Anke Mayer-Bartschmid, Mark Trautwein, Beate Mueller-Tiemann Cell & Protein Sciences, Global Biologics, Bayer HealthCare Getting Cell Line Development off the critical path in Biologics Drug Discovery Biologics Congress February 2 nd and 3 rd , 2015, Berlin • Biologics Congress, 2015, Berlin • B. Mueller-Tiemann Page 1
37
Embed
Getting Cell Line development off the critical path - …€¦ · · 2016-01-04Getting Cell Line Development off the critical path in Biologics Drug Discovery ... “Selection Strategies
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Anke Mayer-Bartschmid, Mark Trautwein, Beate Mueller-TiemannCell & Protein Sciences, Global Biologics, Bayer HealthCare
Getting Cell Line Development off the critical path in Biologics Drug Discovery
Biologics Congress February 2nd and 3rd, 2015, Berlin
• Biologics Congress, 2015, Berlin • B. Mueller-TiemannPage 1
Agenda The opportunity: Global Biologics – organizational set-up
The issue: Cell Line Development in Biologics R&D
The solution: Automation to compensate increased
resource demands
• Theoretical Screening Considerations
• Workflow
• Automation solution
• Data handling
Page 2 • Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
Bayer HealthCare PharmaceuticalsTop 10 Products
• Biologics Congress, 2015, Berlin • B. Mueller-TiemannPage 3
Product [ sales in € million ] 20132012
Kogenate™ 1,182 1,202
Betaferon™ / Betaseron™ 1,216 1,038
Xarelto™ 322 949
YAZ™ / Yasmin™ / Yasminelle™ 1,045 853
Nexavar™ 792 771
Mirena™ 677 719
Adalat™ 670 603
Aspirin™ Cardio 476 452
Avalox™ / Avelox™ 486 426
Glucobay™ 408 423
Bayer HealthCare Pipeline by Indication
• Biologics Congress, 2015, Berlin • B. Mueller-TiemannPage 4
Embolic stroke of undetermined source / Rivaroxaban
Peripheral artery disease / Rivaroxaban
Major Adv. Car. Events Prevent. / Rivaroxaban
CHF and CAD / Rivaroxaban
Long-term VTE prevention / Rivaroxaban
Medically ill / Rivaroxaban
Insufficient PDE5 Inhibitor response / Riociguat
Hemophilia / Damoctocog alfa pegol
Contraception / LCS 16
VV Atrophy / Prasterone (Vaginorm)
Non-CF Bronchiectasis / Cipro DPI
Skin and Lung Infections / Tedizolid
Gram-neg. Pneumonia / Amikacin inhale
Phase III (18)Phase II (19)Phase I (20)
*Regorafenib is a Bayer compound developed solely by Bayer. In 2011, Bayer entered into an agreement with Onyx Pharmaceuticals, Inc. under which Onyx will receive a royalty on any future global net sales of regorafenib in oncology
Status September 2014Selection of major Pharma pipeline projects in clinical Phase I to III
Global Biologics
Biologics ResearchGermany
Global BiologicalDevelopment
GER
Biologics ResearchUS
Research Development
Global BiologicalDevelopment
US
Organizational Set-up at BAYERResearch AND Development within one function
Actively managing the RtoD Interface by dedicated or ganizational set-up ensures competitive timelines and costs for clinica l candidate molecules
A. Application of Developability Criteria in lead optimization (biophysical properties)
• Ensure standardization compatible to mAb platform
• Ensure overall technical robustness of clinical candidates
• Prepare for ease in formulation development
B. Expression titers > 2 g/l as starting point for process development
Page 5 • Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
Agenda The opportunity: Global Biologics – organizational set-up
The issue: Cell Line Development in Bologics R&D
The solution: Automation to compensate increased
resource demands
• Theoretical Screening Considerations
• Workflow
• Automation solution
• Data handling
Page 6 • Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
The CLD process
Page 7
D2 D3
Research DevelopmentStart Lead
Optimization Start Pre-Clinical
Development GMP-Lot
cell line development
Cell Line Development: on critical path in Biologics drug discovery and development
Stages in the Drug Development Pipeline
• Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
� On the critical path after selection of clinical candidate
� Contributes to development timelines!
