on a scenario where the chemical is spilled into an excess of
water (at least 5 fold excess of water), half of the maximum theoretical yield of Sulfur Dioxide
gas will be created in 0.25 minutes.
Protective Clothing
Skin: Wear appropriate personal protective clothing to prevent skin contact.
Eyes: Wear appropriate eye protection to prevent eye contact.
Wash skin: The worker should immediately wash the skin when it becomes contaminated.
Provide eyewash fountains in areas where there is any possibility that workers could be
exposed to the substance; this is irrespective of the recommendation involving the wearing of
eye protection.
Hydrogen Peroxide 50%: Clear, colorless liquid.
Handling:
Will Use only in well-ventilated areas and Keep away from clothing/ combustible materials.
Wear personal protective equipment. Contamination may cause decomposition and generation
of oxygen gas which could result in high pressures and possible container rupture. Empty
drums should be triple rinsed with water before discarding. Utensils used for handling
hydrogen peroxide will be only be made of glass, stainless steel, aluminum or plastic. Pipes
and equipment should be Passivity before first use. Hydrogen peroxide will be stored only in
vented containers and transferred only in a prescribed manner.
Storage:
Keep containers in dedicated & cool areas out of direct sunlight and away from combustibles.
Will provide local exhaust ventilation to prevent release of vapor or mist into work environment.
Store rooms or warehouses will be made of non-combustible materials with impermeable
floors. In case of release, spillage will flow to safe area.
Boiling Point: 114 °C
Ethanol: Clear, colorless Liquid
Handling and Storage
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 223
Handling: Will use only in a well-ventilated area. Ground and bond containers when transferring Material.
Use spark-proof tools and explosion proof equipment.
Avoid contact with eyes, skin, and clothing.
Keep container tightly Closed.
Keep away from heat, sparks and flame.
Avoid ingestion and inhalation.
Do not pressurize, weld, or expose empty containers to heat, sparks or open flames.
Storage:
Keep away from heat, sparks, and flame. Keep away from sources of ignition. Keep from contact with oxidizing materials.
Store in a cool, dry, well-ventilated area away from incompatible substances. Flammables-area.
Do not store near perchlorates, peroxides, chromic acid or nitric acid.
Spills/Leaks:
Absorb spill with inert material (e.g. vermiculite, sand or earth), then place in suitable container. Remove all sources of ignition. Use a spark-proof tool. Provide ventilation
Boiling Point: 77.1 deg C
Flash Point: 17°C
Flammable Limits: LOWER: 3.3% UPPER: 19%
Chloroform: Colorless Liquid. Handling: Do not get in eyes or on skin or clothing. Do not breathe vapor or mist.
Use only with adequate ventilation. Wear appropriate respirator when ventilation is inadequate.
Kept tightly closed when not in use.
Storage: Store in original container, protected from direct sunlight. Keep container tightly
closed and sealed until ready for use. Containers that have been opened must be carefully
resealed and kept upright to prevent leakage.
Boiling Point: 60.5°C
Flash Point: Not Flammable Methods for cleaning up:
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 224
Spill: Stop leak if without risk. Move containers from spill area.
Prevent entry into sewers, water courses, basements or confined areas.
Contain and collect spillage with non-combustible, absorbent material e.g. sand, earth,
vermiculite or diatomaceous earth and place in container for disposal. Contaminated absorbent
material may pose the same hazard as the spilled product.
Ethyl Acetate: Clear colorless liquid
Precautions for safe handling: Do not breathe vapor or mist.
Wear protective gloves/clothing and eye/face protection.
Wash thoroughly after handling.
Ground and secure containers when dispensing or pouring product.
Avoid contact with incompatible materials.
When handling, DO NOT eat, drink or smoke.
Use in a well ventilated place/Use protective clothing commensurate with exposure
levels.
Storage: Store in a cool, well ventilated place.
Store away from incompatible materials.
Keep container tightly closed.
Keep securely closed when not in use.
Major Spill:
Alert Emergency Responders and tell them location and nature of hazard.
Shut off all possible sources of ignition and increase ventilation.
Wear protective clothing, full boots, impervious gloves, safety glasses and Self
Contained Breathing Apparatus (SCBA), as may be deemed appropriate.
Clear area of personnel and move upwind.
Stop leaks if possible.
Prevent, by any means available, spillage from entering drains or water and
watercourses.
Collect recoverable product into labeled containers for recycling, recovery or disposal.
Contain spill with sand, earth or vermiculite.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 225
Spread area with lime or absorbent material, and leave for at least 1 hour before
washing.
Clean up all tools and equipment.
Boiling Point: 76.0 °C
Flash Point: -4.4°C
Flammable limits: 2.2% Lower limit,
9% Upper limit
N-Methyl-2-Pyrrolidone: colorless liquid
Precautions for safe handling: Avoid contact with skin and eyes. Avoid formation of dust and
aerosols. Provide appropriate exhaust ventilation at places where dust is formed. Keep away
from sources of ignition.
Conditions for safe storage: Store in cool place. Keep container tightly closed in a dry and
well-ventilated place.
Boiling Point: 202 °C
Flammable Limits: Upper explosion limit: 9.5 %
Lower explosion limit: 1.3 %
Dichloromethane: Colorless liquid
Precautions for safe handling: Work under hood. Avoid generation of vapors
Immediately change contaminated clothing. Wash hands and face after working with material.
Conditions for safe storage: Tightly close. Keep in a well-ventilated place. Protect from light.
Flammable Limits: Upper explosion limit: 13 %
Lower explosion limit: 23 %
Boiling Point: 40 °C
Methyl ethyl Ketone (MEK):
Precautions for safe handling: Keep away from heat, sparks and open flame. Take
precautionary measures against static discharges.
Conditions for safe storage: Ground container and transfer equipment to eliminate static
electric sparks. Store in a cool and well ventilated place.
Boiling Point: 82 °C
Flash Point: -9 °C
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 226
Flammable Limits: 1.5% Lower limit
11.5% Upper limit
Ethylene Dichloride: Colorless Liquid.
Handling and Storage:
Avoid contact with skin, eyes, and clothing. Avoid inhaling vapour and/or mists. Ensure
electrical continuity by bonding and grounding (earthing) all equipment. Restrict line velocity
during pumping in order to avoid generation of electrostatic discharge.
Storage Temperature: Ambient. Must be stored in a well ventilated area, away from sunlight,
ignition sources and other sources of heat.
Vapours from tanks should not be released to atmosphere. Breathing losses during storage
should be controlled by a suitable vapor treatment system.
