March 30, 2000 Residual Stress Report Page 1 of 15 Die Materials Committee Meeting March 30, 2000 Determine through baseline test measurements the stress Determine through baseline test measurements the stress changes that occur during production cycles. changes that occur during production cycles. Monitor these changes at specific historic area/areas Monitor these changes at specific historic area/areas where upset heat checking first occurs. where upset heat checking first occurs. Phase II - Using this information see what effect Phase II - Using this information see what effect different surface modifications have on this baseline different surface modifications have on this baseline data. data. Knowing this – translate into an economical method to Knowing this – translate into an economical method to measure and predict these changes on site during normal measure and predict these changes on site during normal production processes. production processes. Goals and Objectives – Dynamic
16

Goals and Objectives – Dynamic

Dec 30, 2015

Download

Documents

quincy-mcneil

Determine through baseline test measurements the stress changes that occur during production cycles. Monitor these changes at specific historic area/areas where upset heat checking first occurs. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Goals and Objectives – Dynamic

March 30, 2000 Residual Stress Report

Page 1 of 15Die Materials Committee MeetingMarch 30, 2000

Determine through baseline test measurements the stress Determine through baseline test measurements the stress

changes that occur during production cycles.changes that occur during production cycles.

Monitor these changes at specific historic area/areas where upset Monitor these changes at specific historic area/areas where upset

heat checking first occurs.heat checking first occurs.

Phase II - Using this information see what effect different surface Phase II - Using this information see what effect different surface

modifications have on this baseline data.modifications have on this baseline data.

Knowing this – translate into an economical method to measure Knowing this – translate into an economical method to measure

and predict these changes on site during normal production and predict these changes on site during normal production

processes.processes.

Goals and Objectives – Dynamic

Page 2: Goals and Objectives – Dynamic

March 30, 2000 Residual Stress Report

Page 2 of 15Die Materials Committee MeetingMarch 30, 2000

Desired die caster criteria for testDesired die caster criteria for testHigh volume runner High volume runner Multiple cavities (4ea preferred)Multiple cavities (4ea preferred)Flat surface prone to h/cFlat surface prone to h/cHistory of rapid h/cHistory of rapid h/cFlexible production schedulingFlexible production schedulingSmaller size inserts for handlingSmaller size inserts for handlingReasonable time frame for resultsReasonable time frame for resultsApproval of end userApproval of end user

Recapping the December 1, 1999 Meeting Notes

Page 3: Goals and Objectives – Dynamic

March 30, 2000 Residual Stress Report

Page 3 of 15Die Materials Committee MeetingMarch 30, 2000

Bob Ehrman Bob Ehrman AST TechnologiesAST Technologies Jerry SkoffJerry Skoff Badger Metal TechBadger Metal Tech Dr. David SchwamDr. David Schwam Case Western UniversityCase Western University Nanda GopalNanda Gopal Intermet (was Ganton)Intermet (was Ganton) Curt KyonkaCurt Kyonka Pace IndustriesPace Industries Vince AdkarVince Adkar Thyssen SteelThyssen Steel Yeou-Li ChuYeou-Li Chu RyobiRyobi

Committee Assistance Members Arnie FultonArnie Fulton Pace Industries CorpPace Industries Corp Jim BerryJim Berry Pace Industries MOPace Industries MO Roy CecilRoy Cecil Pace Industries MOPace Industries MO Dave ThomasonDave Thomason Pace Industries MOPace Industries MO Rex FishRex Fish GMPTGMPT

Committee Members - via email

- via email

Page 4: Goals and Objectives – Dynamic

March 30, 2000 Residual Stress Report

Page 4 of 15Die Materials Committee MeetingMarch 30, 2000

high volume runner multiple cavities flat surface prone to h/c history of rapid h/c flexible production schedule smaller size inserts for handling reasonable time frame for results approval of end user

Current Test Site

Pace Industries

Page 5: Goals and Objectives – Dynamic

March 30, 2000 Residual Stress Report

Page 5 of 15Die Materials Committee MeetingMarch 30, 2000

CASTINGS

GATE FLOW ON CASTINGS

CAVITY #10 CAVITY #9

Biscuitshot

Page 6: Goals and Objectives – Dynamic

March 30, 2000 Residual Stress Report

Page 6 of 15Die Materials Committee MeetingMarch 30, 2000

Heat check prone area

CAVITY #10

Page 7: Goals and Objectives – Dynamic

March 30, 2000 Residual Stress Report

Page 7 of 15Die Materials Committee MeetingMarch 30, 2000

CAVITY #9H

eat c

heck

pro

ne a

rea

Page 8: Goals and Objectives – Dynamic

March 30, 2000 Residual Stress Report

Page 8 of 15Die Materials Committee MeetingMarch 30, 2000

Cavity #9

Photos taken during Pace visit

ShotBiscuit

Die Sampled350 SHOTS

Approximate area where X-ray and Barkhausen

measurementsare being taken

Directions#1 0 degrees# 2 -45 degrees# 3 -90 degrees

Page 9: Goals and Objectives – Dynamic

March 30, 2000 Residual Stress Report

Page 9 of 15Die Materials Committee MeetingMarch 30, 2000

Cavity #10

REAR RETAINERPhotos taken during Pace visit

ShotBiscuit

Die Sampled350 SHOTS

Directions#1 0 degrees# 2 -45 degrees# 3 -90 degrees

Approximate area where X-ray and Barkhausen

measurementsare being taken

Page 10: Goals and Objectives – Dynamic

March 30, 2000 Residual Stress Report

Page 10 of 15Die Materials Committee MeetingMarch 30, 2000

Die was already sampled (350 shots) Die was already sampled (350 shots) (prior to first measurement)(prior to first measurement)

