Page 1: Getting Creative in Bellevue A Unique Approach to ...

2015 Spring Conference | Bellevue, WA

Presented by Doug Lane, PE | City of Bellevue Tom Lindberg, PE | Murray, Smith & Associates

Getting Creative in Bellevue A Unique Approach to Evaluating and Improving a Critical Storage Tank

and Pump Station within a Residential Neighborhood

April 30, 2015

Page 2: Getting Creative in Bellevue A Unique Approach to ...

Existing Horizon View #1 Reservoir & Pump Station

2

700 Zone Welded Steel Reservoir 850 Zone Pump Station • Built in 1964 • Two 1250 gpm centrifugal pumps • Non-reinforced CMU building

• Built in 1958 on another site • Moved to current site in 1963 • 0.2 MG nominal capacity

Page 3: Getting Creative in Bellevue A Unique Approach to ...

Horizon View #1 Vicinity Map

3

Horizon View #1 Site

Page 4: Getting Creative in Bellevue A Unique Approach to ...

Why is the City Doing the Project?

4

• Critical facilities that supply many upper zones • Increase reliability during seismic events • Replace aging structures and equipment

Page 5: Getting Creative in Bellevue A Unique Approach to ...

Unique Approach to Sizing Storage

Unique functionality of reservoir

5

Page 6: Getting Creative in Bellevue A Unique Approach to ...

Unique Approach to Sizing Storage

Conventional and system-specific approaches

6

• DOH Design Manual criteria

• EPS hydraulic modeling

• Power outage impacts

Page 7: Getting Creative in Bellevue A Unique Approach to ...

Unique Approach to Sizing Storage

Conclusion – 300,000 gal tank required

7

Page 8: Getting Creative in Bellevue A Unique Approach to ...

City’s Updated Public Information Program

• City staff training on consent-building

• Bleiker “Informed Consent” Analysis

• Post Cards notification of project initiation

• Annual Status updates

• Community meeting at 30% design

8

Page 9: Getting Creative in Bellevue A Unique Approach to ...

Condition Assessment of Existing Pump Station

9

• Non-reinforced CMU walls • Aging equipment • Best option is replacement

Page 10: Getting Creative in Bellevue A Unique Approach to ...

Condition Assessment of 0.2 MG Reservoir

10

• 1958 original construction; 31’ D x 34’ H • Inadequate freeboard, anchorage and foundation • Rehabilitation or replacement options available

Page 11: Getting Creative in Bellevue A Unique Approach to ...

Reservoir Rehabilitation vs. Replacement Evaluation

11

• Triple Bottom Line decision model approach

• Workshop with City staff • Best option is replacement

Triple Bottom Line Evaluation

Page 12: Getting Creative in Bellevue A Unique Approach to ...

Proposed 0.3 MG Reservoir

12

• Welded steel tank; 41’ D x 43’ H • Self-supporting dome roof • Elevated inlet, separate outlet

Page 13: Getting Creative in Bellevue A Unique Approach to ...

Proposed 1800 gpm Pump Station

13

• Horizontal centrifugal pumps with VFDs

• 850 Zone/700 Zone back-feed • Generator for backup power

Page 14: Getting Creative in Bellevue A Unique Approach to ...

Proposed Site Improvements

14

• Replace AC water mains

• Stormwater improvements

• Increase access around reservoir

Page 15: Getting Creative in Bellevue A Unique Approach to ...

Maintaining Service During Construction

15

1) Build new pump station 2) Remove existing pump station and reservoir 3) Build new reservoir

EXISTING PUMP STATION

Page 16: Getting Creative in Bellevue A Unique Approach to ...

Project Schedule

16

Completing 30% design

Design completion end of 2015

Construction in 2016-2017

Page 17: Getting Creative in Bellevue A Unique Approach to ...

2015 Spring Conference | Bellevue, WA

Presented by Doug Lane, PE | City of Bellevue Tom Lindberg, PE | Murray, Smith & Associates

Questions