Top Banner
Geothermal Tunnel Linings Principles of Geothermal Tunnel Linings Duncan Nicholson - Director, Ove Arup and Partners Limited 11.00 – 11.30hrs 18 October 2012
44

Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Mar 07, 2018

Download

Documents

ngokhanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Geothermal Tunnel Linings

Principles of Geothermal Tunnel Linings

Duncan Nicholson - Director, Ove Arup and Partners Limited

11.00 – 11.30hrs 18 October 2012

Page 2: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Contents

� Background – Ground source heat energy

� Concept - Thermal tunnels� Pipes in segments and connenctions� Cold tunnels and hot tunnels

� Design development process� Linking to surface

2

� Linking to surface� Thermal / ventilation design� Fire

� Building market for tunnel heat

Page 3: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Background – Ground Sourced Heat Energy

Open Systems� Water wells

� Extract water

� 500kW / hole

Closed Systems

� Vertical or horizontal loops

� Extract heat

� 3.5kW / hole

Source: Commercial Earth Energy Systems (Canada Natural Resources)

Page 4: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Thermal Piles and Sprayed Lining

4

Geothermal Piles at

One New Change,

Arup (2009)

Austrian Sprayed concrete lining at Lainzer Tunnel,

After Brandl (2006)

Page 5: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Other Infrastructure Projects

� Loops are used in;-� Diaphragm walls� Base slabs � Linings of the station tunnels, eg metro NATMtunnel lining,� Channel Tunnel heat-exchange pipes

Crossrail – Stations boxes

5

Diaphragm wall, Brandl (2006)

Crossrail – Stations boxes

• Thermal diaphragm walls • Thermal piles

Page 6: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Concept - Thermal Tunnel

6

Access points at 500m centres for each tunnel

Page 7: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Concept -Segment Connections

� Segment to segment

� Box-outs

� Ring to ring

� Header pipes below

7

walk way

� Control valves

� Pressure regulator values (if two pipes)

Page 8: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Concept - Pipes and Box-Outs � PE-Xa grade plastic pipe provides:-

� Durability – 120 yrs at operating temperatures pressure.

� Permanent mechanical joint for segment to segment - fast.

� Good bend radius.

8

� Box-out provides:-

� Connection space.

� Joint rotation / extension.

� Mortar filler option.

Page 9: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Flow

Return

Concept - Circuit Diagram• 11 metres of pipe per segment

• 6 segments to one ring

• 5 rings to one circuit

• 33 circuits to branch

• 4 branches to one shaft

• Shafts at 500m centres

12

3

33

12

3

3332

1

1

2

250m

Reverse return header pipe:-Three pipes - no pressure regulator valve - Control values

Page 10: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Position of pipes inside tunnel segment

Concept - Thermal Loops Inside Segment

Box out section for the pipe connections.

Page 11: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Concept - Cold TunnelsCold Tunnels:

� No tunnel heat source� Tunnel air temperature low� Provides building heating and cooling � Heat energy mostly from soil mass not tunnel

No tunnel

11

Cold Tunnel locations

� Short road and rail tunnels

� Cold climates

� Good natural air ventilation

No tunnelheat source

Ground Heat source

Page 12: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Cold Tunnel Example – JanbechTunnel

12

Details to be given by Dr Franzius from Züblin

Page 13: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Segment – Reinforcement

� Fibre Reinforcement – just pipe support cage � Crossrail

� Steel Cage � Janbech Tunnel

� Segment mould effects

13

� Segment mould effects

� Production and testing

Page 14: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Concept - Hot TunnelsHot Tunnels:

� Tunnel air temperature higher than ground� Heat Energy mostly from tunnel

� Mainly for building heating� helps to cool the tunnel� Not efficient for cooling building

Tunnel Heat source

14

Hot tunnel locations :-

� cable tunnels,

� foul sewers,

� Deep/long rail and road tunnels

� Not efficient for cooling building Heat source

Ground Heat source

Crossrail train motors – 1MW heatTrains at 2.5min intervals

Page 15: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Concept – Effect of Ground

� Tunnels in Clay: � Heat stays, - local conduction � Access boreholes - easy to construct

Heat conduction

15

� Tunnels in Sand: � Heat dissipates with ground water

flow (Advection)� Access borehole are difficult to

construct – water bearing sand

Ground water flow

Page 16: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Design Development Process

� Develop concept – overall economics / carbon savings

� Identify design issues – many disciplines

� Tunnel design issues :-� Linking header pipes to surface � Lining construction� Design Process

16

� Design Process- Segment heat transfer model - Tunnel ventilation model- Tunnel thermal stress model

� Fire

� Surface heat market

� Costings / carbon savings

Page 17: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Linking Header pipes to surface