Clean Up Methods
For large liquid spills (> 1 drum), transfer by mechanical means such as vacuum truck to a
salvage tank for recovery or safe disposal. Retain as contaminated waste. Allow residues to
evaporate or soak up with an appropriate absorbent material and dispose of safely. Remove
contaminated soil and dispose of safely. For small liquid spills (< 1 drum), transfer by
mechanical means to a labelled, sealable container for product recovery or safe disposal.
Allow residues to evaporate or soak up with an appropriate absorbent material and dispose of
safely. Remove contaminated soil and dispose of safely.
Boiling Point: 84 °C
Flash Point: 13 °C
Flammable Limits: 6.2 %LOWER LIMIT
15.9% UPPER LIMIT
Acetic Anhydride: A colorless solution
Precautions to Be Taken: Avoid breathing fume/gas
In Handling: Avoid prolonged or repeated exposure.
Keep away from sources of ignition.
Take precautionary measures against static discharge.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 227
Precautions to be taken Keep away from heat, sparks, and flame.
In Storing: Keep container tightly closed.
Other Precautions: Reacts violently with water.
Boiling Point: 138 C
Flash Point: 49 °C
Flammable Limits: 2.7% %LOWER LIMIT
10.3% UPPER LIMIT
Dimethyl Formamide: Colorless liquid
Conditions for safe storage: Keep container tightly closed in a cool, well-ventilated place.
Ground container and transfer equipment to eliminate static electric sparks.
Methods and material for containment and cleaning up:
Eliminate all ignition sources if safe to do so. Take precautionary measures against static
discharges.. Use only non-sparking tools. Absorb spill with vermiculite or other inert material,
then place in a container for chemical waste.
Clean surface thoroughly to remove residual contamination.
Precautions for safe handling:
Do not handle, store or open near an open flame, sources of heat or sources of ignition.
Protect material from direct sunlight.
Take precautionary measures against static discharges.
Ground/bond container and receiving equipment.
Use explosion-proof electrical/ventilating/lighting/equipment.
S. No. Risk Significance Criteria Definition & Action Requirements
1 High (16-25)
―Risk requires attention‖ – Project Management need to ensure that necessary mitigation are adopted to ensure that possible risk remains within acceptable limits.
2 Medium (10-15)
―Risk is tolerable‖ – Project Management to adopt necessary measures to prevent any change/modification of existing risk controls and ensure implementation of all practicable controls.
3 Low (5-9)
―Risk is acceptable‖ – Project related risks are managed by well established controls and routine processes/procedures. Implementation of additional controls can be considered.
4 Very Low (1-4)
―Risk is acceptable‖- All risks are managed by well established controls and routine processes/procedures. Additional risk controls need not to be considered.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 236
The basic physical effect models consist of the following.
Source strength parameters
Calculation of the outflow of liquid, vapor out of a vessel, in case of rupture. Also two-
phase outflow can be calculated.
Calculation in case of liquid outflow, of the instantaneous flash evaporation.
Calculation of the evaporation rate, as a function of volatility of the material, pool
dimensions and wind velocity.
Consequential effects
Dispersion of gaseous material in the atmosphere as a function of source strength,
relative density of the gas, weather conditions and topographical situation of the
surrounding area.
Intensity of heat radiation [in KW / m2] due to a pool fire, as a function of the distance to
the source.
Energy of vapor cloud explosions [in KW / m2], as a function of the distance to the
distance of the exploding cloud.
Concentration of gaseous material in the atmosphere, due to the dispersion of
evaporated chemical. The latter can be either explosive or toxic.
It may be obvious, that the types of models that must be used in a specific risk study strongly
depend upon the type of material involved:
liquid
Inflammable, toxic products
Selection of Damage Criteria
The damage criteria give the relation between extent of the physical effects (exposure)
and the percentage of the people that will be killed or injured due to those effects
The knowledge about these relations depends strongly on the exposure. For instance,
much more is known about the damage caused by heat radiation, than about the
damage due to toxic exposure, and for these toxic effects, the knowledge differs
strongly between different materials.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 237
In consequence analysis studies, in principle three types of exposure to hazardous effects are
distinguished:
Heat radiation from puddle/pool fire
Vapor cloud Explosion
Toxic effect from toxic materials or toxic combustion products.
Heat Radiation
The consequence caused by exposure to heat radiation is a function of:
The radiation energy onto the human body [KW / m2]
The exposure duration [sec]
The protection of the skin tissue [clothed or naked body]
7.8 DAMAGES TO HUMAN LIFE DUE TO HEAT RADIATION
Injuries to People —Definition of Burn Degrees
First Degree: A mild level of skin burn affecting the epidermis, with persistent redness but no
formation of blisters. More severe first - degree burns will produce some pain, but no
permanent damage. Flaking or scaling of the outer skin layer will occur several days after
exposure.
Second Degree: An intermediate level of skin burn characterized by the formation of blisters.
The blister depth may be shallow (epidermis), with only the surface layers of the skin
damaged, or more severe with nearly the full depth of the skin destroyed (epidermis and
dermis).
Third Degree: Deep burns characterized by the destruction of all skin layers and by charring.
The underlying tissue may also be damaged.
TABLE 7.8: HEAT FLUX INTENSITY AND EXPOSURE TIME-DAMAGE CRITERIA FOR PEOPLE
Thermal Radiation Intensity (KW/m2) Type of Damage
1.6 No harm for long exposures. 4 to 5 Pain for 20 seconds exposure; first degree burn 9.5 Second degree burn after 20 Seconds 10 to 15 Potentially lethal with in 1 minute.
25 Significant injury in 10 seconds; 100 % lethality in 1 minute.
35 to 37.5 1 % lethality in 10 seconds.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 238
Since in practical situations, only the own employees will be exposed to heat radiation in case
of a fire, it is reasonable to assume the protection by clothing. It can be assumed that people
would be able to find a cover or a shield against thermal radiation in 10 sec. time. Furthermore,
100% lethality may be assumed for all people suffering from direct contact with flames, such
as the pool fire, a flash fire or a jet flame.
Explosion
In case of vapor cloud explosion, two physical effects may occur:
A flash fire over the whole length of the explosive gas cloud;
A blast wave, with typical peak overpressures circular around ignition source.
As explained above, 100% lethality is assumed for all people who are present within the cloud
proper.
