Date of Examination: 05/06/2013 Operating Test Number: LOT
2012-1
Facility: Grand Gulf Nuclear Station JPM Number:
GJPM-OPS-2012-1AS1
Revision 0 2/20/2013 Page 1 of 8
GGNS
2012-1 NRC Operating Test
Job Performance Measure JPM Number: GJPM-OPS-2012-1AS1 JPM
Title: Verify Surveillances Status for 03-1-01-5 Att. I Facility
Number: N/A __________ (If Bank or Modified from Bank)
JPM Attributes:
New Modified Direct from bank
Time Critical Alternate Path Validation Time: 15 min
Applicant: ________________________________ Examiner:
_________________________________ Performance Time:
________________________ Performance Rating: SAT UNSAT
Prepared By: Kyle Grillis 2/20/13 Exam Developer Date
Ops Review: Robert Brinkman 3/21/2013 1st Validation by Ops Rep
or Ops Validation Crew Date
Validated By: Keith Huff / Dustin Hill 3/25/2013 2nd Validation
by Ops Validation Crew Date
Approved By: Steve Reeves 3/25/2013 Project Lead or Exam Team
Lead Date
Comments:
-
Date of Examination: 05/06/2013 Operating Test Number: LOT
2012-1
Facility: Grand Gulf Nuclear Station JPM Number:
GJPM-OPS-2012-1AS1
Revision 0 2/20/2013 Page 2 of 8
Verify Surveillances Status for 03-1-01-5 Att. I Setting:
Classroom Type: SRO Task: SRO-NO-31 K&A: 2.1.25 (3.9/4.2),
2.1.36 (3.0/4.1), 2.1.40 (2.8/3.9), 2.1.42 (2.5/3.4) Safety
Function: Conduct of Operations Performance: Actual Reference(s):
03-1-01-5, Refueling Handout(s): 03-1-01-5 Att. I, page 1,
partially completed and Exerpt from Surveillance
Late Date Report sorted by procedure number # Manipulations: N/A
# Critical Steps: 1 Simulator Setup/Required Plant Conditions:
• None Safety Concerns:
• None
Task Standard(s):
• Reviews the surveillance Late Date Report sheets provided and
identifies 06-OP-1T41-Q-0002 is late/not current.
-
Date of Examination: 05/06/2013 Operating Test Number: LOT
2012-1
Facility: Grand Gulf Nuclear Station JPM Number:
GJPM-OPS-2012-1AS1
Revision 0 2/20/2013 Page 3 of 8
Name: ___________________________ Time Start: _______ Time Stop:
_______
Initial Condition(s):
• Today is 5/09/2013.
• The plant is in Mode 5 for a scheduled refueling outage.
• Preparations are being made for Core Alterations.
• 03-1-01-5 Attachment I, page 1 has been turned over in
progress from the previous shift.
Initiating Cue(s):
• You are the Control Room Supervisor. The Shift Manager has
directed you to ensure the appropriate surveillance requirements on
03-1-01-5 Att. I, page 1 have been performed prior to performing
Core Alterations, per 03-1-01-5 step 5.20. You do not need to
recheck the items already completed by the previous shift.
REFER TO 03-1-01-5 ATT. I, PAGE 1 AND THE SURVEILLANCE LATE DATE
REPORT SORTED BY PROCEDURE NUMBER, PROVIDED.
-
Date of Examination: 05/06/2013 Operating Test Number: LOT
2012-1
Facility: Grand Gulf Nuclear Station JPM Number:
GJPM-OPS-2012-1AS1
Revision 0 2/20/2013 Page 4 of 8
Verify Surveillance Status for 03-1-01-5 Att. I Notes: (Notes to
Evaluator)
• Refer to the Evaluator Copy of the Surveillance Late Date
Report sorted by procedure number, but DO NOT allow student to see
it.
Task Overview: (Detailed description of task)
• This task is to perform the SRO review of the Surveillance
Late Date Report to determine whether surveillances required during
Core Alterations are current. One surveillance on the list of
surveillances to be verified is past its Tech Spec late date and
is, therefore, not current
-
Date of Examination: 05/06/2013 Operating Test Number: LOT
2012-1
Facility: Grand Gulf Nuclear Station JPM Number:
GJPM-OPS-2012-1AS1
Revision 0 2/20/2013 Page 5 of 8
Critical tasks are underlined, italicized, and denoted by an (*)
Step 1: 03-1-01-5 Att. I, page 1
* Reviews the Surveillance Late Date Report to determine whether
surveillances listed on 03-1-01-5 Att. I, page 1 are current or are
past their Tech Spec late date.
Standard:
• Reviews the surveillance Late Date Report sheets provided and
determines all listed surveillances except 06-OP-1T41-Q-0002 are
current by initialing beside them on 03-1-01-5 Att. I, page 1 but
does not initial beside 06-OP-1T41-Q-0002.
• Student identifies surveillance 06-OP-1T41-Q-0002-01 as
LATE/not current.
Cue: Once the student identifies 06-OP-1T41-Q-0002 is late, if
asked how to proceed, tell the student to complete 03-1-01-5 Att.
I, signing for all surveillances that are current.
Notes: 06-OP-1T41-Q-0002-01, which satisfies quarterly testing
requirements, is a distinct surveillance from 06-OP-1T41-Q-0002-02,
which is scheduled only to meet 18 month/2 year requirements. Just
because 06-OP-1T41-Q-0002-02 is current on the late Date Report
provided, it does not mean the quarterly requirements of
06-OP-1T41-Q-0002-01 are current. The requirement represented by
“06-OP-1T41-Q-0002” listed on 03-1-01-5 Att. 1, page 1 is that all
requirements of 06-OP-1T41-Q-0002, both attachments -01 and -02 are
current.
Another surveillance, 06-OP-1T42-Q-0001-01 has exceeded the
conservative late date imposed by the surveillance scheduling
program (IAS), but is within the Tech Spec late date and is not
late. If the student identifies this surveillance as late (not
current), this is not critical and does not constitute failure of
the JPM.
SAT / UNSAT
-
Date of Examination: 05/06/2013 Operating Test Number: LOT
2012-1
Facility: Grand Gulf Nuclear Station JPM Number:
GJPM-OPS-2012-1AS1
Revision 0 2/20/2013 Page 6 of 8
Task Standard(s):
• Reviews the surveillance Late Date Report sheets provided and
identifies 06-OP-1T41-Q-0002 is late/not current.
SAT / UNSATRemember to record stop time
-
Date of Examination: 05/06/2013 Operating Test Number: LOT
2012-1
Facility: Grand Gulf Nuclear Station JPM Number:
GJPM-OPS-2012-1AS1
Revision 0 2/20/2013 Page 7 of 8
Follow-Up Questions & Answers:
Comments:
-
Give this page to the student Initial Condition(s):
• Today is 5/09/2013.
• The plant is in Mode 5 for a scheduled refueling outage.
• Preparations are being made for Core Alterations.
• 03-1-01-5 Attachment I, page 1 has been turned over in
progress from the previous shift.
Initiating Cue(s):
• You are the Control Room Supervisor. The Shift Manager has
directed you to ensure the appropriate surveillance requirements on
03-1-01-5 Att. I, page 1 have been performed prior to performing
Core Alterations, per 03-1-01-5 step 5.20. You do not need to
recheck the items already completed by the previous shift.
REFER TO 03-1-01-5 ATT. I, PAGE 1 AND THE SURVEILLANCE LATE DATE
REPORT SORTED BY PROCEDURE NUMBER, PROVIDED.
