1. IF ANY REMAINING SERVICES, PIPES, DUCTS, DUCT INSULATION OR EQUIPMENT ARE DAMAGED IN APPEARANCE, OR BECOMES UNSERVICEABLE DUE TO CONTRACTOR OPERATIONS, THE CONTRACTOR SHALL REPLACE WITH NEW PRODUCTS OF EQUAL CAPACITY AND QUALITY. 2. COORDINATE WITH THE CONTRACTING OFFICER FOR SCHEDULING SHUT DOWNS, OUTAGES, CAPPING, OR ANY DISCONTINUATION OF UTILITY SERVICES BEFORE PERFORMING ANY WORK. 3. COORDINATE WITH THE CONTRACTING OFFICER FOR ALL TEMPORARY PARTITIONS AND MEANS OF EGRESS RESULTING FROM DEMOLITION OPERATIONS. 4. THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER ALL DEMOLITION THAT AFFECTS OCCUPIED PORTIONS OF THE FACILITY. 5. COORDINATE WITH THE CONTRACTING OFFICER ON MEANS OF PROTECTION FOR ITEMS TO REMAIN AND ITEMS IN PATH OF WASTE REMOVAL FROM THE FACILITY. 6. NOTIFY THE CONTRACTING OFFICER OF DISCREPANCIES BETWEEN EXISTING CONDITIONS AND DRAWINGS BEFORE PROCEEDING WITH DEMOLITION. 7. DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT AS INDICATED. USE METHODS REQUIRED TO COMPLETE WORK WITHIN LIMITATIONS OF GOVERNING REGULATIONS AND AS FOLLOWS: A. HOLES IN WALLS AND FLOORS SHALL BE CUT NEATLY WITH STRAIGHT AND PLUMB EDGES. PROCEED WITH DEMOLITION SYSTEMATICALLY; NEATLY CUT OPENINGS AND HOLES PLUMB; AND SQUARE TRUE TO DIMENSIONS REQUIRED. USE CUTTING METHODS LEAST LIKELY TO DAMAGE NEW CONSTRUCTION. USE HAND TOOLS OR SMALL POWER TOOLS DESIGNED FOR SAWING OR GRINDING. THE CONTRACTOR SHALL MINIMIZE HAMMERING AND CHOPPING TO REDUCE DISTURBANCE TO ADJACENT SURFACES. TEMPORARILY COVER OPENINGS. B. CUT OR DRILL FROM THE EXPOSED OR FINISHED SIDE INTO CONCEALED SURFACES TO AVOID MARRING EXISTING FINISHED SURFACES. C. DO NOT USE CUTTING TORCHES OR GRINDING EQUIPMENT UNTIL WORK AREA IS CLEARED OF FLAMMABLE MATERIALS. AT CONCEALED SPACES, SUCH AS DUCT INTERIORS AND PIPE INTERIORS, VERIFY CONDITIONS AND CONTENTS OF HIDDEN SPACE BEFORE STARTING FLAME-CUTTING OR GRINDING OPERATIONS. MAINTAIN A FIRE WATCH AND PORTABLE FIRE- SUPPRESSION DEVICES DURING FLAME-CUTTING OR GRINDING OPERATIONS. CONTRACTOR SHALL OBTAIN ALL REQUIRED BURN PERMITS BEFORE ANY OF THIS WORK IS PERFORMED. D. MAINTAIN ADEQUATE VENTILATION WHEN USING CUTTING TORCHES AND GRINDING. E. REMOVE DECAYED, VERMIN-INFESTED, OR OTHERWISE DANGEROUS OR UNSUITABLE MATERIAL AND PROMPTLY DISPOSE OF OFF-SITE. F. DEMOLISHED MATERIAL AT ALL ELEVATIONS ABOVE FINISHED FLOOR SHALL BE LOWERED TO GROUND BY METHODS SUITABLE TO AVOID FREE FALL AND PREVENT GROUND IMPACT AND DUST GENERATION. G. AT ALL ELEVATIONS ABOVE FINISHED FLOOR, LOCATE DEMOLISHED EQUIPMENT, DEBRIS AND MATERIALS SO AS NOT TO IMPOSE EXCESSIVE LOADS ON SUPPORTING WALLS, FLOORS, ROOFS OR FRAMING. GENERAL NOTES: 8. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON-SITE. 9. DISPOSAL: TRANSPORT DEMOLISHED MATERIALS OFF PROPERTY AND LEGALLY DISPOSE OF DEBRIS. 10. CLEAN REMAINING AND ADJACENT SPACES AND STRUCTURES OF DUST, DIRT, AND DEBRIS CAUSED BY DEMOLITION OPERATIONS. 11. OBTAIN APPROVAL FROM CONTRACTING OFFICER BEFORE CUTTING. PRIOR APPROVALS DO NOT WAIVE THE OWNER'S RIGHT TO LATER REQUIRE ADDITIONAL REMOVALS AND REPLACEMENTS OF UNSATISFACTORY WORK. 12. CONTRACTOR TO PROVIDE LOCKOUT/TAGOUT PROGRAM TO ENSURE ALL IMPACTED POTENTIAL ENERGY SYTEMS INCLUDING ELECTRICAL HYRAULIC AND PNUEMATIC INFRASTRUCTURE IS DE-ENERGIZED PRIOR TO CONSTRUCTION. 13. WHERE PIPING IS REMOVED THROUGH A WALL OR FLOOR, THE REMAINING OPENINGS SHALL BE PATCHED AND SEALED. 14. REMOVE ALL PIPE SUPPORTS ASSOCIATED WITH ALL REMOVED PIPING. 15. REMOVE ALL PLUMBING FIXTURE CARRIERS AND SUPPORTS SERVING DEMOLISHED FIXTURES. 16. DOCUMENT CONDITION OF EXISTING HVAC EQUIPMENT AND ASSOCIATED COMPONENTS PRIOR TO CONSTRUCTION. FIELD MEASURE CAPACITIES AND FLOW RATES OF EXISTING AHU'S. REPORT DATA TO CONTRACTING OFFICER TO VERIFY THE PERFORMANCE REQUIREMENTS CAN BE ACHIEVED. GENERAL NOTES - RENOVATION: 1. DO NOT ROUTE ANY NEW WET PIPING ABOVE ELECTRICAL, COMMUNICATION OR CLEAN WORK AREAS. 2. ALL WORK SHALL BE IN ACCORDANCE WITH UFC 3-410-01 AND UFC 3-401-01. 3. PROVIDE AIR FOIL TURNING VANES ON ALL NEW DUCT 90 DEGREE ELBOWS. 4. ALL EXISTING CONDITIONS AS INDICATED ARE APPROXIMATIONS OF ACTUAL CONDITIONS. VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO STARTING WORK. 5. WHEREVER EXISTING SYSTEMS ARE ALTERED, EXTENDED, OR PARTS THEY ARE OF ABANDONED, MAINTAIN, IN GOOD OPERATING CONDITION, THE INTEGRITY OF THE REMAINING SYSTEM, OR PARTS THEREOF. 6. COORDINATE ALL MECHANICAL WORK & EQUIPMENT WITH STRUCTURAL MEMBERS, ELECTRICAL WORK AND FIXTURES, ALL OTHER TRADES AND ALL EXISTING CONDITIONS. 7. CONTRACTOR SHALL INCLUDE AN ALLOWANCE FOR REPLACEMENT OF UP TO 5% OF THE SUPPLY AIR DUCTWORK SHOWN AND UP TO 10% OF THE SUPPLY AIR DUCTWORK INSULATION AS NECESSARY TO REPAIR ISOLATED AREAS WHERE DUCT AND/OR INSULATION MAY HAVE BEEN DAMAGED PRIOR TO CONTRACT. INSULATION REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH ASBESTOS HANDLING SPECIFICATIONS. 8. PROVIDE ACCESS DOORS IN NEW DUCTWORK TO SERVICE DEVICES WITHIN DUCTS NOT OTHERWISE ACCESSIBLE THROUGH GRILLES / DIFFUSERS OR OPEN DUCT. 9. PROVIDE ACCESS DOORS IN INACCESSIBLE CEILINGS TO ACCESS MECHANICAL DEVICES ABOVE CEILINGS NOT OTHERWISE ACCESSIBLE FOR NEW WORK. 10. DUCT SHALL BE FABRICATED PER SMACNA-HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE. 11. PROVIDE INSULATED TRAPPED CONDENSATION DRAIN PIPING, WITH AIR GAPS, FROM COOLING COIL DRAIN PANS TO FLOOR DRAIN, ROOF DRAIN, OR OTHER TERMINATION AS SHOWN ON DRAWINGS. 12. PROVIDE ALL HVAC AND PLUMBING EQUIPMENT AS PER MANUFACTURER REQUIREMENTS AND DIVISION 23 SPECIFICATIONS. 13. DETERMINE FINAL LOCATIONS AND ORIENTATION OF ALL EQUIPMENT IN THE FIELD. 14. COORDINATE FINAL EQUIPMENT/FIXTURE LOCATIONS WITH THE GENERAL CONTRACTOR. LOCATIONS AS INDICATED ON THE DRAWINGS ARE APPROXIMATE AND MUST BE FIELD VERIFIED. 15. PROVIDE NEW MANUAL AIR VENTS AT ALL NEW HIGH SYSTEM POINTS & DRAIN VALVES. 16. FIRESTOP/SMOKESTOP ALL NEW PIPE PENETRATIONS THROUGH FIRE/SMOKE RATED ASSEMBLIES TO MAINTAIN THE INTEGRITY OF THE ASSEMBLY. 17. FOR NEW CONNECTION PROVIDE FLANGED PIPING CONNECTIONS AT COILS TO ALLOW FOR TUBE/COIL REMOVAL/REINSTALLATION. 18. ALL NEW CONDENSATE DRAIN AND NEW FLOOR DRAIN PIPING SHALL HAVE A MINIMUM SLOPE OF 1/8" PER 12" RUN. 19. ALL MECHANICAL PENETRATIONS THROUGH PRESSURE BOUNDARIES SHALL BE CAULKED AND SEALED TO MINIMIZE LOSS OF SPACE PRESSURIZATION. 