ENGINE 0-LINE 1250 A B C D E F ENGINE 0-LINE 315 6115 (270 ton CAPACITY) 850 277 (7656) 3000 3733 6200 8625 3050 8000 6265 12999 1175 4732 522 21000 32140 500 5m Rail 12m Rail A B C D E F 8 1250 ENGINE 0-LINE 12m 5m 12m 5m 1000 1213 6200 1213 8625 11000 3000 3740 7000 10000 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D DESCRIPTION: DATE: CHECKED: DRAWN: REV. FORMAT: SCALE: SUBJECT: PROJ.NAME/LOCATION: CLIENT/LOCATION: DRAWING No.: Drostdy st, The Gables Cleveland PO Box 40604 Cleveland, 2022 [email protected] VANGUARD SHEET: 1/10 JH 2016/03/17 FOR INFORMATION ONLY NTS SLT 00642 - V0109 PROPOSED LIFTING PLAN GENERATOR INSTALLATION METHODOLOGY A3 0 METHODOLOGY · ASSEMBLE THE GANTRY SYSTEM. · POSITION THE LOAD UNDERNEATH THE GANTRY SYSTEM (ABOUT 500mm OFFSET FROM THE ENGINE 0 - LINE IN ORDER TO AVOID OBSTRUCTING STEEL STRUCTURES) WHEN SKIDDING DOWN THE ENGINE HALL.. · ATTACH LIFTING GEAR TO THE LOAD LIFTING POINTS.
10

Genset Installation Methodology

Jan 23, 2018

Download

Documents

Joost Heystek
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Genset Installation Methodology

EN

GIN

E 0-LIN

E

1250

A B C D E F

EN

GIN

E 0

-L

IN

E

315

6115 (270 ton C

AP

AC

IT

Y)

850

277

(7656)

3000

3733

6200

8625

3050

8000

6265

12999

1175

4732

522

21000

32140

500

5m Rail12m Rail

A B C D E F

8

1250

EN

GIN

E 0-LIN

E

1

2m

5

m

1

2m

5

m

1000

1213

6200

1213

8625

11000

3000

3740

7000 10000

1

1

2

2

3

3

4

4

5

5

6

6

A A

B B

C C

D D

DESCRIPTION:

DATE: CHECKED:DRAWN:REV.

FORMAT:SCALE:

SUBJECT:

PROJ.NAME/LOCATION:

CLIENT/LOCATION:

DRAWING No.:

Drostdy st, The Gables

Cleveland

PO Box 40604

Cleveland, 2022

[email protected]

VANGUARD SHEET:

1/10

JH2016/03/17

FOR INFORMATION ONLY

NTS

SLT 00642 - V0109

PROPOSED LIFTING PLAN

GENERATOR INSTALLATION METHODOLOGY

A3

0

METHODOLOGY

· ASSEMBLE THE GANTRY SYSTEM.

· POSITION THE LOAD UNDERNEATH THE

GANTRY SYSTEM (ABOUT 500mm OFFSET

FROM THE ENGINE 0 - LINE IN ORDER TO

AVOID OBSTRUCTING STEEL STRUCTURES)

WHEN SKIDDING DOWN THE ENGINE HALL..

· ATTACH LIFTING GEAR TO THE LOAD

LIFTING POINTS.

Page 2: Genset Installation Methodology

EN

GIN

E 0-LIN

E

1250

A B C D E F

EN

GIN

E 0

-L

IN

E

315

6215 (270 ton C

AP

AC

IT

Y)

850

277

(7656)

3740

6200

8625

3050

8000

6265

12999

1275

4732

522

A B C D E F

8

1250

EN

GIN

E 0-LIN

E

1

2m

5

m

1

2m

5

m

5m Rail12m Rail

500

1

1

2

2

3

3

4

4

5

5

6

6

A A

B B

C C

D D

DESCRIPTION:

DATE: CHECKED:DRAWN:REV.

FORMAT:SCALE:

SUBJECT:

PROJ.NAME/LOCATION:

CLIENT/LOCATION:

DRAWING No.:

Drostdy st, The Gables

Cleveland

PO Box 40604

Cleveland, 2022

[email protected]

VANGUARD SHEET:

2/10

JH2016/03/17

FOR INFORMATION ONLY

NTS

SLT 00642 - V0109

PROPOSED LIFTING PLAN

GENERATOR INSTALLATION METHODOLOGY

A3

0

METHODOLOGY

· LIFT THE LOAD TO REQUIRED HEIGHT AND

REMOVE TRAILER FROM UNDERNEATH THE

SUSPENDED LOAD.

· POSITION THE SLIDE SYSTEM

UNDERNEATH THE LOAD.

