GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
Pierre UNGEMACH and Miklos ANTICS
GEOPRODUCTION CONSULTANTS (GPC)
Paris Nord 2, 14 rue de la Perdrix, Lot 109, B.P. 50030
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
SCOPE
• INTRODUCTION1. HISTORICAL OVERVIEW2. RESOURCE AND RESERVOIR SETTING3. DEVELOPMENT STATUS AND MILESTONES4. TECHNOLOGY OUTLOOK5. OPERATION AND MAITENANCE6. RISK ASSESSMENT7. RESERVOIR MANAGEMENT / ENGINEERING /
SIMULATION8. SUSTAINABILITY• CONCLUSIONS
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
HISTORICAL OVERVIEW
HYDRO CAR BO NEXPR O
RESERVOIRASSESSM ENT
RISK ANALYSISFEASIBILITY
FIELDDEVELOPM EN T
RESERVOIRASSESSM ENT
UPDATE
EXPLOITATIONRECOR DS
DATABASE
RISK(RE)ASSESSMENT
W E LL L IF ES Y S TE M L IFE
E C O N O M ICV IA B IL ITY
S U S TA IN A B L ER E S E R V O IR
M A N A G E M E N TS C E N A R IO S
RESERVOIRLIFE
E NVIRO N M EN TALB ENE FITS
S O CIAL IM A G EFIS CAL
IN CE NTIVE S
PRODU CTIONM ODEL
PROCESSIN G
MO NITORINGSURVEILLANCE
CASING CONTRO LDAMAGE DIAG NOSIS
TRA CER LEAK O FF TESTSW ELL W O RK O VER
C O R RO S IO N /SCA LIN GABATEM EN T
LEGAL/INSTITUTIO NAL
FINANCINGINCENTIVES
BACKUP
ENVIRO N-M ENTALIMPACT
W E L LD E L IV E R A B IL IT IE S
P R O D U C T IO ND E S IG N
TESTING (DST)SAMPLING
DRILLINGCO RING
LO GGING
1950
1970
1975
1985
1990
2000
2005
TIME SCALE MILESTONES
F irst district heating doublet
F irst O il Shock
Com pletion of three doublets
E n f o r c e m e n t o f t h e G eotherm al Act (M in ing Law)
Second O il S hockState supported incentives
End of fie ld developm ent (52 doublets com pleted)
Issuing of a com prehensive reservo ir assessm entDebt renegotiationF irst AT I insta lla tionI m p l e m e n t a t i o n o f t h e workover waste processing line
Com pletion of the new anti-co r ros ion p ro du c tion w e ll. Im plem entation of the trip let concept
F i r s t c o m b i n e d g a s / c o g e n e r a t i o n h e a t in g p lant
10 year extension of m utual insurance contracts
C o m p l e t i o n o f t h e 1 7 cogeneration plant
34 d istrict heating doublets in operation
Design of future heat m in ing schem es
t h
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
HISTORICAL OVERVIEW
HYDROCARBONEXPRO
RESERVOIRASSESSMENT
RISK ANALYSISFEASIBILITY
FIELDDEVELOPM EN T
RESERVOIRASSESSMENT
UPDATE
EXPLOITATIONRECOR DS
DATABASE
RISK(RE)ASSESSMENT
W E LL L IF ES Y S TE M L IFE
E C O N O M ICV IA B IL ITY
S U S TA IN A B LER E S E R V O IR
M A N A G E M E N TS C E N A R IO S
RESERVOIRLIFE
E NVIRO N M EN TALB ENE FITS
S O CIAL IM A G EFIS CAL
IN CE NTIVE S
PRODU CTIONM ODEL
PROCESSIN G
MO NITORINGSURVEILLANCE
CASING CONTRO LDAMAGE DIAG NOSIS
TRA CER LEAK OFF TESTSW ELL W O RK OVER
C OR ROS ION /SCA LIN GABATEM EN T
LEGAL/INSTITUTIONAL
FINANCINGINCENTIVES
BACKUP
ENVIRON-M ENTALIMPACT
W E L LD E L IV E R A B IL IT IE S
P R O D U C T IO ND E S IG N
TESTING (DST)SAMPLING
DRILLINGCORING
LOGGING
1950
1970
1975
1985
1990
2000
2005
TIME SCALE MILESTONES
F irst district heating doublet
F irst O il Shock
Com pletion of three doublets
E n f o r c e m e n t o f t h e G eotherm al Act (M in ing Law)
Second O il S hockState supported incentives
End of fie ld developm ent (52 doublets com pleted)
Issuing of a com prehensive reservo ir assessm entDebt renegotia tionF irst AT I insta lla tionI m p l e m e n t a t i o n o f t h e workover waste processing line
Com pletion of the new anti-c o r ros ion p ro du c tion w e ll. Im plem entation of the trip let concept
F i r s t c o m b i n e d g a s / c o g e n e r a t i o n h e a t in g p lant
10 year extension of m utual insurance contracts
C o m p l e t i o n o f t h e 1 7 cogeneration plant
34 d istrict heating doublets in operation
Design of future heat m in ing schem es
t h
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RESOURCE AND RESERVOIR SETTING
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
DEVELOPMENT STATUS AND MILESTONESLOCATION OF GEOTHERMAL DISTRIC HEATING DOUBLETS
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
DEVELOPMENT STATUS AND MILESTONESTARGETED, ACHIEVED, FORECASTED OBJECTIVES
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
TECHNOLOGY OUTLOOK (1)THE GEOTHERMAL WELL DOUBLET OF HEAT MINING
A B AW H W H
H X
P P
P W
C
IP
IW
IW
