Fern Valley Interchange Construction Update DECEMBER 2015
14

General fvi construction_update_dec_8_2015

Apr 15, 2017

Download

Engineering

Megan Yang
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: General fvi construction_update_dec_8_2015

Fern Valley Interchange Construction

Update

DECEMBER 2015

Page 2: General fvi construction_update_dec_8_2015

Note the size difference between the old interstate bridge and new

Page 3: General fvi construction_update_dec_8_2015

Note the size difference between the old interstate bridge and new

Page 4: General fvi construction_update_dec_8_2015

Another full weekend closure to concrete the intersection

Page 5: General fvi construction_update_dec_8_2015

Concrete intersection – 7 p.m. Fri. to 5 a.m. Monday

Orange will be placed in concrete. The green will be left to allow access to the Shoppes @ 24 during the next weekend closure until last piece of the bridge is finished. Then, it too will be concreted.

Page 6: General fvi construction_update_dec_8_2015
Page 7: General fvi construction_update_dec_8_2015
Page 8: General fvi construction_update_dec_8_2015

Eastbound North Phoenix Road @ I-5

Page 9: General fvi construction_update_dec_8_2015

Eastbound North Phoenix Road @ I-5 NOTE PEDESTRIAN WALKWAY (CENTER) ACROSS BRIDGE

Page 10: General fvi construction_update_dec_8_2015

Temporary Off-Ramp UNDER CONSTRUCTION

Page 11: General fvi construction_update_dec_8_2015

Northbound off-ramp/looking south THE NEW NORTHBOUND OFF-RAMP WILL TIE IN WITH THE NEW ROADWAY IN THE FOREGROUND

Page 12: General fvi construction_update_dec_8_2015

OREGON 99 - EASTSIDE INSTALLING STORM SEWER PIPE

Page 13: General fvi construction_update_dec_8_2015

CONCRETE LUMAN INTERSECTION- DEC. 11/18/OR?

PARTIAL INTERCHANGE OPENING – EARLY 2016 OPEN TEMPORARY NORTHBOUND OFF-RAMP OPEN NORTHBOUND ON & SOUTHBOUND OFF RAMP

DEMO OLD BRIDGE BUILD NEW NB OFF AND SB ON-RAMPS COMPLETE BEAR CREEK BRIDGE

OREGON 99 – Eastside OR 99, Bolz, westside OR 99

FINAL PAVING & WRAP UP - SUMMER 2016

SCHEDULE AT A GLANCE

Page 14: General fvi construction_update_dec_8_2015

THANKS!