-
All
Surv
eilla
nces
~~~
Sor
ted
byPr
oced
ure
Num
ber/
Late
Dat
e ~
~~$$
Dol
lar S
igns
den
otes
Sur
veill
ance
s w
hich
hav
e ex
ceed
ed th
e N
RC L
ate
Dat
e W
edne
sda y
,May
8,20
13
11:1
7
**
1-PO
WER
OPS
; 2- S
TAR
TUP;
3-H
OT
SHU
TDO
WN
; 4-C
OLD
SH
UTD
OW
N; 5
-REF
UEL
;6-C
ON
TRO
L R
OD
S W
ITH
DR
AW
N
7,8,
9 ID
ENTI
FIED
B *
ASTE
RIS
K :
7-C
OR
E AL
TER
ATI
ON
S; 8
-PO
TEN
TIA
L FO
R D
RA
INN
G V
ESSE
L; 9
-HAN
DLI
NG
IRR
AD
IATE
D F
UEL
Pa
ge 1
35 o
f 144
PMR
Q #
/ FR
EQ D
AYS
WO
# /
STA
TUS
LAST
PE
RFO
RM
ED
DU
E D
ATES
LA
TE
DAT
ES
PRO
CED
UR
E / D
ESC
RIP
TIO
N
MO
DE
APPL
. C
OM
MEN
TS
50
0199
95-0
1 52
4654
91
02/1
5/20
13
01 1
5 05
/25/
2013
0
6/01
/201
3 06
OP
1R20
-W-0
001-
01 P
LAN
T A
C &
DC
ELE
CTR
ICA
L P
OW
ER
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, *,
7 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
5/25
/201
3 06
/02/
2013
191
5 D
ISTR
IBU
TIO
N W
EE
KLY
LIN
EU
P; U
SE
ATT
AC
HM
EN
T 1.
5001
9995
-01
5246
7128
02
/15/
2013
01
15
06/0
7/20
13
06/
14/2
013
06O
P1R
20-W
-000
1-01
PLA
NT
AC
& D
C E
LEC
TRIC
AL
PO
WE
R
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, 5, *
, 7
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
06/
07/2
013
06/1
5/20
13 1
915
DIS
TRIB
UTI
ON
WE
EK
LY L
INE
UP
; US
E A
TTA
CH
ME
NT
1.
50
0199
95-0
1 52
4687
45
02/1
5/20
13
01 1
5 06
/14/
2013
0
6/21
/201
3 06
OP
1R20
-W-0
001-
01 P
LAN
T A
C &
DC
ELE
CTR
ICA
L P
OW
ER
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, *,
7 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
6/14
/201
3 06
/22/
2013
191
5 D
ISTR
IBU
TIO
N W
EE
KLY
LIN
EU
P; U
SE
ATT
AC
HM
EN
T 1.
5001
9995
-01
5247
0351
02
/15/
2013
01
15
06/2
1/20
13
06/
28/2
013
06O
P1R
20-W
-000
1-01
PLA
NT
AC
& D
C E
LEC
TRIC
AL
PO
WE
R
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, 5, *
, 7
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
06/
21/2
013
06/2
9/20
13 1
915
DIS
TRIB
UTI
ON
WE
EK
LY L
INE
UP
; US
E A
TTA
CH
ME
NT
1.
50
0199
95-0
1 52
4718
45
02/1
5/20
13
01 1
5 06
/28/
2013
0
7/05
/201
3 06
OP
1R20
-W-0
001-
01 P
LAN
T A
C &
DC
ELE
CTR
ICA
L P
OW
ER
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, *,
7 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
6/28
/201
3 07
/06/
2013
191
5 D
ISTR
IBU
TIO
N W
EE
KLY
LIN
EU
P; U
SE
ATT
AC
HM
EN
T 1.
5001
9996
-01
5246
9217
05
/04/
2013
15
30
06/0
4/20
13
06/
11/2
013
06O
P1R
21-M
-000
2-01
DIV
1 L
OA
D S
HE
DD
ING
& S
EQ
UE
NC
ING
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, *,
28
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
06/
06/2
013
06/1
4/20
13 0
330
FUN
CTI
ON
AL
TES
T. U
SE
ATT
AC
HM
EN
T 1.
5001
9998
-01
5247
2103
04
/13/
2013
02
51
05/1
3/20
13
05/
20/2
013
06O
P1R
21-M
-000
2-02
DIV
2 L
OA
D S
HE
DD
ING
& S
EQ
UE
NC
ING
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, *,
28
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
05/
15/2
013
05/2
2/20
13 1
451
FUN
CTI
ON
AL
TES
T. U
SE
ATT
AC
HM
EN
T 2.
5001
9999
-01
5240
0916
02
/19/
2012
22
00
08/2
1/20
13
01/
05/2
014
06O
P1R
21-R
-000
1 ES
F D
IVIS
ION
3 P
OW
ER S
UP
PLY
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, 5, *
, 54
9 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
8/21
/201
3 01
/06/
2014
040
0 FU
NC
TIO
NA
L TE
ST
50
0200
00-0
1 52
4009
17
02/1
9/20
12
21 0
0 08
/21/
2013
0
1/05
/201
4 06
OP1
R21
-R-0
002
ESF
DIV
ISIO
N 2
PO
WER
SU
PPL
Y **
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, *,
549
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
08/
21/2
013
01/0
6/20
14 0
300
FUN
CTI
ON
AL
TES
T
5002
0001
-01
5240
0918
02
/19/
2012
21
40
08/2
1/20
13
01/
05/2
014
06O
P1R
21-R
-000
3 ES
F D
IVIS
ION
1 P
OW
ER S
UP
PLY
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, 5, *
, 54
9 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
8/21
/201
3 01
/06/
2014
034
0 FU
NC
TIO
NA
L TE
ST
50
0200
02-0
1 52
4668
43
04/2
5/20
13
03 0
0 05
/22/
2013
0
6/01
/201
3 06
OP
1T10
-M-0
001
SE
CO
ND
AR
Y C
ON
TAIN
ME
NT
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
28
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
05/
24/2
013
06/0
3/20
13 1
500
PEN
ETR
ATIO
N IS
OLA
TIO
N M
ON
THLY
CH
ECK
$$
0001
2304
-01
5246
4559
01
/13/
2013
04
58
04/0
7/20
13
04/
28/2
013
06O
P1T4
1-Q
-000
2-01
AU
X. B
LDG
. VE
NT.
SYS
. VA
LVE
TES
T;
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, , ,
84
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
04/
14/2
013
05/0
6/20
13 2
258
USE
ATT
. 1
UP
DA
TED
BY
PM
RQ
500
2000
4-01
, A
TT 2
0001
2305
-01
5246
4543
01
/13/
2013
04
58
07/0
7/20
14
01/
01/2
015
06O
P1T
41-Q
-000
2-02
AU
X. B
LDG
. VE
NT.
SYS
. VA
LVE
TES
T;
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, , ,
540
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
07/
07/2
014
11/1
9/20
14 0
458
18 M
ON
U
PD
ATE
S A
TT 1
, PM
RQ
000
1230
4-
01
$$
50
0200
05-0
1 52
4657
48
01/1
9/20
13
18 2
1 04
/13/
2013
0
5/04
/201
3 06
OP1
T42-
Q-0
001-
01 F
HA
VE
NT.
SYS
TEM
FU
NC
TIO
NAL
TE
ST.
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
84
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
04/
20/2
013
05/1
3/20
13 1
221
UP
DA
TED
BY
PMR
Q 5
0020
008-
01
50
0200
08-0
1 52
4657
34
01/1
9/20
13
18 2
1 07
/13/
2014
0
1/07
/201
5 06
OP1
T42-
Q-0
001-
02 F
HA
VE
NT.
SYS
TEM
FU
NC
TIO
NAL
TE
ST.
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, 5, ,
54
0 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
7/13
/201
4 11
/25/
2014
182
1 U
PD
ATE
S P
MR
Q 5
0020
005-
01
50
0200
09-0
1 52
4707
98
05/0
7/20
13
13 5
5 06
/04/
2013
0
6/11
/201
3 06
OP1
T48-
M-0
001
STA
ND
YB
Y G
AS
TR
EATM
EN
T S
YSTE
M '
A'
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
28
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
06/
09/2
013
06/1
7/20
13 0
155
10 H
OU
R R
UN
U
PD
ATE
D B
Y PM
RQ
500
1874
1-01
O
R P
MR
Q 5
0018
739-
01
EVAL
UAT
OR
COPY
–
DO N
OT
GIVE
TO
ST
UDE
NT
Curr
ent d
ate
is p
ast T
ECH
SPEC
La
te D
ate,
surv
eilla
nce
is L
ATE
Upp
er d
ate
is th
e In
dus A
sset
Sui
te la
te d
ate
used
for s
ched
ulin
g
Low
er d
ate
is th
e ac
tual
Tec
h Sp
ec la
te d
ate
used
for T
ech
Spec
com
plia
nce
/ op
erab
ility
. Th
is su
rvei
llanc
e is
pas
t the
co
nser
vativ
e sc
hedu
ling
late
dat
e, b
ut is
with
in th
e Te
ch
Spec
allo
wed
late
dat
e, so
it is
“cu
rren
t”.
