From: Frazier, Ricks (EOHED) To: Kadish, Steven (GOV) Subject: Accepted: Boston Project Call Start: Sunday, December 13, 2015 12:00:00 PM End: Sunday, December 13, 2015 1:00:00 PM Location:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 1/975
From: Frazier, Ricks (EOHED)
To: Kadish, Steven (GOV)
Subject: Accepted: Boston Project Call
Start: Sunday, December 13, 2015 12:00:00 PM
End: Sunday, December 13, 2015 1:00:00 PM
Location:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 2/975
From: Kadish, Steven (GOV)
To:
Cc: Cowan, Mo; Daniel Koh; [email protected]; Ash, Jay (EOHED); Tom Glynn; Lepore, Kristen (ANF)
Subject: Boston means Innovation, Talent, Inspiration
Date: Wednesday, December 30, 2015 5:54:56 PM
Attachments: Boston means Innovation Talent Leadership.Dec30.2015.pptx
Ann,
On behalf of the Governor’s Office and the Mayor’s Office, attached is the presentation that we had
mentioned that helps to describe the strengths of the Boston area.
We believe it provides some helpful information.
Please let us know if you have any comments and/or would like any further information.
We have appreciated the discussions with you and your team.
Please let us know if we may help with any other questions that you may have.
As you had mentioned, the Governor and the Mayor are both interested in talking with the
Chairman.
Please let us know when next week or soon thereafter this makes sense to happen.
Very best wishes and Happy New Year!
Steven Kadish and Daniel Koh
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 3/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 4/975
2
oston has the complete package – the hub of
nnovation, talent and infrastructure – to meet GE’
eeds now and in the future
No other destination can confidently boast of having the
complete package: the hub of innovation, talent and
infrastructure:
• Global draw of international students
• Inspiring millennial to come as students, employees and
residents
• State and local government commitment
• Best higher education institutions in the world
• Highest # of STEM degrees granted in the country
• Most innovative universities
• Significant pipeline of capital for emerging companies
• Top incubator for life science and technology companies
• World-renowned research centers
• Development partnerships focused on growing
• Most advanced academic medical centers in the world
• A global hub for international air travel
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 5/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 6/975
4
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 7/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 8/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 9/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 10/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 11/975
nfrastructure for Supporting the Startup
ommunity: Starthub Boston
The City of Boston in partnership with IBM, Venture
Café, and Gust provides a one-stop resource forBoston’s startup community
Starthub Boston offers a one-stop resource guide to events, jobs,
investments, courses, workspaces, incubators, among other resources to
support the startup community in Boston and the Greater Boston region.
starthub.org9
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 12/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 13/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 14/975
A new Kendall Square envisioned in
$1.2b MIT plan
JULY 28, 2015: The plan, six years in the making, calls fo
six new buildings on what is now a string of parking lots
along Main Street. In addition to academic and business
uses, the complex would include apartments for graduastudents and low-income tenants, stores, and a tree-
covered plaza near the Charles River.
Boston, Cambridge are ground zero for life sciences
MARCH 16, 2015: BOSTON-CAMBRIDGE is ground zero
or the development and deployment of many of the
bleeding edge life science discoveries and
echnologies. One corner alone, Vassar and Main
treet in Cambridge, will likely generate 1 to 2 percent
of the future world GDP.
…On a per capita basis, nowhere else comes close in
erms of research grants, patents, and publicationshat drive new gene code, which in turn alters the
evolution of bacteria, plants, animals, and ourselves.
reater Boston - the most innovative area in the world
nd growing…
Vassar and Main: The World's Most Innovative IntersectionNOEMBER 2, 2015: If one had to pick a single corner, anywhere on the planet, as
the most innovative and productive crossroads in history, the intersection of
Vassar Street and Main Street, in the new world's Cambridge, Massachusetts,
would be a leading candidate… 12
The hub of health care
DECEMBER 8, 2015: When it comes to advancing
innovation, the Boston area is one of the world’s most
vital resources for a number of industries, especiallyhealth care.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 15/975
oston-area academic medical centers are driving
he Boston economy and are a worldwide leader
medical innovation
Coalition of 14 Boston-area teaching
hospitals• Beth Israel Deaconess Medical Center
• Boston Children’s Hospital
• Boston Medical Center
• Brigham and Women’s Hospital
• Cambridge Health Alliance
• Carney Hospital
• Dana-Farber Cancer Institute
• Faulkner Hospital
• Lahey Clinic Medical Center• Massachusetts Eye and Ear
• Massachusetts General Hospital
• St. Elizabeth’s Medical Center
• Tufts Medical Center
• VA Boston Healthcare System
Healthcare professionals around
the world begin in Boston
#1 in the # of residents and fellows trained, per cap
#3 in the # of primary care doctors trained, per cap
Boston’s academic, professional medical enterprise
and business climate thrives from a culture ofinnovation, commitment to new discovery and
scaling thee innovations to patients across the globe
#1. Massachusetts Gene
Hospital
#6. Brigham and Wome
Hospital
13
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 16/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 17/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 18/975
16
he world (and the workforce) is experiencing a
ramatic shift in talent supply and talent demand
“There are 80 mill ion Baby Boomers who are going to retire over
the next 5-7 years, and they’re going to be replaced by 40 mill ionGeneration Xers. That’s 2 to 1, so you’d better be developing your
next generation now if you’re going to be ready for that transition.”
- Michael White, Chairman, President, CEO, The Directv Group, Inc
16alent mobility: 2020 and Beyond, PWC, (2012) PwC 15th Annual CEO Survey
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 19/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 20/975
Changed Talent Demands Supply:
Are you ready for them? (Massachusetts is)
“The millennial generation, born between 1980 and 2000 are now
entering employment in vast numbers [sic] will shape the world of workfor years to come. Attracting the best of these millennial workers is
critical to the future of your business. Their career aspirations,
attitudes about work, and knowledge of new technologies will define the
culture of the 21st century workplace.”
“Millennials matter because that
are not only different from those
that have gone before, they arealso more numerous than any
since the soon-to-retire Baby
Boomers…By 2020, millennials
will form 50% of the global
workforce.”
illennials at work, Reshaping the Workforce, (2011). PWC18
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 21/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 22/975
20
Likewise, millennials have made their impact
on the way Boston governs, educates and
inspires…
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 23/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 24/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 25/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 26/975
Massachusetts has been a national leader in
ecruiting and inspiring millennials
Over 46% of incoming freshman are from outside the state.
Nationally, Massachusetts ranks in the top 5 in both completed mastdegrees and doctorate degrees.
• Due to Boston’s world-class educational offerings and emerging industries, Boston is home to th
highest proportion of young adults of any major city in America. Over 35% of Bostonians are
between the ages of 20-34.
• Recognizing the importance of this demographic, the City of Boston launched a special initiative
called, ONEin3, to support, grow and empower Boston’s young adult population.
• In its 11th year, ONEin3 serves to engage Boston’s young adults through opportunities to particip
city government and civic affairs, facilitate communication between young adults and the city’s
leadership, and support a culture which supports the recruitment and retention of millennials.
“With the highest proportion of young adults out of any major city in the country, Boston is leading th
way in attracting and retaining millennials…Together, using innovation and creative thinking, we are
growing Boston as a sustainable place for young adults to live, work, play, and put down roots.“
Boston Mayor, Marty Walsh
24
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 27/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 28/975
oston is an international city that is a great place
or millennials to live, work and be inspired
Mayor Walsh and the City of Boston actively engage millennials through
civic leadership, neighborhood networks and inspirational events such as
the Imagine Boston 2030 citywide planning process and the 2014 World CuViewing Party on City Hall Plaza.
26
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 29/975
.S. News & World Report 2015: Ten Massachuset
chools in the Top 100 National University Ranking
#2
#7
#27
#30
#34
#47
#57
#75
#75
27
#41
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 30/975
Massachusetts has over 114 Colleges and
niversit ies; with over 400,000 students enrolled
28
There are 114 colleges and universities in the Commonwealth of Massachusetts enrolling over
400,000 students seeking bachelor's or associate degrees (Based on National Center for Education
Statistics, 2014).
• There are as many students seeking bachelor's or associate degrees in the Commonwealth as residents in
three of Connecticut’s largest cities (Hartford, Bridgeport and New Haven.)
50 of these colleges and universities are in the greater Boston metropolitan area, which is home t
more than 250,000 students.
In addition to the ten Massachusetts colleges and universities ranked in the top ten, there are a
number of other renowned higher education institutions in the Commonwealth:
American International College
Assumption College
Babson College
Bay Path University
Bentley University
Bridgewater State University
Cambridge College
College of the Holy Cross
Curry College
Emerson College
Emmanuel College
Endicott College
Fitchburg State University
Framingham State University
Lesley University
Massachusetts College of Pharmacy and Health Science
Merrimack College
Mount Holyoke College
Northeastern University Global Network
Salem State University
Simmons College
Smith College
Springfield College
Stonehill College
Suffolk University
University of Massachusetts-Boston
University of Massachusetts-Dartmou
University of Massachusetts-Lowell
Wellesley College
Western New England University
Westfield State University
Williams College
Worcester State University
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 31/975
oston is the center of STEM education: Both the
ational leader in STEM degrees granted and top
anked universit ies in STEM
STEM (Science, Technology, Engineering & Math)
• MA is #1 nationally in STEM graduate and professional degrees granted per capita
• Two Massachusetts universities rank in the top five best graduate schools for
math: Massachusetts Institute of Technology (#1) and Harvard University (#3)
Science
• MA is #4 nationally in number of Science graduate and professional degrees granted
• Three Massachusetts universities rank in the top 25 of the best schools for computer
science: Massachusetts Institute of Technology (#1) , Harvard University (#18) and
University of Massachusetts Amherst #25).
Engineering
• MA is #5 nationally in number of Engineering graduate and professional degrees granted
• Four Massachusetts universities rank in the top 50 engineering schools : Massachusetts
Institute of Technology (#1) , Harvard University (#20), Boston University (#37) and
Northeastern (#43).
29
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 32/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 33/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 34/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 35/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 36/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 37/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 38/975
36
MAY 6, 2015: Announced plans to
eate a new drug delivery and device
innovation center with over 30
scientists and engineers.
MARCH 2, 2015: Announced t
formation of a new global innova
and R&D center in MA with plan
employ over 400 people.
MAY 19, 2015: Announced the creation of a new $25 millio
five-year research alliance with MIT and is moving its U.S. R
headquarters to MA from its current headquarters in New Y
JULY 30, 2014: Announced an expansion of
its research center with plans to add more
jobs to their existing 180 employees.
JANURY 7,2015: Manufacturer of next-
generation carbon nanotubes, announced the
relocation of its corporate headquarters from
Arizona to MA.
**, **
FEBRUARY, 4, 2014: Opened its new 1.1 million square f
corporate headquarters in Boston’s Seaport District;
bringing all 1,300 of its Massachusetts employees toget
under the same roof by mid-2014.
MARCH 18, 2013: Announced plans to
expand its Waltham research anddevelopment center over the next
two years as the company eliminates
about 1,200 positions at its US
headquarters in Wilmington, Del.
**
*MIT Technology Review: 50 Smartest Companies 2015 or 2014; ** Fortune 500 Company
Many of the world's most leading-edge companies ha
either moved or expanded in MA over the last year
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 39/975
37
DECEMBER 16, 2015: Announced plans to
create a new drug delivery and deviceinnovation center with over 30 scientists
and engineers.
DECEMBER 16, 2015: Unveiled a $600
million, 550,000 square-foot facility that
will campus will be a life sciences gateway ,
employing over 1,000 researchers and staff.
JANUARY 16, 2015: Announced the expansion of their existing loas part of an expanded US headquarters for Shire covering abo
900,000 square feet including the building a new manufacturing
and headquarters for its Human Genetic Therapies.
SEPTEMBER 23, 2015: Announced plans create a new operatio
house its new digital health venture, IBM Watson Health, to Gre
Boston; creating 160,000 square feet of R&D space and hiring least 500 new senior-level researchers and computer scientist
DECEMBER 21, 2015: Announced a new
$335 million joint venture with CRISPR
Therapeutics with plans to employ 40-50
people; operating out of Cambridge, MA.
*
DECEMBER 18, 2015: Announced a $300
million renovation and expansion of its
manufacturing plant in Walpole resulting in
up to 700 research and operations staff.
*MIT Technology Review: 50 Smartest Companies 2015 or 2014; ** Fortune 500 Company
**
Massachusetts is THE DESTINATION of the world's mo
nnovative, dynamic and leading-edge companies
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 40/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 41/975
From: Karyn Polito
To: Jay Ash; Steven Kadish
Subject: Connecticut -
Date: Monday, June 01, 2015 9:58:23 PM
There's an article in Hartford Courant about raising taxes- and response from AETNA
Travellers and GE. Would be nice to welcome more insurers to MA!
Capitol Watch
Reports from the Courant's politics staff
Politics Capitol Watch
GE, Aetna, Travelers Issue
Statements Against CT Tax
Package In Rare Move
Weather Alert inTolland, Hartford, New London, New Ha
Middlesex and Fairfield counties.
Sign up today and save up to 83% on a Ha
Courant digital subscri
GOV E-
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 42/975
Sent from my iPhoneKaryn Polito
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 43/975
From: Kadish, Steven (GOV)
To: Sullivan, Jennifer F. (ANF); Povich, Lon (GOV); Frazier, Ricks (EOHED)
Cc: Lepore, Kristen (ANF); Ash, Jay (EOHED)
Subject: connecting Jen, Lon,Ricks
Date: Tuesday, December 08, 2015 7:28:50 AM
Jen’s #
From: Sullivan, Jennifer F. (ANF)Sent: Monday, December 07, 2015 8:33 PMTo: Kadish, Steven (GOV)Subject: Re: MassWorks document
Yes, is my cell or home.
On Dec 7, 2015, at 8:27 PM, Kadish, Steven (GOV) <[email protected]> wrote:
Jen,
Can I call you tonight?
What#?
Thx.
Sent from my iPhone
Begin forwarded message:
From: "Kadish, Steven (GOV)" <[email protected]>
Date: December 7, 2015 at 7:53:45 PM EST
To: "Lepore, Kristen (ANF)" <[email protected]>
Cc: "Kennealy, Michael (EOHED)"
<[email protected]>, "Ash, Jay (EOHED)"
< [email protected]>, "Sullivan, Jennifer F. (ANF)"
Subject: Re: MassWorks document
We just tried you.
What # can we call?
Sent from my iPhone
On Dec 7, 2015, at 7:17 PM, Lepore, Kristen (ANF)
<[email protected]> wrote:
We need to talk ASAP. Jen got info from bond counsel that
significantly changes things.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 44/975
From: Kennealy, Michael (EOHED)Sent: Monday, December 07, 2015 5:56 PMTo: Ash, Jay (EOHED); Kadish, Steven (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF)Subject: Re: MassWorks document
And all to be reviewed by City too - Jay calling Barros to update him.
Mike Kennealy
On Dec 7, 2015, at 5:46 PM, Kennealy, Michael (EOHED)
<[email protected]> wrote:
Attached please find a memo from our
MassWorks director describing some of the
larger projects completed. I need to give this a
closer read tonight, but I think it is at least a
good start. On other items:
- Jennifer is doing a first draft of the 1 –
1½ page document. I will look at
tonight, made comments and send
back to her; we are then discussing at
7am tomorrow and will send to this
group ASAP guessing 8/8:30am.
- Jay and I discussed sending the 1 – ½
pager with two attachments (slightly
different game plan than discussed in
the meeting)
o MassPort site document – I think
I heard them commit to
getting us something mid-
morning tomorrow
o MassWorks document attached
(with edits obviously)
- Do not propose that we send either
o A separate site document from us – I think MassPort really
needs to drive this; obviously
we’ll make edits/additions
o The MOBD memo on other
benefits to GE – these points
are really all captured in the 1-
1/2 pager now
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 45/975
So a good concise package to them by [noon?]
tomorrow
- Cover letter
- Site document
- MassWorks
Any questions let me know.
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic
DevelopmentOne Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
<Updated - Examples of MassWorks Capabilities 20151207.docx MJK.docx>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 46/975
From: Kadish, Steven (GOV)
To: Ash, Jay (EOHED); ; [email protected]; Lepore, Kristen (ANF); Buckley, Timothy (GOV); Conroy, Jim (GOV); Povich, Lon (GOV)
Subject: Did you see Wall St Journal article about GE decision to move?
Date: Friday, September 11, 2015 8:07:41 AM
Immelt talks about support for the Ex-Im Bank as a key factor.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 47/975
From: John Regan
To: Ash, Jay (EOHED)
Subject: FW: BD"s number
Date: Sunday, May 31, 2015 3:38:13 PM
Brackett Denison's cell number is
And, according to Jim McGaugh, the GE team is really fired up over this
situation...
Please let me know if there is anything I/AIM can do to help...
John
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 48/975
From: Povich, Lon (GOV)
To: Frazier, Ricks (EOHED)
Cc: Kadish, Steven (GOV)
Subject: Fw: Call for noon tomorrow/Sunday
Date: Sunday, November 29, 2015 1:50:57 PM
adding Ricks
________________________________________
From: Kadish, Steven (GOV)
Sent: Sunday, November 29, 2015 1:47 PM
To: Kennealy, Michael (EOHED)
Cc: Wehrs, Brianna (GOV); Zarrella, Lily (GOV); Goodall, Devon (GOV); Ash, Jay (EOHED); Lepore, Kristen
(ANF); Pollack, Stephanie (DOT); Garrity, Rob (DOT); Povich, Lon (GOV); Elizabeth Morse; Tom Glynn;
Buckley, Timothy (GOV); Conroy, Jim (GOV); ; Polito, Karyn (GOV); Sullivan, Jennifer F. (ANF)
Subject: Re: Call for noon tomorrow/Sunday
If I understand the format of the proposal, I think that there are 3 documents needed:
1. Booklet of properties, including site information
2. Letter outlining the elements of the City-State proposal
3. An appendix type document that outlines the various statutes, application process, how the calculations work.
This document could also include the parking discussion and requirements, as well as a possible comparison of key
state and local tax features comparing MA, CT and NY. This document could work as a PowerPoint.
Sent from my iPhone
> On Nov 29, 2015, at 11:33 AM, Kennealy, Michael (EOHED) <[email protected]>
wrote:
>
> Attached please find two documents for our call today at 12pm:
>> - An update memo
> - Jay's chart sent on Friday
>
> Looking forward to speaking then.
>
> Mike
>
> ________________________________________
> From: Wehrs, Brianna (GOV)
> Sent: Saturday, November 28, 2015 4:45 PM
> To: Kadish, Steven (GOV)
> Cc: Zarrella, Lily (GOV); Goodall, Devon (GOV); Ash, Jay (EOHED); Kennealy, Michael (EOHED); Lepore,
Kristen (ANF); Pollack, Stephanie (DOT); Garrity, Rob (DOT); Povich, Lon (GOV); Elizabeth Morse; Tom Glynn;
Buckley, Timothy (GOV); Conroy, Jim (GOV); ; Polito, Karyn (GOV)
> Subject: Re: Call for noon tomorrow/Sunday
>
> I just sent a calendar invite. Please let me know if there's any issues.
>
> Brianna Wehrs
> Executive Assistant to Governor Charlie Baker
> Office: 617-725-4048
> Cell: 617-483-3397
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 49/975
>
>> On Nov 28, 2015, at 4:36 PM, Kadish, Steven (GOV) <[email protected]> wrote:
>>
>> Brianna, Lily or Devon--please send out a calendar invite for a call at noon tomorrow/Sunday for the folks
copied on this email.
>>
>> Elizabeth: please invite Jim D if you would like.
>>
>> If you have questions about the call, please contact Sec Ash, Mike Kennealy or me.
>>
>> Thx.
>> Steve
>>
>> Sent from my iPhone
> <Project Plum memo Nov. 29.docx>
> <Project Plum - Chart of Second Offer.docx>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 50/975
From: Kennealy, Michael (EOHED)
To: jdoolin
Subject: FW: Call to review proposal
Date: Tuesday, December 08, 2015 3:23:00 PM
Jim, looks like 2 calls – Amy and Brent. Would 5pm work today for you with Amy?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 2:52 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: Call to review proposal
Also, let me know about a call with Brent and Massport – that discussion is maybe even more
important to understanding how to properly value the offer (assuming the sites work).
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Tuesday, December 08, 2015 2:49 PMTo: Eisenstadt, Amy (GE, Corporate)Subject: RE: Call to review proposal
Ok let me see about 5pm today, thanks.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 51/975
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 2:46 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: Call to review proposal
We can be available at 5 today or anytime tomorrow morning.
I’m not sure about Brent, but I think he can do a call separately with whoever from the State and
Massport is best positioned to talk about the specifics of the structure/lease terms etc.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Tuesday, December 08, 2015 2:41 PMTo: Eisenstadt, Amy (GE, Corporate); [email protected]: Mcgaugh, James (GE Corporate); Roberti, Scott (GE, Corporate); Woodruff, Brent (GE Global Operations, consultant)Subject: RE: Call to review proposal
Of course Amy. Could you let me know some times that might work for a call and I’ll assemble the
team here?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 2:36 PM
To: Kennealy, Michael (EOHED) <[email protected]>;
Cc: Mcgaugh, James (GE Corporate) < [email protected]>; Roberti, Scott (GE, Corporate)
<[email protected]>; Woodruff, Brent (GE Global Operations, consultant)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 52/975
Subject: Call to review proposal
Mike/John:
Please let me know when you can do a call to review the proposal. As I’m sure you expected, we do
need clarification of a few points.
Also, we need someone from Massport who can discuss the structure of the building development
with Brent Woodruff. I’m copying Brent on this email as the timing of that discussion will need to
be arranged directly with him.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 53/975
From: Kennealy, Michael (EOHED)
To: Kadish, Steven (GOV); Ash, Jay (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Tom Glynn; Elizabeth Morse; jdoolin; Povich, Lon (GOV); Garrity, Rob (DOT)
Subject: FW: Call to review proposal
Date: Tuesday, December 08, 2015 2:52:34 PM
Team, please see 2 emails below from GE tax counsel – who should be on this call and does 5pm
today work or tomorrow morning?
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 2:46 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: Call to review proposal
We can be available at 5 today or anytime tomorrow morning.
I’m not sure about Brent, but I think he can do a call separately with whoever from the State and
Massport is best positioned to talk about the specifics of the structure/lease terms etc.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Kennealy, Michael (SEA) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 2:41 PMTo: Eisenstadt, Amy (GE, Corporate); [email protected]: Mcgaugh, James (GE Corporate); Roberti, Scott (GE, Corporate); Woodruff, Brent (GE Global Operations, consultant)Subject: RE: Call to review proposal
Of course Amy. Could you let me know some times that might work for a call and I’ll assemble the
team here?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of MassachusettsExecutive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 54/975
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 2:36 PM
To: Kennealy, Michael (EOHED) <[email protected]>;
Cc: Mcgaugh, James (GE Corporate) < [email protected]>; Roberti, Scott (GE, Corporate)
<[email protected]>; Woodruff, Brent (GE Global Operations, consultant)
<[email protected]>Subject: Call to review proposal
Mike/John:
Please let me know when you can do a call to review the proposal. As I’m sure you expected, we do
need clarification of a few points.
Also, we need someone from Massport who can discuss the structure of the building development
with Brent Woodruff. I’m copying Brent on this email as the timing of that discussion will need to
be arranged directly with him.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 55/975
From: Kennealy, Michael (EOHED)
Subject: FW: Call to review proposal
Date: Tuesday, December 08, 2015 2:49:00 PM
John, would 5pm work today for you?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 2:46 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: Call to review proposal
We can be available at 5 today or anytime tomorrow morning.
I’m not sure about Brent, but I think he can do a call separately with whoever from the State and
Massport is best positioned to talk about the specifics of the structure/lease terms etc.
Amy EisenstadtState Tax Counsel
General Electric Company
(cell)
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Tuesday, December 08, 2015 2:41 PMTo: Eisenstadt, Amy (GE, Corporate); [email protected]: Mcgaugh, James (GE Corporate); Roberti, Scott (GE, Corporate); Woodruff, Brent (GE Global
Operations, consultant)Subject: RE: Call to review proposal
Of course Amy. Could you let me know some times that might work for a call and I’ll assemble the
team here?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 56/975
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 2:36 PM
To: Kennealy, Michael (EOHED) <[email protected]>;
Cc: Mcgaugh, James (GE Corporate) < [email protected]>; Roberti, Scott (GE, Corporate)
<[email protected]>; Woodruff, Brent (GE Global Operations, consultant)
Subject: Call to review proposal
Mike/John:
Please let me know when you can do a call to review the proposal. As I’m sure you expected, we do
need clarification of a few points.
Also, we need someone from Massport who can discuss the structure of the building development
with Brent Woodruff. I’m copying Brent on this email as the timing of that discussion will need to
be arranged directly with him.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 57/975
From: Kennealy, Michael (EOHED)
To: John Barros
Subject: FW: Call to review proposal
Date: Tuesday, December 08, 2015 2:38:00 PM
John, let me see who we need from the state and their availability.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 2:36 PM
To: Kennealy, Michael (EOHED) <[email protected]>;
Cc: Mcgaugh, James (GE Corporate) <[email protected]>; Roberti, Scott (GE, Corporate)
<[email protected]>; Woodruff, Brent (GE Global Operations, consultant)
Subject: Call to review proposal
Mike/John:
Please let me know when you can do a call to review the proposal. As I’m sure you expected, we do
need clarification of a few points.
Also, we need someone from Massport who can discuss the structure of the building development
with Brent Woodruff. I’m copying Brent on this email as the timing of that discussion will need to
be arranged directly with him.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 58/975
From: Frazier, Ricks (EOHED)
To: Kreuter, Erica (EOHED); Cosco, Jonathan (EOHED)
Subject: FW: Call to review proposal
Date: Tuesday, December 08, 2015 4:11:00 PM
FYI
Ricks
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 08, 2015 3:59 PM
To: Kadish, Steven (GOV); Ash, Jay (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Ross,
Robert (ANF); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Tom Glynn; Elizabeth Morse; jdoolin;
Povich, Lon (GOV); Garrity, Rob (DOT)
Subject: RE: Call to review proposal
FYI – call scheduled today with GE tax, CBRE, Massport, possibly A&F. Ann Klee also emailed and
said she will be presenting the terms of the Boston proposal to Plum senior leadership tomorrow end of day. I will report back to this group after the 5pm. I expect tomorrow may be another round
of discussion/negotiation with them ahead of their presentation tomorrow.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640Cell: 617-634-4762
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 08, 2015 2:53 PM
To: Kadish, Steven (GOV) <[email protected]>; Ash, Jay (EOHED)
< [email protected]>; Lepore, Kristen (ANF) <[email protected]>;
Sullivan, Jennifer F. (ANF) <[email protected]>; Ross, Robert (ANF)
<[email protected]>; Frazier, Ricks (EOHED)
<[email protected]>; Pollack, Stephanie (DOT) <[email protected]>; Tom Glynn <[email protected]>; 'Elizabeth Morse'
<[email protected]>; 'jdoolin' < [email protected]>; Povich, Lon (GOV)
<[email protected]>; Garrity, Rob (DOT) <[email protected]>
Subject: FW: Call to review proposal
Team, please see 2 emails below from GE tax counsel – who should be on this call and does 5pm
today work or tomorrow morning?
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 59/975
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 2:46 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: Call to review proposal
We can be available at 5 today or anytime tomorrow morning.
I’m not sure about Brent, but I think he can do a call separately with whoever from the State and
Massport is best positioned to talk about the specifics of the structure/lease terms etc.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Tuesday, December 08, 2015 2:41 PMTo: Eisenstadt, Amy (GE, Corporate); [email protected]: Mcgaugh, James (GE Corporate); Roberti, Scott (GE, Corporate); Woodruff, Brent (GE Global Operations, consultant)Subject: RE: Call to review proposal
Of course Amy. Could you let me know some times that might work for a call and I’ll assemble the
team here?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]Sent: Tuesday, December 08, 2015 2:36 PM
To: Kennealy, Michael (EOHED) <[email protected]>;
Cc: Mcgaugh, James (GE Corporate) < [email protected]>; Roberti, Scott (GE, Corporate)
<[email protected]>; Woodruff, Brent (GE Global Operations, consultant)
Subject: Call to review proposal
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 60/975
Mike/John:
Please let me know when you can do a call to review the proposal. As I’m sure you expected, we do
need clarification of a few points.
Also, we need someone from Massport who can discuss the structure of the building development
with Brent Woodruff. I’m copying Brent on this email as the timing of that discussion will need to be arranged directly with him.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 61/975
From: Ash, Jay (EOHED)
To: "Mike Kennealy"
Subject: FW: Meeting Confirmation, GE Team & Logistics - Massachusetts
Date: Monday, July 13, 2015 7:20:00 PM
Attachments: Matthew_G_Cribbins.pdf Laurie Bevier bio.docPereira Outside Bio with photo.pdf Cavanaugh bio 2015.docMay Bio 1-2015.doc
Wills Bio July 2015.docCDrumgoole Bio - GE Chief Operating Officer 04102015tr (2).pdf Klee Bio.docx
You’re the one coordinating this. You, me and Nam – anyone else?
From: Kulish, Karen (GE, Corporate) [mailto:[email protected]]
Sent: Friday, July 10, 2015 4:50 PM
To: Ash, Jay (EOHED)
Cc: Kulish, Karen (GE, Corporate)
Subject: Meeting Confirmation, GE Team & Logistics - Massachusetts
Jay,
I am writing to confirm your meeting at our GE offices in Fairfield, CT on July 30 at 1:30 – 3:30. We
look forward to seeing you then.
Below are the GE folks who’ll be at the meeting, and their bios are also attached.
Laurie Bevier Sr. Human Resources Manager
Eileen Cavanaugh CFO Corporate/Global Operations
Matt Cribbins VP, Investor CommunicationsChris Drumgoole CFO, IT
Ann Klee VP, Global Operations, Environment, Health & Safety
Michelle May Director, Culture Communications
Chris Pereira Chief, Securities & Finance Counsel
Sarah Wills Executive Director, Strategy
We would also request bios be provided for all those who will attend from your side.
The meeting will be held at our GE Guest House, Conference Room “B”, and upon going through
Security and obtaining badges you will be directed to Guest House parking.
If there are any changes, please be sure that you provide to me the names of EVERYONE who will
attend the meeting as I need to clear each individual through GE Security. Please confirm whether
the Governor will attend and, if so, whether you will be sending a security detail in advance of the
visit. We are a secure facility, however, we do understand that you may want to do this.
Don’t hesitate to contact me with any questions.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 62/975
Have a good weekend,
Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
O:
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 63/975
Matthew G. Cribbins
Vice President
Corporate Investor Communications
Matthew Cribbins has been the vice president of Corporate Investor Communications since January
2014.
Cribbins is a 1998 graduate of GE Capital's Financial Management Program, where he rotated
through multiple finance assignments in GE Capital and GE Company. He spent six years on GE's
Corporate Audit Staff (CAS), becoming an executive audit manager for Commercial Finance. In
2003, he was named chief financial officer (CFO) for GE Energy Financial Services. He was
promoted to CFO, GE Commercial Finance Asia in 2006, based in Tokyo, Japan. In 2008, he became
the CFO of GE Capital Asia. In 2009, he was named the vice president of Financial Planning and
Analysis for GE Capital. Prior to his current role, Cribbins was the vice president of Audit Staff since
January 2011.
Cribbins is a graduate of Holy Cross College with a B.A. in Economics and resides in New Canaan,
CT.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 64/975
Laurie F. Bevier
Senior Human Resources Leader
GE Corporate
Fairfield, CT
Laurie Bevier is Senior Human Resource Manager for GE Corporate. In this role, she is responsible for developing the
company’s global talent pipeline, functional learning programs, and corporate HR strategy. She also leads the company’s
global leadership development programs.
Prior to her current role, Laurie served as the Organization and Talent Development Leader for GE’s Global Growth and
Operations organization, responsible for developing the global talent pipeline from entry level to executive leadership in
key growth markets. She is also the founder and Senior HR Sponsor for GE’s Corporate Leadership Staff program (CLS),
GE’s premier, leadership acceleration program focused on developing business leadership capabilities and industry
domain expertise for the next generation of GE’s global business leaders. In November of 2012, Laurie’s role expanded
to include responsibility for all global leadership programs across GE.
Laurie began her career with GE Energy in 1992 on GE’s Human Resources Leadership Program (HRLP) with her firstassignment off the program as a Plant HR Generalist. She then became the HR Manger for GE Healthcare Latin America
team. In 1998, Laurie was promoted to Director of HR Development for GE Capital, responsible for building the
functional pipeline and leading organization and staffing activities across the business for GE Capital. In 2002, she was
named as a leader in GE’s Corporate Executive Development team working on executive slates and development
programs across the company, including the creation of GE’s Growth Traits and Employee Engagement initiative. She
became the HR Leader for GE Sensing in May 2005, and assumed additional HR responsibilities for Inspection
Technologies in April 2006 following the merger of these two businesses. Most recently, Laurie served as senior HR
leader for GE Security until the business disposition in March 2010.
Laurie holds a bachelor’s degree in Public Policy Studies from Duke University and a master’s degree in Management
from the Kellogg School at Northwestern University. She and her husband have two children.
T:E:W: www.ge.com
3135 Easton Turnpike
Fairfield, CT, 06828, USA
General Electric Company
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 65/975
Christoph A. PereiraChief Corporate, Securities & Finance CounselGeneral Electric Company
Mr. Pereira serves as General Electric Company's Chief Corporate, Securities & Finance Counsel. Heoversees all legal matters for GE and its businesses relating to global securities law, corporategovernance, corporate finance and corporate law. Mr. Pereira joined GE in March of 2007.
From 2004 to 2007, Mr. Pereira served as Vice President of Legal Affairs & Secretary of Exelixis, aNASDAQ-listed biotechnology company based in South San Francisco. He reported to the CEOand was a member of the Company’s executive management committee with responsibility for a wide range of general counsel duties.
Before joining Exelixis, Mr. Pereira practiced law at Sullivan & Cromwell’s New York and Silicon Valley offices from 1998 to 2004. He specialized in mergers and acquisitions, securities law and privateequity.
From 1995 to 1997, Mr. Pereira clerked at the Federal Courts in Austria.
Mr. Pereira received his law degrees from the University of Chicago Law School and the University ofVienna Law School, and is a CFA charterholder.
Mr. Pereira is a frequent speaker on securities, finance and board related matters. He serves on the
NYSE Governance Council, the Securities Regulation Committee of the New York City Bar Association
and the Executive Committee of the Shareholder Relations Society of New York.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 66/975
EILEEN M. CAVANAUGH
"EILEEN"
CFO – Corporate /Global Operations
GE CorporateFairfield, CT
Eileen was born in Long Island, New York. She attended Fairfield University
and graduated with a B.A. Degree in Economics and Political Science in
1989. After graduation Eileen joined General Electric's Financial
Management Program at Electrical Distribution & Control and had
assignments in Plainville and Puerto Rico. After FMP Eileen held several
finance positions in Puerto Rico, London and Plainville. In 1994 Eileen
joined GE Power Systems in Schenectady, NY as a Program Manager for
Sourcing Finance. In late 1995 Eileen joined Corporate Treasury in Fairfield
as a Project Manager and Analyst. In 1997 Eileen joined Corporate
Financial Planning & Analysis as an Analyst. In 1998 she was appointed
Manager of Financial Planning & Analysis for GE Supply. In 2000 Eileen
rejoined Corporate FP&A as the Senior Income Analyst for Total Company.
In 2004 Eileen was promoted to Manager – Corporate Operations &
Controllership. Eileen and her team support the Corporate Functions and
over 50 residual entities. In 2014 Eileen was named CFO – Corporate and
Global Operations, expanding her responsibilities to include the Global Ops
business. Eileen is a graduate of GE’s Experienced Financial Leadership
Program and has an MBA in International Business from RPI.
Eileen is married to Peter and they have four children – a sixteen year old
son, fourteen year old twin daughters and an eight year old boy. She
enjoys spending her time with her family, friends and traveling.
3135 Easton Turnpike W3E
Fairfield, CT 06431
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 67/975
Michelle MayDirector, Culture CommunicationsGE
Michelle May is the director of culture communications for GE. In this role, she isresponsible for strengthening GE’s culture by engaging employees and leaders aroundGE’s strategy helping them to think and act in new ways, pushing our boundaries to createa simpler, faster GE for our customers, employees and shareholders. Michelle is focusedon creating 360-degree communications programs working together with business,function and region communicators to deliver better outcomes for our customers. Sheleads communications for the Communications & Commercial function and participates in
the Commercial Council supporting its initiatives and best practice sharing. In addition, sheworks with commercial leaders and business communications teams to create a consistentand compelling narrative across GE.
Michelle joined GE in 1995 as communications/health care manager for GE Motors &Industrial Systems after working for a health care system leading public relations,community relations, sales and physician recruiting. She has held a variety ofcommunications, public relations and marketing communications roles across thecompany in several industrial and consumer businesses. In 2007, Michelle was namedcommunications leader for Enterprise Solutions. In December 2009, she transitioned toleading executive communications and public relations for GE Home & BusinessSolutions, IT, GE Advantage, Licensing and Corporate Leadership Staff. In February 2013,
she took on the role of commercial communications for GE Corporate and her roleexpanded in August 2013 to include employee communications for GE.
Michelle received her bachelor of science in business from Indiana University and amaster’s degree in business administration from Krannert School of Management atPurdue University.
Michelle is married and has two children.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 68/975
Sarah is General Manager, Strategy and Growth, GE Corporate HQ.
In this role, Sarah drives change to fortify the company’s overall competitive advantage
in the marketplace, including identifying disruptive trends, technologies and market
themes, and leading execution of strategic priorities. Sarah also develops and manageskey strategic relationships for GE’s market development. In addition, Sarah leads
FastWorks, GE’s tools, principles and platform for delivering speed and customer
intensity.
Prior to this role, Sarah was Executive Counsel in the Chairman’s Office. Sarah joined GE
in 2007.
Before joining GE, Sarah was Executive Director of a non-profit organization founded by
then-Senator Hillary Rodham Clinton. The organization was dedicated to developing
entrepreneurs and start-ups in emerging technologies. Sarah started her career as apolicy advisor in the U.S. Senate in Washington DC.
Sarah is a graduate of Georgetown University Law Center and Illinois Wesleyan
University. She lives in Ridgefield, CT with her husband and twin sons.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 69/975
Chris DrumgooleChief Operating Officer
Chris Drumgoole is GE’s Chief Operating Officer – IT. In this role, he leads the company’s IT Infrastructure
teams globally, responsible for the successful operation of the IT systems supporting all of GE’s business
units around the world. Additionally he leads GE’s enterprise and industrial cloud strategy, including the
company’s provider and application transition to the cloud as well as the company’s infrastructure
supporting the Industrial Internet and Internet of Things.
Chris has a proven reputation for transforming enterprise IT infrastructure, operating models and
services delivery frameworks.
He joined GE from Verizon Terremark, where he served as Chief Operating Officer and Senior Vice
President of Global Operations with responsibilities including data center commissioning and operations,
service delivery, product development, as well as cloud computing operations across the enterprise. He
also has over 15 years of technology and financial services experience, including design and
architecture work for large retail trading platforms, high-traffic consumer Web properties, and
computing/storage grids, having held leadership and technologist positions with the Toronto Dominion
Bank, IBM, MasterCard International, Cable & Wireless, and Exodus/Savvis. Chris studied Information
Systems at Pace University in New York. He and his family currently reside in Connecticut.
About IT at GE
IT is being reimagined around us and forward thinking companies like General Electric (NYSE: GE) are
leaning in. As IT takes an ever greater role in the world, we’re finding ourselves at the center of the show,
not just in computing and communication; but manufacturing, finance, transportation and more. We’re
no longer here to support the strategy of our businesses; today, IT is a catalyst for shaping that strategy.
At GE, our IT team are the integrators of innovation, process and technology and will redefine the way
business is done.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 70/975
Ann R. Klee
VP Global Operations - Environment, Health & Safety GE, Fairfield, CT
Ann Klee is the Vice President, Global Operations – Environment, Health &Safety at GE.
Prior to joining GE, Ann was a partner and co-chair of the Environmentaland Natural Resources Group of Crowell & Moring LLP. Ann served as theGeneral Counsel of the U.S. Environmental Protection Agency (2004-2006)and Counselor and Special Assistant to the Secretary of the U.S.
Department of the Interior (2001 to 2004). She also spent time on CapitolHill as Chief Counsel to the Senate Committee on Environment and PublicWorks.
She has served on the Board of Trustees of the National Park Foundation,Center for Climate and Energy Strategies, and the Environmental LawInstitute.
Ann received her J.D. from the University of Pennsylvania, and her B.A.with High Honors from Swarthmore College.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 71/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 72/975
From: Kennealy, Michael (EOHED)
To: Ash, Jay (EOHED); Kirk, Carolyn (EOHED); Nunnelly, Mark E (DOR); Pham, Nam (EOHED); Distefano, Maria (MOBD); Servetnick, Adrian (EOHED)
Subject: FW: Meeting Confirmation, GE Team & Logistics - Massachusetts
Date: Wednesday, July 29, 2015 7:01:00 PM
Attachments: Matthew_G_Cribbins.pdf Laurie Bevier bio.docPereira Outside Bio with photo.pdf Cavanaugh bio 2015.doc
May Bio 1-2015.docWills Bio July 2015.docCDrumgoole Bio - GE Chief Operating Officer 04102015tr (2).pdf Klee Bio.docxCommonwealth of Massachusetts bios.pdf
Everybody travelling to Connecticut tomorrow - please see two emails below with information about
our meeting. I have also attached bios for the GE folks as well as the bios on us that we sent over.
Could folks let me know how they are getting there tomorrow? They wanted to have some idea of
number of cars. Any questions please call my cell phone number below. See you tomorrow.
Thanks,Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: [email protected]
-------- Original message --------From: "Kulish, Karen (GE, Corporate)" <[email protected]>Date: 07/21/2015 3:05 PM (GMT-05:00)To: "Ash, Jay (EOHED)" < [email protected]>Cc: "Kulish, Karen (GE, Corporate)" <[email protected]>Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
Jay,
I am writing to reconfirm your meeting with us on Thursday, July 30th from 1:30 – 3:30. The meeting will be held at our GE Guest House, 3135 Easton Turnpike, Fairfield, CT 06828, and upon going through Security and obtaining badges you will be directed to the Guest House and parking. I will be present at the Guest House entry upon the team’s arrival to guide folks to the meeting.
I would also ask that the team contact me when they are approx. 10 mins. out. My cell is 203-598-1348. Please let me know if you have any questions.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 73/975
Thank you,Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & SafetyO:
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
From: Kulish, Karen (GE, Corporate) [mailto:[email protected]]
Sent: Friday, July 10, 2015 4:50 PM
To: Ash, Jay (EOHED)
Cc: Kulish, Karen (GE, Corporate)
Subject: Meeting Confirmation, GE Team & Logistics - Massachusetts
Jay,
I am writing to confirm your meeting at our GE offices in Fairfield, CT on July 30 at 1:30 – 3:30. We
look forward to seeing you then.
Below are the GE folks who’ll be at the meeting, and their bios are also attached.
Laurie Bevier Sr. Human Resources Manager
Eileen Cavanaugh CFO Corporate/Global Operations
Matt Cribbins VP, Investor Communications
Chris Drumgoole CFO, IT
Ann Klee VP, Global Operations, Environment, Health & Safety
Michelle May Director, Culture Communications
Chris Pereira Chief, Securities & Finance Counsel
Sarah Wills Executive Director, Strategy
The meeting will be held at our GE Guest House, Conference Room “B”, and upon going through
Security and obtaining badges you will be directed to Guest House parking.
Don’t hesitate to contact me with any questions.
Have a good weekend,
Karen
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 74/975
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
O:
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 75/975
Matthew G. Cribbins
Vice President
Corporate Investor Communications
Matthew Cribbins has been the vice president of Corporate Investor Communications since January
2014.
Cribbins is a 1998 graduate of GE Capital's Financial Management Program, where he rotated
through multiple finance assignments in GE Capital and GE Company. He spent six years on GE's
Corporate Audit Staff (CAS), becoming an executive audit manager for Commercial Finance. In
2003, he was named chief financial officer (CFO) for GE Energy Financial Services. He was
promoted to CFO, GE Commercial Finance Asia in 2006, based in Tokyo, Japan. In 2008, he became
the CFO of GE Capital Asia. In 2009, he was named the vice president of Financial Planning and
Analysis for GE Capital. Prior to his current role, Cribbins was the vice president of Audit Staff since
January 2011.
Cribbins is a graduate of Holy Cross College with a B.A. in Economics and resides in New Canaan,
CT.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 76/975
Laurie F. Bevier
Senior Human Resources Leader
GE Corporate
Fairfield, CT
Laurie Bevier is Senior Human Resource Manager for GE Corporate. In this role, she is responsible for developing the
company’s global talent pipeline, functional learning programs, and corporate HR strategy. She also leads the company’s
global leadership development programs.
Prior to her current role, Laurie served as the Organization and Talent Development Leader for GE’s Global Growth and
Operations organization, responsible for developing the global talent pipeline from entry level to executive leadership in
key growth markets. She is also the founder and Senior HR Sponsor for GE’s Corporate Leadership Staff program (CLS),
GE’s premier, leadership acceleration program focused on developing business leadership capabilities and industry
domain expertise for the next generation of GE’s global business leaders. In November of 2012, Laurie’s role expanded
to include responsibility for all global leadership programs across GE.
Laurie began her career with GE Energy in 1992 on GE’s Human Resources Leadership Program (HRLP) with her firstassignment off the program as a Plant HR Generalist. She then became the HR Manger for GE Healthcare Latin America
team. In 1998, Laurie was promoted to Director of HR Development for GE Capital, responsible for building the
functional pipeline and leading organization and staffing activities across the business for GE Capital. In 2002, she was
named as a leader in GE’s Corporate Executive Development team working on executive slates and development
programs across the company, including the creation of GE’s Growth Traits and Employee Engagement initiative. She
became the HR Leader for GE Sensing in May 2005, and assumed additional HR responsibilities for Inspection
Technologies in April 2006 following the merger of these two businesses. Most recently, Laurie served as senior HR
leader for GE Security until the business disposition in March 2010.
Laurie holds a bachelor’s degree in Public Policy Studies from Duke University and a master’s degree in Management
from the Kellogg School at Northwestern University. She and her husband have two children.
T:E: l
W: www.ge.com
3135 Easton Turnpike
Fairfield, CT, 06828, USA
General Electric Company
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 77/975
Christoph A. PereiraChief Corporate, Securities & Finance CounselGeneral Electric Company
Mr. Pereira serves as General Electric Company's Chief Corporate, Securities & Finance Counsel. Heoversees all legal matters for GE and its businesses relating to global securities law, corporategovernance, corporate finance and corporate law. Mr. Pereira joined GE in March of 2007.
From 2004 to 2007, Mr. Pereira served as Vice President of Legal Affairs & Secretary of Exelixis, aNASDAQ-listed biotechnology company based in South San Francisco. He reported to the CEOand was a member of the Company’s executive management committee with responsibility for a wide range of general counsel duties.
Before joining Exelixis, Mr. Pereira practiced law at Sullivan & Cromwell’s New York and Silicon Valley offices from 1998 to 2004. He specialized in mergers and acquisitions, securities law and privateequity.
From 1995 to 1997, Mr. Pereira clerked at the Federal Courts in Austria.
Mr. Pereira received his law degrees from the University of Chicago Law School and the University ofVienna Law School, and is a CFA charterholder.
Mr. Pereira is a frequent speaker on securities, finance and board related matters. He serves on the
NYSE Governance Council, the Securities Regulation Committee of the New York City Bar Association
and the Executive Committee of the Shareholder Relations Society of New York.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 78/975
EILEEN M. CAVANAUGH
"EILEEN"
CFO – Corporate /Global Operations
GE CorporateFairfield, CT
Eileen was born in Long Island, New York. She attended Fairfield University
and graduated with a B.A. Degree in Economics and Political Science in
1989. After graduation Eileen joined General Electric's Financial
Management Program at Electrical Distribution & Control and had
assignments in Plainville and Puerto Rico. After FMP Eileen held several
finance positions in Puerto Rico, London and Plainville. In 1994 Eileen
joined GE Power Systems in Schenectady, NY as a Program Manager for
Sourcing Finance. In late 1995 Eileen joined Corporate Treasury in Fairfield
as a Project Manager and Analyst. In 1997 Eileen joined Corporate
Financial Planning & Analysis as an Analyst. In 1998 she was appointed
Manager of Financial Planning & Analysis for GE Supply. In 2000 Eileen
rejoined Corporate FP&A as the Senior Income Analyst for Total Company.
In 2004 Eileen was promoted to Manager – Corporate Operations &
Controllership. Eileen and her team support the Corporate Functions and
over 50 residual entities. In 2014 Eileen was named CFO – Corporate and
Global Operations, expanding her responsibilities to include the Global Ops
business. Eileen is a graduate of GE’s Experienced Financial Leadership
Program and has an MBA in International Business from RPI.
Eileen is married to Peter and they have four children – a sixteen year old
son, fourteen year old twin daughters and an eight year old boy. She
enjoys spending her time with her family, friends and traveling.
3135 Easton Turnpike W3E
Fairfield, CT 06431
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 79/975
Michelle MayDirector, Culture CommunicationsGE
Michelle May is the director of culture communications for GE. In this role, she isresponsible for strengthening GE’s culture by engaging employees and leaders aroundGE’s strategy helping them to think and act in new ways, pushing our boundaries to createa simpler, faster GE for our customers, employees and shareholders. Michelle is focusedon creating 360-degree communications programs working together with business,function and region communicators to deliver better outcomes for our customers. Sheleads communications for the Communications & Commercial function and participates in
the Commercial Council supporting its initiatives and best practice sharing. In addition, sheworks with commercial leaders and business communications teams to create a consistentand compelling narrative across GE.
Michelle joined GE in 1995 as communications/health care manager for GE Motors &Industrial Systems after working for a health care system leading public relations,community relations, sales and physician recruiting. She has held a variety ofcommunications, public relations and marketing communications roles across thecompany in several industrial and consumer businesses. In 2007, Michelle was namedcommunications leader for Enterprise Solutions. In December 2009, she transitioned toleading executive communications and public relations for GE Home & BusinessSolutions, IT, GE Advantage, Licensing and Corporate Leadership Staff. In February 2013,
she took on the role of commercial communications for GE Corporate and her roleexpanded in August 2013 to include employee communications for GE.
Michelle received her bachelor of science in business from Indiana University and amaster’s degree in business administration from Krannert School of Management atPurdue University.
Michelle is married and has two children.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 80/975
Sarah is General Manager, Strategy and Growth, GE Corporate HQ.
In this role, Sarah drives change to fortify the company’s overall competitive advantage
in the marketplace, including identifying disruptive trends, technologies and market
themes, and leading execution of strategic priorities. Sarah also develops and manageskey strategic relationships for GE’s market development. In addition, Sarah leads
FastWorks, GE’s tools, principles and platform for delivering speed and customer
intensity.
Prior to this role, Sarah was Executive Counsel in the Chairman’s Office. Sarah joined GE
in 2007.
Before joining GE, Sarah was Executive Director of a non-profit organization founded by
then-Senator Hillary Rodham Clinton. The organization was dedicated to developing
entrepreneurs and start-ups in emerging technologies. Sarah started her career as apolicy advisor in the U.S. Senate in Washington DC.
Sarah is a graduate of Georgetown University Law Center and Illinois Wesleyan
University. She lives in Ridgefield, CT with her husband and twin sons.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 81/975
Chris DrumgooleChief Operating Officer
Chris Drumgoole is GE’s Chief Operating Officer – IT. In this role, he leads the company’s IT Infrastructure
teams globally, responsible for the successful operation of the IT systems supporting all of GE’s business
units around the world. Additionally he leads GE’s enterprise and industrial cloud strategy, including the
company’s provider and application transition to the cloud as well as the company’s infrastructure
supporting the Industrial Internet and Internet of Things.
Chris has a proven reputation for transforming enterprise IT infrastructure, operating models and
services delivery frameworks.
He joined GE from Verizon Terremark, where he served as Chief Operating Officer and Senior Vice
President of Global Operations with responsibilities including data center commissioning and operations,
service delivery, product development, as well as cloud computing operations across the enterprise. He
also has over 15 years of technology and financial services experience, including design and
architecture work for large retail trading platforms, high-traffic consumer Web properties, and
computing/storage grids, having held leadership and technologist positions with the Toronto Dominion
Bank, IBM, MasterCard International, Cable & Wireless, and Exodus/Savvis. Chris studied Information
Systems at Pace University in New York. He and his family currently reside in Connecticut.
About IT at GE
IT is being reimagined around us and forward thinking companies like General Electric (NYSE: GE) are
leaning in. As IT takes an ever greater role in the world, we’re finding ourselves at the center of the show,
not just in computing and communication; but manufacturing, finance, transportation and more. We’re
no longer here to support the strategy of our businesses; today, IT is a catalyst for shaping that strategy.
At GE, our IT team are the integrators of innovation, process and technology and will redefine the way
business is done.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 82/975
Ann R. Klee
VP Global Operations - Environment, Health & Safety GE, Fairfield, CT
Ann Klee is the Vice President, Global Operations – Environment, Health &Safety at GE.
Prior to joining GE, Ann was a partner and co-chair of the Environmentaland Natural Resources Group of Crowell & Moring LLP. Ann served as theGeneral Counsel of the U.S. Environmental Protection Agency (2004-2006)and Counselor and Special Assistant to the Secretary of the U.S.
Department of the Interior (2001 to 2004). She also spent time on CapitolHill as Chief Counsel to the Senate Committee on Environment and PublicWorks.
She has served on the Board of Trustees of the National Park Foundation,Center for Climate and Energy Strategies, and the Environmental LawInstitute.
Ann received her J.D. from the University of Pennsylvania, and her B.A.with High Honors from Swarthmore College.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 83/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 84/975
COMMONWEALTH OF MASSACHUSETTS
Executive Office of Housing & Economic Development
Secretary Jay Ash
Jay Ash serves as the Secretary of Housing and Economic Development for the Commonwealth of
Massachusetts. Secretary Ash is responsible for directing and executing Governor Charlie Baker’s agenda
on housing and community development, job creation, business development, consumer affairs, and
business regulation. He previously served as the city manager in his native Chelsea, a position he held
from 2000 to 2014. In Chelsea, Secretary Ash’s leadership produced both economic expansion and fiscal
stability. He grew the city’s housing stock by over ten percent, expanded its commercial base with twodozen major projects, led all Gateway Cities with a 15% increase in new employment, developed 10 new
parks, secured five credit rating increases, and won two All-America City designations for Chelsea.
Secretary Ash has led statewide initiatives on health insurance, youth violence, transportation
infrastructure and expanded gaming in Massachusetts. He previously served as co-founder and vice-
chair of the Metropolitan Mayors Coalition, as past president of the Metropolitan Area Planning Council,
as a board member of the public policy think tank MassINC, the staff director to the Massachusetts
House Majority Leader, and as an elected trustee of his alma mater, Clark University.
Deputy Secretary Carolyn Kirk
Carolyn A. Kirk joined the Baker-Polito Administration in January of 2015 and serves as the Deputy
Secretary of the Executive Office of Housing and Economic Development. In this position, Kirk leadsoperational management and shares policy responsibility for the Executive Office of Housing and
Economic Development, the Office of Consumer Affairs and Business Regulation, the Department of
Housing and Community Development, the Mass. Office of Business Development and its ancillary
agencies of Mass. Travel and Tourism, the Mass. Marketing Partnership, and the Mass. Office of
International Trade and Investment. In addition, Kirk is responsible for economic planning and growth in
the Maritime economic sector, oversees the MassWorks grant program, and provides direct support to
the Lieutenant Governor’s office on a number of initiatives. Prior to her appointment with the
Baker/Polito administration, in 2007 Kirk was the first woman popularly elected as Mayor of the City of
Gloucester. Kirk went on to win three subsequent general municipal elections, never lost a ward or a
precinct in any of her contests, and served as Mayor for seven years. Kirk’s administration invested
over $100 million in infrastructure thus laying the groundwork for future economic growth. The first-
ever business class hotel is under construction in the city in a long sought after waterfront location
adjacent to downtown. A new $40 million elementary school, the first one to be built since World War
II and which Kirk led the effort on for seven years, is also under construction in the city. Mayor Kirk’s
professional career spans over 25 years. She is a long-time management consultant and her clients have
included many of the Top 20 banks in the US, along with Fortune 500 companies. She and her husband
Bill Kirk have two children, Sam, 17 and Baylee, 14. Both are enrolled in Gloucester Public Schools. A
graduate of the Boston College class of 1984, Mayor Kirk was born and raised in Clinton, NY and moved
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 85/975
to Massachusetts to attend college. She moved to Gloucester in 1988 where she still resides, and was
drawn to the diversity and beauty of the city.
Assistant Secretary Mike Kennealy
Mike Kennealy is the Assistant Secretary for Business Growth for the Commonwealth of Massachusetts
in the Executive Office of Housing & Economic Development. Mike joined the Baker-Polito
Administration in March 2015 and brings two decades of experience working with the management
teams of growing companies. He joined Spectrum Equity in 1997 and was a Managing Director of the
firm until early 2013. Founded in 1994 with offices in Boston and San Francisco, Spectrum is a leading
growth private equity firm that provides capital and strategic support to its portfolio companies. During
Mike’s more than 15 years at the firm, Spectrum grew from $360 million in assets under management to
$4.7 billion and invested in nearly 100 high growth information services, digital media, software, and
Internet companies. After retiring from Spectrum, he spent two years as Special Advisor to the Receiver
at Lawrence Public Schools. There he worked with the state-appointed superintendent/receiver on
strategic and financial initiatives to support the turnaround plan and developed and managed
relationships with non-profit partners, philanthropic funders, and the municipal government. Earlier in
his career, Mike was an Associate at TA Associates, a Boston-based private equity firm. Mike, his wife,
and three children live in Lexington, where he has served on the Town’s finance committee and a varietyof non-profit boards. He has been a member of the Board of Trustees of St. John’s Prep in Danvers, MA
since 2009 and is Vice Chairman of the Board. Mike received an AB magna cum Laude, Phi Beta Kappa,
with High Honors in Government from Dartmouth College and an MBA from Harvard Business School.
Assistant Secretary Nam Pham
Nam recently joined the Baker-Polito Administration as the Assistant Secretary of Business Development
which oversees the Mass. Office of Business Development, Mass. Office of Travel and Tourism, Mass.
Film Office and Mass. Office of International Trade & Investment. Previously Nam was the CEO of
Vietnamese American Initiative for Development (VietAID). Nam has been a commercial banker for
more than 20 years in both lending and credit for premier community banks and large commercial
banks. From 1994 to 2000 Nam served as Commissioner of Massachusetts Office for Refugees andImmigrants, and Deputy Director of the Massachusetts Office of International Trade & Investment. Nam
earned his BS degree in Business Administration from the University of Minnesota’s Carlson School of
Management, and MPA in Political Economy from Harvard’s Kennedy School of Government.
Regional Director Maria Nigro DiStefano
Maria Nigro DiStefano joined the Baker-Polito Administration in June as the new Northeast Regional
Director for the Massachusetts Office of Business Development (MOBD). MOBD is the state’s one-stop
source for businesses seeking to relocate to Massachusetts or to expand their current operations
here. It provides businesses with information on site locations, workforce availability, funding and
financing and tax incentives. Prior to joining the Administration, she worked for Boston Main Streets as
a Neighborhood Business Manager where she oversaw the development and implementation of
business strategies and provided technical assistance to local Main Streets managers and
volunteers. She graduated cum laude from Salem State College and earned a BA in Political Science &
Sociology, and she lives with her husband and two children in Rockport.
Program and Communications Coordinator Adrian Servetnick
Adrian Servetnick serves as the Program and Communications Coordinator for the Executive Office of
Housing and Economic Development. He is responsible for data analysis and research, as well as
receiving and responding to press inquiries across EOHED. Adrian received a Bachelor of Arts degree in
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 86/975
Political Science from the University of Washington, Seattle, and previously worked as an intern with
Representative Derek Kilmer (D-WA), and with the House Armed Services Committee.
Massachusetts Department of Revenue
Commissioner Mark Nunnelly
Mark Nunnelly serves as Commissioner of the Department of Revenue. He is responsible for overseeing
nearly 2,000 DOR employees in offices across the state who work in tax administration, child support
enforcement and local services for cities and towns. He was appointed on March 30, 2015.
Commissioner Nunnelly, who also serves as Special Advisor to Governor Baker for Technology and
Innovation Competitiveness, brings a track record of building organizations and growing companies in
Massachusetts and across the country. Commissioner Nunnelly joined Bain Capital, one of the world’s
foremost private investment firms, in 1989 as a Managing Director. He held a number of leadership roles
as part of the firm’s growth and global expansion and worked extensively in the business services and
technology industries. Prior to joining Bain Capital, the Commissioner was a Partner at the consulting
firm Bain & Company, working in the US, Asian and European strategy practices. Previously, he worked
at Procter & Gamble in product management. Additionally, Commissioner Nunnelly founded, and had
operating responsibility for, several entrepreneurial ventures. He has been deeply involved in a numberof Massachusetts and national philanthropic efforts, with a particular focus on children and national
service. Commissioner Nunnelly received an MBA with Distinction from Harvard Business School and an
AB from Centre College.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 87/975
From: Kennealy, Michael (EOHED)
To: Jennifer F. Sullivan (ANF) ([email protected])
Subject: FW: Plum
Date: Monday, November 23, 2015 3:26:00 PM
-----Original Message-----
From: Crystal Torman [mailto:[email protected]]Sent: Monday, November 23, 2015 2:29 PM
To: Eisenstadt, Amy (GE, Corporate) <[email protected]>
Cc: John Barros <[email protected]>; Kennealy, Michael (EOHED)
Subject: Re: Plum
Hi all,
Please find conference call information below:
Dial-in Number:
Meeting ID:
Thanks,
Crystal
Crystal Torman
Senior Advisor to the Chief
Mayor's Office of Economic Development
One City Hall Square, 603
Boston, MA. 02201
O: (617) 635-5708
On Mon, Nov 23, 2015 at 2:23 PM, Eisenstadt, Amy (GE, Corporate)
<[email protected]> wrote:
> Will you guys call me or send a call in number? Otherwise I can do it
> tonight or tomorrow am.
>
> Sent from my iPhone
>
> On Nov 23, 2015, at 12:11 PM, John Barros
> <[email protected]<mailto:[email protected]>> wrote:
>
> Amy,
>
> Michael and I can make ourselves available tomorrow morning before
> 10:30AM.
>
> Does 9:30AM work for you? If not please suggest a time. Thanks.
>
> On Mon, Nov 23, 2015 at 8:25 AM, Eisenstadt, Amy (GE, Corporate)
> <[email protected]<mailto:[email protected]>> wrote:
> Tuesday morning. Name a time other than 11.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 88/975
>
> Sent from my iPad
>
> On Nov 23, 2015, at 8:24 AM, John Barros
> <[email protected]<mailto:[email protected]><mailto:[email protected]>>>
> wrote:
>
> Amy,
>
> Michael and I are glad to figure out some time that would work for a call.
> Do you mean a call today when you write "tomorrow morning?"
>
> Johh
>
> On Mon, Nov 23, 2015 at 7:50 AM, Eisenstadt, Amy (GE, Corporate)
> <[email protected]<mailto:[email protected]><mailto:[email protected]>>>
> wrote:
> Thanks for the submission last night. I have reviewed it and the
> regulations for the bond program. I have a number of technical questions
> about the program and the proposal. Can we do a call tomorrow morning to
> discuss?
>
> Sent from my iPad
>
>
>
> --
> John Barros
> Chief of Economic Development
> Office of Mayor Martin J. Walsh
> 6th Floor, Room 603
> Boston City Hall, Boston MA 02201
> t: 617-635-5729<tel:617-635-5729>
> http://www.cityofboston.gov<https://urldefense.proofpoint.com/v2/url?u> =http-3A__www.cityofboston.gov&d=CwMFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_
> RiV3wUrLrDQYWSI&r=H5UBAcrNVbw8cC-NRciouCFogbdFsBHQaW8Swp0XhoM&m=1uZHCl
> D6TJ9Utqq8My3GV6rB3HzaVOzBqpzvC34tpjo&s=Yp8Q2FkaDt5VOCPwk7VwK0U6s0RF3A
> nrXGGa6yjQyZM&e=><https://urldefense.proofpoint.com/v2/url?u=http-3A__
> www.cityofboston.gov&d=CwMFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrD
> QYWSI&r=H5UBAcrNVbw8cC-NRciouCFogbdFsBHQaW8Swp0XhoM&m=yeZwLS-2ZvzF_yUv
> vwNYojMtP8veZ9qUaI_ookgDCKI&s=cN_PGwsTRHc0I3bRzjbl8vq7xcQF6Aun_D0tRlso
> hXI&e=>
>
> SHARE YOUR VISION. SHAPE OUR CITY.
> http://imagine.boston.gov/<https://urldefense.proofpoint.com/v2/url?u=
> http-3A__imagine.boston.gov_&d=CwMFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_Ri
> V3wUrLrDQYWSI&r=H5UBAcrNVbw8cC-NRciouCFogbdFsBHQaW8Swp0XhoM&m=1uZHClD6> TJ9Utqq8My3GV6rB3HzaVOzBqpzvC34tpjo&s=P8mngFNGSQ-ikKcF-ksivLmgchQU2UQ_
> UGwN65Ddnh4&e=><https://urldefense.proofpoint.com/v2/url?u=http-3A__im
> agine.boston.gov_&d=CwMFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYW
> SI&r=H5UBAcrNVbw8cC-NRciouCFogbdFsBHQaW8Swp0XhoM&m=yeZwLS-2ZvzF_yUvvwN
> YojMtP8veZ9qUaI_ookgDCKI&s=DEmswgJBMCfMzTbh8Bm7W3VEnXvZMRclqCoEmU7WvjI
> &e=>
>
>
>
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 89/975
>
> --
> John Barros
> Chief of Economic Development
> Office of Mayor Martin J. Walsh
> 6th Floor, Room 603
> Boston City Hall, Boston MA 02201
> t: 617-635-5729
> http://www.cityofboston.gov<https://urldefense.proofpoint.com/v2/url?u
> =http-3A__www.cityofboston.gov&d=CwMFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_
> RiV3wUrLrDQYWSI&r=H5UBAcrNVbw8cC-NRciouCFogbdFsBHQaW8Swp0XhoM&m=1uZHCl
> D6TJ9Utqq8My3GV6rB3HzaVOzBqpzvC34tpjo&s=Yp8Q2FkaDt5VOCPwk7VwK0U6s0RF3A
> nrXGGa6yjQyZM&e=>
>
> SHARE YOUR VISION. SHAPE OUR CITY.
> http://imagine.boston.gov/<https://urldefense.proofpoint.com/v2/url?u=
> http-3A__imagine.boston.gov_&d=CwMFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_Ri
> V3wUrLrDQYWSI&r=H5UBAcrNVbw8cC-NRciouCFogbdFsBHQaW8Swp0XhoM&m=1uZHClD6
> TJ9Utqq8My3GV6rB3HzaVOzBqpzvC34tpjo&s=P8mngFNGSQ-ikKcF-ksivLmgchQU2UQ_
> UGwN65Ddnh4&e=>
>
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 90/975
From: Kennealy, Michael (EOHED) on behalf of Eisenstadt, Amy (GE, Corporate)
To: "Morse, Elizabeth"; "Doolin, James"; JPranckevicius; "McDonald, Catherine"
Subject: FW: Plum
Date: Wednesday, December 09, 2015 11:44:00 AM
-----Original Appointment-----From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Wednesday, December 09, 2015 11:31 AM
To: Eisenstadt, Amy (GE, Corporate); Kennealy, Michael (EOHED); Woodruff, Brent @ Atlanta
Peachtree ([email protected])
Subject: Plum
When: Wednesday, December 09, 2015 12:00 PM-1:00 PM (UTC-05:00) Eastern Time (US &
Canada).
Where: participant code
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 91/975
From: Kadish, Steven (GOV)
To: Kelleher, Michael (GOV); Weikel, Adam (GOV); Zarrella, Lily (GOV)
Cc: Ash, Jay (EOHED); Kennealy, Michael (EOHED); Kirk, Carolyn (EOHED)
Subject: FW: Presentation on why Boston!
Date: Wednesday, December 23, 2015 3:55:05 PM
Attachments: MA talent_slides draft1.pptx
Mike: Some quick comments.
Jay, Mike, Carolyn – can you please help out on slide 20?
Thx!
Steve
___________________________
p.13: please add Boston University. I think that they are ranked about the same as Northeastern.
p.18: drop the chart at the bottom as the stats presented could be interpreted in a number of ways.
p.19: are there sources for these statements?
p.20: is slide about who has moved here recently or expanded? That’s how I think it should be
titled. I would add Novartis and its enormous new campus in Cambridge, the new Vertex facilities in
the Seaport along with others who have moved to the Seaport, Siemens has a major expansion in
Walpole, BASF has a major facility/expansion in Worcester. (Mike Kennealy, Jay Ash, Carolyn – can
you please help out here?)
p.21: I would drop the quote from Barry Bluestone.
p.23: Please include Lincoln Labs and add a slide that has some of the centers at Northeastern, BU,
Tufts…especially NU. This may be an additional slide?
p.26: This is interesting! What do you mean when you indicate GE under the innovations?
p.27: Can you provide a statement about destinations to key GE locations in the US
p.28: Please do the same for the innovation centers you mentioned internationally? Are there any
direct flights to South America???