Cell Line Development in a nutshellTransfection
DNA
Selection and Cloning
~5010-20~81Product Quality Productivity &
Growth Rate
Stability of Cell Line
+
CHO-Cells
~81
Suitability in Bioreactor
D3
Expansion
• Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
Reduction of overall project timelinesby paralellelization in cell line development
D2 D3
Yesterday: Start of Cell Line Development at handov er to Development
Reduction ofDevelopment Timeline
6 months
Research DevelopmentStart Lead
Optimization Start Pre-Clinical
Development GMP-Lot
D2 D3
Research DevelopmentStart Lead
Optimization Start Pre-Clinical
Development GMP-Lot
Today: Start of Cell Line Development for multiple Candidates in late Research Phase
cell line development
cell line development
• Biologics Congress, 2015, Berlin • B. Mueller-TiemannPage 9
Agenda The opportunity: Global Biologics – organizational set-up
The issue: Cell Line Development in Biologics R&D
The solution: Automation to compensate increased
resource demands
• Theoretical Screening Considerations
• Workflow
• Automation solution
• Data handling
Page 10 • Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
How to screen for cloneswith top fed-batch performance ?
A. Porter: “Selection Strategies for Isolating ‘Desirable’ GS-CHO Cell Lines”, Cell Line Development & Engineering 2008, PraguePorter et al., Biotechnol Prog. 2010 Sep-Oct;26(5):1455-64.
• Biologics Congress, 2015, Berlin • B. Mueller-TiemannPage 11
Cell Line Development in a nutshellNeed for predictive Higher Throughput fed-batch format
Transfection
DNA
Selection
Cloning
> 481
Product QualityProductivity & Growth Rate in fed-batch
Stability of Cell Line
D3
+
CHO-Cells
Suitability in Bioreactor &extended Product Quality
• Biologics Congress, 2015, Berlin • B. Mueller-TiemannPage 12
Screening concept: Predictivity
How to screen >1000 clones in a fed-batch predictive for the later bioreactor?
Page 13
Comparison of small-scale models with different feeding strategies in parallel
Deep well platesSystem “Duetz” ambr™TubeSpins®Shake flasks
• Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
Fed-batch scale comparison:one clone, four different feedings, four incubation devices
Page 14 • Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
From dozens to hundredsEarly screening of clones in fed-batch
http://www.tpp.ch http://www.enzyscreen.com
• Biologics Congress, 2015, Berlin • B. Mueller-TiemannPage 15
How many clones to screen?
If it is technologically feasible to screen hundreds of clon es –
• What is a reasonable number of clones to screen ?
• At which point do we reach saturation ?
• How can we dedicate resources in an effective & efficient way ?
The answer will also depend on what you aim for –
• One TOP clone is not enough in our view
• A variety of TOP clones is desirable due to
• Variations in product quality
• Stability issues
• Bioreactor suitability & growth profile
• Metabolic profile
• Biologics Congress, 2015, Berlin • B. Mueller-TiemannPage 16
Theoretical Screening Considerations
2 g/l 2 g/l
5% 1%
3 g/l
1%
System A
System A
System B
Probability of Success will depend on - Expression System used, comprising
- Expression Vector- Selection Pressure- Host Cell Line- Medium & Process
- Aim- Molecule to be expressed
mAb X
mAb X
mAb X
Fre
quen
cyF
requ
ency
Fre
quen
cy
2 g/l
1%
System A
mAb Y
Fre
quen
cy
Page 17 • Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
How many clones to be screened to find 8 clones for the bioreactor evaluation?
• Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
Theoretical Screening Considerations
Fan et al., Biotechnol Bioeng. 2012
~ 2%~ 11%
2 g/l
2%
System A
mAb X
Fre
quen
cy
2 g/l
11%
System B
mAb XFre
quen
cy
Page 19 • Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
Theoretical Screening ConsiderationsRaising the odds ?
