PROJECT NO: 20120606FILE: 20130402_TG_GarageAddn_BIDSET.plnDRAWN BY: W. PalladinoCHK'D BY: Al Cheatham
HAND DRYERHAND SINKHANDICAPPEDHANDRAILHARDWAREHARDWOODHEAD JOINTHEADERHEAT ABSORBING GLASSHEATING, VENTILATING & A/CHEATING WATER SUPPLYHEATING WATER RETURNHEAVY DUTYHEIGHTHEXAGONHIGHHIGH DENSITY POLYETHYLENEHIGH EFFICIENCY PARTICLE AIR FILTERHIGH INTENSITY DISCHARGEHIGH PRESSURE/ HIGH POINTHIGH STRENGTHHIGH VOLTAGEHIGHWAYHOLD OPENHOLLOW COREHOLLOW METALHOLLOW METAL DOORHOLLOW METAL FRAMEHORIZONTALHORSEPOWERHOSE BIBHOSE CABINETHOSPITALHOT WATERHOT WATER BOILERHOT WATER RETURNHOT WATER SUPPLYHOURHOUSEKEEPINGHYDRANTHYDRAULIC
H
IDINCANDININCLINFOIDIFIFSINSTLINSULINTINVINT EL
IDENTIFICATIONINCANDESCENTINCH / INCHESINCLUDE/ INCLUDINGINFORMATIONINSIDE DIAMETER/ DIMENSIONINSIDE FACEINSIDE FACE OF STUDINSTALLINSULATIONINTERIORINVERTINVERT ELEVATION
I
IDINCANDININCLINFOIDIFIFSINSTLINSULINTINVINT EL
IDENTIFICATIONINCANDESCENTINCH / INCHESINCLUDE/ INCLUDINGINFORMATIONINSIDE DIAMETER/ DIMENSIONINSIDE FACEINSIDE FACE OF STUDINSTALLINSULATIONINTERIORINVERTINVERT ELEVATION
JAN CLOJSJ-BOXJR
JANITOR CLOSETJANITOR SINKJUNCTION BOXJUNIOR
JKPLKWKITKBKDKOP
KICK PLATEKILOWATTKITCHENKNEE BRACEKNOCK DOWNKNOCK OUT PANEL
RABBETEDRADIUSRAIN WATER LEADERRAILINGRAILROADRECEIVEDRECEPTACLERECEPTIONRECESSEDRECTANGLE/ RECTANGULARREDUCERREDWOODREFERENCEREFLECTREFLECTED CEILING PLANREFRIGERATORREGISTERREINFORCEREMOVE/ REMOVABLEREPAIRRELACEREQUIREDRESILIENTRESILIENT BASERESILIENT FLOORINGRETURNRETURN AIRRETURN AIR DUCTRETURN AIR FANRETURN AIR GRILLEREVISED/ REVISIONREVOLUTIONS PER MINUTERISERRIGHT HANDRIGHT OF WAYROADROOFINGROOF DRAINROOF HATCHROOF LEADERROOF VENTILATOR/ VENTROOFINGROOF TOP UNITROOMROUGH OPENINGROUNDROUND HEAD MACHINE SCREWROUND HEAD WOOD SCREWRUBBERRUBBER TILE FLOOR
TACKBOARDTANGENTTECHNICALTELEPHONETELEVISIONTEMPERATURETEMPERED GLASSTERRAZZOTEST BORINGTHERMOSTATTHERMAL RESISTANCETHICK/THICKNESSTHRESHOLDTHROUGHTO BE DETERMINED/ DESIGNEDTOILET PAPER DISPENSERTOILET PAPER HOLDERTONGUE AND GROOVETOP AND BOTTOMTOP OF CURB/ TOP OF CONCRETETOP ELEVATIONTOP OFTOP OF FOOTINGTOP OF MASONRYTOP OF PARAPETTOP OF RIMTOP OF STEEL/SLABTOP OF WALLTOPOGRAPHYTOWEL BARTOWEL DISPENSERTOWEL DISPENSER/ RECEPTACLETRANSFER GRILLETRANSFORMERTRANSOMTRENCH DRAINTYPICAL
TACKBOARDTANGENTTECHNICALTELEPHONETELEVISIONTEMPERATURETEMPERED GLASSTERRAZZOTEST BORINGTHERMOSTATTHERMAL RESISTANCETHICK/THICKNESSTHRESHOLDTHROUGHTO BE DETERMINED/ DESIGNEDTOILET PAPER DISPENSERTOILET PAPER HOLDERTONGUE AND GROOVETOP AND BOTTOMTOP OF CURB/ TOP OF CONCRETETOP ELEVATIONTOP OFTOP OF FOOTINGTOP OF MASONRYTOP OF PARAPETTOP OF RIMTOP OF STEEL/SLABTOP OF WALLTOPOGRAPHYTOWEL BARTOWEL DISPENSERTOWEL DISPENSER/ RECEPTACLETRANSFER GRILLETRANSFORMERTRANSOMTRENCH DRAINTYPICAL