From: Kadish, Steven (GOV)Sent: Wednesday, December 23, 2015 3:28 PMTo: ; Ash, Jay (EOHED); Polito, Karyn (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Povich, Lon (GOV); Kennealy, Michael (EOHED); Peyser, Jim (EOE); Reale, Ann (EOE); Tom Glynn; Morse, Elizabeth; [email protected]; Conroy, Jim (GOV); Buckley, Timothy (GOV)Cc: Kelleher, Michael (GOV); Zarrella, Lily (GOV); Weikel, Adam (GOV)Subject: Presentation on why Boston!
Governor, Lt. Governor and colleagues:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 92/975
Attached is terrific presentation on Why Boston/The War for Talent as it relates to the Boston
project.
I want to thank those that have provided the source information.
And I want to especially thank our newest member of the Cabinet Relations team – Michael Keller,
along with support from Lily and Adam – to put this presentation together.
Comments, edits, further additions welcome.Please share your thoughts with Michael, Adam, Lily and me.
I will share this now with the folks from the City.
Best,
Steve
From: Kelleher, Michael (GOV)Sent: Wednesday, December 23, 2015 12:47 PMTo: Kadish, Steven (GOV)
Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)Subject: RE: draft for your review
Steve,
Please see attached for your review a draft slide deck for discussions with GE. You will find herein 30
slides (25 or so with real content). I am not 100% sure the length of time that is available but these
are the slides I would present as the most compelling for “why Boston?”
I am around all day if you want to discuss further or have specific edits/suggestions.
Look forward to your feedback.
Thanks,
Michael
From: Kadish, Steven (GOV)Sent: Monday, December 21, 2015 11:18 AMTo: Kelleher, Michael (GOV); Zarrella, Lily (GOV); Weikel, Adam (GOV)Subject: FW: Any idea of timing for War on Talent materials?
Impressive!
And very much on the right track.
More ideas:
1. Please take a look at the GE website and other sources to see about themes, and other info
that may be relevant. I am hearing on their ads that GE is your industrial and tech
company. For example, the health group and the energy group (Current) are or will be
locating here. What are the other parts of GE that would find the MA ecosystem attractive?
2. I am hearing that Massachusetts is a leader in robotics and industrial design. Can you find
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 93/975
out more and present how this would be attractive to GE?
3.
There are some more War on Talent slides that Adam would have.
4. Can you check on where the top firms go for their recruitment?
5.
Please develop a list of the various institutes on health, tech, innovation, engineering, etc.
Please check the university websites. Broad, MIT’s Center for the Brain, etc.
Good stuff!I will provide more feedback, but please keep going.
From: Kelleher, Michael (GOV)Sent: Saturday, December 19, 2015 10:49 PMTo: Kadish, Steven (GOV)Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)Subject: RE: Any idea of timing for War on Talent materials?
Steve,
Attached are some slides Lily and I put together in the last day or so for your review and comment. I
will look into your questions below re: total # of engineers and scientist going to school in the
Boston area. The slides attached do not have that data but I will dig up tomorrow.
Look forward to your review and guidance,
Michael
From: Kadish, Steven (GOV)Sent: Friday, December 18, 2015 6:28 PMTo: Kelleher, Michael (GOV)Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)Subject: Re: Any idea of timing for War on Talent materials?
If you aren't already, please look at US News and World Report.
Can you also research the # of scientists, engineers who:
-work in the area and a comparative % of the total in the US, World, or whatever makes sense
-were educated in the area
Total # of engineers and scientists going to school in the Boston metro area and how many
graduate each year and what % that may be of the total in the US
More to come!
From: Kadish, Steven (GOV)
Sent: Friday, December 18, 2015 5:00 PM
To: Kelleher, Michael (GOV)
Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)
Subject: Re: Any idea of timing for War on Talent materials?
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 94/975
Great!!
Sent from my iPhone
On Dec 18, 2015, at 4:14 PM, Kelleher, Michael (GOV)
<[email protected]> wrote:
Steve,
Thanks for the additional guidance for the war on talent materials. Lily and I were able
to add a few slides based on previous direction you and Adam provided. We are going
to plow through the list of additional items (as outlined below, assigned to Lily or
myself) and will send you a revised PPT later this evening/first thing tomorrow for your
review and additional edits.
• list of universities in the top 50 - mk
• list of the top colleges - mk
• Top 10 engineering schools - mk
• Top Schools for Innovation in the United States- mk
• Top schools or departments for the sciences - mk
• # of international students going to school in Boston, what specialties - mk
• Top academic medical centers - mk
• List of GE locations around the country/world and an indication of how many of
their leaders went to school here – mk
• # of international patients traveling to Boston AMCs to receive care – mk
• Insert language from innovation one pager that HED put together - Lily• List of all the bio tech, IT, pharma, etc firms that have determined to locate, grow
here in the last few years. (Vertex, Shire, Novartis, Pfizer, Siemens...and all the small
firms) - HED
• Locations of all the company's national and international locations with a map
showing flights from Logan - Massport
Thanks,
Michael
-----Original Message-----From: Kadish, Steven (GOV)
Sent: Friday, December 18, 2015 2:53 PM
To: Weikel, Adam (GOV)
Cc: Kelleher, Michael (GOV); Zarrella, Lily (GOV)
Subject: Re: Any idea of timing for War on Talent materials?
Adam, Michael, Lily,
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 95/975
Ok for you to add more slides on the war on talent idea. I am remembering a pretty
rich set of them that we cut back on in later versions. More to review/include is better
now.
Include a list of universities in the top 50? Also a list of the top colleges?
Top 10 engineering schools?Top schools for innovation?
Top schools or departments for the sciences?
# of international students going to school in Boston, and if possible in what
specialties? I remember lists that would show this.
Top academic medical centers?
Include information where the top firms go to recruit talent?
List of GE locations around the country/world and an indication of how many of their leaders went to school here?
...you get the idea!!
Sent from my iPhone
> On Dec 18, 2015, at 8:29 AM, Weikel, Adam (GOV)
<[email protected]> wrote:
>
> Great!
> I added a few slides overnight and brought Michael into the loop this morning.
> He will keep building and send us something revised this afternoon. He is also able to
help and edit over the weekend.
>
>
>
> -----Original Message-----
> From: Kadish, Steven (GOV)
> Sent: Friday, December 18, 2015 6:46 AM
> To: Weikel, Adam (GOV)
> Subject: Re: Any idea of timing for War on Talent materials?
>
> Not a problem!
> We may have more time and I will let you know.
> Please think if this is something to assign to Michael. It may be good to see what he
can do with something like this!!
>
> Sent from my iPhone
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 96/975
>
>> On Dec 17, 2015, at 9:55 PM, Weikel, Adam (GOV)
<[email protected]> wrote:
>>
>> Thanks Steve. Good to hear we have a little more time.
>>
>> I know this is an important assignment and I feel guilty responding with an excuse.I'm usually all over these kinds of assignments, but we are driving to North Carolina on
Saturday/Sunday for a week with the family.
>> I can find a couple more hours to work on it Friday but I just don't think I can do any
major work by Monday.
>>
>> I will review the info from Sec Ash to see what I can incorporate and I'll try to add a
couple more slides to fill-in the story.
>>
>> I hope this isn't a huge problem.
>> -Adam>>
>>
>> -----Original Message-----
>> From: Kadish, Steven (GOV)
>> Sent: Thursday, December 17, 2015 6:19 PM
>> To: Weikel, Adam (GOV)
>> Subject: RE: Any idea of timing for War on Talent materials?
>>
>> Wow!
>> This is terrific!
>>
>> We just got the word that rather than making a decision this week, that they will not
make a decision until mid-January.
>> So both the good and bad news is that we have more time.
>>
>> With this in mind, what further would you do by Monday?
>>
>> -----Original Message-----
>> From: Weikel, Adam (GOV)
>> Sent: Thursday, December 17, 2015 5:50 PM
>> To: Kadish, Steven (GOV)
>> Subject: RE: Any idea of timing for War on Talent materials?
>>
>> I'm sorry it is so late.
>> We only had a 20 min break midday and 10 minutes in the afternoon.
>> Attached is what I came up with
>>
>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 97/975
>>
>>
>> -----Original Message-----
>> From: Kadish, Steven (GOV)
>> Sent: Thursday, December 17, 2015 3:38 PM
>> To: Weikel, Adam (GOV)
>> Subject: Any idea of timing for War on Talent materials?>>
>> Thx.
>>
>> Sent from my iPhone
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 98/975
The Commonwealth of Massachusetts
Your hub for Top Talent
1
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 99/975
2
Talent Landscape
The world (and the workforce) is changing!
“Let’s face it. There are 80 mill ion Baby Boomers who are going to
retire over the next 5-7 years, and they’re going to be replaced by40 mil lion Generation Xers. That’s 2 to 1, so you’d better be
developing your next generation now if you’re going to be ready
for that transition.”
- Michael White, Chairman, President, CEO, The Directv Group, Inc
2alent mobility: 2020 and Beyond, PWC, (2012) PwC 15th Annual CEO Survey
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 100/975
“Talent management has become a headache for CEOs, with only 30%
saying that they have the talent they need to fulfill their future growth
ambitions.
3
It is hardly surprising, then, that talent
management is right at the top of CEO’s
agendas. Two-thirds say that they plan
to devote more attention to developing
the talent pipeline and the future leaders
of their organization
78% said they expected to see changes
in the way their company manages talentin the near future.”
he War for Talent (2001). McKinsey & Company Inc.
alent Needs?
Massachusetts is positioned to meet them!
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 101/975
GenY is here & GenZ is on their way!
Are you ready for them? (Massachusetts is!)
“The millennial generation is now entering employment in vast
numbers, will shape the world of work for years to come. Attracting thebest of these millennial workers is cr itical to the future of your
business. Their career aspirations, attitudes about work, and
knowledge of new technologies will define the culture of the 21st
century workplace.”
“Millennials matter because that
are not only different from those
that have gone before, they arealso more numerous than any
since the soon-to-retire Baby
Boomers…By 2020, millennials
will form 50% of the global
workforce.”
illennials at work, Reshaping the Workforce, (2011). PWC4
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 102/975
Millennials have made their impact on the way GE
ecruits, inspires and designs products
In order to adjust to the needs of emerging leaders,
companies are moving beyond the traditional, closedmodel of innovation and embracing a new paradigmthat is more collaborative, creative, and focused ondelivering local solutions.
GE Artistry™ Series, GE’s designers focus on the needsof Millennials and their desire to uniquely expressthemselves. Inspired and created by a 27-year-old GEindustrial designer with his own generation in mind.
GE’s new commercials are aimed at showing techminded millennials that they’re the place to work ifyou want to make a real impact on the world. GE’snew television commercials tell the story of Owen, amillennial software developer and his new job at GE.
“A 135+ year old company can on
survive if it is constantly re-engineernot just its product portfolio, but i
culture as well," said General
Electric spokesperson Laura Parede
Millennials comprise a significan
number of first-time homebuyers;
fact, the 25- to 34-year-old age gro
make up the largest proportion o
homebuyers.
“GE..Manufacturer….Yes, GE make
powerful machines but I will be writ
the code that will allow those machi
to share information with each othe
5
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 103/975
6
Likewise, Millennials have made their impact
on the way Boston governs, educates and
inspires…
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 104/975
oston is at the center of the innovation universe
ith all the right ingredients to continue to lead
Boston
• Best universities in the nation
• Strong pipeline of emerging talent• Highly skilled workforce
• Top destination for international students
• Top academic medical centers
• Research centers that attract the brightest minds in the world
• Number #1 in STEM degrees granted, per capita
• Worldwide leader in medical professional training
• World renowned business incubators
• Number 1# U.S. state recepient, per capita, of federal research funding• Long standing government commitment to recruiting and inspring Millenials
• Significant seed money and investment capital availale for funding for new
compaines
• Strong public-private partnerships focused on housing, lab and office space
development
• Recent investment and long-term strategy to expand international air travel
capacity, particularly to Asia
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 105/975
What we have…
A strong and diverse economy in both growing and stable industries
Highly educated and skilled employment base
Unemployment rate that is and has been below the national average
Solid pipeline of students as Massachusetts ranks in the top 5 in Best High Schools in successfullypreparing students for college
World renowned hospitals with two in the top ten 2015-2016 U.S. News and World Reports(Massachusetts General Hospital & Brigham and Women's Hospital)
A fertile ground for recruitment of established medical professionals with six of Boston’s largestprivate employers are teaching hospitals
A federal research funding pipeline second to only California in NIH funding per state, per capita
The brightest Millennial minds are working on life-saving treatments, devices and advancedtechnologies as Massachusetts is home to more than 400 biotechnology and medical devicecompanies
Meeting the needs of your employees
Greater Boston has what your workforce wants!
Location plays a key role in attracting top talent and ours
provides a culture which naturally appeals to the recruitment a
retention of the millennial generation.
8
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 106/975
Massachusetts has been a national leader in
ecruiting and inspiring millennials
Over 46% of incoming freshman are from outside the state
Nationally, Massachusetts ranks in the top 5 in both completed Mastdegrees and Doctorate degrees
• Due to Boston’s world-class educational offerings and emerging industries, Boston is home to th
highest proportion of young adults out of any major city in America with over 35% of Bostonia
between the ages of 20-34.
• Recognizing the importance of this demographic, the City of Boston launched a special initiative
called, ONEin3, in 2004 to support grow and empower Boston’s young adult population.
• In its 11th year ONEin3 serves to engage Boston’s young adults through opportunities to participa
city government and civic affairs, facilitate communication between young adults and the city’s
leadership, and support a culture which naturally appeals to the recruitment and retention of th
millennial generation.
• Leadership understand that it is not only important to draw the brightest minds to the
Commonwealth, but inspire them to stay.
9
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 107/975
he Millennials targeted by Onein3 Boston are the
feblood of the city and the foundation of our futur
32% speak alanguage other
than English at
home
35% of Bostonians are between the
ages of 20-34
They contribute
more than $1
billion to the
Gross CityProduct
They makeup 48% of
the city’s
workforce
94% have a high
school diploma,
48% have abachelor’s
degree or higher
60% were born
outside of MA
26% were born
outside the U.S.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 108/975
oston is an international city that is a great place
or Millennials to live, work and be inspired!
One example of the result of Boston’s desire to be a popular destination for
Millennials to l ive and work was the decision of former Mayor Menino tobroadcast the 2010 World Cup on City Hall Plaza.
The Boston Globe
GLOBE EDITORIAL
World Cup: Boston shows its international face
June 15, 2010
Walking around downtown, Boston’s international character is barely vi
So Mayor Menino’s plan to broadcast the World Cup finals on City Hall P
— and the explosion of interest in the tournament, replete with costum
and flags, at downtown sports bars — is a welcome expression of the cit
makeup.
The fact that Boston is among the most international of American cities
evident at most times in its public center, amid all the tourist sites, offic
towers, and expense-account steakhouses. But Boston is a diverse city,
even in terms of national origin than race: while about 1 in 6 Massachus
residents is foreign-born, in Boston that number is closer to 1 in 3.
The World Cup gives Boston a chance to show its true face. From Roslin
to Beacon Hill, thousands of people have taken to the streets wearing th
colors of their ethnic homelands and proudly supporting their favored sq
The city’s melting pot will be on even greater display most prominently
11, when a multinational crowd of fans will converge on City Hall. The sc
will be festive and multi-cultural — and truly Bostonian.11
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 109/975
he Milken Institute identified MA as the top tech &
cience state across five major economic factors
12
Based on Five Major Factors
• Human Capital: Who is investing in Human
Capital?
• Risk Capital: Who has been successful in
converting research into products and
services?
• Research and Development Inputs: Which
states have R&D capacity to attract funding
• Technology Concentration: Who has been
successful at turning assets into prosperity?
• Technology and Science Workforce: Where
are the best places to find high-tech talent?
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 110/975
.S. News & World Report : Nine Massachusetts
chools in the Top 100 National University Ranking
#2
#7
#27
#30
#34
#47
#57
#75
#75
13
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 111/975
oston is the center of STEM education: Both the
ational leader in STEM degrees granted and top
anked universit ies in STEM
STEM (Science, Technology, Engineering & Math)
• MA is #1 nationally in STEM graduate and professional degrees granted per capita
• Two Massachusetts universities rank in the top five best graduate schools for
math: Massachusetts Institute of Technology (#1) and Harvard University (#3)
Science
• MA is #4 nationally in number of Science graduate and professional degrees granted
• Three Massachusetts universities rank in the top 25 of the best schools for computer
science: Massachusetts Institute of Technology (#1) , Harvard University (#18) and
University of Massachusetts Amherst #25).
Engineering
• MA is #5 nationally in number of Engineering graduate and professional degrees granted
• Four Massachusetts universities rank in the top 50 engineering schools : Massachusetts
Institute of Technology (#1) , Harvard University (#20), Boston University (#37) and
Northeastern (#43).
14
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 112/975
hompson Reuters The World's Most Innovative
niversities: Boston has two of the top five schoo
1,222
46.4%
150.3
761
35%
102.5
149
28.9%
53
236
38.1%
53.2
Patents Filed
Patents
Granted
Commercial
Impact Score
Ranking #2 #3 #57 #59
Rankings based in patent volume, patent success, global patents, patent citations, patent citatio
mpact, % of patents cited, patent to article citation impact, industry citation impact, percentage
ndustry collaborative articles and total web of science core collection papers.
15
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 113/975
oston is the third most popular destination for
nternational students
• The number of international students nationwide grew at the fasted rate in 35 years
increasing by 10% over the previous year.
• The surge of international student brought the total number of foreign students in
Boston to 47,895, up from 43,801 the previous year.
• With 55,447, Massachusetts ranks #4 in the number of foreign students
• The majority of international students are from China, followed by India, South Kore
Canada and Saudi Arabia.
• Eight Massachusetts colleges/universities have over 10% of international students
within their student body
• Northeastern (10,559)
• Boston University (7,860)
• Havard University (5,749)
• MIT (4,220)
• Umass Amerst (2,352)
86% or 47,985 attend
a metro-based school
16
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 114/975
17
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 115/975
early 40% of the MA workforce is employed in the
nnovation economy- more than any other state
• Massachusetts added roughly 50,000 new innovation economy jobs since 2006
• Science & Engineering occupations make up 6.5% of all occupations inMassachusetts, a higher percentage than in any other Leading TechnologyStates. This has steadily increased since 2003 in Massachusetts
• During 2011 – 2012, the Commonwealth attracted a higher share of college-educated adults to the state when compared to other LTS. This statistic countersrecent trends which pointed to a ‘brain drain’ of MA
mployment By Industry Sector: MA 2009-2013
MassTech 2014 Innovation Economy Inde18
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 116/975
19
eed and investment capital for
unding for new companies
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 117/975
20
Announced plans to create a new 23,000
square foot drug delivery and device innovation
center in Cambridge with a planned staff of 30
scientists and engineers.
Announced the formation of a new global innovation
and R&D center in Cambridge that began operations at
the end of 2014 with plans to employ over 400 people.
Announced the creation of a $25 million, five-year
research alliance with MIT and is moving its U.S. R&D
headquarters to Cambridge from its currentheadquarters in Westchester County, New York.
Announced expansion of its research centerin Kendall Square with plans to add more
jobs to its 180 employees in Cambridge.
Announced relocation of its
corporate headquarters from
Phoenix, Arizona to Cambridge.
Announced a $335 million joint venture with CRISPR
Therapeutics to develop treatments for blood
disorders, blindness and congenial heart disease with
plans to employ 40-50 people.
Massachusetts is THE destination of the world's most
nnovative, dynamic and leading-edge companies
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 118/975
Massachusetts is a top incubator of cutting edge
fe science and technology companies
Massachusetts has won a third of all U.S. seed stage funding for biotech from 2009 to 2013- mo
than $761 million (2015 MoneyTree Report, a joint study produced by PwC and the National Venture Capita
Association)
Nine of the world’s 10 biggest drug companies have opened offices or research and developme
labs in Massachusetts over the past few years
R&D jobs in the Massachusetts Biotech industry have grown more than 21% over the last few
years, nearly three times the U.S. rateIn the last year, Massachusetts has committed up to $88M in matching funds for the
implementation of public private research projects, under the federal National Network
Manufacturing Innovation advance manufacturing competition.
The bottom line: ”State subsidies for startups helped Massachusetts win more than $76
million in seed stage biotech funding from 2009 to 2013”- Bloomberg Businessweek
“If you can attract small companies that are on the cutting edge of research, th
big companies will follow because they want a front-row seat,”
- Barry Bluestone, Northeastern University economist
21
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 119/975
nfrastructure for Supporting Innovation: Life
cience, engineering and technology incubators
Greater Boston possesses mature and expanding
infrastructure for supporting innovationambridge Innovation Center:
Companies originally
eadquartered at CIC have
reated between $3.5b and $4.3b
n publicly disclosed exit value
ince 2001” cic.us
LabCentral: A Launch Pad
for high potential, highgrowth Life-Science and
Biotech startups. Alumni
companies have attracted
over $100 million in
combined venture funding.
xconomy.com
GreenTown Labs: The Countr
largest cleantech incubator.
Greentown has housed nearl
organizations since 2010.
Together have raised over $2
and employ over 100 people
greentownlabs.org
22
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 120/975
23
Projects included physical electronics, microwav
physics, electromagnetic properties of matter,
and microwave communication principles. The
"Rad Lab" designed almost half of the radar
deployed in World War II, created over 100
different radar systems, and constructed $1.5
billion worth of radar.
The McGovern Institute for Brain Research’s
mission is to understand how the brain works
and to discover new ways to prevent or treat
brain disorders
The Institute’s core facilities include the Martino
Imaging Center, which provides neuroimaging
technologies for human and animal research,
including magnetic resonance imaging,
electroencephalogram and
magnetoencephalography.
nfrastructure for Supporting Innovation: Life
cience, engineering and technology research centers
Highlights of several research centers
current research include:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 121/975
A new Kendall Square envisioned in
$1.2b MIT plan
JULY 28, 2015: The plan, six years in the making, calls f
six new buildings on what is now a string of parking lotalong Main Street. In addition to academic and busine
uses, the complex would include apartments for gradu
students and low-income tenants, stores, and a tree-
covered plaza near the Charles River.
Boston, Cambridge are ground zero for life sciencesMARCH 16, 2015: BOSTON-CAMBRIDGE is ground zero
or the development and deployment of many of the
bleeding edge life science discoveries and
echnologies. One corner alone, Vassar and Main
treet in Cambridge, will likely generate 1 to 2 percent
of the future world GDP.
…On a per capita basis, nowhere else comes close in
erms of research grants, patents, and publications
hat drive new gene code, which in turn alters the
evolution of bacteria, plants, animals, and ourselves.
endall Square, the most innovative area in the world
nd growing…
Vassar and Main: The World's Most Innovative IntersectionNOEMBER 2, 2015: If one had to pick a single corner, anywhere on the planet, as
the most innovative and productive crossroads in history, the intersection of
Vassar Street and Main Street, in the new world's Cambridge, Massachusetts,
would be a leading candidate…24
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 122/975
Aoston-area academic medical centers are driving
he Boston economy and are a worldwide leader
medical innovation
Coalition of 14 Boston-area teaching
hospitals• Beth Israel Deaconess Medical Center
• Boston Children’s Hospital
• Boston Medical Center
• Brigham and Women’s Hospital
• Cambridge Health Alliance
• Carney Hospital
• Dana-Farber Cancer Institute
• Faulkner Hospital
• Lahey Clinic Medical Center• Massachusetts Eye and Ear
• Massachusetts General Hospital
• St. Elizabeth’s Medical Center
• Tufts Medical Center
• VA Boston Healthcare System
Healthcare professionals around
the world begin in Boston
#1 in the # of residents and fellow trained, per capi
#3 in the # of primary care doctors trained, per cap
Boston’s academic, professional medical enterprise
and business climate thrives from a culture ofinnovation, commitment to new discovery and
scaling thee innovations to patients across the globe
#1. Massachusetts Gene
Hospital
#6. Brigham and Wome
Hospital
25
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 123/975
AMany of the innovations produced on a the global
cale have been supported by MIT-based research
nd graduates
1905861
MIT
corporated
1892 Invention of the transistor
which became the basis
for the electronic age.:
William Bradford Shockley
received his Ph.D. degree
GE ELECTRONICS
1936
Geophysical
Analysis
Group
founded at
MIT
GE OIL
1954
MIT graduate Yet-Ming Chiang
developed technology with
materials that would allow
batteries to produce more
power and charge more quickly
GE ELECTRONICS
2001
2011
X-Ray Machine: William D. Coolidge
ttended MIT from 1891-1896esearch assistant at MIT from 1899-1905
esearcher at General Electric in 1905
irector of GE research laboratory in 1932
Vice-President of GE in 1940
GE HEALTHCARE
Arthur Thomas Ippen
developed
Hydrodynamics Laboratory
and built up a research
program
GE ENERGY
1971General Electric
Founded
GE joined with MIT to cre
Medical Electronic Devi
Realization Center to drrevolutionary improveme
medical imaging systems
devices that take medic
diagnosis, treatments a
monitoring.
GE HEALTHCARE
Brian Wardle
Director of MIT's Nano-
Engineered Compositeaerospace STructures
Consortium, and is a principal
member of the Technology
Laboratory for Advanced
Materials and Structures
GE AERONAUTICS
1986
26
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 124/975
Note: Includes Seasonal Service, Source: OAG & Innovata Schedules
oston Logan has Nonstop
omestic Service to 75 Destinations
27
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 125/975
Note: Includes Seasonal Service, Source: OAG & Innovata Schedules
oston Logan has Nonstop
nternational Service to 53 Destinations
28
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 126/975
Logan is preparing for more international service and connections to new markets
• International interest and activity continues to grow
– 32% growth in international passengers from 2010 to 2014
• $160 million modernization project underway in Terminal E
– Will upgrade three gates to serve A380s for Emirates, British Airways andLufthansa
• $500 million Terminal E expansion project in development
– Will add 500,000 square feet of terminal space and 5-7 new internationalgates to accommodate increased international flights
– Currently, in permitting phase; construction anticipated 2016-2018
ogan Airport is a crucial and expanding connectio
o the global marketplace
Logan Airport has increased the number of nonstop
nternational markets served by 142% since 2006 rising to markets served in 2015.
29
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 127/975
oston is at the center of the innovation universe
ith all the right ingredients to lead the world
… for we must consider that we shall be as a City upon a
Hill, the eyes of all people are upon us.
John Winthrop's
City upon a Hill
1630
We’re a global leader in health care, biotechnology, high
technology, education, finance, energy efficiency and
advanced manufacturing…
The time has come to write the next chapter in the history
of this great Commonwealth. To build on what makes us
great.
Gov. Charlie Baker’s
Inaugural Speech
2015
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 128/975
From: Kennealy, Michael (EOHED)
To: Servetnick, Adrian (EOHED)
Subject: FW: Project Plum -- Boston RFI
Date: Friday, July 24, 2015 9:43:00 AM
Attachments: Boston RFI - Plum (2) (1).docx
Adrian FYI - I will work with Mike on finalizing (this needs work) but
sending to you now in case anything in here that's helpful.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----From: Quinlin, Michael (MOTT)
Sent: Thursday, July 23, 2015 5:46 PM
To: Kennealy, Michael (EOHED); Pham, Nam (EOHED)
Subject: RE: Project Plum -- Boston RFI
Hi Mike and Nam,
Here is the completed form. I ended up putting reference links to some of
them in case you have time to dig deeper.
Any questions about the material herein, let me know.
Best,
Mike
________________________________________
From: Kennealy, Michael (EOHED)
Sent: Thursday, July 23, 2015 5:08 PM
To: Quinlin, Michael (MOTT); Pham, Nam (EOHED)
Subject: RE: Project Plum -- Boston RFI
FYI apparently they want this tomorrow so would be great to get this very
soon so we can review then send.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 129/975
From: Quinlin, Michael (MOTT)
Sent: Wednesday, July 22, 2015 6:22 PM
To: Kennealy, Michael (EOHED); Pham, Nam (EOHED)
Subject: RE: Project Plum -- Boston RFI
Hi Mike,
I can work on the remaining info on Thursday morning.
Mike
________________________________________
From: Kennealy, Michael (EOHED)
Sent: Wednesday, July 22, 2015 5:32 PM
To: Pham, Nam (EOHED); Quinlin, Michael (MOTT)
Subject: RE: Project Plum -- Boston RFI
Nam, Michael – thank you. Question – how and when can we get the
remaining items filled in?
Best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
[email protected]<mailto:[email protected]>
From: Pham, Nam (EOHED)
Sent: Wednesday, July 22, 2015 4:55 PM
To: Kennealy, Michael (EOHED)Subject: FW: Project Plum -- Boston RFI
Please see the attached.
From: Quinlin, Michael (MOTT)
Sent: Wednesday, July 22, 2015 3:29 PM
To: Pham, Nam (EOHED)
Subject: RE: Project Plum -- Boston RFI
Nam,
I’ve added data to this file, you’ll see the new material in red, just so
you can differentiate from the existing info from Monday.
I see the deadline is this afternoon so I’m sending what I have to date.
If the HED crew need me to track down anything else, let me know and I can
do that.
Thanks,
Mike
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 130/975
From: Pham, Nam (EOHED)
Sent: Monday, July 20, 2015 9:21 PM
To: Quinlin, Michael (MOTT)
Subject: FW: Project Plum -- Boston RFI
Hi Mike,
Can you help with this information? Thanks
Best Regards,
Nam Pham
Assistant Secretary of Business Development & International Trade
Massachusettts Executive Office of Housing & Economic Development
10 Park Plaza, Boston, MA 02116
617-352-8435 (Cell)
From: Kennealy, Michael (EOHED)
Sent: Monday, July 20, 2015 4:13 PM
To: Pham, Nam (EOHED)
<[email protected]<mailto:[email protected]>>;
Servetnick, Adrian (EOHED)
<[email protected]<mailto:Adrian.Servetnick@MassMail.
State.MA.US>>
Subject: FW: Project Plum -- Boston RFI
Nam, Adrian,
I wanted to send this along and ensure that we are all on the same page
re: “Project Project” –
- Nam’s office is going to fill out the attached RFI so that we
can provide GE with all the data points they are requesting. We should
send this to them ahead of the meeting, say Monday of next week so, Nam,
can MOBD fill this out and send it back to me by end of day Wednesday?
This will also help with . . .
- Adrian is creating the presentation deck that we will use in
the meeting – this will cover a bunch of topics discussed with Jay today
plus, Nam, I will include some content from the EDIP slides. Adrian,
please take a look at their requested data points, and if any of these
prompt ideas for slides or other analysis let’s discuss.
- Adrian - Nam also said that there is a researcher in his office
who has access to all sorts of data; so if any of the interns run into
roadblocks or need help they should reach out to MOBD. Nam, who is the
person you are thinking of?
Any questions please let me know.
Mike
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 131/975
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
[email protected]<mailto:[email protected]>
From: Ash, Jay (EOHED)
Sent: Tuesday, July 14, 2015 12:01 PM
To: Kennealy, Michael (EOHED); Pham, Nam (EOHED)
Subject: FW: Project Plum -- Boston RFI
FYI
From: Klee, Ann (GE, Corporate) [
Sent: Tuesday, July 14, 2015 9:52 AM
To: Ash, Jay (EOHED)
Subject: Project Plum -- Boston RFI
Jay,
As promised, I’ve attached a version of the RFI for Boston that includes
the information that we have gathered during our internal due diligence.
Please feel free to amend and supplement as appropriate. I would also be
happy to set up a call with you and your team over the next week to answer
any questions you have and/or discuss the RFI and your presentation at the
end of the month.
Regards,
ann
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 132/975
PROJECT PLUM: REQUEST FOR INFORMATION
STATE: Massachusetts
COUNTY: Suffolk County
CITY: Boston
# Criteria Units of Measure Response
1 State/County Data
1.
01
Populati
onNo. of People
4.7 Million in Boston-Cambridge-Newton metro area as of 2013 (US Census
Bureau)
1.
02
Populati
on
Growth
2005-
2015
% Growth2.6% growth in Boston-Cambridge-Newton metro area from 2010 to 2013 (US
Census Bureau)
1.
03
Projecte
d
Populati
on
Growth
2016-
2020
% Growth
Suffolk County’s population is projected to increase by 240,000 or 16% between
2010 and 2035
http://suffolkcountyny.gov/Portals/0/planning/CompPlan/vol1/vol1_chpt2.pdf
1.
04
Domesti
c
migratio
n rate
%2.3% migration from Massachusetts to other US states at % of population in 2013
(US Census Bureau)
1.
05
Regional
diversity
rank
RankBoston ranked # 32 in Wallethub's 2015 study of cities with most and least ethno-
racial and linguistic diversity
1.
06
Size of
Labor
force
within
County
% of Population & No. of
People617,466 workforce (June 2014)
1.
07
Real
Estate
Foreclos
ure Rate
2014 HUD rate1 in every 3040. US Labor Statistics
1.
08
Median
Home
Value
(andbasis for
estimate
)
2015 USD$389.8K 2014 median home value in Boston-Cambridge-Newton metro area
(National Association of Realtors)
1.
09
Median
Rent
(Cost per
Calendar
Month)
2013
$2,400
http://www.zillow.com/suffolk-county-ma/home-values/
1.
1
Median
Househo
ld
2015 USD$83,867 median household income in Massachusetts from 2011-2013 (US Census
Bureau)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 133/975
Income
1.
11
Increase
in
Househo
ld
Income
2010-
2015
2015 USD
3.7% wage gain, 29th highest in USA
http://www.bls.gov/regions/new-england/news-
release/countyemploymentandwages_massachusetts.htm
1.
12
Per
Capita
Income
2015 USD $61,992. http://data.bls.gov/cgi-bin/surveymost
1.
13
Percent
Below
100%
Federal
Poverty
Level
20.8%
20.8%
2009-13
http://quickfacts.census.gov/qfd/states/25/25025.html
1.
14
Drug
Abuse /
Sale /
Possession
Statistics
(per UCR
program
)
909.8 per 100,000
909.8 per 100,000
http://wwwn.cdc.gov/CommunityHealth/profile/currentprofile/MA/Suffolk/31005
2
1.
15
Top 2
School
Districts
including
State
Rank
District & Rank
Ratings 1-5, with 1 being highest and 5 lowest in terms of proficiency.
http://www.doe.mass.edu/
Revere Level 2
Winthrop Level 2
Chelsea Level 3
Boston Level 4
1.
16
Unemplo
yment
Rate
% & No. of Persons Affected
3.8% unemployment as of April '15 in Boston-Cambridge-Newton metro area
(Bureau of labor statistics)
4.6% unemployment in Suffolk County, Dec 14
http://www.cityofboston.gov/images_documents/SandP%202015ratingsreport.pd
1.
17
2010-
2015
Increase
in
Employ
ment
% / Total Number of Jobs
3.7% gain between 2nd quarter 2013-14.
http://www.bls.gov/regions/new-england/news-
release/countyemploymentandwages_massachusetts.htm
1.18
Cost of
Living
Index(closest
urban
area)
US Census BureauCost of living index of 132.5 as of 2010 in Boston-Cambridge-Newton metro area(US Census Bureau)
1.
19
Commer
cial real
estate
average
cost per
foot
2015 USD
$413 sf in Boston
http://www.trulia.com/real_estate/Boston-Massachusetts/market-trends/
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 134/975
1.
2
County
& State:
Standard
& Poor
Bond
Rating
-
MA rated AA+ by S&P in 2014
Boston rated AAA on 4/1/2014
http://www.cityofboston.gov/images_documents/SandP%202015ratingsreport.pd
1.
21
Business
friendlin
ess
ranking(CNBC &
Forbes)
- State ratings: CNBC 2015: 7 | Forbes 2014: 13
1.
22
Name
and # of
Fortune
1000
compani
es in
nearest
metropo
litan
area
Appendix 1 9 in Boston, 25 total in Massachusetts. See Appendix 1.
1.
23
History
of
Natural
Disasters
(Last 10
Years)
NOAA National Centers
for Environmental
Information
https://www.ncdc.noaa.g
ov/billions/events
Dollar Figure is Damage
Amount.
Hurricane Sandy 2012
-$67 billion
Hurricane Irene 2011
-$14 billion
Flooding 2010
-$2 billion
Severe Weather and Flooding 2011
-$3 billion
Tornado 2011
-$50.3 million
Snowstorm October 2011
-$3 billionWinter Snowstorm 2014
-$2 billion
Winter Snowstorm 2015
-$2.5 billion
2 Tax Considerations
2.
01
Total (all
applicabl
e
jurisdicti
ons)millage
rate for
business
real and
personal
property
Number
Boston Tax Rate: Residential is $12.11; Commercial is $29.52 per thousand dollar
value
Chelsea: Residential $14.40; Commercial $33.45
Everett: Residential $14.61; Commercial $39.45Winthrop: Residential $14.34; Commercial $14.34
http://www.bizjournals.com/boston/blog/bbj_research_alert/2015/01/massachus
etts-property-tax-rates-in-2015-by-town.html
2.
02
Assessm
ent ratio
for
business
Percentage
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 135/975
real and
personal
property
2.
03
Local
Business
Tax
Yes or No No
2.
04
Local
Personal
Income
Tax
Yes or No No
2.
05
Local
Sales Tax
Rate (if
applicabl
e)
Yes or No No
2.
06
State
personal
Income
Tax
If Yes, % State income tax based on $50K salary: 5.2%
2.
07
State
corporat
e IncomeTax Rank
Rank Ranked # 24 in 2015 by taxfoundation.org
3 Workforce/Talent
3.
01
Average
Age of
Populati
on
Age in YearsAverage age 31 (Suffolk)
(39 in Massachusetts)
3.
02
Populati
on Age
18-45
Percentage of Workforce 79% of workforce is 18+
3.
03
Age 18 &
OverEnrolled
in
College /
Graduat
e School
Percentage of Workforce Couldn’t find any matrix on this question.
3.
04
Percent
of
populati
on with
high
school
degree
or higher
(Includes
Equivale
ncy)
Percentage of Workforce
83.9% Suffolk County 2009-13
http://quickfacts.census.gov/qfd/states/25/25025.html
90.6% of population in Boston-Cambridge-Newton metro area with high school
degree or higher
3.
05
Percent
of
populati
on with
bachelor
's degree
or
Percentage of Workforce
40% Bachelors degree or higher 2009-2013
http://quickfacts.census.gov/qfd/states/25/25025.html
43% of population in Boston-Cambridge-Newton metro area with bachelors degree
or higher
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 136/975
Higher
3.
06
# of
accredite
d
universit
ies with
campuse
s in
potential
city
26 colleges and universities
in Boston.
Bay State College
Benjamin Franklin Institute of Technology
Berklee College of Music
Boston Architectural College
Boston College
Boston Conservatory of Music
Boston UniversityBunker Hill Community College
Emerson College
Emmanuel College
Fisher College
Harvard University
Laboure College
Massachusetts College of Art and Design
MCPHS University
New England College of Optometry
New England Conservatory ofMusic
New England School of Law
New England School of Photography
Northeastern University
School of the Museum of Fine Arts
Simmons College
Suffolk University
Wentworth Institute of Technology
Wheelock College
University of Massachusetts/ Boston
3.
07
Enrollme
nt Size of
Universit
y orCollege
in above
question
# of Full /Part Time
Students
250,000 college students live in Suffolk County, according to Association of
Independent Colleges and Universities in Massachusetts (AICUM)
4 Quality of Life
4.
01
No. of
Local
Health
Systems
Provider
s (i.e.
Trident,TriHealth
, Kaiser,
etc.)
Massachusetts has 15 major hospital systems, 64 acute hospitals, 55 community
health centers, 9 provider networks, and 169 major medical groups (2013 data)
http://bluecrossmafoundation.org/delivery-system-map-archive/
There are 36 federally funded Health Center organizations in MA serving 659,521
patients, 18.7% of whom are uninsured.
http://www.nachc.com/client/documents/research/maps/MA2015.pdf
4.
02
Primary
Care
Doctor-
to-
Populati
on Ratio
Per 1,000 Residents31.4 for every 1,000 patients.
4.
03
# of
ranked#17
17 nationally or regionally ranked hospitals in Boston-Cambridge-Newton metro
area
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 137/975
hospitals
in the
metro
area
Mass General is ranked #1 and Brigham & Women’s ranked #7 in the most recent
US News & World Report rankings.
http://www.usnews.com/info/blogs/press-room/2015/07/21/us-news-releases-
201516-best-hospitals
4.
04
#
Specialty
Health
Care
Facilities(e.g.
Cancer,
NICU)
#17
Here is a list of specialty facilities
http://www.massleague.org/Programs/ClinicalQualityInitiatives/ClinicalResources.
php
4.
05
Major
(Felony)
Crime
Rate
Per 100,000 Residents
343.3 per 100,000 (U.S. average is 294.7)
http://www.city-data.com/crime/crime-Boston-Massachusetts.html
4.
06
Average
annual
high
tempera
ture
Degrees in FAverage high 59 degrees based on weather data collected from 1981 to 2010 by
the NOAA National Climatic Data Center
4.
07
Average
annual
low
tempera
ture
Degrees in FAverage low 44 degrees based on weather data collected from 1981 to 2010 by the
NOAA National Climatic Data Center
4.
08
Average
days
with
rainfall
#Average 127 days based on weather data collected from 1971 to 2000 by the
National Oceanic and Atmospheric Administration (NOAA)
4.
09
Gallup
wellbein
g score
- State rank in 2014 Gallup Wellbeing index: 17
4.
1
# of
professio
nal
sports
teams
# 5 major league sports teams in urban area
4.
11
Forbes
coolness
ranking
Rank Ranking: 9
5 Transportation
5.
01
Distance
to
nearest
major
Internati
onal
Airport
Miles 5 miles to Boston Logan International
5.
02
Distance
to
addition
al
airports
(domesti
Miles
55 miles to Worcester Regional Airport
32 miles Lawrence Municipal Airport
66 miles to Gardner Municipal Airport
138 miles to Pittsfield Municipal Airport
22 miles to Laurence G. Hanscom Field
92 miles to Westover Metro Airport
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 138/975
c, civil
aviation,
internati
onal)
5.
03
# of
direct
flights to
domestic
cities
76 domestic cities, non-stop76 direct domestic cities from Boston Logan International
126,593 domestic flights per year.
5.
04
Direct
flights to
Europe
14 cities, 7,556 flights per
year.
AmsterdamDublin
Frankfort
Istanbul
Lisbon
London
Madrid
Munich
Paris
Reykjavik
Rome
Shannon
Terceira, Port.
Zurich
5.
05
Direct
flights to
Latin
America
17 cities, 3,589 flights per
year
Aruba
Barbados
Bermuda
Cancun
Grand Cayman
Mexico City
Nassau
Panama City
Ponta Delgada
Port Au Prince
Providenciales
Puerto Plata, DRPunta Cana, DR
Santiago, DR
Santo Domingo, DR
St. Lucia
St. Maarten
5.
06
Direct
flights to
Asia /
Africa
7 cities and 2,361 flights per
year
Toyko
Tel Aviv
Beijing
Shanghai
Hong Kong
Dubai
Doha
5.
07
Public
transpor
tation
systems
ranking
Rank Ranked # 34 metro area for public transportation by Brookings.com
5.
08
Inrix
traffic
scorecar
d
ranking
Rank Ranked # 9 by Inrix (lower numbers reflect worse traffic commute)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 139/975
6 Incentives
6.
01
Available
incentive
packages
Please describe
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 140/975
APPENDIX 1 Fortune 1,000 companies in Massachusetts
1.2.2
FleetBoston 80 Boston MA 02110 Boston
Raytheon 82 Lexington MA 02421 Boston
Liberty Mutual Insurance 111 Boston MA 02117 Boston
Gillette 172 Boston MA 02199 Boston
Massachusetts Mutual Life Insurance 173 Springfield MA 01111 Springfield MA
Staples 192 Framingham MA 01702 Boston
TJX 196 Framingham MA 01701 Boston
Reebok International 515 Stoughton MA 02072 Boston
Boston Scientific 523 Natick MA 01760 Boston
New England Electric System 555 Westborough MA 01582 Boston
Harcourt General 646 Chestnut Hill MA 02467 Boston
Polaroid 694 Cambridge MA 02139 Boston
John Hancock Financial Services 233 Boston MA 02117 Boston
EMC 260 Hopkinton MA 01748 Boston
State Street 345 Boston MA 02110 Boston
Thermo Electron 369 Waltham MA 02254 Boston
BJ’s Wholesale Club 377 Natick MA 01760 Boston
Allmerica Financial 440 Worcester MA 01653 Boston
NSTAR 733 Boston MA 02199 Boston
Teradyne 750 Boston MA 02118 Boston
Cabot 786 Boston MA 02109 Boston
PerkinElmer 798 Wellesley MA 02481 Boston
Bradlees 859 Braintree MA 02184 Boston
Analog Devices 874 Norwood MA 02062 Boston
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 141/975
Stone & Webster 983 Boston MA 02210 Boston
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 142/975
From: Frazier, Ricks (EOHED)
To: Durante, George (EOHED)
Cc: Kennealy, Michael (EOHED)
Subject: FW: Project Plum
Date: Saturday, December 05, 2015 4:18:00 PM
George
A late, last minute request. Erica has not confirmed her ability to participate in a call in about 15
minutes. If you get this and are able, could you dial in? It should be about a half hour or so, I
suspect. Many apologies for the last minute notice on a Saturday.
Ricks
From: Kennealy, Michael (EOHED)
Sent: Saturday, December 05, 2015 8:07 AM
To: Kennealy, Michael (EOHED); Sullivan, Jennifer F. (ANF); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks (EOHED); Kreuter, Erica (EOHED)
Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)
Subject: RE: Project Plum
It looks like we have folks available for a call at 4:30pm today. Please use this number:
access code .
Looking forward to speaking then and discussing ideas from the group.
Mike
From: Kennealy, Michael (EOHED)Sent: Friday, December 04, 2015 6:23 PMTo: Jennifer F. Sullivan (ANF) ([email protected]); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks (EOHED); Kreuter, Erica (EOHED)Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)Subject: Project Plum
I am emailing a group of people that I hope can work as a team this weekend and into Monday to
advance the Project Plum work. As you know, we presented a proposal to Plum that relies heavily
on I-Cubed and Massworks funding, and we also suggested some sites. The good news from today
is that we are very much in the game here, and the company will be visiting Boston on Wednesday
to look at sites, with a significant internal meeting in about 10 days. (Note – not clear yet what
involvement they want from us on Wednesday, possibly none though of course we are pushing).
As Steve and Sec. Lepore and I just discussed, we think our mission at this point is to make this
proposed infrastructure funding more tangible for them – how could these dollars be used to the
direct benefit of their project? Said differently, our ~$100 MM dollar proposal was $80 MM I-
Cubed/MassWorks and $20 MM local property tax incentives; they know how to value the $20 MM
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 143/975
but are unsure how to value the $80 MM, and we need this proposal to look a lot closer to $100
MM than $20 MM, especially in the face of competition offering incentives that are much easier to
value.
To that end, there are two deliverables that we would like to send to the company by noon on
Monday:
1. A list/discussion of historical examples of I-Cubed and MassWorks projects. I have attached
a draft memo from Erica and the language that Jen provided for our letter. What other
examples can we provide, and in what level of detail, specifically ones that are as analogous
as possible to their project?
2. Specific examples of how I-Cubed and MassWorks could be deployed at the MCCA and
Massport sites. I have attached information about those sites. No site or building has been
ruled out, but initial guidance from Plum’s location advisor was to focus on the sites vs. the
buildings.
Could I ask the following:
1. Could folks start giving consideration to #1 and #2 above and develop specific ideas.
2. Could you please also suggest (if applicable) others from your organization that could help in
this effort.
3. Can we all get on a call tomorrow at 4:30pm to discuss.
On the call tomorrow, I would like to review what we think the deliverables should look like and
discuss specific examples. We can then decide what other needs we may have, and plan the work
over Sunday and into Monday.
I hope all of that makes sense and, as always, please call with questions. Please respond as soon as
you can with respect to your availability tomorrow at 4:30pm.
All the best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 144/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 145/975
From: Kennealy, Michael (EOHED)
To: Ash, Jay (EOHED); Kirk, Carolyn (EOHED); Nunnelly, Mark E (DOR); Pham, Nam (EOHED); Distefano, Maria (MOBD); Servetnick, Adrian (EOHED)
Cc: McMorrow, Paul (EOHED)
Subject: FW: Project Plum: MA Thank you
Date: Friday, August 07, 2015 2:36:08 PM
Attachments: Scanned from a Xerox Multifunction Printer.pdf
FYI - nice note from the folks we met last week. We have a letter and
materials going out to them today to say thanks and to answer some of
their questions. Will keep you all posted.
Best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kulish, Karen (GE, Corporate)
Sent: Thursday, August 06, 2015 4:12 PM
To: Kennealy, Michael (EOHED)
Subject: Project Plum: MA Thank you
Mike,
Please find attached a thank you letter from Ann Klee to the team. Thank
you for your assistance in forwarding to the others.
Karen Kulish
Executive Assistant to Ann Klee
Global Operations - Environment, Health & Safety
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 146/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 147/975
From: Kennealy, Michael (EOHED)
To: Jennifer F. Sullivan (ANF) ([email protected])
Subject: FW: Project Plum
Date: Monday, December 07, 2015 12:04:00 PM
Attachments: Ground Lease Process Memo JPD updates 12 7 15.doc
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Doolin, James [mailto:[email protected]]
Sent: Monday, December 07, 2015 11:46 AM
To: Kennealy, Michael (EOHED) <[email protected]>
Cc: Morse, Elizabeth <[email protected]>; McDonald, Catherine
<[email protected]>; DeTour, Michele <[email protected]>
Subject: RE: Project Plum
Mike – here’s one memo that incorporates our ground lease statement and our procurement
statement. Jim
James P. Doolin
Chief Development Officer
Massachusetts Port Authority
O 617-568-3102
C 617-594-5953
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Monday, December 07, 2015 10:25 AMTo: Doolin, James
Subject: Re: Project Plum
Jim can I get this incorporated in the memo sent earlier.
Mike Kennealy
On Dec 7, 2015, at 9:58 AM, Doolin, James <[email protected]> wrote:
Mike – here’s our language on the ground lease as requested. Jim
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 148/975
James P. Doolin
Chief Development Officer
Massachusetts Port Authority
O 617-568-3102
C 617-594-5953
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Monday, December 07, 2015 8:19 AMTo: Doolin, JamesSubject: RE: Project Plum
Will come back to you likely later today on this Jim. More urgent is the lease language
we talked about – coming over this morning?
Mike Kennealy
Assistant Secretary for Business GrowthThe Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Doolin, James [mailto:[email protected]]
Sent: Sunday, December 06, 2015 9:44 AMTo: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: Project Plum
Mike – yes we do have folks that can do some graphic layout type production. We can
look at once we have the pieces to see if possible (I assume its close of business
Monday?) Jim
James P. Doolin
Chief Development Officer
Massachusetts Port Authority
O 617-568-3102
C 617-594-5953
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Saturday, December 05, 2015 8:17 PMTo: Doolin, JamesSubject: Fwd: Project Plum
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 149/975
Jim, suggestion from Sec Lepore that Massport has a marketing dept that could help
package/present whatever we come up with - thoughts?
Mike Kennealy
Begin forwarded message:
From: "Kennealy, Michael (EOHED)"
Date: December 5, 2015 at 8:14:01 PM EST
To: "Kennealy, Michael (EOHED)"
<[email protected]>, "Garrity, Rob (DOT)"
<[email protected]>, "Doolin, James"
<[email protected]>, "Sullivan, Jennifer F. (ANF)"
<[email protected]>, "Frazier, Ricks (EOHED)"
<[email protected]>, "Kreuter, Erica (EOHED)"
Cc: "Ash, Jay (EOHED)" < [email protected]>, "Lepore,
Kristen (ANF)" <[email protected]>
Subject: Re: Project Plum
Same number tomorrow please 10am Jay, Mike, Ricks, Erica, others if
interested and available. Whole group to reconvene when Jen has
feedback from outside counsel.
Mike Kennealy
On Dec 5, 2015, at 8:08 AM, Kennealy, Michael (EOHED)
<[email protected]> wrote:
It looks like we have folks available for a call at 4:30pm today.Please use this number:
access code .
Looking forward to speaking then and discussing ideas from the group.
Mike
From: Kennealy, Michael (EOHED)Sent: Friday, December 04, 2015 6:23 PMTo: Jennifer F. Sullivan (ANF) ([email protected]); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks (EOHED); Kreuter, Erica (EOHED)Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)Subject: Project Plum
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 150/975
I am emailing a group of people that I hope can work as a
team this weekend and into Monday to advance the Project
Plum work. As you know, we presented a proposal to Plum
that relies heavily on I-Cubed and Massworks funding, and
we also suggested some sites. The good news from today is
that we are very much in the game here, and the company
will be visiting Boston on Wednesday to look at sites, with a
significant internal meeting in about 10 days. (Note – not
clear yet what involvement they want from us on
Wednesday, possibly none though of course we are
pushing).
As Steve and Sec. Lepore and I just discussed, we think our
mission at this point is to make this proposed infrastructure
funding more tangible for them – how could these dollars
be used to the direct benefit of their project? Said
differently, our ~$100 MM dollar proposal was $80 MM I-
Cubed/MassWorks and $20 MM local property tax
incentives; they know how to value the $20 MM but are
unsure how to value the $80 MM, and we need this
proposal to look a lot closer to $100 MM than $20 MM,
especially in the face of competition offering incentives that
are much easier to value.
To that end, there are two deliverables that we would like to
send to the company by noon on Monday:
1. A list/discussion of historical examples of I-Cubed
and MassWorks projects. I have attached a draft
memo from Erica and the language that Jen
provided for our letter. What other examples can
we provide, and in what level of detail, specifically
ones that are as analogous as possible to their
project?
2. Specific examples of how I-Cubed and MassWorks
could be deployed at the MCCA and Massport sites.I have attached information about those sites. No
site or building has been ruled out, but initial
guidance from Plum’s location advisor was to focus
on the sites vs. the buildings.
Could I ask the following:
1. Could folks start giving consideration to #1 and #2
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 151/975
above and develop specific ideas.
2. Could you please also suggest (if applicable) others
from your organization that could help in this effort.
3. Can we all get on a call tomorrow at 4:30pm to
discuss.
On the call tomorrow, I would like to review what we think
the deliverables should look like and discuss specific
examples. We can then decide what other needs we may
have, and plan the work over Sunday and into Monday.
I hope all of that makes sense and, as always, please call with
questions. Please respond as soon as you can with respect
to your availability tomorrow at 4:30pm.
All the best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
<ground lease terms statement.docx>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 152/975
TO: Elizabeth Morse, Chief of Staff
FROM: James Doolin, Chief Development Officer, Catherine McDonald, Acting Chief
Legal Counsel and Michele DeTour, Deputy Chief Legal Counsel
SUBJECT: Massport’s Ground Lease Process Regarding Massport Parcels A-2, H, D-2 and
D-3 and WTC Avenue Parcel
DATE: December 7, 2015
Massachusetts Port Authority (Massport) Ground Lease
As part of its mission to be an economic engine for the Commonwealth and New England and to
further a shared civic vision of creating a new and vibrant part of the City of Boston, the
Massport property within the South Boston Waterfront has been developed to include a mix of
commercial, residential and maritime related uses. Massport has made significant investments in
roadways, utilities infrastructure and public open space.
Within the commercial / residential area clustered around Seaport Boulevard, Congress Street,
Summer Street and D Street, Fidelity, John Hancock and a host of other major companies have
made major investments and have a strong corporate employment presence. In addition, two firstclass apartment buildings have been built with additional units on the near term horizon. Two 4-
star hotels are immediately available in the Seaport Hotel and the Boston Waterfront
Renaissance Hotel. There is also a destination restaurant cluster centered around Liberty Wharf.
These projects which are all on Massport land and many others in the South Boston Waterfront
have established the area nationally as a highly desirable location for real estate investment.
On Massport property projects have been undertaken by private third party developers / investors
under long term ground leases. Long term ground leases present the opportunity to be creative in
how the ground rent terms for rent are structured over time. In order to stimulate project
execution and based upon the asset type and the realities of the market conditions, Massport has previously structured rent payments for certain projects that delay or reduce payments in the
early years of the lease while still achieving fair market value for land through a combination of
fixed rent and participating rent. For Project Plum, Massport would expect to work closely and
creatively with the development entity to establish terms that facilitate project execution while
meeting fair market value for the long term ground lease.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 153/975
2
In response to a request from Michael Kennealy to prepare a memorandum similar to
MassDOT’s District Six Headquarters Memo dated November 30, 2015, we have prepared thefollowing summary of pertinent issues related to Massport’s ground leasing process for internal
discussion (and if desired to form the basis of the memorandum to Michael Kennealy).
• Massport’s long-standing practice, as a public agency, is to solicit bids for thedevelopment and direct long term lease of its property, although not specifically required
by statute to engage in a competitive bid process. (When Massport did not engage in a
competitive bid process for a Seaport development parcel, the State Auditor stated in a2002 Independent State Auditors Report that “there are no circumstances that we can
envision where a public agency such as Massport, could justify awarding a no-bid real
estate development contract”.)
• At a minimum, Massport would, in accordance with its Trust Agreement (furtherdescribed below) and its public mission, determine the property’s fair market value. A
fair market value determination may not relieve Massport of a competitive bid obligationin the eyes of independent state oversight agencies and/or other interested parties. (A fairmarket value determination did not persuade the State Auditor in 2002.)
• Massport’s Enabling Act, Chapter 456 of the Acts of 1956, as amended, provides that
Massport may lease its Port Properties (Parcels A-2, H, D-2 and D-3 and WTC Avenue
Parcel are considered Port Properties under the Enabling Act) if Massport’s Board
determines that the property is no longer needed for its original maritime/industrial use.
• Massport’s Trust Agreement dated as of August 1, 1978, as supplemented and amended, between the Authority and U.S. Bank, National Association, as trustee, governs
Massport’s relationship with its bondholders and generally provides that Massport willnot enter into any contract or take any action that might impair or diminish the rights ofthe trustee or the bondholders. This section may need to be further reviewed based on the
specific terms of the proposed transaction, however, evidence of fair market value is
generally sufficient to satisfy this constraint.
• In order to comply with the grant assurances included in each federal grant agreement
under the Airport Improvement Program, Massport requires its tenants to limit the height
of structures constructed on Massportproperty so as not to constitute an obstruction to airnavigation under 14 CFR Part 77. (See Grant Assurance No. 21 – Compatible Land Use.)
•
Any long term lease is subject to the approval of Massport’s board.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 154/975
From: Kennealy, Michael (EOHED)
To: Kadish, Steven (GOV); Ash, Jay (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Tom Glynn; Elizabeth Morse; jdoolin; Povich, Lon (GOV); Garrity, Rob (DOT)
Subject: FW: Proposal from Boston
Date: Tuesday, December 08, 2015 1:16:00 PM
Attachments: Project Plum Dec 8.pdf Massport 12 8 15 Deck Final.pdf
FYI, and many thanks to all!
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 08, 2015 1:15 PM
To: Ann R. Klee 'Cowan, Mo'
Cc: 'John Barros' <[email protected]>
Subject: Proposal from Boston
Ann, Mo,
Please see the attached documents – we look forward to discussing.
All the best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 155/975
1
December 8, 2015
Ann R. Klee
Vice President
Corporate Environment, Health and Safety
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
Dear Ms. Klee,
We are pleased to provide some additional thoughts on a partnership between General Electric,
the Commonwealth and the City. We again have endeavored to listen to your feedback and
accordingly have strengthened our proposal and added some additional elements:
1. Public support for your headquarters through a partnership with Massport: Our
December 1 proposal contemplated up to $80 million in public infrastructure improvements
financed by the state. We now propose that Massport be your development partner,
construct a building on a Massport site and, by discounting the construction cost by $80M,
arrive at substantial lease savings for GE. Massport also proposes to build a parkingstructure nearby, allowing GE the benefit of proximate parking. Further, Massport has
previously structured lease payments for certain projects that delay or reduce payments in
the early years of the lease while still achieving fair market value overall, and they expect to
work closely and creatively with you.
Massport has a mission to promote economic development and a record of success in
developing its extensive real estate portfolio (including in the Seaport District). Massport
has great experience working with City and state officials, federal regulators and private
parties and in dealing with security and public safety concerns. Attached please see the
specific sites and other information related to this Massport opportunity.
2. Corporate Jets and Helicopters: We understand the importance of immediate access to
your corporate fleet. We now propose:
Parking of one executive jet and one helicopter at Logan Airport for 24/7 access.
A hanger for executive aircraft at Hanscom Airport, with on-call service to Logan.
State financed construction of a new public helipad in Boston (one-site has FAA
approval; other site options can be reviewed).
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 156/975
2
3. Innovation Center – a premier talent pipeline: As presented on December 1, we propose
a $5M investment to launch an Innovation Center in your building or another location with
MassChallenge, an internationally renowned start-up accelerator. To advance this potential,
we propose to invite participation from Harvard, MIT, Northeastern, the UMass schools and
others, bringing together the best of our public and private universities and research
institutions. This partnership would allow you to collaborate with, and recruit, the world’smost talented students, engineers, scientists, programmers, MDs, and entrepreneurs.
4. Local property tax incentive: Same $20M as proposed before.
5. Coordinated Permitting: Coordinated and streamlined permitting process by City and state
authorities and a permitting Ombudsman to assist in addressing any permitting issues. We
will dedicate staff in the office of the Secretary of Administration and Finance, supported by
the Governor’s Office. A similar dedication of staff will be provided by the Boston
Redevelopment Authority, supported by the Mayor’s Office.
6. GE’s Current: We are prepared to support the launch of your Current business here in
Boston with a grant of $5-10M over two years.
7. Improvements to Local Transportation:
Investment of public funds to purchase new vehicles and provide additional service to
the GE headquarters site as part of the Seaport Transportation Management Association
Up to $50 million of improvements through our I-Cubed program, including streetscapes,
water taxi, parking, utilities, public safety features and other public infrastructure
Up to $125 million in City and state financed improvements to streets, transit, bridges
and bikeways.
8. Workforce Training Fund: Same $1M as proposed before.
9. Concierge and housing service: As discussed in our December 1 proposal, a Concierge
team will be dedicated to easing the transition for GE and your employees, including home
buying assistance with the Boston Home Center and MassHousing.
We believe we are presenting to you the premier ecosystem to grow your business, an
exceptional place to live, substantial public investment in your project, and other amenities that
will make it as easy as possible for GE and your employees to move to and live in Boston. We
look forward to your response.
Sincerely,
Charles D. Baker Martin J. Walsh
Governor Mayor of Boston
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 157/975
MassportEconomic Development Partner
December 8, 2015
DRAFT 12/8/15 12:45 pm
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 158/975
Massport Overview
• Quasi-public authority – “a body corporate and politic”
• Governed by a seven member board
• Financially self-sufficient – can “fix, revise, charge andcollect tolls, rates, fees, rentals and charges”
• Operates three business lines• Aviation
• Maritime Operations
• Real Estate
• FY16 budget is $667 million• Logan Airport is 85% of total operating budget
• Maritime business is 10%, all other is 5%
• Massport bond ratings• Moody’s Aa2, S&P AA, Fitch AA
2
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 159/975
Why the Massachusetts Port Authority can assist
1. Massport has a proven track record as a successful
development partner2. Massport has Six development ready parcels in
Boston’s Seaport – “Innovation District”
3. Massport can execute flexible, creative, anddeliverable development opportunities to suit
commercial tenant needs expeditiously
3
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 160/975
uccessful History of Innovative Developments
• Massport is a Proven Development Partner• Since 1996, 5 million square feet of new mixed use, commercial, and
hotel developments were executed by Massport in South Boston• These developments have created $2.4 billion new value for the
Commonwealth and the City of Boston• 11,660 jobs in the Seaport Innovation District have been added as a
result of Massport’s Real Estate development initiatives
• Massport produces these positive results by working withdevelopers to:
• Execute creative and strategic “win- win” Long Term Ground Leases that afinanceable
• A proven track record and ability to Execute a One-Stop Shopping
approach to development• Streamlined Permitting
• 7 million square feet of mixed-use development master plan successfullypermitted for Commonwealth Flats
• Expedited / coordinated review process by the Commonwealth and City ofBoston managed by Massport
4
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 161/975
uccessful History of Innovative Developments in Southoston
1. Fidelity - World Trade Center (1996)
2. Fidelity - Seaport Hotel (1998)
3. Fidelity - East Office Building (2000)
4. Fidelity - West Office Building (2002)
5. John Hancock U.S. Corporate Headquarters (2003
6. Park Lane Seaport Apartments (2006)
7. Boston Waterfront Renaissance Hotel (2008)
8. Liberty Wharf (2011)
9. Waterside Place (2014)
5
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 162/975
Seaport WorldTrade Center
Boston
FidelityInvestments
6
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 163/975
Six pad ready Parcels owned by Massport available inthe Seaport / Innovation District
1. World Trade Center Parcel (WTC Avenue)
2. Parcel D-3
3. Summer Street Parcel
4. Parcel D-2
5. Parcel A-26. Parcel H
7
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 164/975
8
Location Overview of 6 pad ready parcels in the South
Boston Innovation District
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 165/975
9
World Trade Center Parcel • Development site
adjacent to the
Massport’s 1,500 spa
Air Rights Garage (un
design)
• Able to achieve 150,0to 200,000 sf of offic
development
• Parking provided in
adjacent Massport Ai
Rights Garage
• Prominent views ofdowntown
• Adjacent to MBTA Silv
Line station
Air Rights
Garage Site Parcel
D-2
ParcelD-3
Parcel H
Parcel
A-2
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 166/975
Parcel D-3
• 2.8 acre parcel
• Frontage on Summer
D Streets
• Master plan program
allocation of 500,000
650,000 sf
• Suitable for commerc
office use within mixe
use
• Directly across from t
BCEC/Westin Hotel
• Potential for on-site
structured parking
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 167/975
11
3 acre parcel
Summer Street
Frontage
Site capacity of 400,000
sf
Potential for on-site
structured parking
Opportunity to expand
site through acquisition
of U.S. Army property
South BostonTransportation Plan
recommended
extension of E Street to
Summer Street
Summer Street Parce
Summer Street
Parcel D-3
E
S t r e e t
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 168/975
Parcel D-2• 2.1 acre parcel
• Frontage on Summer,
Street and World Trad
Center Avenue
• Subject of RFQ which
issued by Massport onNov. 9 for hotel/mixed
development
• Requirement for mini
250 room hotel
• Opportunity for well i
excess of 150,000 sf ooffice
• Parking provided in
adjacent Massport Air
Rights Garage (under
design)
Air
Rights
Garage
Site
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 169/975
Parcel A-2
13
• 1.2-acre parcel
• Frontage on Congress
Street and World Tra
Center Avenue
• Master plan program
allocation up to 450,0
sf, suitable for
commercial office us
• Adjacent MBTA Silver
WTC Station, with
potential direct
pedestrian connectio
• Available parking in
planned Air Rights Ga
(adjacent with poten
direct pedestrian
connection)
Parcel
D-2
ParcelD-3
Parcel H
Air Rights
Garage Site
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 170/975
Parcel H
14
1.8 acre parcel
Frontage on Congress
Street
Master plan program
allocation up to 500,000
sf, suitable for
commercial office use
Potential for on-site
structured parking
(either below or above
ground)
Adjacent to existingSilver Line Station
Potential air rights
overbuild of Silver Line
Way and T Station
Air Rights
Garage Site
Parcel
A-2
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 171/975
Flexible, creative, deliverable, and financeabledevelopment capabilities
• “Turnkey” development capabilities
• Using a selected private developer,• or through Massport itself
• Tenant Improvements to suit occupiers’ needs included
• Construction costs for parking options or otherinfrastructure needs are available
• Flexible space lease terms are negotiable to produce lowerinitial occupancy costs
• Attractive pre-packaged lease terms are available in partnershipwith Commonwealth / City investments opportunities
• Early lease periods are discountable with gradual adjustments toover a longer lease period
15
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 172/975
Massport Aviation – Logan International Airport
• Minutes from South Boston Innovation District
• Provides access for private aircraft 24/7, including overnight
parking• General Aviation activities operated by Signature Flight
Support (Fixed Based Operator)
• Automobile parking available at Signature
• Helicopter pad and parking at Signature
16
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 173/975
Massport Aviation – Hanscom Airfield
• 13.5 nautical miles from Logan Airport
• Easy, efficient access to and from Downtown
• Readily available sites for permanent hangars for aircraftfleets
• Full services available
• Existing and new construction options
• Will accommodate multiple planes and helicopters
• Home to multiple Fortune 500 corporate fleets
17
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 174/975
oston Logan Has Nonstop International Service to 53 Destinatio
• 13.5 nautical miles from Logan Airport• Easy, efficient access to and from Downtown
• Readily available sites for permanent hangars foraircraft fleets
• Full services available
• Existing and new construction options
• Will accommodate multiple planes and helicopters
18Note: Includes Seasonal Service, Source: OAG & Innovata Schedules
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 175/975
Boston Logan Has Nonstop Domestic Service to 75 Destinations
19Note: Includes Seasonal Service, Source: OAG & Innovata Schedules
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 176/975
Massport Air Cargo
• Air cargo is reported on a calendar year basis by the carriersthemselves
• The YTD December 2014 numbers reflect the full year’s total• Total Cargo & Mail: 585,459,955 lbs.
• Express (FedEX, UPS etc): 334,315,119 lbs.
• Freight (“belly of plane”): 203,877,671 lbs.
• October 2015 YTD is nearly the same (+0.3%) as Calendar2014 October YTD
20
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 177/975
Massport’s Port of Boston
• Multiple public and private maritime assets that provide New England businesseswith connections to the global marketplace.