Page 20
2 g/l
3%
> 5% ??
Rejectionof lowperformers byterminal batch
MoleculeFrequency of clones ≥ 2 g/l
Highest Titerin Shake Flask
Most advancedBAYER expression system
mAb X 3 / 96 4.5 g/l ~ 3%
Test screening
⇒Check at least 400 clones in a fed-batch screen!
A. Porter: “Selection Strategies for Isolating ‘Desirable’ GS-CHO Cell Lines”, Cell Line Development & Engineering 2008, PraguePorter et al., Biotechnol Prog. 2010 Sep-Oct;26(5):1455-64.
• Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
Screening strategy for the Bayer CHO EXPRESSion System
•CLDE Dublin 2015 Anke Mayer-BartschmidPage 21
• Use a batch screening to eliminate low performers
• Screening of 384 clones in fed-batch should yield ~ 5-8 clones with > 2 g/l
• Enough to carefully analyze these to select the final clone with respect to product quality, stability, bioreactor suitability and metabolic profile
• Use a batch screening to eliminate low performers
• The fed-batch has to be increased to max 1,000
� Anything between 384 and 1,000 seems reasonable to be checked in a predictive fed-batch
Standard mAbmolecules without issues
Difficult mAb or other protein format
Cell Line Development in a nutshellTransfection
DNA
Selection
Cloning
> 481
Product Quality Productivity & Growth Rate in fed-batch
Suitability in Bioreactor & extended Product Quality
Stability of Cell Line
D3
+
CHO-Cells
> 384
Page 22 • Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
Workflow envisioned
Plating Copy #3
Copy #2
Copy #1 Freeze (backup)
PassagingExpansion
& Cryopreservation
DWPfed-batch
Terminal batch
Transfection
TubeSpinin depth
Fed-batchCharacterization
384
ClonePicking~ 800
TOP48
Rejection of low performers(50% of clones)
TOP48
Page 23
Fed-batch screen
• Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
Real test case: mAb Yin manual workflow
Devised workflow yields five clones exceeding 2 g/l , three are close
���� Excellent starting point for bioreactor characteriz ation
Page 24
731 clonespicked
360 clonesin fed-batch screen
24 clonesin Shake Flask���� ����
• Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
Screening cascade for future cell line development projects
One candidate
1,000clonesin DWP
fed-batch
2,000 clonesin terminal batch
50x384 MTP seeded
Project A
Page 25
Six candidates in parallel
6 x 384
clonesin DWP
fed-batch
6 x 800 clonesin terminal batch
6 x 20x384 MTP seeded
Project B
• Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
� Need for automation solution
Cell Line Development Stationfrom Beckman-Coulter (3D simulation)
96 head liquid handler
8 needle liquid handler
Multidrop
Clone Select Imager
CO2 incubator
Robotic arm
Stacker & hotel
96 vialdecapper
Sterile Housing
Page 26 • Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
• Management of up to 6 candidates in parallel
• Flexible scheduling and staggered workflows
• A well-based hit picking process
• Start DWP fed-batch process with defined cell number
• Full traceability for each clone with data transfer to our in-house Biologics database
Automation Software –Biologics Data Platform
BDP => Bayer’s Large Molecule Workflow Management Platform
• Therapeutic mAbs, incl. ADCs & next-gen. Abs• non-mAb therapeutic proteins• Protein reagents & tools for HTS and structural biology
• The core platform for management of molecules (BMOLs, tools)
• Registration interface toBayer‘s overall compoundregistration system
• The central DB for key data from screening and automation projects in GBR
• The clone and sample (batch) tracking tool
• The data repository for keyassay and analytics data
Based on
Page 27 • Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
Biologics Data Platform (BDP) –Bayer’s Integrated Biopharma R&D Workflow Platform
Page 28
Antigen Registration Panning, Immunization Plate Management Assay Results Sequencing Run Redundancy Analysis Hit Selection Protein engineering
Target Protein Vectors Cell Lines Protein Expression Protein Purification Final
Candidate
Analytics, Assay Data Sample Management
Automated
Cell Line Development
Microbioreactor Evaluation Bioreactor Evaluation Production
Cell Line
Based on
Supporting cell line development campaigns
