Top Banner
GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg
36

GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Dec 26, 2015

Download

Documents

Mitchell Pitts
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

GERDA: the Germanium Detector Array at LNGS

IDEA meeting, April 14/15, Orsay

Stefan Schoenert, MPIK Heidelberg

Page 2: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

INFN LNGS, Assergi, ItalyA.Di Vacri, M. Junker, M. Laubenstein, C. Tomei, L. Pandola

JINR Dubna, RussiaS. Belogurov,V. Brudanin, V. Egorov, K. Gusev, S. Katulina, A. Klimenko, O. Kochetov, I. Nemchenok, V. Sandukovsky, A. Smolnikov, J. Yurkowski, S. Vasiliev,

MPIK, Heidelberg, GermanyC. Bauer, O. Chkvorets, W. Hampel, G. Heusser, W. Hofmann, J. Kiko, K.T. Knöpfle, P. Peiffer, S. Schönert, J. Schreiner, B. Schwingenheuer, H. Simgen, G. Zuzel

Univ. Köln, GermanyJ. Eberth, D. Weisshaar

Jagiellonian University, Krakow, PolandM.Wojcik

Univ. di Milano Bicocca e INFN, Milano, ItalyE. Bellotti, C. Cattadori

INR, Moscow, RussiaI. Barabanov, L. Bezrukov, A. Gangapshev, V. Gurentsov, V. Kusminov, E. Yanovich

ITEP Physics, Moscow, RussiaV.P. Bolotsky, E. Demidova, I.V. Kirpichnikov, A.A. Vasenko, V.N. Kornoukhov

Kurchatov Institute, Moscow, RussiaA.M. Bakalyarov, S.T. Belyaev, M.V. Chirchenko, G.Y. Grigoriev, L.V. Inzhechik, V.I. Lebedev, A.V. Tikhomirov, S.V. Zhukov

MPP, München, GermanyI. Abt, M. Altmann, C. Büttner. A. Caldwell, R. Kotthaus, X. Liu, H.-G. Moser, R.H. Richter

Univ. di Padova e INFN, Padova, ItalyA. Bettini, E. Farnea, C. Rossi Alvarez, C.A. Ur

Univ. Tübingen, GermanyM. Bauer, H. Clement, J. Jochum, S. Scholl, K. Rottler

GERDA Collaboration

71 physicists / 12 institutions / 4 countries

Page 3: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

GERDA @ Gran Sasso:experimental concept

• HP Ge-diodes (76Ge): point-like energy deposition at Q = 2039 keV

• Operation of bare Ge diodes in high-purity LN2 / LAr shield (Heusser, Ann, Rev. Nucl. Part. Sci. 45 (1995) 543); proposals based on this idea: GENIUS (H.V. Klapdor-Kleingrothaus et. al., hep-ph/9910205 (1999)); GEM (Y.G. Zdesenko et al., J. Phys. G27 (2001))

• Baseline: LN2; possible upgrade LAr: =1.4 g/cm3, active anti-coincidence with scintillation light from LAr

• Reduction of backgrounds key to sensitivity : – Half-life limit

• w/o backgrounds: t1/2 (MT)• with backgrounds: t1/2 (MT)1/2

Goal: background free!

Page 4: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Why Ge-76 ?

• High resolution (4 keV @ Q): no bgd from 2-mode

• Huge leap in sensitivity possible ……applying ultra-low background techniques…novel background / 0- signal discrimination

methods (ie. point-like vs. compton events)• Segmentation & pulse shape (with true coaxial detectors) • Liquid argon scintillation read out

• Phased approach: increment of target mass• Probably only method to scrutinize 0-DBD

claim on short time scale: test T1/2, not mee !