The following damage criteria may be distinguished with respect to the peak overpressures
resulting from a blast wave:
TABLE 7.9: DAMAGE DUE TO OVERPRESSURES
PEAK OVERPRESSURE DAMAGE TYPE
0.83 bar Total destruction
0.30 bar Heavy damage
0.10 bar Moderate damage
0.03 bar Significant damage
0.01 bar Minor damage
7.9 MAXIMUM CREDIBLE LOSS ACCIDENT SCENARIOS
A Maximum Credible Accident (MCA) can be characterized as the worst credible accident. In
other words: an accident in an activity, resulting in the maximum consequence distance that is
still believed to be possible. A MCA-analysis does not include a quantification of the probability
of occurrence of the accident. Another aspect, in which the pessimistic approach of MCA
studies appears, is the atmospheric condition that is used for dispersion calculations. The
Maximum Credible Loss (MCL) scenarios have been developed for the Facility. The MCL
cases considered, attempt to include the worst ―Credible‖ incidents-what constitutes a credible
incident is always subjective. Nevertheless, guidelines have evolved over the years and based
on basic engineering judgment, the cases have been found to be credible and modeling for
assessing vulnerability zones is prepared accordingly.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 239
The objective of the study is Emergency planning, is to prevent by technical and organizational
measures, the unintentional escape of hazardous materials out of the facility and minimize
accidents and losses. Hence, though the outcomes may look pessimistic, the planning for
emergency concept demonstrates the organizational commitment to the safety of employees
and increases organization‘s safety awareness.
In Consequence analysis, geographical location of the source of potential release plays an
important role. Consideration of a large number of scenarios in the same geographical location
serves little purpose if the dominant scenario has been identified and duly considered.
The Consequence Analysis has been done for selected scenarios. The details of software
used for MCA analysis are described below.
A computer based version ALOHA is used to calculate toxic and Thermal radiation
effect of the accidental release of liquid chemicals within the plant area.
ALOHA models key hazards-toxicity, flammability, thermal radiation (Heat), and over
pressure (expansion blast force)-related to chemical releases that result in toxic gas
dispersion, fire and/or explosion
The plant is having solvents drum storage shed approved by Chief controller of
explosives.
In the drum storage shed Toluene, Acetone, Methanol, MIBK, THF, Ethyl acetate and
Petroleum ether are being stored. The total solvents quantity is 10600 Lts.
One scenario has been considered that, in case Methanol has leaked from drum &
caught fire and spread to other solvents which resulted in the following consequence.
The total solvents considered as Methanol and its quantity as 10600 Lts.
1. Overpressure (blast force) from vapor cloud explosion
Second Scenario has been considered that, in case the solvents are leaked in the
storage shed and its consequence are:
1. Flammable Area of Vapor Cloud (not burning)
2. Toxic Area of Vapor cloud (not burning)
1. Overpressure (blast force) from vapor cloud explosion
CHEMICAL DATA: Chemical Name: METHANOL CAS Number: 67-56-1
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 240
Molecular Weight: 32.04 g/mol Ambient Boiling Point: 64° C ATMOSPHERIC DATA: Wind: 1.36 meters/second from NW at 3 meters Air Temperature: 38.1° C Relative Humidity: 50% SOURCE STRENGTH: Direct Source: 10.6 cubic meters Source State: Liquid Total Amount Released: 8243 kgs
THREAT ZONE: Threat Modeled: Overpressure (blast force) from vapor cloud explosion Type of Ignition: ignited by spark or flame Level of Congestion: congested Model Run: Heavy Gas Yellow: 234 yards --- (1.0 psi = shatters glass)
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 241
The leakage of solvents and its consequences are considered as Major and its likelihood is
unlikely
Significance = Likelihood X Consequence
=3*4 =12
As defined in Risk Criteria and action requirements
The risk significance is medium.
―Risk is tolerable.‖ –
Mitigation measure: To avoid such incidents day to day the storage shed to be inspected for
any damage of drums and leakage of solvents. In case if any solvent is leaking the particular
drum to be isolated immediately and its contents to be transferred to another empty drum.
While stacking the filled solvents drums, stack the drums solvent wise and maintain at least
three feet distance as free walk way from each group of solvent drums. This facilitates easy
removal of drums from the area.
In case if explosion occurs the impact of over pressure of one psi will be up to a distance of
213 meters.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 242
2. Flammable Area of Vapor Cloud (not burning)
CHEMICAL DATA: Chemical Name: METHANOL CAS Number: 67-56-1 Molecular Weight: 32.04 g/mol Ambient Boiling Point: 64.0° C ATMOSPHERIC DATA: Wind: 1.4 meters/second from NW at 3 meters Air Temperature: 38.1° C Relative Humidity: 5% SOURCE STRENGTH: Direct Source: 10.6 cubic meters Source State: Liquid Source Temperature: 30° C Total Amount Released: 8326 kgs THREAT ZONE: Threat Modeled: Flammable Area of Vapor Cloud Model Run: Heavy Gas Red : 305 yards --- (43080 ppm = 60% LEL) Yellow: 774 yards --- (7180 ppm = 10% LEL)
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 243
The leakage of solvents and its consequences are considered as Moderate and its likelihood is
unlikely
Significance = Likelihood X Consequence
=3*3 =9
As defined in Risk Criteria and action requirements
The risk significance is low.
―Risk is acceptable.‖ –
Mitigation measure: To avoid such incidents day to day the storage shed to be inspected for
any damage of drums and leakage of solvents. In case if any solvent is leaking the particular
drum to be isolated immediately and its contents to be transferred to another empty drum.
While stacking the filled solvents drums, stack the drums solvent wise and maintain at least
three feet distance as free walk way from each group of solvent drums. This facilitates easy
removal of drums from the area.
In case sudden leakage of solvents on to the ground which results in formation flammable
area of vapor cloud of value of 43080 ppm up to a distance of 278 mts will have 60% lower
explosive limit of leaked solvent .
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 244
(Abnormal) Shower available PPE to be used –Mask / Goggles / Hand gloves
11 Exothermic Reaction (Abnormal)
Injury due to chemical splash, loss of Human efficiency.
3 3 9
MSDS Training & JSA Temp. controller available to Heating Bath Jacket Chilling / cooling supply available Spillage is collected and charged in reactor Spill KIT Use trolley PPE to be used –Mask / Goggles / Hand gloves
1 2 2 Y
12 Fire (Emergency)
Loss of Human efficiency, Skin Injury, Eye Injury, Burn Injury, Body Injury
3 4 12
Temp. controller available to Heating Bath Fire-Fighting equipment available
1 3 3 Y
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 254
Hazard Control Measures
Procedures and actions are well defined and known to all operating personnel for safe
shut down of plant in case of failure of any power, instrumentation, etc.
1. All the motors and other rotating equipment machines have been provided with
suitable safety guards.
2. Suitable fire extinguishers, such as, DCP, CO2 & foam type have been kept in
plant area at easily approachable spots and in sufficient numbers.
3. Fire hydrant points with sufficient length of hose reel have been provided at major
emergency spots.
4. Rupture disc followed by safety valve are provided to prevent over pressurization
5. of process reactors.
