Top Banner
Geotechnical Master Use Permit Report 4328 Brooklyn Avenue NE Seattle, Washington for LPC West, Inc. March 23, 2020
96

Geotechnical Master Use Permit Report

Oct 16, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Geotechnical Master Use Permit Report

Geotechnical Master Use Permit Report

4328 Brooklyn Avenue NE Seattle, Washington

for LPC West, Inc.

March 23, 2020

Page 2: Geotechnical Master Use Permit Report

Geotechnical Master Use Permit Report

4328 Brooklyn Avenue NE Seattle, Washington

for LPC West, Inc.

March 23, 2020

17425 NE Union Hill Road, Suite 250 Redmond, Washington 98052 425.861.6000

Page 3: Geotechnical Master Use Permit Report
Page 4: Geotechnical Master Use Permit Report

March 23, 2020 | Page i File No. 15669-003-00

Table of Contents 1.0 INTRODUCTION .................................................................................................................................................. 1 2.0 SCOPE OF SERVICES ........................................................................................................................................ 1 3.0 PROJECT DESCRIPTION .................................................................................................................................... 1 4.0 PREVIOUS SITE EVALUATIONS ........................................................................................................................ 2 5.0 SITE CONDITIONS .............................................................................................................................................. 2

5.1. Surface Conditions...................................................................................................................................... 2 5.2. Subsurface Soil Conditions ........................................................................................................................ 2 5.3. Groundwater Conditions ............................................................................................................................. 3 6.0 CONCLUSIONS AND RECOMMENDATIONS .................................................................................................... 3

6.1. Earthquake Engineering ............................................................................................................................. 3 6.1.1. Liquefaction ..................................................................................................................................... 3 6.1.2. Other Seismic Hazards .................................................................................................................... 4 2015 IBC Seismic Design Information ........................................................................................................ 4

TABLE 1. 2015 IBC RECOMMEND VALUES ............................................................................................................. 4

6.2. Excavation Support ..................................................................................................................................... 4 6.2.1. Excavation Considerations .............................................................................................................. 4 6.2.2. Soldier Pile Walls ............................................................................................................................. 5

TABLE 2. RECOMMENDED LAGGING THICKNESS ................................................................................................... 5

6.2.3. Shoring Wall Performance .............................................................................................................. 6 7.0 DEEP FOUNDATIONS ......................................................................................................................................... 7

7.1. Drilled Shafts ............................................................................................................................................... 7 7.1.1. Construction Considerations .......................................................................................................... 7 7.1.2. Axial Capacity ................................................................................................................................... 8

TABLE 3. 48-INCH-DIAMETER DRILLED SHAFT ....................................................................................................... 8

7.1.3. Lateral Pile Capacity ........................................................................................................................ 8 7.1.4. Foundation Springs ......................................................................................................................... 8

7.2. Slab-on-Grade Floors .................................................................................................................................. 9 7.2.1. Subgrade Preparation ..................................................................................................................... 9 7.2.2. Design Parameters .......................................................................................................................... 9 7.2.3. Below-Slab Drainage ....................................................................................................................... 9

7.3. Below-Grade Walls ................................................................................................................................... 10 7.3.1. Permanent Subsurface Walls ...................................................................................................... 10 7.3.2. Other Cast-in-Place Walls ............................................................................................................. 10 7.3.3. Drainage ........................................................................................................................................ 11

7.4. Earthwork ................................................................................................................................................. 11 7.4.1. Subgrade Preparation .................................................................................................................. 11 7.4.2. Structural Fill................................................................................................................................. 12 7.4.3. Temporary Slopes ......................................................................................................................... 13

7.5. Recommended Additional Geotechnical Services ................................................................................. 14 8.0 LIMITATIONS .................................................................................................................................................... 14 9.0 REFERENCES ................................................................................................................................................... 15

Page 5: Geotechnical Master Use Permit Report

March 23, 2020 | Page ii File No. 15669-003-00

LIST OF FIGURES

Figure 1. Vicinity Map Figure 2. Site Plan Figure 3. Earth Pressure Diagrams – Temporary Cantilever Soldier Pile Wall Figure 4. Recommended Surcharge Pressure

APPENDICES

Appendix A. Boring Logs, Site Plans, and Cross Sections from Previous Studies Appendix B. Report Limitations and Guidelines for Use

Page 6: Geotechnical Master Use Permit Report

March 23, 2020 | Page 1 File No. 15669-003-00

1.0 INTRODUCTION

This report presents the results of GeoEngineers, Inc.’s (GeoEngineers) preliminary geotechnical engineering services for the proposed 4328 Brooklyn Avenue NE project. The project includes the construction of a high-rise office tower. The project will bear on and adjacent to the recently constructed U-District Light Rail Station (U-District Station). The project is bounded by private property (1301 NE 45th Street) to the north, an alley to the east, NE 43rd Street to the south, and Brooklyn Avenue NE to the west in Seattle’s University District neighborhood. The site is shown relative to surrounding physical features in Figure 1, Vicinity Map, and Figure 2, Site Plan.

The purpose of this report is to provide preliminary geotechnical engineering conclusions and recommendations for the design and construction of the planned development. The site consists of one King County parcel and covers approximately 37,000 square feet. GeoEngineers’ geotechnical engineering services have been completed in general accordance with our signed agreement executed February 13, 2020.

2.0 SCOPE OF SERVICES

GeoEngineers’ scope of services includes:

■ Reviewing existing subsurface information available for the site and surrounding area;

■ Providing recommendations for seismic design in accordance with the 2018 International Building Code (IBC);

■ Providing preliminary foundation, temporary shoring, slab-on-grade and permanent below-grade wall recommendations;

■ Providing preliminary recommendations for temporary dewatering and permanent below-grade drainage and groundwater seepage estimates; and

■ Preparing this report.

3.0 PROJECT DESCRIPTION

We understand that LPC West, Inc. is planning to develop a 14-story office tower constructed at grade. The project will bear on and adjacent to the recently constructed U-District Station.

Temporary shoring may be required east side of the planned excavation depending on the excavation depth required to complete the foundation support system. A portion of the loading from the planned U-District Station Building will bear on the existing station structure, which has been designed and constructed to accommodate such loading. Where the planned building is located outside the footprint of the existing station structure, foundations are anticipated to consist of deep foundations so that the adjacent U-District Station below grade walls are not surcharged.

Page 7: Geotechnical Master Use Permit Report

March 23, 2020 | Page 2 File No. 15669-003-00

4.0 PREVIOUS SITE EVALUATIONS

The logs and cross sections of selected explorations from previous site evaluations in the project vicinity were reviewed and are presented in Appendix A, Boring Logs and Cross Sections from Previous Studies. The approximate locations of the previous logs are also shown on Figure 2.

5.0 SITE CONDITIONS

5.1. Surface Conditions

The project site is bounded by private property (Neptune Theatre; 1301 NE 45th Street) to the north, an alley to the east, NE 43rd Street to the south, and Brooklyn Avenue NE to the west. The site is currently occupied by the U-District Station. Existing site grades are located between approximately Elevation 194 feet (northwest) and 178 feet (southeast).

Buried utilities consisting of sanitary sewer, storm drain, gas, water, electric and telecommunications fiber are anticipated in the alley and/or right-of-way adjacent to the site.

5.2. Subsurface Soil Conditions

GeoEngineers’ understanding of subsurface conditions is based on the review of existing geotechnical information. The approximate locations of the previous and recent explorations are presented in Figure 2.

Soils encountered at the site consist of relatively shallow fill overlying competent glacially consolidated soils. Cross sections depicting interpreted subsurface soil and groundwater conditions prepared for the U-District Station project are included in Appendix A.

The fill generally consists of loose to medium dense silty sand with variable gravel content and soft to medium stiff silt deposits with variable sand content. Fill in the vicinity of the site typically ranged in thickness between approximately 2 to 9 feet.

The glacially consolidated soils were encountered below the fill deposits and extended to the depths explored. The glacially consolidated soils generally consists of till-like deposits, cohesive silt and clay, and cohesionless sand and gravel.

■ The till-like deposits consist of very dense/hard silty sand/silt with gravel and variable cobble and boulder content and isolated layers of hard clay. The till-like deposits were typically observed below the fill. In the location closest to the planned deep foundations the till-like deposits extended to approximately 60 feet below site grades.

■ The cohesive silt and clay unit consists of stiff to hard silt or clay. The cohesive silt and clay was generally encountered below the till-like deposits and ranged up to approximately 10 feet in thickness.

■ The cohesionless sand and gravel soils consist of very dense sand and gravel with variable silt and cobble content with interbedded layers of silt. The cohesionless sand and gravel was encountered below the till-like deposits and interbedded with the till-like deposits at depths of greater than approximately 60 feet below site grades.