-
All
Surv
eilla
nces
~~~
Sor
ted
byPr
oced
ure
Num
ber/
Late
Dat
e ~
~~$$
Dol
lar S
igns
den
otes
Sur
veill
ance
s w
hich
hav
e ex
ceed
ed th
e N
RC L
ate
Dat
e W
edne
sda y
,May
8,20
13
11:1
7
**
1-PO
WER
OPS
; 2- S
TAR
TUP;
3-H
OT
SHU
TDO
WN
; 4-C
OLD
SH
UTD
OW
N; 5
-REF
UEL
;6-C
ON
TRO
L R
OD
S W
ITH
DR
AW
N
7,8,
9 ID
ENTI
FIED
B *
ASTE
RIS
K :
7-C
OR
E AL
TER
ATI
ON
S; 8
-PO
TEN
TIA
L FO
R D
RA
INN
G V
ESSE
L; 9
-HAN
DLI
NG
IRR
AD
IATE
D F
UEL
Pa
ge 1
36 o
f 144
PMR
Q #
/ FR
EQ D
AYS
WO
# /
STA
TUS
LAST
PE
RFO
RM
ED
DU
E D
ATES
LA
TE
DAT
ES
PRO
CED
UR
E / D
ESC
RIP
TIO
N
MO
DE
APPL
. C
OM
MEN
TS
50
0200
10-0
1 52
4692
18
05/0
3/20
13
17 1
3 06
/02/
2013
0
6/09
/201
3 06
OP1
T48-
M-0
002
STA
ND
YB
Y G
AS
TR
EATM
EN
T S
YSTE
M '
B'
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
28
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
06/
03/2
013
06/1
2/20
13 0
513
10 H
OU
R R
UN
U
PD
ATE
D B
Y PM
RQ
500
1873
8-01
, 06
OP
1T48
-Q-0
003-
02 a
nd 5
0018
740-
01
, 06O
P1T4
8-Q
-000
3-01
5002
0011
-01
5246
4592
04
/11/
2013
09
34
05/0
9/20
13
05/
16/2
013
06O
P1T
48-M
-000
3 S
EC
ON
DA
RY
CO
NTA
INM
EN
T IN
TEG
RIT
Y
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
28
AW
AIT/
C
TEC
H S
PEC
DAT
E/TI
ME
= 0
5/12
/201
3 05
/20/
2013
213
4 C
HE
CK
5001
8741
-01
5247
0787
02
/07/
2013
13
55
05/0
2/20
13
05/
23/2
013
06O
P1T4
8-Q
-000
2-01
SBG
T "A
" VA
LVE
TE
ST A
ND
10
HR
RU
N
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
84
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
05/
09/2
013
06/0
1/20
13 0
755
UP
DAT
ES
PM
RQ
500
2000
9-01
. U
PD
ATE
D B
Y A
TT. 2
, PM
RQ
50
0187
39-0
1.
50
0187
39-0
1 52
4583
75
12/0
7/20
12
12 1
0 05
/31/
2014
1
0/13
/201
4 06
OP1
T48-
Q-0
002-
02 S
BGT
"A" V
ALV
E T
EST
AN
D 1
0 H
R R
UN
**
MO
DE
AP
PL. =
1,
2, 3
, *, ,
, 54
0 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
5/31
/201
4 10
/13/
2014
121
0 U
PD
ATE
S P
MR
Q 5
0020
009-
01 &
A
TT 1
, PM
RQ
500
1874
1-01
5001
8740
-01
5246
2961
04
/06/
2013
04
00
07/0
1/20
13
07/
22/2
013
06O
P1T4
8-Q
-000
3-01
SBG
T "B
" VA
LVE
TE
ST A
ND
10
HR
RU
N
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
84
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
07/
07/2
013
07/2
9/20
13 2
200
UP
DAT
ES
PM
RQ
500
2001
0-01
, 06
OP
1T48
-M-0
002
50
0187
38-0
1 52
4629
53
01/0
6/20
13
04 0
0 06
/30/
2014
1
2/25
/201
4 06
OP1
T48-
Q-0
003-
02 S
BGT
"B" V
ALV
E T
EST
AN
D 1
0 H
R R
UN
**
MO
DE
AP
PL. =
1,
2, 3
, *, ,
, 54
0 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
6/30
/201
4 11
/12/
2014
040
0 U
PD
ATE
S P
MR
Q 5
0020
010-
01
50
0200
14-0
1 52
4046
79
03/0
5/20
12
02 4
4 09
/05/
2013
0
1/20
/201
4 06
OP1
T48-
R-0
002-
01 S
BGT
'A' L
OG
IC T
EST
US
E
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
549
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
09/
05/2
013
01/2
0/20
14 0
844
ATTA
CH
ME
NT
1
5002
0015
-01
5236
4484
03
/20/
2011
15
44
08/1
4/20
13
12/
23/2
013
06O
P1T
48-R
-000
2-02
SB
GT
'A' V
AC
UU
M T
ES
T;
**W
C43
- S
CH
**
MO
DE
AP
PL. =
1,
2, 3
, *, ,
, 10
95
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
08/
22/2
013
01/0
5/20
14 1
544
18 M
ON
THS
FR
OM
PER
FOR
MA
NC
E O
F 06
OP
1T48
-R-0
003-
02
(500
2001
9-01
) W
C43
- Pe
rform
Atta
chm
ent 2
ei
ghte
en m
onth
s fro
m p
erfo
rman
ce o
f at
tach
men
t 3 o
n a
rota
ting
basi
s.-
SC
H 1
8 M
ON
THS
FR
OM
P
ERFO
RM
AN
CE
OF
06O
P1T
48-R
- 00
03-0
2 (5
0020
019-
01)
50
0200
16-0
1 52
2835
10
06/0
5/20
12
11 5
2 11
/26/
2013
0
4/06
/201
4 06
OP
1T48
-R-0
002-
03 S
BG
T 'A
' VA
CU
UM
TE
ST;
**
WC
43 -
SC
H
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
1095
A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 1
1/26
/201
3 04
/10/
2014
115
2 18
MO
NTH
S F
RO
M P
ERFO
RM
AN
CE
OF
06O
P1T
48-R
-000
3-03
(5
0020
020-
01
WC
43 -
Perfo
rm A
ttach
men
t 3
eigh
teen
mon
ths
from
per
form
ance
of
atta
chm
ent 2
on
a ro
tatin
g ba
sis.
- S
CH
18
MO
NTH
S F
RO
M
PER
FOR
MA
NC
E O
F 06
OP
1T48
-R-
0003
-03
(500
2002
0-01
5002
0018
-01
5240
4680
03
/05/
2012
23
45
09/0
5/20
13
01/
20/2
014
06O
P1T4
8-R
-000
3-01
SB
GT
'B' L
OG
IC T
EST;
US
E
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
549
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
09/
05/2
013
01/2
1/20
14 0
545
ATTA
CH
ME
NT
1
5002
0019
-01
5240
9813
03
/20/
2011
02
30
03/1
9/20
14
08/
02/2
014
06O
P1T4
8-R
-000
3-02
SB
GT
'B' V
ACU
UM
TE
ST; U
SE
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
1095
A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
3/20
/201
4 08
/04/
2014
023
0 A
TTA
CH
ME
NT
2.