UCUCDUFDUGNDULUNFINUHUNOURUTILUP
UNDERCUTUNCER CUT DOORUNDER FLOOR DUCTUNDERGROUNDUNDERWRITER'S LABORATORYUNFINISHEDUNIT HEATERUNLESS NOTED OTHERWISEURINALUTILITYUTILITY POLE
GENERAL NOTESTHE FOLLOWING NOTES SHALL SUPPLEMENT THEDRAWINGS AND CONTRACT DOCUMENTS. WHEREARTICLES OR PARAGRAPHS IN THE SPECIFICATIONS AND/OR DRAWINGS ARE SUPPLEMENTED BY ONE OR MOREOF THE FOLLOWING NOTES, THE PROVISIONS OF SUCHARTICLE, PARAGRAPH AND/OR DETAIL SHALL REMAIN INEFFECT AND THE SUPPLEMENTAL NOTE SHALL BECONSIDERED AS ADDED THERETO. IF THERE IS ACONFLICT OR AMBIGUITY CREATED BY A NOTE, THEMORE STRINGENT REQUIREMENT SHALL APPLY.
IT IS IMPORTANT THAT ALL PARTIES UNDERSTAND THATCONSTRUCTION DOCUMENTS ARE NOT INTENDED TO BEA COMPLETE SET OF INSTRUCTION ON HOW TOCONSTRUCT A BUILDING. CONSTRUCTION MEANS,METHODS, TECHNIQUES, SEQUENCES, PROCEDURESAND SITE SAFETY PRECAUTIONS ARE ASSIGNEDRESPONSIBILITIES OF THE CONTRACTOR.
GENERAL REQUIREMENTS1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERALCONTRACTORS, SUB-CONTRACTORS, MANUFACTURERS,SUPPLIERS: CAREFULLY AND THOROUGHLY REVIEWTHESE GENERAL NOTES. IT IS YOUR RESPONSIBILITY TOKNOW AND ADHERE TO THESE REQUIREMENTS.
2. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATEDINTO DISCIPLINES FOR THE CONVENIENCE OF THEARCHITECT AND THE CONTRACTOR. THE SEPARATIONSUSED HEREIN ARE USED ONLY FOR THE PURPOSES OFCONVENIENCE AND REFERENCE, AND IN NO WAY DOTHEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANYPART OF THE DRAWINGS, OR OF THE DRAWINGS ANDSPECIFICATIONS AS A WHOLE. THE FACT THAT THEDRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THATTHE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE,INTEGRATED AND UNIFIED WHOLE.
3. THE GENERAL CONTRACTOR SHALL BE SOLELYRESPONSIBLE FOR AND HAVE CONTROL OVERCONSTRUCTION MEANS, METHODS, TECHNIQUES,SEQUENCES, PROCEDURES AND COORDINATION OF ALLPORTIONS OF THE WORK. THE GENERAL CONTRACTORSHALL DETERMINE HOW THE WORK WILL BE DIVIDEDINTO SEPARATE TRADES, HOW THE WORK WILL BE BIDAND PURCHASED AND HOW THE PURCHASED PRODUCTSA N D S Y S T E M S W I L L B E C O O R D I N AT E D A N DINCORPORATED INTO THE COMPLETED WORK..
4. ALL SUB-CONTRACTORS SHALL SUBMIT SHOPDRAWINGS, PRODUCT DATA, SAMPLES AND SIMILARSUBMITTALS AS REQUIRED FOR ARCHITECTS APPROVALPRIOR TO COMMENCING ANY WORK. THE CONTRACTORWILL DETERMINE AND VERIFY MATERIALS, FIELDMEASUREMENTS AND FIELD CONSTRUCTION CRITERIARELATED THERETO AND WILL CHECK AND COORDINATETHE INFORMATION CONTAINED WITHIN SUBMITTALS WITHTHE REQUIREMENTS OF THE WORK AND OF THECONTRACT DOCUMENTS PRIOR TO APPROVING ANDSUBMITTING SHOP DRAWINGS, PRODUCT DATA, SAMPLESAND SIMILAR SUBMITTALS TO THE ARCHITECT FORREVIEW FOR CONFORMANCE.