20. CLEANING: ALL EXISTING AND GRILLES AND REGISTERS SHALL BE CLEANED OF ALL VISIBLE DIRT AND DEBRIS. SURFACE SHALL BE WIPED "VISUAL CLEAN" WITH LINT FREE CLOTH AND ISOPROPYL ALCOHOL. 21. FIRE DAMPER SHALL BE PROVIDED AT ALL POINTS WHERE THE DUCTWORK PENETRATES A FIRE BARRIER OF MORE THAN A ONE-HOUR RATING UNLESS OTHERWISE INDICATED ON THE DRAWINGS. 22. ALL STEEL SHAPES (FABRICATIONS) SHALL CONFORM TO ASTM-A-3C AND ALL SHARP EDGES SHALL BE ROUNDED. ALL BURRS SHALL BE REMOVED. 23. REFER TO DIVISION 26 SPECIFICATIONS FOR ALL BONDING AND GROUNDING REQUIREMENTS. 24. REFER TO DIVISION 23 SPECIFICATIONS FOR ALL WELDING AND COATING REQUIREMENTS. 25. PROVIDE LABOR, MATERIALS, TOOLS, EQUIPMENT, AND DEVICES NECESSARY TO PROVIDE COMPLETE AND OPERATIONAL SYSTEMS IN ACCORDANCE WITH THE INTENT OF THE CONTRACT DRAWINGS. FULLY TEST, BALANCE, CLEAN, AND LEAVE SYSTEMS IN A COMPLETE AND OPERATIONAL STATUS. 26. ALL MATERIALS SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER WITH THE COORDINATION OF ALL INVOLVED TRADES. 27. ALL MATERIALS AND EQUIPMENT PROVIDED SHALL BE NEW, SHALL BE U.L. LISTED WHERE APPLICABLE, AND SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDATIONS WITH ADEQUATE MAINTENANCE CLEARANCES. PROVIDE SUBMITTALS AS INDICATED ON THE SUBMITTAL SCHEDULE. 28. EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE CONTRACT DRAWINGS ARE TO ESTABLISH THE SPECIFIED STANDARD OF QUALITY AND TO PROVIDE THE REQUIRED TYPE(S), SIZE(S), AND CONFIGURATION. 29. EXCEPT WHERE INDICATED IN DIMENSIONAL DETAIL, THE LOCATIONS OF PLUMBING, MECHANICAL EQUIPMENT, PIPING, AND FITTINGS ARE APPROXIMATE. EXACT LOCATIONS SHALL BE DETERMINED BY THE CONTRACTOR AND SHALL BE COORDINATED WITH ALL APPLICABLE TRADES. 30. EXTERIOR PAINT IS ASSUMED TO CONTAIN HEAVY METALS. PROPER PPE MUST BE WORN IF ADDITIONAL OPENINGS ARE MADE INTO EXTERIOR CMU WALLS. DISPOSAL OF HAZARDOUS WASTE SHALL BE IN ACCORDANCE WITH OSHA RULES AND REGULATIONS AND SPECIFICATION SECTION 02 82 33.13 20. 31. HANGERS FOR ALL COPPER PIPING SHALL BE PLASTIC-COATED TYPE. 32. CONFIRM LOCATION AND ELEVATION OF ALL CROSSING LINES PRIOR TO INSTALLING ANY PIPE. ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER. 33. FIELD VERIFY ALL EXISTING PIPE SIZES AND LOCATIONS. NEW TO EXISTING CONNECTIONS SHALL BE MADE USING THE SAME PIPE SIZE AS EXISTING (UNLESS NOTED OTHERWISE). 34. WHERE PIPING IS ROUTED THROUGH A WALL OR FLOOR, THE OPENINGS SHALL BE SEALED AND THE PIPES PROTECTED ACCORDING TO THE SPECIFICATIONS. SHEET IDENTIFICATION 1 2 3 4 5 D C B A SHEET OF 45TH SPACE WING CCAFS, FL CONTRACT NO.: DRAWN BY: DESIGN BY: SBMT BY: SIZE: FILE NAME: ISSUE DATE: CONTRACT NO.: DELIVERY ORDER NO.: CKD BY: 22" x 34" FILE NUMBER: PLOT SCALE: PLOT DATE: TRACES TECHNICAL RANGE ARCHITECTURAL ENGINEERING SERVICES AA0002809 rhodes + brito A R C H I T E C T S 1/8" = 1'-0" 8 / 2 9 / 2 0 1 9 2 : 3 5 : 0 9 P M ER STARS RELOCATION M-001 0 MECHANICAL GENERAL NOTES DBEH 18-1690 E M-001- FA2521-18D-0002 August 30, 2019 FA252119FA126 FA2521-18D-0002 R. SPEELER G. CLINE RR R. FAUTH
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1. IF ANY REMAINING SERVICES, PIPES, DUCTS, DUCT INSULATION OR EQUIPMENT ARE DAMAGED IN APPEARANCE, OR BECOMES UNSERVICEABLE DUE TO CONTRACTOR OPERATIONS, THE CONTRACTOR SHALL REPLACE WITH NEW PRODUCTS OF EQUAL CAPACITY AND QUALITY.
2. COORDINATE WITH THE CONTRACTING OFFICER FOR SCHEDULING SHUT DOWNS, OUTAGES, CAPPING, OR ANY DISCONTINUATION OF UTILITY SERVICES BEFORE PERFORMING ANY WORK.
3. COORDINATE WITH THE CONTRACTING OFFICER FOR ALL TEMPORARY PARTITIONS AND MEANS OF EGRESS RESULTING FROM DEMOLITION OPERATIONS.
4. THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER ALL DEMOLITION THAT AFFECTS OCCUPIED PORTIONS OF THE FACILITY.
5. COORDINATE WITH THE CONTRACTING OFFICER ON MEANS OF PROTECTION FOR ITEMS TO REMAIN AND ITEMS IN PATH OF WASTE REMOVAL FROM THE FACILITY.
6. NOTIFY THE CONTRACTING OFFICER OF DISCREPANCIES BETWEEN EXISTING CONDITIONS AND DRAWINGS BEFORE PROCEEDING WITH DEMOLITION.
7. DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT AS INDICATED. USE METHODS REQUIRED TO COMPLETE WORK WITHIN LIMITATIONS OF GOVERNING REGULATIONS AND AS FOLLOWS:
A. HOLES IN WALLS AND FLOORS SHALL BE CUT NEATLY WITH STRAIGHT AND PLUMB EDGES. PROCEED WITH DEMOLITION SYSTEMATICALLY; NEATLY CUT OPENINGS AND HOLES PLUMB; AND SQUARE TRUE TO DIMENSIONS REQUIRED. USE CUTTING METHODS LEAST LIKELY TO DAMAGE NEW CONSTRUCTION. USE HAND TOOLS OR SMALL POWER TOOLS DESIGNED FOR SAWING OR GRINDING. THE CONTRACTOR SHALL MINIMIZE HAMMERING AND CHOPPING TO REDUCE DISTURBANCE TO ADJACENT SURFACES. TEMPORARILY COVER OPENINGS.
B. CUT OR DRILL FROM THE EXPOSED OR FINISHED SIDE INTO CONCEALED SURFACES TO AVOID MARRING EXISTING FINISHED SURFACES.
C. DO NOT USE CUTTING TORCHES OR GRINDING EQUIPMENT UNTIL WORK AREA IS CLEARED OF FLAMMABLE MATERIALS. AT CONCEALED SPACES, SUCH AS DUCT INTERIORS AND PIPE INTERIORS, VERIFY CONDITIONS AND CONTENTS OF HIDDEN SPACE BEFORE STARTING FLAME-CUTTING OR GRINDING OPERATIONS. MAINTAIN A FIRE WATCH AND PORTABLE FIRE-SUPPRESSION DEVICES DURING FLAME-CUTTING OR GRINDING OPERATIONS. CONTRACTOR SHALL OBTAIN ALL REQUIRED BURN PERMITS BEFORE ANY OF THIS WORK IS PERFORMED.
D. MAINTAIN ADEQUATE VENTILATION WHEN USING CUTTING TORCHES AND GRINDING.
E. REMOVE DECAYED, VERMIN-INFESTED, OR OTHERWISE DANGEROUS OR UNSUITABLE MATERIAL AND PROMPTLY DISPOSE OF OFF-SITE.
F. DEMOLISHED MATERIAL AT ALL ELEVATIONS ABOVE FINISHED FLOOR SHALL BE LOWERED TO GROUND BY METHODS SUITABLE TO AVOID FREE FALL AND PREVENT GROUND IMPACT AND DUST GENERATION.
G. AT ALL ELEVATIONS ABOVE FINISHED FLOOR, LOCATE DEMOLISHED EQUIPMENT, DEBRIS AND MATERIALS SO AS NOT TO IMPOSE EXCESSIVE LOADS ON SUPPORTING WALLS, FLOORS, ROOFS OR FRAMING.
GENERAL NOTES:
8. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON-SITE.
9. DISPOSAL: TRANSPORT DEMOLISHED MATERIALS OFF PROPERTY AND LEGALLY DISPOSE OF DEBRIS.
10. CLEAN REMAINING AND ADJACENT SPACES AND STRUCTURES OF DUST, DIRT, AND DEBRIS CAUSED BY DEMOLITION OPERATIONS.
11. OBTAIN APPROVAL FROM CONTRACTING OFFICER BEFORE CUTTING. PRIOR APPROVALS DO NOT WAIVE THE OWNER'S RIGHT TO LATER REQUIRE ADDITIONAL REMOVALS AND REPLACEMENTS OF UNSATISFACTORY WORK.
