Top Banner
GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session
8

GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session.

Mar 27, 2015

Download

Documents

Ethan Pugh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session.

GEO Work Plan Symposium 2011

Days 2 & 3

Presentation of ID-02 Catalyzing Resources for GEOSS Implementation

for Plenary Session

Page 2: GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session.

ID-02 Version 0 Catalyzing Resources for GEOSS Implementation

Definition Leverage resources for Earth observation capacity

building efforts. Ensure the engagement and committed involvement of resource providers in the GEO capacity building process (Capacity Building Strategic Target).

Advocate funding of multinational projects to leverage the end-to-end value of observations including the establishment of necessary infrastructure (GEOSS 10-Year Implementation Plan, p.13).

Page 3: GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session.

Deliverables Objectives

1. Resource mobilization for capacity building – individual, institutional and infrastructure (e.g. through the implementation of the Seville Roadmap, Call for Proposals)

2. Resource mobilization for Research and Development (e.g. encourage national governments and international organizations to address GEOSS science and technology needs in their Research and Development programmes)

Priority Actions:

N/A

Leads (Members and/or Organizations, tentative):

N/A

Page 4: GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session.

Resources Available for Implementation

(current status and in planning)

• Egida (EU's FP7)• GeoNetGab (EU's FP7)

Page 5: GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session.

Issues and Gaps I

• Remove 'multinational' in order to allow both national and international contributions to be included in GEOSS

• Addressing funding and matching of resources at different levels in GEO, both at task level (concrete actions and deliverables) and higher levels (dialog between GEO and funding organization at policy and overall level)

Page 6: GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session.

Issues and Gaps II

• Handbook/document (description of a methodology) on processes for matching GEOSS needs and resources (both direct funding and coordination of existing resources) (This is a deliverable that is already funded through EGIDA project and that is answering partly the ST 09-01 task)

• Identify examples of how GEO related projects have been successfully funded – and make them available to all through web or other means

• Describe in more detail the process of funding in existing projects such as Geo NetCaB

Page 7: GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session.

Possible Measures to fill Gaps

• Ensure a [better] link between the task level (deliverables) and policy level within GEO when catalyzing resources for GEOSS implementation

Page 8: GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session.

Open for Plenary Discussion

→ Identify Synergies

→ Improve Cross-Fertilization

→ Identify Measures and Actions to Fill Gaps