DR
AW
DO
WN
TE
STI
NG
WIT
H A
UX
BLD
G
RAI
LRO
AD
BA
Y D
OO
RS
1A
310/
1A31
2 C
LOSE
D, R
AILR
OAD
BA
Y C
EILI
NG
HA
TCH
ES I
NST
ALL
ED
, A
ND
RA
ILR
OA
D B
AY
DO
OR
1A3
19A
(EX
TER
IOR
DO
OR
)OP
EN
WC
43 -
Perfo
rm A
ttach
men
t 2
eigh
teen
mon
ths
from
per
form
ance
of
atta
chm
ent 3
on
a ro
tatin
g ba
sis.
SC
H
18 M
ON
THS
FR
OM
PE
RFO
RM
AN
CE
O
F 06
OP1
T48-
R-0
002-
02 (5
0020
015-
01
)
EVAL
UAT
OR
COPY
–
DO N
OT
GIVE
TO
ST
UDE
NT
-
All
Surv
eilla
nces
~~~
Sor
ted
byPr
oced
ure
Num
ber/
Late
Dat
e ~
~~$$
Dol
lar S
igns
den
otes
Sur
veill
ance
s w
hich
hav
e ex
ceed
ed th
e N
RC L
ate
Dat
e W
edne
sda y
,May
8,20
13
11:1
7
**
1-PO
WER
OPS
; 2- S
TAR
TUP;
3-H
OT
SHU
TDO
WN
; 4-C
OLD
SH
UTD
OW
N; 5
-REF
UEL
;6-C
ON
TRO
L R
OD
S W
ITH
DR
AW
N
7,8,
9 ID
ENTI
FIED
B *
ASTE
RIS
K :
7-C
OR
E AL
TER
ATI
ON
S; 8
-PO
TEN
TIA
L FO
R D
RA
INN
G V
ESSE
L; 9
-HAN
DLI
NG
IRR
AD
IATE
D F
UEL
Pa
ge 1
37 o
f 144
PMR
Q #
/ FR
EQ D
AYS
WO
# /
STA
TUS
LAST
PE
RFO
RM
ED
DU
E D
ATES
LA
TE
DAT
ES
PRO
CED
UR
E / D
ESC
RIP
TIO
N
MO
DE
APPL
. C
OM
MEN
TS
50
0200
20-0
1 52
4233
63
06/0
5/20
12
11 5
2 06
/05/
2015
1
0/05
/201
5 06
OP1
T48-
R-0
003-
03 S
BG
T 'B
' VAC
UU
M T
EST
; USE
**
MO
DE
AP
PL. =
1,
2, 3
, *, ,
, 10
95
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
06/
05/2
015
10/2
0/20
15 1
152
ATTA
CH
ME
NT
3. D
RA
WD
OW
N T
EST
WIT
H R
AILR
OAD
BA
Y D
OO
R 1
A31
9A(E
XTE
RIO
R D
OO
R)C
LOS
ED
AN
D D
OO
RS
1A
310
AND
1A
312
OPE
N.
WC
43 -
Perfo
rm A
ttach
men
t 3
eigh
teen
mon
ths
from
per
form
ance
of
atta
chm
ent 2
on
a ro
tatin
g ba
sis.
- .S
CH
18
MO
NTH
S F
RO
M
PER
FOR
MA
NC
E O
F 06
OP
1T48
-R-
0002
-03
(500
2001
6-01
)
5002
0021
-01
5245
8383
02
/07/
2013
17
30
05/0
1/20
13
05/
22/2
013
06O
P1Z5
1-Q
-000
1-01
CO
NTR
OL
RO
OM
HV
AC
SY
STEM
VA
LVE
**
MO
DE
AP
PL. =
1,
2, 3
, *, ,
, 84
A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
5/08
/201
3 05
/31/
2013
113
0 TE
ST. U
SE A
TTAC
HM
EN
T 1.
UPD
ATE
D B
Y PM
RQ
500
2002
2-01
U
PD
ATE
D B
Y 06
OP1
Z51-
Q-0
001-
02,
PM
RQ
500
2002
2-01
.
5002
0022
-01
5235
4499
07
/14/
2011
03
45
01/0
4/20
13
07/
01/2
013
06O
P1Z5
1-Q
-000
1-02
CO
NTR
OL
RO
OM
HV
AC
SY
STE
M
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
540
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
01/
04/2
013
05/1
9/20
13 0
345
VALV
E T
EST
. USE
ATT
AC
HM
EN
T 2.
UPD
ATE
S P
MR
Q
5002
0021
-01
UP
DA
TES
PM
RQ
500
2002
1-01
50
0196
42-0
1 52
4645
53
04/1
0/20
13
17 3
0 07
/04/
2013
0
7/25
/201
3 06
OPS
C85
-Q-0
001
SEIS
MIC
MO
NIT
OR
ING
SYS
TEM
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, ,
84
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
071
1/20
13
08/0
4/20
13 1
130
FUN
CTI
ON
AL
TES
T
5001
9643
-01
5245
6127
03
/22/
2012
22
35
06/1
4/20
13
07/
07/2
013
06O
PSD
17-Q
-000
8 R
ADW
AST
E B
LDG
VE
NT
RA
D M
ON
ITO
R
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, 5, ,
84
A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
6/21
/201
3 07
/16/
2013
163
5 FU
NC
T. T
EST
5001
9644
-01
5246
5037
01
/17/
2013
12
27
04/1
1/20
13
05/
02/2
013
06O
PS
D17
-Q-0
018
LIQ
UID
RA
DW
AS
TE E
FFLU
EN
T R
AD
IATI
ON
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, ,
84
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
04/
18/2
013
05/1
1/20
13 0
627
MO
NIT
OR
FU
NC
TIO
NA
L TE
ST
50
0196
45-0
1 52
4707
81
02/1
0/20
13
21 4
5 05
/05/
2013
0
5/26
/201
3 06
OPS
P21
-Q-0
001-
01 M
AKEU
P W
ATE
R T
RE
ATM
EN
T **
MO
DE
AP
PL. =
1,
2, 3
, , ,
, 84
A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
5/12
/201
3 06
/04/
2013
154
5 Q
UA
RTE
RLY
VAL
VE T
EST.
US
E A
TTAC
HM
ENT
1 U
PD
ATE
D B
Y PM
RQ
500
1964
6-01
, 06
OP
SP21
-Q-0
001-
02
50
0196
46-0
1 52
4537
97
11/1
2/20
12
02 4
6 05
/06/
2014
1
0/31
/201
4 06
OPS
P21
-Q-0
001-
02 M
AKEU
P W
ATE
R T
RE
ATM
EN
T **
MO
DE
AP
PL. =
1,
2, 3
, , ,
, 54
0 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
5/06
/201
4 09
/18/
2014
024
6 Q
UA
RTE
RLY
VAL
VE T
EST.
18
MO
NTH
; 6 M
ON
TH G
RA
CE
U
PD
ATE
S P
MR
Q 5
0019
645-
01,
06O
PSP
21-Q
-000
1-01
5001
9647
-01
5239
5431
08
/19/
2012
06
31
08/1
9/20
13
11/
17/2
013
06O
PSP6
4-A
-000
4 FI
RE
PR
OTE
CTI
ON
SYS
TEM
VAL
VE
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, 5, ,
29
2 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
8/19
/201
3 11
/19/
2013
063
1 ST
RO
KE T
EST
.
