Top Banner
Geospatial Data Production NSF Workshop on GeoSpatial and GeoTemporal Informatics Jan 8-9, 2009 J. Chris McGlone SAIC, Inc 14668 Lee Rd Chantilly, VA 20151 [email protected] 703-676-9228
8

Geospatial Data Production NSF Workshop on GeoSpatial and GeoTemporal Informatics Jan 8-9, 2009 J. Chris McGlone SAIC, Inc 14668 Lee Rd Chantilly, VA 20151.

Jan 02, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Geospatial Data Production NSF Workshop on GeoSpatial and GeoTemporal Informatics Jan 8-9, 2009 J. Chris McGlone SAIC, Inc 14668 Lee Rd Chantilly, VA 20151.

Geospatial Data Production

NSF Workshop on GeoSpatial and GeoTemporal Informatics

Jan 8-9, 2009

J. Chris McGlone

SAIC, Inc

14668 Lee Rd

Chantilly, VA 20151

[email protected]

703-676-9228

Page 2: Geospatial Data Production NSF Workshop on GeoSpatial and GeoTemporal Informatics Jan 8-9, 2009 J. Chris McGlone SAIC, Inc 14668 Lee Rd Chantilly, VA 20151.

Energy | Environment | National Security | Health | Critical Infrastructure

What is solved (90%)?

• Photogrammetry: determination of image<->world relationship – Bundle adjustment, direct georeferencing, camera self-calibration

• Synthesis of photogrammetry, computer vision, computer graphics– Geometric and metric properties– Stochastic characteristics– Feature extraction

• Photogrammetry for the non-technical user: photogrammetry (e.g., Photosynth)

• Semi-automated construction of 3d urban models

Page 3: Geospatial Data Production NSF Workshop on GeoSpatial and GeoTemporal Informatics Jan 8-9, 2009 J. Chris McGlone SAIC, Inc 14668 Lee Rd Chantilly, VA 20151.

Energy | Environment | National Security | Health | Critical Infrastructure

Texture-mapped lidar building models, w/ road centerlines

Page 4: Geospatial Data Production NSF Workshop on GeoSpatial and GeoTemporal Informatics Jan 8-9, 2009 J. Chris McGlone SAIC, Inc 14668 Lee Rd Chantilly, VA 20151.

Energy | Environment | National Security | Health | Critical Infrastructure

Visual simulation database examples

Page 5: Geospatial Data Production NSF Workshop on GeoSpatial and GeoTemporal Informatics Jan 8-9, 2009 J. Chris McGlone SAIC, Inc 14668 Lee Rd Chantilly, VA 20151.

Energy | Environment | National Security | Health | Critical Infrastructure

What is almost solved?

• Lidar exploitation (40%)

• Data fusion (based on geometry) (70%)

• Image sequence registration (50%)

• Semi-automatic feature extraction (40%)

• Building interior generation from plans or scans (50%)

• Interaction with 3D worlds (30%)– Navigation– Query– 3D – Immersive worlds (e.g, Second Life)

Page 6: Geospatial Data Production NSF Workshop on GeoSpatial and GeoTemporal Informatics Jan 8-9, 2009 J. Chris McGlone SAIC, Inc 14668 Lee Rd Chantilly, VA 20151.

Energy | Environment | National Security | Health | Critical Infrastructure

What has failed (so far)?

• Automatic cartographic feature extraction– Still scene/image specific – Low productivity due to training, parameter fiddling, or editing requirements

Page 7: Geospatial Data Production NSF Workshop on GeoSpatial and GeoTemporal Informatics Jan 8-9, 2009 J. Chris McGlone SAIC, Inc 14668 Lee Rd Chantilly, VA 20151.

Energy | Environment | National Security | Health | Critical Infrastructure

What is missing?

• Database maintenance models – Updates: scheduled, need based – Reasoning on status

• Integration of crowd sourcing into standard production flows– Verification – Characterization: accuracy, completeness, timeliness

• Simultaneous interaction with multiple datasources, SDIs – Understanding differences (timeliness, accuracy, coverage, design goals,

etc) – Automatically select best source for current purpose

• Non-geometric feature attribution (e.g., function, materials, description)

• Data fusion based on semantics

• Consumer understanding of data quality issues

• New business models for data acquisition, processing, distribution

Page 8: Geospatial Data Production NSF Workshop on GeoSpatial and GeoTemporal Informatics Jan 8-9, 2009 J. Chris McGlone SAIC, Inc 14668 Lee Rd Chantilly, VA 20151.

Energy | Environment | National Security | Health | Critical Infrastructure

What is next?

• Improved realism and interactions for 3D models s

• Crowd-sourced photogrammetry (distributed acquisition)

• 3D modeling as consumer video camera application

• Video game boxes as photogrammetry/modeling/geospatial data platforms

• Mapping from image sequences

• Continuous mapping instead of discrete updates

• Better sensors, new sensing modalities (e.g., lidar + video)