GEOTHERMAL PROJECT COST ESTIMATING By Lorie M. Dilley
11

GEOTHERMAL PROJECT COST ESTIMATING By Lorie M. Dilley.

Jan 12, 2016

Download

Documents

Miranda Fox
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: GEOTHERMAL PROJECT COST ESTIMATING By Lorie M. Dilley.

GEOTHERMAL PROJECT COST ESTIMATING

By

Lorie M. Dilley

Page 2: GEOTHERMAL PROJECT COST ESTIMATING By Lorie M. Dilley.
Page 3: GEOTHERMAL PROJECT COST ESTIMATING By Lorie M. Dilley.

Exploration – chemical, geophysical, aerial photos

Page 4: GEOTHERMAL PROJECT COST ESTIMATING By Lorie M. Dilley.

Drilling Costs

• Wells – Wells – Determine # of wells based on temperature, flow rate, and production required.

• MW/well = F/50 – 3.5 (temp. > 175 F)– 200 F: 0.5 MW– 400 F: 4.5 MW

• Low temperature 0.1 to 0.4 MW/well

• Drilling success rate 25% to 80% increase as knowledge of field increases

Page 5: GEOTHERMAL PROJECT COST ESTIMATING By Lorie M. Dilley.

Temperature “Gradient” holes

Page 6: GEOTHERMAL PROJECT COST ESTIMATING By Lorie M. Dilley.

Drilling Costs

• Slim hole/temperature gradient Drilling: 3 to 4 inch– 3,000 ft: $1.5 to $2 M

• Production Drilling: 9 to 12 inch– 3,000 ft : $3.9 to $4.3 M– 5,000 ft: $4.5 M – 30 to 40 days of drilling– 8,000 ft: $7.5 M

• Alaska Factor: 1.25 to 2 times

Page 7: GEOTHERMAL PROJECT COST ESTIMATING By Lorie M. Dilley.

Infrastructure Needs

• Construction – camp, access, skilled workforce• Plant – power generation, piping, geothermal

wells, waste fluid disposal – trained operators• Support Facilities – transmission line, road, living

quarters, water supply & storage, wastewater treatment, maintenance shop, drilling equipment/ core shop,

• Facilities: greenhouses, pools, rooms

Page 8: GEOTHERMAL PROJECT COST ESTIMATING By Lorie M. Dilley.

Power Production

Page 9: GEOTHERMAL PROJECT COST ESTIMATING By Lorie M. Dilley.

Plant Costs

UTC System : 200 to 250 kW is about $1,300 per KW UTC System : 200 to 250 kW is about $1,300 per KW $260,000 $260,000Binary System: $1,600 to $2,400 per kW : Binary System: $1,600 to $2,400 per kW :

1 MW to 5 MW -$1.6M to $2.4M1 MW to 5 MW -$1.6M to $2.4MSteam Plants: $1,500 per kWSteam Plants: $1,500 per kW

5 MW to 25 MW - $7.5M to $37.5M5 MW to 25 MW - $7.5M to $37.5M

Page 10: GEOTHERMAL PROJECT COST ESTIMATING By Lorie M. Dilley.

Support Facilities• Roads – equipment, access wells,:

gravel sources estimated cost is $30 to $250 per cubic yard depending upon material source location and quality – route selection critical

• Site Development – pads for plant, shops, living quarters, greenhouses – gravel, placement

• Transmission line – route selection – closer to village – power use $200,000 to $400,000+ per mile

Page 11: GEOTHERMAL PROJECT COST ESTIMATING By Lorie M. Dilley.

Costs

• < 1 MW: UTC - $7M to $30M

• 1 MW to 10 MW : Binary - $40M to $100M

• Greater than 10 MW: Steam - $100M to $400M

Based on drilling depths, gravel costs, temperature of resource, flow, size of project.