GLAST LAT Project Managers F2F 6/15/05 4.1.9 - Integration and Test 1 GLAST Large Area GLAST Large Area Telescope: Telescope: Face to Face Managers Face to Face Managers Meeting Meeting LAT Integration & Test LAT Integration & Test June 15, 2005 2:00 PM June 15, 2005 2:00 PM Integration and Test Integration and Test 6 Towers 6 Towers Elliott Bloom Elliott Bloom I&T Manager I&T Manager Ken Fouts Ken Fouts I&T Engineering Manager I&T Engineering Manager SLAC SLAC Eduardo do Couto e Silva Eduardo do Couto e Silva SVAC Manager SVAC Manager Gamma-ray Large Gamma-ray Large Area Space Area Space Telescope Telescope
32
Embed
GLAST LAT Project Managers F2F 6/15/05 4.1.9 - Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 1
GLAST Large Area Telescope: GLAST Large Area Telescope: Face to Face Managers MeetingFace to Face Managers Meeting
LAT Integration & Test LAT Integration & Test June 15, 2005 2:00 PMJune 15, 2005 2:00 PM
Integration and Test Integration and Test 6 Towers6 Towers
Elliott BloomElliott BloomI&T ManagerI&T Manager
Ken FoutsKen FoutsI&T Engineering ManagerI&T Engineering Manager
SLACSLAC
Eduardo do Couto e SilvaEduardo do Couto e SilvaSVAC ManagerSVAC Manager
Gamma-ray Large Gamma-ray Large Area Space Area Space TelescopeTelescope
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 2
Last Month's Accomplishments (1 of 2)Last Month's Accomplishments (1 of 2)
• Management– Tracking hardware shortages for LAT integration.– Procedure Status
– 68 of 70 submitted for sign-off or released
• IFCT – Completed 4 tower tests.– Completed I&T receiving tests on 3 TKR’s, 3 CAL’s and 3
TEM’s.– Completed assembly and installation of the grid cooler (aka
the Chilla from Manila).– Completed installation of 2 additional towers for a total of 6
towers installed in the grid.– Preparations complete for 6 tower tests.
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 3
Last Month's Accomplishments (2 of 2)Last Month's Accomplishments (2 of 2)
• Online– LATTE
• Supported VSC software Python interface implementation• Exploratory work in progress to demonstrate interaction with
the VSC and its software interface• 4.9.0 released
– Initiated by ACD-discovered bug – Bug fixes, Trigger GUI, GPIB support– Updated Hippodraw addressing some memory leaks– Updated trigger GUI to address concerns raised in trigger meeting– Bug fix for incorrectly initialized TEM BUSY_LRS_MASK register
(measures TEM deadtime)
• Housekeeping multi-pen strip-chart GUI V2.0 deployed to cleanroom for real-time monitoring.
• E-logbook Version 3.4.1 released (minor bug fixes with corresponding tutorial and documentation updates)
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 4
I&T ActivitiesI&T Activities
Grid Chiller Unit Installation Grid Cooling
Six CAL/TEM’s Installed Six Tower’s Integration
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 5
Procedure StatusProcedure Status• 70 documents total• 68 latest versions submitted for sign-off• 65 are released
19 19 19 19 18 18 18 18 18 18 18 18 18
15 15 15 15 15 15 15 15 15 15 15 15 15
7 7 7 7 7 6 6 6 4 4 4 4 4
4 4 4 4 4 4 4 43 3 3 3 3
12 12 12 12 12 12 12 1212 12 12 12 12
2 2 2 2 2 2 2 22 2 2 2 2
11 11 11 11 11 11 11 1111 11 11 11 11
0
10
20
30
40
50
60
70
80
Co
un
t o
f D
ocu
men
t #
Co
un
t o
f D
ocu
men
tN
um
ber
Ass
ign
ed
Co
un
t o
f D
raft
Sta
rted
Co
un
t o
f D
raft
Co
mp
lete
Co
un
t o
f In
tern
alR
evie
w C
om
ple
te
Co
un
t o
f su
bm
itte
dfo
r si
gn
off
Co
un
t o
f D
CN
wri
tten
Co
un
t o
f D
CN
an
dD
oc
sen
t fo
r si
gn
off
Co
un
t o
f S
ign
ed b
yA
uth
or
Co
un
t o
f S
ign
ed b
yE
llio
tt B
loo
m
Co
un
t o
f S
ign
ed b
yQ
A
Co
un
t o
f S
ign
ed b
yO
ther
s
Co
un
t o
f R
elea
sed
inL
AT
Do
cs
Do
cum
ents
Online
SVAC
Particle
MGSE
Manage.