• Weekly service to North Europe/Latin America, the Mediterranean, and Asia; easyaccess to Logan Airport and interstate highway system.
• Home to New England’s only full service container terminal; serves over 1,600businesses that use it to export and import goods.
• Annual economic impact of $4.6 billion. Record-breaking volume in FY2015 with221,000 twenty foot equivalent units (TEUs) and 13% growth year to date in FY2016.
• Working with state/federal officials to dredge Boston Harbor to prepare for largercontainer vessels; estimated to double volumes.
21
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 178/975
Massachusetts:An Innovation Capital
22
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 179/975
23
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 180/975
24
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 181/975
25
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 182/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 183/975
Appendix
27
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 184/975
Governing Documents
1956 Enabling Act• Quasi-public authority – “a body corporate and politic”• May only borrow for capital construction, not working capital
• Maintain, repair and operate, or extend, enlarge and improve itsbusiness facilities
• Construct or acquire additional facilities
1978 Trust Agreement, 1999 PFC Trust Agreement, and 2011 CFCTrust Agreement
• Massport’s contract with bondholders, includes specific covenants• Defines use of Massport’s generated revenues (funds flow
requirements)• Federal tax regulations restricts the use of bond proceeds
Current Federal Aviation Law• Restricts the use of aviation revenue (revenue diversion)• Regulates the calculation of aeronautical rates and charges• Regulates the collection and use of Passenger Facility Charges (PFCs)
28
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 185/975
From: Kennealy, Michael (EOHED)
To: Milano, Peter (MOBD)
Subject: FW: Responding to the RFI
Date: Thursday, September 03, 2015 3:02:00 PM
Attachments: Boston RFI Response - 2015.pdf
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Servetnick, Adrian (EOHED)
Sent: Monday, July 27, 2015 5:26 PM
To:
Cc: Kennealy, Michael (EOHED)
Subject: Responding to the RFI
Karen-
I hope this finds you well. Please find attached the RFI requested for Metro-Boston/ Massachusetts.
If you have any questions or follow-up requests, please contact Mike Kennealy, CC’d here.Phone: 1-617-788-3640
Mobile: 1-617-634-4762
All the best, and many thanks-
Adrian Servetnick
Program and Communications Coordinator
Executive Office of Housing and Economic Development
p: 617-788-3615
t: @MassEOHED
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 186/975
PROJECT PLUM: REQUEST FOR INFORMATION
STATE: Massachusetts
COUNTY: Suffolk County
CITY: Boston
# Criteria Units of Measure Response
1 State/County Data
1.01 Population No. of People
4.7 Million in Boston-Cambridge-Newton metro area as of 2013 (US Census
Bureau)
State population: 6.745 million (2014)
1.02
Population
Growth 2005-
2015
% Growth
2.6% growth in Boston-Cambridge-Newton metro area from 2010 to 2013 (US
Census Bureau)
State population growth: 3% (2013 to 2014)
1.03ProjectedPopulation
Growth 2016-
2020
% Growth
Suffolk County’s population is projected to increase by 240,000 or 16% between
2010 and 2035
http://suffolkcountyny.gov/Portals/0/planning/CompPlan/vol1/vol1_chpt2.pdf
Greater Boston is expected to see a 2.7% increase in population between 2015
and 2020
http://pep.donahue-
institute.org/UMDI_LongTermPopulationProjectionsReport_2013.11.pdf
1.04Domestic
migration rate%
2.3% migration from Massachusetts to other US states at % of population in 2013
(US Census Bureau)
1.05Regional
diversity rankRank
Boston ranked # 32 in Wallethub's 2015 study of cities with most and least
ethno-racial and linguistic diversity
1.06
Size of Labor
force within
County
% of Population &
No. of People621,794 workforce in Suffolk County, 81% of county population (June 2014)
1.07
Real Estate
Foreclosure
Rate
2014 HUD rate
Massachusetts: 1 in every 1,624
Suffolk County: 1 in every 3,281
http://www.realtytrac.com/statsandtrends/foreclosuretrends/ma
1.08
Median Home
Value (and
basis for
estimate)
2015 USD$389.8K 2014 median home value in Boston-Cambridge-Newton metro area
(National Association of Realtors)
1.09
Median Rent
(Cost per
Calendar
Month)
2013
Suffolk County: $2,400
http://www.zillow.com/suffolk-county-ma/home-values/
1.1
Median
Household
Income
2015 USD$83,867 median household income in Massachusetts from 2011-2013 (US Census
Bureau)
1.11
Increase in
Household
Income 2010-
2015
2015 USD
Massachusetts: 3.7% wage gain, 29th highest in USA
http://www.bls.gov/regions/new-england/news-
release/countyemploymentandwages_massachusetts.htm
1.12Per Capita
Income2015 USD
Massachusetts Per Capita: $35.763
Massachusetts Per Household: $61,992.
http://data.bls.gov/cgi-bin/surveymost
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 187/975
1.13
Percent Below
100% Federal
Poverty Level
%
Massachusetts: 20.8%
2009-13
http://quickfacts.census.gov/qfd/states/25/25025.html
1.14
Drug Abuse /
Sale /
Possession
Statistics (per
UCR program)
Per 100,000
Suffolk County: 909.8 per 100,000
http://wwwn.cdc.gov/CommunityHealth/profile/currentprofile/MA/Suffolk/3100
52
1.15
Top 2 School
Districts
including State
Rank
District & Rank
Top 10 Ranked Public School Systems in Greater Boston:Lexington
Westwood
Westford
Weston
Dover-Sherborn
Brookline
Wayland
Newton
Wellesley
https://k12.niche.com/rankings/public-school-districts/best-overall/m/boston-
metro-area/
Overall Massachusetts ranks #1 for education
http://www.aecf.org/m/databook/aecf-2014kidscountdatabook-embargoed-
2014.pdf
1.16Unemployment
Rate
% & No. of
Persons Affected
3.8% unemployment as of April '15 in Boston-Cambridge-Newton metro area
(Bureau of labor statistics)
4.6% unemployment in Suffolk County, Dec 14
http://www.cityofboston.gov/images_documents/SandP%202015ratingsreport.p
df
1.17
2010-2015
Increase in
Employment
% / Total Number
of Jobs
Massachusetts gained 220,477 jobs between 2010 and 2015- a 7% increase
http://lmi2.detma.org/lmi/lmi_es_a.asp#IND_LOCATION
1.18
Cost of Living
Index (closest
urban area)
US Census BureauCost of living index of 132.5 as of 2010 in Boston-Cambridge-Newton metro area
(US Census Bureau)
1.19
Commercial
real estate
average cost
per foot
2015 USD
$413 sf in Boston
http://www.trulia.com/real_estate/Boston-Massachusetts/market-trends/
1.2
County & State:
Standard &
Poor Bond
Rating
Rating
MA rated AA+ by S&P in 2014
Boston rated AAA on 4/1/2014
http://www.cityofboston.gov/images_documents/SandP%202015ratingsreport.p
df
1.21
Business
friendliness
ranking (CNBC
& Forbes)
Rank State ratings: CNBC 2015: 7 | Forbes 2014: 13
1.22
Name and # of
Fortune 1000
companies in
nearest
metropolitan
area
Number 26 total in Massachusetts. See Appendix 1.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 188/975
1.23
History of
Natural
Disasters (Last10 Years)
Type, date,
damages
Hurricane Sandy 2012
-$67 billion
Hurricane Irene 2011
-$14 billion
Flooding 2010
-$2 billion
Severe Weather and Flooding 2011
-$3 billion
Tornado 2011
-$50.3 millionSnowstorm October 2011
-$3 billion
Winter Snowstorm 2014
-$2 billion
Winter Snowstorm 2015
-$2.5 billion
https://www.ncdc.noaa.gov/billions/events
2 Tax Considerations
2.01
Total (all
applicable jurisdictions)
millage rate for
business real
and personal
property
Number
Boston Tax Rate: Residential is $12.11; Commercial is $29.52 per thousand dollar
value
http://www.bizjournals.com/boston/blog/bbj_research_alert/2015/01/massach
usetts-property-tax-rates-in-2015-by-town.html
2.02
Assessment
ratio for
business real
and personal
property
% 100% of fair market value
2.03Local Business
TaxYes or No No
2.04Local Personal
Income TaxYes or No No
2.05
Local Sales Tax
Rate (if
applicable)
Yes or No No
2.06State personal
Income TaxIf Yes, % 5.15% flat tax
2.07
State corporate
Income Tax
Rank
Rank Ranked # 24 lowest in 2015 by taxfoundation.org
3 Workforce/Talent
3.01Average Age of
PopulationAge in Years
Metropolitan Boston: 31.7
Massachusetts: 39.4
3.02Population Age
18-45
Percentage of
Workforce79% of workforce is 18+
3.03
Age 18 & Over
Enrolled in
College /
Graduate
School
Percentage11% of Massachusetts’ over-18 population is currently enrolled in college or
graduate school
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 189/975
3.04
Percent of
population with
high school
degree or
higher (Includes
Equivalency)
Percentage of
Workforce
89.4% in Massachusetts
http://quickfacts.census.gov/qfd/states/25/25025.html
3.05
Percent of
population with
bachelor's
degree orHigher
Percentage of
Workforce
Statewide, 39.4% of 25+ population have a bachelors degree or higher, and
16.4% had an advanced degree as of 2008
Metro Boston: 54% of the 25+ population have a 2- or 4- year degree or greater,and 19% have an advanced degree
3.06
# of accredited
universities
with campuses
in potential city
#
Bay State College
Benjamin Franklin Institute of Technology
Berklee College of Music
Boston Architectural College
Boston College
Boston Conservatory of Music
Boston University
Bunker Hill Community College
Cambridge College
Cambridge School of Culinary Arts
Emerson College
Emmanuel College
Episcopal Divinity School
Fisher College
Harvard University
Laboure College
Lesley College
Longy School of Music
Massachusetts College of Art and Design
Massachusetts Institute of Technology
MCPHS University
New England College of Optometry
New England Conservatory of Music
New England School of LawNew England School of Photography
Northeastern University
School of the Museum of Fine Arts
Simmons College
Suffolk University
Wentworth Institute of Technology
Wheelock College
University of Massachusetts: Boston
32 colleges and universities in Boston & Cambridge.
3.07
Enrollment Size
of University orCollege in
above question
# of Full /PartTime Students 250,000 college students live in Suffolk County, according to Association ofIndependent Colleges and Universities in Massachusetts (AICUM)
4 Quality of Life
4.01
No. of Local
Health Systems
Providers (i.e.
Trident,
TriHealth,
Kaiser, etc.)
#
Massachusetts has 15 major hospital systems, 64 acute hospitals, 55 community
health centers, 9 provider networks, and 169 major medical groups (2013 data)
http://bluecrossmafoundation.org/delivery-system-map-archive/
There are 36 federally funded Health Center organizations in MA serving
659,521 patients, 18.7% of whom are uninsured.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 190/975
http://www.nachc.com/client/documents/research/maps/MA2015.pdf
4.02
Primary Care
Doctor-to-
Population
Ratio
Per 1,000
Residents
31.4 for every 1,000 patients.
4.03
# of ranked
hospitals in the
metro area
#
17 nationally or regionally ranked hospitals in Boston-Cambridge-Newton metro
area
Mass General is ranked #1 and Brigham & Women’s ranked #6 in the most recent
US News & World Report rankings.
http://www.usnews.com/info/blogs/press-room/2015/07/21/us-news-releases-
201516-best-hospitals
4.04
# Specialty
Health Care
Facilities (e.g.
Cancer, NICU)
#29 in metropolitan Boston
4.05Major (Felony)
Crime Rate
Per 100,000
Residents
343.3 per 100,000
http://www.city-data.com/crime/crime-Boston-Massachusetts.html
4.06Average annualhigh
temperature
Degrees in FAverage high 59 degrees based on weather data collected from 1981 to 2010 by
the NOAA National Climatic Data Center
4.07
Average annual
low
temperature
Degrees in FAverage low 44 degrees based on weather data collected from 1981 to 2010 by
the NOAA National Climatic Data Center
4.08Average days
with rainfall#
Average 127 days based on weather data collected from 1971 to 2000 by the
National Oceanic and Atmospheric Administration (NOAA)
4.09Gallup
wellbeing score- State rank in 2014 Gallup Wellbeing index: 17
4.1
# of
professional
sports teams
# 5 major league sports teams in urban area
4.11Forbes coolness
rankingRank Ranking: 9
5 Transportation
5.01
Distance to
nearest major
International
Airport
Miles 5 miles to Boston Logan International
5.02
Distance to
additional
airports
(domestic, civil
aviation,
international)
Miles
55 miles to Worcester Regional Airport
32 miles Lawrence Municipal Airport
66 miles to Gardner Municipal Airport
138 miles to Pittsfield Municipal Airport
22 miles to Laurence G. Hanscom Field
92 miles to Westover Metro Airport
5.03
# of direct
flights to
domestic cities
#76 direct domestic cities from Boston Logan International
126,593 domestic flights per year.
5.04Direct flights to
Europe#
Amsterdam
Dublin
Frankfort
Istanbul
Lisbon
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 191/975
London
Madrid
Munich
Paris
Reykjavik
Rome
Shannon
Terceira, Port.
Zurich
14 cities, 7,556 flights per year
5.05Direct flights to
Latin America#
Aruba
Barbados
Bermuda
Cancun
Grand Cayman
Mexico City
Nassau
Panama City
Ponta Delgada
Port Au Prince
Providenciales
Puerto Plata, DR
Punta Cana, DR
Santiago, DR
Santo Domingo, DR
St. Lucia
St. Maarten
17 cities, 3,589 flights per year
5.06Direct flights to
Asia / Africa #
Toyko
Tel Aviv
Beijing
Shanghai
Hong KongDubai
Doha
7 cities and 2,361 flights per year
5.07
Public
transportation
systems ranking
Rank Ranked # 34 metro area for public transportation by Brookings.com
5.08
Inrix traffic
scorecard
ranking
Rank Ranked # 9 by Inrix
6 Incentives
6.01
Available
incentive
packages
Please describe
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 192/975
Appendix 1: Top Massachusetts companies on
Fortune 1000 Lis
Liberty Mutual Holding Company Inc. David H. Long Boston Massachusetts
Massachusetts Mutual Life Insurance Company Roger W. Crandall Springfield Massachusetts
The TJX Companies, Inc. Carol M. Meyrowitz Framingham Massachusetts
Raytheon Company Thomas A. Kennedy Waltham Massachusetts
Staples, Inc. Ronald L. Sargent Framingham Massachusetts
EMC Corporation Joseph M. Tucci Hopkinton Massachusetts
Global Partners LP Eric Slifka Waltham Massachusetts
Thermo Fisher Scientific Inc. Marc N. Casper Waltham Massachusetts
Analog Devices, Inc. Vincent T. Roche Norwood Massachusetts
Hologic, Inc. Stephen P. MacMillan Bedford Massachusetts
Affiliated Managers Group, Inc. Sean M. Healey Prides Crossing Massachusetts
PerkinElmer, Inc. Robert F. Friel Waltham Massachusetts
Boston Properties, Inc. Owen D. Thomas Boston Massachusetts
PAREXEL International Corporation Josef H. von
Rickenbach
Waltham Massachusetts
Waters Corporation Douglas A.
Berthiaume
Milford Massachusetts
The Hanover Insurance Group, Inc. Frederick H. Eppinger
Jr.
Worcester Massachusetts
LPL Financial Holdings Inc. Mark S. Casady Boston Massachusetts
Clean Harbors, Inc. Alan S. McKim Norwell Massachusetts
Cabot Corporation Patrick M. Prevost Boston Massachusetts
American Tower Corporation James D. Taiclet Jr. Boston Massachusetts
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 193/975
Appendix 1: Top Massachusetts companies on
Fortune 1000 Lis
Alere Inc. Ron Zwanziger Waltham Massachusetts
Iron Mountain Incorporated William L. Meaney Boston Massachusetts
State Street Corporation Joseph L. Hooley Boston Massachusetts
Eversource Thomas J. May Springfield Massachusetts
Boston Scientific Corporation Michael F. Mahoney Natick Massachusetts
Biogen Idec Inc. George A. Scangos Cambridge Massachusetts
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 194/975
From: Kennealy, Michael (EOHED)
To: Ash, Jay (EOHED)
Subject: FW: response
Date: Monday, December 14, 2015 3:18:03 PM
Attachments: GE Updates - To Grid docx MJK.docx
Latest version
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Frazier, Ricks (EOHED)
Sent: Monday, December 14, 2015 3:17 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: response
Mike
.
Ricks
From: Kennealy, Michael (EOHED)
Sent: Monday, December 14, 2015 3:05 PM
To: Frazier, Ricks (EOHED)
Subject: response
?
Mike KennealyAssistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
Attorney-Client
Attorney-Client Privilege
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 195/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 196/975
Updates
1. What are the “employment tax benefits” through the Mass Life Science Center”? – specifically
a. What is the program?
i. MLSC offers a tax credit program to expand life sciences-related employment
opportunities, promote health-related innovations and stimulate research and
development, manufacturing and commercialization in the life sciences in MA.
GE Healthcare Life Sciences has recently secured an MLSC award of $3.15
million. A new application could be made through GE Healthcare, but may
consider both health division future employment growth and the GE corporate
positions. Upon approval of the MLSC Board, GE would receive a tax credit,
which can be refundable depending upon the particular credit applied for.The
new application would include both health div ision future employment growth
and the GE corporate positions. Upon approval of the MLSC Board, GE would
receive a tax credit. We are open discussing it as a refundable tax credit.
b. What is the statutory authority supporting elig ibility?
i.
The Life Sciences tax credit is authorized under G.L. c. 23I, §5(d), which provides
for a number of different incentives, including refundable tax credits for
companies who commit to create at least 50 net new jobs in Massachusetts. To
be eligible for life sciences tax credits, a company must meet the requirements
set out in G.L. c. 23I, §5(b) and be certified by the Center’s board. Qualifying
companies may receive multiple awards. Taxpayers may use Life Sciences Tax
Credits to offset up to 100% of taxable income under the provisions of G.L. c. 62,
§6 (r) and c. 63, §38CC. If the amount of the credit exceeds taxable income, the
taxpayer may receive up to 90% of the value of the credit as a refund. There is
no specific limit on the amount of an award per net new full-time job created,
which is within the discretion of the Center’s board, but the overall program is
subject to a $25 million annual cap. See, G.L. c. 25I, §5(d), c. 62, §6(r)(4) and c.
63, §38CC(d).
c.
How was the $40m calculated?
i.
The $40m proposal represents the largest award ever to be made from the
program. Its calculation is based on up to 100 GE Health jobs and up to 600
corporate jobs be located in MA over the next five years. The award would be
made for FY’18-FY’20 receipt. The award is not based upon a formula, but is a
“stretch” from other awards that have been made.
2.
What are the State “energy efficiency contributions” – explanation of the program, eligibility
requirements, potential benefits, dollar level of support?
i. The funding for energy efficiency/renewable energy program is available from
the Mass Clean Energy Center (through the Alternative Compliance Payment
Fund) and from the Mass Save program. The maximum benefit to would be
derived, which would be based on a customized package customized for the
property selected. A minimum award of approximately $250,000 to a maximum
that could approach or equal $5m or more is possible.
Formatted: Not Highlight
Formatted: Not Highlight
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 197/975
ii.
For a New publicly owned building (Option A), Mass Save (a program of the
utility companies) would be a key participant. Eversource and the MA
Department of Energy Resources (DOER) have expressed interest in working
with Massport as they do with other large customers to drive the a collaborative
efficiency project. Additionally, a publicly owned building could participate in
DOER’s Leading by Example program (LBE), where ACP (Alternative Compliance
Payment – controlled by the MA Clean Energy Center) funds could be utilized to
support energy efficiency/renewable upgrades, particularly around innovation
and new technology. There are currently not existing initiatives that these
scenarios fit into, but there could be future opportunities. LBE awards are
typically run through an application process. DOER/LBE could provide a grant
directly to Massport through a contract that would need to specify that
Massport would need to follow their DOER procurement and contracting rules
for any projects.
iii.
A new privately developed building or an existing private office building could
also benefit from the same Mass Save program. A private building is not eligible
for DOER’s LBE program, so any grant would need to be competitively procured
and follow state procurement law.
3. Property tax abatement – what is the term and expected percentage?
i. The property tax abatement term is assumed to be ____ years and the
percentage of relief is expected to be _____%. The City is interested in both job
creation and the value of the building to be constructed. The assumption has
been 600 jobs and 150,000 s.f. of building , although the calculation as to value
is dependent on many other variables. Thus, the actual value of the tax
abatement will be dependent on the final project to be built, and whether it is
on private or public land.
4.
What are the issues surround building a parking structure near a privately owned lot, ie is it just
availability of land/permitting?
i.
We are willing to explore this possibility if it furthers GE plans. The major issue
is a general parking restriction that could impact any future offsite parking
proposal. Other issues include Among the issues on a parking structure is the
availability of land, the ability to secure permitting and the mix of public or
private parking that would be included in the structure. The State is willing to
engage in a discussion about a grant for the structure through either the
MassWorks or I-Cubed program. Available funding would be requested through
the normal application process. A typical MassWorks award for parking
structure has been in the would be $5m-$10m range, but that is not a hard
limit. The I-Cubed program could make an award of up to $50m for a garage,
dependent upon job growth numbers that are in excess of 600 (the 600 already
being used to calculate other incentives being offered and thus not available to
leverage this I-Cubed opportunity).
Attorney-Client
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 198/975
New privately developed building Mass Save (as mentioned above) would be a key participant in any
energy efficiency building projects. Any DOER grants would need to be competitively procured and
follow state procurement law (laid out below).
Existing private office building Mass Save (as mentioned above) would be a key participant in any
energy efficiency building projects. Any DOER grants would need to be competitively procured and
follow state procurement law (laid out below).
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 199/975
From: Kennealy, Michael (EOHED)
To: McMorrow, Paul (EOHED)
Subject: FW: Signed GE Headquarters Relocation Term Sheet
Date: Tuesday, January 19, 2016 2:21:00 PM
Attachments: GE Headquarters Relocation Terms.Jan13.2016.pdf
Paul, please see attached.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Kadish, Steven (GOV)
Sent: Friday, January 15, 2016 8:09 AM
To: Polito, Karyn (GOV)
<[email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Ash, Jay (EOHED) <[email protected]>;
Pollack, Stephanie (DOT) <[email protected]>; Tom Glynn
<[email protected]>; Povich, Lon (GOV) <[email protected]>; Buckley,
Timothy (GOV) <[email protected]>; Conroy, Jim (GOV)
<[email protected]>; Conroy, Jim (GOV) <[email protected]>;
Sullivan, Jennifer F. (ANF) <[email protected]>; Morse, Elizabeth <[email protected]>; Kennealy, Michael (EOHED)
<[email protected]>; Frazier, Ricks (EOHED)
<[email protected]>; Garrity, Rob (DOT) <[email protected]>
Cc: Zarrella, Lily (GOV) <[email protected]>; Wehrs, Brianna (GOV)
Subject: Signed GE Headquarters Relocation Term Sheet
For our records.
Attached is a PDF version.
A signed original will also be provided.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 200/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 201/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 202/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 203/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 204/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 205/975
From: Frazier, Ricks (EOHED)
To: Brown, Kevin W (DOR) ([email protected])
Cc: Cosco, Jonathan (EOHED)
Subject: FW: Time for a quick call today?
Date: Thursday, December 03, 2015 9:18:00 AM
Kevin
Ricks
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 01, 2015 7:49 PMTo: Frazier, Ricks (EOHED)
Cc: Cosco, Jonathan (EOHED)
Subject: RE: Time for a quick call today?
OK – as long as everyone understands my concern.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Frazier, Ricks (EOHED) [mailto:[email protected]]Sent: Tuesday, December 01, 2015 7:48 PMTo: Eisenstadt, Amy (GE, Corporate)Cc: Cosco, Jonathan (EOHED)Subject: Re: Time for a quick call today?
That's how I read it, but the question of related entities still seemed to be of interest to the experts,
so I don't want to speak for them.
Sent from my iPhone
On Dec 1, 2015, at 7:45 PM, Eisenstadt, Amy (GE, Corporate) <[email protected]> wrote:
This would not be our fact pattern – but this part of the regulation seems to limit the
lessee credit to the fact pattern.
Attorney-Client Privilege
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 206/975
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Frazier, Ricks (EOHED) [mailto:[email protected]]Sent: Tuesday, December 01, 2015 7:44 PMTo: Eisenstadt, Amy (GE, Corporate)Cc: Cosco, Jonathan (EOHED)Subject: RE: Time for a quick call today?
I think we’re going to have to run this one past DOR. We did not discuss this scenario
and I would defer to their views.
Ricks
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 01, 2015 7:07 PM
To: Frazier, Ricks (EOHED)
Cc: Cosco, Jonathan (EOHED)
Subject: RE: Time for a quick call today?
Are you saying this part of the regulation doesn’t apply? How the calculation works,
perhaps with an example, for leased real property would be greatly appreciated.
(b) Lessor. The credit is generally not available to the lessor of eligible property. However, the credit is available to a lessor for eligible property, other than tangible personal property, leased to a lessee
provided the relationship between the lessor and the lessee is:
1. an individual and a corporation if such individual owns, directly or indirectly, 100 percent of the
outstanding stock in the corporation;
2. a corporation and a partnership if the same persons own, directly or indirectly, 100 percent of the
outstanding stock in the corporation and 100 percent of the capital interest or profit interest in the
partnership;
3. a corporation and another corporation if the same persons own, directly or indirectly, 100 percent
of the outstanding stock in each corporation;
4. the fiduciary of the trust that holds the leased property and the sole grantor of the trust;
5. the fiduciary of the trust that holds the leased property and the fiduciary of another trust if the
same person is the sole grantor of both trusts;
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 207/975
6. the fiduciary of the trust that holds the leased property and the sole beneficiary of such property;
7. the fiduciary of the trust that holds the leased property and a corporation if the trust, the sole
grantor of the trust, or the sole beneficiary of the trust owns, directly or indirectly, 100 percent of the
outstanding stock in the corporation.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Frazier, Ricks (EOHED) [mailto:[email protected]]Sent: Tuesday, December 01, 2015 4:57 PMTo: Eisenstadt, Amy (GE, Corporate)Cc: Cosco, Jonathan (EOHED)Subject: FW: Time for a quick call today?
Amy
Here is the language and links to other relevant materials. What we are waiting for
from DOR is whether there is another regulation relating to useful life of real property
that might apply here. Our working assumption is that these are the applicable rules,
but they are checking to make sure we have not missed anything.
Ricks
From: Cosco, Jonathan (EOHED)
Sent: Tuesday, December 01, 2015 4:15 PM
To: Frazier, Ricks (EOHED)
Subject: RE: Time for a quick call today?
Here’s the statutory language:
“A corporation subject to tax under this chapter that participates in a certified project,
as defined in sections 3A and 3F of chapter 23A, may take a credit against the excise
imposed by this chapter to the extent authorized by the economic assistance
coordinating council established by section 3B of said chapter 23A, in an amount not
to exceed 50 per cent of such liability in a taxable year; provided, however, that the 50
per cent limitation shall not apply if the credit is refundable under subsection (b): (i)
for certified expansion projects and certified enhanced expansion projects, as defined
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 208/975
in said sections 3A and 3F of said chapter 23A, an amount up to 10 per cent; (ii) for
certified manufacturing retention projects, as defined in said sections 3A and 3F of said
chapter 23A, an amount up to 40 per cent of the cost of any property that would
qualify for the credit allowed by section 31A if the property were purchased by a
manufacturing corporation or a business corporation engaged primarily in research
and development and is used exclusively in a certified project, as defined in said
sections 3A and 3F of said chapter 23A; and, (iii) for certified job creation projects, as defined in said sections 3A and 3F of said chapter 23A, an amount up to $1,000 per job
created, or up to $5,000 per job created in a gateway municipality as defined by
section 3A of chapter 23A or within a city or town whose average seasonally adjusted
unemployment rate, as reported by the executive office of labor and workforce
development, is higher than the average seasonally adjusted unemployment rate of
the commonwealth; provided, however, that the total award per project shall be no
more than $1,000,000; and further provided that a credit under this clause (iii) shall be
allowed only for the year subsequent to that in which the jobs are created. A lessee
may be eligible for a credit under this subsection for real property leased under an
operating lease.” M.G.L. c. 63, sec. 38N(a) (emphasis added). M.G.L. c. 62, sec. 6(g) has similar language.
The current regulation, 830 CMR 63.38N.1(6)(b), still provides that the credit is not
available for real property, but that has obviously been superseded by statutory
revision in 2009. However, DOR Technical Information Release 10-1 confirms that “the
rules used to calculate the credit for leased real estate will be the same rules used to
calculate the credit for leased tangible personal property set out in Regulation 830
CMR 63.38N.1(6)(b).” Here’s a link to the regulation
http://www.mass.gov/dor/businesses/help-and-resources/legal-library/regulations/63-
00-taxation-of-corporations/830-cmr-6338n1-economic-opportunity-area-credit.html
and to the TIR http://www.mass.gov/dor/businesses/help-and-resources/legal-
library/tirs/tirs-by-years/2010-releases/tir-10-1-economic-development-incentive.html
___________________________________________
Jonathan M. Cosco
Senior Deputy General Counsel
Executive Office of Housing and Economic Development
Commonwealth of Massachusetts
One Ashburton Place, 21st Floor
Boston, MA 02114617-788-3628
From: Frazier, Ricks (EOHED)
Sent: Tuesday, December 01, 2015 4:11 PM
To: Eisenstadt, Amy (GE, Corporate)
Cc: Cosco, Jonathan (EOHED)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 209/975
Subject: RE: Time for a quick call today?
Amy
Sorry I disappeared this morning. For some reason cell coverage and even email
disappeared entirely.
We are still tracking down details on the EDIP lease issue, but have confirmed that a
lessee is eligible for EDIP credits, although the schedule for actually taking them may
be an extended one. DOR still owes us an answer on that question, but they would
definitely be available to you as a lessee.
When we hear more we’ll get back to you.
Ricks
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]Sent: Tuesday, December 01, 2015 9:04 AM
To: Frazier, Ricks (EOHED)
Cc: Cosco, Jonathan (EOHED)
Subject: RE: Time for a quick call today?
Works for me. Should I send in a call-in number or do you want to call me?
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Frazier, Ricks (EOHED) [mailto:[email protected]]Sent: Tuesday, December 01, 2015 9:03 AMTo: Eisenstadt, Amy (GE, Corporate)Cc: Cosco, Jonathan (EOHED)Subject: Re: Time for a quick call today?
Can it be later this morning? Say around 11?
Sent from my iPhone
On Dec 1, 2015, at 8:53 AM, Eisenstadt, Amy (GE, Corporate)
<[email protected]> wrote:
I have two technical questions.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 210/975
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 211/975
From: [email protected]
To: Mike Kennealy
Subject: Fwd: 4pm call today
Date: Friday, November 27, 2015 4:00:37 PM
Mike Kennealy
Begin forwarded message:
From: John Barros < [email protected]>Date: November 27, 2015 at 1:06:28 PM ESTTo: "Kennealy, Michael (EOHED)" <[email protected]>Cc: "Cosco, Jonathan (EOHED)" <[email protected]>, "Milano, Peter (MOBD)" < [email protected]>Subject: Re: 4pm call today
We will use the ML Strategies Conference Call Line; passcode
I believe the following individuals will be on the call:Mo Cowan, ML StrategiesScott Roberti, GEAmy Eisenstadt, GE State Tax CounselOn Fri, Nov 27, 2015 at 12:34 PM, Kennealy, Michael (EOHED)<[email protected]> wrote:
John can you send us info for 4pm call? Jon and Peter please join if you can - I'll send some thoughts before. John who will be on?
Mike Kennealy
--John BarrosChief of Economic DevelopmentOffice of Mayor Martin J. Walsh6th Floor, Room 603Boston City Hall, Boston MA 02201t: 617-635-5729http://www.cityofboston.govSHARE YOUR VISION. SHAPE OUR CITY.http://imagine.boston.gov/
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 212/975
From: Beaton, Matthew (EEA)
To: ; Ash, Jay (EOHED); Povich, Lon (GOV); Kadish, Steven (GOV)
Subject: Fwd: Boston Business Journal- GE"s new energy company will create 200 new jobs in Boston
Date: Wednesday, October 07, 2015 3:14:32 PM
Interesting article confusing everything else that is on the table
Begin forwarded message:
From: "Lorenz, Peter (EEA)" <[email protected]>Date: October 7, 2015 at 2:43:11 PM EDTTo: "Beaton, Matthew (EEA)" <[email protected]>, "Judson, Judith (ENE)" <[email protected]>Cc: "Gerwatowski, Ron (EEA)" <[email protected]>, "Sieger, Daniel (EEA)" <[email protected]>, "Bartlett, Ned (EEA)" < [email protected]>, "Cahill, Alexandra (EEA)" <[email protected]>, "Singleton, Stolle (EEA)" <[email protected]>, "Burgess, Dan (ENE)" <[email protected]>Subject: Boston Business Journal- GE's new energy company will create 200 new jobs in Boston
GE's new energy company will create 200 new jobs in BostonBoston Business Journal Connecticut-based GE announced Wednesday that it's spinning out a "first-of-its-kind" energy company that will be headquartered in Greater Boston.
The new energy company, to be called Current, will be headquartered in the Greater Boston area with additional presence in Silicon Valley and will create about 200 new jobs next year.
"Boston was an obvious choice for us for a lot of different reasons," said Deia Campanelli, a spokeswoman for GE (NYSE:GE). "(Boston) is heavily investing in renewable energy, it has great software talent and it gives us close proximity to where many of our customers are in the region."
Current integrates GE's LED, solar, energy storage and electric vehicle businesses with a software that can deliver and identify the most affordable, efficient energy solutions required by customers, according to a release. The technology will help customers save between 10 percent and 20 percent on their energy bills, and help utility partners better manage their distributed load.
Current already has major customers including JPMorgan Chase, Walgreens, Hilton Worldwide and Intel, who are testing the company's software.
GOV Email
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 213/975
The jobs created by Current will be in the areas of software, engineering and product management. Campanelli said plans for the Boston office will be finalized by early 2016. She didn't disclose how many square feet the company would be needing.
Current's CEO will be Maryrose Sylvester , who was formerly president and CEO at GE Lighting, a $3 billion enterprise. She plans to grow Current from annual
revenue of $1 billion to a $5 billion business by 2020, according to a release. The company's revenue stream comes from existing products and technologies that it's selling to customers, Campanelli said.
GE has a market capitalization of $278 billion.
Peter S. Lorenz
Communications Director
Executive Office of Energy and Environmental Affairs
100 Cambridge Street, Suite 900, Boston, MA 02114Office: 617-626-1106 / Mobile: 617-680-6487
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 214/975
From: Kadish, Steven (GOV)
To: Polito, Karyn (GOV); Ash, Jay (EOHED); Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Buckley, Timothy (GOV); Povich, Lon (GOV); Conroy, Jim (GOV)
Subject: Fwd: Boston means Innovation, Talent, Inspiration
Date: Thursday, December 31, 2015 2:40:27 PM
Fyi.
Sent from my iPhone
Begin forwarded message:
From: "Kadish, Steven (GOV)" <[email protected]>Date: December 31, 2015 at 2:38:56 PM ESTTo: "[email protected]" <[email protected]>Cc: "Cowan, Mo" <[email protected]>, Daniel Koh <[email protected]>, " [email protected]" < [email protected]>, "Ash, Jay (EOHED)"
< [email protected]>, Tom Glynn <[email protected]>, "Lepore, Kristen (ANF)" <[email protected]>Subject: Re: Boston means Innovation, Talent, Inspiration
Ann:Quick update.We had a good call with Amy (and Scott?) with a focus on the Massport development option. Happy to provide you an update and/or answer any questions.We all will be monitoring email this weekend, so please feel free to reach out with
any questions.As suggested, we are also holding Monday, January 4 at 4:30 pm for a check-in call.We hope that you found the PowerPoint and the concept renderings helpful.Best to you and your team and Happy New Year!SteveSent from my iPhone
On Dec 30, 2015, at 5:54 PM, Kadish, Steven (GOV) <[email protected]> wrote:
Ann,
On behalf of the Governor’s Office and the Mayor’s Office, attached is the presentation that we had mentioned that helps to describe the strengths of the Boston area.
We believe it provides some helpful information.
Please let us know if you have any comments and/or would like any
GOV Email
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 215/975
further information.
We have appreciated the discussions with you and your team.
Please let us know if we may help with any other questions that you may have.
As you had mentioned, the Governor and the Mayor are both interested in talking with the Chairman.
Please let us know when next week or soon thereafter this makes sense to happen.
Very best wishes and Happy New Year!
Steven Kadish and Daniel Koh
<Boston means Innovation Talent Leadership.Dec30.2015.pptx>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 216/975
From: Frazier, Ricks (EOHED)
To: Cosco, Jonathan (EOHED)
Subject: Fwd: Call for noon tomorrow/Sunday
Date: Sunday, November 29, 2015 2:07:58 PM
Sent from my iPhone
Begin forwarded message:
From: "Povich, Lon (GOV)" <[email protected]>Date: November 29, 2015 at 12:50:56 PM CSTTo: "Frazier, Ricks (EOHED)" <[email protected]>Cc: "Kadish, Steven (GOV)" <[email protected]>Subject: Fw: Call for noon tomorrow/Sunday
adding Ricks ________________________________________ From: Kadish, Steven (GOV)Sent: Sunday, November 29, 2015 1:47 PMTo: Kennealy, Michael (EOHED)Cc: Wehrs, Brianna (GOV); Zarrella, Lily (GOV); Goodall, Devon (GOV); Ash, Jay (EOHED); Lepore, Kristen (ANF); Pollack, Stephanie (DOT); Garrity, Rob (DOT); Povich, Lon (GOV); Elizabeth Morse; Tom Glynn; Buckley, Timothy (GOV); Conroy, Jim (GOV); Polito, Karyn (GOV); Sullivan, Jennifer F. (ANF)Subject: Re: Call for noon tomorrow/Sunday
If I understand the format of the proposal, I think that there are 3 documents needed:1. Booklet of properties, including site information2. Letter outlining the elements of the City-State proposal3. An appendix type document that outlines the various statutes, application process, how the calculations work. This document could also include the parking discussion and requirements, as well as a possible comparison of key state and local tax features comparing MA, CT and NY. This document could work as a PowerPoint.Sent from my iPhone
On Nov 29, 2015, at 11:33 AM, Kennealy, Michael (EOHED) <[email protected]> wrote:
Attached please find two documents for our call today at 12pm:
- An update memo
- Jay's chart sent on Friday
GOV Email
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 217/975
Looking forward to speaking then.
Mike
________________________________________
From: Wehrs, Brianna (GOV)
Sent: Saturday, November 28, 2015 4:45 PM
To: Kadish, Steven (GOV)
Cc: Zarrella, Lily (GOV); Goodall, Devon (GOV); Ash, Jay (EOHED); Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Pollack, Stephanie (DOT); Garrity, Rob (DOT); Povich, Lon (GOV); Elizabeth Morse; Tom Glynn; Buckley, Timothy (GOV); Conroy,
Jim (GOV); Polito, Karyn (GOV)
Subject: Re: Call for noon tomorrow/Sunday
I just sent a calendar invite. Please let me know if there's any issues.
Brianna Wehrs
Executive Assistant to Governor Charlie Baker
Office: 617-725-4048
Cell: 617-483-3397
On Nov 28, 2015, at 4:36 PM, Kadish, Steven (GOV) <[email protected]> wrote:
Brianna, Lily or Devon--please send out a calendar invite for a call at noon tomorrow/Sunday for the folks copied on this email.
Elizabeth: please invite Jim D if you would like.
If you have questions about the call, please contact Sec Ash, Mike Kennealy or me.
Thx.
GOV Email
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 218/975
Steve
Sent from my iPhone
<Project Plum memo Nov. 29.docx>
<Project Plum - Chart of Second Offer.docx>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 219/975
From: [email protected]
To: Jay Ash
Subject: Fwd: Connecting you
Date: Tuesday, January 12, 2016 9:29:43 AM
Jay - FYI.
Mike Kennealy
Begin forwarded message:
From: "Mcgaugh, James (GE Corporate)" < [email protected]>Date: January 11, 2016 at 7:56:33 PM ESTTo: "Buckley, Timothy (GOV)" <[email protected]>Cc: "Kennealy, Michael (EOHED)" <[email protected]>Subject: Re: Connecting you
Thanks. I think we are all good for the moment. We may run the drill on Wednesday but for now I think we can all breathe. We're going to connect with Laura OggeriChief of Communication cell .
On Jan 11, 2016, at 7:53 PM, Buckley, Timothy (GOV) <[email protected]> wrote:
OK. Thanks.
I have not contacted Mayor Walsh's office. Let me know if you would like us to do that.
________________________________________
From: Mcgaugh, James (GE Corporate) < [email protected]>
Sent: Monday, January 11, 2016 7:20 PM
To: Buckley, Timothy (GOV); Kennealy, Michael (EOHED)
Subject: RE: Connecting you
Tim & Mike---thanks a bunch. I will share with our comms team. The likely contact will be Una Pullizi or could be Seth Martin. One or the other will reach out to you, Tim, at go-time. Jim
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 220/975
-----Original Message-----
From: Buckley, Timothy (GOV) [mailto:[email protected]]
Sent: Monday, January 11, 2016 4:26 PM
To: Kennealy, Michael (EOHED); Mcgaugh, James (GE Corporate)
Subject: RE: Connecting you
My cell is
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Monday, January 11, 2016 4:20 PM
To: Jim McGaugh; Buckley, Timothy (GOV)
Subject: Connecting you
Jim, Tim - connecting you over email. Jim, do you want to call Tim to discuss plan? Let me know if I can do anything else here.
Thanks,
Mike
Mike Kennealy
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 221/975
From: [email protected]
To: Mike Kennealy
Subject: Fwd: Draft Incentive Letter for Project Plum
Date: Thursday, November 19, 2015 4:45:42 PM
Attachments: Joint Plum Letter - Draft.docx ATT00001.htmPlum Incentive narrative.docx ATT00002.htmI-Cubed Bond Sizing - Project Plum - 400 Empl - 100% Net New.pdf
ATT00003.htm
Mike Kennealy
Begin forwarded message:
From: John Barros < [email protected]>Date: November 19, 2015 at 4:44:02 PM EST
To: "Ash, Jay (EOHED)" < [email protected]>Cc: Lauren Jones <[email protected]>, "Kennealy, Michael (EOHED)" <[email protected]>Subject: Draft Incentive Letter for Project Plum
Sec. Ash,
Attached, find the draft letter and incentive description for your review and approval. Upon getting your edits and final approval we will format and place it on letterhead for the Governor and Mayor's signatures tomorrow morning.
Thanks.
--John BarrosChief of Economic DevelopmentOffice of Mayor Martin J. Walsh6th Floor, Room 603Boston City Hall, Boston MA 02201t: 617-635-5729http://www.cityofboston.gov
SHARE YOUR VISION. SHAPE OUR CITY.http://imagine.boston.gov/
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 222/975
JOINT STATE / CITY LETTERHEAD
DATE
Dear Mr. ____________________,
The Commonwealth of Massachusetts and the City of Boston are pleased to present a joint proposal to welcome Project Plum to Boston. We strongly believe that Boston,Massachusetts offers the thriving, healthy, and innovative ecosystem that Project Plumis seeking in order to grow and succeed.
Boston is the hub of an expansive transportation infrastructure, including aninternational airport within city limits. Our universities, hospitals, and research centersare global engines of talent and innovation. And Massachusetts offers an unparalleledquality of life for your current and prospective employees, featuring a vibrant culturalscene, a sparkling waterfront, and access to all of New England’s natural and historic
amenities.
In addition to these advantages, we offer Project Plum a uniquely forward-thinkingpartnership of public and private leaders. The enclosed booklet details the attractivelocations and incentives that you need to move your headquarters to Boston and growgreat jobs here. Our proposal offers both state and local incentives, including the state’sInfrastructure Investment Incentive (“I-Cubed”) program, as well as local property taxrelief. Under this proposal, the state can provide up to $50 million in I-Cubed support atthe 400 job level. The amount of I-Cubed support that would benefit Project Plum is sitespecific and dependent on a development project’s infrastructure requirements. I-Cubedsupport can be complemented by local property tax incentives. Similar to I-Cubed, the
exact amount of property tax incentives is dependent on the site selected. Given theemployment levels and the sites under consideration, the City anticipates property taxincentives will range between $8 and $12 million (see the attached detailed summary ofincentives for details).
We are committed to supporting Project Plum’s relocation and expansion plans.Specifically, we will establish a Joint State-City Task Force to provide a single point ofaccess to government services that support every step in the development and
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 223/975
relocation process. Boston’s Concierge Relocation Services will also support youremployees as they transition to their new Massachusetts home.
We want to thank you for the opportunity to present this exciting proposal. We lookforward to working closely with you to support Project Plum’s innovation, growth, and
success in Boston.
Sincerely,
Charles D. Baker Martin J. Walsh
Governor Mayor of Boston
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 224/975
//sea-fp-sea-007/ricks.frazier$/My%20Documents/GE%20Extraction%201/ATT00001.htm[4/20/2016 12:01:44 PM]
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 225/975
DRAFT
Incentives
The State and City propose an incentive package utilizing the I Cubed programsupplemented with additional property tax relief for Project Plum. This combination,which has been used together in previous incentive programs, provides the mostresource to support the project by leveraging the significant number of Plum jobs thatwould be relocated to Boston. Both these incentive programs are dependent on the siteselected and the number of jobs Plum relocates to Boston. Since the exact number of
jobs is not yet known, the incentive amounts will be projected at 400 and 600 jobs forillustration purposes.
I Cubed
I Cubed (Infrastructure Investment Initiative) is an incentive program that leveragesnew state tax revenue generated by real estate projects to provide infrastructuresupport to lower the cost of development. Many potential Project Plum sites have
significant infrastructure requirements that would benefit from I Cubed. I Cubedfunding can remove infrastructure expenses from the total cost of a project. The Cityand State will work directly with the developer to ensure that infrastructure relatedcosts savings flow directly to Plum in the form of reduced occupancy costs.
Based on the projected revenue associated with new jobs and salary informationprovided by Plum, the state can provide up to $50 million in I cubed support, themaximum allowed under the enabling statute, at the 400 job level. The amount ofactual of I cubed support that would benefit Plum is site specific and dependent on adevelopment project’s infrastructure requirements. A more refined estimate of I Cubedsupport can be developed as Plum identifies specific sites that it is interested inpursuing.
Property Tax Incentive
The City offers several property tax incentive programs to help enable the developmentof a space suitable for Plum. The programs most likely to be employed includepayment in lieu of tax programs under Chapters 121A and 121B as well as TaxIncrement Financing (TIF) under the EDIP (Economic Development Incentive Program)program. The choice of incentive is highly dependent on the site selected. Forexample, 2 of the sites under consideration already have a Chapter 121A structure in
place. Other sites located on public land lend themselves to a Chapter 121B basedincentive. If neither of these options is available, a TIF can be employed provided thatthere is new development that can provide a significant tax increment to be discounted.
Similar to I Cubed, the exact amount of the property tax incentive is dependent on thesite selected. Given the employment levels and the sites under consideration, the Cityanticipates that it will be able to offer between $8 and $12 million in property taxincentives.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 226/975
Alternative Option
The State and City’s preferred approach is this combination of I Cubed and property taxincentives. However, if Plum selects a site that cannot benefit from significantinfrastructure investment assistance provided under I Cubed, the City and State canprovide an alternative approach under the EDIP program. Here, the property taxincentive described above would be delivered in the form of a TIF Agreement. TheState would supplement this assistance with an Investment Tax Credit that can extendup to $[18] million at the 600 employee level.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 227/975
//sea-fp-sea-007/ricks.frazier$/My%20Documents/GE%20Extraction%201/ATT00002.htm[4/20/2016 12:01:51 PM]
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 228/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 229/975
//sea-fp-sea-007/ricks.frazier$/My%20Documents/GE%20Extraction%201/ATT00003.htm[4/20/2016 12:01:52 PM]
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 230/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 231/975
featuring all the technologies and how they can work together for their
customers to see and experience.
<!--[if !supportLists]-->• <!--[endif]-->Massachusetts was chosen for its
outstanding workforce and beat out California and Colorado. They like the
close proximity to universities, as well as our software engineers are more
familiar with products/widgets vs. California where they mostly do web
applications.<!--[if !supportLists]-->• <!--[endif]-->Their senior management will be in Boston
in a couple of weeks and it may be a good opportunity to set up a meeting
with the Secretary and/or Governor. Let me know if you would like me to
coordinate.
<!--[if !supportLists]-->• <!--[endif]-->They are interested in coordinating with
DOER’s energy efficiency programs and other opportunities to engage with MA
energy policy, including the storage initiative.
<!--[if !supportLists]-->• <!--[endif]-->Their storage business is taking off, they
have recently won a couple new contracts with California utilities for storage
projects in the 20 – 30 MW range.
Let me know if you have questions or would like me to work on coordinating a meeting
with GE.
Thanks,
Judith
Judith Judson
Commissioner
Massachusetts Department of Energy Resources
100 Cambridge Street, Suite 1020, Boston, MA 02114
Ph: 617.626.7351 Fax: 617.727.0030
http://www.mass.gov/doer/
Creating a Cleaner Energy Future for the Commonwealth
Follow DOER on Twitter: http://twitter.com/MassDOER
Visit the Energy Smarts blog: www.mass.gov/blog/energy
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 232/975
From: Meyers, Steven (GE, Corporate)
To: Frazier, Ricks (EOHED)
Subject: Fwd: MA NDA
Date: Tuesday, July 21, 2015 3:08:33 PM
Attachments: Scanned from a Xerox Multifunction Printer.pdf ATT00001.htm
Signed copy. Have this one signed if you can. Thx!!
Sent from my iPhone
Begin forwarded message:
From: "Kulish, Karen (GE, Corporate)"
Date: July 21, 2015 at 2:21:26 PM EDT
To: "Meyers, Steven (GE, Corporate)"
Cc: "Wertz, Tammy (GE, Corporate)"
Subject: MA NDA
Steve - Ann has signed it. We'll await the return from MA once signed.
Thanks,
Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations - Environment, Health & Safety
O:
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
-----Original Message-----
From: Kulish, Karen (GE, Corporate)
Sent: Tuesday, July 21, 2015 2:08 PM
To: Kulish, Karen (GE, Corporate)
Subject: Scanned from a Xerox Multifunction Printer
Please open the attached document. It was scanned and sent to you using a Xerox Multifunction Printer.
Attachment File Type: pdf, Multi-Page
Multifunction Printer Location: E1G101
Device Name: E1G-MFD01
For more information on Xerox products and solutions, please visit http://www.xerox.com
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 233/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 234/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 235/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 236/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 237/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 238/975
From: Ash, Jay (EOHED)
To: Kennealy, Michael (EOHED)
Subject: Fwd: Meeting Confirmation, GE Team & Logistics - Massachusetts
Date: Tuesday, July 21, 2015 6:24:29 PM
Plz respond to her
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Kulish, Karen (GE, Corporate)"Date: 07/21/2015 3:05 PM (GMT-05:00)To: "Ash, Jay (EOHED)" <[email protected]>Cc: "Kulish, Karen (GE, Corporate)"Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
Jay,
I am writing to reconfirm your meeting with us on Thursday, July 30th from 1:30 – 3:30. The meeting will be held at our GE Guest House, 3135 Easton Turnpike, Fairfield, CT 06828, and upon going through Security and obtaining badges you will be directed to the Guest House and parking. I will be present at the Guest House entry upon the team’s arrival to guide folks to the meeting.Please be sure that you provide to me a list of the names of EVERYONE, including any Security
personnel, who will be on site as I need to clear each individual through GE Security.
I would also ask that the team contact me when they are approx. 10 mins. out. My cell is 203-598-1348.
When we last spoke you indicated the Governor would not participate in the meeting. Of course if that changes please advise. I know you’re working on your attendee list and bios and we look forward to receiving them. Please let me know if you have any questions.
Thank you,Karen
Karen KulishExecutive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
O:
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 239/975
GE Imagination at Work
From: Kulish, Karen (GE, Corporate)Sent: Friday, July 10, 2015 4:50 PMTo: [email protected]: Kulish, Karen (GE, Corporate)
Subject: Meeting Confirmation, GE Team & Logistics - Massachusetts
Jay,
I am writing to confirm your meeting at our GE offices in Fairfield, CT on July 30 at 1:30 – 3:30. We
look forward to seeing you then.
Below are the GE folks who’ll be at the meeting, and their bios are also attached.
Laurie Bevier Sr. Human Resources Manager
Eileen Cavanaugh CFO Corporate/Global Operations
Matt Cribbins VP, Investor Communications
Chris Drumgoole CFO, IT
Ann Klee VP, Global Operations, Environment, Health & Safety
Michelle May Director, Culture Communications
Chris Pereira Chief, Securities & Finance Counsel
Sarah Wills Executive Director, Strategy
We would also request bios be provided for all those who will attend from your side.
The meeting will be held at our GE Guest House, Conference Room “B”, and upon going through
Security and obtaining badges you will be directed to Guest House parking.
If there are any changes, please be sure that you provide to me the names of EVERYONE who will
attend the meeting as I need to clear each individual through GE Security. Please confirm whether
the Governor will attend and, if so, whether you will be sending a security detail in advance of the
visit. We are a secure facility, however, we do understand that you may want to do this.
Don’t hesitate to contact me with any questions.
Have a good weekend,
Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
O:
C:
General Electric Company
3135 Easton Turnpike
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 240/975
Fairfield, CT 06828
GE Imagination at Work
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 241/975
From: [email protected]
To: Jay Ash
Subject: Fwd: need a 2 minute call with you
Date: Sunday, December 06, 2015 4:41:53 PM
FYI - interesting. Will set something up as early in day as possible.
Mike Kennealy
Begin forwarded message:
From: "Eisenstadt, Amy (GE, Corporate)"Date: December 6, 2015 at 4:17:29 PM ESTTo: "Kennealy, Michael (EOHED)" <[email protected]>, " [email protected]" < [email protected]>Subject: need a 2 minute call with you
Let me know what works for you. Tomorrow is fine. We’ve ruined enough weekends.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 242/975
From: [email protected]
To: Susan Saia
Subject: Fwd: Plum: MA Thank you
Date: Wednesday, August 12, 2015 8:44:58 AM
Hi Susan - Karen's address below, thanks.
Mike Kennealy
Begin forwarded message:
From: "Kulish, Karen (GE, Corporate)"Date: August 11, 2015 at 5:58:12 PM EDTTo: "Kennealy, Michael (EOHED)" <[email protected]>Cc: "Kulish, Karen (GE, Corporate)"Subject: Plum: MA Thank you
Hi Mike,I have a hard copy of the letter Ann emailed to Secretary Ash and am writing to ask you to please send the mailing address to me. Sorry for the delay, as I was out of the office for a couple of days and am just back in today.Have a good evening!KarenKaren KulishExecutive Assistant to Ann KleeGlobal Operations - Environment, Health & SafetyO:
C:General Electric Company3135 Easton TurnpikeFairfield, CT 06828GE Imagination at Work
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 243/975
From: Kennealy, Michael (EOHED)
To: Ash, Jay (EOHED)
Subject: Fwd: Plum
Date: Tuesday, December 22, 2015 12:44:27 PM
Attachments: meeting.ics ATT00001.htm
Jay FYI - don't know what this is; I can call her.
Mike Kennealy
Begin forwarded message:
From: "Eisenstadt, Amy (GE, Corporate)"To: "Kennealy, Michael (EOHED)" <[email protected]>Subject: Fwd: Plum
FyiSent from my Verizon Wireless 4G LTE smartphoneWhen: Dec 22, 2015 1:30:00 PM Where: participant code
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 244/975
Attachment meeting_1.ics (0 Bytes) cannot be converted to PDF format.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 245/975
//sea-fp-sea-007/ricks.frazier$/My%20Documents/GE%20Extraction%201/ATT00001_3.htm[4/20/2016 12:01:53 PM]
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 246/975
From: Ash, Jay (EOHED)
To: Kennealy, Michael (EOHED)
Subject: Fwd: Project Plum -- Site visit
Date: Thursday, August 27, 2015 2:24:32 PM
We'll talk tomorrow about this.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Klee, Ann (GE, Corporate)"Date: 08/27/2015 1:41 PM (GMT-05:00)To: "Ash, Jay (EOHED)" <[email protected]>Subject: Project Plum -- Site visit
Jay,
I wanted to follow up on the scheduling of our visit to Boston and surrounding area. At this point,
we’re looking at September 15 and hope that works on your end. Our key point of contact for the
planning and logistics of the visit will be Brent Woodruff from CBRE, who works closely with us on
these kinds of projects.
If you could let me know who your point of contact will be, Brent will reach out to her/him and begin
the planning process, including potential sites that we would want to see and any other agenda
items. The plan is to cover everything in a day.
Many thanks.
Best,
ark
Ann R. Klee
Vice President
Global Operations – Environment, Health & Safety
GE
3135 Easton Turnpike
Fairfield, CT 06824
(o)
(m)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 247/975
From: [email protected]
To: Jay Ash
Subject: Fwd: Project Plum
Date: Sunday, December 06, 2015 4:14:48 PM
Jay, just to be clear on the deliverables Steve mentioned below, if we decide we still need, and we really put on hold after call today:
1. Don't have anything specific yet.2. Have content from Erica on MassWorks and Jen on I-Cubed.3. Some good ideas from MLSC, MOBD and City.
So good starts on 2 and 3. Also, if we decide we need these we can do tomorrow and submit end of day in my view.
Mike Kennealy
Begin forwarded message:
From: "Kadish, Steven (GOV)" <[email protected]>Date: December 6, 2015 at 11:53:37 AM ESTTo: "Ash, Jay (EOHED)" < [email protected]>Cc: "Kennealy, Michael (EOHED)" <[email protected]>, "Lepore, Kristen (ANF)" <[email protected]>, "Sullivan, Jennifer F. (ANF)" <[email protected]>Subject: Re: Project Plum
How fast can we move from questions to facts and tools and their application?Or maybe we are already doing so?We need to have something solid by tomorrow morning. I am hoping to see drafts of the 3 deliverables by sometime this evening:1. What we can do on some proposed Seaport locations2. Examples of what has been done with the tools we are proposing3. What can we offer at the existing Plum sites and for Connect
Let's please stay focused on the deliverables.Thx.SteveSent from my iPhone
On Dec 6, 2015, at 11:45 AM, Ash, Jay (EOHED) < [email protected]> wrote:
From today's call - MassWorks is most flexible, allowing for private expenditures that are in the cause of economic development - thus, utilizing the MassWorks/EDIP option is more flexible and direct than utilizing some form of I-Cubed. I am working up a list of questions/points about the policy issues around utilizing more MassWorks, maybe as much as $70-80m, for the direct subsidy of building a building. Simple and effective. Will share the questions tonight.
________________________________________
From: Kadish, Steven (GOV)
Sent: Sunday, December 06, 2015 8:03 AM
To: Kennealy, Michael (EOHED)
Cc: Lepore, Kristen (ANF); Ash, Jay (EOHED)
Subject: Re: Project Plum
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 248/975
Thanks for the info.
I'll be on the road then, so I'm iffy about joining.
In any case, look forward to an update.
Sent from my iPhone
On Dec 6, 2015, at 7:47 AM, Kennealy, Michael (EOHED) <[email protected]<mailto:[email protected]>> wrote:
10am. Just sent info.
Mike Kennealy
On Dec 6, 2015, at 7:21 AM, Kadish, Steven (GOV)
<[email protected]<mailto:[email protected]>> wrote:
Please let me know when today's call is and I will try to join you.
Sent from my iPhone
On Dec 5, 2015, at 8:19 PM, Kennealy, Michael (EOHED) <[email protected]<mailto:[email protected]>> wrote:
Discussed in concept on call and just emailed Jim D.
Mike Kennealy
On Dec 5, 2015, at 6:48 PM, Lepore, Kristen (ANF) <[email protected]<mailto:[email protected]>> wrote:
Did you ask massport to help with the marketing materials? They have a marketing department. I asked Jen to make that request.
Sent from my iPhone
On Dec 5, 2015, at 6:26 PM, Kennealy, Michael (EOHED) <[email protected]<mailto:[email protected]>> wrote:
Steve, it was a productive call discussing the various ways I-Cubed/MassWorks could be utilized to their benefit on our sites while maintaining public benefit and other statute requirements. Jay, Ricks and I are speaking tomorrow AM in more detail re: MassWorks
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 249/975
and Jen needs to consult outside counsel on some I-Cubed matters. Will reconvene larger group after Jen has what she needs. Goal is to develop very specific scenarios on use of funds on our sites. Jay is back and was on call and may have more to add.
Mike Kennealy
On Dec 5, 2015, at 2:26 PM, Kadish, Steven (GOV)
<[email protected]<mailto:[email protected]>> wrote:
Not sure that I will be able to make, but I would like an update.
Will you be scheduling a call tomorrow?
I can do after 5 pm.
Sent from my iPhone
On Dec 5, 2015, at 11:01 AM, Kennealy, Michael (EOHED) <[email protected]<mailto:[email protected]>> wrote:
Call info
Mike Kennealy
Begin forwarded message:
From: "Kennealy, Michael (EOHED)" <[email protected]<mailto:[email protected]>>
Date: December 5, 2015 at 8:07:26 AM EST
To: "Kennealy, Michael (EOHED)" <[email protected]<mailto:[email protected]>>, "Sullivan, Jennifer F. (ANF)" <[email protected]<mailto:[email protected]>>, "Doolin, James" <[email protected]<mailto:[email protected]>>, "Garrity, Rob (DOT)" <[email protected]<mailto:[email protected]>>, "Frazier, Ricks (EOHED)" <[email protected]<mailto:[email protected]>>,
"Kreuter, Erica (EOHED)" <[email protected]<mailto:[email protected]>>
Cc: "Ash, Jay (EOHED)" < [email protected]<mailto:[email protected]>>, "Lepore, Kristen (ANF)" <[email protected]<mailto:[email protected]>>
Subject: RE: Project Plum
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 250/975
It looks like we have folks available for a call at 4:30pm today. Please use this number:
access code .
Looking forward to speaking then and discussing ideas from the group.
Mike
________________________________
From: Kennealy, Michael (EOHED)
Sent: Friday, December 04, 2015 6:23 PM
To: Jennifer F. Sullivan (ANF) ([email protected]<mailto:[email protected]>); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks (EOHED); Kreuter, Erica (EOHED)
Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)
Subject: Project Plum
I am emailing a group of people that I hope can work as a team this weekend and into Monday to advance the Project Plum work. As you know, we presented a proposal to Plum that relies heavily on I-Cubed and Massworks funding, and we also suggested some sites. The good news from today is that we are very much in the game here, and the company will be visiting Boston on Wednesday to look at sites, with a significant internal meeting in about 10 days. (Note – not clear yet what involvement they want from us on Wednesday, possibly none though of course we are pushing).
As Steve and Sec. Lepore and I just discussed, we think our mission at this point is to
make this proposed infrastructure funding more tangible for them – how could these dollars be used to the direct benefit of their project? Said differently, our ~$100 MM dollar proposal was $80 MM I-Cubed/MassWorks and $20 MM local property tax incentives; they know how to value the $20 MM but are unsure how to value the $80 MM, and we need this proposal to look a lot closer to $100 MM than $20 MM, especially in the face of competition offering incentives that are much easier to value.
To that end, there are two deliverables that we would like to send to the company by noon on Monday:
1. A list/discussion of historical examples of I-Cubed and MassWorks projects. I have attached a draft memo from Erica and the language that Jen provided for our letter. What
other examples can we provide, and in what level of detail, specifically ones that are as analogous as possible to their project?
2. Specific examples of how I-Cubed and MassWorks could be deployed at the MCCA and Massport sites. I have attached information about those sites. No site or building has been ruled out, but initial guidance from Plum’s location advisor was to focus on the sites vs. the buildings.
Could I ask the following:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 251/975
1. Could folks start giving consideration to #1 and #2 above and develop specific ideas.
2. Could you please also suggest (if applicable) others from your organization that
could help in this effort.
3. Can we all get on a call tomorrow at 4:30pm to discuss.
On the call tomorrow, I would like to review what we think the deliverables should look like and discuss specific examples. We can then decide what other needs we may have, and plan the work over Sunday and into Monday.
I hope all of that makes sense and, as always, please call with questions. Please respond as soon as you can with respect to your availability tomorrow at 4:30pm.
All the best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
[email protected]<mailto:[email protected]>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 252/975
From: [email protected]
To: Mike Kennealy
Subject: Fwd: Project Plum
Date: Sunday, December 06, 2015 9:53:13 AM
Mike Kennealy
Begin forwarded message:
From: "Kennealy, Michael (EOHED)" <[email protected]>Date: December 6, 2015 at 7:47:18 AM ESTTo: "Kennealy, Michael (EOHED)" <[email protected]>, "Garrity, Rob (DOT)" <[email protected]>, "Doolin, James" <[email protected]>, "Sullivan, Jennifer F. (ANF)" <[email protected]>, "Frazier, Ricks (EOHED)" <[email protected]>, "Kreuter, Erica (EOHED)" <[email protected]>Cc: "Ash, Jay (EOHED)" < [email protected]>, "Lepore, Kristen (ANF)" <[email protected]>, "Kadish, Steven (GOV)" <[email protected]>Subject: Re: Project Plum
If you are joining the 10am please use this number instead (previous number can only accommodate limited number of callers)
Mike Kennealy
On Dec 5, 2015, at 8:14 PM, Kennealy, Michael (EOHED) <[email protected]> wrote:
Same number tomorrow please 10am Jay, Mike, Ricks, Erica, others if interested and available. Whole group to reconvene when Jen has
feedback from outside counsel.
Mike Kennealy
On Dec 5, 2015, at 8:08 AM, Kennealy, Michael (EOHED) <[email protected]> wrote:
It looks like we have folks available for a call at 4:30pm today. Please use this number:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 253/975
access code .
Looking forward to speaking then and discussing ideas from the group.
Mike
From: Kennealy, Michael (EOHED)Sent: Friday, December 04, 2015 6:23 PMTo: Jennifer F. Sullivan (ANF) ([email protected]); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks (EOHED); Kreuter, Erica (EOHED)Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)Subject: Project Plum
I am emailing a group of people that I hope can work as a
team this weekend and into Monday to advance the Project
Plum work. As you know, we presented a proposal to Plum
that relies heavily on I-Cubed and Massworks funding, and we also suggested some sites. The good news from today is
that we are very much in the game here, and the company
will be visiting Boston on Wednesday to look at sites, with a
significant internal meeting in about 10 days. (Note – not
clear yet what involvement they want from us on
Wednesday, possibly none though of course we are
pushing).
As Steve and Sec. Lepore and I just discussed, we think our
mission at this point is to make this proposed infrastructure funding more tangible for them – how could these dollars
be used to the direct benefit of their project? Said
differently, our ~$100 MM dollar proposal was $80 MM I-
Cubed/MassWorks and $20 MM local property tax
incentives; they know how to value the $20 MM but are
unsure how to value the $80 MM, and we need this
proposal to look a lot closer to $100 MM than $20 MM,
especially in the face of competition offering incentives that
are much easier to value.
To that end, there are two deliverables that we would like to
send to the company by noon on Monday:
1. A list/discussion of historical examples of I-Cubed
and MassWorks projects. I have attached a draft
memo from Erica and the language that Jen
provided for our letter. What other examples can
we provide, and in what level of detail, specifically
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 254/975
ones that are as analogous as possible to their
project?
2. Specific examples of how I-Cubed and MassWorks
could be deployed at the MCCA and Massport sites.
I have attached information about those sites. No
site or building has been ruled out, but initial guidance from Plum’s location advisor was to focus
on the sites vs. the buildings.
Could I ask the following:
1. Could folks start giving consideration to #1 and #2
above and develop specific ideas.
2. Could you please also suggest (if applicable) others
from your organization that could help in this effort.
3. Can we all get on a call tomorrow at 4:30pm to
discuss.
On the call tomorrow, I would like to review what we think
the deliverables should look like and discuss specific
examples. We can then decide what other needs we may
have, and plan the work over Sunday and into Monday.
I hope all of that makes sense and, as always, please call with
questions. Please respond as soon as you can with respect
to your availability tomorrow at 4:30pm.
All the best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 255/975
From: [email protected]
To: John Barros
Subject: Fwd: Project Plum
Date: Saturday, December 05, 2015 9:49:01 AM
Here is the dial in for 430.
Mike Kennealy
Begin forwarded message:
From: "Kennealy, Michael (EOHED)" <[email protected]>Date: December 5, 2015 at 8:07:26 AM ESTTo: "Kennealy, Michael (EOHED)" <[email protected]>, "Sullivan, Jennifer F. (ANF)" <[email protected]>, "Doolin, James" <[email protected]>, "Garrity, Rob (DOT)" <[email protected]>, "Frazier, Ricks (EOHED)" <[email protected]>, "Kreuter, Erica (EOHED)" <[email protected]>Cc: "Ash, Jay (EOHED)" < [email protected]>, "Lepore, Kristen (ANF)" <[email protected]>Subject: RE: Project Plum
It looks like we have folks available for a call at 4:30pm today. Please use this number:
access code .
Looking forward to speaking then and discussing ideas from the group.