Page 5: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

GERDA: Baseline design

Clean roomlock

Vacuum insulated copper vessel

Water tank / buffer/ muon veto

Liquid N/Ar

Ge Array

Page 6: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Phases and physics reach of GERDA

M·T

(M·T)1/2

10-3 / (keV·kg·y)

10-1 / (keV·kg·y)

Phase-IHdM & IGEX

3·1025

Phase-II+new diodes

2·1026

KK

2007 2010

Page 7: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Phases and Physics reach of GERDA world-wide collaboration needed for Phase-III; coop. with MAJORANA started

Phase-II

Phase-III

Phase-I

10-1/(keV·kg·y)

10-2/(keV·kg·y)

10-3/(keV·kg·y)

Page 8: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Phases and Physics reach of GERDA

| m

ee|

in e

V

Lightest neutrino (m1) in eV

F.F

eruglio, A. S

trumia, F

. Vissani, N

PB

659

Phase I:

Phase II:

Phase III:

Page 9: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Backgrounds in GERDA

Source B [10-3 cts/(keV kg y)]

Ext. from 208Tl (232Th) <1

Ext. neutrons <0.05

Ext. muons <0.1

Int. 68Ge (t1/2= 270 d) 12

Int. 60Co (t1/2= 5.27 y) 2.5

222Rn in LN/LAr <0.2

208Tl, 238U in holder <1

Surface contam. <0.6

180 days exposure after enrichment + 180 days underground storage

30 days exposure after crystal growing

Assumptions:

Target for phase II: B 10-3 cts/(keV kg y) additional bgd. reduction techniques

derived from measurements and MC simulations

Page 10: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Background signature: example Co-60

Multi-site energy deposition inside HP-Ge diode

Co-60

Energy deposition in surrounding medium

Ideal detector:1) Measure energy in surrounding

shielding material LAr calorimeter

2) Measure locations of energy deposition inside the crystal

Segmentation

Page 11: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Background reduction techniques

• Anti-coincidence between detectors

• Segmentation of readout electrodes (Phase II)

• Pulse shape analysis (Phase I+II)

• Waiting (Ge-68, …)

• Coincidence in decay chain

• Scintillation light detection (LArGe)

Page 12: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Background reduction techniques

• Anti-coincidence between detectors

• Segmentation of readout electrodes (Phase II)

• Pulse shape analysis (Phase I+II)

• Waiting (Ge-68, …)

• Coincidence in decay chain

• Scintillation light detection (LArGe)

Page 13: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

2: 1.332 MeV: Emax = 318 keV

1: 1.173 MeV

• T0 : crystal growing• 0.017 Bq/kg per day exposure• Test: detector production in 7.4 days • Assume 30 days 2.5 ·10-3 / (keV·kg·y)• HdM: ~5·10-3 / (keV·kg·y) in 2006

• T0 : crystal growing• 0.017 Bq/kg per day exposure• Test: detector production in 7.4 days • Assume 30 days 2.5 ·10-3 / (keV·kg·y)• HdM: ~5·10-3 / (keV·kg·y) in 2006

Example 60Co

Page 14: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

2 kg

60Co background spectrum

1 2

1+ 2

Q

MC simulation

Page 15: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

2 kg

60Co: suppression by segmentation

QMC simulation

Page 16: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

2 kg

60Co: suppression by segmentation

~10Nseg = 1

QMC simulation

Nseg = 3

Page 17: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

60Co: suppression by LAr Ge-anticoinc.

~100LAr anticoinc.

Liquid Argon

QMC simulation

2 kg

Page 18: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

60Co: segmentation and LAr Ge-anticoinc.

~1000

Liquid Argon

Nseg = 1AND

LAr anticoinc

Q

2 kg

MC simulation

Page 19: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Experiment: LAr Ge-anticoincidence

54Mn-source

Liquid Argon

20 cm

0.18 kg

Page 20: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Experiment: LAr Ge-anticoincidence

Liquid Argon

20 cm

Experimental Data

~5

0.18 kg

Page 21: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

LAr Ge-anticoincidence

Liquid Argon

20 cm

MC Simulation

Suppression factor limitedby escape events!