Page 3: Genset Installation Methodology

EN

GIN

E 0-LIN

E

1250

A B C D E F

EN

GIN

E 0

-L

IN

E

315

5271 (270 ton C

AP

AC

IT

Y)

850

277

(6712)

6200

8625

3050

8000

6265

12999

4732

522

3740

A B C D E F

8

1250

EN

GIN

E 0-LIN

E

5

m

1

2m

5

m

5m Rail12m Rail

1

2m

500

1

1

2

2

3

3

4

4

5

5

6

6

A A

B B

C C

D D

DESCRIPTION:

DATE: CHECKED:DRAWN:REV.

FORMAT:SCALE:

SUBJECT:

PROJ.NAME/LOCATION:

CLIENT/LOCATION:

DRAWING No.:

Drostdy st, The Gables

Cleveland

PO Box 40604

Cleveland, 2022

[email protected]

VANGUARD SHEET:

3/10

JH2016/03/17

FOR INFORMATION ONLY

NTS

SLT 00642 - V0109

PROPOSED LIFTING PLAN

GENERATOR INSTALLATION METHODOLOGY

A3

0

METHODOLOGY

· LOWER THE LOAD ONTO THE SLIDE

SYSTEM.

· REMOVE LIFTING GEAR FROM THE LOAD.

Page 4: Genset Installation Methodology

EN

GIN

E 0-LIN

E

1250

A B C D E F

EN

GIN

E 0

-L

IN

E

2500

12999

A B C D E F

8

1250

EN

GIN

E 0-LIN

E

5

m

1

2m

5

m

5m Rail12m Rail

500

332

1

1

2

2

3

3

4

4

5

5

6

6

A A

B B

C C

D D

DESCRIPTION:

DATE: CHECKED:DRAWN:REV.

FORMAT:SCALE:

SUBJECT:

PROJ.NAME/LOCATION:

CLIENT/LOCATION:

DRAWING No.:

Drostdy st, The Gables

Cleveland

PO Box 40604

Cleveland, 2022

[email protected]

VANGUARD SHEET:

4/10

JH2016/03/17

FOR INFORMATION ONLY

NTS

SLT 00642 - V0109

PROPOSED SLIDING PLAN

GENERATOR INSTALLATION METHODOLOGY

A3

0

METHODOLOGY

· MOVE THE GANTRY SYSTEM ASIDE.

· REMOVE THE OBSTRUCTING 12m RAIL.

· EXTEND THE SLIDE RAILS.

· PUSH AND SLIDE THE LOAD WITH THE

HYDRAULIC RAMS ON THE SLIDE RAILS.

Page 5: Genset Installation Methodology

EN

GIN

E 0-LIN

E

1250

A B C D E F

EN

GIN

E 0

-L

IN

E

12999

A B C D E F

1

2

1250

EN

GIN

E 0-LIN

E

500

500

35

1

1

2

2

3

3

4

4

5

5

6

6

A A

B B

C C

D D

DESCRIPTION:

DATE: CHECKED:DRAWN:REV.

FORMAT:SCALE:

SUBJECT:

PROJ.NAME/LOCATION:

CLIENT/LOCATION:

DRAWING No.:

Drostdy st, The Gables

Cleveland

PO Box 40604

Cleveland, 2022

[email protected]

VANGUARD SHEET:

5/10

JH2016/03/17

FOR INFORMATION ONLY

NTS

SLT 00642 - V0109

PROPOSED JACKING & ALIGNMENT PLAN

GENERATOR INSTALLATION METHODOLOGY

A3

0

METHODOLOGY

· SLIDE THE LOAD TO THE REQUIRED

POSITION AND ENGINE BAY.

· POSITION THE JACK AND ALIGNMENT

SYSTEM UNDERNEATH THE DESIGNATED

JACKING POINTS.

· JACK THE LOAD UP.

· REMOVE THE SLIDE RAILS FROM

UNDERNEATH THE SUSPENDED LOAD.

· LOWER THE LOAD TO A SAFE HEIGHT FOR

THE ALIGNMENT OPERATION.

Page 6: Genset Installation Methodology

EN

GIN

E 0-LIN

E

1250

A B C D E F

EN

GIN

E 0

-L

IN

E

12999

A B C D E F

1

2

1250

EN

GIN

E 0-LIN

E

0

0

0

1

1

2

2

3

3

4

4

5

5

6

6

A A

B B

C C

D D

DESCRIPTION:

DATE: CHECKED:DRAWN:REV.