Page 8: Geotechnical Master Use Permit Report

March 23, 2020 | Page 3 File No. 15669-003-00

Occasional cobbles were noted in the glacially consolidated soils. It should be noted that occasional cobbles and boulders are typical of glacially consolidated soils and may be present at the site and have been encountered in nearby construction projects.

5.3. Groundwater Conditions

Groundwater has been typically measured between 20 to 61 feet below grade in monitoring wells located at the site vicinity. The regional groundwater table in the site vicinity is anticipated to be located below Elevation 145 feet. Groundwater above Elevation 145 feet is interpreted to be perched groundwater. Given the site grades and planned depth of excavation, the lowest finished floor of the planned building will be located well above the groundwater table elevation. Localized dewatering may be required during excavation activities for perched groundwater and stormwater and is anticipated to be completed using sumps and pumps.

6.0 CONCLUSIONS AND RECOMMENDATIONS

A summary of the preliminary geotechnical considerations is provided below. The summary is presented for introductory purposes only and should be used in conjunction with the complete recommendations presented in this report.

■ The site is designated as Site Class C per the 2015 IBC.

■ The lowest finished floor elevation is anticipated to be located well above the groundwater table. Temporary dewatering by means of local sumps and pumps within the excavation is anticipated to be sufficient to remove seepage associated with perched groundwater and stormwater, as necessary.

■ Cantilever soldier pile shoring or the use of temporary cut slopes are anticipated to be used in order to construct the planned foundation system. If cantilever soldier piles are used and are located in the City right-of-way, the shoring system should be designed to facilitate removal of the upper 4 feet of the shoring elements after they are no longer required for the project.

■ Deep foundation support is recommended for the planned structure in order to reduce the surcharge of the adjacent U-District Station structure. Drilled shafts should be utilized due to the presence of remnant ground anchors that will be encountered during drilled shaft construction. Temporary casing will likely be required to reliably allow placement of the steel reinforcing cage given the presence of remnant ground anchors.

■ Conventional slabs-on-grade are considered appropriate for this site and should be underlain by a 6-inch-thick layer of clean crushed rock (for example, City of Seattle Mineral Aggregate Type 22). The underslab drainage system is anticipated to consist of a perimeter foundation drain.

Our specific preliminary geotechnical recommendations are presented in the following sections of this report.

6.1. Earthquake Engineering

6.1.1. Liquefaction

Liquefaction refers to the condition by which vibration or shaking of the ground, usually from earthquake forces, results in the development of excess pore pressures in saturated soils with subsequent loss of

Page 9: Geotechnical Master Use Permit Report

March 23, 2020 | Page 4 File No. 15669-003-00

strength. In general, soils that are susceptible to liquefaction include very loose to medium dense, clean to silty sands that are below the water table.

Groundwater levels at the site are generally within the dense to very dense glacially consolidated soils. Our analysis indicates that the soils that underlie the proposed building area have a low risk of liquefying because of the density and gradation of these soils.

6.1.2. Other Seismic Hazards

Due to the location of the site and the site’s topography, the risk of adverse impacts resulting from seismically induced slope instability, differential settlement, or surface displacement due to faulting is considered to be low.

2015 IBC Seismic Design Information

Table 1 includes a summary of the recommend 2015 IBC parameters for site class, short period spectral response acceleration (SS), 1-second period spectral response acceleration (S1) and seismic coefficients (FA and FV) for the project site.

TABLE 1. 2015 IBC RECOMMEND VALUES

2015 IBC Parameter Recommended Value

Site Class C

Short Period Spectral Response Acceleration, SS (percent g) 128.6

1-Second Period Spectral Response Acceleration, S1 (percent g) 49.8

Seismic Coefficient, FA 1.0

Seismic Coefficient, FV 1.3

6.2. Excavation Support

We understand that the planned development will be constructed near existing grade. The bottom of the planned foundations may extend between 5 to 10 feet below site grades. We anticipate the use of cantilever soldier piles or temporary cut slopes in order to construct the planned foundations.

The City of Seattle typically requires that shoring walls be designed to limit lateral deflections to 1 inch or less in order to reduce the risk of damage to existing improvements. The City of Seattle requires that remedial measures be implemented when lateral deflections reach 1 inch. We do not anticipate that ground anchors will be required for the project for the anticipated excavation depth.

6.2.1. Excavation Considerations

Site soils may be excavated with conventional excavation equipment, such as trackhoes or dozers. It may be necessary to rip the glacially consolidated soils locally to facilitate excavation. The contractor should be prepared for occasional cobbles and boulders in the site soils. Likewise, surficial fill may contain foundation elements and/or utilities from previous site development, debris, rubble and/or cobbles and boulders. We recommend that project specifications identify procedures for measurement and payment of work associated with obstructions.

Page 10: Geotechnical Master Use Permit Report

March 23, 2020 | Page 5 File No. 15669-003-00

6.2.2. Soldier Pile Walls

Soldier pile walls consist of steel beams that are concreted into drilled vertical holes located along the wall alignment, typically about 8 feet on center. Timber lagging is typically installed behind the flanges of the steel beams to retain the soil located between the soldier piles. Geotechnical design recommendations for each of these components of the cantilever soldier pile wall system are presented in the following sections.

6.2.2.1. Soldier Piles We recommend that soldier pile walls be designed using the earth pressure diagram presented in Figure 3, Earth Pressure Diagram — Temporary Cantilever Soldier Pile Wall. The earth pressures presented in Figure 3 are for cantilever soldier pile walls and the pressures represent the estimated loads that will be applied to the wall system for various wall heights.

Earth pressures presented in Figure 3 include the loading from traffic surcharge. Other surcharge loads, such as cranes, construction equipment or construction staging areas, should be applied to the shoring system as recommended in Figure 4, Recommended Surcharge Pressure. No seismic pressures have been included in Figure 3 because it is assumed that the shoring will be temporary.

We recommend that the embedded portion of the soldier piles be at least 2 feet in diameter and extend a minimum distance of 10 feet below the base of the excavation to resist “kick-out.” The axial capacity of the soldier piles must resist the downward component of any vertical loads, as appropriate. We recommend using an allowable end bearing value of 30 kips per square foot (ksf) for piles supported on glacially consolidated soils. The allowable end bearing value should be applied to the base area of the drilled hole into which the soldier pile is concreted. This value includes a factor of safety of about 2.5. The allowable end bearing value assumes that the shaft bottom is cleaned out immediately prior to concrete placement. If necessary, an allowable pile skin friction of 1.5 ksf may be used on the embedded portion of the soldier piles to resist the vertical loads.

6.2.2.2. Lagging Table 2 presents GeoEngineers’ recommended lagging thicknesses (roughcut) as a function of soldier pile clear span and depth.

TABLE 2. RECOMMENDED LAGGING THICKNESS

Depth (feet)

Recommended Lagging Thickness (roughcut) for clear spans of:

5 feet 6 feet 7 feet 8 feet 9 feet 10 feet

0 to 25 2 inches 3 inches 3 inches 3 inches 4 inches 4 inches

Lagging should be installed promptly after excavation, especially in areas where perched groundwater or clean sand and gravel soils are present and caving soil conditions are likely. The workmanship associated with lagging installation is important for maintaining the integrity of the excavation.

The space behind the lagging should be backfilled as soon as practicable. The City of Seattle requires that voids be backfilled immediately or within a single shift, depending on the selected method of backfill. Placement of this material will help reduce the risk of voids developing behind the wall and damage to existing improvements behind the wall.

Page 11: Geotechnical Master Use Permit Report

March 23, 2020 | Page 6 File No. 15669-003-00

Controlled density fill (CDF) is a suitable option for backfill behind the wall, as it will reduce the volume of voids. Full-depth CDF backfill is recommended for the walls located near adjacent buildings (north wall and northern one-fourth of the east wall), for improved deflection control.

For the remaining walls, on-site soil or CDF can be used. Alternatively, CDF may be used for backfill behind the upper 15 to 20 feet of the excavation to limit caving and sloughing of the upper soils, with on-site soils used to backfill the voids for the remainder of the excavation. Based on our experience, the voids between each CDF lift are sufficient for preventing the buildup of hydrostatic pressure behind the wall.

6.2.2.3. Drainage Drainage for soldier pile and lagging walls is achieved through seepage through the timber lagging. Seepage flows at the bottom of the excavation should be contained and controlled to prevent loss of soil from behind the lagging. Drainage should be provided for permanent below-grade walls as described below in the “Below-Grade Walls” section of this report.