~5

Page 22: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

LAr Ge-anticoincidence

Liquid Argon

100 cm

MC Simulation

~60

Suppression factor limitedby dead layer0.18 kg

Page 23: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Status of GERDA• March 2004: LoI to LNGS

• Sep. 2004: Proposal to LNGS

• Sep. 2004: 70% of funding secured

• Feb. 05: Approval by LNGS

• Feb. 05: Ge-76 enrichment for Phase II started at ECP

• Feb. 05: Underground locations frozen (in front of LVD, TIR tunnel Sec. A-B & adjacent to LUNA II)

• March 05: LArGe facility (i.e. detector laboratory Phase I) under construction

• March 05: Technical proposal (Vers. 0.1)

• Autumn 06 (Goal): Detector filling and commissioning

Page 24: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Locations of GERDA

Page 25: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Infrastructures in HALL A:Super-Structure & Water tank

Page 26: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Infrastructures in Hall A:floor plan

NB: Sufficient access space for dismounting of LVD

Page 27: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Infrastructures in Hall A: Super-insulated cryogenic vessel

Cu-cryostat:hanging from neck

Cu-cryostat:resting on pads

Steel-cryostat:with optimized shielding

Two design studies for Cu-cryostat available:

•Cu-cryostat purchase process commenced with publication in ’Supplememnt of the Official Journal of the European Union’ a ’Prior Information Notice’ - SIMAP-MPI-K 31 Jan’05 ID:2005-002331; 7 companies expressed interest

•Decision taking Cu vs. steel cryostat: Cu-Steel welding tests and certification

Page 28: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Infrastructures in HALL A:Penthouse

Page 29: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

LArGe Facility

•Barrack modification close to completion

•Re-machined shielding system of LArGe underground

Underground detector laboratory

Page 30: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Testing and modification of enriched detectors

November, 2004, in LENS barrack(prior to barrack refurbishment)

ANG1 ANG2 ANG3 ANG4 ANG5

HdMo

Setup

3.0 3.4 3.0 3.5 3.4

GERDA

Lab, Jan.05

3.9 2.7 3.0 2.8 3.1

Notes Warm Up

PA gain

‘jumps’

•Co-60 source - absolute efficiency (done)•Ba-133 source - dead layer thickness estimation (done)•Check of ANG2 (ongoing)

Energy resolution at 2.615 MeV

Page 31: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Modification of enriched detectors

Design study for a Cu/Si/PTFE-onlydetector support/contact system

Alternative: Silicon support

Minimizing mass vs. strength(current design: factor 5 safety)

Page 32: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

New detectors for Phase II:Procurement of enriched Ge

• Ge procurement is done in two steps:

1) procurement of 15 kg of natural Ge (‘test run’)

2) subsequently procurement of 30-35 kg of 76Ge (‘real run’)

• Both samples produced in Siberia / Russian Federation

• 15 kg ‘test run’ (6N) Ge shipped in same way as enriched sample.

• Specially designed protective steel container (PSC) which reduces activation by cosmic rays by factor 20 is used for transportation

Procurement of natural Ge successfully concluded; sample received at MPI Munich on March 7, 2005

Page 33: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

New detectors for Phase II

• Production of 30-35 kg sample of enriched Ge-76 started in Siberia in February, 2005;

• Production time: 6 months • Increase of purity of enriched Ge-76 to 99.99 %

(99.8% originally quoted)• R&D on chemical purification technique: yield

≥85%, to be compared to the 70% of the standard procedure

• Segmented prototype detectors (p-type) ordered and are currently being produced

Page 34: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Updated schedule (preliminary)

Page 35: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Updated schedule (preliminary)

Page 36: GERDA: the Germanium Detector Array at LNGS IDEA meeting, April 14/15, Orsay Stefan Schoenert, MPIK Heidelberg.

Summary/Outlook

• GERDA collaboration operational; plans to further grow (Phase II and beyond)

• Major progress achieved over last 6 months• Co-operation with Majorana (MaGe, LArGe) very

positive: mutual benefit!• Schedule: items on critical path:

– Funding for water tank and muon veto (water Cherenkov)

– Integration of cryo-vessel, water tank, super-structure, laboratory building and penthouse

• GERDA well on its way