5. THE DRAWINGS AND SPECIFICATIONS ARE PROVIDEDTO DESCRIBE THE CONCEPT OF AN INSTALLATION ANDSPECIFIES THE PRODUCTS OR SYSTEMS ADVERTISED ORKNOWN TO BE CONCEPTUALLY EQUAL IN QUALITY. THEGENERAL CONTRACTOR IS RESPONSIBLE FORDETERMINING AND DEFINING SPECIFICALLY HOW THECONCEPTUALLY EQUAL BUT NOMINALLY DIFFERENTPRODUCTS OR SYSTEMS THAT HAVE BEEN CHOSEN FORUSE IN THE PROJECT WILL BE INCORPORATED INTO THEWORK.
6. THE ARCHITECT'S DRAWINGS WILL MOST LIKELY BE INCONFLICT WITH THE SELECTED EQUIPMENT ANDREQUIRED CLEARANCES TO THE EXTENT THATCOORDINATION IS NECESSARY AND ADVISABLE. THECONTRACTOR IS SPECIFICALLY DIRECTED TO PROVIDESKETCHES FOR RESOLUTION OF SUCH PREDICTABLECONFLICTS PRIOR TO ANY REQUEST FOR INFORMATIONOR CLARIFICATION FROM THE ARCHITECT.
7. EVERY EFFORT HAS BEEN MADE TO MAKE THESEDOCUMENTS CONCISE AND COORDINATED, TO DEFINEWORK IN THE MOST LOGICAL PLACE AND TO ELIMINATEREDUNDANCY. DO NOT PRESUME THAT YOUR SCOPE OFWORK IS SINGULARLY DEFINED. YOUR SCOPE OF WORKIS DEFINED THROUGHOUT THE ENTIRE SET OFDRAWINGS AND SPECIFICATIONS AND IS NOT CONTAINEDIN JUST ONE SERIES OF DRAWINGS OR DIVISION OFSPECIFICATIONS. YOU MUST REVIEW THE ENTIRE SET OFCONTRACT DOCUMENTS TO DETERMINE YOUR SCOPE OFWORK.
8. THE DRAWINGS AND SPECIFICATIONS, INCLUDINGDRAWINGS PREPARED BY SPECIFIC ENGINEERINGDISCIPLINES (SUCH AS CIVIL, STRUCTURAL, MECHANICAL,ELECTRICAL, ETC.) ARE COMPLEMENTARY; ITEMS SHOWNIN ANY ONE LOCATION IN THE DRAWINGS SHALL BECONSIDERED TO BE REQUIREMENTS OF THE CONTRACTF O R C O N S T R U C T I O N . I N T H E E V E N T O F A NINCONSISTENCY BETWEEN THE DRAWINGS ANDSPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THECONTRACTOR SHALL SEEK CLARIFICATION ORINTERPRETATION FROM THE ARCHITECT PRIOR TOBIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIEDPRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTIONOR INTENT CANNOT BE REASONABLY INFERRED, THECONTRACTOR SHALL PROVIDE THE BETTER QUALITY ORGREATER QUANTITY OF WORK.
9. MECHANICAL AND ELECTRICAL DRAWINGS SHOWINFORMATION IN A DIAGRAMMATIC FASHION WITHOUTDIMENSIONING. THE GENERAL CONTRACTOR IS TOCOORDINATE THE LOCATIONS OF ALL M.E. EQUIPMENTWITH RESPECT TO THE ARCHITECTURAL ANDSTRUCTURAL DETAILING OF SHAFTS, CHASES, ANDSUCH.
10. THE CONTRACTOR AND ALL SUB-CONTRACTORSSHALL VISIT THE SITE AND BECOME FAMILIAR WITH SITECONDITIONS AS THEY MAY AFFECT CARRYING OUT THEWORK AS DESCRIBED IN THESE CONTRACT DOCUMENTS.THE CONTRACTOR SHALL INVESTIGATE, VERIFY, AND BERESPONSIBLE FOR ALL CONDITIONS OF THE PROJECT,AND NOTIFY THE ARCHITECT OF ANY CONDITIONS THATREQUIRE MODIFICATION BEFORE PROCEEDING WITH THEWORK.
11. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLEFOR LOCATING AND PROTECTING ALL UTILITY LINES.LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALLDAMAGE TO UTILITY LINES CAUSED BY CONSTRUCTIONOPERATIONS AT NO COST TO THE OWNER.
12, CONTRACTORS ARE REMINDED THAT COORDINATINGTHE ROUTING OF THEIR WORK WITH OTHER TRADES ISESSENTIAL. ANY EXPENSE FOR THE REMOVAL ANDRELOCATION SHALL BE AT THE EXPENSE OF THECONTRACTOR AND NOT OF THE OWNER.
13. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATEDWITH THE PROJECT SHALL BE FAMILIAR WITH THE RULESAND REGULATIONS OF THE OCCUPATIONAL SAFETY ANDHEALTH ACT, AND IMPLEMENT THOSE RULES AS THEYAPPLY TO THIS PROJECT.
14. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS,EQUIPMENT, LABOR, AND SERVICES NECESSARY TOCOMPLETE THE WORK.
15. ALL WORK PERFORMED SHALL BE IN ACCORDANCEWITH THE BUILDING CODE & LOCAL AMENDMENTS.
16. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLEFOR THE COORDINATION OF ALL TRADES AND THEPREVENTION OF CONFLICT BETWEEN ALL TRADES.
17. WHERE APPLICABLE, PRIOR TO BEGINNING ANYWORK, THE CONTRACTOR SHALL CONDUCT A WALKTHROUGH INSPECTION WITH THE OWNER TO DETERMINEIN WRITING THE CONDITION OF THE WORK ALREADY INPLACE. THE CONTRACTOR IS RESPONSIBLE FORREPAIRING OR REPLACING EQUIPMENT PRESENTLY INPLACE THAT IS DAMAGED DURING CONSTRUCTION.
18. CONTRACTOR SHALL SUBMIT CONFIRMATION OFORDERED MATERIALS OR ITEMS NECESSARY TOCOMPLETE THE PROJECT WITH PROJECTED DELIVERYDATE GREATER THAN FOUR WEEKS.
DRAWINGS AND DIMENSIONS1. DO NOT SCALE THE DRAWINGS. THE GENERALCONTRACTOR, SUBCONTRACTORS AND ALL EMPLOYEESON THIS PROJECT SHALL NOT SCALE THE DRAWINGS TODETERMINE DISTANCES NOT DIMENSIONED ON THEDRAWINGS. IF FURTHER DIMENSIONING IS REQUIRED ITSHALL BE REQUESTED IN WRITING BY THE GENERALCONTRACTOR AND ANSWERED IN WRITING BY THEARCHITECT.
2. THE ARCHITECT'S DIMENSIONS MUST BE THOROUGHLYEXAMINED AND VERIFIED BY THE CONTRACTORPREPARING THE PLAN FOR PROCURING AND PLACING THEWORK BECAUSE OF THE VARIABLE IN AVAILABLEPRODUCTS AND CONSTRUCTION TECHNIQUES. COLUMNGRIDS AND BUILDING LIMITS MAY BE USED LITERALLY ASLONG AS THEY HAVE BEEN VERIF IED BY THECONTRACTOR'S SURVEYOR.
3. ALL DIMENSIONS ON PLANS ARE TO FACE OF BLOCK ORTO FACE OF STUD UNLESS NOTED OTHERWISE.
4. DRAWINGS ARE PREPARED USING DIMENSIONS ANDPRODUCT CONFIGURATIONS OR DETAILS OF SPECIFICMANUFACTURERS (TYPICALLY THE FIRST MANUFACTURERLISTED UNDER "ACCEPTABLE MANUFACTURERS" IN THESPECIFICATIONS). DIMENSIONS AND DETAILS FOR SPECIFICPRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLYINCORPORATED INTO THE WORK, AND PRODUCTS BYOTHER MANUFACTURERS MAY ALSO BE ACCEPTABLE.THEREFORE, ACTUAL INSTALLATION DETAILS ANDDIMENSIONS MAY DIFFER FROM THOSE SHOWN.C O N T R A C T O R S H A L L V E R I F Y I N S TA L L AT I O NR E Q U I R E M E N T S F O R A L L P R O D U C T S T O B EINCORPORATED IN THE WORK (INCLUDING PARTITIONTHICKNESSES FOR RECESSED OR SEMI-RECESSEDPRODUCTS), AND IS RESPONSIBLE FOR ACCOMMODATINGAND COORDINATING CHANGES TO OTHER MATERIALS ORPRODUCTS THAT ARE NECESSARY BECAUSE OF THESEDIFFERENCES.
5. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLEFOR NOTIFYING THE ARCHITECT IMMEDIATELY SHOULDANY DISCREPANCIES BE FOUND IN THE DRAWINGS ANDSPECIFICATIONS.
6. THE GENERAL CONTRACTOR IS RESPONSIBLE FORCHECKING ALL FIELD CONDITIONS AND DIMENSIONS ASTHEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIESEXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELDCONDITIONS NOTIFY THE ARCHITECT PRIOR TOPROCEEDING WITH THE WORK.
7. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BYTHE CONTRACTOR AND APPROVED BY THE OWNERBEFORE ACTUAL CONSTRUCTION WORK BEGINS. ANYINDICATION OF PROJECT LIMITS OR LINES OFDEMARCATION ARE SHOWN FOR THE CONVENIENCE OFTHE CONTRACTOR, AND ARE NOT TO BE TAKEN LITERALLY.
8. SEE GENERAL NOTES ON ALL 'A' SERIES DRAWINGS FORINFORMATION RELATED TO PLANS AND DETAILS ON THOSESHEETS.
9. THE TERM "ALIGN" REFERS TO LOCATING DIFFERENTCOMPONENTS OF CONSTRUCTION TO PROVIDE A FLUSHFINISH SURFACE.
10. THE CONTRACTORS SHALL VEIFY ALL DIMENSIONS,GRADES, PITCH AND OTHER CONDITIONS BY TAKINGMEASUREMENTS PRIOR TO ORDERING MATERIALS ORDOING WORK. DISCREPANCIES SHALL BE REFERRED TOTHE ARCHITECT FOR ADDITIONAL INSTRUCTIONS. THECONTRACTOR SHALL BE RESPONSIBLE FOR THESEMEASUREMENTS. NO CONSIDERATION WILL BE GIVEN TOANY CLAIM BASED ON DIFFERENCES BETWEEN THED R AW I N G S O R S P E C I F I C AT I O N S A N D A C T U A LMEASUREMENTS.
11. USE OF THE WORD "VERIFY" POINTS OUT A SITUATIONWHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITHTHE WORK, FABRICATION OF EQUIPMENT, OR ORDERINGMATERIAL. NOTIFY THE ARCHITECT OF ANY DISCREPANCY.
12. WHERE A DETAIL OR SECTION IS SHOWN FOR ONECONDITION, IT SHALL APPLY TO ALL LIKE OR SIMILARCONDITIONS OR LOCATIONS.
13. A DETAIL FOR EVERY CONDITION IS NOT PROVIDED,THERE ARE ADEQUATE DETAILS FOR SIMILAR AND LIKECONDITIONS THAT ARE TYPICAL IN NATURE AND SHALL BEUSED AS GUIDES FOR DETERMINING HOW SPECIFICCONDITION SHOULD BE CONSTRUCTED WHAT WILLPRODUCE RESULTS ACCEPTABLE TO THE ARCHITECT.
14. THE USE OF MATERIAL AND REFERENCE SYMBOLS FORMATERIAL IDENTIFICATION AND FOR KEYING LOCATIONSWHERE SECTIONS AND DETAILS ARE DRAWN AREPROVIDED AS A MATTER OF CONVENIENCE. THE LACK OFUSE OF A MATERIAL SYMBOL OR REFERENCE SYMBOL FORANY LOCATION SHALL NOT DELETE THE REQUIREMENTFOR CONSTRUCTION OF THAT CONDITION TO BE INACCORDANCE WITH THE DETAILS OR SECTIONS THATAPPLY TO OR ARE LIKE OR SIMILAR TO THAT CONDITION.
15. REFER TO THE ARCHITECTURAL REFLECTED CEILINGPLAN FOR EXACT LOCATIONS OF ALL CEILING FIXTURES.REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FORCOMPLETE CONSTRUCTION REQUIREMENTS.
16. ARCHITECTURAL, MECHANICAL, AND ELECTRICALDRAWINGS SHOW WHERE EXPOSED DUCTWORK IS TO BEINSTALLED AT A SPECIFIC ELEVATION IN A CONTROLLEDPATTERN. THE CONTRACTOR MUST RELY ON ALL OF THESEDISCIPLINES TO COMPLETE THE WORK AND SHOULDNOTIFY THE ARCHITECT OF ANY DISCREPANCIES.
17. THE GENERAL CONTRACTOR SHALL COORDINATE THEWORK OF ALL TRADES INSTALLING THEIR RESPECTIVEEQUIPMENT IN THE CEILING PLENUMS. MECHANICAL,ELECTRICAL, STRUCTURAL, AND FIRE SPRINKLERSYSTEMS ALL SHARE THIS SAME SPACE. EACH SUBCONTRACTOR IS TO REVIEW THE REQUIREMENTS OFTHEIR WORK WITH THE AWARENESS OF THE OTHERTRADES THAT NEED TO SHARE THESE SPACES AND MUSTNOT ASSUME THAT THEIR INSTALLATION HAS BEENCONSIDERED IN THE DESIGN AND SHOP DRAWINGS OF THEOTHER TRADES.