5001
9653
-01
5240
2981
05
/28/
2012
14
00
03/1
6/20
13
05/
28/2
013
06O
PS
P64
-A-0
012
AN
NU
AL
YAR
D F
IRE
HYD
RA
NT
FLO
W
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, 5, ,
29
2 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
3/16
/201
3 05
/28/
2013
140
0 C
HEC
K
50
0196
56-0
1 52
4131
47
07/0
8/20
12
05 4
4 04
/26/
2013
0
7/08
/201
3 06
OPS
P64-
A-0
046
FIR
E P
UM
PS L
OW
PR
ESS
UR
E S
TAR
T **
MO
DE
AP
PL. =
, ,
, , ,
, 29
2 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
4/26
/201
3 07
/08/
2013
054
4 FU
NC
TIO
NA
L TE
ST
50
0185
45-0
1 52
4707
97
04/1
8/20
13
07 0
0 05
/16/
2013
0
5/23
/201
3 06
OPS
P64-
M-0
001-
01 F
IRE
PU
MP
C00
3A M
ON
THLY
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, ,
28
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
05/
19/2
013
05/2
4/20
13 1
900
OPE
RAB
ILIT
Y TE
ST
*ATT
1*
US
E A
TTA
CH
MEN
T 1
50
0185
45-0
2 52
4707
99
04/1
8/20
13
07 0
0 05
/16/
2013
0
5/23
/201
3 06
OPS
P64-
M-0
001-
02 F
IRE
PU
MP
C00
3B M
ON
THLY
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, ,
28
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
05/
19/2
013
05/2
4/20
13 1
900
OPE
RAB
ILIT
Y TE
ST
*ATT
2*
US
E A
TTA
CH
MEN
T 2
50
0185
45-0
3 52
4707
96
04/1
8/20
13
07 0
0 05
/16/
2013
0
5/23
/201
3 06
OPS
P64-
M-0
001-
03 M
OTO
R D
RIV
EN
FIR
E P
UM
P C
002
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, 5, ,
28
A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
5/19
/201
3 05
/24/
2013
190
0 O
PER
AB
ILIT
Y *
ATT
3*
US
E A
TTA
CH
MEN
T 3
50
0196
58-0
1 52
4668
41
04/2
8/20
13
14 3
2 05
/26/
2013
0
6/02
/201
3 06
OPS
P64-
M-0
011
FIR
E P
RO
TEC
TIO
N S
YSTE
M V
ALVE
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, ,
EVAL
UAT
OR
COPY
–
DO N
OT
GIVE
TO
ST
UDE
NT
-
GRAND GULF NUCLEAR STATION INTEGRATED OPERATING INSTRUCTION
03-1-01-5 Revision: 127
Attachment I Page 1 of 4
J:\ADM_SRVS\TECH_PUB\REVISION\03\31015.doc
BEFORE AND DURING CORE ALTERATIONS
The following is a list of surveillance requirements that Must
be current before AND during core alterations. This list is in
addition to the list for Mode 5 contained in Attachment VII. REFER
to Table 1 for those valves that require tracking for operability
during Core Alts. Surveillances that are required for Primary AND
Secondary Containment valve operability, Secondary Containment AND
SBGT May NOT be required current IF the plant has NOT been critical
in past 24 hours 06-OP-1T10-M-0001 FW 5/9/13 06-OP-1T48-R-0002 FW
5/9/13 06-OP-1T48-M-0003 FW 5/9/13 06-OP-1G33-Q-0001 FW 5/9/13
06-OP-1B21-R-0006 FW 5/9/13 06-OP-1G41-Q-0001 FW 5/9/13
06-OP-1B21-C-0003 * FW 5/9/13 06-OP-1M41-Q-0001 FW 5/9/13
06-OP-SP21-Q-0001 FW 5/9/13 06-OP-1P11-Q-0001 FW 5/9/13
06-OP-1P45-C-0001 * FW 5/9/13 06-OP-1P52-Q-0001 FW 5/9/13
06-OP-1P45-Q-0002 FW 5/9/13 06-OP-1T41-Q-0002 06-OP-1P60-Q-0001 FW
5/9/13 06-OP-1T42-Q-0001 06-OP-SP66-Q-0001 FW 5/9/13
06-OP-1T48-M-0001 06-OP-1P71-Q-0001 FW 5/9/13 06-OP-1T48-M-0002
06-OP-1E12-Q-0005 FW 5/9/13 06-OP-1T48-R-0003 06-OP-1T48-Q-0002
06-OP-1T48-Q-0003 * Cold shutdown surveillances are current until
90 days after entering Mode 4.
-
All
Surv
eilla
nces
~~~
Sor
ted
byPr
oced
ure
Num
ber/
Late
Dat
e ~
~~$$
Dol
lar S
igns
den
otes
Sur
veill
ance
s w
hich
hav
e ex
ceed
ed th
e N
RC L
ate
Dat
e W
edne
sda y
,May
8,20
13
11:1
7
**
1-PO
WER
OPS
; 2- S
TAR
TUP;
3-H
OT
SHU
TDO
WN
; 4-C
OLD
SH
UTD
OW
N; 5
-REF
UEL
;6-C
ON
TRO
L R
OD
S W
ITH
DR
AW
N
7,8,
9 ID
ENTI
FIED
BY
*AST
ERIS
K :
7-C
OR
E AL
TER
ATI
ON
S; 8
-PO
TEN
TIA
L FO
R D
RA
ININ
G V
ESSE
L; 9
-HAN
DLI
NG
IRR
AD
IATE
D F
UEL
Page
135
of 1
44
PMR
Q #
/ FR
EQ D
AYS
WO
# /
STA
TUS
LAST
PE
RFO
RM
ED
DU
E D
ATES
LA
TE
DAT
ES
PRO
CED
UR
E / D
ESC
RIP
TIO
N
MO
DE
APPL
. C
OM
MEN
TS
50
0199
95-0
1 52
4654
91
02/1
5/20
13
01 1
5 05
/25/
2013
0
6/01
/201
3 06
OP
1R20
-W-0
001-
01 P
LAN
T A
C &
DC
ELE
CTR
ICA
L P
OW
ER
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, *,
7 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
5/25
/201
3 06
/02/
2013
191
5 D
ISTR
IBU
TIO
N W
EE
KLY
LIN
EU
P; U
SE
ATT
AC
HM
EN
T 1.
5001
9995
-01
5246
7128
02
/15/
2013
01
15
06/0
7/20
13
06/
14/2
013
06O
P1R
20-W
-000
1-01
PLA
NT
AC
& D
C E
LEC
TRIC
AL
PO
WE
R
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, 5, *
, 7
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
06/
07/2
013
06/1
5/20
13 1
915
DIS
TRIB
UTI
ON
WE
EK
LY L
INE
UP
; US
E A
TTA
CH
ME
NT
1.
50
0199
95-0
1 52
4687
45
02/1
5/20
13
01 1
5 06
/14/
2013
0
6/21
/201
3 06
OP
1R20
-W-0
001-
01 P
LAN
T A
C &
DC
ELE
CTR
ICA
L P
OW
ER
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, *,
7 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
6/14
/201
3 06
/22/
2013
191
5 D
ISTR
IBU
TIO
N W
EE
KLY
LIN
EU
P; U
SE
ATT
AC
HM
EN
T 1.
5001
9995
-01
5247
0351
02
/15/
2013
01
15
06/2
1/20
13
06/
28/2
013
06O
P1R
20-W
-000
1-01
PLA
NT
AC
& D
C E
LEC
TRIC
AL
PO
WE
R
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, 5, *
, 7
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
06/
21/2
013
06/2
9/20
13 1
915
DIS
TRIB
UTI
ON
WE
EK
LY L
INE
UP
; US
E A
TTA
CH
ME
NT
1.
50
0199
95-0
1 52
4718
45
02/1
5/20
13
01 1
5 06
/28/
2013
0
7/05
/201
3 06
OP
1R20
-W-0
001-
01 P
LAN
T A
C &
DC
ELE
CTR
ICA
L P
OW
ER
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, *,
7 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
6/28
/201
3 07
/06/
2013
191
5 D
ISTR
IBU
TIO
N W
EE
KLY
LIN
EU
P; U
SE
ATT
AC
HM
EN
T 1.
5001
9996
-01
5246
9217
05
/04/
2013
15
30
06/0
4/20
13
06/
11/2
013
06O
P1R
21-M
-000
2-01
DIV
1 L
OA
D S
HE
DD
ING
& S
EQ
UE
NC
ING
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, *,
28
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
06/
06/2
013
06/1
4/20
13 0
330
FUN
CTI
ON
AL
TES
T. U
SE
ATT
AC
HM
EN
T 1.
5001
9998
-01
5247
2103
04
/13/
2013
02
51
05/1
3/20
13
05/
20/2
013
06O
P1R
21-M
-000
2-02
DIV
2 L
OA
D S
HE
DD
ING
& S
EQ
UE
NC
ING
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, *,
28
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
05/
15/2
013
05/2
2/20
13 1
451
FUN
CTI
ON
AL
TES
T. U
SE
ATT
AC
HM
EN
T 2.