6. Safety shower and eye washer are installed at crucial places.
7. Sufficient space has been provided for free movement in the plant area. All piping
and equipment have been provided with earthing connection and it will be tested
regularly.
8. Internal and external inspection of tanks, piping, thickness measurement of
Piping, inspection and testing of lifting tackles, etc, will be carried out as per
Schedule. SOP will be available of safe shut-down of plant during any emergency
Situation.
Operational Safety
1. All operators & maintenance personnel concerned with the plant will be given
Material safety data sheets for hazardous chemicals and will be trained regularly
to combat any leakage spillage, etc.
2. Hydrocarbon (HC) detectors will be provided in Solvents drum storage area.
These detectors shall be placed such a way that entire possible source of leaks is
continuously detected and alarm is set at 20% of lower explosive limit of solvent.
3. Safety appliances like PVC suit, hand gloves, safety goggles, and helmets etc.
being used during material handling. Also, SCBA (Self Contained Breathing
Apparatus) will be kept available all the time.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 255
4. When in a production area by reason of manufacturing process contaminants are
given off, it shall be necessary to provide an efficient local exhaust ventilation of
the points at which the contaminants are released to reduce their concentration in
the working area below their threshold limit values. Ventilation is expressed as
m3/hr/m2 of floor area. This industry should have ventilation rate of 40 to 60
m3/hr/m2. At present the industry is not having any exhaust fans, only natural
ventilation is available which is insufficient.
As per the area of production block, based on above given ventilation rate the industry
should provide sufficient nos. of Exhaust fans.
Risk Mitigation Measures for Proposed Expansion
1. Hazardous chemicals will be stored in separate storage along with necessary
Safety measures.
2. Enclosures will be provided with vent connected to scrubber for Sulfur dioxide,
Hcl, HBr and ammonia. etc.
3. Safety fittings like safety valve, pressure / temperature indicators, level indicators,
rupture discs etc. will be provided to the concern equipment.
4. Calibration of all instruments in the plant will be carried out periodically.
5. Flameproof fitting, earthing & bonding of equipments & pipelines will be provided
for flammable chemicals.
6. Periodic on site emergency mock drills are being arranged.
7. Safety training‘s are given regularly to the workers for handling of hazardous
Chemicals.
8. Necessary PPE‘s will be readily available. Jobs will be accomplished using
Relevant PPEs
7.11 DISASTER PREPAREDNESS AND EMERGENCY MANAGEMENT PLAN
GAVL has prepared the onsite Disaster Management Plan which is in force for the
existing facility. The purpose of this plan is to provide GAVL with the means to
effectively utilize all the resources at its disposal for the protection of life, environment
and property. GAVL will update existing emergency management system (Onsite
DMP) to tackle any emergency situation for proposed plants expansion. The details of
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter - VII Page 256
Onsite Emergency plan / Disaster management plan (DMP) are discussed in the
following section.
7.11.1 Objective
To provide detailed guideline in case of emergency situation like major fire, serious
emission of gas, discharge of chemical, liquid fuel & explosion
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – X Page 301
operation on daily basis. The Fugitive Emissions like VOC’s will be monitored in
Production block, Raw Material and Finished goods section on regular basis.
10.12.2 WASTE WATER MONITORING
The quantity of waste generated from ETP unit will be regularly measured using flow
meters. Wastewater samples will be collected and analyzed for critical parameters
like pH, TDS, BOD, COD, Oil and Grease, Chlorides, Sulphates etc.,
10.12.3 GROUND WATER MONITORING
Ground water quality of bore well will be regularly monitored preferably once in a 6 /
12 months.
10.12.4 HAZARDOUS SOLID WASTE MONITORING
Hazardous & Solid waste generated from the plant will be monitored on regular basis
for change of the product.
TABLE 10.2: DETAILS OF POST PROJECT MONITORING PROGRAM
S. No
Type of Monitoring
Location of Monitoring
station
Frequency of
Sampling
Duration of
Sampling Instrument Parameters
to be tested
1 Ambient Air 3 Places at 120o angle
Once in a month
8 hrs/ 24 hrs RDS PM10, PM2.5,
SO2 & NOX
2 Work room concentration
Production Block, Store rooms
Once in a month --- Personal
Sampler VOCs
3 Stack Monitoring
Boilers, D. G. Set, Scrubber vents
Once in a month ---
Stack Monitoring Instrument
PM, SO2, NOX and Scrubbing gases.
4 Noise Levels
D. G. Set, Compressors, Chillers, Boilers section, Production block, Admin. block, ETP area, Open area etc.
Once in a month --- Noise
meter
Day – Night Noise levels in Leq
5 Effluent
Raw HTDS & LTDS effluent, Condensate, Treated wastewater
Daily --- Internal & External Lab
Physical and Chemical Parameters
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – X Page 302
S. No
Type of Monitoring
Location of Monitoring
station
Frequency of
Sampling
Duration of
Sampling Instrument Parameters
to be tested
6 Ground water
Nearest Bore well
Once in six months ---
7 Solid Waste Sludge from Process, ETP
Once in six months ---
All the above observations will be complied and documented by the EMC to serve
the following purposes.
Identification of any environmental problems that are occurring in the area.
Initiating or providing solution to those problems through designed channels
and verification of the implementation status.
Controlling activities inside the plant, until the environmental problem is
corrected.
Suitably responds to emergency situations.
The industry will engage recognized laboratories to carry out all necessary
monitoring parameters. Qualified staff will be appointed for the purpose of Operation
and maintenance of the pollution control facilities. Stand-by facilities are provided to
all the facilities so as to ensure fail proof treatment.
10.13 MANAGEMENT OF PUBLIC INTERESTS
10.13.1 OBJECTIVE
To assure the neighboring communities that the promoters and management have
high consideration for the welfare of this region, the following commitments are made
by the project promoters.
10.13.2 PREFERENCE TO LOCAL POPULATION
For the recruitment of semi-skilled and unskilled workers preference will be given for
the local people.
10.13.3 HEALTH CAMPS
Health camps will be organized along with the local administration and voluntary
organizations like Red Cross, Rotary Club etc., in the surrounding villages.
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – X Page 303
10.13.4 PUBLIC AMENITIES
The management will support the local administration with funds and other forms of
assistance for the development of public amenities in this region.
10.13.5 PUBLIC RELATIONS
The management will set up a public relations office to maintain to good line of
communication between the management and the public on matters of
environmental concern.
10.14 WATER REQUIREMENT
Proposed Water Consumption details are given in below Table 10.3.
