Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss
15

Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss.

Mar 26, 2015

Download

Documents

Faith Clarke
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss.

Geotechnics (not only) of SwitzerlandMajor railroad constructionsGotthard base tunnel (GBT)

Bastian Bommer-Denss

Page 2: Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss.

10. April 2023

Major railroad constructions: Gotthard base tunnel (GBT)

2

Overall context

> The new transalpine rail routes (NEAT - Neue Eisenbahn-Alpentransversale)

Content Overall context

Geological context CostsGeotechnical

problems

Bundesamt für Verkehr BAV

Page 3: Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss.

10. April 2023

Major railroad constructions: Gotthard base tunnel (GBT)

3

Overall context

> The new Gotthard rail link (longer, flatter and faster)

Content Overall context

Geological context CostsGeotechnical

problems

Bundesamt für Verkehr BAV

(2016/17)

(2019)

Page 4: Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss.

10. April 2023

Major railroad constructions: Gotthard base tunnel (GBT)

4

Geological context

> Gotthard base tunnel – Geological profile

Content Overall context

Geological context CostsGeotechnical

problems

AlpTransit Gotthard AGDie Zeit 42/2010

Page 5: Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss.

10. April 2023

Major railroad constructions: Gotthard base tunnel (GBT)

5

Geotechnical problems

> Preliminary study 1992

Content Overall context

Geological context CostsGeotechnical

problems

AlpTransit Gotthard AGTunnel 4/2004

- 950 m- Partially

squeezing rock -> comprising sheared and folded Serizit phyllites (cataclasite)

- 2910 m- Extreme

squeezing rock -> intensively crumbled, kakiritic mica gneisses, mica slates and mica phyllites

- 400 m- Talus material

from rockfall-> unconsoli-dated rock

- 150 - 250 m- Liquid rock with

high water pressure-> sugar-grained Dolomite

Page 6: Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss.

10. April 2023

Major railroad constructions: Gotthard base tunnel (GBT)

6

Geotechnical problems

> Sedrun Part-Section

Content Overall context

Geological context CostsGeotechnical

problems

AlpTransit Gotthard AGTunnel 4/2004

Page 7: Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss.

10. April 2023

Major railroad constructions: Gotthard base tunnel (GBT)

7

Geotechnical problems

> Sedrun Part-Section

Content Overall context

Geological context Methode VorgehenGeotechnical

problems Ergebnisse Zeitplan

AlpTransit Gotthard AGTunnel 4/2004

TZM North

-Geotechnically trickiest section

-1 km long, with 1000 m overburden

Page 8: Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss.

10. April 2023

Major railroad constructions: Gotthard base tunnel (GBT)

8

Geotechnical problems

> Sedrun Part-Section

Content Overall context

Geological context CostsGeotechnical

problems

AlpTransit Gotthard AGTunnel 4/2004

Geol. exploration-Five exploratory drillings-One penetrated the entire TZM=> Intensively crumbled, kakiritic micas

Page 9: Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss.

10. April 2023

Major railroad constructions: Gotthard base tunnel (GBT)

9

Geotechnical problems

> Sedrun Part-Section

Content Overall context

Geological context CostsGeotechnical

problems

Tagungsband Swiss Tunnel Congress 2008Tunnel 4/2004

Information about the danger patterns

Triaxial testsExtreme squeezing behaviourcapacity to close the cavityLoosening phenomena and caving behaviour at the face and on the fringeSecuring the cavity

Page 10: Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss.

10. April 2023

Major railroad constructions: Gotthard base tunnel (GBT)

10

Geotechnical problems

> Sedrun Part-Section

Content Overall context

Geological context CostsGeotechnical

problems

Cavity support-to resist large permissible deformations of up to 70 cm radiallyDeformable steel arches (double ring) every 1 m, 66 cm or 33 cmAnchoring system with radial anchors of up to 12 m in length

Tunnel 4/2004, Swiss Tunnel Congress 2008, IUT’ 02

Page 11: Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss.

10. April 2023

Major railroad constructions: Gotthard base tunnel (GBT)

11

Geotechnical problems

> Sedrun Part-Section

Content Overall context

Geological context CostsGeotechnical

problems

Choice driving method

-Conventional driving with tunnel excavators (shovels, picks and ripper teeth)

On account of squeezing rock

AlpTransit Gotthard AGIUT’02

Page 12: Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss.

10. April 2023

Major railroad constructions: Gotthard base tunnel (GBT)

12

Geotechnical problems

> Situation 2010

Content Overall context

Geological context CostsGeotechnical

problems

AlpTransit Gotthard AGTunnel 4/2004

- 950 m- Partially

squeezing rock -> comprising sheared and folded Serizit phyllites (cataclasite)

- 1000 m- Extreme

squeezing rock -> intensively crumbled, kakiritic mica gneisses, mica slates and mica phyllites

- 400 m- Talus material

from rockfall-> unconsoli-dated rock

- 150 - 250 m- Liquid rock with

high water pressure-> sugar-grained Dolomite

- Difficult Intschi zone crossed without problem with an average daily advance of 6 m by TBM (6/2004)

- Squeezing Rock Conditions Successfully Overcome: breakthrough took place nine months ahead of schedule (TZM)(10/2007)

- Piora syncline definitively and successfully mastered with an average daily advance of 10 to 12 m by TBM. The rock was stable. No deformations and no water. (2/2009)

- Firsts breakthrough in the GBT with special driving method (11/2002)

Page 13: Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss.

10. April 2023

Major railroad constructions: Gotthard base tunnel (GBT)

13

Geotechnical problems

> Unexpected 2003

Content Overall context

Geological context CostsGeotechnical

problems

AlpTransit Gotthard AGTunnel 4/2004

- Fault zone: Squeezing rock in Faido multifunction station (1/2003)

Investigating fault zone Redisposition of the FMS 24 months delay additional costs of 500 million

CHF

Page 14: Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss.

10. April 2023

Major railroad constructions: Gotthard base tunnel (GBT)

14

Costs

> The Costs of the AlpTransit Gotthard Project (2010)

Total costs: CHF 13.157 billion (Gotthard route with the Gotthard and Ceneri Base Tunnels)

Content Overall context

Geological context CostsGeotechnical

problems

AlpTransit Gotthard AGKurzfassung NEAT-Standbericht 2010 / I

Page 15: Geotechnics (not only) of Switzerland Major railroad constructions Gotthard base tunnel (GBT) Bastian Bommer-Denss.