Mike
From: Kennealy, Michael (EOHED)Sent: Friday, December 04, 2015 6:23 PMTo: Jennifer F. Sullivan (ANF) ([email protected]); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks (EOHED); Kreuter, Erica (EOHED)Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)Subject: Project Plum
I am emailing a group of people that I hope can work as a team this weekend and into
Monday to advance the Project Plum work. As you know, we presented a proposal to
Plum that relies heavily on I-Cubed and Massworks funding, and we also suggested
some sites. The good news from today is that we are very much in the game here, and
the company will be visiting Boston on Wednesday to look at sites, with a significant
internal meeting in about 10 days. (Note – not clear yet what involvement they want
from us on Wednesday, possibly none though of course we are pushing).
As Steve and Sec. Lepore and I just discussed, we think our mission at this point is to
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 256/975
make this proposed infrastructure funding more tangible for them – how could these
dollars be used to the direct benefit of their project? Said differently, our ~$100 MM
dollar proposal was $80 MM I-Cubed/MassWorks and $20 MM local property tax
incentives; they know how to value the $20 MM but are unsure how to value the $80
MM, and we need this proposal to look a lot closer to $100 MM than $20 MM,
especially in the face of competition offering incentives that are much easier to value.
To that end, there are two deliverables that we would like to send to the company by
noon on Monday:
1. A list/discussion of historical examples of I-Cubed and MassWorks projects. I
have attached a draft memo from Erica and the language that Jen provided for
our letter. What other examples can we provide, and in what level of detail,
specifically ones that are as analogous as possible to their project?
2. Specific examples of how I-Cubed and MassWorks could be deployed at the
MCCA and Massport sites. I have attached information about those sites. No site or building has been ruled out, but initial guidance from Plum’s location
advisor was to focus on the sites vs. the buildings.
Could I ask the following:
1. Could folks start giving consideration to #1 and #2 above and develop specific
ideas.
2. Could you please also suggest (if applicable) others from your organization that
could help in this effort.
3. Can we all get on a call tomorrow at 4:30pm to discuss.
On the call tomorrow, I would like to review what we think the deliverables should look
like and discuss specific examples. We can then decide what other needs we may
have, and plan the work over Sunday and into Monday.
I hope all of that makes sense and, as always, please call with questions. Please
respond as soon as you can with respect to your availability tomorrow at 4:30pm.
All the best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 257/975
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 258/975
From: Kennealy, Michael (EOHED)
To: Ash, Jay (EOHED)
Subject: Fwd: Revised Package
Date: Monday, December 07, 2015 6:44:34 PM
Will call you to discuss response.
Mike Kennealy
Begin forwarded message:
From: "Eisenstadt, Amy (GE, Corporate)"Date: December 7, 2015 at 6:39:44 PM ESTTo: "Kennealy, Michael (EOHED)" <[email protected]>Cc: "Roberti, Scott (GE, Corporate)" , "Mcgaugh, James (GE Corporate)"Subject: Revised Package
I heard from Ann that a revised package would be sent sometime before noon
tomorrow. I am going to suggest we do a call in the morning before it’s officially
approved for submission. This would give you an opportunity for feedback in case
some adjustments would make sense, as well as assist in keeping within the time
constraints we are all working under.
I’m open most of the morning. Please let me know what works for you.
Thanks.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 259/975
From: Kadish, Steven (GOV)
To: Ash, Jay (EOHED); Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Tom Glynn; Elizabeth Morse; jdoolin; John Barros; Povich, Lon (GOV)
Cc: Daniel Koh
Subject: GE press release
Date: Wednesday, January 13, 2016 2:00:58 PM
Attachments: Press Release_GE moves HQ to Boston.docx ATT00001.htm
Colleagues!
Attached is the official announcement!A release from the Governor and Mayor will be out shortly.
A moment to celebrate.And yes, there's good work to do ahead.
Nice work team!
Best,Steve and Dan
Begin forwarded message:
From: "Martin, Seth (GE Corporate)" <[email protected]>Date: January 13, 2016 at 1:00:01 PM ESTTo: "[email protected]" <[email protected]>Cc: "Latour, Deirdre A (GE, Corporate)"Subject: press release
Seth Martin
Director, Financial & Corporate Communications
GE
203-572-3567 (mobile)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 260/975
1
PRESS RELEASE
GE MOVES HEADQUARTERS TO BOSTON
FAIRFIELD, Conn. – January 13, 2016 – GE today announced that it has selected Boston for its corporate
headquarters location.
“GE aspires to be the most competitive company in the world,” said GE Chairman and CEO Jeff Immelt.
“Today, GE is a $130 billion high-tech global industrial company, one that is leading the digital transformation
of industry. We want to be at the center of an ecosystem that shares our aspirations. Greater Boston is home
to 55 colleges and universities. Massachusetts spends more on research & development than any other
region in the world, and Boston attracts a diverse, technologically-fluent workforce focused on solvingchallenges for the world. We are excited to bring our headquarters to this dynamic and creative city.”
GE has been considering the composition and location of its headquarters for more than three years. The
Company began its formal review in June 2015, with a list of 40 potential locations. Boston was selected after
a careful evaluation of the business ecosystem, talent, long-term costs, quality of life for employees,
connections with the world and proximity to other important company assets.
There is no material financial impact to GE related to the cost of the move. Working with GE, Massachusetts
and the City of Boston structured a package of incentives that provides benefits to the State and City, while
also helping offset the costs of the relocation to GE. GE will sell its offices in Fairfield and at 30 Rockefeller
Plaza in New York City to further offset the cost of the move.
The content of GE’s headquarters will also change, with more emphasis on innovation. In Boston, GE will have
roughly 800 people; 200 from corporate staff and 600 digital industrial product managers, designers and
developers split between GE Digital, Current, robotics and Life Sciences. A GE Digital Foundry will be created
for co-creation, incubation and product development with customers, startups and partners. The remainder of
administration will be placed in shared service operations throughout the Company.
GE has a significant existing presence in Massachusetts, with nearly 5,000 employees across the state in
businesses including Aviation, Oil & Gas and Energy Management. In 2014, GE moved its Life Sciences
headquarters to Marlborough, and in 2015 GE announced its energy services start-up, Current, would also beheadquartered in Boston.
The headquarters will be located in the Seaport District of Boston. Employees will move to a temporary
location in Boston starting in the summer of 2016, with a full move completed in several steps by 2018. GE
will host a public briefing in Boston with government officials, and business and community leaders, on
February 18, 2016.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 261/975
2
About GE
GE (NYSE: GE) is the world’s Digital Industrial Company, transforming industry with software-defined machines and
solutions that are connected, responsive and predictive. GE is organized around a global exchange of knowledge, the
"GE Store," through which each business shares and accesses the same technology, markets, structure and intellect.
Each invention further fuels innovation and application across our industrial sectors. With people, services, technology
and scale, GE delivers better outcomes for customers by speaking the language of industry. www.ge.com
Media Contact:
Seth Martin, [email protected]
Investor Contact:
Matt Cribbins, 203.373.2424
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 262/975
//sea-fp-sea-007/ricks.frazier$/My%20Documents/GE%20Extraction%201/ATT00001_4.htm[4/20/2016 12:02:10 PM]
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 263/975
From: John Regan
To: Ash, Jay (EOHED)
Subject: GE Statement on CT Taxes v2
Date: Monday, June 01, 2015 2:19:57 PM
Attachments: GE Statement on CT Taxes v2.docx
FYI
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 264/975
GE STATEMENT ON POTENTIAL INCREASE TO CONNECTICUT TAXES
FAIRFIELD, CT – June 1, 2015 –
Reports that Connecticut officials intend to raise taxes by another $750
million dollars are truly discouraging. Retroactively raising taxes again on Connecticut’s residents,
businesses and services makes businesses, including our own, and citizens seriously consider whether it
makes any sense to continue to be located in this state. The Connecticut economy continues to struggle as
other states offer more opportunities and a better environment for business growth. It is essential that
Governor Malloy and legislative leaders find a more prudent and responsible path forward for Connecticut
and its citizens in their current budget negotiations.
###
About GE
GE (NYSE: GE) imagines things others don’t, builds things others can’t and delivers outcomes that make the
world work better. GE brings together the physical and digital worlds in ways no other company can. In itslabs and factories and on the ground with customers, GE is inventing the next industrial era to move,
power, build and cure the world. www.ge.com.
GE Contacts:
Seth Martin
Corporate Communications
P: 203.572.3567
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 265/975
From: Steffen, Mark (GOV)
To: Steffen, Mark (GOV)
Subject: Governor"s Office Press Clips 01.07.2016
Date: Thursday, January 07, 2016 8:09:29 AM
MBTA:
Boston Herald: MBTA’s runaway pay: Report reveals T paying workers top dollar
Boston Herald: Mayor: Schools may have to ‘find the money’ for T hike
Boston Globe: Delays on Needham commuter rail line
Boston.com: The difference between fares and passes is the key to the MBTA’s price increases
Fox 25: Bill pushed by head of state's transportation committee could help fund Green Line
expansion [VIDEO]
Fox 25: FOX25 Investigates crime at T stations [VIDEO]
WGBH: Aloisi: It Will Take More Than a Fare Hike To Fix The MBTA
Lynn Item: Editorial: You get what you pay for
Gun Control:
Boston Globe: Officials back bill mandating markings for fake guns
Boston Herald: President Obama seeks Mass. help with firearms agenda
Boston Herald: Peterson: Obama should tackle urban gun crime
DCF:
Boston Globe: Bella Bond’s mother pleads not guilty
Boston.com: Mother of Bella Bond held on $1 million bail in toddler’s death
Worcester T&G: Dianne Williamson: Judgment of Worcester toddler's mother is too hasty
Opioid Addiction:
AP: 40 Mass. Communities To Get Funds For Anti-Overdose Drug
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 266/975
Boston.com: Massachusetts cities and towns will get $700,000 to fight the opioid epidemic
Metro: Forty Massachusetts cities and towns will get $700,000 for Narcan
Springfield Repub: Gov. Baker announces $700,000 in Narcan grants as Massachusetts towns
continue to battle heroin epidemic
Lowell Sun: Lowell, Fitchburg land state grants for naloxone
Worcester T&G: Worcester, Fitchburg, Leominster receive money for overdose drug
Worcester Mag: Governor, state DPH announce $700,000 in naloxone grants
WWLP: More Narcan coming to western Mass. communities [VIDEO]
Western Mass News: Five local cities to receive grants to purchase opioid reversal drug
Fall River Herald: High opioid overdose death rate lands naloxone grant for Fall River
Brockton Enterprise: Gov. Baker announces Narcan grant money for Brockton
WHDH: Several local communities to receive grants for opioid overdose reversal drug
MetroWest Daily: Framingham gets state grant to help it purchase opioid overdose reversal drug
Quincy Patriot-Ledger: Quincy, Weymouth and Plymouth first responders receive Narcan
grants
Wicked Local: Gov. Baker announces $700,000 in Naxolone grants for first responders
Stoughton Journal: Gov. Baker announces Narcan grant money for Brockton
Other:
Boston Globe: Driver’s license law may change
Boston Globe: Regulators approve $1.2b Vermont power line
Boston Herald: Hanscom may house children entering U.S. without parents
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 267/975
North of Boston Media: Editorial: Baker is right on need for fiscal discipline
SHNS: Baker plan would move driver citations into electronic realm
SHNS: Baker joins DeLeo, cabinet members at Boston hospital
Lynn Item: Baker stays in Swampscott for ideas about job creation
MetroWest Daily: Baker says it's a 'no-brainer': Framingham should be a city
News:
Boston Globe:
Editorial: The city’s lawyer needs to stay out of politics
Fear of deportations swirls in state
Mass. police chiefs urge fingerprinting for Uber drivers
Decision expected from GE this month
Mass. lawmakers hear testimony on bike safety proposals
Panel orders police recruit reinstated
Abraham: City Hall not open to all, lawyer’s rise suggests
Garcia: Immigrants deliver the day
Boston apartment rents up nearly 6 percent in 2015
Boston Herald:
Editorial: Sex offender snafu
Sex offenders set to be delisted by court ruling
Walsh: Foes of Olympic Games ‘had a point’
Ex-Walsh aide among three lobbyists for Grand Prix
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 268/975
Handicapped time limit, scofflaws targeted
AP:
Lawmakers approve drug offender driver's license bill
SHNS:
Mass. DPH: Latest data shows more died by suicide than car crashes, homicides combined.
Senate plans pair of special elections on may 10th
IG: Abuse of disability parking placards rampant
Fortune:
Business Gets Schooled: A look into the battle over Common Core
CNHI:
Proposals would stop drivers' cellphone use
WGBH:
Bike Advocates Urge Safety Guards To Prevent Tractor Trailer Deathtraps
WBUR:
Massachusetts Education Again Ranks No. 1 Nationally
Bay State Banner:Foreclosure activists fight to halt law
Fox 25:
Friends, family of victims push for new bike safety laws [VIDEO]
FOX25 Investigates uncovers disturbing allegations against former Swampscott
principal [VIDEO]
State Senator proposes harsher highway protesting fines [VIDEO]
Springfield Repub:
Editorial: Suicide figures among Massachusetts correctional officers paint frightening picture
Department of Homeland Security office in Springfield in disarray, wracked by internal
squabbling, court records show
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 269/975
Salem News:
Moulton confirms he will seek reelection
Lynn Item:
Posse Foundation rescues Lynn students
Lowell Sun:
Report: Ex-Lowell High headmaster left Swampscott post amid online sex-talk allegations
Fitchburg Sentinel:
Devens tour highlights manufacturing potential
New Bedford Standard-Times:
New Bedford mayor continues to push for retail, commercial uses at waterfront
New Bedford-area lawmakers pushing for ex-casino site plans
Cape Cod Times:
Editorial: Should state raise charter cap?
Greenfield Recorder:
Editorial: 5 issues that should be legislative priorities
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 270/975
From: Sullivan, Jennifer F. (ANF)
To: Amy Eisenstadt
Cc: Kennealy, Michael (EOHED)
Subject: Hypothetical I-Cubed Pricing Summary
Date: Wednesday, November 25, 2015 3:12:38 PM
Attachments: Commonwealth of MA, (Commonwealth Contract Assistance) - Hypothetical $50 Million New Money Cash Flows 11.24.2015.pdf
Amy,
I asked a banker who has worked on previous I-Cubed transactions to run a simulation of a hypothetical I-Cubed bond issue pricing, had the bonds been offered yesterday. This is a snapshot of yesterday’s market at our current Commonwealth GO bond rating of AA+. I need to caveat that the attached document does not constitute an offer to buy or sell actual securities; it is just an example of how a bond issue might look for 30 year debt on a $50 million project. Different circumstances could produce different results. I hope this is illustrative.
It was a pleasure speaking with you yesterday. If you have any additional questions about the I-Cubed program or any other related matter, please do not hesitate to contact me. I look forward to working with you. Have a happy Thanksgiving.
Regards,
Jennifer
Jennifer Sullivan
Assistant Secretary for Capital Finance
Executive Office for Administration and FinanceState House Room 373
Boston, Massachusetts 02133P: (617) 727-2040 ext. 35432
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 271/975
Nov 24, 2015 5:29 pm Prepared by J.P. Morgan Securities LLC
TABLE OF CONTENTS
Commonwealth of Massachusetts
Special Obligation Bonds (Commonwealth Contract Assistance)
**Proposed $50 Million New Money Financing**
Rates as of November 24, 2015.
Report Page
Sources and Uses of Funds .............................. 1
Bond Summary Statistics .............................. 2
Bond Pricing ................................... 3
Bond Debt Service ................................. 5
Disclaimer .................................... 6
Municipal Advisor Rule’s IRMA Exemption ....................... 7
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 272/975
Nov 24, 2015 5:29 pm Prepared by J.P. Morgan Securities LLC Page 1
SOURCES AND USES OF FUNDS
Commonwealth of Massachusetts
Special Obligation Bonds (Commonwealth Contract Assistance)
**Proposed $50 Million New Money Financing**
Rates as of November 24, 2015.
Sources:
Bond Proceeds:Par Amount 43,305,000.00
Premium 6,694,287.50
49,999,287.50
Uses:
Project Fund Deposits:
Project Fund 49,476,067.50
Delivery Date Expenses:Cost of Issuance 350,000.00
Underwriter's Discount:
Other Underwriter's Discount 173,220.00
49,999,287.50
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 273/975
Nov 24, 2015 5:29 pm Prepared by J.P. Morgan Securities LLC Page 2
BOND SUMMARY STATISTICS
Commonwealth of Massachusetts
Special Obligation Bonds (Commonwealth Contract Assistance)
**Proposed $50 Million New Money Financing**
Rates as of November 24, 2015.
Dated Date 12/09/2015Delivery Date 12/09/2015
Last Maturity 05/01/2045
Arbitrage Yield 2.939125%
True Interest Cost (TIC) 3.792718%
Net Interest Cost (NIC) 4.180419%
All-In TIC 3.850785%Average Coupon 4.991672%
Average Life (years) 18.562
Duration of Issue (years) 12.391
Par Amount 43,305,000.00
Bond Proceeds 49,999,287.50Total Interest 40,124,380.56
Net Interest 33,603,313.06
Total Debt Service 83,429,380.56
Maximum Annual Debt Service 2,840,450.00Average Annual Debt Service 2,838,270.36
Underwriter's Fees (per $1000)
Average Takedown Other Fee 4.000000
Total Underwriter's Discount 4.000000
Bid Price 115.058463
Par Average Average PV of 1 bp
Bond Component Value Price Coupon Life change
Serial Bonds Through 2035 21,395,000.00 117.144 4.973% 11.665 16,692.10
Term Bond Maturing in 2040 9,620,000.00 114.153 5.000% 22.492 8,369.40Term Bond Maturing in 2045 12,290,000.00 113.546 5.000% 27.492 10,569.40
43,305,000.00 18.562 35,630.90
All-In Arbitrage
TIC TIC Yield
Par Value 43,305,000.00 43,305,000.00 43,305,000.00 + Accrued Interest
+ Premium (Discount) 6,694,287.50 6,694,287.50 6,694,287.50
- Underwriter's Discount -173,220.00 -173,220.00
- Cost of Issuance Expense -350,000.00
- Other Amounts
Target Value 49,826,067.50 49,476,067.50 49,999,287.50
Target Date 12/09/2015 12/09/2015 12/09/2015
Yield 3.792718% 3.850785% 2.939125%
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 274/975
Nov 24, 2015 5:29 pm Prepared by J.P. Morgan Securities LLC
BOND PRICING
Commonwealth of Massachusetts
Special Obligation Bonds (Commonwealth Contract Assistance)
**Proposed $50 Million New Money Financing**
Rates as of November 24, 2015.
Maturity Yield to Call CBond Component Date Amount Rate Yield Price Maturity Date P
Serial Bonds Through 2035:
05/01/2016 280,000 2.000% 0.200% 100.709
05/01/2017 715,000 3.000% 0.620% 103.298
05/01/2018 740,000 4.000% 0.900% 107.326
05/01/2019 765,000 4.000% 1.100% 109.635 05/01/2020 800,000 5.000% 1.300% 115.752
05/01/2021 840,000 5.000% 1.510% 118.013
05/01/2022 880,000 5.000% 1.710% 119.846
05/01/2023 925,000 5.000% 1.910% 121.212
05/01/2024 970,000 5.000% 2.080% 122.382
05/01/2025 1,020,000 5.000% 2.220% 123.453
05/01/2026 1,070,000 5.000% 2.390% 121.843 C 2.589% 05/01/2025 100.05/01/2027 1,125,000 5.000% 2.500% 120.814 C 2.848% 05/01/2025 100.
05/01/2028 1,180,000 5.000% 2.620% 119.703 C 3.076% 05/01/2025 100.
05/01/2029 1,240,000 5.000% 2.730% 118.695 C 3.265% 05/01/2025 100.
05/01/2030 1,300,000 5.000% 2.810% 117.969 C 3.410% 05/01/2025 100.05/01/2031 1,365,000 5.000% 2.870% 117.427 C 3.523% 05/01/2025 100.
05/01/2032 1,435,000 5.000% 2.920% 116.978 C 3.618% 05/01/2025 100.
05/01/2033 1,505,000 5.000% 2.970% 116.532 C 3.702% 05/01/2025 100.
05/01/2034 1,580,000 5.000% 3.020% 116.087 C 3.778% 05/01/2025 100.05/01/2035 1,660,000 5.000% 3.070% 115.644 C 3.848% 05/01/2025 100.
21,395,000
Term Bond Maturing in 2040:
05/01/2036 1,740,000 5.000% 3.240% 114.153 C 4.078% 05/01/2025 100.05/01/2037 1,830,000 5.000% 3.240% 114.153 C 4.078% 05/01/2025 100.
05/01/2038 1,920,000 5.000% 3.240% 114.153 C 4.078% 05/01/2025 100.
05/01/2039 2,015,000 5.000% 3.240% 114.153 C 4.078% 05/01/2025 100.
05/01/2040 2,115,000 5.000% 3.240% 114.153 C 4.078% 05/01/2025 100.
9,620,000
Term Bond Maturing in 2045:05/01/2041 2,225,000 5.000% 3.310% 113.546 C 4.194% 05/01/2025 100.
05/01/2042 2,335,000 5.000% 3.310% 113.546 C 4.194% 05/01/2025 100.
05/01/2043 2,450,000 5.000% 3.310% 113.546 C 4.194% 05/01/2025 100.
05/01/2044 2,575,000 5.000% 3.310% 113.546 C 4.194% 05/01/2025 100.
05/01/2045 2,705,000 5.000% 3.310% 113.546 C 4.194% 05/01/2025 100.
12,290,000
43,305,000
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 275/975
Nov 24, 2015 5:29 pm Prepared by J.P. Morgan Securities LLC
BOND PRICING
Commonwealth of Massachusetts
Special Obligation Bonds (Commonwealth Contract Assistance)
**Proposed $50 Million New Money Financing**
Rates as of November 24, 2015.
Dated Date 12/09/2015Delivery Date 12/09/2015
First Coupon 05/01/2016
Par Amount 43,305,000.00
Premium 6,694,287.50
Production 49,999,287.50 115.458463%Underwriter's Discount -173,220.00 -0.400000%
Purchase Price 49,826,067.50 115.058463%
Accrued Interest
Net Proceeds 49,826,067.50
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 276/975
Nov 24, 2015 5:29 pm Prepared by J.P. Morgan Securities LLC Page 5
BOND DEBT SERVICE
Commonwealth of Massachusetts
Special Obligation Bonds (Commonwealth Contract Assistance)
**Proposed $50 Million New Money Financing**
Rates as of November 24, 2015.
PeriodEnding Principal Coupon Interest Debt Service
05/01/2016 280,000 2.000% 839,180.56 1,119,180.56
05/01/2017 715,000 3.000% 2,121,900.00 2,836,900.00
05/01/2018 740,000 4.000% 2,100,450.00 2,840,450.00
05/01/2019 765,000 4.000% 2,070,850.00 2,835,850.00
05/01/2020 800,000 5.000% 2,040,250.00 2,840,250.0005/01/2021 840,000 5.000% 2,000,250.00 2,840,250.00
05/01/2022 880,000 5.000% 1,958,250.00 2,838,250.00
05/01/2023 925,000 5.000% 1,914,250.00 2,839,250.00
05/01/2024 970,000 5.000% 1,868,000.00 2,838,000.00
05/01/2025 1,020,000 5.000% 1,819,500.00 2,839,500.00
05/01/2026 1,070,000 5.000% 1,768,500.00 2,838,500.00
05/01/2027 1,125,000 5.000% 1,715,000.00 2,840,000.0005/01/2028 1,180,000 5.000% 1,658,750.00 2,838,750.00
05/01/2029 1,240,000 5.000% 1,599,750.00 2,839,750.00
05/01/2030 1,300,000 5.000% 1,537,750.00 2,837,750.00
05/01/2031 1,365,000 5.000% 1,472,750.00 2,837,750.0005/01/2032 1,435,000 5.000% 1,404,500.00 2,839,500.00
05/01/2033 1,505,000 5.000% 1,332,750.00 2,837,750.00
05/01/2034 1,580,000 5.000% 1,257,500.00 2,837,500.00
05/01/2035 1,660,000 5.000% 1,178,500.00 2,838,500.0005/01/2036 1,740,000 5.000% 1,095,500.00 2,835,500.00
05/01/2037 1,830,000 5.000% 1,008,500.00 2,838,500.00
05/01/2038 1,920,000 5.000% 917,000.00 2,837,000.00
05/01/2039 2,015,000 5.000% 821,000.00 2,836,000.00
05/01/2040 2,115,000 5.000% 720,250.00 2,835,250.00
05/01/2041 2,225,000 5.000% 614,500.00 2,839,500.00
05/01/2042 2,335,000 5.000% 503,250.00 2,838,250.0005/01/2043 2,450,000 5.000% 386,500.00 2,836,500.00
05/01/2044 2,575,000 5.000% 264,000.00 2,839,000.00
05/01/2045 2,705,000 5.000% 135,250.00 2,840,250.00
43,305,000 40,124,380.56 83,429,380.56
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 277/975
Nov 24, 2015 5:29 pm Prepared by J.P. Morgan Securities LLC Page 6
DISCLAIMER
Commonwealth of Massachusetts
Special Obligation Bonds (Commonwealth Contract Assistance)
**Proposed $50 Million New Money Financing**
Rates as of November 24, 2015.
This presentation was prepared exclusively for the benefit and internal use of the J.P. Morgan client to whom it is directly addressed and delivered (including suchclient's affiliates, the 'Client') in order to assist the Client in evaluating, on a preliminary basis, the feasibility of possible transactions referenced herein. The materials
have been provided to the Client for informational purposes only and may not be relied upon by the Client in evaluating the merits of pursuing transactions describedherein. No assurance can be given that any transaction mentioned herein could in fact be executed.
Information has been obtained from sources believed to be reliable but J.P. Morgan does not warrant its completeness or accuracy. Opinions and estimates constitute
our judgment as of the date of this material and are subject to change without notice. Past performance is not indicative of future results. Any financial products
discussed may fluctuate in price or value. This presentation does not constitute a commitment by any J.P. Morgan entity to underwrite, subscribe for or place anysecurities or to extend or arrange credit or to provide any other services.
J.P. Morgan's presentation is delivered to you for the purpose of being engaged as an underwriter, not as an advisor, (including, without limitation, a Municipal
Advisor (as such term is defined in Section 975(e) of the Dodd-Frank Wall Street Reform and Consumer Protection Act)). The role of an underwriter and its
relationship to an issuer of debt is not equivalent to the role of an independent financial advisor. The primary role of an underwriter is to purchase, or arrange for the
purchase of, securities in an arm's-length commercial transaction between the issuer and the underwriter.An underwriter has financial and other interests that differ
from those of the issuer. If selected as your underwriter, J.P. Morgan will be acting as a principal and not as your agent or your fiduciary with respect to the offering ofthe securities or the process leading to issuance (whether or not J.P. Morgan or any affiliate has advised or is currently advising the Client on other matters). Any
portion of this presentation which provides information on municipal financial products or the issuance of municipal securities is given in response to your questions
or to demonstrate our experience in the municipal markets and does not constitute 'advice' within the meaning of Section 975 of the Dodd-Frank Wall Street Reform
and Consumer Protection Act. We encourage you to consult with your own legal and financial advisors to the extent you deem appropriate in connection with theoffering of the securities. If you have any questions concerning our intended role and relationship with you, we would be happy to discuss this with you further.
This communication shall not constitute an offer to sell or the solicitation of an offer to buy, nor shall there be any sale of the securities in any state or jurisdiction in
which such an offer, solicitation or sale would be unlawful prior to registration or qualification under the securities laws of any such state or jurisdiction.
This material is not a product of the Research Departments of J.P. Morgan Securities LLC ('JPMS') and is not a research report. Unless otherwise specifically stated,
any views or opinions expressed herein are solely those of the authors listed, and may differ from the views and opinions expressed by JPMS's Research Departments
or other departments or divisions of JPMS and its affiliates. Research reports and notes produced by the Research Departments of JPMS are available from your
Registered Representative or at http://www.morganmarkets.com. JPMS's policies prohibit employees from offering, directly or indirectly, a favorable research rating
or specific price target, or offering to change a rating or price target, to a subject Client as consideration or inducement for the receipt of business or for compensation.
JPMS also prohibits its research analysts from being compensated for involvement in investment banking transactions except to the extent that such participation isintended to benefit investors.
J.P. Morgan makes no representations as to the legal, tax, credit, or accounting treatment of any transactions mentioned herein, or any other effects such transactions
may have on you and your affiliates or any other parties to such transactions and their respective affiliates. You should consult with your own advisors as to such
matters.
IRS Circular 230 Disclosure: JPMorgan Chase & Co. and its affiliates do not provide tax advice. Accordingly, any discussion of U.S. tax matters included herein (including any attachments) is not intended or written to be used, and cannot be used, in connection with the promotion, marketing or recommendation by anyone not
affiliated with JPMorgan Chase & Co. of any of the matters addressed herein or for the purpose of avoiding U.S. tax-related penalties.
This presentation does not carry any right of publication or disclosure, in whole or in part, to any other party, without the prior consent of J.P. Morgan. Additional
information is available upon request.
J.P. Morgan is the marketing name for the investment banking activities of JPMorgan Chase Bank, N.A., J.P. Morgan Securities LLC (member, NYSE), J.P. MorganSecurities plc (authorized by the FSA and member, LSE) and their investment banking affiliates.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 278/975
Nov 24, 2015 5:29 pm Prepared by J.P. Morgan Securities LLC Page 7
MUNICIPAL ADVISOR RULE’S IRMA EXEMPTION
Commonwealth of Massachusetts
Special Obligation Bonds (Commonwealth Contract Assistance)
**Proposed $50 Million New Money Financing**
Rates as of November 24, 2015.
(a) This material is provided to you in reliance on the Independent Registered Municipal Advisor exemption pursuant to Section 15B of the Securities Exchange Act of1934, as amended; (b) J.P. Morgan is not acting as an advisor to you and does not owe a fiduciary duty pursuant to Section 15B of the Securities Exchange Act of
1934, as amended, to you with respect to the information and material contained in this communication; (c) J.P. Morgan is acting for its own interests; (d) You shoulddiscuss any information and material contained in this communication with any and all internal or external advisors and experts that you deem appropriate before
acting on this information or material; and (e) J.P. Morgan seeks to serve as an underwriter on a future transaction and not as a financial advisor or municipal advisor.
The information provided is for discussion purposes only in anticipation of being engaged to serve or in relation to our engagement as an underwriter. The primary
role of an underwriter is to purchase securities with a view to distribute in an arm’s-length commercial transaction. The underwriter has financial and other interests
that differ from yours.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 279/975
Nov 24, 2015 5:29 pm Prepared by J.P. Morgan Securities LLC
TABLE OF CONTENTS
Commonwealth of Massachusetts
Special Obligation Bonds (Commonwealth Contract Assistance)
**Proposed $50 Million New Money Financing**
Rates as of November 24, 2015.
Report Page
Sources and Uses of Funds .............................. 1
Bond Summary Statistics .............................. 2
Bond Pricing ................................... 3
Bond Debt Service ................................. 5
Disclaimer .................................... 6
Municipal Advisor Rule’s IRMA Exemption ....................... 7
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 280/975
Nov 24, 2015 5:29 pm Prepared by J.P. Morgan Securities LLC Page 1
SOURCES AND USES OF FUNDS
Commonwealth of Massachusetts
Special Obligation Bonds (Commonwealth Contract Assistance)
**Proposed $50 Million New Money Financing**
Rates as of November 24, 2015.
Sources:
Bond Proceeds:Par Amount 43,305,000.00
Premium 6,694,287.50
49,999,287.50
Uses:
Project Fund Deposits:
Project Fund 49,476,067.50
Delivery Date Expenses:Cost of Issuance 350,000.00
Underwriter's Discount:
Other Underwriter's Discount 173,220.00
49,999,287.50
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 281/975
Nov 24, 2015 5:29 pm Prepared by J.P. Morgan Securities LLC Page 2
BOND SUMMARY STATISTICS
Commonwealth of Massachusetts
Special Obligation Bonds (Commonwealth Contract Assistance)
**Proposed $50 Million New Money Financing**
Rates as of November 24, 2015.
Dated Date 12/09/2015Delivery Date 12/09/2015
Last Maturity 05/01/2045
Arbitrage Yield 2.939125%
True Interest Cost (TIC) 3.792718%
Net Interest Cost (NIC) 4.180419%
All-In TIC 3.850785%Average Coupon 4.991672%
Average Life (years) 18.562
Duration of Issue (years) 12.391
Par Amount 43,305,000.00
Bond Proceeds 49,999,287.50Total Interest 40,124,380.56
Net Interest 33,603,313.06
Total Debt Service 83,429,380.56
Maximum Annual Debt Service 2,840,450.00Average Annual Debt Service 2,838,270.36
Underwriter's Fees (per $1000)
Average Takedown Other Fee 4.000000
Total Underwriter's Discount 4.000000
Bid Price 115.058463
Par Average Average PV of 1 bp
Bond Component Value Price Coupon Life change
Serial Bonds Through 2035 21,395,000.00 117.144 4.973% 11.665 16,692.10
Term Bond Maturing in 2040 9,620,000.00 114.153 5.000% 22.492 8,369.40Term Bond Maturing in 2045 12,290,000.00 113.546 5.000% 27.492 10,569.40
43,305,000.00 18.562 35,630.90
All-In Arbitrage
TIC TIC Yield
Par Value 43,305,000.00 43,305,000.00 43,305,000.00 + Accrued Interest
+ Premium (Discount) 6,694,287.50 6,694,287.50 6,694,287.50
- Underwriter's Discount -173,220.00 -173,220.00
- Cost of Issuance Expense -350,000.00
- Other Amounts
Target Value 49,826,067.50 49,476,067.50 49,999,287.50
Target Date 12/09/2015 12/09/2015 12/09/2015
Yield 3.792718% 3.850785% 2.939125%
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 282/975
Nov 24, 2015 5:29 pm Prepared by J.P. Morgan Securities LLC
BOND PRICING
Commonwealth of Massachusetts
Special Obligation Bonds (Commonwealth Contract Assistance)
**Proposed $50 Million New Money Financing**
Rates as of November 24, 2015.
Maturity Yield to Call CBond Component Date Amount Rate Yield Price Maturity Date P
Serial Bonds Through 2035:
05/01/2016 280,000 2.000% 0.200% 100.709
05/01/2017 715,000 3.000% 0.620% 103.298
05/01/2018 740,000 4.000% 0.900% 107.326
05/01/2019 765,000 4.000% 1.100% 109.635 05/01/2020 800,000 5.000% 1.300% 115.752
05/01/2021 840,000 5.000% 1.510% 118.013
05/01/2022 880,000 5.000% 1.710% 119.846
05/01/2023 925,000 5.000% 1.910% 121.212
05/01/2024 970,000 5.000% 2.080% 122.382
05/01/2025 1,020,000 5.000% 2.220% 123.453
05/01/2026 1,070,000 5.000% 2.390% 121.843 C 2.589% 05/01/2025 100.05/01/2027 1,125,000 5.000% 2.500% 120.814 C 2.848% 05/01/2025 100.
05/01/2028 1,180,000 5.000% 2.620% 119.703 C 3.076% 05/01/2025 100.
05/01/2029 1,240,000 5.000% 2.730% 118.695 C 3.265% 05/01/2025 100.
05/01/2030 1,300,000 5.000% 2.810% 117.969 C 3.410% 05/01/2025 100.05/01/2031 1,365,000 5.000% 2.870% 117.427 C 3.523% 05/01/2025 100.
05/01/2032 1,435,000 5.000% 2.920% 116.978 C 3.618% 05/01/2025 100.
05/01/2033 1,505,000 5.000% 2.970% 116.532 C 3.702% 05/01/2025 100.
05/01/2034 1,580,000 5.000% 3.020% 116.087 C 3.778% 05/01/2025 100.05/01/2035 1,660,000 5.000% 3.070% 115.644 C 3.848% 05/01/2025 100.
21,395,000
Term Bond Maturing in 2040:
05/01/2036 1,740,000 5.000% 3.240% 114.153 C 4.078% 05/01/2025 100.05/01/2037 1,830,000 5.000% 3.240% 114.153 C 4.078% 05/01/2025 100.
05/01/2038 1,920,000 5.000% 3.240% 114.153 C 4.078% 05/01/2025 100.
05/01/2039 2,015,000 5.000% 3.240% 114.153 C 4.078% 05/01/2025 100.
05/01/2040 2,115,000 5.000% 3.240% 114.153 C 4.078% 05/01/2025 100.
9,620,000
Term Bond Maturing in 2045:05/01/2041 2,225,000 5.000% 3.310% 113.546 C 4.194% 05/01/2025 100.
05/01/2042 2,335,000 5.000% 3.310% 113.546 C 4.194% 05/01/2025 100.
05/01/2043 2,450,000 5.000% 3.310% 113.546 C 4.194% 05/01/2025 100.
05/01/2044 2,575,000 5.000% 3.310% 113.546 C 4.194% 05/01/2025 100.
05/01/2045 2,705,000 5.000% 3.310% 113.546 C 4.194% 05/01/2025 100.
12,290,000
43,305,000
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 283/975
Nov 24, 2015 5:29 pm Prepared by J.P. Morgan Securities LLC
BOND PRICING
Commonwealth of Massachusetts
Special Obligation Bonds (Commonwealth Contract Assistance)
**Proposed $50 Million New Money Financing**
Rates as of November 24, 2015.
Dated Date 12/09/2015Delivery Date 12/09/2015
First Coupon 05/01/2016
Par Amount 43,305,000.00
Premium 6,694,287.50
Production 49,999,287.50 115.458463%Underwriter's Discount -173,220.00 -0.400000%
Purchase Price 49,826,067.50 115.058463%
Accrued Interest
Net Proceeds 49,826,067.50
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 284/975
Nov 24, 2015 5:29 pm Prepared by J.P. Morgan Securities LLC Page 5
BOND DEBT SERVICE
Commonwealth of Massachusetts
Special Obligation Bonds (Commonwealth Contract Assistance)
**Proposed $50 Million New Money Financing**
Rates as of November 24, 2015.
PeriodEnding Principal Coupon Interest Debt Service
05/01/2016 280,000 2.000% 839,180.56 1,119,180.56
05/01/2017 715,000 3.000% 2,121,900.00 2,836,900.00
05/01/2018 740,000 4.000% 2,100,450.00 2,840,450.00
05/01/2019 765,000 4.000% 2,070,850.00 2,835,850.00
05/01/2020 800,000 5.000% 2,040,250.00 2,840,250.0005/01/2021 840,000 5.000% 2,000,250.00 2,840,250.00
05/01/2022 880,000 5.000% 1,958,250.00 2,838,250.00
05/01/2023 925,000 5.000% 1,914,250.00 2,839,250.00
05/01/2024 970,000 5.000% 1,868,000.00 2,838,000.00
05/01/2025 1,020,000 5.000% 1,819,500.00 2,839,500.00
05/01/2026 1,070,000 5.000% 1,768,500.00 2,838,500.00
05/01/2027 1,125,000 5.000% 1,715,000.00 2,840,000.0005/01/2028 1,180,000 5.000% 1,658,750.00 2,838,750.00
05/01/2029 1,240,000 5.000% 1,599,750.00 2,839,750.00
05/01/2030 1,300,000 5.000% 1,537,750.00 2,837,750.00
05/01/2031 1,365,000 5.000% 1,472,750.00 2,837,750.0005/01/2032 1,435,000 5.000% 1,404,500.00 2,839,500.00
05/01/2033 1,505,000 5.000% 1,332,750.00 2,837,750.00
05/01/2034 1,580,000 5.000% 1,257,500.00 2,837,500.00
05/01/2035 1,660,000 5.000% 1,178,500.00 2,838,500.0005/01/2036 1,740,000 5.000% 1,095,500.00 2,835,500.00
05/01/2037 1,830,000 5.000% 1,008,500.00 2,838,500.00
05/01/2038 1,920,000 5.000% 917,000.00 2,837,000.00
05/01/2039 2,015,000 5.000% 821,000.00 2,836,000.00
05/01/2040 2,115,000 5.000% 720,250.00 2,835,250.00
05/01/2041 2,225,000 5.000% 614,500.00 2,839,500.00
05/01/2042 2,335,000 5.000% 503,250.00 2,838,250.0005/01/2043 2,450,000 5.000% 386,500.00 2,836,500.00
05/01/2044 2,575,000 5.000% 264,000.00 2,839,000.00
05/01/2045 2,705,000 5.000% 135,250.00 2,840,250.00
43,305,000 40,124,380.56 83,429,380.56
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 285/975
Nov 24, 2015 5:29 pm Prepared by J.P. Morgan Securities LLC Page 6
DISCLAIMER
Commonwealth of Massachusetts
Special Obligation Bonds (Commonwealth Contract Assistance)
**Proposed $50 Million New Money Financing**
Rates as of November 24, 2015.
This presentation was prepared exclusively for the benefit and internal use of the J.P. Morgan client to whom it is directly addressed and delivered (including suchclient's affiliates, the 'Client') in order to assist the Client in evaluating, on a preliminary basis, the feasibility of possible transactions referenced herein. The materials
have been provided to the Client for informational purposes only and may not be relied upon by the Client in evaluating the merits of pursuing transactions describedherein. No assurance can be given that any transaction mentioned herein could in fact be executed.
Information has been obtained from sources believed to be reliable but J.P. Morgan does not warrant its completeness or accuracy. Opinions and estimates constitute
our judgment as of the date of this material and are subject to change without notice. Past performance is not indicative of future results. Any financial products
discussed may fluctuate in price or value. This presentation does not constitute a commitment by any J.P. Morgan entity to underwrite, subscribe for or place anysecurities or to extend or arrange credit or to provide any other services.
J.P. Morgan's presentation is delivered to you for the purpose of being engaged as an underwriter, not as an advisor, (including, without limitation, a Municipal
Advisor (as such term is defined in Section 975(e) of the Dodd-Frank Wall Street Reform and Consumer Protection Act)). The role of an underwriter and its
relationship to an issuer of debt is not equivalent to the role of an independent financial advisor. The primary role of an underwriter is to purchase, or arrange for the
purchase of, securities in an arm's-length commercial transaction between the issuer and the underwriter.An underwriter has financial and other interests that differ
from those of the issuer. If selected as your underwriter, J.P. Morgan will be acting as a principal and not as your agent or your fiduciary with respect to the offering ofthe securities or the process leading to issuance (whether or not J.P. Morgan or any affiliate has advised or is currently advising the Client on other matters). Any
portion of this presentation which provides information on municipal financial products or the issuance of municipal securities is given in response to your questions
or to demonstrate our experience in the municipal markets and does not constitute 'advice' within the meaning of Section 975 of the Dodd-Frank Wall Street Reform
and Consumer Protection Act. We encourage you to consult with your own legal and financial advisors to the extent you deem appropriate in connection with theoffering of the securities. If you have any questions concerning our intended role and relationship with you, we would be happy to discuss this with you further.
This communication shall not constitute an offer to sell or the solicitation of an offer to buy, nor shall there be any sale of the securities in any state or jurisdiction in
which such an offer, solicitation or sale would be unlawful prior to registration or qualification under the securities laws of any such state or jurisdiction.
This material is not a product of the Research Departments of J.P. Morgan Securities LLC ('JPMS') and is not a research report. Unless otherwise specifically stated,
any views or opinions expressed herein are solely those of the authors listed, and may differ from the views and opinions expressed by JPMS's Research Departments
or other departments or divisions of JPMS and its affiliates. Research reports and notes produced by the Research Departments of JPMS are available from your
Registered Representative or at http://www.morganmarkets.com. JPMS's policies prohibit employees from offering, directly or indirectly, a favorable research rating
or specific price target, or offering to change a rating or price target, to a subject Client as consideration or inducement for the receipt of business or for compensation.
JPMS also prohibits its research analysts from being compensated for involvement in investment banking transactions except to the extent that such participation isintended to benefit investors.
J.P. Morgan makes no representations as to the legal, tax, credit, or accounting treatment of any transactions mentioned herein, or any other effects such transactions
may have on you and your affiliates or any other parties to such transactions and their respective affiliates. You should consult with your own advisors as to such
matters.
IRS Circular 230 Disclosure: JPMorgan Chase & Co. and its affiliates do not provide tax advice. Accordingly, any discussion of U.S. tax matters included herein (including any attachments) is not intended or written to be used, and cannot be used, in connection with the promotion, marketing or recommendation by anyone not
affiliated with JPMorgan Chase & Co. of any of the matters addressed herein or for the purpose of avoiding U.S. tax-related penalties.
This presentation does not carry any right of publication or disclosure, in whole or in part, to any other party, without the prior consent of J.P. Morgan. Additional
information is available upon request.
J.P. Morgan is the marketing name for the investment banking activities of JPMorgan Chase Bank, N.A., J.P. Morgan Securities LLC (member, NYSE), J.P. MorganSecurities plc (authorized by the FSA and member, LSE) and their investment banking affiliates.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 286/975
Nov 24, 2015 5:29 pm Prepared by J.P. Morgan Securities LLC Page 7
MUNICIPAL ADVISOR RULE’S IRMA EXEMPTION
Commonwealth of Massachusetts
Special Obligation Bonds (Commonwealth Contract Assistance)
**Proposed $50 Million New Money Financing**
Rates as of November 24, 2015.
(a) This material is provided to you in reliance on the Independent Registered Municipal Advisor exemption pursuant to Section 15B of the Securities Exchange Act of1934, as amended; (b) J.P. Morgan is not acting as an advisor to you and does not owe a fiduciary duty pursuant to Section 15B of the Securities Exchange Act of
1934, as amended, to you with respect to the information and material contained in this communication; (c) J.P. Morgan is acting for its own interests; (d) You shoulddiscuss any information and material contained in this communication with any and all internal or external advisors and experts that you deem appropriate before
acting on this information or material; and (e) J.P. Morgan seeks to serve as an underwriter on a future transaction and not as a financial advisor or municipal advisor.
The information provided is for discussion purposes only in anticipation of being engaged to serve or in relation to our engagement as an underwriter. The primary
role of an underwriter is to purchase securities with a view to distribute in an arm’s-length commercial transaction. The underwriter has financial and other interests
that differ from yours.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 287/975
From: Morse, Elizabeth
To: Kennealy, Michael (EOHED); Ash, Jay (EOHED); Kadish, Steven (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Povich, Lon (GOV); Garrity, Rob (DOT); Tom Glynn; Doolin, James
Subject: Massport Presentation
Date: Tuesday, December 08, 2015 10:32:47 AM
Attachments: Massport 12 8 15 Deck v2.pdf
Attached please find a draft presentation from Massport. Please email or call with any edits. Thanks, Elizabeth
Elizabeth Morse
Chief of Staff
Massachusetts Port Authority
One Harborside Drive, Suite 200S
East Boston, MA 02128
617-568-1007
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 288/975
MassportEconomic Development Partner
December 8, 2015
DRAFT 12/8/15 10 AM
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 289/975
Massport Overview
• Quasi-public authority – “a body corporate and politic”
• Governed by a seven member board
• Financially self-sufficient – can “fix, revise, charge andcollect tolls, rates, fees, rentals and charges”
• Operates three business lines• Aviation
• Maritime Operations
• Real Estate
• FY16 budget is $667 million• Logan Airport is 85% of total operating budget
• Maritime business is 10%, all other is 5%
• Massport bond ratings• Moody’s Aa2, S&P AA, Fitch AA
2
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 290/975
Massport Real Estate
• Successful History of Massport Developments
• Massport Parcels in Seaport / Innovation District
• Proposed Lease Terms
3
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 291/975
Successful History of Massport Developments
• Massport is a Capable Development Partner
• Long Term Ground Leases
• Creative structure to lease arrangements
• Demonstrated to be financeable
• Ability to Execute
• One-stop shopping
• Demonstrated track record
• Streamlined Permitting
• Massport successfully permitted a master plan for CommonwealthFlats that includes over 7 million square feet of mixed-usedevelopment
• Expedited / coordinated review by the Commonwealth and City ofBoston managed by Massport
4
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 292/975
Successful History of Massport Developments
• Fidelityo Commonwealth Pier / World Trade Center (1996)
o
Seaport Hotel (1998)o East Office Building (2000)
o West Office Building (2002)
• John Hancock U.S. Corporate Headquarters (2003)
• Park Lane Seaport Apartments (2006)
• Boston Waterfront Renaissance Hotel (2008)
• Liberty Wharf Restaurant Row(2011)• Waterside Place Apartments (2014)
5
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 293/975
Seaport WorldTrade Center
Boston
FidelityInvestments
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 294/975
Massport Parcels in Seaport/Innovation District
Six Parcels for Consideration:
1. World Trade Center (WTC) Avenue
2. Parcel D-33. Summer Street Parcel
4. Parcel D-2
5. Parcel A-2
6. Parcel H
7
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 295/975
Massport Development Parcels – South Boston
8
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 296/975
9
World Trade Center Parcel • Development site
adjacent to the
Massport’s 1,500 spa
Air Rights Garage (un
design)
• Able to achieve 150,0to 200,000 sf of offic
development
• Parking provided in
adjacent Massport Ai
Rights Garage
• Prominent views ofdowntown
• Adjacent to MBTA Silv
Line station
Air Rights
Garage Site Parcel
D-2
ParcelD-3
Parcel H
Parcel
A-2
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 297/975
Parcel D-3
• 2.8 acre parcel
• Frontage on Summer
D Streets
• Master plan program
allocation of 500,000
650,000 sf
• Suitable for commerc
office use within mixe
use
• Directly across from t
BCEC/Westin Hotel
• Potential for on-site
structured parking
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 298/975
11
3 acre parcel
Summer Street
Frontage
Site capacity of 400,000
sf
Potential for on-site
structured parking
Opportunity to expand
site through acquisition
of U.S. Army property
South BostonTransportation Plan
recommended
extension of E Street to
Summer Street
Summer Street Parce
Summer Street
Parcel D-3
E
S t r e e t
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 299/975
Parcel D-2• 2.1 acre parcel
• Frontage on Summer,
Street and World Trad
Center Avenue
• Subject of RFQ which
issued by Massport onNov. 9 for hotel/mixed
development
• Requirement for mini
250 room hotel
• Opportunity for well i
excess of 150,000 sf ooffice
• Parking provided in
adjacent Massport Air
Rights Garage (under
design)
Air
Rights
Garage
Site
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 300/975
Parcel A-2
13
• 1.2 acre parcel
• Frontage on Congress
Street and World Tra
Center Avenue
• Master plan program
allocation up to 450,0
sf, suitable for
commercial office us
• Adjacent MBTA Silver
WTC Station, with
potential direct
pedestrian connectio
• Available parking in
planned Air Rights Ga
(adjacent with poten
direct pedestrian
connection)
Parcel
D-2
ParcelD-3
Parcel H
Air Rights
Garage Site
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 301/975
Parcel H
14
1.8 acre parcel
Frontage on Congress
Street
Master plan program
allocation up to 500,000
sf, suitable for
commercial office use
Potential for on-site
structured parking
(either below or above
ground)
Adjacent to existingSilver Line Station
Potential air rights
overbuild of Silver Line
Way and T Station
Air Rights
Garage Site
Parcel
A-2
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 302/975
Proposed Lease Terms
• Turnkey development
• By Massport directly or through selected private development
entity• Tenant Improvements included
• Construction costs for parking included
• Flexible space lease terms create lower occupancy costs• In concert with Commonwealth / City investments, Massport can
offer lease rates that overall are at a significant discount to market
• Early years at significant discount that gradually move to marketrates or discount applied over lease period
15
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 303/975
Massport Aviation – Logan International Airport
• Minutes from South Boston Innovation District
• Provides access for private aircraft 24/7, including overnight
parking• General Aviation activities operated by Signature Flight
Support (Fixed Based Operator)
• Automobile parking available at Signature
• Helicopter pad and parking at Signature
• Home to multiple Fortune 500 corporate fleets
16
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 304/975
Massport Aviation – Hanscom Airfield
• 13.5 nautical miles from Logan Airport
• Easy, efficient access to and from Downtown
• Readily available sites for permanent hangars for aircraftfleets
• Full services available
• Existing and new construction options
• Will accommodate multiple planes and helicopters
17
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 305/975
oston Logan Has Nonstop International Service to 53 Destinatio
• 13.5 nautical miles from Logan Airport• Easy, efficient access to and from Downtown
• Readily available sites for permanent hangars foraircraft fleets
• Full services available
• Existing and new construction options
• Will accommodate multiple planes and helicopters
18Note: Includes Seasonal Service, Source: OAG & Innovata Schedules
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 306/975
Boston Logan Has Nonstop Domestic Service to 75 Destinations
19Note: Includes Seasonal Service, Source: OAG & Innovata Schedules
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 307/975
Massport Air Cargo
• Air cargo is reported on a calendar year basis by the carriersthemselves
• The YTD December 2014 numbers reflect the full year’s total• Total Cargo & Mail: 585,459,955 lbs.
• Express (FedEX, UPS etc): 334,315,119 lbs.
• Freight (“belly of plane”): 203,877,671 lbs.
• October 2015 YTD is nearly the same (+0.3%) as Calendar2014 October YTD
20
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 308/975
Massport’s Port of Boston
• Multiple public and private maritime assets that provide New England businesseswith connections to the global marketplace.
• Weekly service to North Europe/Latin America, the Mediterranean, and Asia; easyaccess to Logan Airport and interstate highway system.
• Home to New England’s only full service container terminal; serves over 1,600businesses that use it to export and import goods.
• Annual economic impact of $4.6 billion. Record-breaking volume in FY2015 with221,000 twenty foot equivalent units (TEUs) and 13% growth year to date in FY2016.
• Working with state/federal officials to dredge Boston Harbor to prepare for largercontainer vessels; estimated to double volumes.
21
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 309/975
Massachusetts:An Innovation Capital
22
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 310/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 311/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 312/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 313/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 314/975
Appendix
27
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 315/975
Governing Documents
1956 Enabling Act• Quasi-public authority – “a body corporate and politic”• May only borrow for capital construction, not working capital
• Maintain, repair and operate, or extend, enlarge and improve itsbusiness facilities
• Construct or acquire additional facilities
1978 Trust Agreement, 1999 PFC Trust Agreement, and 2011 CFCTrust Agreement
• Massport’s contract with bondholders, includes specific covenants• Defines use of Massport’s generated revenues (funds flow
requirements)• Federal tax regulations restricts the use of bond proceeds
Current Federal Aviation Law• Restricts the use of aviation revenue (revenue diversion)• Regulates the calculation of aeronautical rates and charges• Regulates the collection and use of Passenger Facility Charges (PFCs)
28
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 316/975
From: Kulish, Karen (GE, Corporate)
To: Ash, Jay (EOHED)
Cc: Kulish, Karen (GE, Corporate)
Subject: Meeting Confirmation, GE Team & Logistics - Massachusetts
Date: Friday, July 10, 2015 4:51:49 PM
Attachments: Matthew_G_Cribbins.pdf Laurie Bevier bio.docPereira Outside Bio with photo.pdf Cavanaugh bio 2015.doc
May Bio 1-2015.docWills Bio July 2015.docCDrumgoole Bio - GE Chief Operating Officer 04102015tr (2).pdf Klee Bio.docx
Jay,
I am writing to confirm your meeting at our GE offices in Fairfield, CT on July 30 at 1:30 – 3:30. We
look forward to seeing you then.
Below are the GE folks who’ll be at the meeting, and their bios are also attached.
Laurie Bevier Sr. Human Resources Manager
Eileen Cavanaugh CFO Corporate/Global Operations
Matt Cribbins VP, Investor Communications
Chris Drumgoole CFO, IT
Ann Klee VP, Global Operations, Environment, Health & Safety
Michelle May Director, Culture Communications
Chris Pereira Chief, Securities & Finance Counsel
Sarah Wills Executive Director, Strategy
We would also request bios be provided for all those who will attend from your side.
The meeting will be held at our GE Guest House, Conference Room “B”, and upon going through
Security and obtaining badges you will be directed to Guest House parking.
If there are any changes, please be sure that you provide to me the names of EVERYONE who will
attend the meeting as I need to clear each individual through GE Security. Please confirm whether
the Governor will attend and, if so, whether you will be sending a security detail in advance of the
visit. We are a secure facility, however, we do understand that you may want to do this.
Don’t hesitate to contact me with any questions.
Have a good weekend,
Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
O:
C:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 317/975
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 318/975
Matthew G. Cribbins
Vice President
Corporate Investor Communications
Matthew Cribbins has been the vice president of Corporate Investor Communications since January
2014.
Cribbins is a 1998 graduate of GE Capital's Financial Management Program, where he rotated
through multiple finance assignments in GE Capital and GE Company. He spent six years on GE's
Corporate Audit Staff (CAS), becoming an executive audit manager for Commercial Finance. In
2003, he was named chief financial officer (CFO) for GE Energy Financial Services. He was
promoted to CFO, GE Commercial Finance Asia in 2006, based in Tokyo, Japan. In 2008, he became
the CFO of GE Capital Asia. In 2009, he was named the vice president of Financial Planning and
Analysis for GE Capital. Prior to his current role, Cribbins was the vice president of Audit Staff since
January 2011.
Cribbins is a graduate of Holy Cross College with a B.A. in Economics and resides in New Canaan,
CT.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 319/975
Laurie F. Bevier
Senior Human Resources Leader
GE Corporate
Fairfield, CT
Laurie Bevier is Senior Human Resource Manager for GE Corporate. In this role, she is responsible for developing the
company’s global talent pipeline, functional learning programs, and corporate HR strategy. She also leads the company’s
global leadership development programs.
Prior to her current role, Laurie served as the Organization and Talent Development Leader for GE’s Global Growth and
Operations organization, responsible for developing the global talent pipeline from entry level to executive leadership in
key growth markets. She is also the founder and Senior HR Sponsor for GE’s Corporate Leadership Staff program (CLS),
GE’s premier, leadership acceleration program focused on developing business leadership capabilities and industry
domain expertise for the next generation of GE’s global business leaders. In November of 2012, Laurie’s role expanded
to include responsibility for all global leadership programs across GE.
Laurie began her career with GE Energy in 1992 on GE’s Human Resources Leadership Program (HRLP) with her firstassignment off the program as a Plant HR Generalist. She then became the HR Manger for GE Healthcare Latin America
team. In 1998, Laurie was promoted to Director of HR Development for GE Capital, responsible for building the
functional pipeline and leading organization and staffing activities across the business for GE Capital. In 2002, she was
named as a leader in GE’s Corporate Executive Development team working on executive slates and development
programs across the company, including the creation of GE’s Growth Traits and Employee Engagement initiative. She
became the HR Leader for GE Sensing in May 2005, and assumed additional HR responsibilities for Inspection
Technologies in April 2006 following the merger of these two businesses. Most recently, Laurie served as senior HR
leader for GE Security until the business disposition in March 2010.
Laurie holds a bachelor’s degree in Public Policy Studies from Duke University and a master’s degree in Management
from the Kellogg School at Northwestern University. She and her husband have two children.
T:E:W: www.ge.com
3135 Easton Turnpike
Fairfield, CT, 06828, USA
General Electric Company
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 320/975
Christoph A. PereiraChief Corporate, Securities & Finance CounselGeneral Electric Company
Mr. Pereira serves as General Electric Company's Chief Corporate, Securities & Finance Counsel. Heoversees all legal matters for GE and its businesses relating to global securities law, corporategovernance, corporate finance and corporate law. Mr. Pereira joined GE in March of 2007.
From 2004 to 2007, Mr. Pereira served as Vice President of Legal Affairs & Secretary of Exelixis, aNASDAQ-listed biotechnology company based in South San Francisco. He reported to the CEOand was a member of the Company’s executive management committee with responsibility for a wide range of general counsel duties.
Before joining Exelixis, Mr. Pereira practiced law at Sullivan & Cromwell’s New York and Silicon Valley offices from 1998 to 2004. He specialized in mergers and acquisitions, securities law and privateequity.
From 1995 to 1997, Mr. Pereira clerked at the Federal Courts in Austria.
Mr. Pereira received his law degrees from the University of Chicago Law School and the University ofVienna Law School, and is a CFA charterholder.
Mr. Pereira is a frequent speaker on securities, finance and board related matters. He serves on the
NYSE Governance Council, the Securities Regulation Committee of the New York City Bar Association
and the Executive Committee of the Shareholder Relations Society of New York.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 321/975
EILEEN M. CAVANAUGH
"EILEEN"
CFO – Corporate /Global Operations
GE CorporateFairfield, CT
Eileen was born in Long Island, New York. She attended Fairfield University
and graduated with a B.A. Degree in Economics and Political Science in
1989. After graduation Eileen joined General Electric's Financial
Management Program at Electrical Distribution & Control and had
assignments in Plainville and Puerto Rico. After FMP Eileen held several
finance positions in Puerto Rico, London and Plainville. In 1994 Eileen
joined GE Power Systems in Schenectady, NY as a Program Manager for
Sourcing Finance. In late 1995 Eileen joined Corporate Treasury in Fairfield
as a Project Manager and Analyst. In 1997 Eileen joined Corporate
Financial Planning & Analysis as an Analyst. In 1998 she was appointed
Manager of Financial Planning & Analysis for GE Supply. In 2000 Eileen
rejoined Corporate FP&A as the Senior Income Analyst for Total Company.
In 2004 Eileen was promoted to Manager – Corporate Operations &
Controllership. Eileen and her team support the Corporate Functions and
over 50 residual entities. In 2014 Eileen was named CFO – Corporate and
Global Operations, expanding her responsibilities to include the Global Ops
business. Eileen is a graduate of GE’s Experienced Financial Leadership
Program and has an MBA in International Business from RPI.
Eileen is married to Peter and they have four children – a sixteen year old
son, fourteen year old twin daughters and an eight year old boy. She
enjoys spending her time with her family, friends and traveling.
3135 Easton Turnpike W3E
Fairfield, CT 06431
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 322/975
Michelle MayDirector, Culture CommunicationsGE
Michelle May is the director of culture communications for GE. In this role, she isresponsible for strengthening GE’s culture by engaging employees and leaders aroundGE’s strategy helping them to think and act in new ways, pushing our boundaries to createa simpler, faster GE for our customers, employees and shareholders. Michelle is focusedon creating 360-degree communications programs working together with business,function and region communicators to deliver better outcomes for our customers. Sheleads communications for the Communications & Commercial function and participates in
the Commercial Council supporting its initiatives and best practice sharing. In addition, sheworks with commercial leaders and business communications teams to create a consistentand compelling narrative across GE.
Michelle joined GE in 1995 as communications/health care manager for GE Motors &Industrial Systems after working for a health care system leading public relations,community relations, sales and physician recruiting. She has held a variety ofcommunications, public relations and marketing communications roles across thecompany in several industrial and consumer businesses. In 2007, Michelle was namedcommunications leader for Enterprise Solutions. In December 2009, she transitioned toleading executive communications and public relations for GE Home & BusinessSolutions, IT, GE Advantage, Licensing and Corporate Leadership Staff. In February 2013,
she took on the role of commercial communications for GE Corporate and her roleexpanded in August 2013 to include employee communications for GE.
Michelle received her bachelor of science in business from Indiana University and amaster’s degree in business administration from Krannert School of Management atPurdue University.
Michelle is married and has two children.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 323/975
Sarah is General Manager, Strategy and Growth, GE Corporate HQ.
In this role, Sarah drives change to fortify the company’s overall competitive advantage
in the marketplace, including identifying disruptive trends, technologies and market
themes, and leading execution of strategic priorities. Sarah also develops and manageskey strategic relationships for GE’s market development. In addition, Sarah leads
FastWorks, GE’s tools, principles and platform for delivering speed and customer
intensity.
Prior to this role, Sarah was Executive Counsel in the Chairman’s Office. Sarah joined GE
in 2007.
Before joining GE, Sarah was Executive Director of a non-profit organization founded by
then-Senator Hillary Rodham Clinton. The organization was dedicated to developing
entrepreneurs and start-ups in emerging technologies. Sarah started her career as apolicy advisor in the U.S. Senate in Washington DC.
Sarah is a graduate of Georgetown University Law Center and Illinois Wesleyan
University. She lives in Ridgefield, CT with her husband and twin sons.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 324/975
Chris DrumgooleChief Operating Officer
Chris Drumgoole is GE’s Chief Operating Officer – IT. In this role, he leads the company’s IT Infrastructure
teams globally, responsible for the successful operation of the IT systems supporting all of GE’s business
units around the world. Additionally he leads GE’s enterprise and industrial cloud strategy, including the
company’s provider and application transition to the cloud as well as the company’s infrastructure
supporting the Industrial Internet and Internet of Things.
Chris has a proven reputation for transforming enterprise IT infrastructure, operating models and
services delivery frameworks.
He joined GE from Verizon Terremark, where he served as Chief Operating Officer and Senior Vice
President of Global Operations with responsibilities including data center commissioning and operations,
service delivery, product development, as well as cloud computing operations across the enterprise. He
also has over 15 years of technology and financial services experience, including design and
architecture work for large retail trading platforms, high-traffic consumer Web properties, and
computing/storage grids, having held leadership and technologist positions with the Toronto Dominion
Bank, IBM, MasterCard International, Cable & Wireless, and Exodus/Savvis. Chris studied Information
Systems at Pace University in New York. He and his family currently reside in Connecticut.
About IT at GE
IT is being reimagined around us and forward thinking companies like General Electric (NYSE: GE) are
leaning in. As IT takes an ever greater role in the world, we’re finding ourselves at the center of the show,
not just in computing and communication; but manufacturing, finance, transportation and more. We’re
no longer here to support the strategy of our businesses; today, IT is a catalyst for shaping that strategy.
At GE, our IT team are the integrators of innovation, process and technology and will redefine the way
business is done.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 325/975
Ann R. Klee
VP Global Operations - Environment, Health & Safety GE, Fairfield, CT
Ann Klee is the Vice President, Global Operations – Environment, Health &Safety at GE.
Prior to joining GE, Ann was a partner and co-chair of the Environmentaland Natural Resources Group of Crowell & Moring LLP. Ann served as theGeneral Counsel of the U.S. Environmental Protection Agency (2004-2006)and Counselor and Special Assistant to the Secretary of the U.S.
Department of the Interior (2001 to 2004). She also spent time on CapitolHill as Chief Counsel to the Senate Committee on Environment and PublicWorks.
She has served on the Board of Trustees of the National Park Foundation,Center for Climate and Energy Strategies, and the Environmental LawInstitute.
Ann received her J.D. from the University of Pennsylvania, and her B.A.with High Honors from Swarthmore College.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 326/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 327/975
From: Klee, Ann (GE, Corporate)
Subject: Project Plum Follow up
Date: Friday, August 14, 2015 1:06:14 PM
Jay,
I tried to reach you earlier by phone to follow up on our meeting in Fairfield. Would you give me a
call at your convenience on my cell – . More details to follow, but we would like to
proceed to next phase with you and the MA team, including site visits to Boston and the area of
South of Boston that we discussed.
Thanks.
ark
Ann R. Klee
Vice PresidentGlobal Operations – Environment, Health & Safety
GE
3135 Easton Turnpike
Fairfield, CT 06824
(o)
(m)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 328/975
From: Klee, Ann (GE, Corporate)
Subject: Project Plum
Date: Thursday, July 23, 2015 9:56:27 AM
Attachments: CONFIDENTIALITY AGREEMENT(participant).docx
Jay,
A couple of items as we prepare for our meeting next week.
First, if you’re planning to include non-government people (e.g., business leaders) with you next
week to help present for Massachusetts, please make sure that they have signed an NDA. I am
attaching a version that is tailored for non-government individuals. Thanks.
Also please let me know if you have any special AV or IT needs for your presentation.
Finally, we are planning to provide beverages and light refreshments for you and members of your
delegation. We are sensitive that some states have strict policies that govern the provision of food and beverage to government officials, so please let us know how we can best accommodate you.
Thanks again for your attention to the NDA. Please let me know if you have any questions.
Look forward to seeing you next week.
ark
Ann R. Klee
Vice President
Global Operations – Environment, Health & Safety
GE
3135 Easton Turnpike
Fairfield, CT 06824
(o)
(m)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 329/975
CONFIDENTIALITY AGREEMENT
This Confidentiality Agreement (this “Agreement”) is entered into this ___ day of
_________, 20___, by Participant ____________, (the “Participant”) for the benefit of Project
Plum, with General Electric Company a New York corporation (the “Company”).
RECITALS
WHEREAS, the Participant has been requested to participate in a confidential exchange ofinformation of a non-public nature between [the State], the Company and the Participant and its
agents, employees and representatives in connection with discussions regarding the potential
location of Company’s international headquarters ( the “Project”); and
WHEREAS, in the course of its discussions with the Company relating to the Project, the
Participant may receive certain private and confidential proprietary information provided for
discussion concerning the Project from or about the Company, including but not limited toinvestment information, project plans and requirements, technical and business information
regarding business operations and affairs, financial data, sales and marketing information,
specifications, drawings, sketches, data, documentation, correspondence or any other private or proprietary ideas or information (“Confidential Information”); and
WHEREAS, the Participant has reviewed and acknowledges the Confidentiality Agreement previously entered into between [the State] and the Company and understands that parties desire
to establish additional terms governing the disclosures of Confidential Information that will be
made by the Company to the Participant;
NOW, THEREFORE, in consideration of the covenants set forth herein and other good and
valuable consideration, the receipt and sufficiency of which are hereby acknowledged, andintending to be legally bound, the parties agree as follows:
The Participant shall, with respect to any Confidential Information (a) hold the Confidential
Information in strict confidence using at least the same care and caution it affords its ownconfidential information, but in no case less than a reasonable degree of care; (b) take any and all
steps which may be necessary and reasonable to protect the Confidential Information; (c) use the
Confidential Information only in connection with the Project; (d) reproduce the ConfidentialInformation only to the extent necessary in connection with the Project. The obligations of the
Participant to maintain the confidentiality of the Confidential Information it has received under
this Agreement shall continue for a period of three (3) years from the date of receipt of suchConfidential Information.