TABLE 10.3: PROPOSED WATER CONSUMPTION DETAILS
S. No Purpose Water Input in KLD
1 Process 4.42 2 Washings 3.00 3 Boiler Makeup 3.70
4 Cooling towers Makeup 31.50 5 Scrubbing system 2.00 6 Green belt 3.50 7 Domestic 4.00
Total 52.12
Water recovery from ZLD system is 14.94 KLD
Fresh Water Required = 52.12 – 14.94 = 37.18 KLD
The total water requirement of the proposed unit is 52.12 KLD will be met from MIDC
water supply.
10.15 PROCESS EMISSION CONTROL SYSTEM
The process emissions will be controlled by connecting reaction vessel vents to the
scrubbing system.
a) No. of scrubbers and capacity: 2 No. scrubbers installed.
300 mm (Diameter) X 3 meters (Height)
b) Type of scrubber: Scrubber material of construction is PP+FRP with one inch poly
propylene rings as packing material with a circulation pump.
c) Chemical used in scrubber: Alkali solution
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – X Page 304
FIGURE 10.7: SCHEMATIC DIAGRAM OF EMISSION CONTROL SCRUBBING SYSTEM
10.16 FUGITIVE EMISSIONS
Various types of solvents will be used in the manufacturing process. The solvents
will be stored in storage tanks with vent condensers. These are handled in closed
loop system. The industry will take measures for reduction of fugitive emissions by
providing chilled brine circulation to the vent condensers which ensures the recovery
of 95% vapour generated. Good ventilation will be provided to reduce the workroom
concentrations. The reactor generating solvent vapors will be connected to
condensers with reflux system. The solvents like Ethyl acetate, Ethanol, Methanol
and Toluene will be recovered up to 95 % by using distillation and the remaining 5%
will be the loss.
10.17 SOLVENT MANAGEMENT PLAN
Solvent management consists of the following:
Unloading
Storage
Handling / transferring
Process / Reaction
Recovery
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – X Page 305
i) Unloading
Solvents are received in drums / tankers
Drums
Before unloading the drums from the truck, check the drums condition.
Drums may be MS or HDPE Carboys
Drums / barrels will be unloaded from the vehicles onto the unloading platform
by using the drum lifter provided for the purpose. Under no circumstances
drums shall be dropped or rolled on the ground or on any other material
Carboys will not be dropped or allowed to strike against each other and shall
be unloaded on the pallets
Personal protective equipments like safety goggles, hand gloves, PVC aprons
and safety shoes will be used while handling chemicals.
Road tankers
Security will ensure that vehicle personnel shall not carry any match box /
lighters
The store personnel, has to check the paper work before unloading to confirm
that the correct chemical received as well as discharged into the dedicated
tank.
Barriers and flags should be positioned to warn personnel at the unloading.
Brakes should be set and the wheels chocked.
The truck should be earthed.
Tanker should be kept under inert gas flushing through vent while unloading
Make sure that the inert gas valve remains open during the entire unloading
period of delivery is by gravity or by pumping.
Connect the flexible hose to the tanker and to the transfer pump
Check liquid level gauge on storage tank to ensure liquid is being transferred
When tanker is empty, stop pump and close valves on tanker, close valves in
transfer line.
[For flammable material, stop inert gas purge]
Disconnect flexible hose and put into proper catch container to ensure no
product is lost on to the ground.
Remove choked warning signs, earthing and switch locks
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – X Page 306
Read storage tank liquid level gauge and record reading
ii) Storage/ handling/ transferring
Storage Tanks
The solvent pump which is having mechanical seal will be used for
transferring the solvent to the Day Tank of the respective reactor as and when
required. The entire solvent transfer takes place in a closed system. There is
no manual handling.
The above management will results in recovery of solvent more than or equal to
95%.
Drums
As and when required the solvent drums in closed condition will be transferred
to the respective reactor.
By using AODD pump the solvent will be transferred in to the reactor. Hence,
there is no loss of solvent during transfer.
iii) Reaction /Recovery
During reaction stage the solvent vapors will be sent to a primary condenser
having cooling water circulation and later to secondary condenser having
temperature < 50 C chilled brine circulation.
Above system will eliminate solvent losses during reaction stage and recovery
will be the maximum extent possible.
The above management will results in recovery of solvent more than or equal to 95%.
Solvents
Solvent drums will be stored in ware house below 25 ⁰C
As and when required the solvent drums in closed condition will be transferred
to the respective reactor. By using AODD pump the solvent will be transferred
in to the reactor. Hence, there is no loss of solvent during transfer.
During reaction stage the solvent vapors will be sent to two primary
condensers which are arranged in parallel having cooling water circulation
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – X Page 307
followed by a secondary condenser having brine circulation at temperature of
5 ⁰C.
System will eliminate solvent losses during reaction and recovery will be the
maximum extent possible.
The above management will results in recovery of solvent more than or equal to
95%.
10.18 EMISSIONS – UTILITIES
For generation of Steam, the industry will use 0.6 TPH Furnace Oil fired boiler and
proposed to install 0.6 TPH Furnace Oil fired boiler. The total fuel requirement is
2000 Kg/Day will be met from local authorized sources.
The unit has existing 200 KVA DG set for usage during the power failures and
proposed to install solar panels with 115 KW/ Day capacity for power generation.
The emission details are presented in below Table 10.4, Table 10.5 & 10.6
TABLE 10.4: STACK EMISSION DETAILS OF BOILERS
Particulars Units 0.6 TPH Boiler (Existing)
0.6 TPH Boiler (Proposed)
Type of Fuel -- Furnace Oil Furnace Oil Fuel Consumption Kg/ Day 1000 1000 Ash Content % 0.1 0.1 Sulphur Content % 4.5 4.5 Nitrogen Content % 0.15 0.15 No. of Stack No 1 1 Height of the stack m 21 21 Diameter of the stack m 0.25 0.25 Flue Gas Temperature oC 200 200 Flue Gas Velocity m/s 16 16 Emission Rate Details Particular Matter as PM gm/sec 0.0093 0.0093 Sulphur dioxide gm/sec 0.833 0.833 Oxides of Nitrogen gm/sec 0.046 0.046
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – X Page 308
TABLE 10.5: STACK EMISSION DETAILS FOR THERMIC FLUID HEATER
Particulars Units Thermic fluid heater (Existing)
Thermo Fluid Heater Capacity Kcal/hr. 1,00,000 Type of Fuel -- LDO Fuel Consumption per Day Kg/ Day 288 Diameter m 0.3 Stack Temperature oC 120 Stack Height m 18 Emission of PM mg/Nm3 70 Emission of SO2 mg/Nm3 35 Emission of NOx mg/Nm3 50
TABLE 10.6: STACK EMISSION DETAILS OF DG SET
Capacity in KVA
Emission of PM in mg/Nm3
Emission of SO2 in mg/Nm3
Emission of NOx
in mg/Nm3
Stack dia. in m
Flue Gas Temp. in
OC
Stack Height in m
Flue gas Velocity in m/sec.