18. ALL DOORS TO BE LOCATED 4" OFF ADJACENT CMU ORMETAL STUD WALL UNLESS DIMENSIONED OTHERWISE ONTHE PLAN.
PARTITION NOTES1. PROVIDE AND INSTALL ALL BLOCKING STIFFENERS,BRACING, BACK-UP PLATES AND SUPPORTING BRACKETSREQUIRED FOR THE INSTALLATION OF ALL CASEWORKAND OF ALL FLOOR MOUNTED OR SUSPENDEDMECHANICAL AND ELECTRICAL EQUIPMENT.
2. COORDINATE METAL STUD GAUGE WITH PRE-APPROVED EQUIPMENT ANCHORAGE. WHERE ADISCREPANCY OCCURS, THE MORE STRINGENTREQUIREMENT SHALL GOVERN.
3. PROVIDE SOLID BLOCKING WITHIN PARTITIONS AT ALLLOCATIONS WHERE ITEMS WILL BE MOUNTED ONPARTITIONS INCLUDING, BUT NOT LIMITED TO:ACCESSORIES, CASEWORK TRIM, FLASHING, WALLMOUNTED EQUIPMENT, TACK/BULLETIN/MARKER BOARDS,ETC.
4. THERE SHALL BE NO BACK-TO-BACK ELECTRICALTELEPHONE, OR OTHER OUTLETS, EXCEPT WHERESPECIFICALLY SHOWN.
5. PROVIDE ACOUSTIC (SOUND) SEALANT AT NON-RATEDWALLS AND FIRE-RATED SEALANT AT SMOKE PARTITIONAND AS REQUIRED BY TEST NUMBER.
6. PROVIDE SLIP JOINT CONNECTIONS AT PARTITIONSTHAT EXTEND TO STRUCTURE ABOVE. PROVIDE BRACINGABOVE AS REQUIRED. REFERT TO STRUCTURALDRAWINGS AND TO SLIP JOINT DETAILS.
7. ASSUME LEVEL 4 FINISH FOR ALL GYPSUM BOARDPARTITIONS, UNLESS NOTED OTHERWISE.
8. IT IS THE INTENT OF THE DESIGN THAT ALL METAL STUDPARTITIONS BE OF SUFFICIENT WIDTH TO ADEQUATELYENCLOSE PIPING, CONDUITS, AND RECESSEDEQUIPMENT. NOTIFY THE ARCHITECT OF ANYDISCREPANCIES WITH THIS INTENT.
9. PROVIDE 24" X 24" ACCESS PANELS IN PARTITIONSWHERE REQUIRED FOR MECHANICAL EQUIPMENTEXCEPT WHERE SIZES ARE OTHERWISE NOTED.
CONSTRUCTION NOTES1. CONTRACTOR SHALL, DURING CONSTRUCTION,PROVIDE SURFACE SITE DEWATERING BY TEMPORARYDITCHING SUMPING OR OTHER APPROVED METHODS TOSTOP SURFACE WATER FROM RUNNING INTO FOOTINGTRENCHES AND OTHER EXCAVATIONS. TEMPORARYMEASURES SHALL BE MAINTAINED UNTIL PERMANENTDRAINAGE SYSTEMS (DITCHES, SWALES, CULVERTS,CATCH BASINS, ETC.) ARE INSTALLED. ALL WORKDAMAGED BY RAIN SHALL BE CORRECTED TO THEORIGINAL REQUIREMENTS OF THE CONTRACT DOCUMENTSWITHOUT ADDED EXPENSE TO THE OWNER.
2. IF APPLICABLE PER BUILDING CODE, ALL WOODBLOCKING SHALL BE FIRE-RETARDANT WOOD.
3. ALL WOOD MEMBER IN CONTACT WITH CONCRETE,MASONRY, OR IN WET LOCATIONS, INCLUDING FRAMING,BLOCKING, PLYWOOD OR OSB SHALL BE PRESSURETREATED. ALL EXTERIOR APPLICATIONS OF PRESSURETREATED WOOD (PT) TO BE KILN-DRIED AFTER TREATMENT"KDAT".
4. SEAL AROUND ALL PENETRATIONS THROUGH EXISTINGAND PROPOSED FIRE RATED PARTITIONS. PROVIDE ULAPPROVED FIRE STOP SYSTEM TO MEET REQUIREDRATING.
5. MAINTAIN RATING AT ALL BLOCKOUTS FOR ALL FIREEXTINGUISHERS AND TOILET ACCESSORIES THAT ARE TOBE INSTALLED IN RATED WALLS.