6.2.2.4. Construction Considerations Shoring construction shall be completed by a qualified shoring contractor. A shoring contractor is qualified if they have successfully completed at least 10 projects of similar size and complexity in the Seattle/Bellevue area during the previous 5 years. Interested shoring contractors should prepare a submittal documenting their qualifications, unless this requirement is waived by GeoEngineers. The shoring contractor’s superintendent shall have a minimum of 3 years’ experience supervising soil nail/soldier pile and tieback shoring construction and the drill operators and on-site supervisors shall have a minimum of 3 years’ experience installing soil nails/soldier piles and tiebacks. The personnel experience shall be included in the qualification’s submittal.

Temporary casing or drilling fluid may be required to install the soldier piles where:

■ Loose fill is present;

■ The native soils do not have adequate cementation or cohesion to prevent caving or raveling; and/or

■ Perched groundwater is present.

GeoEngineers should be allowed to observe and document the installation and testing of the shoring to verify conformance with design assumptions and recommendations.

6.2.3. Shoring Wall Performance

Temporary shoring walls typically move on the order of 0.1 to 0.2 percent of H, where H is the vertical distance between the existing ground surface and the base of excavation.

Deflections and settlements are usually highest at the excavation face and decrease to negligible amounts beyond a distance behind the wall equal to the height of the excavation. Localized deflections may exceed the above estimates and may reflect local variations in soil conditions (such as around side sewers) or may be the result of the workmanship of the constructed shoring wall. Given that some movement is expected, existing improvements located adjacent to the temporary shoring system will also experience movement. The deformations discussed above are not likely to cause structural damage to structurally sound existing improvements; however, some cosmetic damage should be expected (for instance, cracks in drywall finishes; widening of existing cracks; minor cracking of slabs-on-grade/hardscapes; cracking of sidewalks,

Page 12: Geotechnical Master Use Permit Report

March 23, 2020 | Page 7 File No. 15669-003-00

curbs/gutter, and pavements/pavement panels; etc.). For this reason, it is important to complete pre-construction survey and photo documentation of existing buildings and nearby improvements prior to shoring construction.

7.0 DEEP FOUNDATIONS

We understand that the adjacent station tunnel lid has been designed to accommodate a certain base shear (lateral loading). In order to reduce the lateral loads imposed on the station basement walls for the area of the planned building that will be supported outside of the current U-District Station, deep foundations are planned to support a portion of the building.

7.1. Drilled Shafts

Drilled shafts consist of steel reinforcement cages that are concreted into drilled vertical holes located below foundations or building walls. Drilled shafts are typically drilled with an open flight auger and backfilled with structural concrete via tremie pipe when below the groundwater table after the reinforcement is set in the hole.

Temporary casing is anticipated to be required for the U-District Station Building due the presence of remnant ground anchors that will be encountered during drilled shaft construction. The ground anchors were installed during construction of the U-District Station. Temporary casing will better facilitate installation of the reinforcing cage where the remnant ground anchors are present.

7.1.1. Construction Considerations

Reinforcing steel for bending and uplift should be placed prior to placement of the concrete. Centering devices should be used to provide concrete cover around the reinforcing steel during concrete placement.

The contractor should adhere to a waiting period of at least 12 hours between the installation of drilled shafts spaced closer than 8 feet, center-to-center. This waiting period is necessary to avoid disturbing the curing concrete in previously cast drilled shafts.

Full depth temporary casing will be required to maintain shaft sidewall stability and to prevent remnant soil nails from interfering with the placement of the reinforcing cage.

Drilled shafts should be excavated with equipment that reduces the loose cuttings or slough at the bottom of the drilled hole. Slough and loose cuttings should be removed from the hole prior to placing concrete. Where “wet” construction methods are used, it will be necessary to use tremie methods for placement of concrete.

We recommend that the shaft installation adhere to shaft installation guidelines, construction requirements, integrity testing, and acceptance criteria provided in the Washington State Department of Transportation (WSDOT) Standard Specification 6-19 Shafts and FHWA-NHI-10-016 (Brown et al. 2010).

A qualified geotechnical engineer should observe the drilling operations, monitor grout placement and volumes, and evaluate the adequacy of individual drilled shaft installations.

Page 13: Geotechnical Master Use Permit Report

March 23, 2020 | Page 8 File No. 15669-003-00

In addition to observation during drilling, each of the drilled shafts should be instrumented for thermal integrity profile (TIP) testing. TIP testing consists of installing instrumented cables to the reinforcing cage during installation, and monitoring the temperature change continuously with a datalogger during the concrete curing process. The temperature change data is interpreted to evaluate the pile section over the profile for the presence of voids or necking.

7.1.2. Axial Capacity

As the drilled shafts are planned to be installed entirely within glacially consolidated soils, the capacity of the drilled shafts will be developed from a combination of end bearing and side resistance in the bearing soils. Uplift pile capacity may be developed from side frictional resistance.

Based on discussions with the project team, we understand that the preferred foundation option are 48-inch-diameter drill shafts. Table 3 includes design recommendations for computing the capacity of various lengths of drilled shafts.

TABLE 3. 48-INCH-DIAMETER DRILLED SHAFT

Elevation Range (feet)

Static Conditions (FOS=2.0) Seismic Conditions (FOS=1.0)

Allowable Unit Side Resistance (ksf)

Allowable End Bearing (ksf)

Ultimate Unit Side Resistance (ksf)

Ultimate End Bearing (ksf)

160 to 180 2.1

30

4.2

60

140 to 160 2.6 5.2

120 to 140 2.8 5.7

100 to 120 3.0 6.0

80 to 100 3.1 6.3

The side resistance and end bearing capacities included in Table 3 apply to single piles and are based on AASHTO Drilled Shaft procedures. It should be noted that although AASHTO design procedures were used in design of the piles, the design and capacities included in Table 3 include factors of safety appropriate for Allowable Stress Design procedures (factor of safety of 2).

If piles are spaced at least three pile diameters on center, as recommended, no reduction of axial capacity for group action is needed. The structural characteristics of pile materials and structural connections may impose limitations on pile capacities and should be evaluated by the structural engineer. Full length steel reinforcing will be needed for shafts subjected to uplift loads.

7.1.3. Lateral Pile Capacity

We understand that the adjacent station tunnel lid has been designed to accommodate lateral loads. At this time, we do not anticipate that LPILE parameters and analysis will be required for the project. If these are determined to be required, the LPILE parameters and recommendations will be provided to the structural engineer and summarized in the final geotechnical report.

7.1.4. Foundation Springs

Foundation springs will be prepared and provided to the structural engineer during the design of the drilled shafts and will be incorporated into the final geotechnical report.

Page 14: Geotechnical Master Use Permit Report

March 23, 2020 | Page 9 File No. 15669-003-00

7.1.4.1. Settlement We estimate that the post-construction settlement of deep foundations, designed and installed as recommended, will be on the order of ½ inch or less. Maximum differential settlement should be less than about one-half the post-construction settlement. Most of this settlement will occur rapidly as loads are applied.

7.2. Slab-on-Grade Floors

7.2.1. Subgrade Preparation

The exposed subgrade should be evaluated after site grading is complete. Probing should be used to evaluate the subgrade. The exposed soil should be firm and unyielding, and without significant groundwater. Disturbed areas should be recompacted if possible or removed and replaced with compacted structural fill.

7.2.2. Design Parameters

Conventional slabs may be supported on-grade, provided the subgrade soils are prepared as recommended in the “Subgrade Preparation” section above. We recommend that the slab be founded on either undisturbed glacially consolidated soils or on structural fill placed over the undisturbed glacially consolidated soils. For slabs designed as a beam on an elastic foundation, a modulus of subgrade reaction of 150 pounds per cubic inch (pci) may be used for subgrade soils prepared as recommended.

We recommend that the slab-on-grade floors be underlain by a 6-inch-thick capillary break consisting of material meeting the requirements of Mineral Aggregate Type 22 (¾-inch crushed gravel), City of Seattle Standard Specification 9-03.14.

Provided that loose soil is removed and the subgrade is prepared as recommended, we estimate that slabs-on-grade will not settle appreciably.

7.2.3. Below-Slab Drainage

We recommend installing an underslab drainage system to remove water from below the slab-on-grade. The underslab drainage system should include an interior perimeter drain. The drains should consist of perforated Schedule 40 polyvinyl chloride (PVC) pipes with a minimum diameter of 4 inches placed in a trench at least 12 inches deep. The top of the underslab drainage system trenches should coincide with the base of the capillary break layer. The underslab drainage system pipes should have adequate slope to allow positive drainage to the sump/gravity drain.