200 KVA (Existing) 50 70 75 0.2 160 9.0 15
10.19 WASTEWATER LOADS
The waste water generation will be 18.09 KLD which is from process, floor & reactor
Process 3.98 1.41 5.39 HTDS: HTDS effluent sent to MEE system followed by ETP. Washings 0.00 3.00 3.00
EIA Report Godrej Agrovet Limited (GAVL)
Prepared By Rightsource Industrial Solutions Pvt. Ltd. Chapter – X Page 309
Boiler Blow down 0.00 0.70 0.70 LTDS: LTDS effluent treated in ETP – RO Plant. RO Rejects to MEE System and RO permeate to reuse, Condensate from MEE to reuse and MEE residue to ATFD.
Cooling towers Bleed off 0.00 3.50 3.50
Scrubbing System 2.00 0.00 2.00
Domestic 0.00 3.50 3.50
Total 5.98 12.11 18.09
The pollution loads for various pollutants viz., TDS, In-organics, Organics; COD for
products has worked out based on the material balance.
10.20 STAGE WISE EFFLUENT CHARACTERISTICS
The stage wise effluent characteristics have been arrived for the products based on
the material balance, which is given in Chapter-II.
10.21 HAZARDOUS WASTE DETAILS
The Hazardous waste generated and disposal methods from project are given
2 Details of Applicant Mr. Pravin Dinkar Waykole (Factory Manager)
3 Status
Godrej Agrovet Limited is proposed to expansion of its existing Herbicides / Fungicides /PGRs Manufacturing Unit has applied for Environmental Clearance.
4 Type of Land & Status Industrial land. Proposed Land: 10742 Sq. m
5 Capital Investment of the Project, Rs. in Crores
10 Crores
6 Capital cost for EMP, Rs. in Lakhs
62 Lakhs
7 Recurring cost for EMP, Rs. in Lakhs
11 Lakhs
8 Employment opportunity About 10 persons for proposed unit
9 Green belt Development It is envisaged to develop greenbelt on all sides of the industry in an area of about 1225.12 Sq. m (Total 3571.32 Sq. m).
10
Pollution control measures adopted Effluent water disposal ZLD System
Flue gas emission control For existing & proposed boilers, adequate stack height of 21 mts will be provided for wider dispersion of pollutants.
Process gas emission control Two stage scrubbers installed for process gas emissions
Vent condensers will be provided to the storage tanks and reactors Solvents and chemicals are handling in closed loop system
Hazardous waste management
All the hazardous waste will be collected, stored, handled, transported and disposed to TSDF as per the Hazardous Waste (Management, Handling and Trans boundary Movement) Rules, 2016, amended time to time etc are major Act/rules/notification applicable to industry.
11 Expenditure for CER & CSR activities
Rs. 10 Lakhs for CSR activities for five years.
11.2 CONCLUSIONS
It can be concluded on a positive note that due to the adequate provision and efficient
operation of Environmental Management Systems and after the implementation of the
proposed mitigation measures and environmental management plans, the project
activities during the construction and operation phase would have manageable & largely
have reversible impacts on the environment, and on balance the project would be
beneficial to surrounding communities and the region.
ENCLOSURES
INDUSTRIAL GOVERNMENT ORDER
ENCLOSURE - I
EC COPY & NAME CHANGE LETTER FROM M/s. BAHAR AGROCHEM & FEEDS PVT.
Compliance to the Observations made by the Regional Officer during the visit to the factory site
Sr. No.
Regional Officer Observations Compliance
1. Following conditions were not complied i. General Condition No.viii
PA did not submit the six monthly reports regularly since the grant of environment clearance
The present incumbent Godrej Agrovet Limited purchased the industry in the year 2013 and the EC was transferred in the name of Godrej Agrovet Limited in the year 2014. As there was not much activity till 2016-17 the EC compliance reports were not sent regularly. We assure that, we shall be submitting the EC Compliance Reports regularly in future.
ii. General Condition No. x PA did not submit the details of Financial closure and final approval to the Regional Office
1. The major changes are only the up gradationof ETP, which are still under progress. The work under progress is as under, replacement of Distillation vessel by MEE to have an efficient and economic concentration of salts. Thus the financial closure would be around the end of April- 2019. 2. The final approval would be after thecompletion of the up-gradation work of the ETP.
2. Following condition was partly complied General Condition No. ix Advertisement has been made, however the clause of seven days was not followed
The company has given the advertisement to the Newspapers, well in time, but the delay was mainly due to Late publications by the Newspaper Publishers, which may please be condoned
1.2: COMPLIANCE REPORT OF THE CONSENT TO OPERATE Consent order No: Format 1.0/AST/RO-KP/Amalgamation/CC-1808000689 Issue Date: 16/08/2018
Sr. No. Consent Conditions Compliance
1. The consent is granted for a period upto 30/06/2021
Noted.
2.
The total capital investment of the industry is Rs. 13.47 Cr. (Previous C.I. – Rs. 12.51 Cr. + Increased C.I.- Rs. 0.96 Cr. As per C.A. Certificate Submitted by industry)
effluent shall be limited to 11 m3/day and 4 m3/day respectively
consented values.
5. The industry shall follow the Conditions under Air (P&CP) Act, 1981 for air emissions
Noted.
6. The quantity of non hazardous waste generated shall be limited to 25 KG/day and sent to CHWTSDF for disposal
The quantities are not exceeding the consented values.
7.
The quantity of Herbicide residues and wastes shall be limited to 150 KG/D and the quantity of ETP shall be limited to 6 MT/A and sent to CHWTSDF for disposal
The industry follows all the conditions as per Hazardous and other wastes (Management and Transboundary Movement) Rules, 2016 for treatment and disposal of hazardous waste. The industry sends Herbicide residues and wastes and ETP Sludge to CHWTSDF for disposal. All the storage and handling practices of Hazardous waste are being followed by the industry. SOPs are prepared.
8. The industry shall also comply with the industry specific standards notified under Environment Protection Act.
The industry follows all the standards notified under Environment Protection Act.
9.
The applicant shall not carry out any excess production or produce new products without obtaining consent of the Board and Environmental Clearance wherever it‟s requires. Industry shall
comply with provisions of EIA Notification, 2006 and amended thereof.
Noted.
10.
The project proponent shall amend the existing EC within three months by incorporating inorganic product i.e. Caustic Lye from 27% to 48% by mixing and blending process
Not Applicable, As dilution of Caustic Lye by mixing and blending does not require Environmental Clearance as per the EIA Notification 2006.