12. CONTRACTOR TO PROVIDE LOCKOUT/TAGOUT PROGRAM TO ENSURE ALL IMPACTED POTENTIAL ENERGY SYTEMS INCLUDING ELECTRICAL HYRAULIC AND PNUEMATIC INFRASTRUCTURE IS DE-ENERGIZED PRIOR TO CONSTRUCTION.
13. WHERE PIPING IS REMOVED THROUGH A WALL OR FLOOR, THE REMAINING OPENINGS SHALL BE PATCHED AND SEALED.
14. REMOVE ALL PIPE SUPPORTS ASSOCIATED WITH ALL REMOVED PIPING.
15. REMOVE ALL PLUMBING FIXTURE CARRIERS AND SUPPORTS SERVING DEMOLISHED FIXTURES.
16. DOCUMENT CONDITION OF EXISTING HVAC EQUIPMENT AND ASSOCIATED COMPONENTS PRIOR TO CONSTRUCTION. FIELD MEASURE CAPACITIES AND FLOW RATES OF EXISTING AHU'S. REPORT DATA TO CONTRACTING OFFICER TO VERIFY THE PERFORMANCE REQUIREMENTS CAN BE ACHIEVED.
GENERAL NOTES - RENOVATION:1. DO NOT ROUTE ANY NEW WET PIPING ABOVE ELECTRICAL, COMMUNICATION OR CLEAN
WORK AREAS.
2. ALL WORK SHALL BE IN ACCORDANCE WITH UFC 3-410-01 AND UFC 3-401-01.
3. PROVIDE AIR FOIL TURNING VANES ON ALL NEW DUCT 90 DEGREE ELBOWS.
4. ALL EXISTING CONDITIONS AS INDICATED ARE APPROXIMATIONS OF ACTUAL CONDITIONS. VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO STARTING WORK.
5. WHEREVER EXISTING SYSTEMS ARE ALTERED, EXTENDED, OR PARTS THEY ARE OF ABANDONED, MAINTAIN, IN GOOD OPERATING CONDITION, THE INTEGRITY OF THE REMAINING SYSTEM, OR PARTS THEREOF.
6. COORDINATE ALL MECHANICAL WORK & EQUIPMENT WITH STRUCTURAL MEMBERS, ELECTRICAL WORK AND FIXTURES, ALL OTHER TRADES AND ALL EXISTING CONDITIONS.
7. CONTRACTOR SHALL INCLUDE AN ALLOWANCE FOR REPLACEMENT OF UP TO 5% OF THE SUPPLY AIR DUCTWORK SHOWN AND UP TO 10% OF THE SUPPLY AIR DUCTWORK INSULATION AS NECESSARY TO REPAIR ISOLATED AREAS WHERE DUCT AND/OR INSULATION MAY HAVE BEEN DAMAGED PRIOR TO CONTRACT. INSULATION REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH ASBESTOS HANDLING SPECIFICATIONS.
8. PROVIDE ACCESS DOORS IN NEW DUCTWORK TO SERVICE DEVICES WITHIN DUCTS NOT OTHERWISE ACCESSIBLE THROUGH GRILLES / DIFFUSERS OR OPEN DUCT.
9. PROVIDE ACCESS DOORS IN INACCESSIBLE CEILINGS TO ACCESS MECHANICAL DEVICES ABOVE CEILINGS NOT OTHERWISE ACCESSIBLE FOR NEW WORK.
10. DUCT SHALL BE FABRICATED PER SMACNA-HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE.
11. PROVIDE INSULATED TRAPPED CONDENSATION DRAIN PIPING, WITH AIR GAPS, FROM COOLING COIL DRAIN PANS TO FLOOR DRAIN, ROOF DRAIN, OR OTHER TERMINATION AS SHOWN ON DRAWINGS.
12. PROVIDE ALL HVAC AND PLUMBING EQUIPMENT AS PER MANUFACTURER REQUIREMENTS AND DIVISION 23 SPECIFICATIONS.
13. DETERMINE FINAL LOCATIONS AND ORIENTATION OF ALL EQUIPMENT IN THE FIELD.
14. COORDINATE FINAL EQUIPMENT/FIXTURE LOCATIONS WITH THE GENERAL CONTRACTOR. LOCATIONS AS INDICATED ON THE DRAWINGS ARE APPROXIMATE AND MUST BE FIELD VERIFIED.
15. PROVIDE NEW MANUAL AIR VENTS AT ALL NEW HIGH SYSTEM POINTS & DRAIN VALVES.
16. FIRESTOP/SMOKESTOP ALL NEW PIPE PENETRATIONS THROUGH FIRE/SMOKE RATED ASSEMBLIES TO MAINTAIN THE INTEGRITY OF THE ASSEMBLY.
17. FOR NEW CONNECTION PROVIDE FLANGED PIPING CONNECTIONS AT COILS TO ALLOW FOR TUBE/COIL REMOVAL/REINSTALLATION.
18. ALL NEW CONDENSATE DRAIN AND NEW FLOOR DRAIN PIPING SHALL HAVE A MINIMUM SLOPE OF 1/8" PER 12" RUN.
19. ALL MECHANICAL PENETRATIONS THROUGH PRESSURE BOUNDARIES SHALL BE CAULKED AND SEALED TO MINIMIZE LOSS OF SPACE PRESSURIZATION.
20. CLEANING: ALL EXISTING AND GRILLES AND REGISTERS SHALL BE CLEANED OF ALL VISIBLE DIRT AND DEBRIS. SURFACE SHALL BE WIPED "VISUAL CLEAN" WITH LINT FREE CLOTH AND ISOPROPYL ALCOHOL.
21. FIRE DAMPER SHALL BE PROVIDED AT ALL POINTS WHERE THE DUCTWORK PENETRATES A FIRE BARRIER OF MORE THAN A ONE-HOUR RATING UNLESS OTHERWISE INDICATED ON THE DRAWINGS.
22. ALL STEEL SHAPES (FABRICATIONS) SHALL CONFORM TO ASTM-A-3C AND ALL SHARP EDGES SHALL BE ROUNDED. ALL BURRS SHALL BE REMOVED.
23. REFER TO DIVISION 26 SPECIFICATIONS FOR ALL BONDING AND GROUNDING REQUIREMENTS.
24. REFER TO DIVISION 23 SPECIFICATIONS FOR ALL WELDING AND COATING REQUIREMENTS.
25. PROVIDE LABOR, MATERIALS, TOOLS, EQUIPMENT, AND DEVICES NECESSARY TO PROVIDE COMPLETE AND OPERATIONAL SYSTEMS IN ACCORDANCE WITH THE INTENT OF THE CONTRACT DRAWINGS. FULLY TEST, BALANCE, CLEAN, AND LEAVE SYSTEMS IN A COMPLETE AND OPERATIONAL STATUS.
26. ALL MATERIALS SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER WITH THE COORDINATION OF ALL INVOLVED TRADES.
27. ALL MATERIALS AND EQUIPMENT PROVIDED SHALL BE NEW, SHALL BE U.L. LISTED WHERE APPLICABLE, AND SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDATIONS WITH ADEQUATE MAINTENANCE CLEARANCES. PROVIDE SUBMITTALS AS INDICATED ON THE SUBMITTAL SCHEDULE.
28. EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE CONTRACT DRAWINGS ARE TO ESTABLISH THE SPECIFIED STANDARD OF QUALITY AND TO PROVIDE THE REQUIRED TYPE(S), SIZE(S), AND CONFIGURATION.
29. EXCEPT WHERE INDICATED IN DIMENSIONAL DETAIL, THE LOCATIONS OF PLUMBING, MECHANICAL EQUIPMENT, PIPING, AND FITTINGS ARE APPROXIMATE. EXACT LOCATIONS SHALL BE DETERMINED BY THE CONTRACTOR AND SHALL BE COORDINATED WITH ALL APPLICABLE TRADES.
30. EXTERIOR PAINT IS ASSUMED TO CONTAIN HEAVY METALS. PROPER PPE MUST BE WORN IF ADDITIONAL OPENINGS ARE MADE INTO EXTERIOR CMU WALLS. DISPOSAL OF HAZARDOUS WASTE SHALL BE IN ACCORDANCE WITH OSHA RULES AND REGULATIONS AND SPECIFICATION SECTION 02 82 33.13 20.
31. HANGERS FOR ALL COPPER PIPING SHALL BE PLASTIC-COATED TYPE.
32. CONFIRM LOCATION AND ELEVATION OF ALL CROSSING LINES PRIOR TO INSTALLING ANY PIPE. ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER.
33. FIELD VERIFY ALL EXISTING PIPE SIZES AND LOCATIONS. NEW TO EXISTING CONNECTIONS SHALL BE MADE USING THE SAME PIPE SIZE AS EXISTING (UNLESS NOTED OTHERWISE).
34. WHERE PIPING IS ROUTED THROUGH A WALL OR FLOOR, THE OPENINGS SHALL BE SEALED AND THE PIPES PROTECTED ACCORDING TO THE SPECIFICATIONS.