ProcedureProcedureMeasurements taken by AST at specified areas Measurements taken by AST at specified areas

determined by past history and Case Western determined by past history and Case Western recommendationsrecommendations

Die X-ray site plotted for future measurementsDie X-ray site plotted for future measurementsBarkhausen readings in same locationsBarkhausen readings in same locationsInserts returned to Pace for approximately 20-30K Inserts returned to Pace for approximately 20-30K

shotsshotsRepeat measuring cycle for stress and Barkhausen Repeat measuring cycle for stress and Barkhausen

readings until steel upsets & heat checking occursreadings until steel upsets & heat checking occurs

First Measurement

Page 11: Goals and Objectives – Dynamic

March 30, 2000 Residual Stress Report

Page 11 of 15Die Materials Committee MeetingMarch 30, 2000

Die had 20,523 shots (producing castings (03/29/2000) (Will attempt to pull every 20-30K- takes 2 weeks)

AST commented that, upon receipt, they noted that the calibration area selected on the dies for the 1st measurement appeared to be aggressively ground.

Same reference point used for measurement #1 would make Barkhausen readings (which measures change) not usable.

New calibration piece for reference was made by AST but not from (H-13).

Measurements taken and returned to Pace.

Second Measurement

Page 12: Goals and Objectives – Dynamic

March 30, 2000 Residual Stress Report

Page 12 of 15Die Materials Committee MeetingMarch 30, 2000

RESIDUAL STRESS TASK FORCE - REAR RETAINER CAVITY #9 AND CAVITY #10BASELINE TESTING WITHOUT ANY SURFACE TREATMENTS OR COATINGS

Date Shots X-Ray (XRD in KSI) Barkhausen (BNA numerical)Measured 0 degrees -45 degrees -90 degrees 0 degrees -45 degrees -90 degrees

Part Cav #9FIRST READ 02/17/2000 350 +33.3 +/- 2.6 +34.8 +/- 1.8 +41.2 +/- 1.6 80.1 97.6 173.3

SECOND 03/14/2000 20,523 +29.3 +/- 1.8 +38.7 +/- 2.1 +50.7 +/- 1.4 52.9* 54.9* 98.4*

Part Cav #10FIRST READ 02/17/2000 350 +35.7 +/- 1.6 +40.1 +/- E4 +41.0 +/_ 1.2 44.5 81.4 80

SECOND 03/14/2000 20,523 +38.9 +/- 1.8 +59.8 +/- 1.1 +63.9 +/- 1.5 32.4* 64.8* 69*

* The calibration area selected on the dies during run 1 of testing was aggressively ground when the dies .arrived for round #2. A separate calibration piece (not H-13) was created during round 2 that will be kept at AST.

Sensor Units for Barkhausen were same as first time.(Round #2 dies were ground in area where we took reference barkhausen readings)[Barkhausen measures changes - ie: Residual Stresss, Hardness, Micro-structureand outputs it as a numerical value.

Page 13: Goals and Objectives – Dynamic

March 30, 2000 Residual Stress Report

Page 13 of 15Die Materials Committee MeetingMarch 30, 2000

Measured 0 degrees -45 degrees -90 degrees 0 degrees -45 degrees -90 degreesPart Cav #9FIRST READ 2/17/2000 350 +33.3 +/- 2.6 +34.8 +/- 1.8 +41.2 +/- 1.6 80.1 97.6 173.3

SECOND 3/14/2000 20,523 +29.3 +/- 1.8 +38.7 +/- 2.1 +50.7 +/- 1.4 52.9* 54.9* 98.4*

Part Cav #10FIRST READ 2/17/2000 350 +35.7 +/- 1.6 +40.1 +/- E4 +41.0 +/_ 1.2 44.5 81.4 80

SECOND 3/14/2000 20,523 +38.9 +/- 1.8 +59.8 +/- 1.1 +63.9 +/- 1.5 32.4* 64.8* 69*

* The calibration area selected on the dies during run 1 of testing was aggressively ground when the dies .arrived for round #2. A separate calibration piece (not H-13) was created during round 2 that will be kept at AST.

No trend established as yet, however, indications of

increasing tensile stress developing at measuring point

Page 14: Goals and Objectives – Dynamic

March 30, 2000 Residual Stress Report

Page 14 of 15Die Materials Committee MeetingMarch 30, 2000

Possible Future Testing:

Ganton Technologies

high volume runner multiple cavities flat surface prone to h/c history of rapid h/c flexible production schedule smaller size inserts for handling reasonable time frame for results approval of end user

Page 15: Goals and Objectives – Dynamic

March 30, 2000 Residual Stress Report

Page 15 of 15Die Materials Committee MeetingMarch 30, 2000

Ganton TechnologiesRear Seal

Cover Side

Page 16: Goals and Objectives – Dynamic

March 30, 2000 Residual Stress Report

Page 16 of 15Die Materials Committee MeetingMarch 30, 2000

Continue with subsequent X-ray measuring on Continue with subsequent X-ray measuring on Pace diesPace dies

Pursue possibility of working with Ganton Pursue possibility of working with Ganton ((FordFord)) toolingtooling

Next phase - if DOE funding availableNext phase - if DOE funding availableBegin measuring other tooling that has been Begin measuring other tooling that has been

surface treated surface treated Possible studiesPossible studiesMetalifeMetalifeDyna-blue - Ferritic Nitro-CarburizingDyna-blue - Ferritic Nitro-CarburizingMetalife and Dyna-blue in combinationMetalife and Dyna-blue in combinationVarious coatings - i.e.: PVD (Crn, Crc, TiAln) & Various coatings - i.e.: PVD (Crn, Crc, TiAln) &

CVDCVD

Future Studies