6. PROVIDE GYPSUM BOARD CONTROL JOINTS INPARTITIONS AND CEILINGS AT 30'-0" MAX. SPACING.COORDINATE TO MEET FIRE RESISTIVE RATINGS OF THEASSEMBLY, FIRESTOP JOINTS AT RATED PARTITIONS. SUB-CONTRACTOR MUST PROVIDE A SUBMITTAL FOR JOINTMATERIAL.
7. CAULK ALL JOINTS OR CRACKS WHICH OCCUR WHEREDISSIMILAR MATERIALS INTERSECT PERPENDICULAR TOEACH OTHER AND WHERE THE INTERSECTION IS EXPOSEDTO VIEW, UNLESS INDICATED OTHERWISE ON THEDRAWINGS.
8. FIREBLOCK ALL CONCEALED SPACES, SOFFITS, SHAFTS,CHASES AND CEILING AREAS PER REQUIREMENTS OF THEAPPLICABLE BUILDING CODE.
9. PROVIDE CONTINUOUS PERIMETER BUILDINGINSULATION AT ALL EXTERIOR WALLS FROM SLAB TO ROOFDECK.
10. THE ARCHITECTURAL AND STRUCTURAL DRAWINGSBOTH DESCRIBE VARIOUS FLOOR SLAB SLOPEREQUIREMENTS, RECESSES, AND EDGE CONDITIONS. USEBOTH SETS OF DRAWINGS WHEN INSTALLING THE FLOORSLAB.
11. GROUT CMU CENTER SCORE JOINT SIMILAR TO OTHERADJACENT JOINTS.
12. WHERE APPLICABLE, CMU JOINTS SHALL BE SHALLOWCONCAVE JOINTS IN ALL TOILET ROOMS.
13. CONTRACTOR SHALL PREPARE MASONRY WALLS TOMEET AL REQUIREMENTS OF THE FINISH INSTALLER ANDMANUFACTURER TO ENSURE THAT ALL MATERIAL ANDINSTALLATION WARRANTIES WILL BE IN EFFECT.
14. TRUSS MESH GALVANIZED JOINT REINFORCING MAYNOT BE SHOWN IN SOME DETAILS FOR CLARITY. IT SHALLBE INSTALLED IN ALL CMU JOINTS WHETHER SHOWN ORNOT.
15. ALL FLASHING IS TO BE OVERLAPPED AT JOINTS 4"MINIMUM AND SEALED WATERTIGHT.
16. CONTRACTOR SHALL ARRANGE FOR ARCHITECT TO BEPRESENT TO OBSERVE ALL FLASHING INSTALLATION PRIORTO BEING COVERED BY NEW CONSTRUCTION.
17. ALL VERTICAL AND HORIZONTAL PIPES, CONDUITS,DUCTS, ETC. IN FINISHED ROOMS OR AREAS THROUGHOUTTHE BUILDING SHALL BE FURRED IN TO MATCH THE ROOMFINISH, UNLESS OTHERWISE NOTED.
18. WHERE MECHANICAL WORK PENETRATES ANYCOMPONENT OF A FIRE-RATED ASSEMBLY, PROVIDE THEAPPROPRIATE FIRE AND/OR SMOKE DAMPERS. IF IT IS NOTCLEAR WHETHER DUCTWORK PENETRATES A PORTION OFTHE RATED ASSEMBLY, OBTAIN CLARIFICATION FROM THEARCHITECT PRIOR TO BIDDING. SEAL AROUND ALLPENETRATIONS THROUGH PROPOSED FIRE RATEDPARTITIONS. PROVIDE UL APPROVED FIRESTOP SYSTEM TOMEET REQUIRED RATING.
19. IF APPLICABLE PER BUILDING CODE, THE FIRESPRINKLER SYSTEM WILL BE DESIGNED BY THEI N S TA L L I N G S U B - C O N T R A C TO R . T H E G E N E R A LCONTRACTOR SHALL COORDINATE LAYOUT, CLEARANCES,AND LOCATION OF HEAD HEIGHTS WITH THE STRUCTURE,MECHANICAL DUCTWORK, ELECTRICAL LIGHTING,DRAINAGE PIPING, AND THE ARCHITECTURAL REFLECTEDCEILING PLANS. THE SPRINKLER DESIGN MUST BECOORDINATED WITH THE PROVIS IONS OF ALLENGINEERING AND ARCHITECTURAL DOCUMENTS ANDSHOULD NOT RELY SOLEY ON ONE SERIES OF DRAWINGSOR ONE DISCIPLINE. CONTRACTOR SHALL ADJUST OR ADDFIRE SPRINKLER HEADS TO ACCOMODATE PARTITIONLAYOUT. HEAD SPACING AND PLACEMENT SHALL MEETCODE REQUIREMENTS. SUB-CONTRACTOR SHALLCOORDINATE ANY SPRINKLER HEAD LAYOUT CONFLICTSWITH THE ARCHITECT.