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
45
TH
SP
AC
E W
ING
CC
AF
S, F
L
CO
NT
RA
CT
NO
.:
DR
AW
N B
Y:
DE
SIG
N B
Y:
SB
MT
BY
:
SIZ
E:
FIL
E N
AM
E:
ISS
UE
DA
TE
:
CO
NT
RA
CT
NO
.:
DE
LIV
ER
Y O
RD
ER
NO
.:C
KD
BY
:
22
" x 3
4"
FIL
E N
UM
BE
R:
PL
OT
SC
ALE
:
PL
OT
DA
TE
:
TR
AC
ES
TE
CH
NIC
AL R
AN
GE
AR
CH
ITE
CT
UR
AL E
NG
INE
ER
ING
SE
RV
ICE
S
AA
0002809
rhode
s +
brito
A
R
C
H
I T
E
C
T
S
1/8
" =
1'-0
"
8/2
9/2
019
2:3
5:0
9 P
M
ER
ST
AR
S R
EL
OC
AT
ION
M-0010
ME
CH
AN
ICA
L G
EN
ER
AL
NO
TE
S
DB
EH
18-1
690
E M
-001-
FA
25
21-1
8D
-0002
Au
gu
st
30
, 2
01
9
FA
25
21
19
FA
12
6
FA
25
21
-18D
-000
2
R.
SP
EE
LE
R
G. C
LIN
E
RR
R.
FA
UT
H
ABBREVIATIONS:
V
VOLTS, VOLTAGE
ODP OPEN DRIP PROOF
TEFC TOTALLY ENCLOSED FAN COOLED
TOTALLY ENCLOSED AIR OVERTEAO
ELEC ELECTRIC, ELECTRICAL
SHEETSHT
OUTSIDE AIR LOUVEROAL
TRANSFER AIR GRILLETAG
FIRE ALARM CONTROL PANELFACP
FAS FIRE ALARM SYSTEM
SEC SECOND
NOT IN CONTRACTNIC
NC NOISE CRITERIA
HVAC HEATING, VENTILATION AND AIR CONDITIONING
AMERICAN SOCIETY OF MECHANICAL ENGINEERSASME
AND AIR CONDITIONING ENGINEERS
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION,
CONTRACTORS' NATIONAL ASSOCIATION
SHEET METAL AND AIR CONDITIONINGSMACNA
RH RELATIVE HUMIDITY
SEER SEASONAL ENERGY EFFICIENCY RATIO
ACCESS PANELAP
AF AIRFOIL
PRV PRESSURE REDUCING VALVE
BUILDING AUTOMATION SYSTEMBAS
BYPASSBYP
BPV BYPASS VALVE
BACKFLOW PREVENTERBFP
BTUH BRITISH THERMAL UNIT PER HOUR
DP DIFFERENTIAL PRESSURE
SUPPLY AIR TEMPERATURESAT
SS
RETURN AIR TEMPERATURERAT
OAT OUTSIDE AIR TEMPERATURE
FPS FEET PER SECOND
FCU FAN COIL UNIT
POTABLE WATERPW
TYPICALTYP
VARIABLE FREQUENCY DRIVEVFD
OUTSIDE AIR UNITOAU
RETURN REGISTERRR
EQUIPMENTEQUIP
DIFFERENTIALDIFF
MIN
HEAT EXCHANGERHX
FLOORFLR
DIRECT EXPANSIONDX
ACCESS DOORAD
BACKWARDLY INCLINEDBI
BOTTOM OF PIPEBOP
BRITISH THERMAL UNITBTU
AIR HANDLERAH
ABOVE FINISHED GRADEAFG
AIR CONDITIONERAC
AIR CONDITIONINGA/C
REF REFRIGERANT
CR CEILING REGISTER
1000 BRITISH THERMAL UNITS PER HOUR
MAKE-UP AIR UNIT
NATIONAL ELECTRIC CODE
NORMALLY OPEN
NATIONAL FIRE PROTECTION ASSOCIATION
MINIMUM CIRCUIT AMPACITY
NORMALLY CLOSED
POINT OF CONNECTION
RETURN AIR GRILLE
PRESSURE DROP
STATIC PRESSURE
REVOLUTION PER MINUTE
RATED LOAD AMPS
POUNDS PER SQUARE INCH
STAINLESS STEEL
VARIABLE AIR VOLUME
TOTAL STATIC PRESSURE
TOTAL SENSIBLE HEAT
OUTSIDE AIROA
EXHAUST FAN
EFFICIENCY
FLOOR DRAIN
FACE AREA
FLEXIBLE
FLANGE
FEET
FORWARD CURVE
ENTERING WATER TEMPERATURE
ENERGY EFFICIENCY RATIO
EXTERNAL STATIC PRESSURE
DEGREES FAHRENHEIT
GALVANIZED
HORSEPOWER
HERTZ
INCHES
GALLONS PER MINUTE
HZ
IN
HP
GALV
GPM
°F
FLEX
FLG
FT
FLD
FC
FA
EFF
ESP
EWT
EER
EF
VAV
TSTAT THERMOSTAT
ROOMRM
TSP
TSH
TEMP
STL
SP
RPM
SA
TEMPERATURE
STEEL
SUPPLY AIR
RG
RLA
PSI
RA
POC
PH
PD
OC
RETURN AIR
ON CENTER
PHASE
CAPACITY
CHILLED WATER
CONNECTION
CONTINUE
DRY BULB
DIAMETER
CENTRIFUGAL
AIR HANDLING UNIT
AUTOMATIC FLOW CONTROL VALVE
BOTTOM OF DUCT
BRAKE HORSEPOWER
CUBIC FEET PER MINUTE
DIRECT DIGITAL CONTROL
DRAWING
DOWN
DB
DDC
DIA
DWG
DN
CHW
CONT
CONN
BOD
CAP
CFM
CENTRI
AFCV
BHP
AHU
MECHANICALMECH
NFPA
NTE
NOM
NO
NEC
NC
NOT TO EXCEED
NOMINAL
MINIMUM
MAU
MCA
MBH
MAT MIXED AIR TEMPERATURE
VERTICAL DRAW THRUVDT
CW COLD WATER
EX EXISTING
SF SUPPLY FAN
W
WATT(S)
W/ WITH
LEAK DETECTION SENSOR
LEAVING AIR TEMPERATURE
LDS
LAT
PUMPED CONDENSATEPC
SCHEDULESCH
DOOR GRILLEDG
DOOR LOUVERDL
SD SUPPLY DIFFUSER
EXISTING TO REMAINETR
CHILLED WATER SUPPLY / RETURNCHWS/R
EXST EXISTING
CONTRACTOR FURNISHED,CFCI
FAN POWERED BOXFPB
HVIP HYPER VENT INTERFACE PANEL
HWS/R HEATING WATER SUPPLY / RETURN
REG REGULATION
TS TEMPERATURE SENSOR
VACUUMVAC
EYE WASH SHOWEREWS
CSD CEILING SUPPLY DIFFUSER
OD OUTER DUCT
INSIDE DIMENSIONID
CONCRETECONC
DIVISIONDIV
KILOWATTSKW
POUNDS PER SQUARE INCH GAUGEPSIG
STANDARD CUBIC FEET PER MINUTESCFM
TEMPERATURE DRYBULBTDB
SEN SENSIBLE
FEET PER MINUTEFPM
REQ REQUIRED
QUICK DISCONNECTQD
NTS NOT TO SCALE
CONTRACTOR INSTALLED
DPIT DIFFERENTIAL PRESSURE INDICATING TRANSMITTER
FIRE PROTECTIONFP
ABOVE FINISHED FLOORAFF
TEST ADJUST AND BALANCETAB
CONDENSATE DRAINCD
DAMPERDAMP
EXISTING(E)
ENERGY MANAGEMENT CONTROL SYSTEMEMCS
MAX MAXIMUM
PRESS PRESSURE
RC REHEAT COIL
V
VOLTS ALTERNATING CURRENTVAC
W
HIGH PRESSUREHP
LOW PRESSURE LP
SUMP PUMPSP
FR FILTER-REGULATOR
PNEUMATICPN
EXIST EXISTING
REVERSE OSMOSISRO
FIC FACILITY INTERFACE CABINET
ACOUSTICAL CEILING TILEACT
TRANSFER DUCTTD
TOTAL DYNAMIC HEADTDH
NPT NATIONAL PIPE THREAD
DENOTE NEW(N)
CRAC COMPUTER ROOM AIR CONDITIONER
DATA REDUCTION CENTERDRC
PERCENTPCT
REMOTE SENSORRS
PS PRESSURE SENSOR
DISCHARGE AIT TEMPERATUREDAT
ROOFTOP UNITRTU
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
45
TH
SP
AC
E W
ING
CC
AF
S, F
L
CO
NT
RA
CT
NO
.:
DR
AW
N B
Y:
DE
SIG
N B
Y:
SB
MT
BY
:
SIZ
E:
FIL
E N
AM
E:
ISS
UE
DA
TE
:
CO
NT
RA
CT
NO
.:
DE
LIV
ER
Y O
RD
ER
NO
.:C
KD
BY
:
22
" x 3
4"
FIL
E N
UM
BE
R:
PL
OT
SC
ALE
:
PL
OT
DA
TE
:
TR
AC
ES
TE
CH
NIC
AL R
AN
GE
AR
CH
ITE
CT
UR
AL E
NG
INE
ER
ING
SE
RV
ICE
S
AA
0002809
rhode
s +
brito
A
R
C
H
I T
E
C
T
S
12
" =
1'-0"
8/2
9/2
019
2:3
5:1
0 P
M
ER
ST
AR
S R
EL
OC
AT
ION
M-0020
ME
CH
AN
ICA
L A
BB
RE
VIA
TIO
NS
DB
EH
18
-16
90
M-0
02-
FA
25
21-1
8D
-0002
Au
gu
st
30
, 2
01
9
FA
25
21
19
FA
12
6
FA
25
21
-18D
-000
2
R.
SP
EE
LE
R
G. C
LIN
E
RR
R.