17

� Existing access points

� Shafts, stations, entrances,

� Dedicated access points

� Boreholes

Page 18: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Supply district A

Supply district B

Heat Supply to surface buildings

18

Shaft

Supply district C

borehole to cross-passage

boreholes to tunnel

Page 19: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Vertical Drilling

•Connect cross passage or tunnel • 202 borehole casing with 110mm pipe

•Verticality tolerance •1 in 200 (+/-100mm at 20m depth)

•2 boreholes per access point for header and return•~ £40K for a pair

Page 20: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

- 110 mm flow & return pipe

-500mm opening

BoreholeØ 350 mm

2 x PEXa Pipe

Borehole to tunnel connection

20

Tunnel accessØ 500 mm

600 mm

2 x PEXa PipeØ 110 mm

Page 21: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Impacts on Tunnel Construction

Impact on:-

� Segment construction

� Segment erection

� Space use inside tunnel

21

� Space use inside tunnel

� Construction cost

� Tunnel maintenance

Header pipes

Ring to ring connections

Page 22: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Tunnel Design Process – Hot Tunnels

Mott MacDonald B 37 Fig 15 12:26 5 Jul 00 DAB 00000a00

10

12.5

15

17.5

20

22.5

25

27.5

30

32.5Temperature °C

2d 3d 4d 5d 6d 7d 8d 9d 10d 11d 12d 13d Time - Days

Eastbound Station Temperatures: 32 Trains/h.dirn. Peak Service

100m^3/s UPE at Each Platform, with 75% Capture Efficiency

Crossrail, London, UK

Lumped massthermal model

Revised 1-D modelwith tunnel wall cooling

Mott MacDonald B 37 Fig 15 12:26 5 Jul 00 DAB 00000a00

10

12.5

15

17.5

20

22.5

25

27.5

30

32.5Temperature °C

2d 3d 4d 5d 6d 7d 8d 9d 10d 11d 12d 13d Time - Days

Eastbound Station Temperatures: 32 Trains/h.dirn. Peak Service

100m^3/s UPE at Each Platform, with 75% Capture Efficiency

Crossrail, London, UK

22

Existing 1-D Tunnel ventilation model

FE stress analysis thermal model

PreliminaryFE thermal model

Page 23: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Segement Thermal Model (DYNA)

360mm pipe spacing

200mmcover

• Model represents a 1m length of tunnel with soil

• Builds on under floor heating

Concrete

300mm thick

Concrete

23

Pipe wall (2mm thick)

spacing

Soil, extends to about 100m from

tunnel

Water

Page 24: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Temperature contours in tunnel lining

Model considers:

• Air temperature in tunnel• Boundary condition in soil 15oC at 150m• Assign extraction rates from

24

• Assign extraction rates from pipes

Page 25: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

20

25

30

35P

ipe

Ave

rage

Tem

pera

ture

(D

eg C

)No flow period

Temperature variation in the pipe –continuous extraction

end of summer

25

0

5

10

15

0 1 2 3 4 5 6 7 8

Pip

e A

vera

ge T

empe

ratu

re (

Deg

C)

Time (Years)

10W

30Wend of winter

Page 26: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

10

15

20

25

30

35

Flu

id te

mpe

ratu

re (

degr

ees

C)

Fluid temp half-way along tunnel

Winter operation only - end of winter temp

Winter and Summer operation - end of winter temp

Winter and Summer operation - end of summer temp

Heat extraction rate vs. fluid temp

∆T

26

-15

-10

-5

0

5

10

0 10 20 30 40 50 60Flu

id te

mpe

ratu

re

Output (W/m 2)

For 10W/m2 and 1000mof tunnel, output = 200kW

For 30W/m2 and 1000mof tunnel, output = 600kW

∆T

Page 27: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Tunnel Ventilation Model (Motts input)

Heat exchange fromdraught relief airflows

TrainsHeat

Heat flowto cooling pipes

Outside airTunnel

air

27

5 rings ofsurrounding ground

Distantground temp

fixed

Trains

Tunnelwall

Heatfrom trains

Calculated temperatures

Page 28: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Ventilation Modelling (1)

Tunnel Air Max temp

Tunnel Wall Max temp

Outside Air Max

Typical tunnel temperature for service pattern SP1B (240m trains, 30TPH peak hour service frequency- 2076)

Outside Air Max temp

Page 29: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Ventilation Modelling (2)

Predicted tunnel temperature with heat extraction system operating

Page 30: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Tunnel Cooling @ 15W/m2 UPE 50%

25

30

35

40

45

Tem

pera

ture

/ 'C

Outside air

Tunnel air

Case 45 : Constant cooling 15 W/m2, Early service, UPE 50%

Tunnel temp generally above Outside air temp – little condensation

0

5

10

15

20

25

01 Jan 19 01 Jan 20 01 Jan 21

Tem

pera

ture

/ 'C

Time (years)

Page 31: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Tunnel Cooling Effect – Local Installation800m demonstration tunnel -East of Tottenham Court Road Stn West bound tunnel – Summer peak Best to focus tunnel cooling either side of stations

31

Page 32: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

FE model – tunnel segments with pipe

London clay

Terrace Gravel

Made Ground

� Model of one segment ring + Soil

� Plastic pipes

� Curved segment bearing surfaces

Page 33: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Stress reduction - Due to cooling round pipes

33

Extraction @ 10W/m 2 Extraction @ 15W/m 2 Extraction @ 20W/m 2

Tensile Stress = 253kPa 886kPa 1.53MPa

Stresses reductions combined with earth pressures – (contraction round the outer face)

Page 34: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Joint Rotation Effects and Box Out length� Max ring deformation = 1% of dia.