11.
The applicant shall properly collect, transport and regularly dispose off the hazardous waste to CHWTSDF, in compliance of Hazardous and other wastes (Management and Transboundary Movement) Rules, 2016 and keep proper manifest thereof.
The industry follows all the conditions as per Hazardous and other wastes (Management and Transboundary Movement) Rules, 2016 for treatment and disposal of hazardous waste. The industry sends Herbicide residues and wastes and ETP Sludge to CHWTSDF for disposal. All the storage, transportation and handling practices of Hazardous waste are being followed by the industry. Standard SOPs are prepared.
As per your application, you have provided the ETP of capacities 20 CMD, consisting of primary, secondary, and tertiary treatment systems followed by RO system.
Implemented.
B.
The applicant shall operate the ETP to treat the trade effluent so as to achieve the standards prescribed by the Board or under EP Act, 1986 and Rules made there under from time to time, whichever is stringent.
Complied. Online Monitoring System is already installed, which is connected to CPCB/MPCB Servers.
C.
The applicant shall recycle/. Reuse treated effluent at maximum extent and remaining treated effluent shall be discharged to CETP through MIDC Pipeline. There shall not be any discharge outside the factory premises.
The industry has installed RO system in order to recycle the treated effluent to a maximum extent. The remaining effluent is sent to CETP, Lote-Parashuram. The quantity of discharge of the treated effluent is well below consented quantity
2.
A.
As per your consent you have provided soak pit as a treatment for sewage.
No. Even though it is given in consent to treat domestic effluent in soak pit, the industry is treating the effluent in the ETP along with process effluent to achieve better environmental standards.
B.
The applicant shall operate the sewage treatment system to treat the sewage so as to achieve the standards/ prescribed under EP Act, 1986 and Rules made there under from time to time, whichever is stringent.
The treated sewage is sent to CETP along with process effluent. The effluent standards are achieved as mentioned in the CTO.
C. The treated sewage shall be used on land for gardening/plantation only in the factory premises.
The treated sewage is sent to CETP along with process effluent.
3.
The Board reserves its rights to review plans, specifications or other data relating to plant setup for the treatment of waterworks for the purification thereof and the system for the disposal of sewage or trade effluent or in connection with the grant of any consent conditions. The applicant shall obtain prior consent of the Board to take steps to establish the unit or establish any treatment and disposal system or and extension or addition thereto.
Noted.
4.
The industry shall insure replacement of pollution control system or its parts after expiry of its expected life as defined by manufacturer so as to ensure the compliance of standards and safety of the operation thereof.
Noted.
5. The applicant shall comply with the provisions of the Water (Prevention and Control of Pollution) Act, 1974 and as amended, by installing water
meters, and other provisions as contained in the said act.
6.
The applicant shall provide Specific water Pollution control system as per the conditions of EP Act, 1986 and rule made there under from time to time/ Environment Clearance/ CREP Guidelines
Noted.
Schedule –II
Sr. No. Consent Conditions Compliance
1.
The applicant shall provide Specific Air Pollution control equipments as per the conditions of EP Act, 1986 and rules made there under from time to time/ Environment Clearance
Noted.
2.
The applicant shall operate and maintain the air pollution control system, so as to achieve the level of the pollutants to the following standards:
Particulate matter
Not to exceed
150 mg/Nm3
Acid Mist Not to exceed
35 ppm
Complied. The Stack emission monitoring from an external agency is done on regular basis. The results are within consented standards.
3.
The applicant shall obtain necessary prior permission for providing additional control equipment with necessary specifications and operation thereof or alteration or replacement well before its life come to an end or erection of new pollution control equipment
Noted.
4.
The Board reserves its rights to vary all or any of the condition in the consent, if due to any technological improvement or otherwise such variation (including the change of any control equipment, other in whole or in part is necessary)
Noted.
General Conditions:
Sr. No Consent Conditions Compliance
1.
The applicant shall provide facility for collection of environmental samples and samples of trade and sewage effluents, air emissions and hazardous waste to the Board for services rendered in this behalf
All the necessary arrangements are made.
2.
If the MIDC pipeline is broken/overflowing chamber, in such cases industry shall not discharge their treated effluent into MIDC drain, it shall be sent to CETP by tanker.
Noted.
3. Industry should monitor effluent quality, stack emissions and ambient air quality
Third Party Environmental Monitoring is done from NABL Accredited lab on regular
monthly basis. 6-Monthly compliance report is submitted time to time by the industry
4.
The applicant shall provide ports in chimney(s) and facilities such as ladder, platform etc. for monitoring the air emissions and the same shall be open for inspection to/and for use of the Board‟s Staff. The
chimney(s) vents attached to various sources of emission shall be designated by numbers such as S-1, S-2, etc. and these shall be painted/ displayed to facilitate identification.
Complied.
5.
whenever due to any accident or other unforeseen act or even, such emissions occur or is apprehended to occur in excess of standards laid down, such information shall be forthwith reported to Board, concerned police station, office of Directorate of Health Services, Department of Explosives, Inspectorate of Factories and Local Body. In case of failure of pollution control equipment‟s the production process
connected to it shall be stopped.
Noted.
6.
The applicant shall provide an alternate electric power source sufficient to operate all pollution control facilities installed to maintain compliance with the terms and conditions of the consent. In the absence, the applicant shall stop, reduce or otherwise, control production to abide by terms and conditions of this consent.
Noted and Complied. 200 KVA DG Set is installed for the power backup in case of power failure or shutdowns.
7.
The firm shall submit to this office, the 30th day of September every year, the environmental statement report for the financial year ending 31st March in the prescribed Form V as per the provisions of rule 14 of the Environment (Protection) (Second Amandmennt) Rulles, 1992
Noted.
8.
The industry shall recycle/reprocesses/reuse/recover Hazardous Waste as per the provision contain in the Hazardous and other Wastes(MH&T) Rules 2016, which can be recycled/processed/reused/recovered and only waste which has to be incinerated shall go to incineration and waste which can be used for land filling and cannot be recycled /reprocessed etc. should go for that purpose,
in order to reduce load on incineration and landfill site/environment.
9.
The industry should comply with the Hazardous and Other Waste (MH&T) Rules 2016, and submit the Annual Returns as per Rule 5(6) & 22(2) of Hazardous and Other Waste (MH&T) Rules 2016 for the preceding year April to March in Form-IV by 30th June of every year.
The industry sends its Hazardous waste to CHWTSDF, Taloja for disposal. The annual returns are being submitted by the industry time to time.
10. An inspection book shall be opened and made available to the Board‟s officers during their
visit to the applicant. Noted.
11. The applicant shall obtain Consent to Operate from MPCB before actual commencement of the activity.
Noted.