FA
UT
H
INDICATES PIPING OR EQUIPMENT
TO BE REMOVED
DUCT TO BE DEMOLISHED
LINEWORK INDICATES
NEW PIPING OR EQUIPMENT
SYMBOL ABBR DESCRIPTION
DESCRIPTIONSYMBOL ABBR
CHILLED WATER SUPPLYCHSCHS
CHILLED WATER RETURNCHRCHRCALIBRATED BALANCING VALVECBV
SHUTOFF VALVE (AS SPECIFIED FOR PIPING SYSTEM)
COMBINATION BALANCING/SHUTOFF VALVEBSV
BUTTERFLY VALVEBFV
PRESSURE GAUGEPG
THERMOMETERTH
PRESSURE SWITCHPR SW
Y-TYPE STRAINERSTR
FLOW MEASUREMENT STATIONFMS
3-WAY MODULATING CONTROL VALVE W/ACTUATORACV
MODULATING CONTROL VALVE W/ ACTUATORACV
TEST PLUGTP
FLOW SWITCHFL SW
UNION
CHECK VALVECKV
SOLENOID VALVE (TWO-POSITION W/ ACTUATOR)SOL VA
GLOBE VALVEGLV
BALL VALVEBV
MANUAL AIR VENT
SYMBOL ABBR DESCRIPTION
PUMP (DIAGRAM)
FLEXIBLE CONNECTOR
CAP PIPE END CAP
PIPE TURNING DOWN OR AWAY
PIPE TURNING UP OR TOWARD
PIPE TURNING DOWN OR AWAY (TEE)
PIPE CONNECTION
DIRECTION OF FLOW
LIGHT LINEWORK INDICATES
EXISTING PIPING OR EQUIPMENT
REDUCER
FLANGES
PIPE SLEEVE or ALIGNMENT GUIDES
PIPE ANCHOR
PC PC PUMPED CONDENSATE
PIPING LEGEND
AIR DISTRIBUTION LEGEND
(UNLESS NOTED OTHERWISE)
END OF DUCT WITH CAP
SQUARE TO ROUND TRANSITION
ECCENTRIC DUCT TRANSITION
RECTANGULAR DUCT SIZE IN INCHES
EXISTING DUCT
CONCENTRIC DUCT TRANSITION
BACKDRAFT DAMPER
18x12FIRST SIZE LISTED IS SIDE SHOWN
ROUND DUCT SIZE IN INCHES18"ø
MAV
GENERAL LEGENDDESCRIPTIONSYMBOL SYMBOL ABBR DESCRIPTION
DETAIL SYMBOL:
IDENTIFYING NUMBERA =
SHEET WHERE DETAIL IS SHOWNB =
SECTION SYMBOL:
SHEET WHERE SECTION IS SHOWN
IDENTIFYING LETTER
B
A
=
=
B
A
A
H
T
HUMIDISTAT/HUMIDITY SENSOR (WALL MOUNTED)
(WALL MOUNTED)
H'STAT/HS
T'STAT
TITLE SYMBOL ON SHEET WHERESHOWN:A = IDENTIFYING NUMBER/LETTER
SD-1
800
REVISION CLOUD ANDREVISION NUMBER
EQUIPMENT IDENTIFICATION
(REFER TO SCHEDULES)
CFM
CEILING SUPPLY DIFFUSER. REFER TO SUPPLY DIFFUSER SCHEDULE FOR ADDITIONAL INFORMATION.
CEILING GRILLE (RETURN OR TRANSFER) REFER TO RETURN REGISTE SCHEDULE FOR ADDITIONAL INFORMATION.
CEILING EXHAUST GRILLE. REFER TO DIFFUSERAND GRILLE SCHEDULE FOR ADDITIONAL INFORMATION.
B
A
SHEET WHERE SECTION IS FROMB =
A
B
POINT OF CONNECTION
H
T
HUMIDISTAT (DUCT MOUNTED)
THERMOSTAT (DUCT MOUNTED)
AAV AUTOMATIC AIR VENT
POC
P PRESSURE SENSOR PORT
NEEDLE VALVE
R
RELOCATE
B
A
ELEVATION SYMBOL:
SHEET WHERE SECTION IS SHOWN
IDENTIFYING LETTER
B
A
=
=
SMOKE DETECTORSD
HOSE, MALE, CONNECTION
THERMOSTAT / TEMPERATURE SENSOR
POINT OF DISCONNECTION
AFCV AUTOMATIC FLOW CONTROL VALVE
TO BE DEMOLISHED AND REMOVED
PODBALANCING DAMPER
MOTORIZED (RESETABLE) FIRE DAMPER
TS REMOTE TEMPERATURE SENSOR
M
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
45
TH
SP
AC
E W
ING
CC
AF
S, F
L
CO
NT
RA
CT
NO
.:
DR
AW
N B
Y:
DE
SIG
N B
Y:
SB
MT
BY
:
SIZ
E:
FIL
E N
AM
E:
ISS
UE
DA
TE
:
CO
NT
RA
CT
NO
.:
DE
LIV
ER
Y O
RD
ER
NO
.:C
KD
BY
:
22
" x 3
4"
FIL
E N
UM
BE
R:
PL
OT
SC
ALE
:
PL
OT
DA
TE
:
TR
AC
ES
TE
CH
NIC
AL R
AN
GE
AR
CH
ITE
CT
UR
AL E
NG
INE
ER
ING
SE
RV
ICE
S
AA
0002809
rhode
s +
brito
A
R
C
H
I T
E
C
T
S
12
" =
1'-0"
8/2
9/2
019
2:3
5:1
1 P
M
ER
ST
AR
S R
EL
OC
AT
ION
M-0030
ME
CH
AN
ICA
L L
EG
EN
D
DB
EH
18
-16
90
M-0
03-
FA
25
21-1
8D
-0002
Au
gu
st
30
, 2
01
9
FA
25
21
19
FA
12
6
FA
25
21
-18D
-000
2
R.
SP
EE
LE
R
G. C
LIN
E
RR
R.
FA
UT
H
38x20 S
A
54x20 SA
42x20 S
A
12" THROATS
42x20 S
A
RISE 6"
T
T31
10x6
32x16
36x16
27x15
15x14
VAV-204W
VAV-204E
36x16
27x15
15x15
16x14 SA 10x14
7x14
7x14 SA
VA
V-2
06W
VA
V-2
06E
BOTTOM OF THESE 3 JOINTS OPEN
14x12
8x14 SA
3
3
6
5
1
2
2
4
77
1
7 7
7
FROM EXISTING AHU-3 IN MECHANICAL ROOM
TO EXISTING AHU-3 IN MECHANICAL ROOM
8
8
9
9 9
120x14
ITEMS TO BE DEMOLISHED
DEMOLITION LEGEND
3/16" = 1'-0"
MECHANICAL DEMOLITION PLAN - SECOND FLOORSHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
45
TH
SP
AC
E W
ING
CC
AF
S, F
L
CO
NT
RA
CT
NO
.:
DR
AW
N B
Y:
DE
SIG
N B
Y:
SB
MT
BY
:
SIZ
E:
FIL
E N
AM
E:
ISS
UE
DA
TE
:
CO
NT
RA
CT
NO
.:
DE
LIV
ER
Y O
RD
ER
NO
.:C
KD
BY
:
22
" x 3
4"
FIL
E N
UM
BE
R:
PL
OT
SC
ALE
:
PL
OT
DA
TE
:
TR
AC
ES
TE
CH
NIC
AL R
AN
GE
AR
CH
ITE
CT
UR
AL E
NG
INE
ER
ING
SE
RV
ICE
S
AA
0002809
rhode
s +
brito
A
R
C
H
I T
E
C
T
S
As in
dic
ate
d
8/2
9/2
019
2:3
5:1
2 P
M
ER
ST
AR
S R
EL
OC
AT
ION
M-1010
ME
CH
AN
ICA
L D
EM
O P
LA
N -
1
DB
EH
18
-16
90
E M
-101-
FA
25
21-1
8D
-0002
Au
gu
st
30
, 2
01
9
FA
25
21
19
FA
12
6
FA
25
21
-18D
-000
2
R.
SP
EE
LE
R
G. C
LIN
E
RR
R.
FA
UT
H
KEYNOTES:1. REMOVE (E) VAV BOX, CONTROL WIRING, POWER WIRING, SA DUCT, AND
ALL OTHER RELATED APPURTENANCES. VERIFY LOCATION OF (E) T'STAT & REMOVE T'STAT. PATCH & PAINT WALL TO MATCH (E).
2. (E) VAV BOX TO REMAIN & REUSE, SHOWN FOR REFERENCE.
3. REMOVE (E) SA DUCT TO POD, PREPARE FOR RECONNECTION.
4. REMOVE (E) SA DUCT TO POD, CAP & SEAL AIRTIGHT.
5. REMOVE (E) CR.
6. REMOVE (E) T'STAT & CONTROL WIRING. PATCH & PAINT WALL TO MATCH (E). VERIFY EXACT LOCATION IN FIELD.
7. EXISTING CEILING DIFFUSER TO REMAIN & REUSE.
8. REFER TO SHEET M-102 FOR CONTINUATION OF DUCTWORK.
9. REFER TO EXISTING DRAWINGS FOR CONTINUATION OF DUCTWORK.
0 4' 8' 12'
SCALE: 3/16"=1'-0"
PLAN NORTH
ITEMS TO BE DEMOLISHED
DEMOLITION LEGEND
STAIR 1
12x6 SA
14x10 SA
2
4
1
3
3
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
45
TH
SP
AC
E W
ING
CC
AF
S, F
L
CO
NT
RA
CT
NO
.:
DR
AW
N B
Y:
DE
SIG
N B
Y:
SB
MT
BY
:
SIZ
E:
FIL
E N
AM
E:
ISS
UE
DA
TE
:
CO
NT
RA
CT
NO
.:
DE
LIV
ER
Y O
RD
ER
NO
.:C
KD
BY
:
22
" x 3
4"
FIL
E N
UM
BE
R:
PL
OT
SC
ALE
:
PL
OT
DA
TE
:
TR
AC
ES
TE
CH
NIC
AL R
AN
GE
AR
CH
ITE
CT
UR
AL E
NG
INE
ER
ING
SE
RV
ICE
S
AA
0002809
rhode
s +
brito
A
R
C
H
I T
E
C
T
S
As in
dic
ate
d
8/2
9/2
019
2:3
5:1
2 P
M
ER
ST
AR
S R
EL
OC
AT
ION
M-1020
ME
CH
AN
ICA
L D
EM
O P
LA
N -
2
DB
EH
18
-16
90
M-1
02-
FA
25
21-1
8D
-0002
Au
gu
st
30
, 2
01
9
FA
25
21
19
FA
12
6
FA
25
21
-18D
-000
2
R.