The drainage pipe should be perforated. Perforated pipe should have two rows of ½-inch holes spaced 120 degrees apart and at 4 inches on center. The underslab drainage system trenches should be backfilled with Mineral Aggregate Type 22 or Type 5 (1-inch washed gravel), City of Seattle Standard Specification 9-03.14, or an alternative approved by GeoEngineers. The Type 22 or Type 5 material should be wrapped with a geotextile filter fabric meeting the requirements of construction geotextile for underground drainage, WSDOT Standard Specification 9-33. The underslab drainage system pipes should be connected to a header pipe and routed to a sump or gravity drain. Appropriate cleanouts for drainpipe maintenance should be installed. Conventional below-slab drainage and below grade wall drainage flow rates are anticipated to be low, less than 5 gallons per minute (gpm).

Page 15: Geotechnical Master Use Permit Report

March 23, 2020 | Page 10 File No. 15669-003-00

If no special waterproofing measures are taken, leaks and/or seepage may occur in localized areas of the below-grade portion of the building, even if the recommended wall drainage and below-slab drainage provisions are constructed. If leaks or seepage is undesirable, below-grade waterproofing should be specified. A vapor barrier should be used below slab-on-grade floors located in occupied portions of the building. Specification of the vapor barrier requires consideration of the performance expectations of the occupied space, the type of flooring planned and other factors, and is typically completed by other members of the project team.

7.3. Below-Grade Walls

7.3.1. Permanent Subsurface Walls

Permanent below-grade walls constructed adjacent to temporary shoring walls should be designed for the pressures presented in Figure 3. For seismic loading conditions, a rectangular earth pressure equal to 7H pounds per square foot (psf) (where H is the height of the wall in feet) should be added to the pressures presented in Figure 3. Foundation surcharge loads and traffic surcharge loads should be incorporated into the design of the below-grade walls using the surcharge pressures presented in Figure 4. Other surcharge loads, such as from construction equipment or construction staging areas, should be considered on a case-by-case basis. We can provide the lateral pressures from these surcharge loads as the design progresses.

The soil pressures recommended above assume that wall drains will be installed to prevent the buildup of hydrostatic pressure behind the walls, as described above in the “Excavation Support” section of this report, and tied to permanent drains to remove water to suitable discharge points.

7.3.2. Other Cast-in-Place Walls

Conventional cast-in-place walls may be necessary for small retaining structures located on-site. The lateral soil pressures acting on conventional cast-in-place subsurface walls will depend on the nature, density and configuration of the soil behind the wall and the amount of lateral wall movement that can occur as backfill is placed.

For walls that are free to yield at the top at least 0.1 percent of the height of the wall, soil pressures will be less than if movement is limited by such factors as wall stiffness or bracing. Assuming that the walls are backfilled and drainage is provided as outlined in the following paragraphs, we recommend that yielding walls supporting horizontal backfill be designed using an equivalent fluid density of 35 pounds per cubic foot (pcf) (triangular distribution), while non-yielding walls supporting horizontal backfill be designed using an equivalent fluid density of 55 pcf (triangular distribution). For seismic loading conditions, a rectangular earth pressure equal to 7H psf (where H is the height of the wall in feet) should be added to the active/at-rest pressures. Other surcharge loading should be applied as appropriate.

Lateral resistance for conventional cast-in-place walls can be provided by frictional resistance along the base of the wall and passive resistance in front of the wall. For walls founded on native soils, the allowable frictional resistance may be computed using a coefficient of friction of 0.4 applied to vertical dead-load forces. The allowable passive resistance may be computed using an equivalent fluid density of 400 pcf (triangular distribution). The above coefficient of friction and passive equivalent fluid density values incorporate a factor of safety of about 1.5.

Page 16: Geotechnical Master Use Permit Report

March 23, 2020 | Page 11 File No. 15669-003-00

The above soil pressures assume that wall drains will be installed to prevent the buildup of hydrostatic pressure behind the walls, as discussed below.

7.3.3. Drainage

Drainage behind the permanent below-grade walls is typically provided using prefabricated drainage board attached to the temporary shoring walls. Weep pipes that extend through the permanent below-grade wall should be installed around the perimeter of the building at the foundation elevation. The weep pipes should have a minimum diameter of 4 inches. The weep pipes should be connected to a solid collector pipe located within the structural mat foundation and routed to a sump.

The earth pressures for permanent below-grade walls assume that adequate drainage is provided behind the wall. Prefabricated vertical geocomposite drainage material, such as Aquadrain 15X, should be installed vertically to the face of the timber lagging. The vertical drainage material should extend base of excavation elevation. The weep pipes that penetrate the basement wall should be connected to the vertical drainage material with a drain grate. For soldier pile shoring walls, the drainage material should be installed on the excavation side of the timber lagging, with the fabric adjacent to the timber lagging.

Full wall face coverage is recommended to minimize seepage and/or wet areas at the face of the permanent wall. Full wall face coverage should extend from the base of excavation up to about 3 to 5 feet below site grades to reduce the potential for surface water to enter the wall drainage system. Although the use of full wall face coverage will reduce the likelihood of seepage and/or wet areas at the face of the permanent wall, the potential still exists for these conditions to occur. If this is a concern, waterproofing should be specified.

Positive drainage should be provided behind cast-in-place retaining walls by placing a minimum 2-foot-wide zone of Mineral Aggregate Type 17 (bank run gravel), City of Seattle Standard Specification 9-03.14, with the exception that the percent passing the U.S. No. 200 sieve is to be less than 3 percent. A perforated drainpipe should be placed near the base of the retaining wall to provide drainage. The drainpipe should be surrounded by a minimum of 6 inches of Mineral Aggregate Type 22 (¾-inch crushed gravel) or Type 5 (1-inch washed gravel), City of Seattle Standard Specification 9-03.14, or an alternative approved by GeoEngineers. The Type 22 or Type 5 material should be wrapped with a geotextile filter fabric meeting the requirements of construction geotextile for underground drainage, WSDOT Standard Specification 9-33. The wall drainpipe should be connected to a header pipe and routed to a sump or gravity drain. Appropriate cleanouts for drainpipe maintenance should be installed. A larger-diameter pipe will allow for easier maintenance of drainage systems.

7.4. Earthwork

7.4.1. Subgrade Preparation

Exposed subgrade in structure and hardscape areas should be evaluated after site excavation is complete. Foundation subgrades should be prepared as recommended in “Subgrade Preparation” section above. Where hardscape subgrade soils consist of disturbed soils, it will likely be necessary to remove and replace the disturbed soil with approved structural fill unless the soil can be adequately moisture-conditioned and compacted.

Page 17: Geotechnical Master Use Permit Report

March 23, 2020 | Page 12 File No. 15669-003-00

7.4.2. Structural Fill

Fill placed to support structures or foundations, placed behind retaining structures, for foundation drainage, and/or placed below pavements and sidewalks shall consist of structural fill as specified below:

■ If structural fill is necessary beneath pile caps walls, CDF, structural concrete, or Mineral Aggregate Type 2 or Type 17 (1¼-inch minus crushed rock or bank run gravel), City of Seattle Standard Specification 9-03.14, should be used and extend to competent glacially consolidated soils for foundations.

■ If structural fill is necessary beneath building slabs, the fill should consist of Mineral Aggregate Type 2 or Type 17 (1¼-inch minus crushed rock or bank run gravel), City of Seattle Standard Specification 9-03.14.

■ Structural fill placed as capillary break material should meet the requirements of Type 22 (¾-inch crushed gravel), City of Seattle Standard Specification 9-03.14.

■ Structural fill placed behind retaining walls should meet the requirements of Mineral Aggregate Type 17 (bank run gravel), City of Seattle Standard Specification 9-03.14.

■ Structural fill placed around perimeter footing drains, underslab drains and cast-in-place wall drains should meet the requirements of Mineral Aggregate Type 5 (1-inch washed gravel) or Type 22 (¾-inch crushed gravel), City of Seattle Standard Specification 9-03.14, with the exception that the percent fines be less than 3 percent.

■ Structural fill placed within utility trenches and below pavement and sidewalk areas should meet the requirements of Mineral Aggregate Type 17 (bank run gravel), City of Seattle Standard Specification 9-03.14.

■ Structural fill placed as crushed surfacing base course below pavements and sidewalks should meet the requirements of Mineral Aggregate Type 2 (1¼-inch minus crushed rock), City of Seattle Standard Specification 9-03.14.

7.4.2.1. On-site Soils On-site soils are moisture-sensitive and may have natural moisture contents higher than the anticipated optimum moisture content for compaction. As a result, on-site soils will likely require moisture conditioning to meet the required compaction criteria during dry weather conditions and will not be suitable for reuse during wet weather. Furthermore, most of the fill soils required for the project have specific gradation requirements, and the on-site soils do not meet these gradation requirements. Therefore, imported structural fill meeting the requirements described above should be used where structural fill is necessary.