12.
Industry shall strictly comply with the Water(P&CP) Act, 1981 and Environment Protection Act, 1986 and industry specific standard under Rules 1986 which are available on MPCB website(www.mpcb.gov.in)
Complied.
13.
The industry shall constitute an Environmental Cell with qualified staff/personnel/agency to see the day to day compliance of consent conditions towards Environment Protection
Environment Management cell is constituted, the structure, duty and qualification of the personnel appointed as a part of Environment Management cell is as under 1. Pravin D Waykole ( BE Chemical) FactoryManager. 2. Sanjay S. Bhosale ( MSc) Asst Manager
QC. 3. Lavu C Gurav ( BSc) Officer.4. Operator
14.
Separate drainage system shall be provided for collection of trade and sewage effluents. Terminal manholes shall be provided at the end of the collection system with arrangement for measuring the flow. No effluent shall find its way other than in designed and provided collection system.
Complied.
15. Neither storm water nor discharge from other premises shall be allowed to mix with the effluents from the factory.
Separate drains are provided
16.
The applicant shall install a separate meter showing the consumption of energy for operation of domestic and industrial effluent treatment plants and air pollution control system. A register showing consumption of chemicals used for treatment shall be
a. Noise from the D.G. Set shall be controlled by providing acoustic enclosure or by treating the room acoustically
Acoustic enclosures are provided.
b.
Industry should provide acoustic enclosures for control of noise. The acoustic enclosure/acoustic treatment of the room should be designed for minimum 25 dB(A) insertion loss or for meeting the ambient noise standards, whichever is on higher side. The measurement of insertion loss will be done at different points at 0.5 meters from acoustic enclosure/room and then average.
Complied
c.
Industry should make efforts to bring down noise level due to DG Set, outside industrial premises, within ambient noise requirements by proper sitting and control measures.
Acoustic enclosures and adequate green belt are provided in order to bring down the ambient noise levels within CPCB standards.
d. Installation of DG set must be strictly in compliance with recommendations of DG Set manufacturer.
Noted.
e.
A proper routine and preventive maintenance procedure for DG Set should be set and followed in consultation with the DG Set manufacturer which would help to prevent noise levels of DG set from deteriorating with use.
Periodic maintenance practices are followed.
f. DG Set shall be operated only in case of power failure.
Noted.
g. The applicant should not cause any nuisance in the surrounding area due to operation of DG Set.
Noted.
h.
The applicant shall comply with the notification of MoEF dated 17.05.2002 regarding noise limit for generator sets run with diesel.
Noted and Complied.
18. The industry should not cause any nuisance in the surrounding area.
Noted.
19.
The industry shall take adequate measures for control of noise levels from its own sources within the premises so as to maintain ambient air quality standards in respect of noise to less than 75 dB(A) during day time and 70 dB(A) during night time. Day time is reckoned in between 6 a.m. and 10 p.m. and night time is reckoned between 10 p.m. and 6 a.m.
Noted.
20. The applicant shall maintain good Proper housekeeping practices are already
The applicant shall bring minimum 33% of the available open land under green coverage/plantation. The applicant shall submit a yearly statement by 30th September every year on available open plot area, number of trees surviving as on 30th March of the year and number of trees planted by September end
Green belt of about 20% area is provided. The yearly statement indicating all the details is being submitted by the industry time to time.
22.
The non-hazardous solid waste arising in the factory premises, sweepings etc. be disposed of scientifically so as not to cause any nuisance/pollution. The applicant shall take necessary permissions from civic authorities for disposal of solid waste.
Non hazardous solid waste is being sent to CHWTSDF, Taloja for disposal.
23.
The applicant shall not change or alter the quantity, quality the rate of discharge, temperature or the mode of effluent/emissions or hazardous waste or control equipment‟s
provided for without previous written permission of the Board. The industry shall not carry out any activity, for which this consent has not been granted/without prior consent of the Board.
Noted.
24.
The industry shall ensure that fugitive emissions from the activity are controlled so as to maintain clean and safe environment in and around the factory premises.
Regular sprinkling of water in the factory premises is being done to control the fugitive emissions.
25.
The industry shall submit quarterly statement in respect of industries obligation towards consent and pollution control compliance‟s
duly supported with documentary evidences.
Noted.
26. The industry shall submit official e-mail address and any change will be duly informed to the MPCB.
Noted.
27.
The industry shall achieve the National Ambient Air Quality Standards prescribed vide Government of India, Notification dt. 16.11.2009 as amended.
We have been regularly monitoring the ambient air quality from the third party. The results are meeting the National Ambient Air Quality Standards. The results are given in the EIA Report.
QCI National Accreditation Board for Education & Training
· .. · ... . . ....... ·.·.. .
. <Gt!llTIFIC.AIE OF A<GCREDITATIQN ... Rightsource Industrial Solutions Private limited
Plot No.203, H.No.S-36/203, Prashanthi Nagar, IDA Kukatpally Hyderabad- 500072, Telangana
Accredited as Category c A organization under the QCI-NABET Scheme for Accreditation of EIA
Consultant Organizations· Version 3 for preparing EIA-EMP reports in the following Sectors· 51.
Sector Description Sector (as per)
Cat. No. NABET MoE FCC
1 Mining of minerals including opencast I underground mining 1 1 (a) (i) B
2 Pesticides industry and pesticide specific intermediates (excluding
17 5 (b) A formulations)
Synthetic organic chemicals industry (dyes & dye intermediates;
bulk drugs and intermediates excluding drug formulations; 3
synthetic rubbers; basic organic chemicals, other synthetic organic 21 5 (f) A
chemicals and chemical intermediates)
Isolated storage & handling of Hazardous chemicals. (As per
4 threshold planning quantity indicated in column 3 of schedule 2 & 28 6 (b) B 3 of MSIHC Rules 1989 amended 2000)
5 Common Effluent Treatment Plants (CETPs) 36 7 (h) B
6 Building and construction projects 38 8 (a) B Note: Names of approved EIA Coordmators and Functional Area Experts are mf!ntlonf!d m RA AC mmutf!s dated July 20, 2018 posted on QCI-NABET website.
The Accreditation shall remain in force subject to continued compliance to the terms and conditions mentioned in QCI-NABET's letter of accreditation bearing no. QCI/NABET/ENV/AC0/18/0741 dated Sep. 07, 2018. The accreditation needs to be renewed before the expiry date by Rightsource Industrial Solutions Private Limited, Hyderabad, following due process of assessment.
Certificate No. NABET/ EIA/1821/ RA 0100
Valid till 25.02.2021
For the updated list of Accredited EIA Consultant Organizations with approved Sectors please refer to QCI-NABET website.