Full molecule & sample life cycle traceability thro ughout the whole process
• Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
BDP: Guiding the automated CLD process
Page 29
� Complete traceability of clones• From host cell line passaging, transfection, screening, subcloning to final
clone• Automated & manual processes with flexibility for switching between
these modes during the CLD process
� Decision-making• Evaluation of monoclonality (CSI)• Confluence, passaging decisions (CSI)• Hit selection based on titer (Octet), confluence (CSI), or both
� Instruction of automation platform• Creation of work lists (i.e. picking list)
� Cell banking
CLD Workflow:
• Seeding & selection
• Incubation
• Passaging
• Analyzing
• Cryo-conservation
BDP AutomationSystem
Culture Processing Reports:
• Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
BDP: Hit Selection
Page 30
Hit Selection table including imaging data (CSI)
Hit Selection for Cell Line Development Campaign CLD-5
• Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
Implementation of Cell Line Development Automation at Bayer
Page 31 • Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
Cell Line Development in a nutshellTransfection
DNA
Selection
Cloning
> 481
Productivity & Growth Rate in fed-batch
Suitability in Bioreactor & extended Product Qualit y
Stability of Cell Line
D3
+
CHO-Cells
Up to 6 candidates
Page 32
> 384< 1,000
• Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
Summary
� Start of cell line development in late research phase allows overall timeline
reduction by at least 6 months
� This results in an amplification of cell line development efforts
� An efficient & effective workflow has been designed which is amenable to
automation
� Automation and Data management system critical for success
� Compact automation solution allows parallel management of up to 6
candidates in early stages of cell line development
Page 33 • Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
An R-to-D Interface to Enable Rapid and Cost-effective CMC Development
� Decreased cost and time from start
preclinical development to GMP
� Increased cell line productivity
� Increased PoS by prioritizing drug-like
properties in Lead Optimization
Team objectives
R-to-D Interface Leadership Team
Cross-functional leadership team of
GB Research and Development to integrate
expertise and manage resources globally
and flexibly across projects
CHO cell line productivity achieved at development candidate nomination – g/l
2009 2010 2011 2012 2013 >2014
4.5
mA
bh
3.5
mAb a Bayer CHO
mA
bg
3.0
mA
bf
3.5m
Ab
e3.7
mA
bd
3.5
mA
bc
2.0
mA
bb
2.0
mA
ba
System
B
1.4
mA
ba
System
A
0.5
2006-09 2010 2011 2012 Benchmark
987654321
Timelines (relative):
start preclinical development -GMP DP
Smooth hand-over from Research to Development
Acknowledgements
Page 35
Cell & Protein Sciences, Wuppertal
Anke Mayer-BartschmidMark TrautweinClaudia Goetzberger-SchadAlexander KorseskaMichael Strerath & Teams
Bayer, Global Biologics Development, Berkeley
John ThriftRoy KimuraJianmin ChenRubai DingCarol MirendaGlenn YamasakiPaul Wu & Teams
Bayer, Global Biologics Development, Wuppertal
Alexander JockwerTobias ThueteJennifer DietrichUwe Langer & Teams
GeneData
Christoph FreibergPeter Ernst
• Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
Beckmann Coulter
Christian Kuhl, Oliver Gassmann
Thank you!
Page 36 • Biologics Congress, 2015, Berlin • B. Mueller-Tiemann
Forward-Looking Statements
This presentation may contain forward-looking statements based on current assumptions and forecasts made by Bayer Group or subgroup management.
Various known and unknown risks, uncertainties and other factors could lead to material differences between the actual future results, financial situation, development or performance of the company and the estimates given here. These factors include those discussed in Bayer’s public reports which are available on the Bayer website at www.bayer.com.
The company assumes no liability whatsoever to update these forward-looking statements or to conform them to future events or developments.
Page 37 • Biologics Congress, 2015, Berlin • B. Mueller-Tiemann