The Participant hereby acknowledges and agrees that (a) the term “Confidential Information” as
used herein also includes: (i) the fact that the Confidential Information has been made availableto the Participant; (ii) the fact that the Participant is discussing the Project with the Company;
and (iii) any of the terms, conditions or other facts with respect to the Project or other related
transactions, including the status thereof; and (b) any Confidential Information supplied by the
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 330/975
Company prior to the execution of this Agreement shall be subject to the same treatment as the
Confidential Information made available after the execution of this Agreement.
The obligations with respect to the Confidential Information under this Agreement shall not
apply to any Confidential Information which the Participant can show, by written evidence (a) isin the public domain (provided that such information has not or does not come into the public
domain as the result of a disclosure by the Participant); (b) is received by the Participant on a
non-confidential basis from a source other than the Company (provided that such source is not
bound by a confidentiality agreement with the Company or another party).
The Participant shall not issue any press release or otherwise make any public announcement or
Participant with respect to the transactions contemplated in connection with the Project withoutthe prior written consent of the Company.
The disclosure of Confidential Information shall not be construed to grant to the Participant any
license, ownership or other proprietary interest in the Confidential Information. The Participantagrees that it does not acquire any title, ownership, or other intellectual property right or license
in or to the Confidential Information by virtue of such disclosure, and all Confidential
Information (including tangible copies and computerized or electronic versions and summariesthereof) shall remain the property of the Company.
Within ten (10) days following the receipt of a written request, the Participant shall deliver to theCompany all tangible materials containing or embodying the Confidential Information received
from the Company along with any copies, reproductions, and summaries thereof, together with a
certificate executed by the Participant certifying that all such materials in the Participant’s possession have been delivered to the Company. That portion of the Confidential Information
which has been incorporated into analyses, compilations, comparisons, studies or other
documents prepared by the Participant or its Representatives shall be held by the Participant andkept confidential as provided in this Agreement and shall not be used for any reason other than in
connection with the Project or shall be destroyed.
In the event any legal action is required to enforce this Agreement, each party shall bear itsrepresentative attorney’s fees and costs.
The Participant agrees that its obligations hereunder are necessary and reasonable to protect theCompany and expressly agrees that monetary damages might be inadequate to compensate the
Company for any breach of any covenant or agreement set forth herein. The Participant agrees
and acknowledges that any such violation or threatened violation may cause irreparable injury tothe Company and that, if deemed appropriate by the court presiding over the matter, the
Company (in addition to any other rights and remedies that may be available at law or in equity)
may be entitled to seek injunctive relief against the threatened breach of this Agreement or the
continuation of any such breach.
This Agreement shall be governed and interpreted under the laws of the Participant of New
York, without regard to its choice of law provisions.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 331/975
Neither party shall assign this Agreement without the prior written approval of the other party.
This Agreement constitutes the entire understanding between the parties hereto as to Confidential
Information and merges all prior discussions between them relating thereto. No amendment or
modification of this Agreement shall be valid or binding on the parties unless made in writingand signed on behalf of each of the parties by their respective duly authorized officers or
representatives.
This Agreement may be executed by facsimile signature in any number of counterparts, all ofwhich taken together shall constitute one in the same instrument.
No failure or delay by either party in exercising any right, power or privilege hereunder shalloperate as a waiver thereof, nor shall any single or partial exercise thereof preclude any other or
further exercise thereof or the exercise of any other right, power or privilege hereunder.
IN WITNESS WHEREOF, the parties have executed and delivered this ConfidentialityAgreement effective as of the date first written above.
______________ General Electric Company
By: _________________________________ By: _________________________________
Name: Name: Ann R. KleeTitle: Title: Vice President, Global Operations –
Environment, Health and Safety
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 332/975
From: Klee, Ann (GE, Corporate)
Cc: Meyers, Steven (GE, Corporate)
Subject: Project Plum
Date: Monday, July 06, 2015 7:54:40 PM
Attachments: image001.pngProject Plum NDA -- July 2015.docx
Jay,
Following up on our conversation, we would like to invite the Commonwealth of Massachusetts to
come to Fairfield, CT at end of July to engage in a discussion about the potential relocation of the GE
headquarters to the Boston area. As we discussed, I appreciate your including a representative
from the City on your team.
This is a significant decision for GE. While we want to move expeditiously, we also want to be
thoughtful in our process and are considering a number of factors including business and political
climate, impact on our employees, financial incentives, recruitment, quality of life and several other
issues of importance.
Our exploratory team has done some initial due diligence/screening. We are now in our second
phase where we are inviting a small group of States to come in and engage in a more detailed
discussion.
We will be scheduling those discussions for July 28-30 and later this week will send you a list of
issues/questions that we would like you to address, but also want you to feel free to present
whatever information that you think would be relevant to our decision. The meeting will be set for
2 hours. The members of the GE exploratory team will participate in the meeting.
It is very important to us that these discussions, and even the fact that we are engaged in discussions
with New York remain confidential. As is customary, we will ask that you sign an NDA which is
attached. Steve Meyers on our team will be available to discuss any questions related to the NDA.
He can be reached at .
I will be your GE point of contact on the exploratory team. My contact information is ,
. I will send the template of issues that we would like you to address within the
next day and am also available any time to answer any questions you may have. Additionally, Karen
Kulish will be reaching out to schedule the meeting and will assist with logistics. Karen’s contact info
is, . If you would give me your scheduler’s contact
information, Karen can reach out and work through the details.
We appreciate Governor Baker’s interest in having GE relocate to Massachusetts and look forward to
our meeting at the end of July.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 333/975
Ann R. Klee
Vice President
Global Operations – Environment, Health & Safety
GE3135 Easton Turnpike
Fairfield, CT 06824
(o)
(m)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 334/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 335/975
CONFIDENTIALITY AGREEMENT
This Confidentiality Agreement (this “Agreement”) is entered into this ___ day of
_________, 20___, by the State of ____________, (the “State”) for the benefit of Project Plum,
with General Electric Company a New York corporation (the “Company”).
RECITALS
WHEREAS, the State may receive from the Company information of a non-public nature for use by the State and its agents, employees and representatives (collectively, “Representatives”) in
connection with discussions regarding the potential location of Company’s international
headquarters in the State (the “Project”); and
WHEREAS, in the course of its discussions with the Company relating to the Project, the State
may receive certain private and confidential proprietary information provided for discussion
concerning the Project from or about the Company, including but not limited to investmentinformation, project plans and requirements, technical and business information regarding
business operations and affairs, financial data, sales and marketing information, specifications,
drawings, sketches, data, documentation, correspondence or any other private or proprietary ideasor information (“Confidential Information”); and
WHEREAS, the parties desire to establish terms governing the disclosures of ConfidentialInformation that will be made by the Company to the State;
NOW, THEREFORE, in consideration of the covenants set forth herein and other good andvaluable consideration, the receipt and sufficiency of which are hereby acknowledged, and
intending to be legally bound, the parties agree as follows:
The State shall, with respect to any Confidential Information (a) hold the Confidential Information
in strict confidence using at least the same care and caution it affords its own confidential
information, but in no case less than a reasonable degree of care; (b) take any and all steps which
may be necessary and reasonable to protect the Confidential Information; (c) use the ConfidentialInformation only in connection with the Project; (d) reproduce the Confidential Information only
to the extent necessary in connection with the Project; and (e) restrict disclosure of the
Confidential Information only to Representatives whose duties justify the need to know theConfidential Information in connection with the Project and who are advised as to the confidential
and proprietary nature of the Confidential Information and are required to comply with the
provisions of this Agreement. The obligations of the State to maintain the confidentiality of theConfidential Information it has received under this Agreement shall continue for a period of three
(3) years from the date of receipt of such Confidential Information.
The State hereby acknowledges and agrees that (a) the term “Confidential Information” as usedherein also includes: (i) the fact that the Confidential Information has been made available to the
State; (ii) the fact that the State is discussing the Project with the Company; and (iii) any of the
terms, conditions or other facts with respect to the Project or other related transactions, including
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 336/975
the status thereof; and (b) any Confidential Information supplied by the Company prior to the
execution of this Agreement shall be subject to the same treatment as the Confidential Information
made available after the execution of this Agreement.
The State agrees to exempt from disclosure Confidential Information to the extent authorized by
applicable law, including state and federal Freedom of Information Acts, Open Door Law, PublicRecords Law and other related local, state, and federal laws and ordinances that may be applicable.
The obligations with respect to the Confidential Information under this Agreement shall not apply
to any Confidential Information which the State can show, by written evidence (a) is in the publicdomain (provided that such information has not or does not come into the public domain as the
result of a disclosure by the State); (b) is received by the State on a non-confidential basis from a
source other than the Company (provided that such source is not bound by a confidentialityagreement with the Company or another party); or (c) is required to be disclosed by operation of
law, including but not limited to pursuant to the State and Federal Freedom of Information Acts
(provided that, promptly following receipt of a legal request and prior to making such disclosure,
the State has notified the Company of such request so that the Company may take action tosafeguard its interests, and the State shall cooperate with the Company in seeking to preserve the
confidentiality of the Confidential Information).
The State shall not issue any press release or otherwise make any public announcement or
statement with respect to the transactions contemplated in connection with the Project without the
prior written consent of the Company.
The disclosure of Confidential Information shall not be construed to grant to the State any license,
ownership or other proprietary interest in the Confidential Information. The State agrees that itdoes not acquire any title, ownership, or other intellectual property right or license in or to the
Confidential Information by virtue of such disclosure, and all Confidential Information (including
tangible copies and computerized or electronic versions and summaries thereof) shall remain the property of the Company.
Within ten (10) days following the receipt of a written request, the State shall deliver to the
Company all tangible materials containing or embodying the Confidential Information receivedfrom the Company along with any copies, reproductions, and summaries thereof, together with a
certificate executed by the State certifying that all such materials in the State’s possession have
been delivered to the Company. That portion of the Confidential Information which has beenincorporated into analyses, compilations, comparisons, studies or other documents prepared by the
State or its Representatives shall be held by the State and kept confidential as provided in this
Agreement and shall not be used for any reason other than in connection with the Project or shall be destroyed.
In the event any legal action is required to enforce this Agreement, each party shall bear its
representative attorney’s fees and costs.
The State agrees that its obligations hereunder are necessary and reasonable to protect the
Company and expressly agrees that monetary damages might be inadequate to compensate the
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 337/975
Company for any breach of any covenant or agreement set forth herein. The State agrees and
acknowledges that any such violation or threatened violation may cause irreparable injury to the
Company and that, if deemed appropriate by the court presiding over the matter, the Company (inaddition to any other rights and remedies that may be available at law or in equity) may be entitled
to seek injunctive relief against the threatened breach of this Agreement or the continuation of any
such breach.
This Agreement shall be governed and interpreted under the laws of the State of New York,
without regard to its choice of law provisions.
Neither party shall assign this Agreement without the prior written approval of the other party.
This Agreement constitutes the entire understanding between the parties hereto as to ConfidentialInformation and merges all prior discussions between them relating thereto. No amendment or
modification of this Agreement shall be valid or binding on the parties unless made in writing and
signed on behalf of each of the parties by their respective duly authorized officers or
representatives.
This Agreement may be executed by facsimile signature in any number of counterparts, all of
which taken together shall constitute one in the same instrument.
No failure or delay by either party in exercising any right, power or privilege hereunder shall
operate as a waiver thereof, nor shall any single or partial exercise thereof preclude any other orfurther exercise thereof or the exercise of any other right, power or privilege hereunder.
IN WITNESS WHEREOF, the parties have executed and delivered this ConfidentialityAgreement effective as of the date first written above.
State of ______________ General Electric Company
By: _________________________________ By: _________________________________
Name: Name: Ann R. Klee
Title: Title: Vice President, Global Operations –Environment, Health and Safety
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 338/975
From: Kulish, Karen (GE, Corporate)
To: Kennealy, Michael (EOHED)
Subject: Project Plum: MA Thank you
Date: Thursday, August 06, 2015 4:12:29 PM
Attachments: Scanned from a Xerox Multifunction Printer.pdf
Mike,
Please find attached a thank you letter from Ann Klee to the team. Thank
you for your assistance in forwarding to the others.
Karen Kulish
Executive Assistant to Ann Klee
Global Operations - Environment, Health & Safety
O:
C:
General Electric Company
3135 Easton TurnpikeFairfield, CT 06828
GE Imagination at Work
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 339/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 340/975
From: Kennealy, Michael (EOHED)
To: Povich, Lon (GOV)
Cc: Kadish, Steven (GOV)
Subject: RE:
Date: Sunday, November 29, 2015 4:59:34 PM
Thanks Lon - I am confirming required timing and deliverables with Plum advisors and awaiting something more definitive on EDIP.
From: Povich, Lon (GOV)Sent: Sunday, November 29, 2015 4:41 PMTo: Kennealy, Michael (EOHED)Cc: Kadish, Steven (GOV)Subject:
Mike,
I'll keep you in the loop on everything I get. I assume that you have the pen on this, but am happy to help as I can.
Lon
P.S. My state iPhone is dead, so if you need me ASAP, call . Thanks.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 341/975
From: Kennealy, Michael (EOHED)
To: John Barros
Cc: Cosco, Jonathan (EOHED); Milano, Peter (MOBD)
Subject: RE: 4pm call today
Date: Friday, November 27, 2015 7:52:03 PM
I think that's right John - had a few other things to discuss with you,
but from Peter and Jon we really need help on #1 and #2 - can you guys
help?
________________________________________
From: John Barros [[email protected]]
Sent: Friday, November 27, 2015 5:00 PM
To: Kennealy, Michael (EOHED)
Cc: Cosco, Jonathan (EOHED); Milano, Peter (MOBD)
Subject: Re: 4pm call today
Mike,
1. Send the statutory wording the gives the administration thediscretion and authority to apply the $9,600 rate per job used to
calculate the $48M for EDIP
2. Send the minutes (pubic record) on vote for the IBM $5k and the
Liberty Mutual $3.7k per job decision if possible.
3. They would like the tax credit to be 100% refundable
4. An MOU would need to be written in regards to an application being
filed after an announcement
5. We need to give them what we have by Monday at 12pm.
On Fri, Nov 27, 2015 at 3:41 PM, Kennealy, Michael (EOHED)
<[email protected]> wrote:> No. Want to discuss/introduce EDIP and MassWorks, hear their questions,
and then prepare something. We should talk about actual deliverable and
timing after this call.
>
> Mike Kennealy
>
>> On Nov 27, 2015, at 3:23 PM, John Barros <[email protected]>
wrote:
>>
>> Do we have any calculations or schedules we would like to share with
>> them before the call?
>>
>>
>>
>>> On Fri, Nov 27, 2015 at 3:22 PM, John Barros <[email protected]>
wrote:
>>> Not sure what Scott's title is.
>>> I'lll ask we all do intros on the Call.
>>>
>>>
>>> On Fri, Nov 27, 2015 at 2:18 PM, Kennealy, Michael (EOHED)
>>> <[email protected]> wrote:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 342/975
>>>> Ok thanks. Who is Scott?
>>>>
>>>> Mike Kennealy
>>>>
>>>>> On Nov 27, 2015, at 1:06 PM, John Barros <[email protected]>
wrote:
>>>>>
>>>>> We will use the ML Strategies Conference Call Line
>>>>>>>>>> ; passcode
>>>>>
>>>>> I believe the following individuals will be on the call:
>>>>>
>>>>> Mo Cowan, ML Strategies
>>>>> Scott Roberti, GE
>>>>> Amy Eisenstadt, GE State Tax Counsel
>>>>>
>>>>>
>>>>> On Fri, Nov 27, 2015 at 12:34 PM, Kennealy, Michael (EOHED)
>>>>> <[email protected]> wrote:
>>>>>> John can you send us info for 4pm call? Jon and Peter please join
if you can - I'll send some thoughts before. John who will be on?
>>>>>>
>>>>>> Mike Kennealy
>>>>>
>>>>>
>>>>>
>>>>> --
>>>>> John Barros
>>>>> Chief of Economic Development
>>>>> Office of Mayor Martin J. Walsh
>>>>> 6th Floor, Room 603
>>>>> Boston City Hall, Boston MA 02201
>>>>> t: 617-635-5729>>>>> http://www.cityofboston.gov
>>>>>
>>>>> SHARE YOUR VISION. SHAPE OUR CITY.
>>>>> http://imagine.boston.gov/
>>>
>>>
>>>
>>> --
>>> John Barros
>>> Chief of Economic Development
>>> Office of Mayor Martin J. Walsh
>>> 6th Floor, Room 603
>>> Boston City Hall, Boston MA 02201>>> t: 617-635-5729
>>> http://www.cityofboston.gov
>>>
>>> SHARE YOUR VISION. SHAPE OUR CITY.
>>> http://imagine.boston.gov/
>>
>>
>>
>> --
>> John Barros
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 343/975
>> Chief of Economic Development
>> Office of Mayor Martin J. Walsh
>> 6th Floor, Room 603
>> Boston City Hall, Boston MA 02201
>> t: 617-635-5729
>> http://www.cityofboston.gov
>>
>> SHARE YOUR VISION. SHAPE OUR CITY.
>> http://imagine.boston.gov/
--
John Barros
Chief of Economic Development
Office of Mayor Martin J. Walsh
6th Floor, Room 603
Boston City Hall, Boston MA 02201
t: 617-635-5729
http://www.cityofboston.gov
SHARE YOUR VISION. SHAPE OUR CITY.
http://imagine.boston.gov/
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 344/975
From: [email protected]
To: John Barros
Subject: Re: 4pm call today
Date: Saturday, November 28, 2015 10:42:52 AM
I would reach out to him but don't have contact info.
Mike Kennealy
> On Nov 28, 2015, at 9:53 AM, Kennealy, Michael (EOHED)
<[email protected]> wrote:
>
> Any time is good for me - do you want to email Mo and copy me and see
what works for him? Then you and I can talk before.
>
> Mike Kennealy
>
>> On Nov 28, 2015, at 9:49 AM, John Barros <[email protected]>
wrote:
>>>> Mike, I'm available today until 12pm. I can reach out to Mo is you can
>> talk during that time.
>>
>> Sent from my iPhone
>>
>>> On Nov 28, 2015, at 6:32 AM, Kennealy, Michael (SEA)
<[email protected]> wrote:
>>>
>>> John, when can you talk today? And we can discuss but I think you and
I should do a call with Mo today to talk process generally, particularly
around site visits next week.
>>>
>>> ________________________________________ >>> From: John Barros [[email protected]]
>>> Sent: Friday, November 27, 2015 5:00 PM
>>> To: Kennealy, Michael (EOHED)
>>> Cc: Cosco, Jonathan (EOHED); Milano, Peter (MOBD)
>>> Subject: Re: 4pm call today
>>>
>>> Mike,
>>>
>>> 1. Send the statutory wording the gives the administration the
>>> discretion and authority to apply the $9,600 rate per job used to
>>> calculate the $48M for EDIP
>>> 2. Send the minutes (pubic record) on vote for the IBM $5k and the
>>> Liberty Mutual $3.7k per job decision if possible.
>>> 3. They would like the tax credit to be 100% refundable
>>> 4. An MOU would need to be written in regards to an application being
>>> filed after an announcement
>>> 5. We need to give them what we have by Monday at 12pm.
>>>
>>>
>>>
>>> On Fri, Nov 27, 2015 at 3:41 PM, Kennealy, Michael (EOHED)
>>> <[email protected]> wrote:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 345/975
>>>> No. Want to discuss/introduce EDIP and MassWorks, hear their
questions, and then prepare something. We should talk about actual
deliverable and timing after this call.
>>>>
>>>> Mike Kennealy
>>>>
>>>>> On Nov 27, 2015, at 3:23 PM, John Barros <[email protected]>
wrote:
>>>>>>>>>> Do we have any calculations or schedules we would like to share with
>>>>> them before the call?
>>>>>
>>>>>
>>>>>
>>>>>> On Fri, Nov 27, 2015 at 3:22 PM, John Barros
<[email protected]> wrote:
>>>>>> Not sure what Scott's title is.
>>>>>> I'lll ask we all do intros on the Call.
>>>>>>
>>>>>>
>>>>>> On Fri, Nov 27, 2015 at 2:18 PM, Kennealy, Michael (EOHED)
>>>>>> <[email protected]> wrote:
>>>>>>> Ok thanks. Who is Scott?
>>>>>>>
>>>>>>> Mike Kennealy
>>>>>>>
>>>>>>>> On Nov 27, 2015, at 1:06 PM, John Barros <[email protected]>
wrote:
>>>>>>>>
>>>>>>>> We will use the ML Strategies Conference Call Line
>>>>>>>>
>>>>>>>> ; passcode
>>>>>>>>
>>>>>>>> I believe the following individuals will be on the call:>>>>>>>>
>>>>>>>> Mo Cowan, ML Strategies
>>>>>>>> Scott Roberti, GE
>>>>>>>> Amy Eisenstadt, GE State Tax Counsel
>>>>>>>>
>>>>>>>>
>>>>>>>> On Fri, Nov 27, 2015 at 12:34 PM, Kennealy, Michael (EOHED)
>>>>>>>> <[email protected]> wrote:
>>>>>>>>> John can you send us info for 4pm call? Jon and Peter please
join if you can - I'll send some thoughts before. John who will be on?
>>>>>>>>>
>>>>>>>>> Mike Kennealy
>>>>>>>>>>>>>>>>
>>>>>>>>
>>>>>>>> --
>>>>>>>> John Barros
>>>>>>>> Chief of Economic Development
>>>>>>>> Office of Mayor Martin J. Walsh
>>>>>>>> 6th Floor, Room 603
>>>>>>>> Boston City Hall, Boston MA 02201
>>>>>>>> t: 617-635-5729
>>>>>>>> http://www.cityofboston.gov
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 346/975
>>>>>>>>
>>>>>>>> SHARE YOUR VISION. SHAPE OUR CITY.
>>>>>>>> http://imagine.boston.gov/
>>>>>>
>>>>>>
>>>>>>
>>>>>> --
>>>>>> John Barros
>>>>>> Chief of Economic Development>>>>>> Office of Mayor Martin J. Walsh
>>>>>> 6th Floor, Room 603
>>>>>> Boston City Hall, Boston MA 02201
>>>>>> t: 617-635-5729
>>>>>> http://www.cityofboston.gov
>>>>>>
>>>>>> SHARE YOUR VISION. SHAPE OUR CITY.
>>>>>> http://imagine.boston.gov/
>>>>>
>>>>>
>>>>>
>>>>> --
>>>>> John Barros
>>>>> Chief of Economic Development
>>>>> Office of Mayor Martin J. Walsh
>>>>> 6th Floor, Room 603
>>>>> Boston City Hall, Boston MA 02201
>>>>> t: 617-635-5729
>>>>> http://www.cityofboston.gov
>>>>>
>>>>> SHARE YOUR VISION. SHAPE OUR CITY.
>>>>> http://imagine.boston.gov/
>>>
>>>
>>>>>> --
>>> John Barros
>>> Chief of Economic Development
>>> Office of Mayor Martin J. Walsh
>>> 6th Floor, Room 603
>>> Boston City Hall, Boston MA 02201
>>> t: 617-635-5729
>>> http://www.cityofboston.gov
>>>
>>> SHARE YOUR VISION. SHAPE OUR CITY.
>>> http://imagine.boston.gov/
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 347/975
From: Beaton, Matthew (EEA)
To: Kadish, Steven (GOV)
Cc: Ash, Jay (EOHED); Povich, Lon (GOV); Buckley, Timothy (GOV); Conroy, Jim (GOV); Mahoney, Elizabeth K. (GOV); Barrera, Joel (GOV)
Subject: Re: Boston Business Journal- GE"s new energy company will create 200 new jobs in Boston
Date: Wednesday, October 07, 2015 3:53:24 PM
And just a point of clarification. I meant considering, not confusing. Even though it is a little confusing!
On Oct 7, 2015, at 3:27 PM, Kadish, Steven (GOV) <[email protected]> wrote:
Yes…in many directions…
From: Beaton, Matthew (EEA)
Sent: Wednesday, October 07, 2015 3:15 PMTo: Ash, Jay (EOHED); Povich, Lon (GOV); Kadish, Steven (GOV)Subject: Fwd: Boston Business Journal- GE's new energy company will create 200 new jobs in Boston
Interesting article confusing everything else that is on the table
Begin forwarded message:
From: "Lorenz, Peter (EEA)" <[email protected]>Date: October 7, 2015 at 2:43:11 PM EDT
To: "Beaton, Matthew (EEA)"
<[email protected]>, "Judson, Judith (ENE)"
Cc: "Gerwatowski, Ron (EEA)"
<[email protected]>, "Sieger, Daniel (EEA)"
<[email protected]>, "Bartlett, Ned (EEA)"
<[email protected]>, "Cahill, Alexandra (EEA)"
<[email protected]>, "Singleton, Stolle (EEA)"
<[email protected]>, "Burgess, Dan (ENE)"
Subject: Boston Business Journal- GE's new energy company will create
200 new jobs in Boston
GE's new energy company will create 200 new jobs in
BostonBoston Business Journal
GOV Email
GOV Email
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 348/975
Connecticut-based GE announced Wednesday that it's spinning out a "first-of-its-kind" energy company that will be headquartered in Greater Boston.
The new energy company, to be called Current, will be headquartered in the Greater Boston area with additional presence in Silicon Valley and will create about 200 new jobs next year.
"Boston was an obvious choice for us for a lot of different reasons," said Deia Campanelli, a spokeswoman for GE (NYSE:GE). "(Boston) is heavily investing in renewable energy, it has great software talent and it gives us close proximity to where many of our customers are in the region."
Current integrates GE's LED, solar, energy storage and electric vehicle businesses with a software that can deliver and identify the most affordable, efficient energy solutions required by customers, according to a release. The technology will help customers save between 10 percent and 20 percent on their energy bills, and help utility partners better manage their distributed load.
Current already has major customers including JPMorgan Chase, Walgreens, Hilton Worldwide and Intel, who are testing the company's software.
The jobs created by Current will be in the areas of software, engineering and product management. Campanelli said plans for the Boston office will be finalized by early 2016. She didn't disclose how many square feet the company would be needing.
Current's CEO will be Maryrose Sylvester , who was formerly president and CEO at GE Lighting, a $3 billion enterprise. She plans to grow Current from annual revenue of $1 billion to a $5 billion business by 2020, according to a release. The company's revenue stream comes from existing products and technologies that it's selling to customers, Campanelli said.
GE has a market capitalization of $278 billion.
Peter S. Lorenz
Communications Director
Executive Office of Energy and Environmental Affairs
100 Cambridge Street, Suite 900, Boston, MA 02114
Office: 617-626-1106 / Mobile: 617-680-6487
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 349/975
From: Kennealy, Michael (EOHED)
To: Kadish, Steven (GOV); Ash, Jay (EOHED); Frazier, Ricks (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Tom Glynn; Morse, Elizabeth; [email protected]; Pollack, Stephanie (DOT); Garrity, Rob (DOT); Povich, Lon (GOV); [email protected]; Daniel Koh; JPranckevicius
Subject: RE: Boston Project 4PM Call
Date: Saturday, December 12, 2015 3:30:01 PM
Attachments: Options Grid 4 vs 2.docxParcel A-2 summary JPD 12-12- 15.doc
A couple of items for the 4pm call today: 1. Options grid drafted by Jay.2. A2 facts drafted by Jim. Speak with you soon.
From: Zarrella, Lily (GOV)Sent: Saturday, December 12, 2015 11:12 AMTo: Kadish, Steven (GOV); Ash, Jay (EOHED); Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Tom Glynn; Morse, Elizabeth; [email protected]; Pollack, Stephanie (DOT); Garrity, Rob (DOT); Povich, Lon (GOV); [email protected]; Daniel KohSubject: Boston Project 4PM Call
Hi all-
I have sent out an invite for a 4pm call. The dial in is PIN Please let me
know if there are any issues!
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 350/975
Option Current
Owner
Future
Owner
Incentives Positive Challenges
Massport
Parcels,
including A-2
Massport Massport,
with
Massport
Board vote
required.
$120m in initial
lease
concessions
(MassWorks),
no board vote
required.
Additional
lease
concessions, to
be negotiated
with Massport,
with a value of
$_____.
Offsitestreetscape
improvements
could be
included in
$25m of
additional
State
infrastructure
funding.
Publicownership
allows for
maximum
State energy
efficiency
grant.
City tax relief
of up to $20m
or more
depending on
size of the
property and
employment
commitments.
Publicly owned
requiring no
special legislation
or successful
private
negotiation.
Permitting is
more straight
forward under
cooperative
relationship with
the city, thus
bringing more
time certainty to
thedevelopment.
Building size and
layout can be
right-sized for
the end tenant.
Experienced
developer who
can fully access
other publicsupports.
Especially A-2
can be developed
with only one
tenant; private
vacant parcels
may require
multi-tenants.
New building will
likely allow for
maximum energy
efficiency
installations.
Surrounding
areas still to be
built out.
Existing
Seaport
Private Private Approximately
$50m (MLSC) –
Already
constructed
Higher overall
cost will result to
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 351/975
Building subject to a
board vote.
Offsite
streetscape
improvements
could be
included in
$25m of
additional
State
infrastructure
funding – with
existing
building the
offsite
improvements
may not be asignificant.
building.
Increased
certainty as to
surrounding
build-out.
the company.
Securing the
transaction –
which may
require a
substantial
premium – will
eat into the value
of the $50m.
No lease
concessions are
available for the
company.
City will have less
flexibility on tax
relief on thelease or purchase
of an existing
building.
Length of
negotiation for
purchase may
eclipse time
savings secured
through an
existing building.
Availability of
space in the
existing building
could delay
occupancy
further.
Building size and
layout may not
be right-sized for
the end tenant,
thereby adding
additional cost
and less
functionality.
Additionally
energy efficiency
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 352/975
benefits may be
harder to
achieve.
Availability of
additional
parking may be
inhibited
depending upon
distance from
Massport garage.
Existing
Seaport
Building
Private Massport,
with
Massport
Board vote
required.
Assumptionhere is that
Massport is
able to
acquire the
property.
$120m in initial
lease
concessions
(MassWorks),
no board vote
required.
Additional
lease
concessions, to
be negotiated
with Massport,
with a value of
$_____.
Offsite
streetscape
improvementscould be
included in
$25m of
additional
State
infrastructure
funding – with
existing
building the
offsite
improvements
may not be a
significant.
Already
constructed
building.
Increased
certainty as to
surroundingbuild-out.
Higher overall
cost will result to
the company.
Securing the
transaction –
which mayrequire a
substantial
premium – will
eat into the value
of the $120m, as
well as the ability
for more
favorable lease
concessions for
the company.
City will have less
flexibility on tax
relief on the
purchase of an
existing building.
Length of
negotiation for
purchase may
eclipse time
savings secured
through
purchasing a
building.
Building size and
layout may not
be right-sized for
the end tenant,
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 353/975
thereby adding
additional cost
and less
functionality.
Availability of
space in the
existing building
once acquired
could delay
occupancy
further.
Additionally
energy efficiency
benefits may be
harder to
achieve.
Availability of
additional
parking may be
inhibited
depending upon
distance from
Massport garage.
Vacant
Parcels
For example,
Parcel N is
owned by WS
Development,
called the
most
expensive
land in the
city, and not
currently
permitted for
office.
Parcel P is
designated to
a private
party from
the BRA, thus
Private Private Approximately
$50m (MLSC) –subject to a
board vote.
Offsite
streetscape
improvements
could be
included in
$25m of
additional
State
infrastructure
funding.
City tax relief
of up to $20m
or more
depending on
size of the
May be able to
select a higherdesired location.
Building size and
layout can be
right-sized for
the end tenant.
Increased
certainty as to
surrounding
build-out.
New building will
likely allow for
maximum energy
efficiency
installations.
Availability of
parcels for sale is very uncertain.
Higher overall
cost will result to
the company.
Securing the
transaction –
which may
require a
substantial
premium – will
eat into the value
of the $120m, as
well as the ability
for more
favorable50m;
lease concessions
forare unlikely
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 354/975
is considered
to be under
private
control, in an
area not
currently
permitted for
office.
property and
employment
commitments.
from the
companyprivate
developer.
Length of
negotiation for
purchase may
result.
Permitting
process will not
be any shorter
and will likely be
longer and less
certain, as city
and state zoning
issues may add
mid to long termdelays in
construction.
(with possibility
that some
restrictions will
not be able to be
overcome).
Parcel will likely
be shared with
other users.
Availability of
additional
parking may be
inhibited
depending upon
distance from
Massport garage.
Vacant
Parcels
For example,
Parcel N is
owned by WS
Development,
called the
most
expensive
land in the
Private Massport,
with
Massport
vote
required.
Assumption
here is that
Massport is
able to buy
the property.
$120m in initial
lease
concessions
(MassWorks),
no board vote
required.
Additional
lease
concessions, to
be negotiated
May be able to
select a higher
desired location.
Building size and
layout can be
right-sized for
the end tenant.
Increased
certainty as to
Availability of
parcels for sale is
very uncertain.
Higher overall
cost will result to
the company.
Securing the
transaction –
which may
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 355/975
city, and not
currently
permitted for
office.
Parcel P is
designated to
a private
party from
the BRA, thus
is considered
to be under
private
control, in an
area not
currently
permitted for
office.
A lease of the
property
would
reduce the
ability for
lease
concessions
to be made.
with Massport,
with a value of
$_____.
Offsite
streetscape
improvements
could be
included in
$25m of
additional
State
infrastructure
funding.
Public
ownership
allows formaximum
State energy
efficiency
grant.
City tax relief
of up to $20m
or more
depending on
size of the
property andemployment
commitments.
surrounding
build-out.
New building will
likely allow for
maximum energy
efficiency
installations.
require a
substantial
premium – will
eat into the value
of the $120m, as
well as the ability
for more
favorable lease
concessions for
the company.
Local and state
land use issues
exist and will add
time and
uncertainty to
the process (with
possibility thatsome restrictions
will not be able
to be overcome)..
Length of
negotiation for
purchase may
result.
Availability of
additionalparking may be
inhibited
depending upon
distance from
Massport garage.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 356/975
TO: Michael Kennealy, Assistant Secretary for Business GrowthExecutive Office of Housing & Economic Development
FROM: James Doolin, Chief Development Officer
SUBJECT: Massport Parcel A-2
DATE: December 12, 2015
Visibility
• Located at the entrance to the Seaport / Innovation District coming from Logan
International Airport and points north.
• Highly visible along the Congress Street corridor coming from downtown Boston.
• Highly visible from the Boston Convention and Exhibition Center.
• Views from the site to Boston Harbor.
Connections
•
Across the street from the World Trade Center MBTA Silver Line Station and Massport’sParking Garage (under design).
• Ability to provide a direct and weather-protected pedestrian connection with Silver Line
Station and Garage.
• Walk along World Trade Center Avenue to Boston Harbor and Seaport World Trade
Center or walk to the Boston Convention and Exhibition Center.
Immediate Neighbors and Amenities
(All within a 5 minute walk on / next to Massport property)
Employers
• Fidelity 2,000 employees on Commonwealth Pier.
• John Hancock 1,500 employees at 601 Congress Street.
• Seaport WTC Campus office tenants include: Cabot Corp., AEW and many others.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 357/975
2
Restaurants (within 5 minute walk)
• Morton’s Steakhouse
• Legal Harborside
• Legal Test Kitchen
•
Del Frisco’s Steakhouse
• 75 on Liberty Wharf
• Aura Restaurant
• M.C. Spiedo’s
• Rosa Mexicana
• Sebastians
• Salvatores
• Temezcal
• Jerry Remy’s Grille
•
No-Name Restaurant
Hotels
• Seaport Hotel – Fidelity Real Estate investment.
• Renaissance Boston Waterfront - Marriott.
• Westin Boston Waterfront.
Residences
•
Waterside Place (Phase 1) 236 luxury apartments; Phase 2 under design.• Park Lane Seaport Apartments 465 luxury apartments.
Public Open Space
• Massport’s Maritime Park on D Street.
• Fidelity’s Podium Park on WTC Avenue and Eastport Park on D Street.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 358/975
From: Kennealy, Michael (EOHED)
To: Frazier, Ricks (EOHED)
Cc: Ash, Jay (EOHED)
Subject: Re: Boston project
Date: Saturday, December 12, 2015 9:14:30 PM
Ricks,
Mike Kennealy
> On Dec 12, 2015, at 5:22 PM, Frazier, Ricks (EOHED) <[email protected]> wrote:
>
>
>
> -----Original Message-----
> From: Ash, Jay (EOHED)> Sent: Saturday, December 12, 2015 7:40 AM
> To: Kennealy, Michael (EOHED); Frazier, Ricks (EOHED)
> Subject: RE: Boston project
>
> Im working on something
> ________________________________________
> From: Kennealy, Michael (EOHED)
> Sent: Saturday, December 12, 2015 7:04 AM
> To: Ash, Jay (EOHED); Frazier, Ricks (EOHED)
> Subject: Fwd: Boston project
>
> Jay, Ricks - apologies if you get this twice; not sure went through first time.
>> Mike Kennealy
>
> Begin forwarded message:
>
> From: Mike Kennealy <[email protected]<mailto:[email protected]>>
> Date: December 12, 2015 at 7:02:27 AM EST
> To: "Kennealy, Michael (EOHED)"
<[email protected]<mailto:[email protected]>>
> Subject: Boston project
>
> Jay, Ricks,
>
> Steve called last night and suggested that some thoughts be sent to the group ahead of the 10am call - Jay did you
say you were working on something or should I send? Mostly tied up before 10am (we're up in Kennebunkport)
but could send something high level. Initial thoughts/questions I had on scenarios below:
>
> 1a - say that we're still good for $120 MM, but very different lease since we had to buy the property?
>
> 1b, 1c - no idea what we could do here. We wouldn't own the building, no capex so no EDIP
>
> 2 - I don't know sites N or P - just texted Barros.
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 359/975
> 2a - Massport acquiring a parcel through a swap shouldn't change our offer at all. Really need Massport to weigh
in on this, and everything else.
>
> 2b-d - EDIP could be used here, 10% of capex. Reminder on Liberty Mutual deal - $353 MM capex, $22.5 MM
EDIP, 600 jobs.
>
> Other thought - MLSC. By statute can only do $25 MM per year in tax credits. Would we say $5-10 MM per
year for 5 years to plug any holes in a new proposal?
>> Question - how would local incentives play in these various scenarios? Asked Barros but I'm sure Ricks will have
a view.
>
> Could always use MassWorks or I-Cubed particularly for garage.
>
> Tools:
> $120 MM in development (note - assuming $120 MM cap and floor on whatever we do) MassWorks/I-Cubed
EDIP MLSC Local Other?
>
> Mike
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 360/975
From: Kadish, Steven (GOV)
To: Goodall, Devon (GOV); Ash, Jay (EOHED); Frazier, Ricks (EOHED); Sullivan, Jennifer F. (ANF); Povich, Lon (GOV); Daniel Koh; John Barros; [email protected]; [email protected]; Tom Glynn; Elizabeth Morse; jdoolin; JPranckevicius
Subject: Re: Call at 4:30pm - Boston Project
Date: Wednesday, December 23, 2015 2:14:45 PM
Boston project
Sent from my iPhone
On Dec 23, 2015, at 11:34 AM, Goodall, Devon (GOV) <[email protected]> wrote:
Mo Cowan’s assistant said that she has the call with GE in his calendar for 4:30pm.
Dial in:
PIN:
Devon Goodall
Office of Governor Charlie Baker
Massachusetts State House – Room 360
O: 617-725-4000
C: 617-483-3399
Email: [email protected]
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 361/975
From: Kennealy, Michael (EOHED)
To: Wehrs, Brianna (GOV); Kadish, Steven (GOV)
Cc: Zarrella, Lily (GOV); Goodall, Devon (GOV); Ash, Jay (EOHED); Lepore, Kristen (ANF); Pollack, Stephanie (DOT); Garrity, Rob (DOT); Povich, Lon (GOV); Elizabeth Morse; Tom Glynn; Buckley, Timothy (GOV); Conroy, Jim (GOV); Polito, Karyn (GOV); Sullivan, Jennifer F. (ANF)
Subject: RE: Call for noon tomorrow/Sunday
Date: Sunday, November 29, 2015 11:33:07 AM
Attachments: Project Plum memo Nov. 29.docxProject Plum - Chart of Second Offer.docx
Attached please find two documents for our call today at 12pm:
- An update memo
- Jay's chart sent on Friday
Looking forward to speaking then.
Mike
________________________________________
From: Wehrs, Brianna (GOV)Sent: Saturday, November 28, 2015 4:45 PM
To: Kadish, Steven (GOV)
Cc: Zarrella, Lily (GOV); Goodall, Devon (GOV); Ash, Jay (EOHED);
Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Pollack, Stephanie
(DOT); Garrity, Rob (DOT); Povich, Lon (GOV); Elizabeth Morse; Tom Glynn;
Buckley, Timothy (GOV); Conroy, Jim (GOV); Polito, Karyn (GOV)
Subject: Re: Call for noon tomorrow/Sunday
I just sent a calendar invite. Please let me know if there's any issues.
Brianna Wehrs
Executive Assistant to Governor Charlie Baker
Office: 617-725-4048Cell: 617-483-3397
> On Nov 28, 2015, at 4:36 PM, Kadish, Steven (GOV)
<[email protected]> wrote:
>
> Brianna, Lily or Devon--please send out a calendar invite for a call at
noon tomorrow/Sunday for the folks copied on this email.
>
> Elizabeth: please invite Jim D if you would like.
>
> If you have questions about the call, please contact Sec Ash, Mike
Kennealy or me.
>
> Thx.
> Steve
>
> Sent from my iPhone
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 362/975
PROJECT PLUM UPDATE MEMO NOVEMBER 29, 2015
The following is a summary of where we are with the various pieces of the package for Project Plum,
with objectives outlined, decisions to be made, and items for consideration. This is essentially an update
to Jay’s chart sent on Friday, which is also attached for reference. One note – for this purpose
“objectives” means business development objectives or, in other words, what we suggest to put forward
to win the deal; obviously there are other considerations, some of which I will outline here and others
that I expect we’ll discuss on the call. The package, as now contemplated, consists of three parts –
incentives, real estate and other items:
I. INCENTIVES
Objective
Deliver to Plum a package of State and City incentives totaling ~$100 MM.
State incentives
We are contemplating use of the Economic Development Incentive Program (EDIP). The deal we
propose is $42 – 54 million over a 5 year period for 400 – 600 jobs. Those jobs equate to an annualpayroll (at salary levels indicated by Plum) of $112 – 144 million. At the mid-point of the range, this is
$48 million for 500 jobs or $96K per job; this is quite high by historical standards but in line with
historical precedent on a pro forma, per $100K jobs, basis.
We also propose to use MassWorks funding of up to $32 MM for site improvements if a public site is
selected.
City incentives
The City has proposed a local property tax abatement of $20 MM over a 20 year period dependent on
600 jobs.
Questions/issues
1. How much of our EDIP award can be refundable? Plum wants 100%, despite having tax liability in
Massachusetts. Under current statute it appears that we can only do $1 MM total of the ~$48 million
that is refundable as a Job Creation Project. HED counsel considering other ways to maximize the
refundable amount.
2. If we are severely limited in our ability to offer refundable credits, do we say that we will attempt to
amend the statute as part of our economic development bill or propose special legislation?
3. How will the Boston incentive scale up or down based on actual job numbers? Boston considering
and will respond.
4. Boston said last night that they may want to include language allowing them to give a lower incentive
if the site ultimately is in the Seaport; I discouraged them from doing this.
5. Plum wants detail on EDIP and MassWorks statutes to confirm that the EACC has the discretion for an
award of this magnitude and on the refundable vs non-refundable buckets – HED pulling this together.
6. Plum is concerned about PR and wants to see examples of what was in the public record for other
deals (application, meeting minutes, press release, etc.) and want to agree on an MOU before any EACC
meeting notice.
7. How will we use MassWorks if a private site is selected? This is difficult, and argues for encouraging
Plum to select a public site such that we can provide more incentive.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 363/975
II. REAL ESTATE
Objective
Deliver to Plum a proposal on publicly-owned sites such that we are increasing the economic value of
our offer and maximizing our ability to use MassWorks funding as part of our package. Plum is clearly
now looking for $100 MM in incentives plus value of real estate. Plum may be visiting sites this week.
We now have good profiles/maps of each site.
Sites
There are currently 5 publicly-owned sites under consideration:
State-owned
Massport sites
MCCA sites
DOT District 6
City-owned
Court Street6 Tide Street
For each site we propose to present:
- Value of site – for Massport and MCCA this would be value of land value per building square foot for a
long term lease; for DOT this would be a market level of rent.
- Discount we propose off of market value (land or rent).
- Resulting economic value to Plum.
We are receiving input on value from:
- BRA
- Massport (their estimate of land value per building square foot is $85 - $90 for Massport sites)- CBRE (advisor to Plum)
Questions/issues
1. Do we have a preference for what site Plum selects?
2. What deal are we willing to propose for each site?
III. OTHER ITEMS
Jay’s chart itemizes the other proposed features of our offer, though a few additions and questions:
1. Re: Boston Home Center, there are a variety of MassHousing programs which we will include forhome purchases outside of Boston.
2. On Jay’s last point #14, environmental clean-up, current thinking is to save this for a later point in the
discussion.
3. Do we mention in our next proposal the $25 million in bond authorized Seaport district
transportation improvements?
4. Are there other items that we can propose?
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 364/975
Program Benefit Assumptions/Comments
City property tax relief Up to $20m at $1m per year (20
year benefit)
Assumes a ___,000 s.f. building
State Investment Tax Credit Up to $48m at $9.6m per year (5
year benefit)
Assumes a payroll of $130m
Massworks Infrastructure Grant Up to $32m in 1 year or split into2 (up to a 2 year benefit) Provides for public infrastructurecosts on a reimbursement basis
State Training Fund $1m – the maximum award –
one time
Routine application process
Permitting Ombudsman No cost to GE Combination of City and State
officials to facilitate permitting
Concierge Services No cost to GE City and State partnership to
provide assistance on a range of
employee needs, like RMV
services.
Ferry Service Assistance TBD based upon site selection.
Funding may be secured through
Ferry Boat Discretionary Grant
Program.
Corporate Jet Services To be negotiated with Massport Massport has pledged
assistance, preferring for jets to
be based at Hanscom and
shuttled to Logan Airport, but is
willing to consider all services at
Logan Airport.
Boston Home Center “Live
Where You Work”Program
Provides what? Description
Innovation Center City to provide space at what
cost? Mass Life Science Centeror other to provide capital
funding at approximately $5m.
John determining if
MassChallenge might run thespace. This would be a “outside
the box” benefit to have a fully
fit out innovation space for GE to
operate. MLSC or other grants
could be used for the capital
funding.
Site 1 – Boston’s Court Street –
160k s.f. building in the heart of
downtown.
Free Rent for ___ years MassWorks would be utilized to
offset improvement costs.
Would City charge no property
taxes or is it the City’s intentialto assess the building and issue a
tax bill?
Site 2 – MA DOT District 6 –
adjacent to South Station on
Kneeland Street – 104k s.f. with
sufficient land for additional
space.
___% rent for ___ years MassWorks would be utilized to
offset improvement costs.
Presumably, City would assess
the building and charge property
taxes, but that should be
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 365/975
confirmed.
Site 3 – multiple Convention
Center properties
___% land lease for____ years MassWorks would need to be
confirmed to support
construction of a new building.
Presumably, City would assess
the building and charge property
taxes, but that should be
confirmed.
Site 4 – multiple Massport sites ___% land lease for____ years MassWorks would need to be
confirmed to support
construction of a new building.
Presumably, City would assess
the building and charge property
taxes, but that should be
confirmed. Each of the sites has
hundreds of thousands of
additional build-out potential.
Massport may wish to lease anentire site and have the
developer build the GE building,
which could help reduce the cost
of the land lease.
Site 5 – City’s 6 Tide Street – it’s
snow farm.
____% land lease for ___years MassWorks would need to be
confirmed to support
construction of a new building.
Presumably, City would assess
the building and charge property
taxes, but that should be
confirmed.Site 6 – Private development or
building purchase by GE on a site
they prefer.
A review of how MassWorks
would provide assistance would
be required.
The above could be provided to GE upon filling in all the blanks. John is in charge with Mike to provide
support. John should provide Mike with final draft and Mike be in touch with Steve for the Gov’s
signoff.
Questions/Comments:
1. Blanks should be filled in so that GE has a full picture of the various offers. (John is the
point/Mike provides support)
2. John is updating sites and getting them to GE. GE recognizes a need to narrow down sites, but it
is unrealistic for them to pick one without a significant vetting.
3. What is City’s intention regarding property taxes if a public site is selected, especially if the site
selected is the City’s building on Court Street? Ordinarily, a public site with a private tenant
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 366/975
would be assessed property tax. Would be acceptable either way, taxing or not, and, as noted
below, not taxing it could be a deal closer. (John)
4. Can MassWorks funding be utilized for public building fit-out/renovations? (Mike)
5. How could MassWorks provide financial benefit on private new construction? For example,
could it be used to purchase the land and then lease the land back to the private developer?
(Mike)
6. What are the heliport options for each of the sites? (John)
7. Fill in the blanks on State & Quasi lease expectations and determine what a typical value is for
the full lease so that the benefit of the reduction can be calculated for/by GE. (Steve should ask
the question of Elizabeth at Massport and for the MA DOT building should determine with a
consult with Stephanie, Kristen could be responsible for Mass Convention – provide Mike with
comments so he can communicate with John)
8. John/Mike, you should contact Brent at CBRE to help determine the value of the land, buildings
and benefits. CBRE should be able to provide very good estimates on such matters as the value
of land leases and the cost of office space.
9.
Contact MassChallenge to develop a proposal on the Innovation Center (John). For the benefit
of others, we are thinking of offering up an Innovation Center as a benefit for their use, using
City space and State funding to support it. The success of such a space depends on its
management, so John will have an informal discussion with the MassChallenge people about
doing so.
10. John/Mike, get a tax call with GE to review the benefits.
11. Thoughts on State ITC benefit. No way could we provide entire ITC in one year. Typically it is a
tax credit a company receives on their income. In this case, it could be a “refundable credit”
which means that it would actually be a cash benefit.
12. Thoughts on the State MassWorks benefit. MassWorks need to be spent in the year it is
designated. It is possible, if construction/renovations spans two fiscal years that we would
prefer to make a multi-year award to not eat up all of our funding in one particular year. It is a
reimbursement and has not “refundable credit” option. I am assuming we can use it to repair a
public building, and I believe it can be granted to both a city or a state agency. Not as clear how
we get the benefit to the company if a private entity is building them a building.
13. Check with former Massport exec to figure if there are any agency benefits that might be
brought to the package (Kristen).
14. Deal Closers could include up to $25m in state environmental dollars to help clean-up and put
into productive use GE sites in Lynn or elsewhere, and/or City tax dollars might be totally
forgiven in City or State buildings (and maybe more MassWorks dollars could go into the
building renovations in return).
15. In my absence, Mike is our lead, with Carolyn providing support. I will check in with Mike
directly each morning and in afternoon, connections permitting. Anyone needing me should
communicate need and issues to Mike. Steve should have final say on anything from our end.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 367/975
From: [email protected]
To: Kadish, Steven (GOV)
Cc: Lepore, Kristen (ANF)
Subject: Re: Call for noon tomorrow/Sunday
Date: Sunday, November 29, 2015 7:47:02 PM
Great, thanks.
Mike Kennealy
> On Nov 29, 2015, at 7:45 PM, Kadish, Steven (GOV)
<[email protected]> wrote:
>
> Let's do this at 7:15 am tomorrow morning. I'll have Brianna set this
up.
>
> Sent from my iPhone
>
>> On Nov 29, 2015, at 7:05 PM, Kennealy, Michael (EOHED)
<[email protected]> wrote:>>
>> I was going to email the entire group to suggest that we get on the
phone very early tomorrow morning. I say this because (1) I've been
following the various emails on EDIP and it looks like we are reaching
some sort of conclusion, although not a favorable one; (2) similar with
respect to single sales factor, and how that may or may not differentiate
us; and (3) a better understanding from Mo around the deadlines and
deliverables.
>>
>> On the latter point, Mo said that we should submit by 1pm tomorrow a
summary of the calculations and statutes with regard to the incentives we
propose. HED has prepared a memo which will soon go out to the legal
group that has been focused on these issues today. We will also have, bymid tomorrow morning, the detail they were seeking with regard to
precedent deals. So we will be able to send all of that by 1pm but I
think the group (or some subset of the group) should have a call in the
morning to confirm what we think we are able to offer under EDIP. We next
have a deadline of close of business on Tuesday for a full submission of
the proposal - I think this should be the letter and site detail as
discussed below.
>>
>> I also had an interesting conversation with CBRE who is advising Plum
on sites. He said that they are very focused on the Seaport and as such
(1) thought that Court Street would not be of interest and (2) suspected
that the DOT building would not either. I mentioned the parking issue and
how we thought that should be of value to them; he agreed but said the
team wouldn't really focus on that until they selected a site. He said
that it is good to know that we have that tool in the toolbox and we
should present it. He reiterated that there is a real lack of clarity
internally at Plum with respect to size of site.
>>
>> I think needless to say that collectively State and City are in a very
different place than we thought earlier today based on EDIP restrictions
and inability to offer something sub-market on real estate. I think our
best course of action is to (1) satisfy their deadline for tax incentive
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 368/975
detail tomorrow by 1pm; and (2) present as compelling a package as
possible Tuesday with respect to incentives, other features of our
proposal, and potential sites. We should also discuss whether or not to
proposed the environmental clean-up funds at this stage.
>>
>> Hope that makes sense and please let me know if you think a group call
very early tomorrow makes sense.
>>
>> Mike
>>
>> ________________________________________
>> From: Kennealy, Michael (EOHED)
>> Sent: Sunday, November 29, 2015 3:09 PM
>> To: Kadish, Steven (GOV); Lepore, Kristen (ANF)
>> Subject: RE: Call for noon tomorrow/Sunday
>>
>> Steve, copying Sec. Lepore here -
>>
>> I think that's right. I spoke with John Barros after our call to let
him know about the EDIP issue and told him that I would call later today
once we had further clarity. On sites, he said he needed to confirm with
the mayor but he thought that they would be offering Court Street
essentially for free rent, but only if we were offering something similar
on our sites. I said that that was unlikely given the constraints we
discussed on the call. He also thought that we may have until Tuesday for
some of these items - I have a call into Mo to discuss. We do know that
Plum's tax people are meeting at 3pm tomorrow; what John and I discussed
was providing detail by that time on (1) our tax offer (which obviously
might be quite different now) and (2) the backup information they were
looking for on EDIP, and then sometime on Tuesday present an entire
package - letter describing all facets of the deal and continuing to sell
the City and State as well as the updated site booklet.
>>
>> Ricks just emailed Lon and Sec. Lepore further information on EDIP -once we have further clarity here (which I understand may not be until
tonight) we can discuss how to proceed. Please let me know if that makes
sense.
>>
>> Mike
>> ________________________________________
>> From: Kadish, Steven (GOV)
>> Sent: Sunday, November 29, 2015 1:47 PM
>> To: Kennealy, Michael (EOHED)
>> Cc: Wehrs, Brianna (GOV); Zarrella, Lily (GOV); Goodall, Devon (GOV);
Ash, Jay (EOHED); Lepore, Kristen (ANF); Pollack, Stephanie (DOT);
Garrity, Rob (DOT); Povich, Lon (GOV); Elizabeth Morse; Tom Glynn;
Buckley, Timothy (GOV); Conroy, Jim (GOV); Polito, Karyn (GOV);Sullivan, Jennifer F. (ANF)
>> Subject: Re: Call for noon tomorrow/Sunday
>>
>> If I understand the format of the proposal, I think that there are 3
documents needed:
>>
>> 1. Booklet of properties, including site information
>>
>> 2. Letter outlining the elements of the City-State proposal
>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 369/975
>> 3. An appendix type document that outlines the various statutes,
application process, how the calculations work. This document could also
include the parking discussion and requirements, as well as a possible
comparison of key state and local tax features comparing MA, CT and NY.
This document could work as a PowerPoint.
>>
>> Sent from my iPhone
>>
>>> On Nov 29, 2015, at 11:33 AM, Kennealy, Michael (EOHED)
<[email protected]> wrote:
>>>
>>> Attached please find two documents for our call today at 12pm:
>>>
>>> - An update memo
>>> - Jay's chart sent on Friday
>>>
>>> Looking forward to speaking then.
>>>
>>> Mike
>>>
>>> ________________________________________
>>> From: Wehrs, Brianna (GOV)
>>> Sent: Saturday, November 28, 2015 4:45 PM
>>> To: Kadish, Steven (GOV)
>>> Cc: Zarrella, Lily (GOV); Goodall, Devon (GOV); Ash, Jay (EOHED);
Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Pollack, Stephanie
(DOT); Garrity, Rob (DOT); Povich, Lon (GOV); Elizabeth Morse; Tom Glynn;
Buckley, Timothy (GOV); Conroy, Jim (GOV); Polito, Karyn (GOV)
>>> Subject: Re: Call for noon tomorrow/Sunday
>>>
>>> I just sent a calendar invite. Please let me know if there's any
issues.
>>>
>>> Brianna Wehrs>>> Executive Assistant to Governor Charlie Baker
>>> Office: 617-725-4048
>>> Cell: 617-483-3397
>>>
>>>> On Nov 28, 2015, at 4:36 PM, Kadish, Steven (GOV)
<[email protected]> wrote:
>>>>
>>>> Brianna, Lily or Devon--please send out a calendar invite for a call
at noon tomorrow/Sunday for the folks copied on this email.
>>>>
>>>> Elizabeth: please invite Jim D if you would like.
>>>>
>>>> If you have questions about the call, please contact Sec Ash, MikeKennealy or me.
>>>>
>>>> Thx.
>>>> Steve
>>>>
>>>> Sent from my iPhone
>>> <Project Plum memo Nov. 29.docx>
>>> <Project Plum - Chart of Second Offer.docx>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 370/975
From: Kadish, Steven (GOV)
To: Wehrs, Brianna (GOV)
Cc: Zarrella, Lily (GOV); Goodall, Devon (GOV); Ash, Jay (EOHED); Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Pollack, Stephanie (DOT); Garrity, Rob (DOT); Povich, Lon (GOV); Elizabeth Morse; Tom Glynn; Buckley, Timothy (GOV); Conroy, Jim (GOV); ; Polito, Karyn (GOV); Sullivan, Jennifer F. (ANF); jdoolin; Ross, Robert (ANF); Frazier, Ricks (EOHED); Cosco, Jonathan (EOHED)
Subject: Re: Call for tomorrow/Monday at 7:15 am
Date: Sunday, November 29, 2015 8:17:17 PM
Let's use:
Monday; 7:15 am
November 30
Sent from my iPhone
> On Nov 29, 2015, at 7:48 PM, Kadish, Steven (GOV) <[email protected]> wrote:
>
> Brianna, Lily or Devon: can you please set up this call for 7:15 am tomorrow/Monday?>
> I've added Jennifer Sullivan and Jim Doolin.
>
> Thank you.
> Steve
>
> Sent from my iPhone
>
>> On Nov 28, 2015, at 4:45 PM, Wehrs, Brianna (GOV) <[email protected]> wrote:
>>
>> I just sent a calendar invite. Please let me know if there's any issues.
>>
>> Brianna Wehrs
>> Executive Assistant to Governor Charlie Baker
>> Office: 617-725-4048
>> Cell: 617-483-3397
>>
>>> On Nov 28, 2015, at 4:36 PM, Kadish, Steven (GOV) <[email protected]> wrote:
>>>
>>> Brianna, Lily or Devon--please send out a calendar invite for a call at noon tomorrow/Sunday for the folks
copied on this email.
>>>
>>> Elizabeth: please invite Jim D if you would like.
>>>
>>> If you have questions about the call, please contact Sec Ash, Mike Kennealy or me.
>>>
>>> Thx.
>>> Steve
>>>
>>> Sent from my iPhone
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 371/975
From: Ash, Jay (EOHED)
To: William Cass; Ash, Jay (EOHED)
Subject: RE: call me
Date: Wednesday, January 20, 2016 9:59:01 PM
Ok. Thx. Yes very sweet!
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: William CassDate: 01/20/2016 9:53 PM (GMT-05:00)To: "Ash, Jay (EOHED)" <[email protected]>Cc: "Ash, Jay (EOHED)" <[email protected]>Subject: Re: call me
Will do tomorrow. Thanks. You are busy! GE was pretty sweet.
Sent from my iPad
On Jan 20, 2016, at 9:21 PM, Ash, Jay (EOHED) < [email protected]> wrote:
Call when you can. Not urgent. Another is suggesting that Gov meet with Udit because they are looking at out of state expansion.
Know anything?
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: William CassDate: 10/08/2015 12:01 PM (GMT-05:00)To: "Ash, Jay (EOHED)" < [email protected]>Subject: RE: call me
Tried you from my office. Now calling from cell
-----Original Message-----
From: Ash, Jay (SEA) [mailto:[email protected]]
Sent: Thursday, October 08, 2015 7:16 AM
To: William Cass
Subject: call me
Around noon if you can
-----Original Message-----
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 372/975
From: William Cass
Sent: Friday, August 28, 2015 1:58 PM
To: Ash, Jay (EOHED)
Subject:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 373/975
From: Povich, Lon (GOV)
To: Lepore, Kristen (ANF)
Cc: Kadish, Steven (GOV); Kennealy, Michael (EOHED); Morse, Elizabeth; Ash, Jay (EOHED); Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Tom Glynn; Doolin, James; Garrity, Rob (DOT)
Subject: Re: Call to review proposal
Date: Tuesday, December 08, 2015 8:07:04 PM
Sent from my iPhone
> On Dec 8, 2015, at 7:56 PM, Lepore, Kristen (ANF)
<[email protected]> wrote:
>
> Sure
>
> Sent from my iPhone
>
>> On Dec 8, 2015, at 7:48 PM, Kadish, Steven (GOV)
<[email protected]> wrote:
>>
>> I will call the Governor and the Senator.
>>
>> Sec Lepore -- do you want to speak to Steve Tocco?
>>
>> -----Original Message-----
>> From: Kennealy, Michael (EOHED)
>> Sent: Tuesday, December 08, 2015 7:47 PM
>> To: Kadish, Steven (GOV)
>> Cc: Morse, Elizabeth; Ash, Jay (EOHED); Lepore, Kristen (ANF);
Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks (EOHED);
Pollack, Stephanie (DOT); Tom Glynn; Doolin, James; Povich, Lon (GOV);
Garrity, Rob (DOT)
>> Subject: Re: Call to review proposal
>>
>> FYI - ML (Gov Weld, Tocco) were on the call. Follow up call to one of
them? If so, by who? Call to Cowan?
>>
>> Mike Kennealy
>>
>>> On Dec 8, 2015, at 7:39 PM, Kadish, Steven (GOV)
<[email protected]> wrote:
>>>
>>> Great to read this email chain.
>>>>>> Mike -- are you and the City reaching out to ML?
>>>
>>> All -- is there any other reach out that you recommend?
>>>
>>> -----Original Message-----
>>> From: Morse, Elizabeth [mailto:[email protected]]
>>> Sent: Tuesday, December 08, 2015 7:36 PM
>>> To: Kennealy, Michael (EOHED)
>>> Cc: Kennealy, Michael (EOHED); Kadish, Steven (GOV); Ash, Jay (EOHED);
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 374/975
>>> Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Ross, Robert
>>> (ANF); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Tom Glynn;
>>> Doolin, James; Povich, Lon (GOV); Garrity, Rob (DOT)
>>> Subject: Re: Call to review proposal
>>>
>>> Yes, Massport will report back to the group after the CBRE call.
>>> Thanks, Elizabeth
>>>
>>>
>>>
>>> On Dec 8, 2015, at 7:31 PM, Kennealy, Michael (EOHED)
<[email protected]<mailto:[email protected]
ate.MA.US>> wrote:
>>>
>>> Recommendation that we all stay in very close touch tomorrow - I
thought frankly that there would be more outstanding items or negotiating
points after the 5pm call but those could very well come tomorrow.
Important that everything is as solid as possible before their meeting end
of day tomorrow. Recommend that Massport report back to group right after
CBRE call - if for some reason they perceive less value in the deal as
currently presented we will need to come up with a contingency and should
get on the phone to discuss. Encouraging call today, but clearly not
done.
>>>
>>> ________________________________
>>> From: Kennealy, Michael (EOHED)
>>> Sent: Tuesday, December 08, 2015 7:20 PM
>>> To: Kennealy, Michael (EOHED); Kadish, Steven (GOV); Ash, Jay (EOHED);
>>> Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Ross, Robert
>>> (ANF); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Tom Glynn;
>>> Elizabeth Morse; jdoolin; Povich, Lon (GOV); Garrity, Rob (DOT)
>>> Subject: RE: Call to review proposal
>>>>>> Quick update - this was a good call:
>>>
>>> - A bunch of questions on our proposal, very capably answered by
Massport/Jennifer/Ricks/City, really no issues raised/outstanding.
>>> - Comment from CBRE - "this works"; comment from Plum tax - "exactly
what we were looking for".
>>> - For tomorrow: (1) CBRE/Massport call - more specifics on proposal;
(2) Jennifer to track down information on solar panel grants/programs; and
(3) Plum tax and I to have a call tomorrow at 11am re: MLSC support. Note
- these last two at Plum's request; not interested in discussing specific
incentives for Current.
>>>
>>> Those are all of the outstanding items from the call. I do think theMassport/CBRE call tomorrow is an important one - hoping that will be
early in the day and we will have the ability to react to anything that
comes out of that call given the importance of the Plum presentation to
"senior leadership" end of day tomorrow.
>>>
>>> Mike
>>>
>>> ________________________________
>>> From: Kennealy, Michael (EOHED)
>>> Sent: Tuesday, December 08, 2015 4:26 PM
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 375/975
>>> To: Kadish, Steven (GOV); Ash, Jay (EOHED); Lepore, Kristen (ANF);
>>> Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks
>>> (EOHED); Pollack, Stephanie (DOT); Tom Glynn; Elizabeth Morse;
>>> jdoolin; Povich, Lon (GOV); Garrity, Rob (DOT)
>>> Subject: RE: Call to review proposal
>>>
>>> Here is the info if so
>>>
>>> participant code
>>>
>>> Mike Kennealy
>>> Assistant Secretary for Business Growth The Commonwealth of
>>> Massachusetts Executive Office of Housing & Economic Development One
>>> Ashburton Place, Room 2101 Boston, MA 02108
>>> Office: 617-788-3640
>>> Cell: 617-634-4762
>>> [email protected]<mailto:[email protected]>
>>>
>>> From: Kadish, Steven (GOV)
>>> Sent: Tuesday, December 08, 2015 4:19 PM
>>> To: Kennealy, Michael (EOHED)
>>> <[email protected]<mailto:Michael.kennealy@MassMai
>>> l.State.MA.US>>; Ash, Jay (EOHED)
>>> <[email protected]<mailto:[email protected]>>;
>>> Lepore, Kristen (ANF)
>>> <[email protected]<mailto:[email protected]
>>> ate.MA.US>>; Sullivan, Jennifer F. (ANF)
>>> <[email protected]<mailto:Jennifer.F.Sullivan@M
>>> assMail.State.MA.US>>; Ross, Robert (ANF)
>>> <[email protected]<mailto:[email protected].
>>> MA.US>>; Frazier, Ricks (EOHED)
>>> <[email protected]<mailto:[email protected]
>>> e.MA.US>>; Pollack, Stephanie (DOT)
>>> <[email protected]<mailto:[email protected].>>> ma.us>>; Tom Glynn <[email protected]<mailto:[email protected]>>;
>>> Elizabeth Morse <[email protected]<mailto:[email protected]>>;
>>> jdoolin <[email protected]<mailto:[email protected]>>; Povich,
>>> Lon (GOV)
>>> <[email protected]<mailto:[email protected]
>>> S>>; Garrity, Rob (DOT)
>>> <[email protected]<mailto:[email protected]>>
>>> Subject: RE: Call to review proposal
>>>
>>> It would be good if Jen/A&F can participate on the 5 pm call.
>>> Thanks everyone for the work that you are doing.
>>>
>>> From: Kennealy, Michael (EOHED)>>> Sent: Tuesday, December 08, 2015 3:59 PM
>>> To: Kadish, Steven (GOV); Ash, Jay (EOHED); Lepore, Kristen (ANF);
>>> Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks
>>> (EOHED); Pollack, Stephanie (DOT); Tom Glynn; Elizabeth Morse;
>>> jdoolin; Povich, Lon (GOV); Garrity, Rob (DOT)
>>> Subject: RE: Call to review proposal
>>>
>>> FYI – call scheduled today with GE tax, CBRE, Massport, possibly A&F.
Ann Klee also emailed and said she will be presenting the terms of the
Boston proposal to Plum senior leadership tomorrow end of day. I will
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 376/975
report back to this group after the 5pm. I expect tomorrow may be another
round of discussion/negotiation with them ahead of their presentation
tomorrow.