20. IF APPLICABLE, AT RAINSCREEN PANEL INSTALLATIONUSE HORIZONTAL STRAPPING AS REQUIRES PERMANUFACTURER'S RECOMMENDATION WHERE DENSGLASSOR GYP BOARD IS USED AS EXTERIOR SHEATHING.
STEP 1START WITH ROUGHOPENING SIZED INACCORDANCE WITHWINDOW OR DOORMANUFACTURER'SREQUIREMENTS.
REFERENCE AIR SEALINGDETAILS FOR PROPERINSTALLATION OF WALLSHEATHING TO WALLFRAMING.
INSTALL HOUSE WRAP INSHINGLE/ OVERLAPPINGFASHION WITH APPROVEDFASTENERS. ALIGN ANDTAPE ALL FASTENERS ANDPUNCTURES. HOUSEWRAP TO EXTENDCONTINUOUSLY OVERWINDOW OPENING.
STEP 2MAKE MODIFIED "I" CUT INHOUSE WRAP CENTEREDON WINDOW OPENINGBEYOND.CUT ALONG SOLID LINE,FOLD IN AT DASHED LINE.
STEP 3FOLD IN HOUSE WRAPAND SECURE TO INTERIORSIDE OF WALL WITHAPPROVED FASTENER.
FOLD UP HEAD FLAP ANDTEMPORARILY SECUREWITH TAPE.
INSTALL WOOD BACKDAM.
STEP 4INSTALL FIRST PIECE OFADHESIVE-BACKEDFLASHING MEMBRANE.
INSTALL SECOND PIECEOF ADHESIVE BACKEDSILL FLASHINGMEMBRANE. OVERLAPPRIOR FLASHING.
INSTALL CORNERFLASHING PATCHES ATSILL.
ALTERNATE: INSTALLPREFABRICATED METALOR PLASTIC WINDOW PAN.
STEP 5INSTALL WINDOW PLUMB,LEVEL AND SQUARE PERMANUFACTURER'SINSTRUCTIONS.
PROVIDE AIR SEALING INCOMPLIANCE WITH NOTESAND MANUFACTURER'SINSTRUCTIONS.
STEP 6INSTALL ADHESIVEBACKED JAMB FLASHINGFIRST, OVERLAPPINGNAILING FIN (IFAPPLICABLE.)
INSTALL ADHESIVEBACKED HEAD FLASHING,OVERLAPPING NAILINGFIN (IF APPLICABLE) ANDJAMB FLASHING.
STEP 7FOLD DOWN HEAD HOUSEWRAP.
STEPS FOR FLASHING A FLANGED WINDOWUSING HOUSEWRAP AS A DRAINAGE PLAN
STEP 8APPLY ADHESIVE BACKEDCORNER PATCHES ATHEAD AT SEAMS AND ANYPERFORATIONS.
STEP 9INSTALL WINDOW TRIMBOARDS PER DETAILS.UNLESS NOTEDOTHERWISE, ALLSURFACES, INCLUDINGCUTS AND ENDS, TO BECOATED.
INSTALL CAP FLASHINGOVER AND PAST WINDOWTRIM.
APPLY ADHESIVE BACKEDMEMBRANE STRIP OVERFLASHING ANDFASTENERS AND EXTENDPAST FLASHING ON ENDS.
EXISTING PANEL CAN TO BE REMOVED. PROVIDE NEW 100 MAINBREAKER PANEL AT LOCATION. REFEED EXISTING KITCHEN PANEL WITHNEW 100A/2P BREAKER. PROVIDE NEW 40A/2P BREAKER TO SERVE NEWPANEL TO BE LOCATED IN CARPORT.
EXISTING ELECTRICAL PANEL TO REMAINEXISTING ELECTRICAL PANEL TO REMAIN
EXISTING ELECTRICAL FEEDER CONDUCTOR TO REMAIN
NEW 3/4"C., 3#8, 1#10 OVERHEADTO NEW PANEL IN CARPORT
CEILING MOUNTED MOTION SENSOR SWITCH (TYP. OF (3))
42"
WPMOTION
WPMOTION
WPWP
WP
aa
b
WP b
c
NOTE: ALL NEW ELECTRICAL WORK TO BE PRICED AS A DEDUCTIVE ALTERNATE
NEW 120/240V 60A FLUSH WALLMOUNTED PANEL. WITH MINIMUM SIX(6)20A/1P BREAKERS
NEW CONDUIT SHOULD BE HIDDEN FROM VIEW IN STORAGE AREA AND ABOVE FINISH CEILING