90 0-1 40 0m 14 00 -17 00m
D O G G E R G E O TH E R M A L R E S E R V O IR
U P P E RC R E TA C E U S
LO W E RC R E TA C E U S
55 °
30 ° 30 °
LU S ITA N IA N
U P P E RJU R A S S IC
M ID J U R A S S IC
A - two vertical wellsB - 1 vertical, 1 deviatedC - two deviated wells
PP production pumpIP in jection pumpHX heat exchangerPW production w ellIW in jection wellW H wellhead
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
TECHNOLOGY OUTLOOK (2)EQUIPMENT PERFORMANCE AND LIFETIME RECORD
ITEM LIFE (yrs)
WELLS 20-25
XTREE VALVES 5
PRODUCTION PUMPS
ESP
HTP
4-5
5-8
INJECTION PUMP 10
PRODUCTION TUBING 6-8
DOWNHOLE CHEMICAL INJECTION LINE 5-8
PLATE HEAT EXCHANGER 10-15
FREQUENCY CONVERTER 15
SURFACE PIPING 15-20
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
THERMOCHEMICAL SHORTCOMINGSCORROSION AND SCALING
DRIVING MECHANISMS OF CASING DAMAGEAQUEOS CO2/H2S ENVIRONMENT
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
WELL DRILLING/COMPLETIONANTI-CORROSION PRODUCTION WELL DESIGN
cen tra lize rs
fibe rg lass cas ing
cem ent
expansion spool
free annu lus
seat
stee l casing
reservo ir
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
THERMOCHEMICAL SHORTCOMINGSCORROSION AND SCALING
DOWNHOLE CHEMICAL INJECTION LINESSETUPS IN ARTIFICIAL LIFT WELLS
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
OPERATION AND MAINTENANCE (1)MONITORING/SURVEILLANCE OF PRODUCTION FACILITIES
• geothermal fluid• loop parameters• well deliverabilities• pump and frequency converter characteristics• inhibitor efficiencies• inhibition equipment integrity• well head integrity• surface piping control• casing inspection
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
OPERATION AND MAINTENANCE (2)WELL WORKOVER
CORROSION AND SCALING ABATEMENT
• WELL WORKOVER• casing clean up
• lining of damaged tubulars
• fishing
• reservoir stimulation
• CORROSION AND SCALING ABATEMENT• downhole chemical inhibition lines
• corrosion, scaling, microbiological inhibitors
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
OPERATION AND MAINTENANCE (3)DOGGER DATABASE
• Hosted on ORACLE platform• Data instructed locally via ACCESS interface
GLOSSARY
GENERALINFORMATIONPARAMETERS
DATAARCHIVE
HEAT PLANTEQUIPMENT
INJECTIONEAUIPMENT
PRODUCTIONEQUIPMENT
DICTIONARY
TH ER MO-CHEMICAL
MONITORING
INTERVENINGPARTIES
EVEN TS
CALIBRATION
HEAT PLANTEXPLOITATION
PRODUCTIONFIGU RES
INJECTIONFIGU RES
CASINGCONTROLCORROSIONCORROSION
TR EATMENT
ELEMENT BUBBLEPOINT
W ELLCASING
RESERVOIRPROPERTIES
GEO THERMALSITE
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
-Existing doublet reconditioning/lining 450-Drilling/completion of a new, corrosion resistant, production well 3,000-Miscellaneous equipments/fittings 150
TOTAL 3,6002036-2060
-Abandonment (cementing) of the initial well doublet 350-Replacement of the production well fiberglass liner 450-Drilling/completion of a new, corrosion resistant, injection well 2,750-Miscellaneous equipments/fittings 200
TOTAL 3,750
COMAPARATIVE FIGURES
Capital investments (103 €)Natural gas cogeneration plant (rated 5 MWe) / Conventional, steel cased (9”5/8), well doublet
Impact on a 30,000 MWht/yr district heating doublet 200,000
Unit price impact 7€/MWht
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
ECONOMY (1)•INVESTMENT COSTS
•Total Paris Basin (52 doublets) #500 M€
•Doublet unit costs 10 M€
•Wells 3.3 (33%)
•Heat plant/geothermal loop 0.7 (7%)
•piping/substations 6.0 (60%)
•Ratings:•40000 MWht (geothermal = 30,000 MWht)
•Revenues (45 €/MWht) 1.8 M€
•OPERATION/MAINTENANCE COSTS (103 €)
Ref: 30,000 – 35,000 MWt rated plant
#700
•Energy 400
•Power 100
•Backup/relief fossil fuels 300
•Light maintenance/equipment replacement 40
•Heavy maintenance/equipment replacement 185
•Miscellaneus 75
FINANCIAL
•High debt (90%)/low equity (10%)
•Yearly debt repayment charge #1 M€
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
CONCLUSIONS• GDH scored well• State/public sector involvement proved a decisive
impetus• Operators exhibit mature technological and
entrepreneurial skills• Exploration/exploitation risks mastered to date• Sound resource/reservoir management outline• Sustainable heat mining, up to 50-75 years ahead,
secured• Improve image• Environmental, clean air, benefits to boost fiscally