>>>
>>> Mike Kennealy
>>> Assistant Secretary for Business Growth The Commonwealth of
>>> Massachusetts Executive Office of Housing & Economic Development One
>>> Ashburton Place, Room 2101 Boston, MA 02108
>>> Office: 617-788-3640
>>> Cell: 617-634-4762
>>> [email protected]<mailto:[email protected]>
>>>
>>> From: Kennealy, Michael (EOHED)
>>> Sent: Tuesday, December 08, 2015 2:53 PM
>>> To: Kadish, Steven (GOV)
>>> <[email protected]<mailto:[email protected]
>>> e.MA.US>>; Ash, Jay (EOHED)
>>> <[email protected]<mailto:[email protected]>>;
>>> Lepore, Kristen (ANF)
>>> <[email protected]<mailto:[email protected]
>>> ate.MA.US>>; Sullivan, Jennifer F. (ANF)
>>> <[email protected]<mailto:Jennifer.F.Sullivan@M
>>> assMail.State.MA.US>>; Ross, Robert (ANF)
>>> <[email protected]<mailto:[email protected].
>>> MA.US>>; Frazier, Ricks (EOHED)
>>> <[email protected]<mailto:[email protected]
>>> e.MA.US>>; Pollack, Stephanie (DOT)
>>> <[email protected]<mailto:[email protected].
>>> ma.us>>; Tom Glynn <[email protected]<mailto:[email protected]>>;
>>> 'Elizabeth Morse' <[email protected]<mailto:[email protected]>>;
>>> 'jdoolin' <[email protected]<mailto:[email protected]>>; Povich,
>>> Lon (GOV)
>>> <[email protected]<mailto:[email protected]>>> S>>; Garrity, Rob (DOT)
>>> <[email protected]<mailto:[email protected]>>
>>> Subject: FW: Call to review proposal
>>>
>>> Team, please see 2 emails below from GE tax counsel – who should be on
this call and does 5pm today work or tomorrow morning?
>>>
>>> From: Eisenstadt, Amy (GE, Corporate)
>>> Sent: Tuesday, December 08, 2015 2:46 PM
>>> To: Kennealy, Michael (EOHED)
>>> <[email protected]<mailto:Michael.kennealy@MassMai
>>> l.State.MA.US>>
>>> Subject: RE: Call to review proposal>>>
>>> We can be available at 5 today or anytime tomorrow morning.
>>>
>>> I’m not sure about Brent, but I think he can do a call separately with
whoever from the State and Massport is best positioned to talk about the
specifics of the structure/lease terms etc.
>>>
>>> Amy Eisenstadt
>>> State Tax Counsel
>>> General Electric Company
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 377/975
>>>
>>>
(cell)
>>>
>>> From: Kennealy, Michael (SEA) [mailto:[email protected]]
>>> Sent: Tuesday, December 08, 2015 2:41 PM
>>> To: Eisenstadt, Amy (GE, Corporate);
>>> [email protected]<mailto:[email protected]>
>>> Cc: Mcgaugh, James (GE Corporate); Roberti, Scott (GE, Corporate);
>>> Woodruff, Brent (GE Global Operations, consultant)
>>> Subject: RE: Call to review proposal
>>>
>>> Of course Amy. Could you let me know some times that might work for a
call and I’ll assemble the team here?
>>>
>>> Mike Kennealy
>>> Assistant Secretary for Business Growth The Commonwealth of
>>> Massachusetts Executive Office of Housing & Economic Development One
>>> Ashburton Place, Room 2101 Boston, MA 02108
>>> Office: 617-788-3640
>>> Cell: 617-634-4762
>>> [email protected]<mailto:[email protected]>
>>>
>>> From: Eisenstadt, Amy (GE, Corporate)
>>> Sent: Tuesday, December 08, 2015 2:36 PM
>>> To: Kennealy, Michael (EOHED)
>>> <[email protected]<mailto:Michael.kennealy@MassMai
>>> l.State.MA.US>>; [email protected]<mailto:[email protected]>
>>> Cc: Mcgaugh, James (GE Corporate)
>>> ; Roberti, Scott
>>> (GE, Corporate)
>>> Woodruff, Brent (GE Global Operations, consultant)
>>>
>>> Subject: Call to review proposal>>>
>>> Mike/John:
>>>
>>> Please let me know when you can do a call to review the proposal. As
I’m sure you expected, we do need clarification of a few points.
>>>
>>> Also, we need someone from Massport who can discuss the structure of
the building development with Brent Woodruff. I’m copying Brent on this
email as the timing of that discussion will need to be arranged directly
with him.
>>>
>>>
>>>>>> Amy Eisenstadt
>>> State Tax Counsel
>>> General Electric Company
>>>
>>>
(cell)
>>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 378/975
From: Kadish, Steven (GOV)
To: Morse, Elizabeth; Kennealy, Michael (EOHED)
Cc: Kennealy, Michael (EOHED); Ash, Jay (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Tom Glynn; Doolin, James; Povich, Lon (GOV); Garrity, Rob (DOT)
Subject: RE: Call to review proposal
Date: Tuesday, December 08, 2015 7:39:24 PM
Great to read this email chain.
Mike -- are you and the City reaching out to ML?
All -- is there any other reach out that you recommend?
-----Original Message-----
From: Morse, Elizabeth [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 7:36 PM
To: Kennealy, Michael (EOHED)
Cc: Kennealy, Michael (EOHED); Kadish, Steven (GOV); Ash, Jay (EOHED);
Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Ross, Robert (ANF);
Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Tom Glynn; Doolin, James;
Povich, Lon (GOV); Garrity, Rob (DOT)
Subject: Re: Call to review proposal
Yes, Massport will report back to the group after the CBRE call. Thanks,
Elizabeth
On Dec 8, 2015, at 7:31 PM, Kennealy, Michael (EOHED)
<[email protected]<mailto:[email protected]>>
wrote:
Recommendation that we all stay in very close touch tomorrow - I thought
frankly that there would be more outstanding items or negotiating points
after the 5pm call but those could very well come tomorrow. Important that
everything is as solid as possible before their meeting end of day tomorrow.
Recommend that Massport report back to group right after CBRE call - if for
some reason they perceive less value in the deal as currently presented we
will need to come up with a contingency and should get on the phone to
discuss. Encouraging call today, but clearly not done.
________________________________
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 08, 2015 7:20 PM
To: Kennealy, Michael (EOHED); Kadish, Steven (GOV); Ash, Jay (EOHED);Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Ross, Robert (ANF);
Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Tom Glynn; Elizabeth
Morse; jdoolin; Povich, Lon (GOV); Garrity, Rob (DOT)
Subject: RE: Call to review proposal
Quick update - this was a good call:
- A bunch of questions on our proposal, very capably answered by
Massport/Jennifer/Ricks/City, really no issues raised/outstanding.
- Comment from CBRE - "this works"; comment from Plum tax - "exactly what we
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 379/975
were looking for".
- For tomorrow: (1) CBRE/Massport call - more specifics on proposal; (2)
Jennifer to track down information on solar panel grants/programs; and (3)
Plum tax and I to have a call tomorrow at 11am re: MLSC support. Note -
these last two at Plum's request; not interested in discussing specific
incentives for Current.
Those are all of the outstanding items from the call. I do think the
Massport/CBRE call tomorrow is an important one - hoping that will be early
in the day and we will have the ability to react to anything that comes out
of that call given the importance of the Plum presentation to "senior
leadership" end of day tomorrow.
Mike
________________________________
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 08, 2015 4:26 PM
To: Kadish, Steven (GOV); Ash, Jay (EOHED); Lepore, Kristen (ANF); Sullivan,
Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks (EOHED); Pollack,
Stephanie (DOT); Tom Glynn; Elizabeth Morse; jdoolin; Povich, Lon (GOV);
Garrity, Rob (DOT)
Subject: RE: Call to review proposal
Here is the info if so
participant code
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place, Room
2101 Boston, MA 02108
Office: 617-788-3640Cell: 617-634-4762
[email protected]<mailto:[email protected]>
From: Kadish, Steven (GOV)
Sent: Tuesday, December 08, 2015 4:19 PM
To: Kennealy, Michael (EOHED)
<[email protected]<mailto:[email protected]>>;
Ash, Jay (EOHED)
<[email protected]<mailto:[email protected]>>; Lepore,
Kristen (ANF)
<[email protected]<mailto:[email protected]>>;
Sullivan, Jennifer F. (ANF)
<[email protected]<mailto:[email protected]>>;Ross, Robert (ANF)
<[email protected]<mailto:[email protected]>>;
Frazier, Ricks (EOHED)
<[email protected]<mailto:[email protected]>>;
Pollack, Stephanie (DOT)
<[email protected]<mailto:[email protected]>>;
Tom Glynn <[email protected]<mailto:[email protected]>>; Elizabeth Morse
<[email protected]<mailto:[email protected]>>; jdoolin
<[email protected]<mailto:[email protected]>>; Povich, Lon (GOV)
<[email protected]<mailto:[email protected]>>;
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 380/975
Garrity, Rob (DOT)
<[email protected]<mailto:[email protected]>>
Subject: RE: Call to review proposal
It would be good if Jen/A&F can participate on the 5 pm call.
Thanks everyone for the work that you are doing.
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 08, 2015 3:59 PM
To: Kadish, Steven (GOV); Ash, Jay (EOHED); Lepore, Kristen (ANF); Sullivan,
Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks (EOHED); Pollack,
Stephanie (DOT); Tom Glynn; Elizabeth Morse; jdoolin; Povich, Lon (GOV);
Garrity, Rob (DOT)
Subject: RE: Call to review proposal
FYI – call scheduled today with GE tax, CBRE, Massport, possibly A&F. Ann
Klee also emailed and said she will be presenting the terms of the Boston
proposal to Plum senior leadership tomorrow end of day. I will report back
to this group after the 5pm. I expect tomorrow may be another round of
discussion/negotiation with them ahead of their presentation tomorrow.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place, Room
2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
[email protected]<mailto:[email protected]>
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 08, 2015 2:53 PM
To: Kadish, Steven (GOV)
<[email protected]<mailto:[email protected]>>;Ash, Jay (EOHED)
<[email protected]<mailto:[email protected]>>; Lepore,
Kristen (ANF)
<[email protected]<mailto:[email protected]>>;
Sullivan, Jennifer F. (ANF)
<[email protected]<mailto:[email protected]>>;
Ross, Robert (ANF)
<[email protected]<mailto:[email protected]>>;
Frazier, Ricks (EOHED)
<[email protected]<mailto:[email protected]>>;
Pollack, Stephanie (DOT)
<[email protected]<mailto:[email protected]>>;
Tom Glynn <[email protected]<mailto:[email protected]>>; 'ElizabethMorse' <[email protected]<mailto:[email protected]>>; 'jdoolin'
<[email protected]<mailto:[email protected]>>; Povich, Lon (GOV)
<[email protected]<mailto:[email protected]>>;
Garrity, Rob (DOT)
<[email protected]<mailto:[email protected]>>
Subject: FW: Call to review proposal
Team, please see 2 emails below from GE tax counsel – who should be on this
call and does 5pm today work or tomorrow morning?
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 381/975
From: Eisenstadt, Amy (GE, Corporate)
Sent: Tuesday, December 08, 2015 2:46 PM
To: Kennealy, Michael (EOHED)
<[email protected]<mailto:[email protected]>>
Subject: RE: Call to review proposal
We can be available at 5 today or anytime tomorrow morning.
I’m not sure about Brent, but I think he can do a call separately with
whoever from the State and Massport is best positioned to talk about the
specifics of the structure/lease terms etc.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Kennealy, Michael (SEA) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 2:41 PM
To: Eisenstadt, Amy (GE, Corporate);
[email protected]<mailto:[email protected]>
Cc: Mcgaugh, James (GE Corporate); Roberti, Scott (GE, Corporate); Woodruff,
Brent (GE Global Operations, consultant)
Subject: RE: Call to review proposal
Of course Amy. Could you let me know some times that might work for a call
and I’ll assemble the team here?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place, Room2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
[email protected]<mailto:[email protected]>
From: Eisenstadt, Amy (GE, Corporate)
Sent: Tuesday, December 08, 2015 2:36 PM
To: Kennealy, Michael (EOHED)
<[email protected]<mailto:[email protected]>>;
[email protected]<mailto:[email protected]>
Cc: Mcgaugh, James (GE Corporate)
; Roberti, Scott (GE,
Corporate) ; Woodruff,Brent (GE Global Operations, consultant)
Subject: Call to review proposal
Mike/John:
Please let me know when you can do a call to review the proposal. As I’m
sure you expected, we do need clarification of a few points.
Also, we need someone from Massport who can discuss the structure of the
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 382/975
building development with Brent Woodruff. I’m copying Brent on this email
as the timing of that discussion will need to be arranged directly with him.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 383/975
From: Kennealy, Michael (EOHED)
To: Sullivan, Jennifer F. (ANF)
Subject: RE: Call to review proposal
Date: Tuesday, December 08, 2015 4:29:00 PM
Thanks for being able to join!
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Sullivan, Jennifer F. (ANF)
Sent: Tuesday, December 08, 2015 4:30 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: Re: Call to review proposal
Thanks!
On Dec 8, 2015, at 4:29 PM, Kennealy, Michael (EOHED)
<[email protected]> wrote:
participant code
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Sullivan, Jennifer F. (ANF)
Sent: Tuesday, December 08, 2015 4:28 PM
To: Kadish, Steven (GOV) <[email protected]>; Kennealy, Michael
(EOHED) <[email protected]>
Subject: Re: Call to review proposal
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 384/975
I will leave this meeting to join your call at 5. Is there a dial in? Thanks.
On Dec 8, 2015, at 4:19 PM, Kadish, Steven (GOV) <[email protected]> wrote:
It would be good if Jen/A&F can participate on the 5 pm call.
Thanks everyone for the work that you are doing.
From: Kennealy, Michael (EOHED)Sent: Tuesday, December 08, 2015 3:59 PMTo: Kadish, Steven (GOV); Ash, Jay (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Tom Glynn; Elizabeth Morse; jdoolin; Povich, Lon (GOV); Garrity, Rob (DOT)
Subject: RE: Call to review proposal
FYI – call scheduled today with GE tax, CBRE, Massport, possibly A&F. Ann
Klee also emailed and said she will be presenting the terms of the Boston
proposal to Plum senior leadership tomorrow end of day. I will report
back to this group after the 5pm. I expect tomorrow may be another
round of discussion/negotiation with them ahead of their presentation
tomorrow.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 08, 2015 2:53 PMTo: Kadish, Steven (GOV) <[email protected]>; Ash,
Jay (EOHED) < [email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Sullivan, Jennifer F. (ANF)
<[email protected]>; Ross, Robert (ANF)
<[email protected]>; Frazier, Ricks (EOHED)
<[email protected]>; Pollack, Stephanie (DOT)
<[email protected]>; Tom Glynn
<[email protected]>; 'Elizabeth Morse' <[email protected]>;
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 385/975
'jdoolin' < [email protected]>; Povich, Lon (GOV)
<[email protected]>; Garrity, Rob (DOT)
Subject: FW: Call to review proposal
Team, please see 2 emails below from GE tax counsel – who should be on
this call and does 5pm today work or tomorrow morning?
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 2:46 PM
To: Kennealy, Michael (EOHED)
Subject: RE: Call to review proposal
We can be available at 5 today or anytime tomorrow morning.
I’m not sure about Brent, but I think he can do a call separately with whoever from the State and Massport is best positioned to talk about the
specifics of the structure/lease terms etc.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Tuesday, December 08, 2015 2:41 PMTo: Eisenstadt, Amy (GE, Corporate); [email protected]: Mcgaugh, James (GE Corporate); Roberti, Scott (GE, Corporate); Woodruff, Brent (GE Global Operations, consultant)Subject: RE: Call to review proposal
Of course Amy. Could you let me know some times that might work for a
call and I’ll assemble the team here?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 386/975
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 2:36 PM
To: Kennealy, Michael (EOHED)
<[email protected]>; [email protected]
Cc: Mcgaugh, James (GE Corporate) ; Roberti,
Scott (GE, Corporate) ; Woodruff, Brent (GE Global Operations, consultant)
Subject: Call to review proposal
Mike/John:
Please let me know when you can do a call to review the proposal. As I’m
sure you expected, we do need clarification of a few points.
Also, we need someone from Massport who can discuss the structure of
the building development with Brent Woodruff. I’m copying Brent on this email as the timing of that discussion will need to be arranged directly
with him.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 387/975
From: Kennealy, Michael (EOHED)
To: Sullivan, Jennifer F. (ANF); Kadish, Steven (GOV)
Subject: RE: Call to review proposal
Date: Tuesday, December 08, 2015 4:29:00 PM
participant code
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Sullivan, Jennifer F. (ANF)
Sent: Tuesday, December 08, 2015 4:28 PM
To: Kadish, Steven (GOV) <[email protected]>; Kennealy, Michael (EOHED)
Subject: Re: Call to review proposal
I will leave this meeting to join your call at 5. Is there a dial in? Thanks.
On Dec 8, 2015, at 4:19 PM, Kadish, Steven (GOV) <[email protected]> wrote:
It would be good if Jen/A&F can participate on the 5 pm call.
Thanks everyone for the work that you are doing.
From: Kennealy, Michael (EOHED)Sent: Tuesday, December 08, 2015 3:59 PMTo: Kadish, Steven (GOV); Ash, Jay (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Tom Glynn; Elizabeth Morse; jdoolin; Povich, Lon (GOV); Garrity, Rob (DOT)Subject: RE: Call to review proposal
FYI – call scheduled today with GE tax, CBRE, Massport, possibly A&F. Ann Klee also
emailed and said she will be presenting the terms of the Boston proposal to Plum
senior leadership tomorrow end of day. I will report back to this group after the 5pm.
I expect tomorrow may be another round of discussion/negotiation with them ahead
of their presentation tomorrow.
Mike Kennealy
Assistant Secretary for Business Growth
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 388/975
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 08, 2015 2:53 PM
To: Kadish, Steven (GOV) <[email protected]>; Ash, Jay (EOHED)
< [email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Sullivan, Jennifer F. (ANF)
<[email protected]>; Ross, Robert (ANF)
<[email protected]>; Frazier, Ricks (EOHED)
<[email protected]>; Pollack, Stephanie (DOT)
<[email protected]>; Tom Glynn <[email protected]>; 'Elizabeth Morse' <[email protected]>; 'jdoolin' < [email protected]>; Povich, Lon
(GOV) <[email protected]>; Garrity, Rob (DOT)
Subject: FW: Call to review proposal
Team, please see 2 emails below from GE tax counsel – who should be on this call and
does 5pm today work or tomorrow morning?
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 2:46 PMTo: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: Call to review proposal
We can be available at 5 today or anytime tomorrow morning.
I’m not sure about Brent, but I think he can do a call separately with whoever from the
State and Massport is best positioned to talk about the specifics of the structure/lease
terms etc.
Amy EisenstadtState Tax Counsel
General Electric Company
(cell)
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Tuesday, December 08, 2015 2:41 PM
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 389/975
To: Eisenstadt, Amy (GE, Corporate); [email protected]: Mcgaugh, James (GE Corporate); Roberti, Scott (GE, Corporate); Woodruff, Brent (GE Global Operations, consultant)Subject: RE: Call to review proposal
Of course Amy. Could you let me know some times that might work for a call and I’ll
assemble the team here?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate)
Sent: Tuesday, December 08, 2015 2:36 PM
To: Kennealy, Michael (EOHED) <[email protected]>;
Cc: Mcgaugh, James (GE Corporate) ; Roberti, Scott (GE,
Corporate) ; Woodruff, Brent (GE Global Operations,
consultant)
Subject: Call to review proposal
Mike/John:
Please let me know when you can do a call to review the proposal. As I’m sure you
expected, we do need clarification of a few points.
Also, we need someone from Massport who can discuss the structure of the building
development with Brent Woodruff. I’m copying Brent on this email as the timing of
that discussion will need to be arranged directly with him.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 390/975
From: Kennealy, Michael (EOHED)
To: Eisenstadt, Amy (GE, Corporate)
Subject: RE: Call to review proposal
Date: Tuesday, December 08, 2015 3:13:00 PM
I just emailed Brent
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate)
Sent: Tuesday, December 08, 2015 2:52 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: Call to review proposal
Also, let me know about a call with Brent and Massport – that discussion is maybe even more
important to understanding how to properly value the offer (assuming the sites work).
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Tuesday, December 08, 2015 2:49 PMTo: Eisenstadt, Amy (GE, Corporate)Subject: RE: Call to review proposal
Ok let me see about 5pm today, thanks.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 391/975
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate)
Sent: Tuesday, December 08, 2015 2:46 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: Call to review proposal
We can be available at 5 today or anytime tomorrow morning.
I’m not sure about Brent, but I think he can do a call separately with whoever from the State and
Massport is best positioned to talk about the specifics of the structure/lease terms etc.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Tuesday, December 08, 2015 2:41 PMTo: Eisenstadt, Amy (GE, Corporate); [email protected]: Mcgaugh, James (GE Corporate); Roberti, Scott (GE, Corporate); Woodruff, Brent (GE Global Operations, consultant)Subject: RE: Call to review proposal
Of course Amy. Could you let me know some times that might work for a call and I’ll assemble the
team here?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate)
Sent: Tuesday, December 08, 2015 2:36 PM
To: Kennealy, Michael (EOHED) <[email protected]>;
Cc: Mcgaugh, James (GE Corporate) ; Roberti, Scott (GE, Corporate)
Woodruff, Brent (GE Global Operations, consultant)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 392/975
Subject: Call to review proposal
Mike/John:
Please let me know when you can do a call to review the proposal. As I’m sure you expected, we do
need clarification of a few points.
Also, we need someone from Massport who can discuss the structure of the building development
with Brent Woodruff. I’m copying Brent on this email as the timing of that discussion will need to
be arranged directly with him.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 393/975
From: Kennealy, Michael (EOHED)
To: Woodruff, Brent (GE Global Operations, consultant)
Subject: RE: Call to review proposal
Date: Tuesday, December 08, 2015 3:09:00 PM
Brent, can you let me know some times that work?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate)
Sent: Tuesday, December 08, 2015 2:36 PM
To: Kennealy, Michael (EOHED) <[email protected]>;
Cc: Mcgaugh, James (GE Corporate) ; Roberti, Scott (GE, Corporate)
; Woodruff, Brent (GE Global Operations, consultant)
Subject: Call to review proposal
Mike/John:
Please let me know when you can do a call to review the proposal. As I’m sure you expected, we do
need clarification of a few points.
Also, we need someone from Massport who can discuss the structure of the building development
with Brent Woodruff. I’m copying Brent on this email as the timing of that discussion will need to
be arranged directly with him.
Amy EisenstadtState Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 394/975
From: Kennealy, Michael (EOHED)
To: Garrity, Rob (DOT)
Subject: RE: Call to review proposal
Date: Tuesday, December 08, 2015 2:55:00 PM
No just the emails from Amy asking for a call.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Garrity, Rob (DOT) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 2:55 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: Re: Call to review proposal
Hi mike - no attachment?
Rob Garrity
Chief of Staff
MassDOT
857-368-8893 (o)617-356-4981 (c)
On Dec 8, 2015, at 2:52 PM, Kennealy, Michael (EOHED)
<[email protected]> wrote:
Team, please see 2 emails below from GE tax counsel – who should be on this call and
does 5pm today work or tomorrow morning?
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 2:46 PMTo: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: Call to review proposal
We can be available at 5 today or anytime tomorrow morning.
I’m not sure about Brent, but I think he can do a call separately with whoever from the
State and Massport is best positioned to talk about the specifics of the structure/lease
terms etc.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 395/975
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Tuesday, December 08, 2015 2:41 PMTo: Eisenstadt, Amy (GE, Corporate); [email protected]: Mcgaugh, James (GE Corporate); Roberti, Scott (GE, Corporate); Woodruff, Brent (GE Global Operations, consultant)Subject: RE: Call to review proposal
Of course Amy. Could you let me know some times that might work for a call and I’ll
assemble the team here?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 2:36 PM
To: Kennealy, Michael (EOHED) <[email protected]>;
Cc: Mcgaugh, James (GE Corporate) ; Roberti, Scott (GE,
Corporate) ; Woodruff, Brent (GE Global Operations,
consultant)
Subject: Call to review proposal
Mike/John:
Please let me know when you can do a call to review the proposal. As I’m sure you
expected, we do need clarification of a few points.
Also, we need someone from Massport who can discuss the structure of the building
development with Brent Woodruff. I’m copying Brent on this email as the timing of
that discussion will need to be arranged directly with him.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 396/975
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 397/975
From: Kadish, Steven (GOV)
To: Povich, Lon (GOV)
Cc: Lepore, Kristen (ANF); Kennealy, Michael (EOHED); Morse, Elizabeth; Ash, Jay (EOHED); Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Tom Glynn; Doolin, James; Garrity, Rob (DOT)
Subject: Re: Call to review proposal
Date: Tuesday, December 08, 2015 8:30:32 PM
Can't see any harm!!
Sent from my iPhone
> On Dec 8, 2015, at 8:07 PM, Povich, Lon (GOV) <[email protected]> wrote:
>
>
>
> Sent from my iPhone
>
>> On Dec 8, 2015, at 7:56 PM, Lepore, Kristen (ANF) <[email protected]> wrote:
>>
>> Sure
>>
>> Sent from my iPhone
>>
>>> On Dec 8, 2015, at 7:48 PM, Kadish, Steven (GOV) <[email protected]> wrote:
>>>
>>> I will call the Governor and the Senator.
>>>
>>> Sec Lepore -- do you want to speak to Steve Tocco?
>>>
>>> -----Original Message-----
>>> From: Kennealy, Michael (EOHED)
>>> Sent: Tuesday, December 08, 2015 7:47 PM
>>> To: Kadish, Steven (GOV)
>>> Cc: Morse, Elizabeth; Ash, Jay (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Ross, Robert
(ANF); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Tom Glynn; Doolin, James; Povich, Lon (GOV);
Garrity, Rob (DOT)
>>> Subject: Re: Call to review proposal
>>>
>>> FYI - ML (Gov Weld, Tocco) were on the call. Follow up call to one of them? If so, by who? Call to Cowan?
>>>
>>> Mike Kennealy
>>>
>>>> On Dec 8, 2015, at 7:39 PM, Kadish, Steven (GOV) <[email protected]> wrote:
>>>>
>>>> Great to read this email chain.>>>>
>>>> Mike -- are you and the City reaching out to ML?
>>>>
>>>> All -- is there any other reach out that you recommend?
>>>>
>>>> -----Original Message-----
>>>> From: Morse, Elizabeth [mailto:[email protected]]
>>>> Sent: Tuesday, December 08, 2015 7:36 PM
>>>> To: Kennealy, Michael (EOHED)
>>>> Cc: Kennealy, Michael (EOHED); Kadish, Steven (GOV); Ash, Jay (EOHED);
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 398/975
>>>> Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Ross, Robert
>>>> (ANF); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Tom Glynn;
>>>> Doolin, James; Povich, Lon (GOV); Garrity, Rob (DOT)
>>>> Subject: Re: Call to review proposal
>>>>
>>>> Yes, Massport will report back to the group after the CBRE call.
>>>> Thanks, Elizabeth
>>>>
>>>>
>>>>
>>>> On Dec 8, 2015, at 7:31 PM, Kennealy, Michael (EOHED)
<[email protected]<mailto:[email protected]>> wrote:
>>>>
>>>> Recommendation that we all stay in very close touch tomorrow - I thought frankly that there would be more
outstanding items or negotiating points after the 5pm call but those could very well come tomorrow. Important that
everything is as solid as possible before their meeting end of day tomorrow. Recommend that Massport report back
to group right after CBRE call - if for some reason they perceive less value in the deal as currently presented we
will need to come up with a contingency and should get on the phone to discuss. Encouraging call today, but
clearly not done.
>>>>
>>>> ________________________________
>>>> From: Kennealy, Michael (EOHED)
>>>> Sent: Tuesday, December 08, 2015 7:20 PM
>>>> To: Kennealy, Michael (EOHED); Kadish, Steven (GOV); Ash, Jay (EOHED);
>>>> Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Ross, Robert
>>>> (ANF); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Tom Glynn;
>>>> Elizabeth Morse; jdoolin; Povich, Lon (GOV); Garrity, Rob (DOT)
>>>> Subject: RE: Call to review proposal
>>>>
>>>> Quick update - this was a good call:
>>>>
>>>> - A bunch of questions on our proposal, very capably answered by Massport/Jennifer/Ricks/City, really no
issues raised/outstanding.
>>>> - Comment from CBRE - "this works"; comment from Plum tax - "exactly what we were looking for".>>>> - For tomorrow: (1) CBRE/Massport call - more specifics on proposal; (2) Jennifer to track down information
on solar panel grants/programs; and (3) Plum tax and I to have a call tomorrow at 11am re: MLSC support. Note -
these last two at Plum's request; not interested in discussing specific incentives for Current.
>>>>
>>>> Those are all of the outstanding items from the call. I do think the Massport/CBRE call tomorrow is an
important one - hoping that will be early in the day and we will have the ability to react to anything that comes out
of that call given the importance of the Plum presentation to "senior leadership" end of day tomorrow.
>>>>
>>>> Mike
>>>>
>>>> ________________________________
>>>> From: Kennealy, Michael (EOHED)
>>>> Sent: Tuesday, December 08, 2015 4:26 PM>>>> To: Kadish, Steven (GOV); Ash, Jay (EOHED); Lepore, Kristen (ANF);
>>>> Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks
>>>> (EOHED); Pollack, Stephanie (DOT); Tom Glynn; Elizabeth Morse;
>>>> jdoolin; Povich, Lon (GOV); Garrity, Rob (DOT)
>>>> Subject: RE: Call to review proposal
>>>>
>>>> Here is the info if so
>>>>
>>>> participant code
>>>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 399/975
>>>> Mike Kennealy
>>>> Assistant Secretary for Business Growth The Commonwealth of
>>>> Massachusetts Executive Office of Housing & Economic Development One
>>>> Ashburton Place, Room 2101 Boston, MA 02108
>>>> Office: 617-788-3640
>>>> Cell: 617-634-4762
>>>> [email protected]<mailto:[email protected]>
>>>>
>>>> From: Kadish, Steven (GOV)
>>>> Sent: Tuesday, December 08, 2015 4:19 PM
>>>> To: Kennealy, Michael (EOHED)
>>>> <[email protected]<mailto:Michael.kennealy@MassMai
>>>> l.State.MA.US>>; Ash, Jay (EOHED)
>>>> <[email protected]<mailto:[email protected]>>;
>>>> Lepore, Kristen (ANF)
>>>> <[email protected]<mailto:[email protected]
>>>> ate.MA.US>>; Sullivan, Jennifer F. (ANF)
>>>> <[email protected]<mailto:Jennifer.F.Sullivan@M
>>>> assMail.State.MA.US>>; Ross, Robert (ANF)
>>>> <[email protected]<mailto:[email protected].
>>>> MA.US>>; Frazier, Ricks (EOHED)
>>>> <[email protected]<mailto:[email protected]
>>>> e.MA.US>>; Pollack, Stephanie (DOT)
>>>> <[email protected]<mailto:[email protected].
>>>> ma.us>>; Tom Glynn <[email protected]<mailto:[email protected]>>;
>>>> Elizabeth Morse <[email protected]<mailto:[email protected]>>;
>>>> jdoolin <[email protected]<mailto:[email protected]>>; Povich,
>>>> Lon (GOV)
>>>> <[email protected]<mailto:[email protected]
>>>> S>>; Garrity, Rob (DOT)
>>>> <[email protected]<mailto:[email protected]>>
>>>> Subject: RE: Call to review proposal
>>>>
>>>> It would be good if Jen/A&F can participate on the 5 pm call.>>>> Thanks everyone for the work that you are doing.
>>>>
>>>> From: Kennealy, Michael (EOHED)
>>>> Sent: Tuesday, December 08, 2015 3:59 PM
>>>> To: Kadish, Steven (GOV); Ash, Jay (EOHED); Lepore, Kristen (ANF);
>>>> Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks
>>>> (EOHED); Pollack, Stephanie (DOT); Tom Glynn; Elizabeth Morse;
>>>> jdoolin; Povich, Lon (GOV); Garrity, Rob (DOT)
>>>> Subject: RE: Call to review proposal
>>>>
>>>> FYI – call scheduled today with GE tax, CBRE, Massport, possibly A&F. Ann Klee also emailed and said
she will be presenting the terms of the Boston proposal to Plum senior leadership tomorrow end of day. I will
report back to this group after the 5pm. I expect tomorrow may be another round of discussion/negotiation with them ahead of their presentation tomorrow.
>>>>
>>>> Mike Kennealy
>>>> Assistant Secretary for Business Growth The Commonwealth of
>>>> Massachusetts Executive Office of Housing & Economic Development One
>>>> Ashburton Place, Room 2101 Boston, MA 02108
>>>> Office: 617-788-3640
>>>> Cell: 617-634-4762
>>>> [email protected]<mailto:[email protected]>
>>>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 400/975
>>>> From: Kennealy, Michael (EOHED)
>>>> Sent: Tuesday, December 08, 2015 2:53 PM
>>>> To: Kadish, Steven (GOV)
>>>> <[email protected]<mailto:[email protected]
>>>> e.MA.US>>; Ash, Jay (EOHED)
>>>> <[email protected]<mailto:[email protected]>>;
>>>> Lepore, Kristen (ANF)
>>>> <[email protected]<mailto:[email protected]
>>>> ate.MA.US>>; Sullivan, Jennifer F. (ANF)
>>>> <[email protected]<mailto:Jennifer.F.Sullivan@M
>>>> assMail.State.MA.US>>; Ross, Robert (ANF)
>>>> <[email protected]<mailto:[email protected].
>>>> MA.US>>; Frazier, Ricks (EOHED)
>>>> <[email protected]<mailto:[email protected]
>>>> e.MA.US>>; Pollack, Stephanie (DOT)
>>>> <[email protected]<mailto:[email protected].
>>>> ma.us>>; Tom Glynn <[email protected]<mailto:[email protected]>>;
>>>> 'Elizabeth Morse' <[email protected]<mailto:[email protected]>>;
>>>> 'jdoolin' <[email protected]<mailto:[email protected]>>; Povich,
>>>> Lon (GOV)
>>>> <[email protected]<mailto:[email protected]
>>>> S>>; Garrity, Rob (DOT)
>>>> <[email protected]<mailto:[email protected]>>
>>>> Subject: FW: Call to review proposal
>>>>
>>>> Team, please see 2 emails below from GE tax counsel – who should be on this call and does 5pm today work
or tomorrow morning?
>>>>
>>>> From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
>>>> Sent: Tuesday, December 08, 2015 2:46 PM
>>>> To: Kennealy, Michael (EOHED)
>>>> <[email protected]<mailto:Michael.kennealy@MassMai
>>>> l.State.MA.US>>
>>>> Subject: RE: Call to review proposal>>>>
>>>> We can be available at 5 today or anytime tomorrow morning.
>>>>
>>>> I’m not sure about Brent, but I think he can do a call separately with whoever from the State and Massport is
best positioned to talk about the specifics of the structure/lease terms etc.
>>>>
>>>> Amy Eisenstadt
>>>> State Tax Counsel
>>>> General Electric Company
>>>>
>>>>
>>>> (cell)
>>>>>>>> From: Kennealy, Michael (SEA) [mailto:[email protected]]
>>>> Sent: Tuesday, December 08, 2015 2:41 PM
>>>> To: Eisenstadt, Amy (GE, Corporate);
>>>> [email protected]<mailto:[email protected]>
>>>> Cc: Mcgaugh, James (GE Corporate); Roberti, Scott (GE, Corporate);
>>>> Woodruff, Brent (GE Global Operations, consultant)
>>>> Subject: RE: Call to review proposal
>>>>
>>>> Of course Amy. Could you let me know some times that might work for a call and I’ll assemble the team
here?
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 401/975
>>>>
>>>> Mike Kennealy
>>>> Assistant Secretary for Business Growth The Commonwealth of
>>>> Massachusetts Executive Office of Housing & Economic Development One
>>>> Ashburton Place, Room 2101 Boston, MA 02108
>>>> Office: 617-788-3640
>>>> Cell: 617-634-4762
>>>> [email protected]<mailto:[email protected]>
>>>>
>>>> From: Eisenstadt, Amy (GE, Corporate)
>>>> Sent: Tuesday, December 08, 2015 2:36 PM
>>>> To: Kennealy, Michael (EOHED)
>>>> <[email protected]<mailto:Michael.kennealy@MassMai
>>>> l.State.MA.US>>; [email protected]<mailto:[email protected]>
>>>> Cc: Mcgaugh, James (GE Corporate)
>>>> ; Roberti, Scott
>>>> (GE, Corporate)
>>>> Woodruff, Brent (GE Global Operations, consultant)
>>>>
>>>> Subject: Call to review proposal
>>>>
>>>> Mike/John:
>>>>
>>>> Please let me know when you can do a call to review the proposal. As I’m sure you expected, we do need
clarification of a few points.
>>>>
>>>> Also, we need someone from Massport who can discuss the structure of the building development with Brent
Woodruff. I’m copying Brent on this email as the timing of that discussion will need to be arranged directly with
him.
>>>>
>>>>
>>>>
>>>> Amy Eisenstadt
>>>> State Tax Counsel>>>> General Electric Company
>>>>
>>>>
>>>> (cell)
>>>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 402/975
From: [email protected]
To: John Barros
Subject: Re: Call w/Boston
Date: Friday, December 04, 2015 1:01:45 PM
Can I call you at 245? Should probably talk ahead of the call.
Mike Kennealy
On Dec 4, 2015, at 12:55 PM, John Barros < [email protected]> wrote:
Great. That works for me
Sent from my iPhone
On Dec 4, 2015, at 12:43 PM, Kennealy, Michael (SEA) <[email protected]> wrote:
Thanks Amy – how about 3pm today?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: [email protected]
From: Eisenstadt, Amy (GE, Corporate)
Sent: Friday, December 04, 2015 9:16 AM
To: Kennealy, Michael (EOHED)
<[email protected]>; [email protected]
Cc: Roberti, Scott (GE, Corporate) ; Mcgaugh,
James (GE Corporate)
Subject: FW: Call w/Boston
Mike/John
Scott forwarded your request to me since your proposal falls within my
area, although like you and John, we are a team (plus McGaugh, of
course).
It looks like Scott, Jim and I are available between 12 – 4 this afternoon or
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 403/975
from 10:30 – 11:30 and 1:30 – 3 on Monday, if any of those times work
for you.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Roberti, Scott (GE, Corporate)Sent: Friday, December 04, 2015 9:08 AMTo: Eisenstadt, Amy (GE, Corporate)Subject: FW: Call w/Boston
Scott G. RobertiDirector, State Tax Policy
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
T ; F
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Thursday, December 03, 2015 12:54 PMTo: Roberti, Scott (GE, Corporate)Cc: john. barrosSubject: Call w/Boston
Hi Scott,
I hope you are well. I wanted to see if you might have some time today or
tomorrow to speak with John and me – we would welcome an
opportunity to hear your thoughts, answer any questions, and reiterate
our strong interest in the project.
We will do our best to work around your schedule if you could suggest a
few times.
Hope we can connect soon.
All the best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 404/975
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 405/975
From: Kennealy, Michael (EOHED)
To: Eisenstadt, Amy (GE, Corporate)
Subject: RE: Call w/Boston
Date: Friday, December 04, 2015 1:57:00 PM
Thanks!
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate)
Sent: Friday, December 04, 2015 1:53 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: Call w/Boston
absolutely
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Friday, December 04, 2015 1:52 PMTo: Eisenstadt, Amy (GE, Corporate); [email protected]: Roberti, Scott (GE, Corporate); Mcgaugh, James (GE Corporate)Subject: RE: Call w/Boston
Could you send one please?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 406/975
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate)
Sent: Friday, December 04, 2015 12:49 PM
To: Kennealy, Michael (EOHED) <[email protected]>;
[email protected]: Roberti, Scott (GE, Corporate) ; Mcgaugh, James (GE Corporate)
Subject: RE: Call w/Boston
Let’s go with it. Do you want me to send a call-in or will you?
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Friday, December 04, 2015 12:43 PMTo: Eisenstadt, Amy (GE, Corporate); [email protected]: Roberti, Scott (GE, Corporate); Mcgaugh, James (GE Corporate)Subject: RE: Call w/Boston
Thanks Amy – how about 3pm today?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate)
Sent: Friday, December 04, 2015 9:16 AM
To: Kennealy, Michael (EOHED) <[email protected]>;
Cc: Roberti, Scott (GE, Corporate) ; Mcgaugh, James (GE Corporate)
Subject: FW: Call w/Boston
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 407/975
Mike/John
Scott forwarded your request to me since your proposal falls within my area, although like you and
John, we are a team (plus McGaugh, of course).
It looks like Scott, Jim and I are available between 12 – 4 this afternoon or from 10:30 – 11:30 and
1:30 – 3 on Monday, if any of those times work for you.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Roberti, Scott (GE, Corporate)Sent: Friday, December 04, 2015 9:08 AMTo: Eisenstadt, Amy (GE, Corporate)Subject: FW: Call w/Boston
Scott G. Roberti
Director, State Tax Policy
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
T ; F
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Thursday, December 03, 2015 12:54 PMTo: Roberti, Scott (GE, Corporate)Cc: john. barrosSubject: Call w/Boston
Hi Scott,
I hope you are well. I wanted to see if you might have some time today or tomorrow to speak with
John and me – we would welcome an opportunity to hear your thoughts, answer any questions, and
reiterate our strong interest in the project.
We will do our best to work around your schedule if you could suggest a few times.
Hope we can connect soon.
All the best,
Mike
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 408/975
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 409/975
From: Ash, Jay (EOHED)
To: Frazier, Ricks (EOHED)
Subject: RE: Call
Date: Wednesday, December 23, 2015 11:45:20 PM
My earlier response was a joke. No need for a call, as your email
Thanks
Jay
________________________________________
From: Frazier, Ricks (EOHED)
Sent: Wednesday, December 23, 2015 11:21 PM
To: Ash, Jay (EOHED)
Subject: Re: Call
Sorry, was at the theater. Tomorrow AM?
Sent from my iPhone
On Dec 23, 2015, at 8:31 PM, Ash, Jay (EOHED)
<[email protected]<mailto:[email protected]>> wrote:
If you can call me before 11p my time, I would appreciate that.
Sent from my Verizon Wireless 4G LTE smartphone
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 410/975
From: Kadish, Steven (GOV)
To: Polito, Karyn (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Ash, Jay (EOHED); Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Tom Glynn; Elizabeth Morse; jdoolin; Povich, Lon (GOV); Garrity, Rob (DOT)
Cc: Wehrs, Brianna (GOV); Zarrella, Lily (GOV)
Subject: RE: Can we please do a call 9:45 am or 10 am on the Boston project
Date: Wednesday, December 09, 2015 9:36:20 AM
Key topics for the call:
Plum is interested in low-cost or free temporary space, to permit an early move while building or renovating.
Would like to see this in a revised proposal within the next 24 hours.
Plum also states that it is officially interested in a longer term lease at a MAPT property, despite earlier statements
re preference for 10-year term.
Plum official A. K. is in Boston today.
-----Original Message-----
From: Kadish, Steven (GOV)
Sent: Wednesday, December 09, 2015 9:14 AM
To: Polito, Karyn (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Ash,
Jay (EOHED); Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Tom Glynn;
Elizabeth Morse; jdoolin; Povich, Lon (GOV); Garrity, Rob (DOT)
Cc: Wehrs, Brianna (GOV); Zarrella, Lily (GOV)
Subject: Can we please do a call 9:45 am or 10 am on the Boston project
Importance: High
There are some follow up items that we need to try to address today.
Brianna or Lily--can you please send out an invitation?
Let's use
Thank you,
Steve
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 411/975
From: Povich, Lon (GOV)
To: Kadish, Steven (GOV)
Cc: Kennealy, Michael (EOHED); Ash, Jay (EOHED); Pollack, Stephanie (DOT); Lepore, Kristen (ANF); Beaton, Matthew (EEA); Garrity, Rob (DOT)
Subject: Re: Chart for Updated Offer
Date: Saturday, November 28, 2015 3:08:27 PM
I am happy to help over the weekend and would suggest.
Sent from my iPhone
On Nov 28, 2015, at 2:47 PM, Kadish, Steven (GOV) <[email protected]> wrote:
All:
Just received a message that the folks reviewing our proposal want to see all the
math, statutes, other examples, and understand what the application process is for each item we are proposing.
This suggests to me that we have our legal teams also involved in putting together our response. Who should this be from HED? Lon--who can help this weekend from the Gov's office?
Let's please have a call tomorrow morning. 10 or 11 am?
Thx!Steve
Sent from my iPhone
On Nov 28, 2015, at 2:38 PM, Kadish, Steven (GOV) <[email protected]> wrote:
Sec Pollack (Rob!): we will need some information regarding the District 6 site not later than tomorrow/early. Mike Kenneally can help with what is exactly needed.
Sec Ash/Mike K: please propose what you think makes sense on the land lease and ultimate discount to GE.
Sec Beaton: anything in your world that might be helpful for this project?Energy incentives?
Sec Ash: We are saving other brownfield/remediation $ for other possible sites for a later stage of the negotiations?
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 412/975
Shall we have a call on all of this tomorrow/early, so that we can be on the same page?
Thanks for everyone's time and attention!
Steve
Sent from my iPhone
On Nov 28, 2015, at 6:26 AM, Kennealy, Michael (EOHED) <[email protected]> wrote:
Steve, here is an update from the call yesterday with GE and discussions with Jay and team last night. Bottom line - I think we are in good shape to present something clear and robust on the tax incentive side and with respect to the other features of our offer, but we need more detail on sites and the deals we are willing to do there. I think it would be best to express these as - value of the site/land lease/rent X discount offered = value to GE. They are clearly now looking for $100 MM in tax incentives + value of real estate. Please call with any questions. We will need to submit everything by early afternoon on Monday and are working towards that goal. Also was surprised to learn on call that they are visiting sites in Boston next week - will get more detail today.
Tax incentives
1. EDIP/TIFa. We said $48 MM EDIP for 500 jobs and $130
MM payroll; City had said $20 MM TIF 600 jobs; GE asked how each offer scales up or down based on actual jobs
i. Discussion with Jay – propose $42 – 54 MM EDIP for 400-600 jobs
ii. Confirm with Boston how their offer scales and whether they are focused on jobs
or square feetb. GE wants all tax credits to be refundable
i. By statute can only do $6 MM refundable per year ($1 MM JCP, $5 MM EEP)
ii. Confirm that we can do $9.6 MM across 3 buckets (JCP, EEP, other)
iii. Discussion with Jay – say that we will attempt to amend statute as part of or economic development bill to offer all refundable
c. GE would like to see (all items to be sent this weekend or on Monday)
i. Statutory language on EDIP to confirm that
the board has discretion to offer an award of this size and also refundable vs. non-refundable buckets
ii. Examples of what was in the public record for Liberty Mutual deal (discussed as an example) – application, meeting minutes, press release, etc.
d. Process – GE wants an MOU agreed upon before any EACC meeting notice; very focused on PR (actually asked if they could get the award without an application – no)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 413/975
2. MassWorksa. Will send statutory languageb. Question on what if they have private
developer, private site ownership - difficult Sites
3. Site profiles
a. DOT to provide info on District 6 HQb. City has profiles on other sites
4. Deals – for each site we need:a. Dollar value of rent or land lease; timesb. % discount offeredc. = Dollar value to GEd. Discussion with Jay - ask CBRE for their view of
value of various sites/land lease/rente. GE made the point on the call that they are
now assuming discounted rent for the “2 new” City and State sites
Other
5. Additional features of our offer - new letter will include
a. State training fundb. Permitting ombudsmanc. Concierged. Ferrye. Corporate jetf. Housing – Boston Home Center plus
MassHousing programsg. Innovation Centerh. Helipadi. $25 million in bond authorizedSeaport district
transportation improvements
j. Other? 6. Process
a. They have a 3pm discussion on Mondayb. They are visiting sites in Boston next week c. Barros and I to have a call with Cowan today to
discuss process further
From: Kadish, Steven (GOV)Sent: Friday, November 27, 2015 10:17 PMTo: Ash, Jay (EOHED)Cc: Pollack, Stephanie (DOT); Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Povich, Lon (GOV); Beaton, Matthew (EEA)
Subject: Re: Chart for Updated Offer
Mike -- is there an update from a call today? Thx. Steve
Sent from my iPhone
On Nov 27, 2015, at 4:14 PM, Ash, Jay (EOHED) < [email protected]> wrote:
Great and agreed on the bridge.
Sent from my Verizon Wireless 4G LTE smartphone
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 414/975
-------- Original message --------From: "Pollack, Stephanie (DOT)" <[email protected]>Date: 11/27/2015 5:06 PM (GMT-04:00)To: "Kadish, Steven (GOV)" <[email protected]>, "Ash, Jay (EOHED)" < [email protected]>Cc: "Kennealy, Michael (EOHED)"
<[email protected]>, "Lepore, Kristen (ANF)" <[email protected]>, "Pollack, Stephanie (DOT)" <[email protected]>, "Povich, Lon (GOV)" <[email protected]>, "Beaton, Matthew (EEA)" <[email protected]>Subject: RE: Chart for Updated Offer
There is $25 million in bond authorized Seaport district transportation improvements we could add. Bridge is too expensive and complicated.
Stephanie
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Kadish, Steven (GOV)" <[email protected]>Date: 11/27/2015 2:41 PM (GMT-05:00)To: "Ash, Jay (SEA)" < [email protected]>Cc: "Kennealy, Michael (SEA)" <[email protected]>, "Lepore, Kristen (ANF)" <[email protected]>, "Pollack, Stephanie (DOT)" <[email protected]>, "Povich, Lon (GOV)" <[email protected]>, "Beaton, Matthew (ENV)" <[email protected]>Subject: Re: Chart for Updated Offer
I was looking to have the State total be more than $80M ($85m?)and therefore the package with the City be more than $100M.
Sent from my iPhone
On Nov 27, 2015, at 2:27 PM, Ash, Jay (EOHED) < [email protected]> wrote:
48mm on edip, 32 massworks for 80 plus city's 20m. Northern Avenue Bridge is off the table (may not have been able to get permitted anyway)
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Kennealy, Michael (EOHED)" <[email protected]>Date: 11/27/2015 1:04 PM (GMT-04:00)To: "Kadish, Steven (GOV)" <[email protected]>, "Ash, Jay (EOHED)" < [email protected]>, "Lepore, Kristen (ANF)" <[email protected]>, "Pollack, Stephanie (DOT)" <[email protected]>, "Povich, Lon (GOV)" <[email protected]>,
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 415/975
"Beaton, Matthew (EEA)" <[email protected]>Subject: RE: Chart for Updated Offer
Hi Steve, A few thoughts/questions: - Per my discussion with Jay this morning, we are looking at the Economic Development
Incentive Program instead of ITC.- On your point #2 - would this be $50 MM each for EDIP and MassWorks for $100 MM total vs. the $80 MM total we have now?- Re: the Northern Ave bridge, if I understood my conversation with Jay correctly this is no longer an option. I'm available on cell phone . I will be on a call with GE tax folks and John Barros at 4pm today. Thanks,Mike
From: Kadish, Steven (GOV)
Sent: Friday, November 27, 2015 11:20 AMTo: Ash, Jay (EOHED); Lepore, Kristen (ANF); Pollack, Stephanie (DOT); Povich, Lon (GOV); Kennealy, Michael (EOHED); Beaton, Matthew (EEA)Subject: Fwd: Chart for Updated Offer
Looping in Sec Pollack, Sec Beaton and Mike K.
1. Please include something about the helipad. Could we develop and pay for this as a
common amenity?
2. Bump up the Investment Tax Credit and MassWorks so that they total over $50?
3. Is there any cost of energy or sustainability $ available that may help? Credits for equipment purchase, etc.? Sec Beaton?
4. Please include Northern Ave bridge and other $25M improvements.
5. Sec Pollack -- other ideas?
6. Sec Lepore -- ??
Thx.
Steve
Sent from my iPhone
Begin forwarded message:
From: "Ash, Jay (SEA)" < [email protected]>
Date: November 27, 2015 at 7:04:53 AM ESTTo: "[email protected]"
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 416/975
<[email protected]>, "[email protected]" <[email protected]>
Cc: "[email protected]" <[email protected]>
Subject: Chart for Updated Offer
Here's a rundown of where we are. In my absence, Mike Kennealy has the ball. Steve if you could inquire with Massport on the percentage off they are willing to let out a land lease (I assume that it will depend on how much of the land is left over for the development of a second building) and determine what our offer is on the District 6 building (75% off would be reasonable, and
we could negotiate that to the 100% they will want) and direct that to Mike, that would be helpful. Gov says 100% off for Convention Center site, Kristen could you confirm that.I'll be in touch with Mike regularly. Lon, please give him a call as well to offer your always appreciated assistance. Thanks.John Barros is coordinating with the GE folks. We are in contact.Cheers,JayMike Kennealy 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 417/975
From: Kennealy, Michael (EOHED)
To: Kadish, Steven (GOV)
Cc: Ash, Jay (EOHED); Zarrella, Lily (GOV)
Subject: RE: Chart for Updated Offer
Date: Saturday, November 28, 2015 9:27:45 PM
I think it will just be you and me Steve given Jay's travel schedule.
From: Kadish, Steven (GOV)Sent: Saturday, November 28, 2015 9:23 PMTo: Kennealy, Michael (EOHED)Cc: Ash, Jay (EOHED); Zarrella, Lily (GOV)Subject: Re: Chart for Updated Offer
Are we on for 11:45 am tomorrow--the 3 of us on the same line that Brianna sent out?
Sent from my iPhone
On Nov 28, 2015, at 4:30 PM, Kadish, Steven (GOV) <[email protected]> wrote:
You all will need to take the lead here with some options, some comps, and the pros and cons.
I am setting up a call with our full team for noon tomorrow.
Let us use the same line for a prep call at 11:45 am tomorrow.
You all will lead the call.
Sent from my iPhone
On Nov 28, 2015, at 3:41 PM, Kennealy, Michael (EOHED) <[email protected]> wrote:
Steve, Jay, feels like, between the info we just received from MassPort, request out to DOT, and MCCA info coming tomorrow, that we will have good info on the various sites. Missing piece is what deal we're willing to do - % discount for rent for DOT 6 and % discount on land lease for MassPort and MCCA. Not clear to me how we arrive at this or what constraints there may be - discuss tomorrow on call or today?
From: Kadish, Steven (GOV)Sent: Saturday, November 28, 2015 3:13 PMTo: Povich, Lon (GOV)Cc: Kennealy, Michael (EOHED); Ash, Jay (EOHED); Pollack, Stephanie (DOT); Lepore, Kristen (ANF); Beaton, Matthew (EEA); Garrity, Rob (DOT)Subject: Re: Chart for Updated Offer
All -- I will schedule a call for tomorrow morning. Stay tuned.
All -- lets all be cognizant of what's appropriate for email: phone is good.
Lon and Mike K -- please connect.
Sec Lepore will have info on MCCA properties tomorrow.
Sent from my iPhone
On Nov 28, 2015, at 3:08 PM, Povich, Lon (GOV) <[email protected]> wrote:
I am happy to help over the weekend and would suggest that.
Sent from my iPhone
On Nov 28, 2015, at 2:47 PM, Kadish, Steven (GOV) <[email protected]> wrote:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 418/975
All:
Just received a message that the folks reviewing our proposal want to see all the math, statutes, other examples, and understand what the application process is for each item we are proposing.
This suggests to me that we have our legal teams also involved in putting together our response. Who should this be from HED? Lon--who can help this weekend from the Gov's office?
Let's please have a call tomorrow morning. 10 or 11 am?
Thx!Steve
Sent from my iPhone
On Nov 28, 2015, at 2:38 PM, Kadish, Steven (GOV) <[email protected]> wrote:
Sec Pollack (Rob!): we will need some information regarding the District 6 site not later than tomorrow/early. Mike Kenneally can help with what is exactly needed.
Sec Ash/Mike K: please propose what you think makes sense on the land lease and ultimate discount to GE.
Sec Beaton: anything in your world that might be helpful for this project?Energy incentives?
Sec Ash: We are saving other brownfield/remediation $ for other possible sites for a later stage of the negotiations?
Shall we have a call on all of this tomorrow/early, so that we can be on the same page?
Thanks for everyone's time and attention!
Steve
Sent from my iPhone
On Nov 28, 2015, at 6:26 AM, Kennealy, Michael (EOHED) <[email protected]> wrote:
Steve, here is an update from the call yesterday with GE and discussions with Jay and team last night.Bottom line - I think we are
in good shape to present something clear and robust on the tax incentive side and with respect to the other features of our offer, but we need more detail on sites and the deals we are willing to do there. I think it would be best to express these as - value of the site/land lease/rent X discount offered = value to GE. They are clearly now looking for $100 MM in tax
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 419/975
incentives + value of real estate. Please call with any questions. We will need to submit everything by early afternoon on Monday and are working towards that goal. Also was surprised to learn on call that they are visiting sites in Boston next week - will get more detail
today.
Tax incentives
1. EDIP/TIFa. We
said $48 MM EDIP for 500 jobs and
$130 MM payroll; City had said $20 MM TIF 600 jobs; GE asked how
each offer scales up or down based on actual jobs
i.
Discussion with
Jay – propose $42 – 54 MM EDIP for 400-600
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 420/975
jobs ii.
Confirm with Boston how their offer scales and whether they are focused on jobs or square feet
b. GE wants
all tax credits to be refundable
i. By statute can only do $6 MM refundable
per year ($1 MM JCP, $5 MM EEP)
ii.
Confirm that we can do $9.6 MM across 3 buckets (JCP, EEP, other)
iii.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 421/975
Discussion with Jay – say that we will
attempt to amend statute as part of or economic development bill to offer all
refundablec. GE
would like to see (all items to be sent this weekend
or on Monday)
i.
Statutory language on EDIP to confirm that the board
has discretion to offer an award of this size and also refundable
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 422/975
vs. non-refundable buckets
ii.
Examples of what was in the public record for Liberty Mutual deal (discussed as an example)
– application, meeting minutes, press release, etc.
d. Process – GE wants an MOU
agreed upon before any EACC meeting notice; very focused on PR (actually asked
if they could get the award without an application – no)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 423/975
2. MassWorksa. Will
send statutory language
b. Question on
what if they have private developer, private site ownership - difficult
Sites
3. Site profilesa. DOT
to provide info on District 6 HQ
b. City has profiles on other
sites
4. Deals – for each site we need:
a. Dollar value of rent or land lease; times
b. % discount offered
c. = Dollar value to GE
d. Discussion with Jay -
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 424/975
ask CBRE for their view of value of
various sites/land lease/rent
e. GE made the point on the call that they are now
assuming discounted rent for the “2 new” City and State sites
Other
5. Additional features of our offer - new letter will include
a. State training fund
b. Permitting ombudsman
c. Concierge
d.
Ferrye. Corporate jet
f. Housing – Boston Home Center plus MassHousing
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 425/975
programsg.
Innovation Center
h. Helipad
i. $25 million
in bond authorizedSeaport district transportation improvements
j.
Other?
6. Processa. They
have a 3pm
discussion on Monday
b. They are visiting sites in Boston next week
c. Barros and I to have a call with Cowan today to discuss process further
From: Kadish, Steven
(GOV)Sent: Friday, November 27, 2015 10:17 PMTo: Ash, Jay (EOHED)Cc: Pollack, Stephanie (DOT); Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Povich, Lon (GOV); Beaton, Matthew
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 426/975
(EEA)Subject: Re: Chart for Updated Offer
Mike -- is there an update from a call today? Thx. Steve
Sent from my iPhone
On Nov 27, 2015, at 4:14 PM, Ash, Jay (EOHED) < [email protected]> wrote:
Great and agreed on the bridge.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Pollack, Stephanie (DOT)" <[email protected]> Date: 11/27/2015 5:06 PM (GMT-04:00)To: "Kadish, Steven (GOV)" <[email protected]>, "Ash, Jay (EOHED)" < [email protected]> Cc: "Kennealy, Michael (EOHED)" <[email protected]>, "Lepore, Kristen (ANF)" <[email protected]>, "Pollack, Stephanie (DOT)" <[email protected]>, "Povich, Lon (GOV)" <[email protected]>, "Beaton, Matthew (EEA)" <[email protected]>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 427/975
Subject: RE: Chart for Updated Offer
There is $25 million in bond
authorized Seaport district transportation improvements we could add. Bridge is too expensive and complicated.
Stephanie
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Kadish, Steven (GOV)" <[email protected]>Date: 11/27/2015
2:41 PM (GMT-05:00)To: "Ash, Jay (SEA)" < [email protected]>Cc: "Kennealy, Michael (SEA)" <[email protected]>, "Lepore, Kristen (ANF)" <[email protected]>, "Pollack,
Stephanie (DOT)" <[email protected]>, "Povich, Lon (GOV)" <[email protected]>, "Beaton, Matthew (ENV)" <[email protected]>Subject: Re: Chart for
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 428/975
Updated Offer
I was looking to have the State total be more than
$80M ($85m?)and therefore the package with the City be more than $100M.
Sent from my iPhone
On Nov 27, 2015,
at 2:27 PM, Ash, Jay (EOHED) < [email protected]> wrote:
48mm on edip, 32 massworks for 80 plus city's 20m. Northern Avenue Bridge is off the table (may not have been able to get permitted anyway)
Sent from my Verizon Wireless 4G LTE smartphone
---
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 429/975
----- Original message ---
-----
From: "Kennealy, Michael (EOHED)" <[email protected]>
Date: 11/27/2015 1:04 PM
(GMT-04:00)
To: "Kadish, Steven (GOV)" <[email protected]>, "Ash, Jay (EOHED)" < [email protected]>, "Lepore, Kristen (ANF)" <[email protected]>,
"Pollack, Stephanie (DOT)" <[email protected]>, "Povich, Lon (GOV)" <[email protected]>, "Beaton, Matthew (EEA)" <[email protected]>
Subject: RE: Chart
for Updated Offer
Hi Steve, A few thoughts/questions: -
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 430/975
Per my discussion with Jay this morning, we are looking
at the Economic Development Incentive Program instead of ITC.- On your point #2 - would this
be $50 MM each for EDIP and MassWorks for $100 MM total vs. the $80 MM total we
have now?- Re: the Northern Ave bridge, if I understood my conversation with Jay correctly this is
no longer an option. I'm available on cell phone
.I
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 431/975
will be on a call with GE tax folks and
John Barros at 4pm today. Thanks,Mike
From: Kadish, Steven (GOV)
Sent:
Friday, November 27, 2015 11:20 AM
To: Ash, Jay (EOHED); Lepore, Kristen
(ANF); Pollack, Stephanie (DOT); Povich, Lon (GOV); Kennealy, Michael (EOHED); Beaton, Matthew (EEA)
Subject: Fwd: Chart for Updated Offer
Looping in Sec Pollack,
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 432/975
Sec Beaton and Mike K.
1. Please include something
about the helipad. Could we develop and pay for this as a common amenity?
2. Bump
up the Investment Tax Credit and MassWorks so that they total over $50?
3. Is there
any cost of energy or sustainability $ available that may help? Credits for equipment purchase, etc.? Sec
Beaton?
4. Please include Northern Ave bridge and other $25M improvements.
5.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 433/975
Sec Pollack -- other ideas?
6. Sec Lepore
-- ??
Thx.Steve
Sent from my iPhone
Begin forwarded message:
From: "Ash, Jay (SEA)" < [email protected]>
Date: November 27, 2015 at 7:04:53 AM EST
To: "[email protected]" <[email protected]>, "[email protected]" <[email protected]>
Cc: "[email protected]" <[email protected]>
Subject: Chart for Updated Offer
Here's a rundown of where we are. In my absence, Mike Kennealy has
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 434/975
the ball. Steve if you could inquire with Massport on
the percentage off they are willing to let out a land lease (I assume that it will
depend on how much of the land is left over for the development of a second building)
and determine what our offer is on the District 6 building (75% off would be reasonable, and
we could negotiate that to the 100% they will want) and direct that to
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 435/975
Mike, that would be helpful. Gov says 100% off for
Convention Center site, Kristen could you confirm that.
I'll be in touch with Mike regularly. Lon,
please give him a call as well to offer your always appreciated assistance. Thanks.
John Barros
is coordinating with the GE folks. We are in contact.
Cheers,
Jay
Mike Kennealy
617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 436/975
From: Ash, Jay (EOHED)
To: Karyn Polito; Ash, Jay (EOHED); Kadish, Steven (GOV)
Subject: RE: Connecticut -
Date: Tuesday, June 02, 2015 7:48:02 AM
Thanks! We are already on it.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: Karyn Polito <[email protected]>Date: 06/01/2015 9:58 PM (GMT-05:00)To: "Ash, Jay (EOHED)" <[email protected]>, "Kadish, Steven (GOV)" <[email protected]>
Subject: Connecticut -
There's an article in Hartford Courant about raising taxes- and response from AETNA
Travellers and GE. Would be nice to welcome more insurers to MA!
Capitol Watch
Reports from the Courant's politics staff
Politics Capitol Watch
GE, Aetna, Travelers Issue
Statements Against CT Tax
Weather Alert in Windham, Tolland, Hartford, Ne
London, New Haven, Middlesex and Fair counties.
Sign up today and save up to 83% on a
Hartford Courant digital subscri
GOV E-mail
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 437/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 438/975
Sent from my iPhone
Karyn Polito
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 439/975
From: Kadish, Steven (GOV)
To: Ash, Jay (EOHED)
Subject: RE: Connecticut -
Date: Tuesday, June 02, 2015 8:33:21 AM
Of course!
From: Ash, Jay (EOHED)Sent: Tuesday, June 02, 2015 7:48 AMTo: Karyn Polito; Ash, Jay (EOHED); Kadish, Steven (GOV)Subject: RE: Connecticut -
Thanks! We are already on it.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: Karyn Polito <[email protected]>Date: 06/01/2015 9:58 PM (GMT-05:00)To: , "Ash, Jay (EOHED)" < [email protected]>, "Kadish, Steven (GOV)" <[email protected]>Subject: Connecticut -
Sign up today and save up to 83% on a Hartford Courant digital subscriWeather
Alert in Windham, Tolland, Hartford, New London, New Haven, Middlesex and Fairfield counties.
There's an article in Hartford Courant about raising taxes- and response from AETNA Travellers and GE. Would be nice to welcome more insurers to MA!
Capitol Watch
Reports from the Courant's politics staff
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 440/975
Politics Capitol Watch
GE, Aetna, Travelers Issue Statements Against
CT Tax Package In Rare Move
Sent from my iPhoneKaryn Polito
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 441/975
From: Sullivan, Jennifer F. (ANF)
To: Kadish, Steven (GOV)
Cc: Povich, Lon (GOV); Frazier, Ricks (EOHED); Lepore, Kristen (ANF); Ash, Jay (EOHED)
Subject: Re: connecting Jen, Lon,Ricks
Date: Tuesday, December 08, 2015 7:30:39 AM
I am on my cell:
On Dec 8, 2015, at 7:28 AM, Kadish, Steven (GOV) <[email protected]> wrote:
Jen’s #
From: Sullivan, Jennifer F. (ANF)Sent: Monday, December 07, 2015 8:33 PMTo: Kadish, Steven (GOV)
Subject: Re: MassWorks document
Yes, is my cell or home.
On Dec 7, 2015, at 8:27 PM, Kadish, Steven (GOV)
<[email protected]> wrote:
Jen,
Can I call you tonight?
What#?
Thx.
Sent from my iPhone
Begin forwarded message:
From: "Kadish, Steven (GOV)"
Date: December 7, 2015 at 7:53:45 PM ESTTo: "Lepore, Kristen (ANF)"
Cc: "Kennealy, Michael (EOHED)"
<[email protected]>, "Ash, Jay
(EOHED)" < [email protected]>, "Sullivan,
Jennifer F. (ANF)"
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 442/975
Subject: Re: MassWorks document
We just tried you.
What # can we call?
Sent from my iPhone
On Dec 7, 2015, at 7:17 PM, Lepore, Kristen (ANF)
<[email protected]> wrote:
We need to talk ASAP. Jen got info from bond
counsel that significantly changes things.
From: Kennealy, Michael (EOHED)Sent: Monday, December 07, 2015 5:56 PMTo: Ash, Jay (EOHED); Kadish, Steven (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF)Subject: Re: MassWorks document
And all to be reviewed by City too - Jay calling
Barros to update him.
Mike Kennealy
On Dec 7, 2015, at 5:46 PM, Kennealy, Michael
(EOHED)
wrote:
Attached please find a memo
from our MassWorks director
describing some of the larger
projects completed. I need to
give this a closer read tonight,
but I think it is at least a good
start. On other items:
- Jennifer is doing a first
draft of the 1 – 1½ page document. I will look at
tonight, made comments
and send back to her; we
are then discussing at
7am tomorrow and will
send to this group ASAP
guessing 8/8:30am.
- Jay and I discussed
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 443/975
sending the 1 – ½ pager
with two attachments
(slightly different game
plan than discussed in the
meeting)
o MassPort site
document – I think I heard
them commit to
getting us
something mid-
morning
tomorrow
o MassWorks
document
attached (with
edits obviously)- Do not propose that we
send either
o A separate site
document from
us – I think
MassPort really
needs to drive
this; obviously
we’ll make
edits/additions
o The MOBD memo
on other benefits
to GE – these
points are really
all captured in
the 1-1/2 pager
now
So a good concise package to
them by [noon?] tomorrow
- Cover letter
- Site document
- MassWorks
Any questions let me know.
Mike
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 444/975
Mike Kennealy
Assistant Secretary for Business
Growth
The Commonwealth of
Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
<Updated - Examples of MassWorks Capabilities
20151207.docx MJK.docx>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 445/975
From: Mcgaugh, James (GE Corporate)
To: Buckley, Timothy (GOV)
Cc: Kennealy, Michael (EOHED)
Subject: Re: Connecting you
Date: Monday, January 11, 2016 7:56:39 PM
Thanks. I think we are all good for the moment. We may run the drill on
Wednesday but for now I think we can all breathe. We're going to connect
with Laura Oggeri
Chief of Communication cell 1 .