SP
EE
LE
R
GM
C
RR
RR
KEYNOTES:1. REMOVE (E) SA DUCT TO POD, PREPARE FOR RECONNECTION.
2. EXISTING CEILING DIFFUSER TO REMAIN & REUSE.
3. REFER TO SHEET M-101 FOR CONTINUATION OF DUCTWORK.
4. EXISTING SIDEWALL REGISTER TO REMAIN & REUSE.
3/16" = 1'-0"
MECHANICAL DEMOLITION PLAN - SECOND FLOOR CONTINUATION
0 4' 8' 12'
SCALE: 3/16"=1'-0"
PLAN NORTH
T TT T
T
TS
TS
A B C
2
1
2
20
"x18
" S
A
20"x18" SA 20"x14" SA
10"ø SA
8"ø SA
10
"ø S
A8
"ø S
A
SD-3
120
SD-8
290
SD-5
200
SD-11
295
SD-10
290
SD-9
290
SD-7
290SD-2
120
SD-1
110
SD-6
220
SD-4
200
8"ø SA
8"ø S
A
10"ø SA6"ø SA
14"ø SA 18"ø SA 14"ø SA
10
"ø S
A1
0"ø
SA
10"ø SA
54"x20" SA
42"x20" SA 38"x20" SA
54
"x24
" S
A
14
"x12
" S
A
10
"x10
" S
A
8"x14" SA
8"x
8"
SA
16"x14" SA
13
11
8"ø SA 10"ø SA
RR-5
VAV2.4
VAV2.3
VAV2.2
RR-8RR-7RR-6
6
8"ø
SA
8"ø S
A
10"ø S
A
10"ø SA
8"ø SA
RR-2
RR-3 RR-4
RR-1
VAV2.1
12
8
14 1514 15
7
7
141
4
3
VAV-206E
VAV-206W
5
16 16
7
7
PCCHR
CHSCHR
CHSCHR
CHS
10
9
2" CHS & 2" CHR
VAV-2.3 VAV-2.8 VAV-2.4 VAV-2.7
200 CFM 190 CFM
8
8
7
ø8"
10"ø SA
17
VAV-2.8
D
17
VAV-2.7
PC
D-1
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
45
TH
SP
AC
E W
ING
CC
AF
S, F
L
CO
NT
RA
CT
NO
.:
DR
AW
N B
Y:
DE
SIG
N B
Y:
SB
MT
BY
:
SIZ
E:
FIL
E N
AM
E:
ISS
UE
DA
TE
:
CO
NT
RA
CT
NO
.:
DE
LIV
ER
Y O
RD
ER
NO
.:C
KD
BY
:
22
" x 3
4"
FIL
E N
UM
BE
R:
PL
OT
SC
ALE
:
PL
OT
DA
TE
:
TR
AC
ES
TE
CH
NIC
AL R
AN
GE
AR
CH
ITE
CT
UR
AL E
NG
INE
ER
ING
SE
RV
ICE
S
AA
0002809
rhode
s +
brito
A
R
C
H
I T
E
C
T
S
1/4
" =
1'-0
"
8/2
9/2
019
2:3
5:1
4 P
M
ER
ST
AR
S R
EL
OC
AT
ION
M-1030
ME
CH
AN
ICA
L F
LO
OR
PLA
N -
1
DB
EH
18
-16
90
E M
-103-
FA
25
21-1
8D
-0002
Au
gu
st
30
, 2
01
9
FA
25
21
19
FA
12
6
FA
25
21
-18D
-000
2
R.
SP
EE
LE
R
G. C
LIN
E
RR
R.
FA
UT
H
1/4" = 1'-0"
MECHANICAL PLAN - SECOND FLOOR
KEYNOTES:1. NEW CAP ON EXISTING DUCT. SEALED AIR TIGHT.
2. POINT OF CONNECTION, NEW 20X18 SUPPLY AIR DUCT TO EXISTING 42X20 MAIN DUCT.
3. POINT OF CONNECTION, NEW 8"∅ SUPPLY AIR DUCT TO EXISTING 10X6 DUCT. PROVIDE TRANSITION.
4. POINT OF CONNECTION, NEW 8"∅ SUPPLY AIR DUCT TO EXISTING 38X20
MAIN DUCT.
5. BALANCE EXISTING VAV 206W FOR 390 CFM.
6. 10X10 SOUND LINED Z-BOOT FOR TRANSFER AIR. FOR DETAILS SEE, SHEET M-502 DETAIL 1.
7. VAV W/ ELECTRIC REHEAT COIL. FOR DETAILS SEE, SHEET M-502 DETAIL 4.
8. 8X8 SOUND LINED BOOT. FOR DETAILS SEE, SHEET M-501 DETAIL 2.
9. 2" CHS & 2" CHR CONNECT TO EXISTING 6" CHS & CHR INSIDE MECH ROOM 207. VERIFY EXACT LOCATION IN FIELD. PROVIDE SHUT-OFF SERVICE BALL VALVES IN BOTH LINES IMMEDIATELY AFTER CONNECTION TO EXISTING PIPE.
10. 1" PUMPED CONDENSATE PIPING DN, TERMINATE 1" ABOVE JANITOR FLOOR DRAIN AND SPILL INTO FLOOR DRAIN. REFER TO SHEET M-502, DETAILS 4 & 5 FOR ROUTING DIAGRAM.
11. 28X24 SOUND LINED TRANSFER DUCT. FOR DETAILS SEE, SHEET M-502 DETAIL 1.
12. 36X24 SOUND LINED TRANSFER DUCT. FOR DETAILS SEE, SHEET M-502 DETAIL 1.
13. 24X24 SOUND LINED TRANSFER DUCT. FOR DETAILS SEE, SHEET M-502 DETAIL 1.
14. T'STAT FOR VAV BOX SERVED BY HOUSE SYSTEM. SEE PLANS FOR UNIT DESIGNATION. FOR MOUNTING, SEE SHEET M-501, DETAIL 5.
15. T'STAT FOR VAV BOX UNDER FLOOR SERVED BY CRAC UNITS. SEE PLANS FOR UNIT DESIGNATION. FOR MOUNTING, SEE SHEET M-501, DETAIL 5.
16. BALANCE EXISTING CEILING DIFFUSER FOR CFM SHOWN.
17. REMOTE TEMPERATURE SENSOR MOUNTED ON RETURN AIR REGISTER FEEDING T'STAT FOR UNDER FLOOR VAV BOX SERVED BY CRAC UNITS.
02 4 8134
SCALE: 1/4"=1'-0"
CONTINUATION ON SHEET M-104
PLAN NORTH
TT T
TS
E
E
F
F
1
2
STAIR 1
ELEV
SD-12
600
CRAC2
CRAC1
12"ø SA VAV2.5
8"ø SA
12"ø SA
16"ø SA
12"ø SA
14
"x10
" S
A
38"x20" SA1
2
11109
13
6 7
5
6
3
8
PCCHR
CHS
PCCHR
CHS
12
HI-TEMP
VAV-2.5
VAV-2.6
4
4
RR-19
RR-21
RR-22
RR-24
RR-17RR-16RR-15RR-14
RR-25
7
202A
MANAGERSOFFICE (NIC)
202
VISITORS AREA &CONFERENCE
ROOM (NIC)
203
DATA REDUCTIONCENTER 14
D
D
RR-20
VAV-2.6
RR-18
RR-23
RR-12
RR-11RR-10
RR-9
RR-13
120x14
15
D-2 D-3 D-4 D-5
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
45
TH
SP
AC
E W
ING
CC
AF
S, F
L
CO
NT
RA
CT
NO
.:
DR
AW
N B
Y:
DE
SIG
N B
Y:
SB
MT
BY
:
SIZ
E:
FIL
E N
AM
E:
ISS
UE
DA
TE
:
CO
NT
RA
CT
NO
.:
DE
LIV
ER
Y O
RD
ER
NO
.:C
KD
BY
:
22
" x 3
4"
FIL
E N
UM
BE
R:
PL
OT
SC
ALE
:
PL
OT
DA
TE
:
TR
AC
ES
TE
CH
NIC
AL R
AN
GE
AR
CH
ITE
CT
UR
AL E
NG
INE
ER
ING
SE
RV
ICE
S
AA
0002809
rhode
s +
brito
A
R
C
H
I T
E
C
T
S
1/4
" =
1'-0
"
8/2
9/2
019
2:3
5:1
5 P
M
ER
ST
AR
S R
EL
OC
AT
ION
M-1040
ME
CH
AN
ICA
L F
LO
OR
PLA
N -
2
DB
EH
18
-16
90
M-1
04-
FA
25
21-1
8D
-0002
Au
gu
st
30
, 2
01
9
FA
25
21
19
FA
12
6
FA
25
21
-18D
-000
2
R.
SP
EE
LE
R
G. C
LIN
E
RR
R.