It may be feasible to reuse on-site soils with the addition of cement treatment. If cement treatment is considered, GeoEngineers can work with the contractor to determine the soil/cement ratio and placement procedures.

Page 18: Geotechnical Master Use Permit Report

March 23, 2020 | Page 13 File No. 15669-003-00

7.4.2.2. Fill Placement and Compaction Criteria Structural fill should be mechanically compacted to a firm, non-yielding condition and placed in loose lifts not exceeding 1 foot in thickness. Each lift should be conditioned to the proper moisture content and compacted to the specified density before placing subsequent lifts. Structural fill should be compacted to meet the following criteria:

■ Structural fill placed in building areas (including around foundations and supporting slab-on-grade floors), pavement and sidewalk areas (including utility trench backfill) should be compacted to at least 95 percent of the maximum dry density (MDD) estimated in general accordance with ASTM International (ASTM) D 1557.

■ Structural fill placed against retaining walls should be compacted to between 90 and 92 percent. Care should be taken when compacting fill against retaining walls to avoid overcompaction and hence overstressing the walls.

We recommend that GeoEngineers be present during probing of the exposed subgrade soils in building and pavement areas, and during placement of structural fill. We will evaluate the adequacy of the subgrade soils and identify areas needing further work, perform in-place moisture-density tests to verify compliance with compaction specifications, and advise on any modifications to the procedures that may be appropriate for the prevailing conditions.

7.4.2.3. Weather Considerations On-site soils contain a sufficient percentage of fines (silt and clay) to be moisture-sensitive. When the moisture content of these soils is more than a few percent above the optimum moisture content, these soils become muddy and unstable, and equipment operation becomes difficult. Additionally, disturbance of near-surface soils should be expected if earthwork is completed during periods of wet weather. During wet weather, we recommend the following:

■ The ground surface in and around the work area should be sloped so that surface water is directed away from the work area. The ground surface should be graded such that areas of ponded water do not develop. The contractor should take measures to prevent surface water from collecting in excavations and trenches. Measures should be implemented to remove surface water from the work area.

■ Slopes with exposed soils should be covered with plastic sheeting or similar means.

■ Site soils should not be left uncompacted and exposed to moisture. Sealing the surficial soils by rolling with a smooth-drum roller prior to periods of precipitation will reduce the extent to which these soils become wet or unstable.

■ Construction traffic should be restricted to specific areas of the site, preferably areas that are surfaced with materials not susceptible to wet weather disturbance.

■ Construction activities should be scheduled so that the length of time that soils are left exposed to moisture is reduced to the extent practicable.

7.4.3. Temporary Slopes

Temporary slopes may be used around the site to facilitate early installation of shoring or in the transition between levels at the base of the excavation. We recommend that temporary slopes constructed in the fill

Page 19: Geotechnical Master Use Permit Report

March 23, 2020 | Page 14 File No. 15669-003-00

and recent deposits be inclined at 1½H:1V (horizontal to vertical) and that temporary slopes in the glacially consolidated soils be inclined at 1H:1V. Flatter slopes may be necessary if seepage is present on the face of the cut slopes or if localized sloughing occurs. For open cuts at the site, we recommend that:

■ No traffic, construction equipment, stockpiles or building supplies be allowed at the top of the cut slopes within a distance of at least 5 feet from the top of the cut;

■ Exposed soil along the slope be protected from surface erosion by using waterproof tarps or plastic sheeting;

■ Construction activities be scheduled so that the length of time the temporary cut is left open is reduced to the extent practicable;

■ Erosion control measures be implemented as appropriate such that runoff from the site is reduced to the extent practicable;

■ Surface water be diverted away from the slope; and

■ The general condition of the slopes be observed periodically by the geotechnical engineer to confirm adequate stability.

Because the contractor has control of construction operations, the contractor should be made responsible for the stability of cut slopes, as well as the safety of the excavations. Shoring and temporary slopes must conform to applicable local, state and federal safety regulations.

7.5. Recommended Additional Geotechnical Services

GeoEngineers will complete a design-level geotechnical engineering evaluation for the project, which is anticipated to confirm or modify as appropriate the preliminary design recommendations presented in this report. GeoEngineers should be retained to review the project plans and specifications when complete to confirm that our design recommendations have been implemented as intended.

During construction, GeoEngineers should observe the installation of the shoring system; review/collect shoring monitoring data; observe installation of deep foundations; evaluate the suitability of the foundation subgrades; observe installation of subsurface drainage measures; evaluate structural backfill; observe the condition of temporary cut slopes; and provide a summary letter of our construction observation services. The purposes of GeoEngineers construction phase services are to confirm that the subsurface conditions are consistent with those observed in the explorations and other reasons described in Appendix B, Report Limitations and Guidelines for Use.

8.0 LIMITATIONS

We have prepared this report for the exclusive use of LPC West, Inc. and their authorized agents for 4328 Brooklyn Avenue NE project in Seattle, Washington.

Within the limitations of scope, schedule and budget, our services have been executed in accordance with generally accepted practices in the field of geotechnical engineering in this area at the time this report was prepared. No warranty or other conditions, express or implied, should be understood.

Page 20: Geotechnical Master Use Permit Report

March 23, 2020 | Page 15 File No. 15669-003-00

Any electronic form, facsimile or hard copy of the original document (email, text, table and/or figure), if provided, and any attachments are only a copy of the original document. The original document is stored by GeoEngineers, Inc. and will serve as the official document of record.

Please refer to Appendix B for additional information pertaining to use of this report.

9.0 REFERENCES

Brown, D. A., J. P. Turner, and R. J. Castelli. 2010. Drilled Shafts: Construction Procedures and LRFD Design Methods. NHI Course No. 132014, Geotechnical Engineering Circular No. 10, National Highway Institute, U.S. Department of Transportation, Federal Highway Administration, Washington, D.C.

City of Seattle, 2017, “Standard Specifications for Road, Bridge and Municipal Construction.”

International Code Council, 2015, “International Building Code.”

Jacobs Associates, 2012, “Geotechnical Considerations Report: N125 & N140 U District Station,

Jacobs Associates, 2011, “LR 0177-09 North Link Final Design, Contract N112, Brooklyn Station Site Preparation: Geotechnical Considerations Memorandum.”

Washington State Department of Transportation, 2018, “Standard Specifications for Road, Bridge and Municipal Construction.”

Page 21: Geotechnical Master Use Permit Report

FIGU

RE

S

Page 22: Geotechnical Master Use Permit Report

µ

SITE

Vicinity Map

Figure 1

4328 Brooklyn Avenue NESeattle, Washington

2,000 2,0000

Feet

Data Source: Mapbox Open Street Map, 2016

Notes:1. The locations of all features shown are approximate.2. This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the official record of this communication.

Projection: NAD 1983 UTM Zone 10N

P:\1

5\15

6690

03\G

IS\M

XD\1

5669

0030

0_F0

1_Vi

cini

tyM

ap.m

xd D

ate

Expo

rted:

01/

28/2

0 b

y cc

abre

ra

Page 23: Geotechnical Master Use Permit Report

NB-258NB-603

NL-312

NB-259

NB-515

NL-313

NB-516

NL-429-4NB-260 NL-317

NL-429-1

NL-315NW-501

NL-429-2NB-602

NL-429-3

Brooklyn Ave NE

NE

43rd

St

NL-429-5

Figure 2

4328 Brooklyn Avenue NESeattle, WA

Site Plan

WE

NS

\\ge

oeng

inee

rs.c

om\W

AN\P

roje

cts\

15\1

5669

003\

CAD

\00\

Geo

tech

\156

6900

300_

F02_

Site

Pla

n.dw

g TA

B:F0

2 D

ate

Expo

rted:

03/

17/2

0 - 1

7:13

by

mw

oods

Notes:1. The locations of all features shown are approximate.2. This drawing is for information purposes. It is intended to assist in showing

features discussed in an attached document. GeoEngineers, Inc. cannotguarantee the accuracy and content of electronic files. The master file is storedby GeoEngineers, Inc. and will serve as the official record of this communication.

Data Source: Aerial from Microsoft Bing dated July 2019.