> On Jan 11, 2016, at 7:53 PM, Buckley, Timothy (GOV)
<[email protected]> wrote:
>
> OK. Thanks.
>
> I have not contacted Mayor Walsh's office. Let me know if you would like
us to do that.>
> ________________________________________
> From: Mcgaugh, James (GE Corporate) <[email protected]>
> Sent: Monday, January 11, 2016 7:20 PM
> To: Buckley, Timothy (GOV); Kennealy, Michael (EOHED)
> Subject: RE: Connecting you
>
> Tim & Mike---thanks a bunch. I will share with our comms team. The
likely contact will be Una Pullizi or could be Seth Martin. One or the
other will reach out to you, Tim, at go-time. Jim
>
> -----Original Message-----
> From: Buckley, Timothy (GOV)[mailto:[email protected]]
> Sent: Monday, January 11, 2016 4:26 PM
> To: Kennealy, Michael (EOHED); Mcgaugh, James (GE Corporate)
> Subject: RE: Connecting you
>
> My cell is
>
>
>
> -----Original Message-----
> From: Kennealy, Michael (EOHED)
> Sent: Monday, January 11, 2016 4:20 PM
> To: Jim McGaugh; Buckley, Timothy (GOV)
> Subject: Connecting you
>
> Jim, Tim - connecting you over email. Jim, do you want to call Tim to
discuss plan? Let me know if I can do anything else here.
>
> Thanks,
> Mike
>
> Mike Kennealy
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 446/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 447/975
From: Lepore, Kristen (ANF)
To: Kennealy, Michael (EOHED)
Cc: Povich, Lon (GOV); Frazier, Ricks (EOHED); Cosco, Jonathan (EOHED); Kadish, Steven (GOV); Davenport, David S (DOR); Ross, Robert (ANF); Sullivan, Jennifer F. (ANF)
Subject: Re: DOR Tax questions
Date: Sunday, November 29, 2015 5:15:40 PM
Not unless we can define them as manufacturing.
Sent from my iPhone
On Nov 29, 2015, at 4:59 PM, Kennealy, Michael (EOHED) <[email protected]> wrote:
So is there currently any advantage that MA has over CT or NY? It based on the answer below, but just wanted to confirm.
From: Povich, Lon (GOV)Sent: Sunday, November 29, 2015 4:39 PM
To: Frazier, Ricks (EOHED); Cosco, Jonathan (EOHED); Kennealy, Michael (EOHED); Kadish, Steven (GOV)Cc: Lepore, Kristen (ANF); Davenport, David S (DOR); Ross, Robert (ANF); Sullivan, Jennifer F. (ANF)Subject: Fw: DOR Tax questions
expanding the group
From: Lepore, Kristen (ANF)
Sent: Sunday, November 29, 2015 4:11 PM
To: Davenport, David S (DOR)
Cc: Nunnelly, Mark E (DOR); Rybicki, Michael T (DOR); [email protected];
[email protected]; Brown, Kevin W (DOR); Forter, Rebecca H (DOR); Povich, Lon (GOV)
Subject: Re: DOR Tax questions Lon can you please loop in the appropriate people to this email chain?
Sent from my iPhone
On Nov 29, 2015, at 4:07 PM, Davenport, David S. <[email protected]> wrote:
I
.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 448/975
Looping in Kevin Brown and Rebecca Forter.
.
-Dave
From: Nunnelly, Mark E.Sent: Sunday, November 29, 2015 3:59 PMTo: Lepore, Kristen (ANF); Rybicki, Michael T.Cc: Davenport, David S.; '[email protected]'; ' [email protected]'; Brown, Kevin W.Subject: Re: DOR Tax questions
Remember we are proposing the idea of moving to single sales factor in
the modernization proposals. So we have a lot of fresh stuff on this
Mark Nunnelly, Commissioner
Department of Revenue
Special Advisor to the Governor for
Innovation Competitiveness
Tel: (617)626-2201
Fax:(617)626-2299
From: Lepore, Kristen (ANF) [mailto:[email protected]]Sent: Sunday, November 29, 2015 03:54 PMTo: Rybicki, Michael T.Cc: Nunnelly, Mark E.; Davenport, David S.; Ross, Robert (ANF) <[email protected]>; Sullivan, Jennifer F. (ANF)
< [email protected]>Subject: Re: DOR Tax questions
Jen and Bob,
Please work with Dave to answer the questions about EDIP.
Jen can you please contact Dave with specifics? Bob is driving and will be
available around 6:30.
Thank you everyone.
Sent from my iPhone
On Nov 29, 2015, at 3:48 PM, Rybicki, Michael T.
<[email protected]> wrote:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 449/975
Hi Secretary Lepore,
Dave Davenport (copied) will be available to help out with
those topics.
Thank you,
Michael T. Rybicki | Chief of Staff
Department of Revenue
From: Lepore, Kristen (ANF) [mailto:[email protected]]Sent: Sunday, November 29, 2015 02:20 PMTo: Nunnelly, Mark E.Cc: Rybicki, Michael T.Subject: DOR Tax questions
Hi Mark,
Who from DOR can work with A&F, HED and Gov legal office
today and early tomorrow morning on some questions we
have ?
Kristen
Kristen Lepore
Secretary
Executive Office for Administration and Finance
State House, Room 373
Boston, MA 02133
(617) 727-2040
**********************************************************************
This email and any files transmitted with it are confidential and
intended solely for the use of the individual or entity to whom they
are addressed. If you have received this email in error please notify
the system manager at postmaster at dor.state.ma.us.
**********************************************************************
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 450/975
From: Lepore, Kristen (ANF)
To: Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)
Cc: Kadish, Steven (GOV); Kennealy, Michael (EOHED); Povich, Lon (GOV)
Subject: RE: Final approval of Plum materials
Date: Tuesday, December 01, 2015 7:35:38 PM
Thanks everyone. Good work!
From: Sullivan, Jennifer F. (ANF)Sent: Tuesday, December 01, 2015 7:35 PMTo: Frazier, Ricks (EOHED)Cc: Lepore, Kristen (ANF); Kadish, Steven (GOV); Kennealy, Michael (EOHED); Povich, Lon (GOV)Subject: Re: Final approval of Plum materials
Great!
On Dec 1, 2015, at 7:32 PM, Frazier, Ricks (EOHED) <[email protected]> wrote:
Here’s the revised language.
Ricks
From: Sullivan, Jennifer F. (ANF)Sent: Tuesday, December 01, 2015 7:28 PM
To: Lepore, Kristen (ANF)
Cc: Kadish, Steven (GOV); Kennealy, Michael (EOHED); Povich, Lon (GOV); Frazier, Ricks
(EOHED)
Subject: Re: Final approval of Plum materials
Mike, those are the Bob Ross edits from earlier. Thanks!
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 451/975
On Dec 1, 2015, at 7:18 PM, Lepore, Kristen (ANF)
<[email protected]> wrote:
Mike Jen is sending you comments now. Specifically about the local tax
incentive section and the EDIP reference.
From: Kadish, Steven (GOV)Sent: Tuesday, December 01, 2015 7:18 PMTo: Lepore, Kristen (ANF); Kennealy, Michael (EOHED); Povich, Lon (GOV); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Mike,
Nice job.
My comments are in the attached document.
Let’s get this outta here!
Steve
From: Lepore, Kristen (ANF)Sent: Tuesday, December 01, 2015 7:10 PMTo: Kennealy, Michael (EOHED); Kadish, Steven (GOV); Povich, Lon (GOV); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
I am still reading but the bullets of rankings on page two - some have
periods and some don’t. Please make them all consistent.
From: Kennealy, Michael (EOHED)Sent: Tuesday, December 01, 2015 6:58 PMTo: Lepore, Kristen (ANF); Kadish, Steven (GOV); Povich, Lon (GOV); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Please read this and give any comments. I will do another read right now.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 452/975
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 6:19 PM
To: Lepore, Kristen (ANF) <[email protected]>;
Kadish, Steven (GOV) <[email protected]>; Povich,
Lon (GOV) <[email protected]>; Sullivan, Jennifer F.
(ANF) <[email protected]>; Frazier, Ricks
(EOHED) <[email protected]>
Subject: RE: Final approval of Plum materials
I have the email with Elizabeth, who also called me with the air people
from her office. I have not heard from Tom but Steve was going to try to
reach him. I suspect Tom meant that they cannot store a helicopter at Logan. We should see if Steve reaches Tom and if not I suggest we do
with what Elizabeth said.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640Cell: 617-634-4762
From: Lepore, Kristen (ANF)
Sent: Tuesday, December 01, 2015 6:11 PM
To: Kadish, Steven (GOV) <[email protected]>;
Kennealy, Michael (EOHED) <[email protected]>;
Povich, Lon (GOV) <[email protected]>; Sullivan,
Jennifer F. (ANF) <[email protected]>; Frazier,
Ricks (EOHED) <[email protected]>Subject: RE: Final approval of Plum materials
Mike did you get resolution on the helicopter matter?
From: Kadish, Steven (GOV)Sent: Tuesday, December 01, 2015 6:08 PMTo: Kennealy, Michael (EOHED); Povich, Lon (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 453/975
Yes, I have heard that all the other proposals are in.
We need to get ours in.
From: Kennealy, Michael (EOHED)Sent: Tuesday, December 01, 2015 6:06 PMTo: Kadish, Steven (GOV); Povich, Lon (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Barros and I spoke with Mo who informed us that there is now a meeting
tonight at 7:30pm. I am working on a redraft of the letter now and hope
to have with 30-45 minutes. If you could focus on it as soon as it comes
over that would be appreciated.
Mike KennealyAssistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Kennealy, Michael (EOHED)Sent: Tuesday, December 01, 2015 5:10 PM
To: Kadish, Steven (GOV) <[email protected]>;
Povich, Lon (GOV) <[email protected]>; Lepore, Kristen
(ANF) <[email protected]>; Jennifer F. Sullivan (ANF)
<[email protected]>; Frazier, Ricks (EOHED)
Subject: Final approval of Plum materials
FYI - per my conversation with Steve a bit earlier, we think this is the
group that should have final sign off on the materials being sent to Plum
tonight. Obviously we’re working as fast as possible to get this done, but
I suspect it will be sometime tonight before it is finished, though
hopefully not too late. The City will want to review the final letter and
Barros will be in a meeting from 6-8pm. My goal is to have everything
finished by 8pm, get final sign off from this group and the City, and then
send to Plum. I will provide updates on how we’re doing against that
timing.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 454/975
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 455/975
From: Lepore, Kristen (ANF)
To: Frazier, Ricks (EOHED); Sullivan, Jennifer F. (ANF)
Cc: Kadish, Steven (GOV); Kennealy, Michael (EOHED); Povich, Lon (GOV)
Subject: RE: Final approval of Plum materials
Date: Tuesday, December 01, 2015 7:35:27 PM
Looks good except take out the extra comma in the first sentence of the second paragraph.
From: Frazier, Ricks (EOHED)Sent: Tuesday, December 01, 2015 7:33 PMTo: Sullivan, Jennifer F. (ANF); Lepore, Kristen (ANF)Cc: Kadish, Steven (GOV); Kennealy, Michael (EOHED); Povich, Lon (GOV)Subject: RE: Final approval of Plum materials
Here’s the revised language.
Ricks
From: Sullivan, Jennifer F. (ANF)
Sent: Tuesday, December 01, 2015 7:28 PM
To: Lepore, Kristen (ANF)
Cc: Kadish, Steven (GOV); Kennealy, Michael (EOHED); Povich, Lon (GOV); Frazier, Ricks (EOHED)
Subject: Re: Final approval of Plum materials
Mike, those are the Bob Ross edits from earlier. Thanks!
On Dec 1, 2015, at 7:18 PM, Lepore, Kristen (ANF) <[email protected]> wrote:
Mike Jen is sending you comments now. Specifically about the local tax incentive
section and the EDIP reference.
From: Kadish, Steven (GOV)Sent: Tuesday, December 01, 2015 7:18 PMTo: Lepore, Kristen (ANF); Kennealy, Michael (EOHED); Povich, Lon (GOV); Sullivan,
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 456/975
Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Mike,
Nice job.
My comments are in the attached document.
Let’s get this outta here!
Steve
From: Lepore, Kristen (ANF)Sent: Tuesday, December 01, 2015 7:10 PMTo: Kennealy, Michael (EOHED); Kadish, Steven (GOV); Povich, Lon (GOV); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
I am still reading but the bullets of rankings on page two - some have periods and some
don’t. Please make them all consistent.
From: Kennealy, Michael (EOHED)Sent: Tuesday, December 01, 2015 6:58 PMTo: Lepore, Kristen (ANF); Kadish, Steven (GOV); Povich, Lon (GOV); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Please read this and give any comments. I will do another read right now.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 6:19 PM
To: Lepore, Kristen (ANF) <[email protected]>; Kadish, Steven
(GOV) <[email protected]>; Povich, Lon (GOV)
<[email protected]>; Sullivan, Jennifer F. (ANF)
<[email protected]>; Frazier, Ricks (EOHED)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 457/975
Subject: RE: Final approval of Plum materials
I have the email with Elizabeth, who also called me with the air people from her office.
I have not heard from Tom but Steve was going to try to reach him. I suspect Tom
meant that they cannot store a helicopter at Logan. We should see if Steve reaches
Tom and if not I suggest we do with what Elizabeth said.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Lepore, Kristen (ANF)
Sent: Tuesday, December 01, 2015 6:11 PM
To: Kadish, Steven (GOV) <[email protected]>; Kennealy, Michael
(EOHED) <[email protected]>; Povich, Lon (GOV)
<[email protected]>; Sullivan, Jennifer F. (ANF)
<[email protected]>; Frazier, Ricks (EOHED)
Subject: RE: Final approval of Plum materials
Mike did you get resolution on the helicopter matter?
From: Kadish, Steven (GOV)Sent: Tuesday, December 01, 2015 6:08 PMTo: Kennealy, Michael (EOHED); Povich, Lon (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Yes, I have heard that all the other proposals are in.
We need to get ours in.
From: Kennealy, Michael (EOHED)Sent: Tuesday, December 01, 2015 6:06 PMTo: Kadish, Steven (GOV); Povich, Lon (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Barros and I spoke with Mo who informed us that there is now a meeting tonight at
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 458/975
7:30pm. I am working on a redraft of the letter now and hope to have with 30-45
minutes. If you could focus on it as soon as it comes over that would be appreciated.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic DevelopmentOne Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 5:10 PM
To: Kadish, Steven (GOV) <[email protected]>; Povich, Lon (GOV)
<[email protected]>; Lepore, Kristen (ANF) <[email protected]>; Jennifer F. Sullivan (ANF)
<[email protected]>; Frazier, Ricks (EOHED)
Subject: Final approval of Plum materials
FYI - per my conversation with Steve a bit earlier, we think this is the group that should
have final sign off on the materials being sent to Plum tonight. Obviously we’re
working as fast as possible to get this done, but I suspect it will be sometime tonight
before it is finished, though hopefully not too late. The City will want to review the final letter and Barros will be in a meeting from 6-8pm. My goal is to have everything
finished by 8pm, get final sign off from this group and the City, and then send to Plum.
I will provide updates on how we’re doing against that timing.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 459/975
From: Frazier, Ricks (EOHED)
To: Sullivan, Jennifer F. (ANF); Lepore, Kristen (ANF)
Cc: Kadish, Steven (GOV); Kennealy, Michael (EOHED); Povich, Lon (GOV)
Subject: RE: Final approval of Plum materials
Date: Tuesday, December 01, 2015 7:28:00 PM
.
Ricks
From: Sullivan, Jennifer F. (ANF)
Sent: Tuesday, December 01, 2015 7:28 PM
To: Lepore, Kristen (ANF)
Cc: Kadish, Steven (GOV); Kennealy, Michael (EOHED); Povich, Lon (GOV); Frazier, Ricks (EOHED)
Subject: Re: Final approval of Plum materials
Mike, those are the Bob Ross edits from earlier. Thanks!
On Dec 1, 2015, at 7:18 PM, Lepore, Kristen (ANF) <[email protected]> wrote:
Mike Jen is sending you comments now. Specifically about the local tax incentive
section and the EDIP reference.
From: Kadish, Steven (GOV)Sent: Tuesday, December 01, 2015 7:18 PMTo: Lepore, Kristen (ANF); Kennealy, Michael (EOHED); Povich, Lon (GOV); Sullivan,
Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Mike,
Nice job.
My comments are in the attached document.
Let’s get this outta here!
Steve
From: Lepore, Kristen (ANF)Sent: Tuesday, December 01, 2015 7:10 PMTo: Kennealy, Michael (EOHED); Kadish, Steven (GOV); Povich, Lon (GOV); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
I am still reading but the bullets of rankings on page two - some have periods and some
don’t. Please make them all consistent.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 460/975
From: Kennealy, Michael (EOHED)Sent: Tuesday, December 01, 2015 6:58 PMTo: Lepore, Kristen (ANF); Kadish, Steven (GOV); Povich, Lon (GOV); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Please read this and give any comments. I will do another read right now.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640Cell: 617-634-4762
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 6:19 PM
To: Lepore, Kristen (ANF) <[email protected]>; Kadish, Steven
(GOV) <[email protected]>; Povich, Lon (GOV)
<[email protected]>; Sullivan, Jennifer F. (ANF)
<[email protected]>; Frazier, Ricks (EOHED)
<[email protected]>Subject: RE: Final approval of Plum materials
I have the email with Elizabeth, who also called me with the air people from her office.
I have not heard from Tom but Steve was going to try to reach him. I suspect Tom
meant that they cannot store a helicopter at Logan. We should see if Steve reaches
Tom and if not I suggest we do with what Elizabeth said.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Lepore, Kristen (ANF)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 461/975
Sent: Tuesday, December 01, 2015 6:11 PM
To: Kadish, Steven (GOV) <[email protected]>; Kennealy, Michael
(EOHED) <[email protected]>; Povich, Lon (GOV)
<[email protected]>; Sullivan, Jennifer F. (ANF)
<[email protected]>; Frazier, Ricks (EOHED)
Subject: RE: Final approval of Plum materials
Mike did you get resolution on the helicopter matter?
From: Kadish, Steven (GOV)Sent: Tuesday, December 01, 2015 6:08 PMTo: Kennealy, Michael (EOHED); Povich, Lon (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Yes, I have heard that all the other proposals are in.
We need to get ours in.
From: Kennealy, Michael (EOHED)Sent: Tuesday, December 01, 2015 6:06 PMTo: Kadish, Steven (GOV); Povich, Lon (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Barros and I spoke with Mo who informed us that there is now a meeting tonight at
7:30pm. I am working on a redraft of the letter now and hope to have with 30-45
minutes. If you could focus on it as soon as it comes over that would be appreciated.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 5:10 PM
To: Kadish, Steven (GOV) <[email protected]>; Povich, Lon (GOV)
<[email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Jennifer F. Sullivan (ANF)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 462/975
<[email protected]>; Frazier, Ricks (EOHED)
Subject: Final approval of Plum materials
FYI - per my conversation with Steve a bit earlier, we think this is the group that should
have final sign off on the materials being sent to Plum tonight. Obviously we’re
working as fast as possible to get this done, but I suspect it will be sometime tonight before it is finished, though hopefully not too late. The City will want to review the
final letter and Barros will be in a meeting from 6-8pm. My goal is to have everything
finished by 8pm, get final sign off from this group and the City, and then send to Plum.
I will provide updates on how we’re doing against that timing.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic DevelopmentOne Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 463/975
From: Kennealy, Michael (EOHED)
To: Sullivan, Jennifer F. (ANF); Lepore, Kristen (ANF)
Cc: Kadish, Steven (GOV); Povich, Lon (GOV); Frazier, Ricks (EOHED)
Subject: RE: Final approval of Plum materials
Date: Tuesday, December 01, 2015 7:28:00 PM
Got it
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Sullivan, Jennifer F. (ANF)
Sent: Tuesday, December 01, 2015 7:28 PM
To: Lepore, Kristen (ANF) <[email protected]>
Cc: Kadish, Steven (GOV) <[email protected]>; Kennealy, Michael (EOHED)
<[email protected]>; Povich, Lon (GOV)
<[email protected]>; Frazier, Ricks (EOHED)
Subject: Re: Final approval of Plum materials
Mike, those are the Bob Ross edits from earlier. Thanks!
On Dec 1, 2015, at 7:18 PM, Lepore, Kristen (ANF) <[email protected]> wrote:
Mike Jen is sending you comments now. Specifically about the local tax incentive
section and the EDIP reference.
From: Kadish, Steven (GOV)Sent: Tuesday, December 01, 2015 7:18 PM
To: Lepore, Kristen (ANF); Kennealy, Michael (EOHED); Povich, Lon (GOV); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Mike,
Nice job.
My comments are in the attached document.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 464/975
Let’s get this outta here!
Steve
From: Lepore, Kristen (ANF)Sent: Tuesday, December 01, 2015 7:10 PMTo: Kennealy, Michael (EOHED); Kadish, Steven (GOV); Povich, Lon (GOV); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
I am still reading but the bullets of rankings on page two - some have periods and some
don’t. Please make them all consistent.
From: Kennealy, Michael (EOHED)Sent: Tuesday, December 01, 2015 6:58 PMTo: Lepore, Kristen (ANF); Kadish, Steven (GOV); Povich, Lon (GOV); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Please read this and give any comments. I will do another read right now.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 6:19 PM
To: Lepore, Kristen (ANF) <[email protected]>; Kadish, Steven
(GOV) <[email protected]>; Povich, Lon (GOV)
<[email protected]>; Sullivan, Jennifer F. (ANF)
<[email protected]>; Frazier, Ricks (EOHED)
Subject: RE: Final approval of Plum materials
I have the email with Elizabeth, who also called me with the air people from her office.
I have not heard from Tom but Steve was going to try to reach him. I suspect Tom
meant that they cannot store a helicopter at Logan. We should see if Steve reaches
Tom and if not I suggest we do with what Elizabeth said.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 465/975
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640Cell: 617-634-4762
From: Lepore, Kristen (ANF)
Sent: Tuesday, December 01, 2015 6:11 PM
To: Kadish, Steven (GOV) <[email protected]>; Kennealy, Michael
(EOHED) <[email protected]>; Povich, Lon (GOV)
<[email protected]>; Sullivan, Jennifer F. (ANF)
<[email protected]>; Frazier, Ricks (EOHED)
<[email protected]>Subject: RE: Final approval of Plum materials
Mike did you get resolution on the helicopter matter?
From: Kadish, Steven (GOV)Sent: Tuesday, December 01, 2015 6:08 PMTo: Kennealy, Michael (EOHED); Povich, Lon (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Yes, I have heard that all the other proposals are in.We need to get ours in.
From: Kennealy, Michael (EOHED)Sent: Tuesday, December 01, 2015 6:06 PMTo: Kadish, Steven (GOV); Povich, Lon (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Barros and I spoke with Mo who informed us that there is now a meeting tonight at
7:30pm. I am working on a redraft of the letter now and hope to have with 30-45
minutes. If you could focus on it as soon as it comes over that would be appreciated.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 466/975
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 5:10 PM
To: Kadish, Steven (GOV) <[email protected]>; Povich, Lon (GOV)
<[email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Jennifer F. Sullivan (ANF)
<[email protected]>; Frazier, Ricks (EOHED)
Subject: Final approval of Plum materials
FYI - per my conversation with Steve a bit earlier, we think this is the group that should
have final sign off on the materials being sent to Plum tonight. Obviously we’re working as fast as possible to get this done, but I suspect it will be sometime tonight
before it is finished, though hopefully not too late. The City will want to review the
final letter and Barros will be in a meeting from 6-8pm. My goal is to have everything
finished by 8pm, get final sign off from this group and the City, and then send to Plum.
I will provide updates on how we’re doing against that timing.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of MassachusettsExecutive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 467/975
From: Sullivan, Jennifer F. (ANF)
To: Lepore, Kristen (ANF)
Cc: Kennealy, Michael (EOHED); Kadish, Steven (GOV); Povich, Lon (GOV); Frazier, Ricks (EOHED)
Subject: Re: Final approval of Plum materials
Date: Tuesday, December 01, 2015 7:34:48 PM
One other minor thing, where you've created the table of benefits totaling $106m, finance
types expect to see numbers aligned on the right, and $ only for the first number in the column and in the total. It is jarring to see them left justified like text. In my edits from earlier, I redid it correctly.
On Dec 1, 2015, at 7:26 PM, Lepore, Kristen (ANF) <[email protected]> wrote:
Jen is sending the suggested language that she and Bob sent earlier to use.
From: Sullivan, Jennifer F. (ANF)Sent: Tuesday, December 01, 2015 7:20 PMTo: Kennealy, Michael (EOHED)Cc: Lepore, Kristen (ANF); Kadish, Steven (GOV); Povich, Lon (GOV); Frazier, Ricks (EOHED)Subject: Re: Final approval of Plum materials
A few comments:
Add page numbers
Bullets should all have periods or none; make consistent
P.4 TIF is incompatible with I-cubed; query whether best to strike where it appearsP.4 TIF would only presumably lower lease cost if lessor is taxable; MCCA and MassPort
don't pay property taxes. I recommend striking this clause.
P.4 I think the "local property tax" section repeats, but with slightly different text.
Combine or delete one.
P.5 don't start a sentence with the number 2014. I sent you a rephrase earlier today.
Looks good! Sorry for being persnickety. No excuse except I'm a lawyer. Thanks.
On Dec 1, 2015, at 6:58 PM, Kennealy, Michael (EOHED)
<[email protected]> wrote:
This includes all recent changes – TIF, helicopters, etc
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 468/975
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 6:58 PM
To: Lepore, Kristen (ANF) <[email protected]>;
Kadish, Steven (GOV) <[email protected]>; Povich,
Lon (GOV) <[email protected]>; Sullivan, Jennifer F.
(ANF) <[email protected]>; Frazier, Ricks
(EOHED) <[email protected]>
Subject: RE: Final approval of Plum materials
Please read this and give any comments. I will do another read right now.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 6:19 PM
To: Lepore, Kristen (ANF) <[email protected]>;
Kadish, Steven (GOV) <[email protected]>; Povich,
Lon (GOV) <[email protected]>; Sullivan, Jennifer F.
(ANF) <[email protected]>; Frazier, Ricks
(EOHED) <[email protected]>
Subject: RE: Final approval of Plum materials
I have the email with Elizabeth, who also called me with the air people
from her office. I have not heard from Tom but Steve was going to try to
reach him. I suspect Tom meant that they cannot store a helicopter at
Logan. We should see if Steve reaches Tom and if not I suggest we do
with what Elizabeth said.
Mike Kennealy
Assistant Secretary for Business Growth
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 469/975
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Lepore, Kristen (ANF)
Sent: Tuesday, December 01, 2015 6:11 PM
To: Kadish, Steven (GOV) <[email protected]>;
Kennealy, Michael (EOHED) <[email protected]>;
Povich, Lon (GOV) <[email protected]>; Sullivan,
Jennifer F. (ANF) <[email protected]>; Frazier,
Ricks (EOHED) <[email protected]>
Subject: RE: Final approval of Plum materials
Mike did you get resolution on the helicopter matter?
From: Kadish, Steven (GOV)Sent: Tuesday, December 01, 2015 6:08 PMTo: Kennealy, Michael (EOHED); Povich, Lon (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Yes, I have heard that all the other proposals are in.
We need to get ours in.
From: Kennealy, Michael (EOHED)Sent: Tuesday, December 01, 2015 6:06 PMTo: Kadish, Steven (GOV); Povich, Lon (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Barros and I spoke with Mo who informed us that there is now a meeting
tonight at 7:30pm. I am working on a redraft of the letter now and hope
to have with 30-45 minutes. If you could focus on it as soon as it comes
over that would be appreciated.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 470/975
Office: 617-788-3640
Cell: 617-634-4762
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 5:10 PM
To: Kadish, Steven (GOV) <[email protected]>;
Povich, Lon (GOV) <[email protected]>; Lepore, Kristen
(ANF) <[email protected]>; Jennifer F. Sullivan (ANF)
<[email protected]>; Frazier, Ricks (EOHED)
Subject: Final approval of Plum materials
FYI - per my conversation with Steve a bit earlier, we think this is the
group that should have final sign off on the materials being sent to Plum
tonight. Obviously we’re working as fast as possible to get this done, but I suspect it will be sometime tonight before it is finished, though
hopefully not too late. The City will want to review the final letter and
Barros will be in a meeting from 6-8pm. My goal is to have everything
finished by 8pm, get final sign off from this group and the City, and then
send to Plum. I will provide updates on how we’re doing against that
timing.
Mike Kennealy
Assistant Secretary for Business GrowthThe Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 471/975
From: Kennealy, Michael (EOHED)
To: Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)
Cc: Kadish, Steven (GOV); Povich, Lon (GOV)
Subject: RE: Final approval of Plum materials
Date: Tuesday, December 01, 2015 7:48:00 PM
Sent!
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Lepore, Kristen (ANF)
Sent: Tuesday, December 01, 2015 7:45 PM
To: Sullivan, Jennifer F. (ANF) <[email protected]>; Frazier, Ricks (EOHED)
Cc: Kadish, Steven (GOV) <[email protected]>; Kennealy, Michael (EOHED)
<[email protected]>; Povich, Lon (GOV)
Subject: RE: Final approval of Plum materials
I’m leaving the office now and will be driving so call me on my cell if you need me.
From: Sullivan, Jennifer F. (ANF)Sent: Tuesday, December 01, 2015 7:35 PMTo: Frazier, Ricks (EOHED)Cc: Lepore, Kristen (ANF); Kadish, Steven (GOV); Kennealy, Michael (EOHED); Povich, Lon (GOV)Subject: Re: Final approval of Plum materials
Great!
On Dec 1, 2015, at 7:32 PM, Frazier, Ricks (EOHED) <[email protected]> wrote:
Here’s the revised language.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 472/975
Ricks
From: Sullivan, Jennifer F. (ANF)
Sent: Tuesday, December 01, 2015 7:28 PM
To: Lepore, Kristen (ANF)
Cc: Kadish, Steven (GOV); Kennealy, Michael (EOHED); Povich, Lon (GOV); Frazier, Ricks
(EOHED)Subject: Re: Final approval of Plum materials
Mike, those are the Bob Ross edits from earlier. Thanks!
On Dec 1, 2015, at 7:18 PM, Lepore, Kristen (ANF)
<[email protected]> wrote:
Mike Jen is sending you comments now. Specifically about the local tax
incentive section and the EDIP reference.
From: Kadish, Steven (GOV)Sent: Tuesday, December 01, 2015 7:18 PMTo: Lepore, Kristen (ANF); Kennealy, Michael (EOHED); Povich, Lon (GOV); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Mike,
Nice job.
My comments are in the attached document.
Let’s get this outta here!
Steve
From: Lepore, Kristen (ANF)Sent: Tuesday, December 01, 2015 7:10 PMTo: Kennealy, Michael (EOHED); Kadish, Steven (GOV); Povich, Lon (GOV);
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 473/975
Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
I am still reading but the bullets of rankings on page two - some have
periods and some don’t. Please make them all consistent.
From: Kennealy, Michael (EOHED)Sent: Tuesday, December 01, 2015 6:58 PMTo: Lepore, Kristen (ANF); Kadish, Steven (GOV); Povich, Lon (GOV); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Please read this and give any comments. I will do another read right now.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 6:19 PM
To: Lepore, Kristen (ANF) <[email protected]>;
Kadish, Steven (GOV) <[email protected]>; Povich,
Lon (GOV) <[email protected]>; Sullivan, Jennifer F.
(ANF) <[email protected]>; Frazier, Ricks
(EOHED) <[email protected]>
Subject: RE: Final approval of Plum materials
I have the email with Elizabeth, who also called me with the air people
from her office. I have not heard from Tom but Steve was going to try to
reach him. I suspect Tom meant that they cannot store a helicopter at
Logan. We should see if Steve reaches Tom and if not I suggest we do
with what Elizabeth said.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 474/975
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Lepore, Kristen (ANF)
Sent: Tuesday, December 01, 2015 6:11 PM
To: Kadish, Steven (GOV) <[email protected]>;
Kennealy, Michael (EOHED) <[email protected]>;
Povich, Lon (GOV) <[email protected]>; Sullivan,
Jennifer F. (ANF) <[email protected]>; Frazier,
Ricks (EOHED) <[email protected]>
Subject: RE: Final approval of Plum materials
Mike did you get resolution on the helicopter matter?
From: Kadish, Steven (GOV)Sent: Tuesday, December 01, 2015 6:08 PMTo: Kennealy, Michael (EOHED); Povich, Lon (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Yes, I have heard that all the other proposals are in.
We need to get ours in.
From: Kennealy, Michael (EOHED)Sent: Tuesday, December 01, 2015 6:06 PMTo: Kadish, Steven (GOV); Povich, Lon (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)Subject: RE: Final approval of Plum materials
Barros and I spoke with Mo who informed us that there is now a meeting
tonight at 7:30pm. I am working on a redraft of the letter now and hope
to have with 30-45 minutes. If you could focus on it as soon as it comes
over that would be appreciated.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 475/975
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 5:10 PM
To: Kadish, Steven (GOV) <[email protected]>;
Povich, Lon (GOV) <[email protected]>; Lepore, Kristen
(ANF) <[email protected]>; Jennifer F. Sullivan (ANF)
<[email protected]>; Frazier, Ricks (EOHED)
Subject: Final approval of Plum materials
FYI - per my conversation with Steve a bit earlier, we think this is the
group that should have final sign off on the materials being sent to Plum
tonight. Obviously we’re working as fast as possible to get this done, but
I suspect it will be sometime tonight before it is finished, though
hopefully not too late. The City will want to review the final letter and
Barros will be in a meeting from 6-8pm. My goal is to have everything finished by 8pm, get final sign off from this group and the City, and then
send to Plum. I will provide updates on how we’re doing against that
timing.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 476/975
From: Ash, Jay (EOHED)
To: Kadish, Steven (GOV); Povich, Lon (GOV)
Cc: Polito, Karyn (GOV); Buckley, Timothy (GOV); Conroy, Jim (GOV)
Subject: RE: Following up
Date: Sunday, December 06, 2015 2:41:11 PM
My understanding is that there have been multiple conversations going on.
I have forwarded to Robert Kraft, for example, our pitch to them. This
has been helpful and is providing both positive reinforcement to our pitch
and good feedback (which has largely been consistent from the numerous
sources we have been hearing from).
At this point, it would appear that the outstanding question is the direct
value of the package we are offering.
________________________________________
From: Kadish, Steven (GOV)
Sent: Sunday, December 06, 2015 1:15 PM
To: Povich, Lon (GOV); Ash, Jay (EOHED)
Cc: ; Polito, Karyn (GOV); Buckley, Timothy (GOV); Conroy, Jim (GOV)
Subject: Re: Following up
Tom Glynn also had some good ideas on this.
Looping in Sec Ash.
Sent from my iPhone
On Dec 6, 2015, at 12:05 PM, Povich, Lon (GOV)
<[email protected]<mailto:[email protected]>>
wrote:
Lon
Lon F. Povich
Governor’s Chief Legal Counsel
State House, Room 271
Boston, MA 02133
(617) 725-4082
From: Kadish, Steven (GOV)
Sent: Saturday, December 05, 2015 11:00 AM
To: Polito, Karyn (GOV); Buckley, Timothy (GOV); Conroy, Jim (GOV);
Povich, Lon (GOV)
Subject: Fwd: Following up
We are very much still working this hard.
Conversations with multiple parties yesterday express strong interest in
Boston.
Visit expected this coming Wednesday.
Jeff Immelt may be looking to meet with the Governor then.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 477/975
Sent from my iPhone
Begin forwarded message:
From: "Kennealy, Michael (EOHED)"
<[email protected]<mailto:[email protected]
ate.MA.US>>
Date: December 5, 2015 at 10:13:55 AM EST
To: "Kadish, Steven (GOV)"
<[email protected]<mailto:[email protected]
.US>>, "Lepore, Kristen (ANF)"
<[email protected]<mailto:[email protected].
MA.US>>, "Ash, Jay (EOHED)"
<[email protected]<mailto:[email protected]>>,
"Sullivan, Jennifer F. (ANF)"
<[email protected]<mailto:Jennifer.F.Sullivan@MassM
ail.State.MA.US>>
Subject: RE: Following up
Steve,
- City signed off on materials; sent to Plum last night and forwarded to
our smaller working group as you saw.- Materials just sent to larger group.
- There is a call today at 4:30pm for the working group formed on I-Cubed
and MassWorks deliverables - I will forward you what I sent to the working
group.
- Re: other lines up business - MOBD working on a document, speaking with
MLSC today, and City has been in touch re: Connect and will send over
thoughts.
Mike
________________________________________
From: Kadish, Steven (GOV)
Sent: Saturday, December 05, 2015 9:26 AM
To: Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Ash, Jay (EOHED);Sullivan, Jennifer F. (ANF)
Subject: Following up
Mike:
Can you please provide us an update on the materials sent yesterday
(please send to the larger group and I hope that the City signed off?)
and the profess on the 3 deliverables we discussed:
1. MassWorks, ICubed examples, including specifics on what the $ was
invested in
2. Work-up examples on 2-3 proposed sites in the Seaport using all of our
ideas, including how the lease terms could work
3. How to use all of our tools for the location of their energy group
Connect, and for all of their existing sites.
Is there a call today, and/or tomorrow?!
Thx.
Steve
Sent from my iPhone
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 478/975
From: Kennealy, Michael (EOHED)
To: John Barros
Subject: RE: FW: Call w/Boston
Date: Friday, December 04, 2015 11:15:00 AM
3pm?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: John Barros [mailto:[email protected]]
Sent: Friday, December 04, 2015 10:12 AMTo: Kennealy, Michael (EOHED) <[email protected]>
Subject: Re: FW: Call w/Boston
I can make something work after 2:30pm is you wanted to suggest something.
On Fri, Dec 4, 2015 at 10:08 AM, Kennealy, Michael (SEA)
<[email protected]> wrote:
> John, I’m good this afternoon and would like to do the call then if
> possible – what do you think?
>
>
>
> Mike Kennealy>
> Assistant Secretary for Business Growth
>
> The Commonwealth of Massachusetts
>
> Executive Office of Housing & Economic Development
>
> One Ashburton Place, Room 2101
>
> Boston, MA 02108
>
> Office: 617-788-3640
>
> Cell: 617-634-4762
>
>
>
>
> From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
> Sent: Friday, December 04, 2015 9:16 AM
> To: Kennealy, Michael (EOHED) <[email protected]>;
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 479/975
> Cc: Roberti, Scott (GE, Corporate) <[email protected]>; Mcgaugh,
> James (GE Corporate) <[email protected]>
> Subject: FW: Call w/Boston
>
>
>
> Mike/John
>
>
>
> Scott forwarded your request to me since your proposal falls within my
> area, although like you and John, we are a team (plus McGaugh, of course).
>
>
>
> It looks like Scott, Jim and I are available between 12 – 4 this
> afternoon or from 10:30 – 11:30 and 1:30 – 3 on Monday, if any of
> those times work for you.
>
>
>
> Amy Eisenstadt
>
> State Tax Counsel
>
> General Electric Company
>
>
>
>
>
> (cell)
>>
>
> From: Roberti, Scott (GE, Corporate)
> Sent: Friday, December 04, 2015 9:08 AM
> To: Eisenstadt, Amy (GE, Corporate)
> Subject: FW: Call w/Boston
>
>
>
>
>
>
>> Scott G. Roberti
>
> Director, State Tax Policy
>
> General Electric Company
>
> 3135 Easton Turnpike
>
> Fairfield, CT 06828
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 480/975
> T (203) 373-3413; F (203) 373-2450
>
>
>
>
> From: Kennealy, Michael (SEA) [mailto:[email protected]]
> Sent: Thursday, December 03, 2015 12:54 PM
> To: Roberti, Scott (GE, Corporate)
> Cc: john. barros
> Subject: Call w/Boston
>
>
>
> Hi Scott,
>
>
>
> I hope you are well. I wanted to see if you might have some time
> today or tomorrow to speak with John and me – we would welcome an
> opportunity to hear your thoughts, answer any questions, and reiterate
> our strong interest in the project.
>
>
>
> We will do our best to work around your schedule if you could suggest
> a few times.
>
>
>
> Hope we can connect soon.
>
>
>> All the best,
>
> Mike
>
>
>
>
>
> Mike Kennealy
>
> Assistant Secretary for Business Growth
>
> The Commonwealth of Massachusetts>
> Executive Office of Housing & Economic Development
>
> One Ashburton Place, Room 2101
>
> Boston, MA 02108
>
> Office: 617-788-3640
>
> Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 481/975
>
>
>
--
John Barros
Chief of Economic Development
Office of Mayor Martin J. Walsh
6th Floor, Room 603
Boston City Hall, Boston MA 02201
t: 617-635-5729
http://www.cityofboston.gov
SHARE YOUR VISION. SHAPE OUR CITY.
http://imagine.boston.gov/
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 482/975
From: Daniel Koh
To: Kadish, Steven (GOV)
Cc: Ash, Jay (EOHED); Kennealy, Michael (EOHED); [email protected]; Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Tom Glynn; Morse, Elizabeth; Pollack, Stephanie (DOT); Garrity, Rob (DOT); Cowan, Mo
Subject: Re: FW: GE MOU
Date: Thursday, January 21, 2016 4:36:43 PM
thank you
On Thu, Jan 21, 2016 at 4:19 PM, Kadish, Steven (GOV) <[email protected]> wrote:
FYI.
This was provided to the media as noted below.
Let’s be sure that we all have and share the relevant documents.
From: Pitman, William (GOV)Sent: Thursday, January 21, 2016 6:51 AMTo: Kadish, Steven (GOV); Zarrella, Lily (GOV)Cc: Buckley, Timothy (GOV); Guyton, Elizabeth (GOV)Subject: Fwd: GE MOU
This is the email that went to reporters -- items attached.
Billy Pitman
@wfpitman
Begin forwarded message:
From: "Pitman, William (GOV)" <[email protected]>Date: January 20, 2016 at 4:11:18 PM ESTTo: "Pitman, William (GOV)" <[email protected]>Subject: GE MOU
All --
On Background:
Attached is the State and City’s MOU with GE as well as a background document providing further explanation on certain sections. This document is
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 483/975
for background purposes only, attributable to state and city officials.
-------------------------------
Billy Pitman
Deputy Communications Director
Office of Governor Charlie Baker
o: (617) 725-4025 ext. 35207
c: (617) 483-3393
--Daniel Arrigg KohChief of Staff City of Boston
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 484/975
From: Ash, Jay (EOHED)
To: Povich, Lon (GOV); Kadish, Steven (GOV)
Cc: Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Frazier, Ricks (EOHED); Sullivan, Jennifer F. (ANF)
Subject: RE: GE Letter
Date: Sunday, December 13, 2015 6:23:38 PM
Got it, will fully incorporate.
________________________________________
From: Povich, Lon (GOV)
Sent: Sunday, December 13, 2015 6:21 PM
To: Ash, Jay (EOHED); Kadish, Steven (GOV)
Cc: Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Frazier, Ricks (EOHED); Sullivan, Jennifer F. (ANF)
Subject: Re: GE Letter
Further revised intro:
________________________________________
From: Ash, Jay (EOHED)
Sent: Sunday, December 13, 2015 6:11 PM
To: Ash, Jay (EOHED); Kadish, Steven (GOV)
Cc: Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Povich, Lon (GOV); Frazier, Ricks (EOHED); Sullivan,
Jennifer F. (ANF)
Subject: RE: GE Letter
with salutation
________________________________________
From: Ash, Jay (EOHED)
Sent: Sunday, December 13, 2015 5:58 PM
To: Kadish, Steven (GOV)
Cc: Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Povich, Lon (GOV); Frazier, Ricks (EOHED); Sullivan,
Jennifer F. (ANF)
Subject: RE: GE Memo 2 amended
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 485/975
With incorporated. I'll dig up the salutation structure now.
Love (whops, too gushy)
Somewhat sincerely,
Jay
________________________________________
From: Kadish, Steven (GOV)
Sent: Sunday, December 13, 2015 5:25 PM
To: Ash, Jay (EOHED)
Cc: Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Povich, Lon (GOV); Frazier, Ricks (EOHED); Sullivan,
Jennifer F. (ANF)
Subject: Re: GE Memo 2
Jay,
Please use a more matter of fact tone. It is a little too gushy.
I do like Mike's suggestion about describing what we have done--gathered our legal and financial teams, etc.
I would not use the term 'lease concessions', as we do not know what is accurate, but the language that Massport has
signed off on in the chart.
I would phrase the purchase of existing private property/building, or property swaps as a legal/technical challenge
that we believe would require more time to determine how to possibly overcome.
Please use the same structure of the salutation of the memo that Mike has been using.
Another draft?!
Thx.
Steve
Sent from my iPhone
> On Dec 13, 2015, at 5:01 PM, Ash, Jay (EOHED) <[email protected]> wrote:
>
> Got it - thx
> ________________________________________
> From: Kennealy, Michael (EOHED)
> Sent: Sunday, December 13, 2015 4:56 PM
> To: Ash, Jay (EOHED); Kadish, Steven (GOV); Lepore, Kristen (ANF); Povich, Lon (GOV); Frazier, Ricks
(EOHED)
> Cc: Sullivan, Jennifer F. (ANF)
> Subject: RE: GE Memo 2>
> Jay, I think this looks great - just a couple of thoughts:
>
> - Typo with "timelessness of your occupancy"; should be "timeliness"?
>
> - Maybe a bit more color on what we did over the last 48 hours - extensive discussions between City and State,
exhausted all alternatives with quasis (Massport, MassDevelopment, BRA), thorough evaluation of bond cap issues,
thorough examination of statutes, etc. Those aren't the right words, but I think it would be great if they concluded
that we did a ton of homework (and we did) on this because (a) it shows respect for their request and strong interest
in the project and (b) at the end of the day it really demonstrates that the Massport parcels are the best options for
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 486/975
them.
>
> Mike
>
> ________________________________________
> From: Ash, Jay (SEA) [[email protected]]
> Sent: Sunday, December 13, 2015 4:24 PM
> To: Kennealy, Michael (EOHED); Kadish, Steven (GOV); Lepore, Kristen (ANF); Povich, Lon (GOV); Frazier,
Ricks (EOHED)
> Cc: Sullivan, Jennifer F. (ANF)
> Subject: FW: GE Memo 2
>
> Second time with proper email - no change to memo
> ________________________________________
>
> Feedback? Thought I should include a summary of the benefits, but could easily take it out.
>
> Memo would be accompanied by just 3 options - the two involving Massport acquiring public land were
eliminated as you can see in the memo.
>
> Comments by 5 please.
>
> Thx
>
> Jay
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 487/975
From: Povich, Lon (GOV)
To: Kadish, Steven (GOV)
Cc: Ash, Jay (EOHED); Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Frazier, Ricks (EOHED); Sullivan, Jennifer F. (ANF)
Subject: Re: GE Letter
Date: Sunday, December 13, 2015 6:27:35 PM
I love working with you guys! ________________________________________
From: Kadish, Steven (GOV)
Sent: Sunday, December 13, 2015 6:26 PM
To: Povich, Lon (GOV)
Cc: Ash, Jay (EOHED); Kennealy, Michael (EOHED); Lepore, Kristen (ANF);
Frazier, Ricks (EOHED); Sullivan, Jennifer F. (ANF)
Subject: Re: GE Letter
I like both what Jay and Lon have done.
Are we sure about energy $ in the way it is described in the cover letter?
Please share with John Barros and get his sign off before sending.
Sec Ash -- all your from here!!!!
With so much deep affection and aporeciatyon
Steve
Sent from my iPhone
> On Dec 13, 2015, at 6:21 PM, Povich, Lon (GOV)
> <[email protected]> wrote:
>> Further revised intro:
>
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 488/975
>
>
>
> ________________________________________
> From: Ash, Jay (EOHED)
> Sent: Sunday, December 13, 2015 6:11 PM
> To: Ash, Jay (EOHED); Kadish, Steven (GOV)
> Cc: Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Povich, Lon (GOV);
> Frazier, Ricks (EOHED); Sullivan, Jennifer F. (ANF)
> Subject: RE: GE Letter
>
> with salutation
> ________________________________________
> From: Ash, Jay (EOHED)
> Sent: Sunday, December 13, 2015 5:58 PM
> To: Kadish, Steven (GOV)
> Cc: Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Povich, Lon (GOV);
> Frazier, Ricks (EOHED); Sullivan, Jennifer F. (ANF)
> Subject: RE: GE Memo 2 amended
>
> With incorporated. I'll dig up the salutation
> structure now.
>
> Love (whops, too gushy)
>
> Somewhat sincerely,
>> Jay
> ________________________________________
> From: Kadish, Steven (GOV)
> Sent: Sunday, December 13, 2015 5:25 PM
> To: Ash, Jay (EOHED)
> Cc: Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Povich, Lon (GOV);
> Frazier, Ricks (EOHED); Sullivan, Jennifer F. (ANF)
> Subject: Re: GE Memo 2
>
> Jay,
>
> Please use a more matter of fact tone. It is a little too gushy.
>> I do like Mike's suggestion about describing what we have done--gathered
> our legal and financial teams, etc.
>
> I would not use the term 'lease concessions', as we do not know what is
> accurate, but the language that Massport has signed off on in the chart.
>
> I would phrase the purchase of existing private property/building, or
> property swaps as a legal/technical challenge that we believe would
> require more time to determine how to possibly overcome.
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 489/975
> Please use the same structure of the salutation of the memo that Mike has
> been using.
>
> Another draft?!
>
> Thx.
> Steve
>
>> Sent from my iPhone
>
>> On Dec 13, 2015, at 5:01 PM, Ash, Jay (EOHED)
>> <[email protected]> wrote:
>>
>> Got it - thx
>> ________________________________________
>> From: Kennealy, Michael (EOHED)
>> Sent: Sunday, December 13, 2015 4:56 PM
>> To: Ash, Jay (EOHED); Kadish, Steven (GOV); Lepore, Kristen (ANF);
>> Povich, Lon (GOV); Frazier, Ricks (EOHED)
>> Cc: Sullivan, Jennifer F. (ANF)
>> Subject: RE: GE Memo 2
>>
>> Jay, I think this looks great - just a couple of thoughts:
>>
>> - Typo with "timelessness of your occupancy"; should be "timeliness"?
>>
>> - Maybe a bit more color on what we did over the last 48 hours -
>> extensive discussions between City and State, exhausted all alternatives
>> with quasis (Massport, MassDevelopment, BRA), thorough evaluation of bond
>> cap issues, thorough examination of statutes, etc. Those aren't the
>> right words, but I think it would be great if they concluded that we did
>> a ton of homework (and we did) on this because (a) it shows respect for
>> their request and strong interest in the project and (b) at the end of >> the day it really demonstrates that the Massport parcels are the best
>> options for them.
>>
>> Mike
>>
>> ________________________________________
>> From: Ash, Jay (SEA) [[email protected]]
>> Sent: Sunday, December 13, 2015 4:24 PM
>> To: Kennealy, Michael (EOHED); Kadish, Steven (GOV); Lepore, Kristen
>> (ANF); Povich, Lon (GOV); Frazier, Ricks (EOHED)
>> Cc: Sullivan, Jennifer F. (ANF)
>> Subject: FW: GE Memo 2
>>>> Second time with proper email - no change to memo
>> ________________________________________
>>
>> Feedback? Thought I should include a summary of the benefits, but could
>> easily take it out.
>>
>> Memo would be accompanied by just 3 options - the two involving Massport
>> acquiring public land were eliminated as you can see in the memo.
>>
>> Comments by 5 please.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 490/975
>>
>> Thx
>>
>> Jay
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 491/975
From: Ash, Jay (EOHED)
To: Kadish, Steven (GOV)
Cc: Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Povich, Lon (GOV); Frazier, Ricks (EOHED); Sullivan, Jennifer F. (ANF)
Subject: RE: GE Memo 2 amended
Date: Sunday, December 13, 2015 6:01:27 PM
Attachments: GE Memo 12.13 - 2.docx
With incorporated. I'll dig up the salutation structure now.
Love (whops, too gushy)
Somewhat sincerely,
Jay
________________________________________
From: Kadish, Steven (GOV)
Sent: Sunday, December 13, 2015 5:25 PM
To: Ash, Jay (EOHED)
Cc: Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Povich, Lon (GOV); Frazier, Ricks (EOHED); Sullivan,
Jennifer F. (ANF)
Subject: Re: GE Memo 2
Jay,
Please use a more matter of fact tone. It is a little too gushy.
I do like Mike's suggestion about describing what we have done--gathered our legal and financial teams, etc.
I would not use the term 'lease concessions', as we do not know what is accurate, but the language that Massport has
signed off on in the chart.
I would phrase the purchase of existing private property/building, or property swaps as a legal/technical challenge that we believe would require more time to determine how to possibly overcome.
Please use the same structure of the salutation of the memo that Mike has been using.
Another draft?!
Thx.
Steve
Sent from my iPhone
> On Dec 13, 2015, at 5:01 PM, Ash, Jay (EOHED) <[email protected]> wrote:>
> Got it - thx
> ________________________________________
> From: Kennealy, Michael (EOHED)
> Sent: Sunday, December 13, 2015 4:56 PM
> To: Ash, Jay (EOHED); Kadish, Steven (GOV); Lepore, Kristen (ANF); Povich, Lon (GOV); Frazier, Ricks
(EOHED)
> Cc: Sullivan, Jennifer F. (ANF)
> Subject: RE: GE Memo 2
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 492/975
> Jay, I think this looks great - just a couple of thoughts:
>
> - Typo with "timelessness of your occupancy"; should be "timeliness"?
>
> - Maybe a bit more color on what we did over the last 48 hours - extensive discussions between City and State,
exhausted all alternatives with quasis (Massport, MassDevelopment, BRA), thorough evaluation of bond cap issues,
thorough examination of statutes, etc. Those aren't the right words, but I think it would be great if they concluded
that we did a ton of homework (and we did) on this because (a) it shows respect for their request and strong interest
in the project and (b) at the end of the day it really demonstrates that the Massport parcels are the best options for
them.
>
> Mike
>
> ________________________________________
> From: Ash, Jay (SEA) [[email protected]]
> Sent: Sunday, December 13, 2015 4:24 PM
> To: Kennealy, Michael (EOHED); Kadish, Steven (GOV); Lepore, Kristen (ANF); Povich, Lon (GOV); Frazier,
Ricks (EOHED)
> Cc: Sullivan, Jennifer F. (ANF)
> Subject: FW: GE Memo 2
>
> Second time with proper email - no change to memo
> ________________________________________
>
> Feedback? Thought I should include a summary of the benefits, but could easily take it out.
>
> Memo would be accompanied by just 3 options - the two involving Massport acquiring public land were
eliminated as you can see in the memo.
>
> Comments by 5 please.
>
> Thx
>
> Jay
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 493/975
MEMORANDUM
TO: GE Team
FROM: Secretary Jay Ash, Executive Office of Housing & Economic Development
DATE: December 13, 2015
RE: Project Update and Grid
Thank you for continuing our discussion about the exciting possibilities that the City of Boston’s
Innovation District provides for locating your headquarters. Our public partners, including the
Governor of Massachusetts, the Mayor of Boston and their teams, as well as our quasi-public
partners including Massport, continue to examine the range of ways we may best support your
move to the Seaport District.
As I hope you can continue to sense, we are excited about the possibilities and, therefore,
continue to refine our best thinking to provide additional clarity so you may best complete your
own review. In particular, we have spent considerable time over the past forty-eight hours in
extensive discussions between the public partners and their legal and financial teams, have
considered and exhausted extensive alternatives, examined options allow through statutes and
even consulted with bond counsel on potential sources of public supports. We started with five
potential scenarios you suggested on Friday. Three options are developed in the attached
Options Grid, while the discussion on two others has ended without inclusion in the grid. In
these two cases, involving the public acquisition of a building or land that is currently privately
owned, our combined efforts have not been able to identify a path for a city or state entity toovercome the identify legal/technical challenges to do so. While we are willing to explore any
additional ideas you may have regarding those possibilities, a clear path for those options does
not exist presently and, therefore, we cannot model it for timeliness of your occupancy and
overall cost. Regarding the three fully developed options attached, you will see that Option A,
the public option, provides for the maximization of public incentives and, we believe, certainty
of time. In each of the three scenarios, we are presenting to you the likely direct benefits for
the property development; all other previous made pledges, i.e. a $1 million workforce training
grant, remain intact. In Option A, I would also note we believe additional benefits are
achievable in negotiation with Massport once the many variables of the project are known.Again, Massport remains committed to working with you on favorable lease terms over and
above those that accrue as a result of the $120 million initial lease support.
In order to provide additional perspective on Option A, I am also attaching a general description
of the neighborhood, as well as renderings which you may already have.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 494/975
In short, Option A, the public option, provides for:
• $120 million in direct lease supports;
• Additional lease value opportunities;
•
Up to $20 million or more of City property tax relief;
•
$25 million in State offsite infrastructure and/or public transit improvements;
•
Maximum State energy efficiency contributions, to be determined in conjunction with
project design, and
•
Adjacent public parking availability, thereby reducing the need for on-site parking
constructions and its related cost to the project.
Option B, the existing building option, provides for:
• Up to $40 million in employment tax benefits, in the place of the $120 million in Option
A public lease supports which are not available for private projects;
• No additional publicly supported lease value opportunities;
• A City property tax level which is based only on the improvements then made to the
existing building, thus likely resulting in a significantly reduced benefit;
• Up to $25 million in State support infrastructure, although an existing building may not
be able to maximize this benefit;
• As much State energy efficiency funding as is available and possible for an existing
building, based upon an energy audit, and
• The possibility of making additional parking available should the building be proximate
to the garage Massport is building or if another location can be permitted for anotherpublic parking garage.
Option C, the build on a private property option, provides for:
• Up to $40 million in employment tax benefits, in the place of the $120 million in Option
A public lease supports which are not available for private projects;
• No additional publicly supported lease value opportunities;
• Up to $20 million or more of City property tax relief, as the new construction of the
building will create ample new property tax to then be relieved;
•
$25 million in State offsite infrastructure and/or public transit improvements, whichcould include bringing public utilities to the site and building-out the public sidewalks
around the building;
•
Maximum State energy efficiency contributions, to be determined in conjunction with
project design, and
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 495/975
• The possibility of making additional parking available should the property be proximate
to the garage Massport is building or if another location can be permitted for another
public parking garage.
All members of our team remain available to discuss these matters with you in greater detail.
We look forward to continuing to work with you on this project and the additional aspects of
your company’s interest in Massachusetts.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 496/975
From: Ash, Jay (EOHED)
To: Frazier, Ricks (EOHED)
Subject: RE: GE Memo 2
Date: Sunday, December 13, 2015 4:51:46 PM
thx!
________________________________________ From: Frazier, Ricks (EOHED)
Sent: Sunday, December 13, 2015 4:50 PM
To: Ash, Jay (EOHED)
Subject: RE: GE Memo 2
-----Original Message-----From: Ash, Jay (SEA) [mailto:[email protected]]
Sent: Sunday, December 13, 2015 4:24 PM
To: Kennealy, Michael (EOHED); Kadish, Steven (GOV); Lepore, Kristen
(ANF); Povich, Lon (GOV); Frazier, Ricks (EOHED)
Cc: Sullivan, Jennifer F. (ANF)
Subject: FW: GE Memo 2
Second time with proper email - no change to memo
________________________________________
Feedback? Thought I should include a summary of the benefits, but could
easily take it out.
Memo would be accompanied by just 3 options - the two involving Massport
acquiring public land were eliminated as you can see in the memo.
Comments by 5 please.
Thx
Jay
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 497/975
From: Ash, Jay (EOHED)
To: Povich, Lon (GOV); Kadish, Steven (GOV)
Cc: Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); [email protected]
Subject: RE: GE Memo
Date: Sunday, December 13, 2015 5:20:51 PM
Great thx!
________________________________________
From: Povich, Lon (GOV)
Sent: Sunday, December 13, 2015 5:19 PM
To: Kadish, Steven (GOV); Ash, Jay (EOHED)
Cc: Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer
F. (ANF); [email protected]
Subject: Re: GE Memo
Lon
________________________________________
From: Kadish, Steven (GOV) <[email protected]>
Sent: Sunday, December 13, 2015 5:04 PM
To: Ash, Jay (EOHED)
Cc: Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer
F. (ANF); Povich, Lon (GOV); [email protected]
Subject: Re: GE Memo
Just reading now!
Will be back to you shortly.
Sent from my iPhone
> On Dec 13, 2015, at 4:23 PM, Ash, Jay (EOHED)
<[email protected]> wrote:
>
> Feedback? Thought I should include a summary of the benefits, but could
easily take it out.
>
> Memo would be accompanied by just 3 options - the two involving Massport
acquiring public land were eliminated as you can see in the memo.
>
> Comments by 5 please.
>
> Thx
>
> Jay
> <GE Memo 12.13.docx>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 498/975
From: Ash, Jay (EOHED)
To: Daniel Koh; Sullivan, Jennifer F. (ANF)
Cc: Kadish, Steven (GOV); Ash, Jay (EOHED); Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Lepore, Kristen (ANF); Tom Glynn; Elizabeth Morse; jdoolin; John Barros; Povich, Lon (GOV)
Subject: RE: GE press release
Date: Wednesday, January 13, 2016 9:05:05 PM
Ditto, and more to come!
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: Daniel Koh <[email protected]>Date: 01/13/2016 3:04 PM (GMT-05:00)To: "Sullivan, Jennifer F. (ANF)" <[email protected]>Cc: "Kadish, Steven (GOV)" <[email protected]>, "Ash, Jay
(EOHED)" <[email protected]>, "Kennealy, Michael (EOHED)" <[email protected]>, "Frazier, Ricks (EOHED)" <[email protected]>, "Lepore, Kristen (ANF)" <[email protected]>, Tom Glynn <[email protected]>, Elizabeth Morse <[email protected]>, jdoolin <[email protected]>, John Barros <[email protected]>, "Povich, Lon (GOV)" <[email protected]>Subject: Re: GE press release
It's been an honor working with all of you. Truly. Much, much more to come.
On Wed, Jan 13, 2016 at 3:00 PM, Sullivan, Jennifer F. (ANF)
<[email protected]> wrote:
Congratulations and thanks for your leadership. It has been a privilege to work with this team.
Best,
Jennifer
From: Kadish, Steven (GOV)Sent: Wednesday, January 13, 2016 2:01 PMTo: Ash, Jay (EOHED); Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Tom Glynn; Elizabeth Morse; jdoolin; John Barros; Povich, Lon (GOV)Cc: Daniel KohSubject: GE press release
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 499/975
Colleagues!
Attached is the official announcement!
A release from the Governor and Mayor will be out shortly.
A moment to celebrate.
And yes, there's good work to do ahead.
Nice work team!
Best,
Steve and Dan
Begin forwarded message:
From: "Martin, Seth (GE Corporate)" <[email protected]>Date: January 13, 2016 at 1:00:01 PM ESTTo: "[email protected]"
<[email protected]>Cc: "Latour, Deirdre A (GE, Corporate)" <[email protected]>Subject: press release
Seth Martin Director, Financial & Corporate Communications GE
646-682-5602
203-572-3567 (mobile)[email protected]
--Daniel Arrigg Koh
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 500/975
Chief of Staff City of Boston
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 501/975
From: Lepore, Kristen (ANF)
To: Kadish, Steven (GOV)
Cc: Ash, Jay (EOHED); Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Sullivan, Jennifer F. (ANF); Tom Glynn; Elizabeth Morse; jdoolin; John Barros; Povich, Lon (GOV); Daniel Koh
Subject: Re: GE press release
Date: Wednesday, January 13, 2016 10:49:40 PM
Great work everyone.
Sent from my iPhone
On Jan 13, 2016, at 2:00 PM, Kadish, Steven (GOV) <[email protected]> wrote:
Colleagues!
Attached is the official announcement!A release from the Governor and Mayor will be out shortly.
A moment to celebrate.And yes, there's good work to do ahead.
Nice work team!
Best,Steve and Dan
Begin forwarded message:
From: "Martin, Seth (GE Corporate)" <[email protected]>Date: January 13, 2016 at 1:00:01 PM ESTTo: "[email protected]" <[email protected]>Cc: "Latour, Deirdre A (GE, Corporate)" <[email protected]>Subject: press release
Seth Martin
Director, Financial & Corporate Communications
GE
646-682-5602
203-572-3567 (mobile)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 502/975
<Press Release_GE moves HQ to Boston.docx>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 503/975
From: Sullivan, Jennifer F. (ANF)
To: Kadish, Steven (GOV); Ash, Jay (EOHED); Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Lepore, Kristen (ANF); Tom Glynn; Elizabeth Morse; jdoolin; John Barros; Povich, Lon (GOV)
Cc: Daniel Koh
Subject: RE: GE press release
Date: Wednesday, January 13, 2016 3:00:45 PM
Congratulations and thanks for your leadership. It has been a privilege to work with this team.
Best,
Jennifer
From: Kadish, Steven (GOV)Sent: Wednesday, January 13, 2016 2:01 PMTo: Ash, Jay (EOHED); Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Tom Glynn; Elizabeth Morse; jdoolin; John Barros; Povich, Lon (GOV)Cc: Daniel KohSubject: GE press release
Colleagues!
Attached is the official announcement!
A release from the Governor and Mayor will be out shortly.
A moment to celebrate.
And yes, there's good work to do ahead.
Nice work team!
Best,
Steve and Dan
Begin forwarded message:
From: "Martin, Seth (GE Corporate)" <[email protected]>
Date: January 13, 2016 at 1:00:01 PM EST
To: "[email protected]"
Cc: "Latour, Deirdre A (GE, Corporate)" <[email protected]>
Subject: press release
Seth Martin
Director, Financial & Corporate Communications
GE
646-682-5602
203-572-3567 (mobile)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 504/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 505/975
From: John Barros
To: Ash, Jay (EOHED)
Cc: Daniel Koh; Sullivan, Jennifer F. (ANF); Kadish, Steven (GOV); Ash, Jay (EOHED); Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Lepore, Kristen (ANF); Tom Glynn; Elizabeth Morse; jdoolin; Povich, Lon (GOV)
Subject: Re: GE press release
Date: Wednesday, January 13, 2016 10:18:13 PM
Congrats to the team!
On Wed, Jan 13, 2016 at 9:05 PM, Ash, Jay (EOHED) < [email protected]> wrote:
Ditto, and more to come!
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------
From: Daniel Koh <[email protected]>Date: 01/13/2016 3:04 PM (GMT-05:00)To: "Sullivan, Jennifer F. (ANF)" <[email protected]>Cc: "Kadish, Steven (GOV)" <[email protected]>, "Ash, Jay (EOHED)" < [email protected]>, "Kennealy, Michael (EOHED)" <[email protected]>, "Frazier, Ricks (EOHED)" <[email protected]>, "Lepore, Kristen (ANF)" <[email protected]>, Tom Glynn <[email protected]>, Elizabeth Morse <[email protected]>, jdoolin < [email protected]>, John Barros < [email protected]>, "Povich, Lon (GOV)" <[email protected]>
Subject: Re: GE press release
It's been an honor working with all of you. Truly. Much, much more to come.
On Wed, Jan 13, 2016 at 3:00 PM, Sullivan, Jennifer F. (ANF) <[email protected]> wrote:
Congratulations and thanks for your leadership. It has been a privilege to work with this team.
Best,
Jennifer
From: Kadish, Steven (GOV)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 506/975
Sent: Wednesday, January 13, 2016 2:01 PMTo: Ash, Jay (EOHED); Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Tom Glynn; Elizabeth Morse; jdoolin; John Barros; Povich, Lon (GOV)Cc: Daniel KohSubject: GE press release
Colleagues!
Attached is the official announcement!
A release from the Governor and Mayor will be out shortly.
A moment to celebrate.
And yes, there's good work to do ahead.
Nice work team!
Best,
Steve and Dan
Begin forwarded message:
From: "Martin, Seth (GE Corporate)" <[email protected]>Date: January 13, 2016 at 1:00:01 PM ESTTo: "[email protected]" <[email protected]>Cc: "Latour, Deirdre A (GE, Corporate)" <[email protected]>Subject: press release
Seth Martin Director, Financial & Corporate Communications GE
646-682-5602
203-572-3567 (mobile)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 507/975
--Daniel Arrigg KohChief of Staff
City of Boston
--John BarrosChief of Economic DevelopmentOffice of Mayor Martin J. Walsh6th Floor, Room 603Boston City Hall, Boston MA 02201
t: 617-635-5729http://www.cityofboston.gov
SHARE YOUR VISION. SHAPE OUR CITY.http://imagine.boston.gov/
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 508/975
From: Daniel Koh
To: Sullivan, Jennifer F. (ANF)
Cc: Kadish, Steven (GOV); Ash, Jay (EOHED); Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Lepore, Kristen (ANF); Tom Glynn; Elizabeth Morse; jdoolin; John Barros; Povich, Lon (GOV)
Subject: Re: GE press release
Date: Wednesday, January 13, 2016 3:04:17 PM
It's been an honor working with all of you. Truly. Much, much more to come.
On Wed, Jan 13, 2016 at 3:00 PM, Sullivan, Jennifer F. (ANF) <[email protected]> wrote:
Congratulations and thanks for your leadership. It has been a privilege to work with this team.
Best,
Jennifer
From: Kadish, Steven (GOV)Sent: Wednesday, January 13, 2016 2:01 PMTo: Ash, Jay (EOHED); Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Tom Glynn; Elizabeth Morse; jdoolin; John Barros; Povich, Lon (GOV)Cc: Daniel KohSubject: GE press release
Colleagues!
Attached is the official announcement!
A release from the Governor and Mayor will be out shortly.