5001
9999
-01
5240
0916
02
/19/
2012
22
00
08/2
1/20
13
01/
05/2
014
06O
P1R
21-R
-000
1 ES
F D
IVIS
ION
3 P
OW
ER S
UP
PLY
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, 5, *
, 54
9 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
8/21
/201
3 01
/06/
2014
040
0 FU
NC
TIO
NA
L TE
ST
50
0200
00-0
1 52
4009
17
02/1
9/20
12
21 0
0 08
/21/
2013
0
1/05
/201
4 06
OP1
R21
-R-0
002
ESF
DIV
ISIO
N 2
PO
WER
SU
PPL
Y **
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, *,
549
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
08/
21/2
013
01/0
6/20
14 0
300
FUN
CTI
ON
AL
TES
T
5002
0001
-01
5240
0918
02
/19/
2012
21
40
08/2
1/20
13
01/
05/2
014
06O
P1R
21-R
-000
3 ES
F D
IVIS
ION
1 P
OW
ER S
UP
PLY
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, 5, *
, 54
9 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
8/21
/201
3 01
/06/
2014
034
0 FU
NC
TIO
NA
L TE
ST
50
0200
02-0
1 52
4668
43
04/2
5/20
13
03 0
0 05
/22/
2013
0
6/01
/201
3 06
OP
1T10
-M-0
001
SE
CO
ND
AR
Y C
ON
TAIN
ME
NT
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
28
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
05/
24/2
013
06/0
3/20
13 1
500
PEN
ETR
ATIO
N IS
OLA
TIO
N M
ON
THLY
CH
ECK
$$
0001
2304
-01
5246
4559
01
/13/
2013
04
58
04/0
7/20
13
04/
28/2
013
06O
P1T
41-Q
-000
2-01
AU
X. B
LDG
. VE
NT.
SYS
. VA
LVE
TES
T;
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, , ,
84
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
04/
14/2
013
05/0
6/20
13 2
258
USE
ATT
. 1
UP
DA
TED
BY
PM
RQ
500
2000
4-01
, A
TT 2
0001
2305
-01
5246
4543
01
/13/
2013
04
58
07/0
7/20
14
01/
01/2
015
06O
P1T
41-Q
-000
2-02
AU
X. B
LDG
. VE
NT.
SYS
. VA
LVE
TES
T;
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, , ,
540
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
07/
07/2
014
11/1
9/20
14 0
458
18 M
ON
U
PD
ATE
S A
TT 1
, PM
RQ
000
1230
4-
01
$$
50
0200
05-0
1 52
4657
48
01/1
9/20
13
18 2
1 04
/13/
2013
0
5/04
/201
3 06
OP1
T42-
Q-0
001-
01 F
HA
VE
NT.
SYS
TEM
FU
NC
TIO
NAL
TE
ST.
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
84
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
04/
20/2
013
05/1
3/20
13 1
221
UP
DA
TED
BY
PMR
Q 5
0020
008-
01
50
0200
08-0
1 52
4657
34
01/1
9/20
13
18 2
1 07
/13/
2014
0
1/07
/201
5 06
OP1
T42-
Q-0
001-
02 F
HA
VE
NT.
SYS
TEM
FU
NC
TIO
NAL
TE
ST.
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, 5, ,
54
0 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
7/13
/201
4 11
/25/
2014
182
1 U
PD
ATE
S P
MR
Q 5
0020
005-
01
50
0200
09-0
1 52
4707
98
05/0
7/20
13
13 5
5 06
/04/
2013
0
6/11
/201
3 06
OP1
T48-
M-0
001
STA
ND
YB
Y G
AS
TR
EATM
EN
T S
YSTE
M '
A'
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
28
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
06/
09/2
013
06/1
7/20
13 0
155
10 H
OU
R R
UN
U
PD
ATE
D B
Y PM
RQ
500
1874
1-01
O
R P
MR
Q 5
0018
739-
01
-
All
Surv
eilla
nces
~~~
Sor
ted
byPr
oced
ure
Num
ber/
Late
Dat
e ~
~~$$
Dol
lar S
igns
den
otes
Sur
veill
ance
s w
hich
hav
e ex
ceed
ed th
e N
RC L
ate
Dat
e W
edne
sda y
,May
8,20
13
11:1
7
**
1-PO
WER
OPS
; 2- S
TAR
TUP;
3-H
OT
SHU
TDO
WN
; 4-C
OLD
SH
UTD
OW
N; 5
-REF
UEL
;6-C
ON
TRO
L R
OD
S W
ITH
DR
AW
N
7,8,
9 ID
ENTI
FIED
BY
*AST
ERIS
K :
7-C
OR
E AL
TER
ATI
ON
S; 8
-PO
TEN
TIA
L FO
R D
RA
ININ
G V
ESSE
L; 9
-HAN
DLI
NG
IRR
AD
IATE
D F
UEL
Page
136
of 1
44
PMR
Q #
/ FR
EQ D
AYS
WO
# /
STA
TUS
LAST
PE
RFO
RM
ED
DU
E D
ATES
LA
TE
DAT
ES
PRO
CED
UR
E / D
ESC
RIP
TIO
N
MO
DE
APPL
. C
OM
MEN
TS
50
0200
10-0
1 52
4692
18
05/0
3/20
13
17 1
3 06
/02/
2013
0
6/09
/201
3 06
OP1
T48-
M-0
002
STA
ND
YB
Y G
AS
TR
EATM
EN
T S
YSTE
M '
B'
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
28
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
06/
03/2
013
06/1
2/20
13 0
513
10 H
OU
R R
UN
U
PD
ATE
D B
Y PM
RQ
500
1873
8-01
, 06
OP
1T48
-Q-0
003-
02 a
nd 5
0018
740-
01
, 06O
P1T4
8-Q
-000
3-01
5002
0011
-01
5246
4592
04
/11/
2013
09
34
05/0
9/20
13
05/
16/2
013
06O
P1T
48-M
-000
3 S
EC
ON
DA
RY
CO
NTA
INM
EN
T IN
TEG
RIT
Y
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
28
AW
AIT/
C
TEC
H S
PEC
DAT
E/TI
ME
= 0
5/12
/201
3 05
/20/
2013
213
4 C
HE
CK
5001
8741
-01
5247
0787
02
/07/
2013
13
55
05/0
2/20
13
05/
23/2
013
06O
P1T4
8-Q
-000
2-01
SBG
T "A
" VA
LVE
TE
ST A
ND
10
HR
RU
N
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
84
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
05/
09/2
013
06/0
1/20
13 0
755
UP
DAT
ES
PM
RQ
500
2000
9-01
. U
PD
ATE
D B
Y A
TT. 2
, PM
RQ
50
0187
39-0
1.
