Top Banner
General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture Workers Duration of Project: 3 Years Starting Date : 1st May 2004 Project Language: English & Nepali Preparation date: 6 February 2004 (first draft) Author: Bidur Karki
21

General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

Jan 01, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union

[GEFONT] SUMMARY PROJECT OUTLINE (SPROUT)

Project Title: Strengthen Socio Economic Condition of

Nepalese Agriculture Workers Duration of Project: 3 Years Starting Date : 1st May 2004 Project Language: English & Nepali Preparation date: 6 February 2004 (first draft)

Author: Bidur Karki

Page 2: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT]

1. Background and Justification Out of Total Population of Nepal the active labour force is

estimated to be 11.5 millions. Almost 80% of this workforce are engaged in Agriculture and agro related activity.

Agriculture based workers are living in rural area. There is no access of education and communication.

The Economical situation of agriculture workers is very bad. Lack of systematic Wage system they are compelled to live with domination. The market deregulation has restriction on prices. The cost of living has increased heavily . The minimum wage rate is 60.00 Nrs. for a day. This is very low for the survival. But this is not implemented.

Page 3: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT]

1. Background and Justification The long working hours, low payment, use of

child labour, Gender discrimination in wages, no minimum wages in the informal sector and non existence of any social security.

The rural agriculture workers only 5% are organised and rest of 95% are unorganized. Most of them are unknown about present situation, labour law and their right .

Page 4: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT] 1. Background and Justification

Due to globalization the local small scale Industries has been closing down. The Multinational companies & Transnational companies are increasing. The employment opportunity and real wage also decreasing. Increasing the numbers of contract labours, frizzing of new appointments. Using the voluntary retirement scheme and compulsory retirement scheme in the organized sector also.

I am a participant of this training program, I have been learned various subject for securing workers rights in present global situation. As a member of Education department this is my duty and privilege to share my Knowledge to our friends and leaders.

This programme is not related only with the idea sharing . I hope after this program the workers are able to faced the tackle of the employer and government.

Page 5: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT]

2. Target Groups

This work-plan is targeted for : Our National council members and

leaders of our affiliates altogether 160. Unorganized agriculture workers.

Page 6: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT]

3. Development Objectives

This work-plan will contribute to:

3.1. To enhance the capacity for C.B.A and wage settlement of the agriculture workers.

3.2. Strengthen the knowledge, understanding and create awareness of the Economic and social rights of agriculture workers.

Page 7: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT]

4. Immediate Objectives(1) Our union members will be increased out of total

unorganised Agriculture workers 40% will be organised.

(2) At the end of this programme 40% out of total agriculture labour are able to raised their Economical and social rights, such as living wages, working condition, social security and OSH issues.

(3) Enhance the capacity of our leader to analyse the situation and explain clearly.

(4) Nepal Government compelled to manage social security system in informal sector.

Page 8: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT]

5. Indicators of Achievement (1) For Immediate Objective 1:

5000 agriculture workers will get union membership 200 local level committee will formed.

(2) For Immediate Objective 2 160 Union leaders will be attended in training. 200 training programme will be conducted by this trained

leaders in local level. 160 leaders are able to explained about the various current

economical and social issues .

Page 9: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT]

5. Indicators of Achievement (3) For Immediate Objective 3

160 leaders are able to conduct the training programme in the local level.

(4) For Immediate Objective 4 Strengthen relationship with Government, Trade

union and employer.

Page 10: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT]

6. Key Outputs :

(1) For Immediate Objective 1 Increase union membership Increase the number of committee of our affiliates

FAWN

(2) For Immediate Objective 2 5 central level training programme will be

conducted Local level programme will also be conducted

Page 11: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT]

7. Activities 1. The Planning commission meeting will conduct

for the approval of this program

2. Joint meeting will conduct with GEFONT leaders

and leaders of affiliates

3. Planning workshop for programme preparation among the head of leaders of each affiliates.

4. Curriculum and Training Manual will be prepared by GEFONT Education Department.

Page 12: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT]

7. Activities 5. Three days training programme will be conducted for

the selected participants. ( Five different times ) 6. Each participant has been made plan for the local

level in his area. 7. Prepare & distribution Handbill & Posters for the

agriculture workers. 8. Awareness campaign. 9. Lobbing & Pressuring to the local Government

Authority to implement the Minimum wages for the Agriculture workers.