FA
UT
H
1/4" = 1'-0"
MECHANICAL PLAN - SECOND FLOOR CONTINUATION
KEYNOTES:
1. POINT OF CONNECTION, NEW 12"∅ SUPPLY AIR DUCT TO EXISTING 38X20 MAIN DUCT.
2. POINT OF CONNECTION, NEW 8"∅ SUPPLY AIR DUCT TO EXISTING
PROVIDE TRANSITION AS REQUIRED.
3. POINT OF CONNECTION, NEW 12"∅ SUPPLY AIR DUCT TO EXISTING
PROVIDE TRANSITION AS REQUIRED.
4. BALANCE EXISTING CEILING DIFFUSER FOR 165 CFM.
5. BALANCE EXISTING SIDEWALL DIFFUSER FOR 120 CFM.
6. 48X40 RA DUCT CONNECT TO CRAC UNIT AND DUCT UP THRU CEILING.
7. CRAC UNIT. FOR DETAILS SEE, SHEET M-502 DETAIL 3.
8. 2" CHS, 2" CHR, AND 1" PUMPED CONDENSATE PIPE DN BELOW FLOOR IN SOFFIT. FOR CONTINUATION, SEE SHEET M-103.
9. JOHNSON CONTROLS BI-METAL LINE VOLTAGE T'STAT, HIGH TEMP ALARM, WIRED TO SECURITY ALARM PANEL.
10. ALC T'STAT FOR VAV BOX SERVED BY HOUSE SYSTEM. SEE PLANS FOR UNIT DESIGNATION.
11. ALC T'STAT FOR VAV BOX UNDER FLOOR SERVED BY CRAC UNITS. SEE PLANS FOR UNIT DESIGNATION. USE REMOTE SENSOR MOUNTED ON RETURN AIR REGISTER ABOVE EQUIPMENT SEE DETAIL TBD
12. NEW TRANSFER DUCT SHOWN FOR REFERENCE. FOR NOTES AND SIZE SEE, SHEET M-502 DETAIL 1.
13. VAV W/ ELECTRIC REHEAT COIL. FOR DETAILS SEE, SHEET M-501 DETAIL 2.
14. REMOTE TEMPERATURE SENSOR MOUNTED ON RETURN AIR REGISTER FEEDING T'STAT FOR UNDER FLOOR VAV BOX SERVED BY CRAC UNITS.
15. POINT OF CONNECTION, NEW 120" X 14" RETURN AIR DUCT TO EXISTING 120" X 14" MAIN DUCT. CONTRACTOR SHALL INSTALL (4) VERTICAL CONTROL DAMPERS INTO NEW RETURN DUCT WITHIN ROOM 203.
CONTINUATION ON SHEET M-103
02 4 8134
SCALE: 1/4"=1'-0"
PLAN NORTH
C
C
E
E
1
2
VAV2.8
VAV2.7
VAV2.6
CRAC1
CRAC2
7
7
101 2
9
9
4 5 11
10
8
1
2
7
CH
R
PC
CH
S
13
6
16"ø SA
14"ø SA
14
"ø S
A
14"ø
SA
14"ø SA10"ø SA
6"ø
SA
16"ø SA
13
6
6
6 12
3
5
9
7
7
7
SD-18100
SD-22100
SD-17100
SD-21100
SD-16100
SD-20100
SD-15100
SD-19100
SD-1370
SD-1470
7
SD-32180
SD-31180
SD-29180
SD-39180
SD-28180
14
SD-30180
SD-38180
SD-37180
SD-36180
SD-45180
SD-34180
SD-33180
D
D
SD-27180
SD-26180
SD-24180
SD-23180
SD-25180
4
14
14 14
14
7
7
7
7
14
14
14
18"x
18" S
A
CH
R
PC
CH
SSHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
45
TH
SP
AC
E W
ING
CC
AF
S, F
L
CO
NT
RA
CT
NO
.:
DR
AW
N B
Y:
DE
SIG
N B
Y:
SB
MT
BY
:
SIZ
E:
FIL
E N
AM
E:
ISS
UE
DA
TE
:
CO
NT
RA
CT
NO
.:
DE
LIV
ER
Y O
RD
ER
NO
.:C
KD
BY
:
22
" x 3
4"
FIL
E N
UM
BE
R:
PL
OT
SC
ALE
:
PL
OT
DA
TE
:
TR
AC
ES
TE
CH
NIC
AL R
AN
GE
AR
CH
ITE
CT
UR
AL E
NG
INE
ER
ING
SE
RV
ICE
S
AA
0002809
rhode
s +
brito
A
R
C
H
I T
E
C
T
S
1/4
" =
1'-0
"
8/2
9/2
019
2:3
5:1
7 P
M
ER
ST
AR
S R
EL
OC
AT
ION
M-1050
ME
CH
AN
ICA
L P
LA
N -
RA
ISE
DF
LO
OR
DB
EH
18
-16
90
M-1
05-
FA
25
21-1
8D
-0002
Au
gu
st
30
, 2
01
9
FA
25
21
19
FA
12
6
FA
25
21
-18D
-000
2
R.
SP
EE
LE
R
G. C
LIN
E
RR
R.
FA
UT
H
1/4" = 1'-0"
PARTIAL SECOND BELOW RAISED FLOOR PLAN
KEYNOTES:1. CRAC UNIT. FOR DETAILS SEE, SHEET M-501 DETAIL 2.
2. CRAC UNIT SECURED TO SLAB WITH SEISMIC BASE & NEOPRENE PADS. PROVIDE 32X36 SA PLENUM DN FROM CRAC UNIT BELOW RAISED FLOOR.
3. 2" CHS/R & 1" PUMPED CONDENSATE. DRAIN PIPING UP FROM BELOW RAISED FLOOR TO ABV CEILING. FOR CONTINUATION SEE, SHEET M-103.
4. 2" CHS/R ISOLATION BALL VALVE.
5. POC 2" CHS/R & 1" PUMPED CONDENSATE. DRAIN TO (N) CRAC UNIT. FOR DETAILS SEE, SHEET M-501 DETAIL 2.
9. LOCATED BENEATH RAISED FLOOR, WITH REMOVABLE PANELS FOR ACCESS.
10. EMERSON LIQUI-TECT MODEL 410 SINGLE POINT LEAK DETECTION SENSOR SECURED TO FLOOR & WIRED TO SECURITY CONTROL PANEL. CONTRACTOR SHALL PROVIDE 120V/24V TRANSFORMER FOR LEAK DETECTOR.
11. 2" CHS/R, AND 1" PUMPED CONDENSATE PIPING SHOWN AS SINGLE LINE FOR CLARITY.
12. BALANCE FOR 900 CFM.
13. BALANCE FOR 3100 CFM.
14. TATE DIRECTAIRE STEEL DIRECTIONAL GRATE W/ MOUNTING HANGER & BOLTS W/ OBD FOR BALANCING. COORDINATE ONE SUPPLY DIFFUSER PER RACK.
02 4 8134
SCALE: 1/4"=1'-0"
PLAN NORTH
PIPE INSULATION
INSULATION SHIELD REQUIRED FOR
INSULATED PIPE (TOP & BOTTOM) MIN 6" LONG
PIPE SADDLE W/ U-BOLT(TOLCO FIG 318A OR APPROVED EQUAL)
3"
CONCRETE FLOOR
THREADED PIPE STAND W/ WELDED BASE PLATE (TOLCO FIG316T) SECURED TO SLAB W/ 1/2" HILTI KWIK BOLT
NEW PIPING WITH INSULATION. PROVIDE POLYISOCYANURATE INSULATION (DOW TRYMER 1800) TO EXTEND 2" LONGER THAN PIPE SHIELD
VA
RIE
S
3/8" HILTI KWIK BOLT TZ WITH 3" MIN EMBEDMENT
3/8" THREADED HANGER ROD
NUT & BACKNUT
PIPE HANGER
CONDENSATE PIPING
PIPE INSULATION SHIELD SEE MECHANICAL SPECIFICATION
MAIN SUPPLY AIR DUCT. SEE PLAN FOR SIZES 3'-0" MAX. (TYP)
1 1/8" SHT. METAL HANGER STRAPS SECURED FROM STRUCTURE ABV. (4) STRAPS PER PLENUM BOX
DRAWBAND (TYP)
SECURE TO PLENUM BOX W/ LOAD RATED FASTENER.
SHEET METAL PLENUM BOX WITH SOUND LINING (SIZE AS REQUIRED)
PERFORATED PLATE APPLICABLE FOR SIDE ENTRY DUCT CONN. ONLY
SECURE C.D. TO PLENUM W/ SHT. METAL SCREWS
CEILING DIFFUSERCEILING
SUPPLY AIR DUCT (SIDE ENTRY ALTERNATE)
FLEX. DUCT. SEE PLAN FOR SIZE
1. IF HEIGHT DOES NOT ALLOW A INTERNAL BENDING RADIUS OF 2/3 THE DUCT DIAMETER INTO THE DIFFUSER, THE CONTRACTOR SHALL INSTALL A SIDE ENTRY PLENUM BOX
GENERAL NOTE:
SECTION "A-A"
PIPE W/ INSULATION
SECURE ISOLATOR TO STRUCTURE W/ 1/2"∅BOLT THRU PHILLIPS RED HEAD EXPANSION ANCHOR LOAD RATED. 3" MIN. EMBEDMENT.
UNISTRUT ANGULARBRACKET (TYP)
UNISTRUT CHANNEL SWAY BRACING (TYP)
UNISTRUT CHANNEL
INSULATION SHEILD (TYP)
1/2" NUT & BACKNUT (TYP)
1/2"∅ HANGER ROD. LOAD RATED. LENGTH AS REQ'D
LONGITUDINAL BRACING SIMILAR TO SWAY BRACING
FOR CONNECTION TO CONCRETE STRUCTURE
SEE DETAIL 9 ON SHEET M-503
PC
CHWR
CHWS
ELECTRIC HEATING COIL (WHEN INCLUDED)
DUCT TRANSITION FROM VAV BOX
INTEGRAL ATTENUATOR
SINGLE DUCT VARIABLE AIR VOLUME (V.A.V.) OR CV
TERMINAL BOX. SEE SCHEDULE FOR SIZE.