50
0187
39-0
1 52
4583
75
12/0
7/20
12
12 1
0 05
/31/
2014
1
0/13
/201
4 06
OP1
T48-
Q-0
002-
02 S
BGT
"A" V
ALV
E T
EST
AN
D 1
0 H
R R
UN
**
MO
DE
AP
PL. =
1,
2, 3
, *, ,
, 54
0 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
5/31
/201
4 10
/13/
2014
121
0 U
PD
ATE
S P
MR
Q 5
0020
009-
01 &
A
TT 1
, PM
RQ
500
1874
1-01
5001
8740
-01
5246
2961
04
/06/
2013
04
00
07/0
1/20
13
07/
22/2
013
06O
P1T4
8-Q
-000
3-01
SBG
T "B
" VA
LVE
TE
ST A
ND
10
HR
RU
N
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
84
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
07/
07/2
013
07/2
9/20
13 2
200
UP
DAT
ES
PM
RQ
500
2001
0-01
, 06
OP
1T48
-M-0
002
50
0187
38-0
1 52
4629
53
01/0
6/20
13
04 0
0 06
/30/
2014
1
2/25
/201
4 06
OP1
T48-
Q-0
003-
02 S
BGT
"B" V
ALV
E T
EST
AN
D 1
0 H
R R
UN
**
MO
DE
AP
PL. =
1,
2, 3
, *, ,
, 54
0 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
6/30
/201
4 11
/12/
2014
040
0 U
PD
ATE
S P
MR
Q 5
0020
010-
01
50
0200
14-0
1 52
4046
79
03/0
5/20
12
02 4
4 09
/05/
2013
0
1/20
/201
4 06
OP1
T48-
R-0
002-
01 S
BGT
'A' L
OG
IC T
EST
US
E
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
549
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
09/
05/2
013
01/2
0/20
14 0
844
ATTA
CH
ME
NT
1
5002
0015
-01
5236
4484
03
/20/
2011
15
44
08/1
4/20
13
12/
23/2
013
06O
P1T
48-R
-000
2-02
SB
GT
'A' V
AC
UU
M T
ES
T;
**W
C43
- S
CH
**
MO
DE
AP
PL. =
1,
2, 3
, *, ,
, 10
95
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
08/
22/2
013
01/0
5/20
14 1
544
18 M
ON
THS
FR
OM
PER
FOR
MA
NC
E O
F 06
OP
1T48
-R-0
003-
02
(500
2001
9-01
) W
C43
- Pe
rform
Atta
chm
ent 2
ei
ghte
en m
onth
s fro
m p
erfo
rman
ce o
f at
tach
men
t 3 o
n a
rota
ting
basi
s.-
SC
H 1
8 M
ON
THS
FR
OM
P
ERFO
RM
AN
CE
OF
06O
P1T
48-R
- 00
03-0
2 (5
0020
019-
01)
50
0200
16-0
1 52
2835
10
06/0
5/20
12
11 5
2 11
/26/
2013
0
4/06
/201
4 06
OP
1T48
-R-0
002-
03 S
BG
T 'A
' VA
CU
UM
TE
ST;
**
WC
43 -
SC
H
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
1095
A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 1
1/26
/201
3 04
/10/
2014
115
2 18
MO
NTH
S F
RO
M P
ERFO
RM
AN
CE
OF
06O
P1T
48-R
-000
3-03
(5
0020
020-
01
WC
43 -
Perfo
rm A
ttach
men
t 3
eigh
teen
mon
ths
from
per
form
ance
of
atta
chm
ent 2
on
a ro
tatin
g ba
sis.
- S
CH
18
MO
NTH
S F
RO
M
PER
FOR
MA
NC
E O
F 06
OP
1T48
-R-
0003
-03
(500
2002
0-01
5002
0018
-01
5240
4680
03
/05/
2012
23
45
09/0
5/20
13
01/
20/2
014
06O
P1T4
8-R
-000
3-01
SB
GT
'B' L
OG
IC T
EST;
US
E
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
549
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
09/
05/2
013
01/2
1/20
14 0
545
ATTA
CH
ME
NT
1
5002
0019
-01
5240
9813
03
/20/
2011
02
30
03/1
9/20
14
08/
02/2
014
06O
P1T4
8-R
-000
3-02
SB
GT
'B' V
ACU
UM
TE
ST; U
SE
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
1095
A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
3/20
/201
4 08
/04/
2014
023
0 A
TTA
CH
ME
NT
2.
DR
AW
DO
WN
TE
STI
NG
WIT
H A
UX
BLD
G
RAI
LRO
AD
BA
Y D
OO
RS
1A
310/
1A31
2 C
LOSE
D, R
AILR
OAD
BA
Y C
EILI
NG
HA
TCH
ES I
NST
ALL
ED
, A
ND
RA
ILR
OA
D B
AY
DO
OR
1A3
19A
(EX
TER
IOR
DO
OR
)OP
EN
WC
43 -
Perfo
rm A
ttach
men
t 2
eigh
teen
mon
ths
from
per
form
ance
of
atta
chm
ent 3
on
a ro
tatin
g ba
sis.
SC
H
18 M
ON
THS
FR
OM
PE
RFO
RM
AN
CE
O
F 06
OP1
T48-
R-0
002-
02 (5
0020
015-
01
)
-
All
Surv
eilla
nces
~~~
Sor
ted
byPr
oced
ure
Num
ber/
Late
Dat
e ~
~~$$
Dol
lar S
igns
den
otes
Sur
veill
ance
s w
hich
hav
e ex
ceed
ed th
e N
RC L
ate
Dat
e W
edne
sda y
,May
8,20
13
11:1
7
**
1-PO
WER
OPS
; 2- S
TAR
TUP;
3-H
OT
SHU
TDO
WN
; 4-C
OLD
SH
UTD
OW
N; 5
-REF
UEL
;6-C
ON
TRO
L R
OD
S W
ITH
DR
AW
N
7,8,
9 ID
ENTI
FIED
BY
*AST
ERIS
K :
7-C
OR
E AL
TER
ATI
ON
S; 8
-PO
TEN
TIA
L FO
R D
RA
ININ
G V
ESSE
L; 9
-HAN
DLI
NG
IRR
AD
IATE
D F
UEL
Page
137
of 1
44
PMR
Q #
/ FR
EQ D
AYS
WO
# /
STA
TUS
LAST
PE
RFO
RM
ED
DU
E D
ATES
LA
TE
DAT
ES
PRO
CED
UR
E / D
ESC
RIP
TIO
N
MO
DE
APPL
. C
OM
MEN
TS
50
0200
20-0
1 52
4233
63
06/0
5/20
12
11 5
2 06
/05/
2015
1
0/05
/201
5 06
OP1
T48-
R-0
003-
03 S
BG
T 'B
' VAC
UU
M T
EST
; USE
**
MO
DE
AP
PL. =
1,
2, 3
, *, ,
, 10
95
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
06/
05/2
015
10/2
0/20
15 1
152
ATTA
CH
ME
NT
3. D
RA
WD
OW
N T
EST
WIT
H R
AILR
OAD
BA
Y D
OO
R 1
A31
9A(E
XTE
RIO
R D
OO
R)C
LOS
ED
AN
D D
OO
RS
1A
310
AND
1A
312
OPE
N.
WC
43 -
Perfo
rm A
ttach
men
t 3
eigh
teen
mon
ths
from
per
form
ance
of
atta
chm
ent 2
on
a ro
tatin
g ba
sis.
- .S
CH
18
MO
NTH
S F
RO
M
PER
FOR
MA
NC
E O
F 06
OP
1T48
-R-
0002
-03
(500
2001
6-01
)
5002
0021
-01
5245
8383
02
/07/
2013
17
30
05/0
1/20
13
05/
22/2
013
06O
P1Z5
1-Q
-000
1-01
CO
NTR
OL
RO
OM
HV
AC
SY
STEM
VA
LVE
**
MO
DE
AP
PL. =
1,
2, 3
, *, ,
, 84
A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
5/08
/201
3 05
/31/
2013
113
0 TE
ST. U
SE A
TTAC
HM
EN
T 1.
UPD
ATE
D B
Y PM
RQ
500
2002
2-01
U
PD
ATE
D B
Y 06
OP1
Z51-
Q-0
001-
02,
PM
RQ
500
2002
2-01
.
5002
0022
-01
5235
4499
07
/14/
2011
03
45
01/0
4/20
13
07/
01/2
013
06O
P1Z5
1-Q
-000
1-02
CO
NTR
OL
RO
OM
HV
AC
SY
STE
M
**M
OD
E A
PPL
. =
1, 2
, 3, *
, , ,
540
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
01/
04/2
013
05/1
9/20
13 0
345
VALV
E T
EST
. USE
ATT
AC
HM
EN
T 2.