FORMAT:SCALE:

SUBJECT:

PROJ.NAME/LOCATION:

CLIENT/LOCATION:

DRAWING No.:

Drostdy st, The Gables

Cleveland

PO Box 40604

Cleveland, 2022

[email protected]

VANGUARD SHEET:

6/10

JH2016/03/17

FOR INFORMATION ONLY

NTS

SLT 00642 - V0109

PROPOSED JACKING & ALIGNMENT PLAN

GENERATOR INSTALLATION METHODOLOGY

A3

0

METHODOLOGY

· SKID THE LOAD WITH THE JACK AND

ALIGNMENT SYSTEM AND ALIGN THE

ENGINE 0 - LINES.

· JACK THE LOAD DOWN TO FINAL POSITION.

· REMOVE JACK AND ALIGNMENT SYSTEM.

Page 7: Genset Installation Methodology

0

ENGINE 0-LINE

1 2 3 4 56 7 8

A

B

C

D

E

F

BAY 1 BAY 2 BAY 3 BAY 4 BAY 5 BAY 6

21000

32140

12m

5m

12m

5m

10001213 6200 1213

8625

11000

3000

3740

1

1

2

2

3

3

4

4

5

5

6

6

A A

B B

C C

D D

DESCRIPTION:DATE: CHECKED:DRAWN:REV.

FORMAT:SCALE:

SUBJECT:

PROJ.NAME/LOCATION:

CLIENT/LOCATION:

DRAWING No.:

Drostdy st, The Gables

Cleveland

PO Box 40604

Cleveland, 2022

[email protected]

VANGUARD SHEET:

7/10

JH2016/03/17

FOR INFORMATION ONLY

NTS

SLT 00642 - V0109

PROPOSED LIFTING PLAN

GENERATOR INSTALLATION METHODOLOGY

A3

0

METHODOLOGY

· PLAN VIEW REFERENCE TO PAGE 1.

Page 8: Genset Installation Methodology

0

ENGINE 0-LINE

1 2 3 4 56 7 8

A

B

C

D

E

F

BAY 1 BAY 2 BAY 3 BAY 4 BAY 5 BAY 6

5m

12m

5m

1

1

2

2

3

3

4

4

5

5

6

6

A A

B B

C C

D D

DESCRIPTION:DATE: CHECKED:DRAWN:REV.

FORMAT:SCALE:

SUBJECT:

PROJ.NAME/LOCATION:

CLIENT/LOCATION:

DRAWING No.:

Drostdy st, The Gables

Cleveland

PO Box 40604

Cleveland, 2022

[email protected]

VANGUARD SHEET:

8/10

JH2016/03/17

FOR INFORMATION ONLY

NTS

SLT 00642 - V0109

PROPOSED SLIDING PLAN

GENERATOR INSTALLATION METHODOLOGY

A3

0

METHODOLOGY

· PLAN VIEW REFERENCE TO PAGE 4.

Page 9: Genset Installation Methodology

0

ENGINE 0-LINE

1 2 3 4 56 7 8

A

B

C

D

E

F

BAY 1 BAY 2 BAY 3 BAY 4 BAY 5 BAY 6

5m

12m

5m

1

1

2

2

3

3

4

4

5

5

6

6

A A

B B

C C

D D

DESCRIPTION:DATE: CHECKED:DRAWN:REV.

FORMAT:SCALE:

SUBJECT:

PROJ.NAME/LOCATION:

CLIENT/LOCATION:

DRAWING No.:

Drostdy st, The Gables

Cleveland

PO Box 40604

Cleveland, 2022

[email protected]

VANGUARD SHEET:

9/10

JH2016/03/17

FOR INFORMATION ONLY

NTS

SLT 00642 - V0109

PROPOSED JACKING & ALIGNMENT PLAN

GENERATOR INSTALLATION METHODOLOGY

A3

0

METHODOLOGY

· PLAN VIEW REFERENCE TO PAGE 5 & 6.

Page 10: Genset Installation Methodology

0

ENGINE 0-LINE

1 2 3 4 56 7 8

A

B

C

D

E

F

BAY 1 BAY 2 BAY 3 BAY 4 BAY 5 BAY 6

1

1

2

2

3

3

4

4

5

5

6

6

A A

B B

C C

D D

DESCRIPTION:DATE: CHECKED:DRAWN:REV.

FORMAT:SCALE:

SUBJECT:

PROJ.NAME/LOCATION:

CLIENT/LOCATION:

DRAWING No.:

Drostdy st, The Gables

Cleveland

PO Box 40604

Cleveland, 2022

[email protected]

VANGUARD SHEET:

10/10

JH2016/03/17

FOR INFORMATION ONLY

NTS

SLT 00642 - V0109

GENERATOR INSTALLATION METHODOLOGY

A3

0

METHODOLOGY

· REPEAT OPERATION FOR ALL SIX ENGINES.

· ALL ENGINES IN FINAL POSITION.