Projection: NAD83 Washington State Planes, North Zone, US FootFeet

040 40

LegendSite Boundary

Boring by Shannon & Wilson, Inc., 2010 and 2011NL-429-1

Boring by Aspect, 2009NL-312

Boring by Shannon & Wilson, Inc., 2004NB-258

Page 24: Geotechnical Master Use Permit Report

Figure 3

\\ge

oeng

inee

rs.c

om\W

AN\P

roje

cts\

15\1

5669

003\

CAD

\00\

Geo

tech

\156

6900

300_

F03-

F04_

EPD

s.dw

g TA

B:F0

3 D

ate

Expo

rted:

03/

19/2

0 - 1

4:52

by

mw

oods

Earth Pressure Diagrams -Temporary Cantilever Soldier Pile Wall

Notes:1. Active/apparent earth pressure and traffic surcharge pressure act over the

pile spacing above the base of the excavation.2. Passive earth pressure acts over 2.5 times the concreted diameter of the

soldier pile, or the pile spacing, whichever is less.3. Passive pressure includes a factor of safety of 1.54. Additional surcharge from footings of adjacent buildings should be included

in accordance with recommendations provided on Figure 4.5. This pressure diagram is appropriate for temporary soldier pile and tieback

walls. If additional surcharge loading (such as from soil stockpiles,excavators, dumptrucks, cranes, or concrete trucks) is anticipated,GeoEngineers should be consulted to provide revised surcharge pressures.

2'

H

D

55psf

P = 28.Hpsf

Base of Excavation

1

Ground Surface

Net AllowablePassive Pressure

ActiveEarth

Pressure

TrafficSurchargePressure

Cantilever Soldier Pile and SoldierPile Wall with One Level of Tiebacks

Not To Scale

H =

D =

Height of Excavation, Feet

Soldier Pile Embedment Depth, Feet

Maximum Active Earth Pressure, Poundsper Square FootDesign Groundwater Elevation for Drained Walls/Passive Resistance Design

P =

Legend

1400

400.Dpsf

28

4328 Brooklyn Avenue NESeattle, WA

Page 25: Geotechnical Master Use Permit Report

\\ge

oeng

inee

rs.c

om\W

AN\P

roje

cts\

15\1

5669

003\

CAD

\00\

Geo

tech

\156

6900

300_

F03-

F04_

EPD

s.dw

g TA

B:F0

4 D

ate

Expo

rted:

03/

17/2

0 - 1

7:25

by

mw

oods

H

X= m H

X= m H

Z=nH

R

H

X= m H

Z=nH

R

σH

m R

0.1 0.60H

0.3 0.60H

0.5 0.56H

0.7 0.48H

Q P

For m ≤ 0.4

H2(0.16+n2 )3

For m > 0.4

q (psf)

0.22 · q (psf)

Section A-A'

H

Point load in poundsLine load in pounds/footExcavation height below footing, feetLateral earth pressure from surcharge, psfSurcharge pressure in psfRadiansDistribution of σH in plan viewResultant lateral force acting on wall, poundsDistance from base of excavation to resultant lateral force, feet

H

'

mP

R

0.2 0.78 0.59H

0.4 0.78 0.59H

0.6 0.45 0.48H

Recommended Surcharge Pressure

Face

of W

all

σH

σ

QP =QL =H =σH =q =

σ'H =PH =R =

σ

Notes:1. Procedures for estimating surcharge pressures shown above

are based on Manual 7.02 Naval Facilities EngineeringCommand, September 1986 (NAVFAC DM 7.02).

2. Lateral earth pressures from surcharge should be added toearth pressures presented on Figure 3.

3. See report text for where surcharge pressures areappropriate.

θ

θ =

PH HQ( )

Pressures from Point Load QP

QP

PH

Lateral Earth Pressure from Point Load, QP(Spread Footing)

QL

PH

Lateral Earth Pressure from Line Load,QL (Continuous Wall Footing)

Uniform Surcharges,q (Floor Loads, Large Foundation

Elements or Traffic Loads)

σH = Lateral Surcharge Pressure fromUniform SurchargeσH = 0.28QPn2

H2(m2+n2 )3σH = 1.77QPm2n2

σ'H = σ COS2 (1.1θ )

Resultant PH = 0.64QL

(m2 +1)

For m ≤ 0.4

H(0.16+n2 )2

For m > 0.4

σH = 0.2n · QL

H(m2+n2 )2σH = 1.28m2nQL

Definitions:

Base of Excavation Base of Excavation Base of Excavation

A A'

σH

Resultant lateral force acting on wall, poundsX =Depth of σH to be evaluated below the bottom of QP or QLZ =Ratio of X to Hm =Ratio of Z to Hn =

Not To Scale

Figure 4

4328 Brooklyn Avenue NESeattle, WA

Page 26: Geotechnical Master Use Permit Report

AP

PE

ND

ICE

S

Page 27: Geotechnical Master Use Permit Report

APPENDIX A Boring Logs, Site Plans, and Cross Sections

from Previous Studies

Page 28: Geotechnical Master Use Permit Report

March 23, 2020 | Page B-1 File No. 15669-003-00

APPENDIX A BORING LOGS, SITE PLANS, AND CROSS SECTIONS FROM PREVIOUS STUDIES

Included in this section are boring logs, site plans and cross sections from previous studies completed in the immediate vicinity of the project site.

Boring Logs

■ The logs of six borings with monitoring wells (NL-429-1 through NL-429-4, NW-501, and NB-515), one boring (NL-429-5), and three sonic core borings with monitoring wells (NB-516, NB-602, and NB-603) completed by Shannon & Wilson in 2010 and 2011 for the Phase II ESA for Brooklyn Station and Sound Transit Contracts N120 and N130 projects;

■ The logs of one sonic core boring (NL-312) and three sonic core borings with monitoring wells (NL-313, NL-315, and NL-317) completed by Aspect Consulting in 2009 for the Sound Transit – Link Light Rail – Early Work project; and

■ The logs of two borings with monitoring wells (NB-258 and NB-259) and one boring (NB-260) completed by Shannon & Wilson in 2004 for the Sound Transit North Link project.

Site Plan and Cross Sections

■ The site plan and cross sections from the Jacobs Associates December 2012 report; and

■ The site plan and cross sections from the Jacobs Associates Memorandum dated September 29, 2011.

Page 29: Geotechnical Master Use Permit Report
Page 30: Geotechnical Master Use Permit Report
Page 31: Geotechnical Master Use Permit Report
Page 32: Geotechnical Master Use Permit Report
Page 33: Geotechnical Master Use Permit Report
Page 34: Geotechnical Master Use Permit Report
Page 35: Geotechnical Master Use Permit Report
Page 36: Geotechnical Master Use Permit Report
Page 37: Geotechnical Master Use Permit Report
Page 38: Geotechnical Master Use Permit Report
Page 39: Geotechnical Master Use Permit Report
Page 40: Geotechnical Master Use Permit Report
Page 41: Geotechnical Master Use Permit Report
Page 42: Geotechnical Master Use Permit Report
Page 43: Geotechnical Master Use Permit Report
Page 44: Geotechnical Master Use Permit Report
Page 45: Geotechnical Master Use Permit Report
Page 46: Geotechnical Master Use Permit Report
Page 47: Geotechnical Master Use Permit Report
Page 48: Geotechnical Master Use Permit Report
Page 49: Geotechnical Master Use Permit Report
Page 50: Geotechnical Master Use Permit Report
Page 51: Geotechnical Master Use Permit Report
Page 52: Geotechnical Master Use Permit Report
mgray
Text Box
*Missing Sheets 5 and 6
Page 53: Geotechnical Master Use Permit Report
Page 54: Geotechnical Master Use Permit Report
Page 55: Geotechnical Master Use Permit Report
Page 56: Geotechnical Master Use Permit Report
Page 57: Geotechnical Master Use Permit Report
Page 58: Geotechnical Master Use Permit Report
Page 59: Geotechnical Master Use Permit Report
Page 60: Geotechnical Master Use Permit Report
Page 61: Geotechnical Master Use Permit Report
Page 62: Geotechnical Master Use Permit Report
Page 63: Geotechnical Master Use Permit Report
Page 64: Geotechnical Master Use Permit Report
Page 65: Geotechnical Master Use Permit Report
Page 66: Geotechnical Master Use Permit Report
Page 67: Geotechnical Master Use Permit Report
Page 68: Geotechnical Master Use Permit Report
Page 69: Geotechnical Master Use Permit Report
Page 70: Geotechnical Master Use Permit Report
Page 71: Geotechnical Master Use Permit Report
Page 72: Geotechnical Master Use Permit Report
Page 73: Geotechnical Master Use Permit Report
Page 74: Geotechnical Master Use Permit Report
Page 75: Geotechnical Master Use Permit Report
Page 76: Geotechnical Master Use Permit Report
Page 77: Geotechnical Master Use Permit Report
Page 78: Geotechnical Master Use Permit Report
Page 79: Geotechnical Master Use Permit Report
Page 80: Geotechnical Master Use Permit Report
Page 81: Geotechnical Master Use Permit Report
Page 82: Geotechnical Master Use Permit Report
Page 83: Geotechnical Master Use Permit Report
Page 84: Geotechnical Master Use Permit Report
Page 85: Geotechnical Master Use Permit Report
Page 86: Geotechnical Master Use Permit Report

BORING LOG LEGEND:

09-22-09

NB-501

(Proj. 9' W)

MOST RECENTLY

MEASURED

GROUNDWATER LEVEL

FILTER PACK

SCREENED INTERVAL FOR

OBSERVATION WELL

BOTTOM OF BORING

BORING LOG DATE

OF COMPLETION

APPROXIMATE

GROUND SURFACE

TUNNEL INVERT

BORING DESIGNATION

PROJECTED DISTANCE

AND DIRECTION

GLACIALLY OVERRIDDEN

SOIL UNITS BELOW LINE

TUNNEL CROWN

USCS SYMBOL, SEE TABLE ON LEFT

VIBRATING WIRE

PIEZOMETER (VWP)

?