IFCT-Mech
IFCT-Elec
Depart.
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 6
Procedure Status – ManagementProcedure Status – Management
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 7
Procedure Status – IFCT ElectricalProcedure Status – IFCT Electrical
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 8
I&T NCRs by Month Open/Closed StatusI&T NCRs by Month Open/Closed Status
Power Outage Impact on I&TPower Outage Impact on I&T
• Emergency Generator allowed work to continue in B33.• Room 103 circuit breaker/panel fault was resolved by turning
off non-essential power.• Room 104 was unaffected by the panel fault. TKR 3 was
installed on Thursday, June 19.• Root cause of the circuit breaker fault was found to be a loose
connection on the main power coming into the panel.• The building was brought back to 100% with minimal impact to
building users.
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 10
Online ProgressOnline Progress
– LATTE 5• Meetings with SE, ISOC and FSW• Requirements doc in progress • Took delivery of a Dell blade server
– Used to develop LATTE 5 concepts – Test mobile rack concepts
– Progress on parallelizing the scripts:• TKR scripts nearly complete and tested• CAL CPT and LPT nearly complete and tested. • INT (e2e, SVAC) scripts complete. • CalibGen, CalibDac and MuTrg still to go
– ACD script preparation and test support ongoing.– Risks to schedule:
• Continued ACD problems requiring one or more of the Online team to make a site visit
• LATTE 5 requirements are converging slowly.
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 11
I&T Detail Schedule (1 of 6)I&T Detail Schedule (1 of 6)
ID Task Name Start % Complete Finish
835 Tower 4 - Bay 8 2/22/05 41% 6/27/05836 FM107 Post ship test and receiving test 2/22/05 100% 2/28/05843 Tracker 4 post ship test & receiving test 6/6/05 100% 6/8/05853 TEM/TPS 4 Flight Readiness 6/6/05 100% 6/6/05854 TEM/TPS EICIT & SVT 6/6/05 100% 6/6/05855 TEM/TPS-4 I&T 6/8/05 100% 6/9/05861 Tower-4 Grid Bay 8 I&T 6/9/05 18% 6/27/05862 TKR-5 installation into grid bay 8 6/9/05 100% 6/9/05866 FM107 installation into grid bay 8 6/10/05 100% 6/13/05869 6 Tower Test 6/9/05 5% 6/27/05870 Install Chiller bars 6/9/05 100% 6/9/05871 6 Tower Survey 6/13/05 100% 6/13/05872 Install & Inject Shear plates ( Bay 0,4,5,1) 6/13/05 0% 6/14/05873 Install Cable Trays 6/14/05 0% 6/14/05874 Thermistor bonding/cure on bays 0/4 (NCR351) 6/14/05 0% 6/14/05875 Bay 8 and 9 ECITs 6/15/05 0% 6/15/05876 Bay 8 Cable EICITs 6/15/05 0% 6/15/05877 Bay 9 Cable EICITs 6/15/05 0% 6/15/05
6/6
6/9
5/22 6/12 7/3 7/24 8/14May '05 Jun '05 Jul '05 Aug '05
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 12
I&T Detail Schedule (2 of 6)I&T Detail Schedule (2 of 6)
ID Task Name Start % Complete Finish