� Joint rotation is 1.45 degree

� Joint opening = 150mm tan 1.45 o

� = +/- 3.8mm

� Combined box out lengths = 300mm

34

Page 35: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Box out

Segment joints and box-outs – Caulking groove and bearing

35

Based on hand calculations – anti bursting reinforcement needed for tunnel depths >31m with box-out, or 35m without box-out.

Concrete Section loss - Pipe diameter is 20mm and lining is 300mm - 6.7% loss

Box out

Page 36: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Fire

� Fire load - EUREKA fire curve

� Spalling margin of the segment

� Stakeholders: To consider PE pipes� LU 1-085 Fire Safety of Materials

36

� LU 1-085 Fire Safety of Materials

� PEX-a Pipes: Durability 100 years at 20oC and 15 bar (according to DIN 16892/16893, EN ISO 15875) incl. FoS 1.25

� Check ventilation capacity to remove smoke

Page 37: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Fire – Segment Pipes and Header pipes

37

� Pipes melt at header pipes and box outs

� Gas given off – low load for segment pipes – Header pile in concrete?

� After fire - Repair header and omit damaged rings

Page 38: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Market for Tunnel Geothermal

� Low grade energy source – use locally

� Residential buildings – heating demand +Hot water

� Office blocks – cooling and heating demands

38

� Old buildings - refurbishment – heat + Hot water

� New buildings - renewable source requirement� Helps at Planning Stage with Part L

� Cools tubes / ground – reduces ventilation costs

Page 39: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Typical London Residential Building

� Typical 5 Storey – refurbished buildings� heating needs – 40-50W/m2 of floor.

� Say 16 flats /building unit � Space heating – 40kW. – seasonal

39

� Space heating – 40kW. – seasonal � Hot water – 25kW. – continuous

� Similar to 50 to 100m long tunnel section.

Page 40: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Tunnel Heat Market and Assess Points � All qualifying buildings within 100m of tunnel

alignment- Tier 1: hotels, large residential, hospitals – 34 no.- Tier 2: schools, colleges, libraries, museums – 4 no.- Tier 3: offices, leisure centres, retailers – 327 no.

40

� Circles – centred on shaft / cross passages -500m dia.

� Heat is 200 to 600kW for 500m of twin tunnel

� Heats about 100 apartments per circle. –Link with ESCOS

Page 41: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Market for Tunnel Geothermal

� Building options:� Existing buildings: residential housing dominated by space

heating over the cold season, with DHWthrough out year� Existing building: office/retail complex, heating and cooling� New buildings - heating and cooling

� Base Load and Peak Load� Combined heat pump and gas boiler

41

� Combined heat pump and gas boiler

� GIS mapping of potential users along tunnel alignment

� Cheaper the GSHP borehole loops and higher COP

� Link with ESCO – District heating – sell heat

Page 42: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Crossrail increase ground temp at Oxford Street

Temperature vs Distance from nearest LU Line

12

14

16

18

20

22

0 20 40 60 80 100 120 140 160

Tem

pera

ture

(˚C

)

Distance from Nearest LU line (m)

Temperature vs Distance from nearest LU Line

T31R - 100.73 (mATD) T22R - 99.26 (mATD)

RT119 - 92.93 (mATD) BST15R - 86.09 (mATD)

RT120 - 89.72 (mATD) RT121C - 96.33 (mATD)

� Ground temperature at tunnel level

� Next to tunnel temperature 19oC

� Temperature drops to ~15oC at about 90m from tunnel

Page 43: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Conclusions

1. Thermal tunnels – similar to GSHP systems2. Concept - Well developed - Janbech tunnel3. Hot tunnels – Greater heat outputs - cools tube.4. Shaft access preferred – Boreholes provide flexibility.5. Detailed design issues:-

- Thermal and ventilation models- Concrete stresses

43

- Joint rotation- Fire impacts

6. Buildings assessment process – GIS 7. Commercial case:-

- Cheaper than GSHP borehole loops to install- Save tunnel / station cooling costs- High COP when used at low flow rates – carbon efficient- Work with ESCO district heating provider

Page 44: Geothermal Tunnel Linings Principles of Geothermal Tunnel ... · PDF fileGeothermal Tunnel Linings ... Lining construction Design Process 16 - Segment heat transfer model - Tunnel

Thank you for your attention

Any Questions?

44

Any Questions?