?

APPROXIMATE

GEOLOGIC CONTACT

TOP OF RAIL

NUMBER OF BLOWS &

PENETRATION

SPT N-VALUE

APPROXIMATE EROSIONAL CONTACT

PROFILE HORIZONTAL GRID LEGEND:

OTHER SYMBOLS

CONCRETE

TOPSOIL

FILL

ASPHALT

UNIFIED SOIL CLASSIFICATION SYSTEM (USCS Based on ASTM D2488 & D2487)

MAJOR DIVISIONS TYPICAL DESCRIPTION

GROUP/GRAPHIC

SYMBOL

WELL-GRADED GRAVELGW

CLEAN

GRAVELS (less

than 5% fines)

POORLY GRADED GRAVELGP

WELL-GRADED GRAVEL WITH SILTGW-GM

WELL-GRADED GRAVEL WITH CLAYGW-GC

POORLY GRADED GRAVEL WITH SILTGP-GM

POORLY GRADED GRAVEL WITH CLAYGP-GC

SILTY GRAVELGM

CLAYEY GRAVELGC

WELL-GRADED SANDSW

WELL-GRADED SAND WITH SILTSW-SM

WELL-GRADED SAND WITH CLAYSW-SC

POORLY GRADED SAND WITH SILTSP-SM

POORLY GRADED SAND WITH CLAYSP-SC

SILTY SANDSM

CLAYEY SANDSC

SILTML

LEAN CLAYCL

LOW PLASTICITY ORGANIC CLAYOL

ELASTIC SILTMH

FAT CLAYCH

HIGH PLASTICITY ORGANIC CLAYOH

PEATPT

GRAVELS

(with 5 to 12%

fines)

GRAVELS

WITH FINES

(more than 12%

fines)

CLEAN SANDS

(less than 5%

fines)

SANDS

(with 5 to 12%

fines)

SANDS WITH

FINES

(more than 12%

fines)

INORGANIC

ORGANIC

INORGANIC

ORGANIC

PRIMARILY ORGANIC

MATTER

POORLY GRADED SANDSP

HIGHLY

ORGANIC

SOILS

SILTS & CLAYS

(liquid limit

greater than 50)

SILTS & CLAYS

(liquid limit less

than 50)

SANDS (less

than 50%

retained on No.

4 sieve)

GRAVELS

(more than 50%

retained on No.

4 sieve)

COARSE-

GRAINED

SOILS

(50% or

more

retained on

No. 200

sieve)

FINE-

GRAINED

SOILS

(50% or

more passes

No. 200

sieve)

NOTES:

1. DUAL SOIL SYMBOLS (e.g. SP-SM, ML-CL) ARE USED TO INDICATE SOILS HAVING PROPERTIES OF BOTH

GROUPS.

2. BORDERLINE SOIL SYMBOLS (e.g. SP/SM, CL/CH) ARE USED TO INDICATE SOILS WITH PROPERTIES THAT

DO NOT DISTINCTLY PLACE THEM IN A SPECIFIC GROUP, SUCH AS INTERBEDDED SOILS WITH DIFFERENT

PROPERTIES.

ENGINEERED AND NON-ENGINEERED FILL (ENF)

RECENT GRANULAR DEPOSITS (RGD)

RECENT CLAY AND SILT (RCS)

COHESIONLESS SAND AND GRAVEL (CSG)

COHESIONLESS SILT AND FINE SAND (CSF)

COHESIVE CLAY AND SILT (CCS)

TILL AND TILL-LIKE DEPOSITS (TLD)

NB: NORTHBOUND

SB: SOUTH BOUND

ALIGNMENT STATION

ENGINEERING SOIL (ESU) UNIT LEGEND:

NO

N-O

VE

RR

ID

DE

N E

SU

SG

LA

CIA

LLY

O

VE

RR

ID

DE

N E

SU

S

BUILDING DEMOLISHED IN N112 CONTRACT

BORING DESIGNATION & LOCATION

PROFILE & SECTION LOCATION

PLAN SYMBOLS

NORTHGATE LINK EXTENSION FINAL DESIGN

GEOTECHNICAL CONSIDERATIONS REPORT

U DISTRICT STATION

PLAN AND PROFILE LEGEND

FIGURE 2

Page 87: Geotechnical Master Use Permit Report

175

NB

1258+

00

NB

1260+

00

NB

1262+

00

NB-258

NB-260

NB-515

NB-516

NB-602

NB-603

NL-312

NL-313

NL-315

NL-317

NW-501

NB-259

SB

1260+

00

SB

1258+

00

SB

1262+

00

NL-429-1

NL-429-2

NL-429-3

NL-429-4

NL-429-5

3515

A

A'

B'

C

C'

E

E'

4301 - 4

345 U

NIV

ER

SIT

Y W

AY

NE

NB TUNNEL

SB TUNNEL

UW

TOWER

UW

SOUTH

ANNEX

UNIVERSITY

MANOR

APARTMENTSNEPTUNE

THEATER

96" SEWER TUNNEL

NORTHGATE LINK EXTENSION FINAL DESIGN

GEOTECHNICAL CONSIDERATIONS REPORT

U DISTRICT STATION

SITE & EXPLORATION PLAN

FIGURE 3

PEDESTRIAN

WALKWAY

RETAINING WALL

Page 88: Geotechnical Master Use Permit Report

NB-259

NB-260

NB-516

NL-317

NB-603

-40

0

40

80

120

160

240

Approxim

ate E

levation in F

eet

-40

0

120

160

240

South

A

North

A'

NE 43rd St

200200

U DISTRICT STATION PLATFORM (PROJECTED)

40

80

?

?

?

?

?

?

?

?

?

??

?

?

?

?

?

?

?

?

?

??

NB1257+80 NB1258+20NB1257+40 NB1258+60 NB1259+00 NB1259+40 NB1259+80 NB1260+20 NB1260+60 NB1261+00 NB1261+40 NB1261+80 NB1262+20 NB1262+60 NB1263+00 NB1263+40

NB-515

NL-429-4

NE 45th St

?

NL-312

?

C E

NORTHGATE LINK EXTENSION FINAL DESIGN

GEOTECHNICAL CONSIDERATIONS REPORT

U DISTRICT STATION

STATION WEST WALL PROFILE

FIGURE 4

Page 89: Geotechnical Master Use Permit Report

-40

0

-40

0

NL-312

NL-315

NB1257+80 NB1258+20NB1257+40 NB1258+60 NB1259+00 NB1259+40 NB1259+80 NB1260+20 NB1260+60 NB1261+00 NB1261+40 NB1261+80 NB1262+20 NB1262+60 NB1263+00 NB1263+40

Approxim

ate E

levation in F

eet

South

B

North

B'

40

80

120

160

240

40

80

120

160

240

NE 43rd St

200200

U DISTRICT STATION PLATFORM (PROJECTED)

?

?

NB-259

?

?

?

?

?

?

?

?

?

?

?

?

?

??

?

?

?

?

?

?

?

?

NE 45th St

Neptune Theatre

University

Manor Apts

?

?

?

?

?

?

?

EX 96" METRO

SEWER TUNNEL

C E

NORTHGATE LINK EXTENSION FINAL DESIGN

GEOTECHNICAL CONSIDERATIONS REPORT

U DISTRICT STATION

STATION EAST WALL PROFILE

FIGURE 5

Page 90: Geotechnical Master Use Permit Report

West

C

East

C'

-40

0

40

80

120

160

240

-40

0

40

80

120

160

240

NL-312

NL-313

200200

Brooklyn Ave NE

Approxim

ate E

levation in F

ee

t

U DISTRICT STATION

PLATFORM (PROJECTED)

?