878 Setup EM GASU EM PDU and connect cables 6/15/05 0% 6/16/05879 Install EM GASU 6/15/05 0% 6/15/05880 Install EM PDU 6/15/05 0% 6/15/05881 Configure EM PDU/ EM GASU Primary 6/15/05 0% 6/15/05882 EM PDU / EM GASU register Tests 6/15/05 0% 6/15/05883 Reconfigure EM PDU/ EM GASU Redundant 6/15/05 0% 6/15/05884 EM PDU / EM GASU register Tests 6/15/05 0% 6/15/05885 Connect GASU and PDU cables for Bays 0,1,4,5,8,9 6/15/05 0% 6/16/05886 TEM Register Tests 0,1,4,5,8,9 6/16/05 0% 6/16/05887 TEM Register Test Bay 0 Redundant 6/16/05 0% 6/16/05888 TEM Register Test Bay 1 Redundant 6/16/05 0% 6/16/05889 TEM Regisiter Test Bay 4 Redundant 6/16/05 0% 6/16/05890 TEM Register Test Bay 5 Redundant 6/16/05 0% 6/16/05891 TEM Register Test Bay 8 Redundant 6/16/05 0% 6/16/05892 TEM Register Test Bay 9 Redundant 6/16/05 0% 6/16/05893 Set up for TEM Register Test Primary Side 6/16/05 0% 6/16/05894 TEM Register Test Bay 0 Primary 6/16/05 0% 6/16/05895 TEM Register Test Bay 1 Primary 6/16/05 0% 6/16/05
5/22 6/12 7/3 7/24 8/14May '05 Jun '05 Jul '05 Aug '05
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 13
ID Task Name Start % Complete Finish
895 TEM Register Test Bay 1 Primary 6/16/05 0% 6/16/05896 TEM Regisiter Test Bay 4 Primary 6/16/05 0% 6/16/05897 TEM Register Test Bay 5 Primary 6/16/05 0% 6/16/05898 TEM Register Test Bay 8 Primary 6/16/05 0% 6/16/05899 TEM Register Test Bay 9 Primary 6/16/05 0% 6/16/05900 Bay 8 and 9 Post Integration Testing and part of
NCR 5096/16/05 0% 6/17/05
901 Tracker CPT Bay 8 6/16/05 0% 6/16/05902 Tracker CPT Bay 9 6/16/05 0% 6/16/05903 Calorimeter CPT Bay 8 6/16/05 0% 6/16/05904 Calorimeter CPT Bay 9 6/16/05 0% 6/17/05905 Calorimeter CPT Bay 0 (NCR 509) 6/17/05 0% 6/17/05906 Calorimeter CPT Bay 4 (NCR 509) 6/17/05 0% 6/17/05907 TE702 Bay 8 6/17/05 0% 6/17/05908 TE704 Bay 8 6/17/05 0% 6/17/05909 TE702 Bay 9 6/17/05 0% 6/17/05910 TE704 Bay 9 6/17/05 0% 6/17/05911 TE702 Bay 1 (NCR 509) 6/17/05 0% 6/17/05
5/22 6/12 7/3 7/24 8/14May '05 Jun '05 Jul '05 Aug '05
I&T Detail Schedule (3 of 6)I&T Detail Schedule (3 of 6)
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 14
ID Task Name Start % Complete Finish
911 TE702 Bay 1 (NCR 509) 6/17/05 0% 6/17/05912 TE702 Bay 5 (NCR 509) 6/17/05 0% 6/17/05913 STR 13 6/17/05 0% 6/17/05914 Tracker LPTs Bays 0,1,4,5,8,9 6/17/05 0% 6/20/05915 Tracker LPT Bay 0 6/17/05 0% 6/17/05916 Tracker LPT Bay 1 6/17/05 0% 6/20/05917 Tracker LPT Bay 4 (also covers NCR 420) 6/20/05 0% 6/20/05918 Tracker LPT Bay 5 (also covers NCR 420) 6/20/05 0% 6/20/05919 Tracker LPT Bay 8 6/20/05 0% 6/20/05920 Tracker LPT Bay 9 6/20/05 0% 6/20/05921 Calorimeter LPTs 0,1,4,5,8,9 6/20/05 0% 6/20/05922 Calorimeter LPT Bay 0 6/20/05 0% 6/20/05923 Calorimeter LPT Bay 1 6/20/05 0% 6/20/05924 Calorimeter LPT Bay 4 6/20/05 0% 6/20/05925 Calorimeter LPT Bay 5 6/20/05 0% 6/20/05926 Calorimeter LPT Bay 8 6/20/05 0% 6/20/05927 Calorimeter LPT Bay 9 6/20/05 0% 6/20/05928 Trigger Tests 6/20/05 0% 6/22/05
5/22 6/12 7/3 7/24 8/14May '05 Jun '05 Jul '05 Aug '05
I&T Detail Schedule (4 of 6)I&T Detail Schedule (4 of 6)
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 15
ID Task Name Start % Complete Finish