UPD
ATE
S P
MR
Q
5002
0021
-01
UP
DA
TES
PM
RQ
500
2002
1-01
50
0196
42-0
1 52
4645
53
04/1
0/20
13
17 3
0 07
/04/
2013
0
7/25
/201
3 06
OPS
C85
-Q-0
001
SEIS
MIC
MO
NIT
OR
ING
SYS
TEM
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, ,
84
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
071
1/20
13
08/0
4/20
13 1
130
FUN
CTI
ON
AL
TES
T
5001
9643
-01
5245
6127
03
/22/
2012
22
35
06/1
4/20
13
07/
07/2
013
06O
PSD
17-Q
-000
8 R
ADW
AST
E B
LDG
VE
NT
RA
D M
ON
ITO
R
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, 5, ,
84
A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
6/21
/201
3 07
/16/
2013
163
5 FU
NC
T. T
EST
5001
9644
-01
5246
5037
01
/17/
2013
12
27
04/1
1/20
13
05/
02/2
013
06O
PS
D17
-Q-0
018
LIQ
UID
RA
DW
AS
TE E
FFLU
EN
T R
AD
IATI
ON
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, ,
84
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
04/
18/2
013
05/1
1/20
13 0
627
MO
NIT
OR
FU
NC
TIO
NA
L TE
ST
50
0196
45-0
1 52
4707
81
02/1
0/20
13
21 4
5 05
/05/
2013
0
5/26
/201
3 06
OPS
P21
-Q-0
001-
01 M
AKEU
P W
ATE
R T
RE
ATM
EN
T **
MO
DE
AP
PL. =
1,
2, 3
, , ,
, 84
A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
5/12
/201
3 06
/04/
2013
154
5 Q
UA
RTE
RLY
VAL
VE T
EST.
US
E A
TTAC
HM
ENT
1 U
PD
ATE
D B
Y PM
RQ
500
1964
6-01
, 06
OP
SP21
-Q-0
001-
02
50
0196
46-0
1 52
4537
97
11/1
2/20
12
02 4
6 05
/06/
2014
1
0/31
/201
4 06
OPS
P21
-Q-0
001-
02 M
AKEU
P W
ATE
R T
RE
ATM
EN
T **
MO
DE
AP
PL. =
1,
2, 3
, , ,
, 54
0 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
5/06
/201
4 09
/18/
2014
024
6 Q
UA
RTE
RLY
VAL
VE T
EST.
18
MO
NTH
; 6 M
ON
TH G
RA
CE
U
PD
ATE
S P
MR
Q 5
0019
645-
01,
06O
PSP
21-Q
-000
1-01
5001
9647
-01
5239
5431
08
/19/
2012
06
31
08/1
9/20
13
11/
17/2
013
06O
PSP6
4-A
-000
4 FI
RE
PR
OTE
CTI
ON
SYS
TEM
VAL
VE
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, 5, ,
29
2 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
8/19
/201
3 11
/19/
2013
063
1 ST
RO
KE T
EST
.
5001
9653
-01
5240
2981
05
/28/
2012
14
00
03/1
6/20
13
05/
28/2
013
06O
PS
P64
-A-0
012
AN
NU
AL
YAR
D F
IRE
HYD
RA
NT
FLO
W
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, 5, ,
29
2 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
3/16
/201
3 05
/28/
2013
140
0 C
HEC
K
50
0196
56-0
1 52
4131
47
07/0
8/20
12
05 4
4 04
/26/
2013
0
7/08
/201
3 06
OPS
P64-
A-0
046
FIR
E P
UM
PS L
OW
PR
ESS
UR
E S
TAR
T **
MO
DE
AP
PL. =
, ,
, , ,
, 29
2 A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
4/26
/201
3 07
/08/
2013
054
4 FU
NC
TIO
NA
L TE
ST
50
0185
45-0
1 52
4707
97
04/1
8/20
13
07 0
0 05
/16/
2013
0
5/23
/201
3 06
OPS
P64-
M-0
001-
01 F
IRE
PU
MP
C00
3A M
ON
THLY
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, ,
28
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
05/
19/2
013
05/2
4/20
13 1
900
OPE
RAB
ILIT
Y TE
ST
*ATT
1*
US
E A
TTA
CH
MEN
T 1
50
0185
45-0
2 52
4707
99
04/1
8/20
13
07 0
0 05
/16/
2013
0
5/23
/201
3 06
OPS
P64-
M-0
001-
02 F
IRE
PU
MP
C00
3B M
ON
THLY
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, ,
28
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
05/
19/2
013
05/2
4/20
13 1
900
OPE
RAB
ILIT
Y TE
ST
*ATT
2*
US
E A
TTA
CH
MEN
T 2
50
0185
45-0
3 52
4707
96
04/1
8/20
13
07 0
0 05
/16/
2013
0
5/23
/201
3 06
OPS
P64-
M-0
001-
03 M
OTO
R D
RIV
EN
FIR
E P
UM
P C
002
**M
OD
E A
PPL
. =
1, 2
, 3, 4
, 5, ,
28
A
CTI
VE
TEC
H S
PEC
DAT
E/TI
ME
= 0
5/19
/201
3 05
/24/
2013
190
0 O
PER
AB
ILIT
Y *
ATT
3*
US
E A
TTA
CH
MEN
T 3
50
0196
58-0
1 52
4668
41
04/2
8/20
13
14 3
2 05
/26/
2013
0
6/02
/201
3 06
OPS
P64-
M-0
011
FIR
E P
RO
TEC
TIO
N S
YSTE
M V
ALVE
**
MO
DE
AP
PL. =
1,
2, 3
, 4, 5
, ,
28
AC
TIVE
TE
CH
SPE
C D
ATE/
TIM
E =
05/
28/2
013
06/0
5/20
13 0
232
LIN
EU
P V
ER
IFIC
ATI
ON
-
All
Surv
eilla
nces
~~~
Sor
ted
byPr
oced
ure
Num
ber/
Late
Dat
e ~
~~$$
Dol
lar S
igns
den
otes
Sur
veill
ance
s w
hich
hav
e ex
ceed
ed th
e N
RC L
ate
Dat
e W
edne
sda y
,May
8,20
13
11:1
7
**
1-PO
WER
OPS
; 2- S
TAR
TUP;
3-H
OT
SHU
TDO
WN
; 4-C
OLD
SH
UTD
OW
N; 5
-REF
UEL
;6-C
ON
TRO
L R
OD
S W
ITH
DR
AW
N
7,8,
9 ID
ENTI
FIED
BY
*AST
ERIS
K :
7-C
OR
E AL
TER
ATI
ON
S; 8
-PO
TEN
TIA
L FO
R D
RA
ININ
G V
ESSE
L; 9
-HAN
DLI
NG
IRR
AD
IATE
D F
UEL
Page
138
of 1
44
EN
D
PA
GE
-
Date of Examination: 5/06/2013 Operating Test Number: LOT
2012-1
Facility: Grand Gulf Nuclear Station JPM Number:
GJPM-OPS-2012-1AS2
Revision 0 2/21/13 Page 139 of 9
GGNS
2012-1 NRC Operating Test
Job Performance Measure JPM Number: GJPM-OPS-2012-1AS2 JPM
Title:
Determine Firewatch Requirements_
Facility Number: GJPM-OPS-ADMS95 (If Bank or Modified from
Bank)
JPM Attributes:
New Modified Direct from bank
Time Critical Alternate Path Validation Time: 25 min
Applicant: ______________________ Examiner:
____________________________ Performance Time:
________________________ Performance Rating: SAT UNSAT
Comments:
Prepared By: Kyle Grillis 2/21/13 Exam Developer Date
Ops Review: Robert Brinkman 3/21/2013 1
st Validation by Ops Rep or Ops Validation Crew Date
Validated By: Keith Huff / Dustin Hill 3/25/2013 2
nd Validation by Ops Validation Crew Date
Approved By: Steve Reeves 3/25/2013 Project Lead or Exam Team
Lead Date
-
Date of Examination: 5/06/2013 Operating Test Number: LOT
2012-1
Facility: Grand Gulf Nuclear Station JPM Number:
GJPM-OPS-2012-1AS2
Revision 0 2/21/13 Page 140 of 9
Determine Fire Watch Requirements Setting: Classroom Type: SRO
Task: SRO- NO-035 K&A: Generic 2.1.2: (4.1/4.4); 2.1.8:
(3.4/4.1); 2.2.22:
(4.0/4.7);2.1.25: (3.9/4.2); 2.4.25: (3.3/3.7) Safety Function:
Conduct of Operations [10CFR55.45a(12)] Performance: Actual
Reference(s): 02-S-01-17, Control of Limiting Conditions for
Operati