NB-603

Approxim

ate E

levation in F

ee

t

?

?

?

?

?

?

?

?

?

?

??

3515

West

E

East

E'

0

40

80

120

160

280

0

40

80

120

160

280

200200

Brooklyn Ave NE

Approxim

ate E

levation in F

ee

t

U DISTRICT STATION

PLATFORM (PROJECTED)

NL-429-4

NB-260

NL-429-5

240240

Approxim

ate E

levation in F

ee

t

?

? ?

??

?

?

?

??

?

SOUTH HEADWALL SECTIONNORTH HEADWALL SECTION

NB ALIGNMENTNB ALIGNMENT

BASE SLAB

NB

TUNNELS

TUNNELS

SB

NBSB

A B BA

BASE SLAB

NORTHGATE LINK EXTENSION FINAL DESIGN

GEOTECHNICAL CONSIDERATIONS REPORT

U DISTRICT STATION

STATION SUBSURFACE SECTIONS

FIGURE 6

Page 91: Geotechnical Master Use Permit Report

APPENDIX B Report Limitations and Guidelines for Use

Page 92: Geotechnical Master Use Permit Report

March 23, 2020 | Page B-1 File No. 15669-003-00

APPENDIX B REPORT LIMITATIONS AND GUIDELINES FOR USE1

This appendix provides information to help you manage your risks with respect to the use of this report.

Geotechnical Services Are Performed for Specific Purposes, Persons and Projects

This report has been prepared for the exclusive use of LPC West, Inc. and other project team members for 4328 Brooklyn Avenue NE project. This report is not intended for use by others, and the information contained herein is not applicable to other sites.

GeoEngineers structures our services to meet the specific needs of our clients. For example, a geotechnical or geologic study conducted for a civil engineer or architect may not fulfill the needs of a construction contractor or even another civil engineer or architect that are involved in the same project. Because each geotechnical or geologic study is unique, each geotechnical engineering or geologic report is unique, prepared solely for the specific client and project site. Our report is prepared for the exclusive use of our Client. No other party may rely on the product of our services unless we agree in advance to such reliance in writing. This is to provide our firm with reasonable protection against open-ended liability claims by third parties with whom there would otherwise be no contractual limits to their actions. Within the limitations of scope, schedule and budget, our services have been executed in accordance with our Agreement with the Client and generally accepted geotechnical practices in this area at the time this report was prepared. This report should not be applied for any purpose or project except the one originally contemplated.

A Geotechnical Engineering or Geologic Report Is Based on a Unique Set of Project-specific Factors

This report has been prepared for the 4328 Brooklyn Avenue NE project in Seattle, Washington. GeoEngineers considered a number of unique, project-specific factors when establishing the scope of services for this project and report. Unless GeoEngineers specifically indicates otherwise, do not rely on this report if it was:

■ Not prepared for you,

■ Not prepared for your project,

■ Not prepared for the specific site explored, or

■ Completed before important project changes were made.

For example, changes that can affect the applicability of this report include those that affect:

■ The function of the proposed structure;

■ Elevation, configuration, location, orientation or weight of the proposed structure;

1 Developed based on material provided by ASFE, Professional Firms Practicing in the Geosciences; www.asfe.org .

Page 93: Geotechnical Master Use Permit Report

March 23, 2020 | Page B-2 File No. 15669-003-00

■ Composition of the design team; or

■ Project ownership.

If important changes are made after the date of this report, GeoEngineers should be given the opportunity to review our interpretations and recommendations and provide written modifications or confirmation, as appropriate.

Subsurface Conditions Can Change

This geotechnical or geologic report is based on conditions that existed at the time the study was performed. The findings and conclusions of this report may be affected by the passage of time, by manmade events such as construction on or adjacent to the site, or by natural events such as floods, earthquakes, slope instability or groundwater fluctuations. Always contact GeoEngineers before applying a report to determine if it remains applicable.

Most Geotechnical and Geologic Findings Are Professional Opinions

Our interpretations of subsurface conditions are based on field observations from widely spaced sampling locations at the site. Site exploration identifies subsurface conditions only at those points where subsurface tests are conducted or samples are taken. GeoEngineers reviewed field and laboratory data and then applied our professional judgment to render an opinion about subsurface conditions throughout the site. Actual subsurface conditions may differ, sometimes significantly, from those indicated in this report. Our report, conclusions and interpretations should not be construed as a warranty of the subsurface conditions.

Geotechnical Engineering Report Recommendations Are Not Final

Do not over-rely on the preliminary construction recommendations included in this report. These recommendations are not final, because they were developed principally from GeoEngineers’ professional judgment and opinion. GeoEngineers’ recommendations can be finalized only by observing actual subsurface conditions revealed during construction. GeoEngineers cannot assume responsibility or liability for this report's recommendations if we do not perform construction observation.

Sufficient monitoring, testing and consultation by GeoEngineers should be provided during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed during the work differ from those anticipated, and to evaluate whether or not earthwork activities are completed in accordance with our recommendations. Retaining GeoEngineers for construction observation for this project is the most effective method of managing the risks associated with unanticipated conditions.

A Geotechnical Engineering or Geologic Report Could Be Subject to Misinterpretation

Misinterpretation of this report by other design team members can result in costly problems. You could lower that risk by having GeoEngineers confer with appropriate members of the design team after submitting the report. Also retain GeoEngineers to review pertinent elements of the design team's plans and specifications. Contractors can also misinterpret a geotechnical engineering or geologic report. Reduce that risk by having GeoEngineers participate in pre-bid and preconstruction conferences, and by providing construction observation.

Page 94: Geotechnical Master Use Permit Report

March 23, 2020 | Page B-3 File No. 15669-003-00

Do Not Redraw the Exploration Logs

Geotechnical engineers and geologists prepare final boring and testing logs based upon their interpretation of field logs and laboratory data. To prevent errors or omissions, the logs included in a geotechnical engineering or geologic report should never be redrawn for inclusion in architectural or other design drawings. Only photographic or electronic reproduction is acceptable, but recognize that separating logs from the report can elevate risk.

Give Contractors a Complete Report and Guidance

Some owners and design professionals believe they can make contractors liable for unanticipated subsurface conditions by limiting what they provide for bid preparation. To help prevent costly problems, give contractors the complete geotechnical engineering or geologic report, but preface it with a clearly written letter of transmittal. In that letter, advise contractors that the report was not prepared for purposes of bid development and that the report's accuracy is limited; encourage them to confer with GeoEngineers and/or to conduct additional study to obtain the specific types of information they need or prefer. A pre-bid conference can also be valuable. Be sure contractors have sufficient time to perform additional study. Only then might an owner be in a position to give contractors the best information available, while requiring them to at least share the financial responsibilities stemming from unanticipated conditions. Further, a contingency for unanticipated conditions should be included in your project budget and schedule.

Contractors Are Responsible for Site Safety on Their Own Construction Projects

Our geotechnical recommendations are not intended to direct the contractor’s procedures, methods, schedule or management of the work site. The contractor is solely responsible for job site safety and for managing construction operations to minimize risks to on-site personnel and to adjacent properties.

Read These Provisions Closely

Some clients, design professionals and contractors may not recognize that the geoscience practices (geotechnical engineering or geology) are far less exact than other engineering and natural science disciplines. This lack of understanding can create unrealistic expectations that could lead to disappointments, claims and disputes. GeoEngineers includes these explanatory “limitations” provisions in our reports to help reduce such risks. Please confer with GeoEngineers if you are unclear how these “Report Limitations and Guidelines for Use” apply to your project or site.

Geotechnical, Geologic and Environmental Reports Should Not Be Interchanged

The equipment, techniques and personnel used to perform an environmental study differ significantly from those used to perform a geotechnical or geologic study and vice versa. For that reason, a geotechnical engineering or geologic report does not usually relate any environmental findings, conclusions or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Similarly, environmental reports are not used to address geotechnical or geologic concerns regarding a specific project.

Page 95: Geotechnical Master Use Permit Report

March 23, 2020 | Page B-4 File No. 15669-003-00

Biological Pollutants

GeoEngineers’ Scope of Work specifically excludes the investigation, detection, prevention or assessment of the presence of Biological Pollutants. Accordingly, this report does not include any interpretations, recommendations, findings, or conclusions regarding the detecting, assessing, preventing or abating of Biological Pollutants and no conclusions or inferences should be drawn regarding Biological Pollutants, as they may relate to this project. The term “Biological Pollutants” includes, but is not limited to, molds, fungi, spores, bacteria, and viruses, and/or any of their byproducts.

If Client desires these specialized services, they should be obtained from a consultant who offers services in this specialized field.

Page 96: Geotechnical Master Use Permit Report