GLAST LAT Project I&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart Integration and Test Organization Chart I&T Manager Elliott Bloom WBS 4.1.9 I&T Engineer B. Grist WBS 4.1.9.1 Reliability & QA D. Marsh WBS 4.1.9.2 Environmental Test Manager M. Lovellette Online Manager R. Claus Science Verification, Analysis, and Calibration E. do Couto e Silva Particle Test Manager G. Godfrey Integration, Facilities, Configuration, and Test L. Wai Instrument Operations Coordinator S. Williams Mechanical Ground Support Equipment TBD I&T Preparation 4.1.9.3 EM1 Model I&T Calibration Unit I&T 4.1.9.4 Flight LAT I&T 4.1.9.6 Mission I&T Support 4.1.9.7 I&T Preparation 4.1.9.3 EM1 Model I&T Calibration Unit I&T 4.1.9.4 Flight LAT I&T 4.1.9.6 Mission I&T Support 4.1.9.7 I&T Preparation 4.1.9.3 Flight LAT I&T 4.1.9.6 Mission I&T Support 4.1.9.7 I&T Preparation 4.1.9.3 EM1 Model I&T Calibration Unit I&T 4.1.9.4 Flight LAT I&T 4.1.9.6 Mission I&T Support 4.1.9.7
15
Embed
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS 4.1.9.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
GLAST LAT Project I&T PDR Presentation (IFCT Dept.) – January 9, 2002
Larry Wai
Integration and Test Organization ChartIntegration and Test Organization Chart
I&T ManagerElliott Bloom
WBS 4.1.9
I&T EngineerB. Grist
WBS 4.1.9.1
Reliability & QAD. Marsh
WBS 4.1.9.2
Environmental Test Manager
M. Lovellette
Online ManagerR. Claus
Science Verification, Analysis, and Calibration
E. do Couto e Silva
Particle Test ManagerG. Godfrey
Integration, Facilities, Configuration, and Test
L. Wai
Instrument Operations CoordinatorS. Williams
Mechanical Ground Support Equipment
TBD
I&T Preparation 4.1.9.3
EM1 Model I&T
Calibration Unit I&T 4.1.9.4
Flight LAT I&T 4.1.9.6
Mission I&T Support 4.1.9.7
I&T Preparation 4.1.9.3
EM1 Model I&T
Calibration Unit I&T 4.1.9.4
Flight LAT I&T 4.1.9.6
Mission I&T Support 4.1.9.7
I&T Preparation 4.1.9.3
Flight LAT I&T 4.1.9.6
Mission I&T Support 4.1.9.7
I&T Preparation 4.1.9.3
EM1 Model I&T
Calibration Unit I&T 4.1.9.4
Flight LAT I&T 4.1.9.6
Mission I&T Support 4.1.9.7
GLAST LAT Project I&T PDR Presentation (IFCT Dept.) – January 9, 2002
7. Wireless alarm system for disaster prevention: automated real time analysis of environmental data, manager (me) lives within 10 min of Integration Area
8. Tape lift, witness plate processing
GLAST LAT Project I&T PDR Presentation (IFCT Dept.) – January 9, 2002