Top Banner
Ghana Telecommunications Company Limited NGN Migration: Scenario and Strategy David Mettle CTO
25

Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

Apr 04, 2018

Download

Documents

vanlien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

Ghana Telecommunications Company Limited

NGN Migration: Scenario and Strategy

David MettleCTO

Page 2: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

AGENDA

Network Architecture: Where we are today

Network Architecture: Where do we want to go?

Why Telcos Should Care About NGN

Ghana Telecom’s Migration Strategy

2

Page 3: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

WHERE WE ARE

TODAY:SINGLE-SERVICE VERTICAL NETWORKS

3

Page 4: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

WHERE WE ARE?

PSTNPLMN (GSM)ATMIP/MPLS

4

Page 5: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

5

Distinguishing Feature of Legacy Equipment.

For legacy equipment, the intelligence for service delivery was linked rigidly to the hardware for call connection.

Page 6: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

6

One Network Per Service - Challenges

High CAPEXHigh OPEX

• Different subsets of technicians per technology.• Different stock of spare parts per vendor.• Different support contracts per equipment type.

Variations in enhanced facility features.• Pass Word usage between NEAX and FETEX• Some features unavailable on certain switches.

Customer Dissatisfaction

Page 7: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

7

Examples of Scrapped Vertical (Silo) Platforms.

TELEX EXCHANGE

MARINE COMMUNICATONS

HDX 10 (PSTN)

Page 8: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

8

TELEX

Telex services introduced in 1961 using step by step Strowger Switch.Strowger switch replaced by ELTEX in 1982.Telex services were stopped and

hardware sold as scrap in 2004.

Page 9: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

9

MARINE COMMUNICATIONS

Ghana Telecom provided Marine Vessel to Land Communications using HF technology.

With the availability of IMMARSAT serviceson ships, marine communications traffic virtually disappeared.Equipment built for this particular service was rendered useless. Retrain and redeploy staff.

Page 10: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

10

Page 11: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

11

Key Concept for the Vision of NGN

DECOUPLE THE SERVICE INTELLIGENCE FROM THEHARDWARE PROVIDINGCALL CONNECTION AND TRANSPORT.

Page 12: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

WHERE DO WE WANT TO GO?

TOMORROW:MULTI-SERVICEINTEGRATED NETWORK

12

Page 13: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

13

The NGN Paradigm Shift

Page 14: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

14

Page 15: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

15

Value Proposition for NGN Architecture.(Why Should Telcos Care about NGN?)

In the new millennium business success for public network operators requires finding new ways to add value to their transport services..

Page 16: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

16

Value Proposition for NGN Architecture.(Why Should Telcos Care about NGN?)

Enabler of cost effective support for new suite of sophisticated services.Cost reduction by eliminating service specific proprietary solutions.

Page 17: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

17

Value Proposition for NGN Architecture.(Why Should Telcos Care about NGN?)

Reduce time to market and life cycle costs of offering new Services.Enable Telcos to deploy advanced services and thereby remain competitive

Page 18: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

Ghana Telecom’s Migration Strategy – Steps to NGN.

The Overall Strategy is a Gradual Replacement of old equipment as they come to the end of their useful lives.

18

Page 19: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

Ghana Telecom’s Migration Strategy – Steps to NGN.

Introduction of Network Elements with Open Interfaces & Compatible with NGN Architecture.Eg. nHLR, IPTV

19

Page 20: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

20

Pilot for NGN Migration @ Ghana Telecom

Page 21: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

Replacement of Old Switches

Small Capacity PSTN Switches are being replaced by NGN-ready Multi Service Access Nodes.Network Extension to new areas will be done by NGN access devices (MSANs and IPDSLAM) with the capability to deliver Triple Play Services.

21

Page 22: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

Page 22

Ho

SOFTX3000 UMS2000

SS7

(North Accra)PSTN

DDF

POTS(5024))

POTS(1216) ADSL2+(192)Hohoe

UA5000

10* E1

10* E1

UMG8900

North Accra

PRA

IP MPLS

POTS(1216) ADSL2+(96)Kpando

UA5000

POTS(1216) ADSL2+(96)Keta

UA5000

POTS(1216) ADSL2+(128)Denu-Aflao

UA5000

POTS(768) ADSL2+(64)Akatsi

UA5000

ADSL2+(512)UA5000

CX300

CX200

CX200 CX200 CX200 CX200

NGN Structure for Ho Project

FE

FE

6E18E17E17E1

12E1

Note: The transmission bandwidth is based on the assumption that the average bandwidth for each ADSL2+ subscriber is 1M

Page 23: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

Mobile Expansion

The next phase of the Mobile expansion will be done using softswitch technology

Fibre in the Metro will be deployed to make the access NGN-ready.

23

Page 24: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

Upgrade of IPMPLS Core

The existing IP/MPLS core will be upgraded for higher capacity and reliability.

Metro Ethernet will be constructed in Accra to aggregate IP traffic.

24

Page 25: Ghana Telecommunications Company Limited · Page 22 Ho SOFTX3000 UMS2000 SS7 (North Accra) PSTN D D F POTS(5024)) POTS(1216) ADSL2+(192) Hohoe UA5000 10* E1 10* E1 UMG8900 North Accra

25

THANK YOU!!!