DUCT CONNECTION (SAME SIZE AS UNIT INLET)
MOTOR SHROUD
ACCESS DOOR
48
" M
AX
.
CENTERLINE OF THERMOSTAT CONTROL
MOUNTING HEIGHT
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
45
TH
SP
AC
E W
ING
CC
AF
S, F
L
CO
NT
RA
CT
NO
.:
DR
AW
N B
Y:
DE
SIG
N B
Y:
SB
MT
BY
:
SIZ
E:
FIL
E N
AM
E:
ISS
UE
DA
TE
:
CO
NT
RA
CT
NO
.:
DE
LIV
ER
Y O
RD
ER
NO
.:C
KD
BY
:
22
" x 3
4"
FIL
E N
UM
BE
R:
PL
OT
SC
ALE
:
PL
OT
DA
TE
:
TR
AC
ES
TE
CH
NIC
AL R
AN
GE
AR
CH
ITE
CT
UR
AL E
NG
INE
ER
ING
SE
RV
ICE
S
AA
0002809
rhode
s +
brito
A
R
C
H
I T
E
C
T
S
As in
dic
ate
d
8/2
9/2
019
2:3
5:1
7 P
M
ER
ST
AR
S R
EL
OC
AT
ION
M-5010
ME
CH
AN
ICA
L D
ET
AIL
S I
DB
EH
18
-16
90
M-5
01-
FA
25
21-1
8D
-0002
Au
gu
st
30
, 2
01
9
FA
25
21
19
FA
12
6
FA
25
21
-18D
-000
2
R.
SP
EE
LE
R
G. C
LIN
E
RR
R.
FA
UT
H
NTSM-501
3 TYPICAL PIPE SUPPORT DETAILNTSM-501
1 CONDENSATE PIPE SUPPORT DETAIL
NTSM-501
4 FLEXIBLE CONNECTION TO CDNTSM-501
6 PIPE SUPPORT DETAIL
NTSM-501
2 VAV BOX DETAIL
NTSM-501
5 THERMOSTAT MOUNTING DETAIL
EXISTING STRUCTURE
W
2W
(M
IN)
W
2W (MIN)
2" THICK ACOUSTIC DUCT LINER WALL (PER PLAN)
1 1
1 1
2
33
NOTES:1. SEAL BETWEEN TRANSFER BOOT AND WALL.
2. TRANSFER BOOTS TO BE CONSTRUCTED OF SHEET METAL: GAUGE PER SMACNA GUIDLINES.
3. 500 F.P.M., MAX. AIRFLOW VELOCITY.
3/8" HILTI KWIK BOLT TZ WITH 3" MINIMUM EMBEDMENT
3/8" THREADED HANGER ROD
ROD CONNECTIONS TO CONCRETE
3/8" HILTI KWIK BOLT TZWITH 3" MINIMUM EMBEDMENT
3/8" - 20 NUT AND WASHER
1-1/8" x 18 GA. HANGER STRAP
CONCRETE DECK
3/8" HILTI KWIK BOLT TZ WITH 3" MINIMUM EMBEDMENT
ANGLE IRON TO CONCRETE
HANGER STRAP CONNECTION TO CONCRETE
CHS
CHR
PC
2" BALL VALVE (TYP)
P/T TEST PORT (TYP)
CAP
CH
S
CH
R
PC
SOFFIT
STRAINER W/ BALL VALVE, NIPPLE HOSE ADAPTER AND CAP W/ CHAIN (TYP)
RAISED FLOOR
CEILING
CRAC1
CRAC2
1. FACTORY MOUNTED & INSTALLED CONDENSATE PUMP.
2. 1" PUMPED CONDENSATE TO FLOOR DRAIN LOCATED IN RM 218.
3. 2" CHWS/R PIPING TO MECHANICAL RM 207.
NOTES:
3
2
1 1
1"2"
1" PUMPED CONDENSATE
2" 1"2"
1" PVC SCH 40 PIPE
AHU-3
AHU-3
AHU-3
1
1
1
KEYNOTES:
1. POINT OF CONNECTION FOR NEW 2" CHWS & CHWR. CONTRACTOR SHALL VERIFY CONNECTION LOCATION IS ADEQUATE AND ACCURATE WITH THE CONNECTION INTO THE CHWS AND CHWR. IF DISCREPANCIES ARE FOUND, CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD IMMEDIATELY.
2" CHWR 2" CHWS
2" CHWR
2" CHWS
1" PUMPED CONDENSATE ROUTED FROM RM 207
ROUTE NEW 1" PUMPED CONDENSATE TO EXISTING FLOOR DRAIN
EXISTING WATER HEATER
LOCATED IN ROOM 218
REFER TO SHEET M-103 FOR CONTINUATION OF 1" PUMPED CONDENSATE
WITH NEOPRENE PADS, BACNET NTERFACE, ZONE MASTER CONTROLLER, LEAK DETECTION WITH FIELD INSTALLED SENSORS, FACTORY MOUNTED & INSTALLED CONDENSATE PUMP, & START UP. FIELD WIRED FOR SHUT DOWN FROM FIRE ALARM SYSTEM FROM AREA SMOKE DETECTORS. UNITS ARE 100% REDUNDANT AND EC MOTOR SHALL VARY AIRFLOW BASED ON RETURN AIR TEMPERATURE.
NOTES:1. REMOVE EXISTING CONTROL (POINTS)FOR VAV'S BEING DEMOLISHED.
2. PROVIDE NEW CONTROL (POINTS) FOR VAV'S BEING ADDED.
3. USE EXISTING SEQUENCE OF OPERATION INCLUDING NEW VAV'S.
VAV - 2.6 VAV - 2.7 VAV - 2.8
CRAC - 1
CRAC - 2
DAT
PS
DAT
PS
T VAV - 2.6RS
RS T
RS T
REMOTE SENSORS LOCATED ON WALL
CRAC 1 & 2 CONTROL
VAV - 2.6
VAV - 2.6
CRAC 1 & 2 CONTROL
CRAC 1 & 2 CONTROL
CRAC 1 & 2 CONTROL CRAC 1 & 2 CONTROL CRAC 1 & 2 CONTROL
ECM
ECM
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
SHEET OF
45
TH
SP
AC
E W
ING
CC
AF
S, F
L
CO
NT
RA
CT
NO
.:
DR
AW
N B
Y:
DE
SIG
N B
Y:
SB
MT
BY
:
SIZ
E:
FIL
E N
AM
E:
ISS
UE
DA
TE
:
CO
NT
RA
CT
NO
.:
DE
LIV
ER
Y O
RD
ER
NO
.:C
KD
BY
:
22
" x 3
4"
FIL
E N
UM
BE
R:
PL
OT
SC
ALE
:
PL
OT
DA
TE
:
TR
AC
ES
TE
CH
NIC
AL R
AN
GE
AR
CH
ITE
CT
UR
AL E
NG
INE
ER
ING
SE
RV
ICE
S
AA
0002809
rhode
s +
brito
A
R
C
H
I T
E
C
T
S
12
" =
1'-0"
8/2
9/2
019
2:3
5:2
1 P
M
ER
ST
AR
S R
EL
OC
AT
ION
M-9020
ME
CH
AN
ICA
L D
IAG
RA
MS
II
DB
EH
18
-16
90
M-9
02-
FA
25
21-1
8D
-0002
Au
gu
st
30
, 2
01
9
FA
25
21
19
FA
12
6
FA
25
21
-18D
-000
2
R.
SP
EE
LE
R
G. C
LIN
E
RR
R.
FA
UT
H
12" = 1'-0"
CRAC UNIT VARIABLE VOLUME NTS
SEQUENCE OF OPERATION:CRAC UNIT
THE CRAC UNIT SHALL BE ON AT ALL TIMES WHEN ANY OF THE THE DATA RACKS ARE POWERED ON.THE CRAC UNIT SHALL BE OPERATED WITH A CONSTANT STATIC PREESURE NOT TO EXCEED 1.5 INCHES W.G.
ZONE TEMPERATURE CONTROL-VAV'S
WHEN THE CRAC UNIT SHALL IS ON THE ZONE TEMPERATURE SETPOINT SHALL BE AT THE CONFIGURED SETPOINT OR AT THE OCCUPANT-ADJUSTABLE SETPOINT VIA THE WALL-MOUNTED THERMOSTAT.
THE CONTROLLER SHALL MODULATE THE VAV BOX DAMPER TO MAINTAIN VAV BOX SUPPLY AIR FLOW AT SETPOINT AS MEASURED BY A MULTI-POINT FLOW SENSING ELEMENT AT THE INLET TO THE VAV BOX. SEQUENCING SHALL BE AS SHOWN: UPON A RISE IN ZONE TEMPERATURE ABOVE ZONE TEMPERATURE SETPOINT, SUBJECT TO THE ZONE TEMPERATURE SETPOINT DEADBAND, THE AIRFLOW SETPOINT SHALL BE ADJUSTED BETWEEN MINIMUM AND MAXIMUM FLOW BASED ON THE DIFFERENCE BETWEEN ZONE TEMPERATURE AND ZONE TEMPERATURE SETPOINT AS SHOWN. UPON A FALL IN ZONE TEMPERATURE BELOW ZONE TEMPERATURE SETPOINT, SUBJECT TO THE DEADBAND AS SHOWN, THE AIRFLOW SHALL BE MAINTAINED AT A FIXED AIR FLOW SETPOINT.