Page 13: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT]

8. Inputs For conducting central level Training Programme. i. Resource Person :

Gefont Central Education Department …… 3

Tribhuvan University .……………………. 1

ii. Training hall : Gefont Hall iii. Stationary iv. Training Material

Page 14: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT]

8. Inputs : For conducting Local level training

Resource person : Our Central programme trainees Training Hall : Local suitable areaStationary & Material

One programme Co-ordinator & One Assistant Co-ordinator for supervision of the programme.

Page 15: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT]

9. Monitoring, Reporting and Evaluation Monitoring : The Project coordinator is the main responsible person and

GEFONT Central Planning Commission will monitor the programme.

Reporting : The project coordinator is the responsible for the reporting.

The joint project coordinator will help for reporting. She/he report direct to the planning commission and education department. And planning commission will report to the other organisations.

Evaluation : Yearly programme evaluation meeting will conduct by the

Planning commission with Top leaders of the affiliates. Final evaluation is end of the programme.

Page 16: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT] 10. Preliminary Budget Estimate

Total estimated costs for the project: 25,29,700.00 ( US$ 33,955.70)[Breakdown]1. Budget For the Planning Commission meeting 5,000.00 Fooding & other expenses 2. Budget for the Joint Meeting 20,200.00 Fooding & others [35+16*200] 10,200.00 Transportation for out of valley 10,000.00

3. Planing Workshop 39,500.00

Fooding & Others [35+16+4*2 *250] 27,500.00 Transportation 5,000.00 Lodging 7,000.00

Page 17: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT]

10. Preliminary Budget Estimate 4. Central 5 Training Programme 3,30,000.00

Lodging & Fooding [160*500*3] 2,40,000.00 Lodging & Fooding R. Persons 30,000.00 [4 person @ 500.00 *3 five times] Transportation Outside Kathmandu 60,000.00

5. Local Tranning Programme 10,00,000.00

Lodging & Fooding and other expenses200 program. per.@ 5,000.00

6. Stationery [ Central and Local ] 80,000.00 7. Educational Material 50,000.00

Manual printing & Curriculum

Page 18: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT]

10. Preliminary Budget Estimate Central 5 Training Programme 3,30,000.00

Lodging & Fooding [160*500*3] 2,40,000.00 Lodging & Fooding R. Persons 30,000.00 [4 person @ 500.00 *3 five times] Transportation Outside Kathmandu 60,000.00

5. Local Tranning Programme 10,00,000.00Lodging & Fooding and other expenses200 program. per.@ 5,000.00

6. Stationery [ Central and Local ] 80,000.00 7. Educational Material 50,000.00

Manual printing & Curriculum

Page 19: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT]

10. Preliminary Budget Estimate4. Central 5 Training Programme 3,30,000.00

Lodging & Fooding [160*500*3] 2,40,000.00Lodging & Fooding R. Persons 30,000.00 [4 person @ 500.00 *3 five times] Transportation Outside Kathmandu 60,000.00

5. Local Tranning Programme 10,00,000.00Lodging & Fooding and other expenses200 program. per.@ 5,000.00

6. Stationery [ Central and Local ] 80,000.00 7. Educational Material 50,000.00

Manual printing & Curriculum

Page 20: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT]

10. Preliminary Budget Estimate8. Printing cost for Poster and Handbill 2,50,000.00

9. Resourse Person allowances 42,000.00

10. Salary 6,63,000.00 Program coordinator 3,90,000.00 Joint Coordinator 2,73,000.00 10. Misceallneous Expenses in office 50,000.00

Total :

25,29,700.00

Page 21: General Federation of Nepalese Trade Union [GEFONT] SUMMARY PROJECT OUTLINE (SPROUT) Project Title: Strengthen Socio Economic Condition of Nepalese Agriculture.

General Federation of Nepalese Trade Union [GEFONT]

Thank you