928 Trigger Tests 6/20/05 0% 6/22/05929 TREQ Scan Bay 8 6/20/05 0% 6/20/05930 TREQ Scan Bay 9 6/20/05 0% 6/20/05931 TACK Scan 6/20/05 0% 6/21/05932 Efficiency Bay 8 6/21/05 0% 6/21/05933 Efficiency w/ paddle offset Bay 8 6/21/05 0% 6/21/05934 Efficiency Bay 9 6/21/05 0% 6/21/05935 Efficiency w/ paddle offset Bay 9 6/21/05 0% 6/21/05936 Efficiency Bay 1 (NCR 509) 6/21/05 0% 6/21/05937 Efficiency w/ paddle offset Bay 1 (NCR 509) 6/21/05 0% 6/21/05938 Efficiency Bay 5 (NCR 509) 6/21/05 0% 6/21/05939 Efficiency w/ paddle offset Bay 5 (NCR 509) 6/22/05 0% 6/22/05940 Calibration 6/22/05 0% 6/23/05941 CalibDac Bay 8 (w/ file extract) 6/22/05 0% 6/22/05942 CalibGen Bay 8 6/22/05 0% 6/22/05943 MuTrig Bay 8 6/22/05 0% 6/22/05944 CalibDac Bay 9 (w/ file extract) 6/22/05 0% 6/22/05945 CalibGen Bay 9 6/22/05 0% 6/22/05
5/22 6/12 7/3 7/24 8/14May '05 Jun '05 Jul '05 Aug '05
I&T Detail Schedule (5 of 6)I&T Detail Schedule (5 of 6)
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 16
ID Task Name Start % Complete Finish
945 CalibGen Bay 9 6/22/05 0% 6/22/05946 MuTrig Bay 9 6/22/05 0% 6/23/05947 TE601/TE602/TE604 Bay 8 (pending input from Hiro) 6/23/05 0% 6/23/05
• Warren Implemented an offline variable to measure time without being affected by roll over of counter
• Measured deadtime in several configurations
– Trying to understand numbers right now
• Proposed a new test to prescale hits at the GEM level
– Similar to on-orbit operations– enable more than one
trigger engine
– However, it stresses less the TD&F
– Therefore keep current prescaling tests
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 29
Do we have enough data yet?Do we have enough data yet?
• One tower
• Two towers
– End-to-end cosmic ray data– To exercise trigger and data flow capabilities
– SVAC cosmic ray data– To perform calibrations – To do performance studies that require large statistical sample
• Four towers to Sixteen towers (prior to ACD integration)
– Only planned to collect SVAC data
– May request some tests (most likely between 6 and 8 towers) to– Configure the instrument to take data with 2 Trigger Engines
(simulate on-orbit operation) – Study nominal/high rates with TEM diagnostics OFF– Understand TKR one-shot behavior– Study TKR cable FIFO errors (caused by induced showers)
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 30
Number of Talks in the IA meetingsNumber of Talks in the IA meetings
0
5
10
15
20
25
30
Jun-7-2004
Jul-30-2004
Aug-13-2004
Sep-3-2004
Nov-5-2004
Nov-19-2004
Dec-10-2004
Jan-21-2005
Feb-18-2005
Mar-4-2005
Mar-18-2005
Apr-1-2005
Apr-15-2005
Apr-29-2005
May-13-2005
Jun-10-2005
SVAC LAT Collaboration
Workshop 1Workshop 2
Workshop 3
Workshop 4Scheduled for
July14-15, 2005
After a year of effort, here we are….
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 31
Contributions to Instrument Analysis EffortContributions to Instrument Analysis Effort
GLAST LAT Project Managers F2F 6/15/05
4.1.9 - Integration and Test 32
Data Analysis EffortsData Analysis Efforts
• We generated a list of 15 potential topics for– Immediate analysis with data from 1 to 6 towers – Presentations during IA workshop July 14-15
• Working with subsystems (Neil,Dave,Ronaldo,Francesco) to – Sharpen topics and ideas– Identify names for presentations
• Initiated contacts ACD– Would like to have presentation during IA workshop
– If Dave can support that given the ACD schedule
– Need to discuss details for ACD tests at SLAC– Test plans– SAS Offline software– Pipeline scripts and related infrastructue