A moment to celebrate.
And yes, there's good work to do ahead.
Nice work team!
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 509/975
Best,
Steve and Dan
Begin forwarded message:
From: "Martin, Seth (GE Corporate)" <[email protected]>Date: January 13, 2016 at 1:00:01 PM ESTTo: "[email protected]" <[email protected]>Cc: "Latour, Deirdre A (GE, Corporate)" <[email protected]>Subject: press release
Seth Martin
Director, Financial & Corporate Communications GE
646-682-5602
203-572-3567 (mobile)
--
Daniel Arrigg KohChief of Staff City of Boston
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 510/975
From: Povich, Lon (GOV)
To: Kennealy, Michael (EOHED); Lepore, Kristen (ANF)
Cc: Kadish, Steven (GOV); Ash, Jay (EOHED); Frazier, Ricks (EOHED); Sullivan, Jennifer F. (ANF); Tom Glynn; Elizabeth Morse; jdoolin; John Barros; Daniel Koh
Subject: RE: GE press release
Date: Thursday, January 14, 2016 7:46:57 AM
Great team! Great work! Great win!
Thanks to all.
Lon
Lon F. Povich
Governor’s Chief Legal Counsel
State House, Room 271
Boston, MA 02133
(617) 725-4082
From: Kennealy, Michael (EOHED)Sent: Thursday, January 14, 2016 6:44 AMTo: Lepore, Kristen (ANF)Cc: Kadish, Steven (GOV); Ash, Jay (EOHED); Frazier, Ricks (EOHED); Sullivan, Jennifer F. (ANF); Tom Glynn; Elizabeth Morse; jdoolin; John Barros; Povich, Lon (GOV); Daniel KohSubject: Re: GE press release
Fantastic teamwork! Great working with all of you.
Mike Kennealy
On Jan 13, 2016, at 10:49 PM, Lepore, Kristen (ANF) <[email protected]>
wrote:
Great work everyone.
Sent from my iPhone
On Jan 13, 2016, at 2:00 PM, Kadish, Steven (GOV)
<[email protected]> wrote:
Colleagues!
Attached is the official announcement!
A release from the Governor and Mayor will be out shortly.
A moment to celebrate.
And yes, there's good work to do ahead.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 511/975
Nice work team!
Best,
Steve and Dan
Begin forwarded message:
From: "Martin, Seth (GE Corporate)" <[email protected]>
Date: January 13, 2016 at 1:00:01 PM EST
To: "[email protected]"
Cc: "Latour, Deirdre A (GE, Corporate)"
Subject: press release
Seth Martin
Director, Financial & Corporate Communications
GE
646-682-5602
203-572-3567 (mobile)
<Press Release_GE moves HQ to Boston.docx>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 512/975
From: Kennealy, Michael (EOHED)
To: Lepore, Kristen (ANF)
Cc: Kadish, Steven (GOV); Ash, Jay (EOHED); Frazier, Ricks (EOHED); Sullivan, Jennifer F. (ANF); Tom Glynn; Elizabeth Morse; jdoolin; John Barros; Povich, Lon (GOV); Daniel Koh
Subject: Re: GE press release
Date: Thursday, January 14, 2016 6:44:11 AM
Fantastic teamwork! Great working with all of you.
Mike Kennealy
On Jan 13, 2016, at 10:49 PM, Lepore, Kristen (ANF) <[email protected]> wrote:
Great work everyone.
Sent from my iPhone
On Jan 13, 2016, at 2:00 PM, Kadish, Steven (GOV) <[email protected]> wrote:
Colleagues!
Attached is the official announcement!A release from the Governor and Mayor will be out shortly.
A moment to celebrate.And yes, there's good work to do ahead.
Nice work team!
Best,Steve and Dan
Begin forwarded message:
From: "Martin, Seth (GE Corporate)" <[email protected]>Date: January 13, 2016 at 1:00:01 PM EST
To: "[email protected]" <[email protected]>Cc: "Latour, Deirdre A (GE, Corporate)" <[email protected]>Subject: press release
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 513/975
Seth Martin
Director, Financial & Corporate Communications
GE
646-682-5602
203-572-3567 (mobile)
<Press Release_GE moves HQ to Boston.docx>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 514/975
From: Kadish, Steven (GOV)
To: Ash, Jay (EOHED)
Cc:
Subject: RE: GE visit?
Date: Tuesday, July 28, 2015 8:34:28 AM
An update on Wed would be good!
Daily meeting works.Thank you.
From: Ash, Jay (EOHED)Sent: Tuesday, July 28, 2015 7:39 AMTo: Kadish, Steven (GOV); Ash, Jay (EOHED)Cc: Subject: RE: GE visit?
I'll send along the deck we are using. I'm in Minnesota today. GE is Thursday. Just intro meeting.. Happy to provide recap and talk about next sreps at cabinet on Friday, unless you feel like he should hear something on Wed. I will be at Wed daily meeting.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Kadish, Steven (GOV)" <[email protected]>Date: 07/28/2015 6:52 AM (GMT-05:00)To: "Ash, Jay (EOHED)" < [email protected]>Cc:
Subject: GE visit?
Sec Ash, I understand from Sec Lepore that you have a visit with GE coming up.Should we do a preview with the Governor? Best, Steve
GOV E-mail
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 515/975
From: Ash, Jay (EOHED)
To: Kadish, Steven (GOV)
Subject: RE: GE visit?
Date: Tuesday, July 28, 2015 8:40:42 AM
Ok
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Kadish, Steven (GOV)" <[email protected]>Date: 07/28/2015 8:34 AM (GMT-05:00)To: "Ash, Jay (EOHED)" <[email protected]>Cc:Subject: RE: GE visit?
An update on Wed would be good!
Daily meeting works.
Thank you.
From: Ash, Jay (EOHED)Sent: Tuesday, July 28, 2015 7:39 AMTo: Kadish, Steven (GOV); Ash, Jay (EOHED)Cc: Subject: RE: GE visit?
I'll send along the deck we are using. I'm in Minnesota today. GE is Thursday. Just intro
meeting.. Happy to provide recap and talk about next sreps at cabinet on Friday, unless you feel like he should hear something on Wed. I will be at Wed daily meeting.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Kadish, Steven (GOV)" <[email protected]>Date: 07/28/2015 6:52 AM (GMT-05:00)
To: "Ash, Jay (EOHED)" < [email protected]>Cc:Subject: GE visit?
Sec Ash, I understand from Sec Lepore that you have a visit with GE coming up.Should we do a preview with the Governor? Best,
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 516/975
Steve
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 517/975
From: Ash, Jay (EOHED)
To: ; Ash, Jay (EOHED)
Cc: Lepore, Kristen (ANF); Povich, Lon (GOV); Polito, Karyn (GOV); Conroy, Jim (GOV); [email protected]; Buckley, Timothy (GOV)
Subject: RE: GE
Date: Sunday, November 15, 2015 3:01:56 PM
Correct. We're talking on Monday about the programs we have available and what they may or may not derire.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From:Date: 11/15/2015 2:53 PM (GMT-05:00)To: "Ash, Jay (EOHED)" <[email protected]>
Cc: "Lepore, Kristen (ANF)" <[email protected]>, "Povich, Lon (GOV)" <[email protected]>, "Polito, Karyn (GOV)" <[email protected]>, "Conroy, Jim (GOV)" <[email protected]>, [email protected], "Buckley, Timothy (GOV)" <[email protected]>Subject: Re: GE
We won't offer anything to GE that we don't process internally first. Too big and too important.
Sent from my iPhone
On Nov 15, 2015, at 2:22 PM, Ash, Jay (EOHED) < [email protected]> wrote:
No, this is a call between Boston, Mike Kennealy and their staff about the type and availability of incentives.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Lepore, Kristen (ANF)" <[email protected]>Date: 11/15/2015 1:41 PM (GMT-05:00)To: "Ash, Jay (EOHED)" < [email protected]>Cc: "Povich, Lon (GOV)" <[email protected]>,
>, "Polito, Karyn (GOV)" <[email protected]>, "Conroy, Jim (GOV)" < [email protected]>, [email protected], "Buckley, Timothy (GOV)" <[email protected]>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 518/975
Subject: Re: GE
What is the tax call about? I assume I should be in that call.
Sent from my iPhone
On Nov 15, 2015, at 12:03 PM, Ash, Jay (EOHED)
< [email protected]> wrote:
Thx. Good discussion with Barros of Boston yesterday. We've got a game plan on sites, are meeting after a Monday call w the GE tax people, and are working towards a Friday submission to them.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Povich, Lon (GOV)" <[email protected]>Date: 11/15/2015 10:22 AM (GMT-05:00)To: "Polito, Karyn (GOV)" <[email protected]>, "Ash, Jay (EOHED)" < [email protected]>, "Conroy, Jim (GOV)" < [email protected]>, [email protected], "Buckley, Timothy (GOV)" <[email protected]>, "Lepore, Kristen (ANF)" <[email protected]>Subject: GE
Lon
Sent from my iPhone
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 519/975
From: Povich, Lon (GOV)
To: Kennealy, Michael (EOHED)
Subject: RE: Info to share on the Boston project?
Date: Tuesday, December 01, 2015 3:41:28 PM
Attachments: Project Plum Dec 1 MJK2 lfp.docx
Mike
Lon F. Povich
Governor’s Chief Legal Counsel
State House, Room 271
Boston, MA 02133
(617) 725-4082
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 3:20 PM
To: Kadish, Steven (GOV)Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF); Pollack, Stephanie (DOT);
Garrity, Rob (DOT); Povich, Lon (GOV); Elizabeth Morse; Tom Glynn;
Buckley, Timothy (GOV); Conroy, Jim (GOV); Sullivan, Jennifer F. (ANF);
jdoolin; Ross, Robert (ANF); Cosco, Jonathan (EOHED); Frazier, Ricks
(EOHED)
Subject: RE: Info to share on the Boston project?
Updates/thoughts:
Letter - Want to make sure we agree on basics of offer and presentation - 1
offer, no mention of EDIP, appendix to provide an example of I-Cubed. If
we need to discuss we should do so ASAP.
I AGREE
- Question - do we propose anything that would attempt to steer them to
one site or another?
I MADE SOME LIGHT SUGGESTIONS IN THAT DIRECTION, BUT BELIEVE THEY WANT THE
SEAPORT AND WE SHOULD SEE WHAT OPTION THEY LIKE THERE BEST
- Should we say more about how valuable parking is in Seaport?
I THINK A SENTENCE IN THAT DIRECTION IS A GOOD IDEA, and I MADE A
SUGGESTION, BUT FEEL FREE TO REWORK
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 520/975
Site book
- Working with City to find a way to incorporate all the great content
folks have sent on sites.
Mike Kennealy
Assistant Secretary for Business Growth The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 2:18 PM
To: Kadish, Steven (GOV) <[email protected]>
Cc: Ash, Jay (EOHED) <[email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Pollack, Stephanie (DOT)
<[email protected]>; Garrity, Rob (DOT)
<[email protected]>; Povich, Lon (GOV)<[email protected]>; Elizabeth Morse <[email protected]>;
Tom Glynn <[email protected]>; Buckley, Timothy (GOV)
<[email protected]>; Conroy, Jim (GOV)
<[email protected]>; Sullivan, Jennifer F. (ANF)
<[email protected]>; jdoolin
<[email protected]>; Ross, Robert (ANF)
<[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Frazier, Ricks (EOHED)
Subject: RE: Info to share on the Boston project?
Next draft attached. I will follow with an email shortly with what I
believe are open items/needs and questions.
Mike Kennealy
Assistant Secretary for Business Growth The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 521/975
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 12:48 PM
To: Kadish, Steven (GOV) <[email protected]>
Cc: Ash, Jay (EOHED) <[email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Pollack, Stephanie (DOT)
<[email protected]>; Garrity, Rob (DOT)
<[email protected]>; Povich, Lon (GOV)
<[email protected]>; Elizabeth Morse <[email protected]>;
Tom Glynn <[email protected]>; Buckley, Timothy (GOV)
<[email protected]>; Conroy, Jim (GOV)
<[email protected]>; Sullivan, Jennifer F. (ANF)
<[email protected]>; jdoolin
<[email protected]>; Ross, Robert (ANF)
<[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Frazier, Ricks (EOHED)
Subject: RE: Info to share on the Boston project?
FYI - draft still in process; will send as soon as I can but not by 1pm.
Mike Kennealy
Assistant Secretary for Business Growth The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 8:29 AM
To: Kennealy, Michael (EOHED) <[email protected]>;Kadish, Steven (GOV) <[email protected]>
Cc: Ash, Jay (EOHED) <[email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Pollack, Stephanie (DOT)
<[email protected]>; Garrity, Rob (DOT)
<[email protected]>; Povich, Lon (GOV)
<[email protected]>; Elizabeth Morse <[email protected]>;
Tom Glynn <[email protected]>; Buckley, Timothy (GOV)
<[email protected]>; Conroy, Jim (GOV)
<[email protected]>; Sullivan, Jennifer F. (ANF)
<[email protected]>; jdoolin
<[email protected]>; Ross, Robert (ANF)
<[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Frazier, Ricks (EOHED)
Subject: RE: Info to share on the Boston project?
I will reach out individually to folks this morning for help/input as
needed on the letter. I will send the next draft to this group by 1pm
today - I hope that will be a draft that is close to final, but that
timing will still allow for an iteration or two before close of business.
If you have specific suggestions on either the letter or site book sent
last night, please email or call me.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 522/975
________________________________________
From: Kennealy, Michael (EOHED)
Sent: Monday, November 30, 2015 10:54 PM
To: Kadish, Steven (GOV)
Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF); Pollack, Stephanie (DOT);
Garrity, Rob (DOT); Povich, Lon (GOV); Elizabeth Morse; Tom Glynn;
Buckley, Timothy (GOV); Conroy, Jim (GOV); Sullivan, Jennifer F. (ANF);
jdoolin; Ross, Robert (ANF); Cosco, Jonathan (EOHED); Frazier, Ricks
(EOHED)
Subject: RE: Info to share on the Boston project?
Attached please find a draft of a revised letter. This represents edits
to a draft provided by the City earlier tonight; I would characterize this
as still very rough with items in brackets and areas where the writing
needs to be improved. After discussion tomorrow morning, the balance of
the day will be dedicated to finalizing it for submission by close of
business. For our discussion at 7am, I would suggest that we focus not on
specific wording but rather on the key decision points and structural
aspects of the letter; for example, do we:
- Want to submit what amounts to a 3rd proposal (informed by discussionwith Steve earlier tonight), with proposals 1 and 2 presented as
appendices/for reference? And if so, is this the right proposal?
- Want to include the section that "sells" the State and City?
- Like the structure (provided by the City) of "Your HQ, Your Lab, Your
Home"
We should also discuss where we can/should provide more detail - potential
uses of I-Cubed, permitting, etc. - and what those details might be.
Discussion of the next draft can focus more on specific wording.
Speak with you soon.
Mike KennealyAssistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Monday, November 30, 2015 6:51 PM
To: Kadish, Steven (GOV) <[email protected]>
Cc: Ash, Jay (EOHED) <[email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Pollack, Stephanie (DOT)
<[email protected]>; Garrity, Rob (DOT)
<[email protected]>; Povich, Lon (GOV)
<[email protected]>; 'Elizabeth Morse'
<[email protected]>; Tom Glynn <[email protected]>; Buckley, Timothy
(GOV) <[email protected]>; Conroy, Jim (GOV)
<[email protected]>; Sullivan, Jennifer F. (ANF)
<[email protected]>; 'jdoolin'
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 523/975
<[email protected]>; Ross, Robert (ANF)
<[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Frazier, Ricks (EOHED)
Subject: RE: Info to share on the Boston project?
Quick update - the City had started a re-draft of the letter and the site
book which I thought I would have received a while ago but am still
awaiting. As soon as it comes in I will make whatever edits I see fit and
send to this group. So expect something later tonight and then we can
discuss on our call tomorrow. We do have until close of business tomorrow
to finalize.
Mike Kennealy
Assistant Secretary for Business Growth The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Monday, November 30, 2015 2:58 PM
To: Kadish, Steven (GOV) <[email protected]>
Cc: Ash, Jay (EOHED) <[email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Pollack, Stephanie (DOT)
<[email protected]>; Garrity, Rob (DOT)
<[email protected]>; Povich, Lon (GOV)
<[email protected]>; 'Elizabeth Morse'
<[email protected]>; Tom Glynn <[email protected]>; Buckley, Timothy
(GOV) <[email protected]>; Conroy, Jim (GOV)
<[email protected]>; Sullivan, Jennifer F. (ANF)<[email protected]>; 'jdoolin'
<[email protected]>; Ross, Robert (ANF)
<[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Frazier, Ricks (EOHED)
Subject: RE: Info to share on the Boston project?
Attached please find the final versions of the documents sent today. Now
on to the letter.
Mike Kennealy
Assistant Secretary for Business Growth The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Monday, November 30, 2015 2:08 PM
To: Kadish, Steven (GOV) <[email protected]>
Cc: Ash, Jay (EOHED) <[email protected]>; Lepore, Kristen (ANF)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 524/975
<[email protected]>; Pollack, Stephanie (DOT)
<[email protected]>; Garrity, Rob (DOT)
<[email protected]>; Povich, Lon (GOV)
<[email protected]>; Elizabeth Morse <[email protected]>;
Tom Glynn <[email protected]>; Buckley, Timothy (GOV)
<[email protected]>; Conroy, Jim (GOV)
<[email protected]>; Sullivan, Jennifer F. (ANF)
<[email protected]>; jdoolin
<[email protected]>; Ross, Robert (ANF)
<[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Frazier, Ricks (EOHED)
Subject: RE: Info to share on the Boston project?
I would like to send my short memo and Rick's memo as soon as each is
ready - doesn't need to be together.
Please let me know ASAP if there are suggested changes to my
memo.
Mike Kennealy
Assistant Secretary for Business Growth The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kadish, Steven (GOV)
Sent: Monday, November 30, 2015 2:03 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Cc: Ash, Jay (EOHED) <[email protected]>; Lepore, Kristen (ANF)<[email protected]>; Pollack, Stephanie (DOT)
<[email protected]>; Garrity, Rob (DOT)
<[email protected]>; Povich, Lon (GOV)
<[email protected]>; Elizabeth Morse <[email protected]>;
Tom Glynn <[email protected]>; Buckley, Timothy (GOV)
<[email protected]>; Conroy, Jim (GOV)
<[email protected]>; Sullivan, Jennifer F. (ANF)
<[email protected]>; jdoolin
<[email protected]>; Ross, Robert (ANF)
<[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Frazier, Ricks (EOHED)
Subject: Re: Info to share on the Boston project?
Mike,
Do we assume that both letters go out together?
Please circulate the final docs.
Steve
Sent from my iPhone
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 525/975
> On Nov 30, 2015, at 1:32 PM, Kennealy, Michael (EOHED)
<[email protected]> wrote:
>
> Steve, all,
>
> Please see the attached documents - I will email again shortly with
further thoughts/detail, and my short memo requires another read, but I
wanted to get these in folks' hands now.
>
> Mike Kennealy
> Assistant Secretary for Business Growth The Commonwealth of
> Massachusetts Executive Office of Housing & Economic Development One
> Ashburton Place, Room 2101 Boston, MA 02108
> Office: 617-788-3640
> Cell: 617-634-4762
>
>
> -----Original Message-----
> From: Kadish, Steven (GOV)
> Sent: Monday, November 30, 2015 1:10 PM
> To: Kennealy, Michael (EOHED) <[email protected]>;
> Ash, Jay (EOHED) <[email protected]>; Lepore, Kristen (ANF)
> <[email protected]>; Pollack, Stephanie (DOT)
> <[email protected]>; Garrity, Rob (DOT)
> <[email protected]>; Povich, Lon (GOV)
> <[email protected]>; Elizabeth Morse
> <[email protected]>; Tom Glynn <[email protected]>; Buckley,
> Timothy (GOV) <[email protected]>; Conroy, Jim
> (GOV) <[email protected]>; Sullivan, Jennifer F. (ANF)
> <[email protected]>; jdoolin
> <[email protected]>; Tom Glynn <[email protected]>; Ross, Robert
> (ANF) <[email protected]>; Cosco, Jonathan (EOHED)
> <[email protected]>> Subject: Info to share on the Boston project?
>
> Mike:
>
> Can you please circulate the letter/info we were discussing this
morning?
>
> What is the target time for the next set of information later today?
>
> Thank you,
> Steve
> <Project Plum Incentives Memo clean.docx> <Plum memo Nov 30.docx>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 526/975
December 1, 2015
Ann R. Klee
Vice President
Corporate Environment, Health and Safety
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
Dear Ms. Klee,
We are pleased to present a proposal that details over $100 million of financial support for your
relocation and growth in Boston.
opportunities that will
directly benefit General Electric and your employees.
We believe that no State and City can match
, your headquarters, your innovation lab, and your home.
BOSTON, MASSACHUSETTS
Our Commonwealth and City are excellent places to:
Work - Record job levels, national and international leadership in high growth sectors, a
culture of innovation and entrepreneurship, strong anchor industries, a highly functioning
ecosystem, and ample connections to the world.
Live - Prospering communities, #1 in K-12 public education, top private high schools and
universities, world class health care, and great culture.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 527/975
Play - Museums, theatres, history, sports, concerts, beaches, shopping, restaurants, hikingtrails, and festivals.
Massachusetts has the concentration of institutions of higher education in the
United States - 140 colleges and universities, 55 within Greater Boston – and the combination of
education, research and development, and technology transfers drives a vibrant culture of
innovation and entrepreneurship. Currently, among the states, Massachusetts ranks:
#1 on the Milken Institute State Technology and Science Index.
#1 in R&D spending as a percentage of GDP and per capita.
#1 in federal expenditures for academic and non-profit R&D
#1 in funding from the National Institute of Health as percentage of GDP
#1 in life sciences employment per capita
#1 in percentage of workforce in science and engineering occupations
#1 in technology transfers
#2 in venture capital under management.
#2 in technology patents per capita.
#2 in pre-market biopharmaceutical notifications.
#2 highest growth rate in defense manufacturing and instrumentation
#2 largest medical device industry of any state
Massachusetts is a highly educated state, and we pride ourselves on a world class education
system from kindergarten through higher education. Half of all Nobel Prize winners in the
United States were educated in Massachusetts, our 8 th graders rank #2 in the world in science
achievement and, among the states, Massachusetts ranks:
#1 in K-12 achievement by Education Week.
#1 in percentage of adults with bachelor’s degrees at 38.2%.
#1 percentage of over 25 population with advanced degrees at 16.8%, 19% in Boston.
#1 in 4th grade math and reading
#1 in 8th grade math
#1 in 8th grade reading
#2 in 4th grade writing scores.
Moreover, the Commonwealth is a great place to do business. Our tax structure is competitive;
our public sector economic development groups are proactive; and our business community is
represented by exceptional and complementary financial services, technology, life sciences and
professional services firms. Our businesses and all of our citizens benefit from political and
fiscal stability, with leaders committed to bipartisanship,
from across the political spectrum and
engages in regular, open dialogue with legislative and municipal leaders. At the state level, weclosed a combined $2.5 billion FY15 and FY16 budget deficit without raising taxes, and we are
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 528/975
undertaking a comprehensive review of all Executive Department regulations to be completedby March 31, 2016 with the goal of making it easier to conduct business in Massachusetts.
In Massachusetts, leaders from business, higher education, philanthropy, non-profits, and state
and local government work together to advance individual and common aspirations, including
prosperity, innovation, a great quality of life, and meaningful impacts on our country and the
world. We invite you to join us.
YOUR HEADQUARTERS
Financial Support: Drawing on ideas shared with you previously,
proposal that we believe maximizes the
value we can provide. The key components of this new proposal are:
I-Cubed plus MassWorks funding $80 million
Local property tax incentive $20 million
Innovation Center $5 million
Workforce training $1 million
Total $106 million
I-Cubed and MassWorks: We propose a combined total of $80 million from the State’s
Infrastructure Investment Incentive (I-Cubed) and MassWorks programs and are prepared to
commit up to $50 million from either. Combined, the programs can provide funds for economic
development projects that require major public infrastructure investments; they can fund a
variety of commercial infrastructure developments and improvements and various capital
investment projects as well as assist municipalities to advance projects that support job creation
and expansion. We are prepared to discuss a variety of opportunities for the use of these funds
including a parking facility (Appendix 1 to this letter provides an example) or helipad, and we will
structure any program to provide security and convenience for GE as well as a public benefit.
Local property tax in centive: The City offers several property tax incentive programs to help
enable the development of a space suitable for GE. The programs most likely to be employed
include payment in lieu of tax programs under Chapters 121A and 121B or Tax Increment
Financing (TIF) under the EDIP (Economic Development Incentive Program)
program.
For example, two of the sites under consideration already have a Chapter 121A structure in
place. Other sites located on public land lend themselves to a Chapter 121B based
incentive. If neither of these options is available, a TIF can be employed provided that there isnew development that can provide a significant tax increment to be discounted.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 529/975
be driven by the site youselect. Given the employment levels and sites under consideration, the City anticipates that it
will be able to offer up to $20 million in property tax incentives.
Workforce Training Fund: The State will provide $1 million in employee training funds, the
maximum award allowed per company.
Proposed Available Sites: In addition to lowering the cost to move, we have identified sites
that we believe could be excellent
The accompanying booklet details the following sites, each
representing a shared opportunity to innovate and grow your business:
Site Selection & Permitting Support: To review and make your transition to any of these
buildings easier, the State and the City will appoint a Permitting Ombudsman to assist with any
site selection and permitting needs. The Permitting Ombudsman will work directly with the
Project Plum State-City Joint Task Force to support all project development needs.
YOUR INNOVATION CENTER
The Center: As GE joins Boston’s innovation ecosystem, we propose an exciting partnership to
launch an Innovation Center in Downtown Boston to showcase your technology, especially
healthcare and digital hardware technology. The proposed Life Sciences Innovation Center
would be in partnership with GE, the City of Boston, MassChallenge, and the Massachusetts
Life Sciences Center (MLSC). As part of this partnership, MassChallenge would operate the
Center and MLSC would support up to $5 million to build-out the facility.
The proposed Life Sciences Innovation Center be hosted at 26 Court Street, a
municipally-owned building in close proximity to Government Center and Faneuil Hall, one of
the top tourist attractions in the country. In collaboration with Mass Challenge - the world’s
largest startup - and with up to $5 million in support from MLSC, your engineers will join the
doctors, researchers, and entrepreneurs of our region to test the latest equipment and methods
in pursuit of solving the world’s hardest health problems.
University and Research Partnerships: The Boston area is home to 55 institutions of higher
education, and four of Boston’s top employers are hospitals. 2014 marked the 20th consecutive
year that Boston received the most National Institutes of Health funding of any U.S. city. Forty-
six Boston institutions received 3,521 NIH awards for more than $1.7 billion in funding.
We will facilitate opportunities to leverage this existing network of academia and research to
support GE’s innovation in Boston.
YOUR HOME
Commented [LFP1]:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 530/975
Attracting and retaining talent is even easier when people want to call your city home. Boston is America’s Walking City; our beautiful neighborhoods and the communities that surround us are
diverse, dynamic, and historic.
Concierge Team: To help you access all that the Commonwealth has to offer, we will assign a
concierge team for transitioning your employees to our city, helping them with anything from
finding homes to enrolling in schools to networking with area cultural groups.
Transportation Assistance: We will make it easier for your employees to get to work. We will
partner with you to make corporate jet service, helipads, and - where relevant - ferry service a
possibility. Recognizing that 400 – 600 or more Project Plum vehicles and 500 or more general
public vehicles have the potential of further congesting already challenged roadways and
commutes, the State and City are combining to offer as much as another $125 million in
currently not planned for public improvements in the Seaport District. These improvements,
while benefitting the entire district, will be tailored to directly improve the commute in and out of
the Innovation Block, home to Project Plum employees and visitors.
We also plan to embark on the following transportation infrastructure improvements:
● The City is committed to a significant undertaking to replace the Northern Avenue
Bridge. Closed for nearly two decades, the bridge will require as much as $100 million in
planning, design, and construction funding. This investment will significantly improve
transportation in the Seaport District.
● The State will coordinate with the City and GE to undertake $25 million in local street
improvements and/or public transportation enhancements. These infrastructure
improvements will target various modes of transportation and should make the district an
even more appealing center of commerce and livability.
As you know, our State and our City are synonymous with innovation. Generation after
generation - for the entire history of our country - this region has been on the forefront, and the
world’s toughest challenges are tackled here. From the American to Industrial revolutions, from
the rise of the information age to the birth of personalized medicine, Massachusetts has led the
way. is our heritage and our future, and that is why we believe
that Boston should be home.
Sincerely,
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 531/975
Charles D. Baker Martin J. Walsh
Governor Mayor of Boston
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 532/975
Appendix 1- Ori ginal I-Cubed proposal , November 21, 2015
The State and City propose building a $50 million combined corporate and public parkinggarage with 800 - 1,000 spaces, funded through the State’s Infrastructure Investment Incentive(I-Cubed) program. This will relieve GE from the cost of constructing or operating a parkingfacility while providing a potentially free and convenient service for your workforce and visitors,and the foundation for a high rise above the garage, if desired.
The garage, to be constructed in full coordination and perhaps by GE’s contractor, will alsoprovide a substantial public benefit - the creation of additional public parking in the SeaportDistrict. In doing so, it also provides the following benefits to GE, the ranges for which can benarrowed as site selection and further imagination is put to work:
● It relieves GE from the responsibility of the cost of constructing its own parking facility
(estimated savings of $12 million to $30 million);
●
It spares GE the cost of interest associated with paying the debt on the permanentfinancing of a parking garage (estimated savings of $4 million to $12 million);
● It allows GE to mitigate property tax expenses, operating and maintenance expenses,
and future capital improvements expenses to satisfy i ts parking needs (estimated
savings of $15 million to $30 million);
● It creates an opportunity for GE to offer a great amenity by providing employees and
visitors with substantially reduced parking costs (estimated savings of $20 million to 35
million); and
● It allows for the public financing of the foundation work necessary to support a high rise
office building (estimated savings of $5 million to $15 million).
In total, the $50 million state I-Cubed grant provides GE with an estimated $56 million - $122million of benefits. The market rate charges for the public parking would likely support all thecarrying costs for the future operation of the garage. The garage could have at its base aground floor for innovation for GE and potentially others drawn from the City’s vast array of
innovators and entrepreneurs. As a critical public project, fully constructed with public dollarsand maintained with operating revenues, the public benefit created allows for and justifies theprivate benefit GE would receive.
The garage serves as the building foundation, and air-rights for a vertical building. It is possiblethat the garage generates income necessary to write down the cost of those air-rights. It is alsopossible, and fully dependent on compatibility with and approval of GE, that the garage hasfloors of additional office or hospitality upon it as well. The additional office, not initially occupiedby GE, would allow flex-space for future GE expansion. The possibility of a hotel could enhanceGE’s convenience as an amenity, providing additional on-site meeting space, restaurants,lounges, and, of course, lodging. Both would impact the bottom line as another incomegenerator. Whether with or without a hotel, the air-rights savings would be influenced by the sizeof the garage and its ability to reduce the cost of what would likely be a long-term lease. Thatlease, depending upon GE’s siting decision, might be on private or public land, which would alsoinfluence the cost to GE. Especially enhancing our opportunity to maximize our support to GEwould be your selection of a publicly owned parcel. No savings is therefore assigned to thesecuring of air-rights, but the parties look forward to exploring the possibilities once a site hasbeen selected.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 533/975
From: Frazier, Ricks (EOHED)
To: Kennealy, Michael (EOHED); Kadish, Steven (GOV)
Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF); Pollack, Stephanie (DOT); Garrity, Rob (DOT); Povich, Lon (GOV); Elizabeth Morse; Tom Glynn; Buckley, Timothy (GOV); Conroy, Jim (GOV); Sullivan, Jennifer F. (ANF); jdoolin; Ross, Robert (ANF); Cosco, Jonathan (EOHED)
Subject: RE: Info to share on the Boston project?
Date: Tuesday, December 01, 2015 6:19:00 PM
Ricks
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 5:43 PM
To: Kadish, Steven (GOV)
Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF); Pollack, Stephanie (DOT); Garrity, Rob (DOT); Povich, Lon
(GOV); Elizabeth Morse; Tom Glynn; Buckley, Timothy (GOV); Conroy, Jim (GOV); Sullivan, Jennifer F. (ANF);
jdoolin; Ross, Robert (ANF); Cosco, Jonathan (EOHED); Frazier, Ricks (EOHED)
Subject: RE: Info to share on the Boston project?
Article mentioned on one our calls - how about as an appendix to our letter?
Mike Kennealy
Assistant Secretary for Business Growth The Commonwealth of Massachusetts Executive Office of Housing &
Economic Development One Ashburton Place, Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 3:20 PM
To: Kadish, Steven (GOV) <[email protected]>
Cc: Ash, Jay (EOHED) <[email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Pollack, Stephanie (DOT) <[email protected]>;
Garrity, Rob (DOT) <[email protected]>; Povich, Lon (GOV) <[email protected]>;
Elizabeth Morse <[email protected]>; Tom Glynn <[email protected]>; Buckley, Timothy (GOV)
<[email protected]>; Conroy, Jim (GOV) <[email protected]>;
Sullivan, Jennifer F. (ANF) <[email protected]>; jdoolin <[email protected]>;
Ross, Robert (ANF) <[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Frazier, Ricks (EOHED) <[email protected]>
Subject: RE: Info to share on the Boston project?
Updates/thoughts:
Letter
- Have a number of great wording suggestions from Jennifer Sullivan which I will incorporate into next draft, along
with I-Cubed examples
- City sending edits as well
- Want to make sure we agree on basics of offer and presentation - 1 offer, no mention of EDIP, appendix to provide
an example of I-Cubed. If we need to discuss we should do so ASAP.
- Question - do we propose anything that would attempt to steer them to one site or another?
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 534/975
- Should we say more about how valuable parking is in Seaport?
Site book
- Working with City to find a way to incorporate all the great content folks have sent on sites.
Mike Kennealy
Assistant Secretary for Business Growth The Commonwealth of Massachusetts Executive Office of Housing &
Economic Development One Ashburton Place, Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 2:18 PM
To: Kadish, Steven (GOV) <[email protected]>
Cc: Ash, Jay (EOHED) <[email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Pollack, Stephanie (DOT) <[email protected]>;
Garrity, Rob (DOT) <[email protected]>; Povich, Lon (GOV) <[email protected]>;
Elizabeth Morse <[email protected]>; Tom Glynn <[email protected]>; Buckley, Timothy (GOV)
<[email protected]>; Conroy, Jim (GOV) <[email protected]>;
Sullivan, Jennifer F. (ANF) <[email protected]>; jdoolin <[email protected]>;
Ross, Robert (ANF) <[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Frazier, Ricks (EOHED) <[email protected]>
Subject: RE: Info to share on the Boston project?
Next draft attached. I will follow with an email shortly with what I believe are open items/needs and questions.
Mike Kennealy
Assistant Secretary for Business Growth The Commonwealth of Massachusetts Executive Office of Housing &
Economic Development One Ashburton Place, Room 2101 Boston, MA 02108
Office: 617-788-3640Cell: 617-634-4762
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 12:48 PM
To: Kadish, Steven (GOV) <[email protected]>
Cc: Ash, Jay (EOHED) <[email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Pollack, Stephanie (DOT) <[email protected]>;
Garrity, Rob (DOT) <[email protected]>; Povich, Lon (GOV) <[email protected]>;
Elizabeth Morse <[email protected]>; Tom Glynn <[email protected]>; Buckley, Timothy (GOV)
<[email protected]>; Conroy, Jim (GOV) <[email protected]>; Sullivan, Jennifer F. (ANF) <[email protected]>; jdoolin <[email protected]>;
Ross, Robert (ANF) <[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Frazier, Ricks (EOHED) <[email protected]>
Subject: RE: Info to share on the Boston project?
FYI - draft still in process; will send as soon as I can but not by 1pm.
Mike Kennealy
Assistant Secretary for Business Growth The Commonwealth of Massachusetts Executive Office of Housing &
Economic Development One Ashburton Place, Room 2101 Boston, MA 02108
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 535/975
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 01, 2015 8:29 AM
To: Kennealy, Michael (EOHED) <[email protected]>; Kadish, Steven (GOV)
Cc: Ash, Jay (EOHED) <[email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Pollack, Stephanie (DOT) <[email protected]>;
Garrity, Rob (DOT) <[email protected]>; Povich, Lon (GOV) <[email protected]>;
Elizabeth Morse <[email protected]>; Tom Glynn <[email protected]>; Buckley, Timothy (GOV)
<[email protected]>; Conroy, Jim (GOV) <[email protected]>;
Sullivan, Jennifer F. (ANF) <[email protected]>; jdoolin <[email protected]>;
Ross, Robert (ANF) <[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Frazier, Ricks (EOHED) <[email protected]>
Subject: RE: Info to share on the Boston project?
I will reach out individually to folks this morning for help/input as needed on the letter. I will send the next draft to
this group by 1pm today - I hope that will be a draft that is close to final, but that timing will still allow for an
iteration or two before close of business. If you have specific suggestions on either the letter or site book sent last
night, please email or call me.
________________________________________
From: Kennealy, Michael (EOHED)
Sent: Monday, November 30, 2015 10:54 PM
To: Kadish, Steven (GOV)
Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF); Pollack, Stephanie (DOT); Garrity, Rob (DOT); Povich, Lon
(GOV); Elizabeth Morse; Tom Glynn; Buckley, Timothy (GOV); Conroy, Jim (GOV); Sullivan, Jennifer F. (ANF);
jdoolin; Ross, Robert (ANF); Cosco, Jonathan (EOHED); Frazier, Ricks (EOHED)
Subject: RE: Info to share on the Boston project?
Attached please find a draft of a revised letter. This represents edits to a draft provided by the City earlier tonight; I
would characterize this as still very rough with items in brackets and areas where the writing needs to be improved.
After discussion tomorrow morning, the balance of the day will be dedicated to finalizing it for submission by close
of business. For our discussion at 7am, I would suggest that we focus not on specific wording but rather on the key
decision points and structural aspects of the letter; for example, do we:
- Want to submit what amounts to a 3rd proposal (informed by discussion with Steve earlier tonight), with proposals
1 and 2 presented as appendices/for reference? And if so, is this the right proposal?
- Want to include the section that "sells" the State and City?
- Like the structure (provided by the City) of "Your HQ, Your Lab, Your Home"
We should also discuss where we can/should provide more detail - potential uses of I-Cubed, permitting, etc. - and
what those details might be. Discussion of the next draft can focus more on specific wording.
Speak with you soon.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place, Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 536/975
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Monday, November 30, 2015 6:51 PM
To: Kadish, Steven (GOV) <[email protected]>
Cc: Ash, Jay (EOHED) <[email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Pollack, Stephanie (DOT) <[email protected]>;
Garrity, Rob (DOT) <[email protected]>; Povich, Lon (GOV) <[email protected]>;
'Elizabeth Morse' <[email protected]>; Tom Glynn <[email protected]>; Buckley, Timothy (GOV)
<[email protected]>; Conroy, Jim (GOV) <[email protected]>;
Sullivan, Jennifer F. (ANF) <[email protected]>; 'jdoolin' <[email protected]>;
Ross, Robert (ANF) <[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Frazier, Ricks (EOHED) <[email protected]>
Subject: RE: Info to share on the Boston project?
Quick update - the City had started a re-draft of the letter and the site book which I thought I would have received a
while ago but am still awaiting. As soon as it comes in I will make whatever edits I see fit and send to this group.
So expect something later tonight and then we can discuss on our call tomorrow. We do have until close of
business tomorrow to finalize.
Mike Kennealy
Assistant Secretary for Business Growth The Commonwealth of Massachusetts Executive Office of Housing &
Economic Development One Ashburton Place, Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Monday, November 30, 2015 2:58 PM
To: Kadish, Steven (GOV) <[email protected]>
Cc: Ash, Jay (EOHED) <[email protected]>; Lepore, Kristen (ANF) <[email protected]>; Pollack, Stephanie (DOT) <[email protected]>;
Garrity, Rob (DOT) <[email protected]>; Povich, Lon (GOV) <[email protected]>;
'Elizabeth Morse' <[email protected]>; Tom Glynn <[email protected]>; Buckley, Timothy (GOV)
<[email protected]>; Conroy, Jim (GOV) <[email protected]>;
Sullivan, Jennifer F. (ANF) <[email protected]>; 'jdoolin' <[email protected]>;
Ross, Robert (ANF) <[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Frazier, Ricks (EOHED) <[email protected]>
Subject: RE: Info to share on the Boston project?
Attached please find the final versions of the documents sent today. Now on to the letter.
Mike Kennealy
Assistant Secretary for Business Growth The Commonwealth of Massachusetts Executive Office of Housing & Economic Development One Ashburton Place, Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Monday, November 30, 2015 2:08 PM
To: Kadish, Steven (GOV) <[email protected]>
Cc: Ash, Jay (EOHED) <[email protected]>; Lepore, Kristen (ANF)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 537/975
<[email protected]>; Pollack, Stephanie (DOT) <[email protected]>;
Garrity, Rob (DOT) <[email protected]>; Povich, Lon (GOV) <[email protected]>;
Elizabeth Morse <[email protected]>; Tom Glynn <[email protected]>; Buckley, Timothy (GOV)
<[email protected]>; Conroy, Jim (GOV) <[email protected]>;
Sullivan, Jennifer F. (ANF) <[email protected]>; jdoolin <[email protected]>;
Ross, Robert (ANF) <[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Frazier, Ricks (EOHED) <[email protected]>
Subject: RE: Info to share on the Boston project?
I would like to send my short memo and Rick's memo as soon as each is ready - doesn't need to be together.
Please let me know ASAP if there are suggested changes to my memo.
Mike Kennealy
Assistant Secretary for Business Growth The Commonwealth of Massachusetts Executive Office of Housing &
Economic Development One Ashburton Place, Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kadish, Steven (GOV)
Sent: Monday, November 30, 2015 2:03 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Cc: Ash, Jay (EOHED) <[email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Pollack, Stephanie (DOT) <[email protected]>;
Garrity, Rob (DOT) <[email protected]>; Povich, Lon (GOV) <[email protected]>;
Elizabeth Morse <[email protected]>; Tom Glynn <[email protected]>; Buckley, Timothy (GOV)
<[email protected]>; Conroy, Jim (GOV) <[email protected]>;
Sullivan, Jennifer F. (ANF) <[email protected]>; jdoolin <[email protected]>;
Ross, Robert (ANF) <[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Frazier, Ricks (EOHED) <[email protected]>
Subject: Re: Info to share on the Boston project?
Mike,
Do we assume that both letters go out together?
Please circulate the final docs.
Steve
Sent from my iPhone
> On Nov 30, 2015, at 1:32 PM, Kennealy, Michael (EOHED) <[email protected]>
wrote:
>> Steve, all,
>
> Please see the attached documents - I will email again shortly with further thoughts/detail, and my short memo
requires another read, but I wanted to get these in folks' hands now.
>
> Mike Kennealy
> Assistant Secretary for Business Growth The Commonwealth of
> Massachusetts Executive Office of Housing & Economic Development One
> Ashburton Place, Room 2101 Boston, MA 02108
> Office: 617-788-3640
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 538/975
> Cell: 617-634-4762
>
>
> -----Original Message-----
> From: Kadish, Steven (GOV)
> Sent: Monday, November 30, 2015 1:10 PM
> To: Kennealy, Michael (EOHED) <[email protected]>;
> Ash, Jay (EOHED) <[email protected]>; Lepore, Kristen (ANF)
> <[email protected]>; Pollack, Stephanie (DOT)
> <[email protected]>; Garrity, Rob (DOT)
> <[email protected]>; Povich, Lon (GOV)
> <[email protected]>; Elizabeth Morse
> <[email protected]>; Tom Glynn <[email protected]>; Buckley,
> Timothy (GOV) <[email protected]>; Conroy, Jim
> (GOV) <[email protected]>; Sullivan, Jennifer F. (ANF)
> <[email protected]>; jdoolin
> <[email protected]>; Tom Glynn <[email protected]>; Ross, Robert
> (ANF) <[email protected]>; Cosco, Jonathan (EOHED)
> Subject: Info to share on the Boston project?
>
> Mike:
>
> Can you please circulate the letter/info we were discussing this morning?
>
> What is the target time for the next set of information later today?
>
> Thank you,
> Steve
> <Project Plum Incentives Memo clean.docx> <Plum memo Nov 30.docx>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 539/975
From: Polito, Karyn (GOV)
To: Kadish, Steven (GOV)
Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF); Pollack, Stephanie (DOT); Buckley, Timothy (GOV); Conroy, Jim (GOV); Povich, Lon (GOV); D"Arbeloff, Mindy (GOV)
Subject: Re: Invitation to State of the Commonwealth
Date: Tuesday, January 19, 2016 4:43:52 PM
Terrific!
Sent from my iPhone
On Jan 19, 2016, at 1:59 PM, Kadish, Steven (GOV) <[email protected]> wrote:
I would love to join you.
Sent from my iPhone
On Jan 19, 2016, at 1:49 PM, wrote:
Great!
Sent from my iPhone
On Jan 19, 2016, at 12:57 PM, Kadish, Steven (GOV) <[email protected]> wrote:
Fyi.Ann Klee will be joining us from GE.
Sent from my iPhone
Begin forwarded message:
From: "Kadish, Steven (GOV)" <[email protected]>Date: January 19, 2016 at 12:56:08 PM ESTTo: "Klee, Ann (GE, Corporate)"
<[email protected]>Cc: "Serpa, Dean (GOV)" <[email protected]>, "Conway, Scott (GOV)" <[email protected]>, "D'Arbeloff, Mindy (GOV)" <[email protected]>, "Zarrella, Lily (GOV)" <[email protected]>
GOV E-mail
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 540/975
Subject: Re: Invitation to State of the Commonwealth
Ann,We would be delighted to welcome you!Please send our best to Jeff and Jeff.
Best and look forward to seeing you soon,SteveSent from my iPhone
On Jan 19, 2016, at 12:31 PM, Klee, Ann (GE, Corporate) <[email protected]> wrote:
Steve,
Just heard back from Jeff and Jeff. Unfortunately, Friday is our earnings call, so they won't be able to make the Governor's State of the State. They send their regrets; both wish they could have been there.
I'd be delighted to accept your very kind invitation, though.
Many thanks to you and the Governor.
Best,
ark
Sent from my iPhone
On Jan 19, 2016, at 12:18 PM, Kadish, Steven (GOV) <[email protected]> wrote:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 541/975
Ann,
We hope that you all can come on Thursday for Governor Baker's
State of the Commonwealth.
When you are able, please let us know who will be able to attend and we can then help with the logistics.
Best and look
forward to seeing you soon,
Steve
Sent from my iPhone
On Jan 14, 2016, at 6:42 PM, Klee, Ann (GE, Corporate) <[email protected]>
wrote:
Steve,
Thank you and the
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 542/975
Governor very much for the invitations. What an
honor. I'll check with Jeff and Jeff and get back to you
as soon as possible.
ark
-----Original
Message-----
From: Kadish, Steven (GOV) [mailto:[email protected]]
Sent:
Thursday, January 14, 2016 6:39 PM
To: Klee, Ann
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 543/975
(GE, Corporate)
Cc: Serpa, Dean
(GOV); Conway, Scott (GOV); D'Arbeloff, Mindy (GOV)
Subject: Invitation
to State of the Commonwealth
Ann,
The Governor
would like to invite Chairman Immelt, Jeff Bornstein and you to the State
of the Commonwealth on this Thursday evening, 6:30 pm, January 21, 2016.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 544/975
A formal invitation would follow.
Can you let us know if this can work or if you have
any questions?
Best,
Steve
Sent from
my iPhone
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 545/975
From: Povich, Lon (GOV)
To: Ash, Jay (EOHED); Kadish, Steven (GOV)
Subject: RE: Joint Draft Incentives Letter for Project Plum
Date: Sunday, November 22, 2015 6:07:35 PM
.
Lon F. Povich
Governor’s Chief Legal Counsel
State House, Room 271
Boston, MA 02133
(617) 725-4082
From: Ash, Jay (EOHED)Sent: Sunday, November 22, 2015 6:07 PMTo: Kadish, Steven (GOV); Povich, Lon (GOV)
Subject: Fwd: Joint Draft Incentives Letter for Project Plum
I have not reviewed this draft as I am just receiving it as well. If one is doing any work off of anything I would suggest it be off this draft. I just got off a conference call with Boston and the project people from GE if you would like an update let me know.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: John Barros < [email protected]>Date: 11/22/2015 6:04 PM (GMT-05:00)To: "Ash, Jay (EOHED)" < [email protected]>Cc: "Ash, Jay (EOHED)" < [email protected]>, "Kadish, Steven (GOV)" <[email protected]>Subject: Re: Joint Draft Incentives Letter for Project Plum
With attachment
On Sun, Nov 22, 2015 at 6:02 PM, John Barros < [email protected]> wrote:> Jay and Steve,
>
> Here is the latest taking all the edits in consideration
>
>
> On Sun, Nov 22, 2015 at 1:24 PM, Ash, Jay (EOHED)
> < [email protected]> wrote:
>> Sorry, here are the two docs referenced.
>> ________________________________________
>> From: Ash, Jay (EOHED)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 546/975
>> Sent: Sunday, November 22, 2015 12:32 PM
>> To: John Barros; [email protected]
>> Subject: RE: Joint Draft Incentives Letter for Project Plum
>>
>> John, here is a redraft based upon Steve's comments. I've attached the document as a clean draft and a
comparison document.
>
>
>
> --
> John Barros
> Chief of Economic Development
> Office of Mayor Martin J. Walsh
> 6th Floor, Room 603
> Boston City Hall, Boston MA 02201
> t: 617-635-5729
> http://www.cityofboston.gov
>
> SHARE YOUR VISION. SHAPE OUR CITY.
> http://imagine.boston.gov/
--
John Barros
Chief of Economic Development
Office of Mayor Martin J. Walsh
6th Floor, Room 603
Boston City Hall, Boston MA 02201
t: 617-635-5729
http://www.cityofboston.gov
SHARE YOUR VISION. SHAPE OUR CITY.
http://imagine.boston.gov/
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 547/975
From: Ash, Jay (EOHED)
To: Cowan, Mo; Klee, Ann (GE, Corporate)
Cc: [email protected]; Ash, Jay (EOHED)
Subject: RE: Klee Call: Project Plum
Date: Wednesday, November 25, 2015 4:40:47 PM
Thanks very much. Can we ask you to get a call scheduled with the tax people for Friday?
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Cowan, Mo" <[email protected]>Date: 11/25/2015 3:10 PM (GMT-05:00)To: "Klee, Ann (GE, Corporate)" <[email protected]>Cc: [email protected], "Ash, Jay (EOHED)" <[email protected]>Subject: Re: Klee Call: Project Plum
We can use this number for the 4pm call:
; passcode
Thanks.
Mo Cowan
Sent from my iPhone
> On Nov 25, 2015, at 2:57 PM, Klee, Ann (GE, Corporate) <[email protected]> wrote:
>
> Mo will be joining me and will send around a call in number. Look forward to hearing your update.
>> ark
>
> ----- Original Message -----
> From: John Barros [mailto:[email protected]]
> Sent: Wednesday, November 25, 2015 02:52 PM
> To: Klee, Ann (GE, Corporate)
> Subject: Re: Klee Call: Project Plum
>
> Great. 4pm works.
>
> I will conference Jay and call you directly.
>
> Is 203.373.3198 the right number?
>
>
> On Wed, Nov 25, 2015 at 2:14 PM, Klee, Ann (GE, Corporate)
> <[email protected]> wrote:
>> John,
>>
>> I could do a quick call at 4.
>>>> ark
>>
>>> On 11/25/15, 2:12 PM, "John Barros" <[email protected]> wrote:
>>>
>>> Ann,
>>>
>>> Jay and I have an update for you and need 15mins of your time to give
>>> you a quick update. We're excited about where we are and can use your
>>> feedback before moving forward.
>>>
>>> Please let us know if that would be possible for today. Thank you.
>>>
>>> Best,
>>> John
>>>
>>>
>>>
>>> Sent from my iPhone
>>>
>>>> On Nov 24, 2015, at 8:39 AM, Klee, Ann (GE, Corporate)
>>>> <[email protected]> wrote:>>>>
>>>> Great. Thanks.
>>>>
>>>> Sent from my iPhone
>>>>
>>>>> On Nov 24, 2015, at 8:16 AM, John Barros <[email protected]>
>>>>> wrote:
>>>>>
>>>>> Good morning Ann,
>>>>>
>>>>> Jay Ash will be joining us on a conference call at 4:30PM if you have
>>>>> no objections.
>>>>>
>>>>> The following conference call line is available to us:
>>>>>
>>>>> Dial-in Number:
>>>>> Meeting ID:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 548/975
>>>>>
>>>>> Best,
>>>>> John
>>>>>
>>>>> On Mon, Nov 23, 2015 at 6:38 PM, Kulish, Karen (GE Corporate)
>>>>> <[email protected]> wrote:
>>>>>> The best number to reach Ann on tomorrow would be her office #, which
>>>>>> is
>>>>>> 203.373.3198.
>>>>>>
>>>>>> Thank you!
>>>>>>
>>>>>>
>>>>>>>>>>>> Karen Kulish
>>>>>>
>>>>>> Executive Assistant to Ann Klee
>>>>>>
>>>>>> Global Operations Environment, Health & Safety
>>>>>>
>>>>>> O: 203 373-2575
>>>>>> C: 203 598-1348
>>>>>>
>>>>>>
>>>>>>
>>>>>> General Electric Company
>>>>>>
>>>>>> 3135 Easton Turnpike
>>>>>>
>>>>>> Fairfield, CT 06828
>>>>>>
>>>>>>
>>>>>>
>>>>>> GE Imagination at Work
>>>>>>>>>>>>
>>>>>>
>>>>>> From: John Barros [mailto:[email protected]]
>>>>>> Sent: Monday, November 23, 2015 6:14 PM
>>>>>> To: Klee, Ann (GE, Corporate)
>>>>>> Subject: Re: Project Plum
>>>>>>
>>>>>>
>>>>>>
>>>>>> Ann,
>>>>>>
>>>>>>
>>>>>>
>>>>>> Tomorrow at 4:30pm would work for me. If that works, I will call you.
>>>>>>
>>>>>> Sent from my iPhone
>>>>>>
>>>>>>
>>>>>> On Nov 23, 2015, at 6:03 PM, Klee, Ann (GE, Corporate)
>>>>>> <[email protected]>
>>>>>> wrote:>>>>>>
>>>>>> John,
>>>>>>
>>>>>>
>>>>>>
>>>>>> I¹d be happy to talk. Would tomorrow afternoon after 3:30 work for
>>>>>> you?
>>>>>>
>>>>>>
>>>>>>
>>>>>> Thanks.
>>>>>>
>>>>>>
>>>>>>
>>>>>> ark
>>>>>>
>>>>>>
>>>>>>
>>>>>> From: John Barros [mailto:[email protected]]
>>>>>> Sent: Monday, November 23, 2015 12:27 PM
>>>>>> To: Klee, Ann (GE, Corporate)>>>>>> Subject: Project Plum
>>>>>>
>>>>>>
>>>>>>
>>>>>> Ann,
>>>>>>
>>>>>>
>>>>>>
>>>>>> I hope this email finds you well. I know this is a very busy time.
>>>>>>
>>>>>> I would like to have a quick conversation in regards to our letter to
>>>>>> GE.
>>>>>> Please let me know the best time to talk. Thank you.
>>>>>>
>>>>>>
>>>>>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 549/975
>>>>>> Best,
>>>>>> John
>>>>>>
>>>>>>
>>>>>>
>>>>>> --
>>>>>>
>>>>>> John Barros
>>>>>> Chief of Economic Development
>>>>>> Office of Mayor Martin J. Walsh
>>>>>> 6th Floor, Room 603
>>>>>> Boston City Hall, Boston MA 02201
>>>>>> t: 617-635-5729
>>>>>>>>>>>> https://urldefense.proofpoint.com/v2/url?u=http-3A__www.cityofboston.go
>>>>>> v&d=CwIFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=8FupxIcsSIFU
>>>>>> b2LfGqJlIg&m=9TwuY_q8LnotSC3U7o4XjaGnzMEmr7-z7aXEAKUaS7k&s=P95Ib1kdeYIc
>>>>>> B3DQo946Lr-wmpxyA26vVN3DrJKUlfo&e=
>>>>>>
>>>>>>
>>>>>>
>>>>>> SHARE YOUR VISION. SHAPE OUR CITY.
>>>>>>
>>>>>>
>>>>>> https://urldefense.proofpoint.com/v2/url?u=http-3A__imagine.boston.gov_
>>>>>> &d=CwIFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=8FupxIcsSIFUb
>>>>>> 2LfGqJlIg&m=9TwuY_q8LnotSC3U7o4XjaGnzMEmr7-z7aXEAKUaS7k&s=QY3F_vR9BMCnX
>>>>>> 1JvooBK2gwKJBqIfgKo-2OVWoKVo3I&e=
>>>>>
>>>>>
>>>>>
>>>>> --
>>>>> John Barros
>>>>> Chief of Economic Development
>>>>> Office of Mayor Martin J. Walsh>>>>> 6th Floor, Room 603
>>>>> Boston City Hall, Boston MA 02201
>>>>> t: 617-635-5729
>>>>>
>>>>> https://urldefense.proofpoint.com/v2/url?u=http-3A__www.cityofboston.gov
>>>>> &d=CwIFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=8FupxIcsSIFUb2
>>>>> LfGqJlIg&m=9TwuY_q8LnotSC3U7o4XjaGnzMEmr7-z7aXEAKUaS7k&s=P95Ib1kdeYIcB3D
>>>>> Qo946Lr-wmpxyA26vVN3DrJKUlfo&e=
>>>>>
>>>>> SHARE YOUR VISION. SHAPE OUR CITY.
>>>>>
>>>>> https://urldefense.proofpoint.com/v2/url?u=http-3A__imagine.boston.gov_&
>>>>> d=CwIFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=8FupxIcsSIFUb2L
>>>>> fGqJlIg&m=9TwuY_q8LnotSC3U7o4XjaGnzMEmr7-z7aXEAKUaS7k&s=QY3F_vR9BMCnX1Jv
>>>>> ooBK2gwKJBqIfgKo-2OVWoKVo3I&e=
>
>
>
> --
> John Barros
> Chief of Economic Development> Office of Mayor Martin J. Walsh
> 6th Floor, Room 603
> Boston City Hall, Boston MA 02201
> t: 617-635-5729
> https://urldefense.proofpoint.com/v2/url?u=http-
3A__www.cityofboston.gov&d=CwIFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=8FupxIcsSIFUb2LfGqJlIg&m=WXORJY0X_Xn66NLZ5PPubmuQFCJTz7eLyDvgcY-
tO08&s=kyLIuWixnIWLzdTrvZyIqRRi5T3f4j1lpiC75MLe0TI&e=
>
> SHARE YOUR VISION. SHAPE OUR CITY.
> https://urldefense.proofpoint.com/v2/url?u=http-
3A__imagine.boston.gov_&d=CwIFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=8FupxIcsSIFUb2LfGqJlIg&m=WXORJY0X_Xn66NLZ5PPubmuQFCJTz7eLyDvgcY-
tO08&s=dGDcvl3eNTodCLGzDkCsL-CfbL025T4R6Uvg6lsvdu8&e=
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 550/975
From: Cowan, Mo
To: Ash, Jay (EOHED)
Cc: [email protected]; Ash, Jay (EOHED)
Subject: Re: Klee Call: Project Plum
Date: Wednesday, November 25, 2015 5:53:10 PM
Given holiday travel plans I have asked the company's tax team to be
available tonight. They can speak at 830pm if you're available. If so,
please use the dial in number from earlier today.
Mo Cowan
Sent from my iPhone
On Nov 25, 2015, at 4:43 PM, Ash, Jay (EOHED)
<[email protected]<mailto:[email protected]>> wrote:
Thanks very much. Can we ask you to get a call scheduled with the tax people
for Friday?
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------
From: "Cowan, Mo" <[email protected]<mailto:[email protected]>>
Date: 11/25/2015 3:10 PM (GMT-05:00)
To: "Klee, Ann (GE, Corporate)" <[email protected]<mailto:[email protected]>>
Cc: [email protected]<mailto:[email protected]>, "Ash, Jay
(EOHED)" <[email protected]<mailto:[email protected]>>
Subject: Re: Klee Call: Project Plum
We can use this number for the 4pm call:
; passcode
Thanks.
Mo Cowan
Sent from my iPhone
> On Nov 25, 2015, at 2:57 PM, Klee, Ann (GE, Corporate)
> <[email protected]<mailto:[email protected]>> wrote:
>
> Mo will be joining me and will send around a call in number. Look forward
> to hearing your update.
>
> ark
>
> ----- Original Message -----
> From: John Barros [mailto:[email protected]]
> Sent: Wednesday, November 25, 2015 02:52 PM
> To: Klee, Ann (GE, Corporate)
> Subject: Re: Klee Call: Project Plum
>
> Great. 4pm works.
>
> I will conference Jay and call you directly.
>
> Is 203.373.3198 the right number?
>
>
> On Wed, Nov 25, 2015 at 2:14 PM, Klee, Ann (GE, Corporate)
> <[email protected]<mailto:[email protected]>> wrote:
>> John,
>>
>> I could do a quick call at 4.
>>
>> ark
>>
>>> On 11/25/15, 2:12 PM, "John Barros"
>>> <[email protected]<mailto:[email protected]>> wrote:
>>>
>>> Ann,
>>>
>>> Jay and I have an update for you and need 15mins of your time to give
>>> you a quick update. We're excited about where we are and can use your
>>> feedback before moving forward.
>>>
>>> Please let us know if that would be possible for today. Thank you.
>>>
>>> Best,
>>> John
>>>
>>>
>>>
>>> Sent from my iPhone
>>>
>>>> On Nov 24, 2015, at 8:39 AM, Klee, Ann (GE, Corporate)
>>>> <[email protected]<mailto:[email protected]>> wrote:
>>>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 551/975
>>>> Great. Thanks.
>>>>
>>>> Sent from my iPhone
>>>>
>>>>> On Nov 24, 2015, at 8:16 AM, John Barros
>>>>> <[email protected]<mailto:[email protected]>>
>>>>> wrote:
>>>>>
>>>>> Good morning Ann,
>>>>>
>>>>> Jay Ash will be joining us on a conference call at 4:30PM if you have
>>>>> no objections.
>>>>>
>>>>> The following conference call line is available to us:>>>>>
>>>>> Dial-in Number:
>>>>> Meeting ID:
>>>>>
>>>>> Best,
>>>>> John
>>>>>
>>>>> On Mon, Nov 23, 2015 at 6:38 PM, Kulish, Karen (GE Corporate)
>>>>> <[email protected]<mailto:[email protected]>> wrote:
>>>>>> The best number to reach Ann on tomorrow would be her office #, which
>>>>>> is
>>>>>> 203.373.3198.
>>>>>>
>>>>>> Thank you!
>>>>>>
>>>>>>
>>>>>>
>>>>>> Karen Kulish
>>>>>>
>>>>>> Executive Assistant to Ann Klee
>>>>>>>>>>>> Global Operations Environment, Health & Safety
>>>>>>
>>>>>> O: 203 373-2575
>>>>>> C: 203 598-1348
>>>>>>
>>>>>>
>>>>>>
>>>>>> General Electric Company
>>>>>>
>>>>>> 3135 Easton Turnpike
>>>>>>
>>>>>> Fairfield, CT 06828
>>>>>>
>>>>>>
>>>>>>
>>>>>> GE Imagination at Work
>>>>>>
>>>>>>
>>>>>>
>>>>>> From: John Barros [mailto:[email protected]]
>>>>>> Sent: Monday, November 23, 2015 6:14 PM>>>>>> To: Klee, Ann (GE, Corporate)
>>>>>> Subject: Re: Project Plum
>>>>>>
>>>>>>
>>>>>>
>>>>>> Ann,
>>>>>>
>>>>>>
>>>>>>
>>>>>> Tomorrow at 4:30pm would work for me. If that works, I will call you.
>>>>>>
>>>>>> Sent from my iPhone
>>>>>>
>>>>>>
>>>>>> On Nov 23, 2015, at 6:03 PM, Klee, Ann (GE, Corporate)
>>>>>> <[email protected]<mailto:[email protected]>>
>>>>>> wrote:
>>>>>>
>>>>>> John,
>>>>>>
>>>>>>>>>>>>
>>>>>> I¹d be happy to talk. Would tomorrow afternoon after 3:30 work for
>>>>>> you?
>>>>>>
>>>>>>
>>>>>>
>>>>>> Thanks.
>>>>>>
>>>>>>
>>>>>>
>>>>>> ark
>>>>>>
>>>>>>
>>>>>>
>>>>>> From: John Barros [mailto:[email protected]]
>>>>>> Sent: Monday, November 23, 2015 12:27 PM
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 552/975
>>>>>> To: Klee, Ann (GE, Corporate)
>>>>>> Subject: Project Plum
>>>>>>
>>>>>>
>>>>>>
>>>>>> Ann,
>>>>>>
>>>>>>
>>>>>>
>>>>>> I hope this email finds you well. I know this is a very busy time.
>>>>>>
>>>>>> I would like to have a quick conversation in regards to our letter to
>>>>>> GE.
>>>>>> Please let me know the best time to talk. Thank you.>>>>>>
>>>>>>
>>>>>>
>>>>>> Best,
>>>>>> John
>>>>>>
>>>>>>
>>>>>>
>>>>>> --
>>>>>>
>>>>>> John Barros
>>>>>> Chief of Economic Development
>>>>>> Office of Mayor Martin J. Walsh
>>>>>> 6th Floor, Room 603
>>>>>> Boston City Hall, Boston MA 02201
>>>>>> t: 617-635-5729
>>>>>>
>>>>>> https://urldefense.proofpoint.com/v2/url?u=http-3A__www.cityofboston.go
>>>>>> v&d=CwIFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=8FupxIcsSIFU
>>>>>> b2LfGqJlIg&m=9TwuY_q8LnotSC3U7o4XjaGnzMEmr7-z7aXEAKUaS7k&s=P95Ib1kdeYIc
>>>>>> B3DQo946Lr-wmpxyA26vVN3DrJKUlfo&e=>>>>>>
>>>>>>
>>>>>>
>>>>>> SHARE YOUR VISION. SHAPE OUR CITY.
>>>>>>
>>>>>>
>>>>>> https://urldefense.proofpoint.com/v2/url?u=http-3A__imagine.boston.gov_
>>>>>> &d=CwIFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=8FupxIcsSIFUb
>>>>>> 2LfGqJlIg&m=9TwuY_q8LnotSC3U7o4XjaGnzMEmr7-z7aXEAKUaS7k&s=QY3F_vR9BMCnX
>>>>>> 1JvooBK2gwKJBqIfgKo-2OVWoKVo3I&e=
>>>>>
>>>>>
>>>>>
>>>>> --
>>>>> John Barros
>>>>> Chief of Economic Development
>>>>> Office of Mayor Martin J. Walsh
>>>>> 6th Floor, Room 603
>>>>> Boston City Hall, Boston MA 02201
>>>>> t: 617-635-5729
>>>>>>>>>> https://urldefense.proofpoint.com/v2/url?u=http-3A__www.cityofboston.gov
>>>>> &d=CwIFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=8FupxIcsSIFUb2
>>>>> LfGqJlIg&m=9TwuY_q8LnotSC3U7o4XjaGnzMEmr7-z7aXEAKUaS7k&s=P95Ib1kdeYIcB3D
>>>>> Qo946Lr-wmpxyA26vVN3DrJKUlfo&e=
>>>>>
>>>>> SHARE YOUR VISION. SHAPE OUR CITY.
>>>>>
>>>>> https://urldefense.proofpoint.com/v2/url?u=http-3A__imagine.boston.gov_&
>>>>> d=CwIFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=8FupxIcsSIFUb2L
>>>>> fGqJlIg&m=9TwuY_q8LnotSC3U7o4XjaGnzMEmr7-z7aXEAKUaS7k&s=QY3F_vR9BMCnX1Jv
>>>>> ooBK2gwKJBqIfgKo-2OVWoKVo3I&e=
>
>
>
> --
> John Barros
> Chief of Economic Development
> Office of Mayor Martin J. Walsh
> 6th Floor, Room 603
> Boston City Hall, Boston MA 02201
> t: 617-635-5729> https://urldefense.proofpoint.com/v2/url?u=http-
3A__www.cityofboston.gov&d=CwIFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=8FupxIcsSIFUb2LfGqJlIg&m=WXORJY0X_Xn66NLZ5PPubmuQFCJTz7eLyDvgcY-
tO08&s=kyLIuWixnIWLzdTrvZyIqRRi5T3f4j1lpiC75MLe0TI&e=
>
> SHARE YOUR VISION. SHAPE OUR CITY.
> https://urldefense.proofpoint.com/v2/url?u=http-
3A__imagine.boston.gov_&d=CwIFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=8FupxIcsSIFUb2LfGqJlIg&m=WXORJY0X_Xn66NLZ5PPubmuQFCJTz7eLyDvgcY-
tO08&s=dGDcvl3eNTodCLGzDkCsL-CfbL025T4R6Uvg6lsvdu8&e=
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 553/975
From: Ash, Jay (EOHED)
To: Cowan, Mo
Subject: RE: Klee Call: Project Plum
Date: Thursday, November 26, 2015 9:08:45 PM
Sorry, didn't see this last night.
Mike will be available for a call on Friday or Monday with them.
Thx!
________________________________________
From: Cowan, Mo [[email protected]]
Sent: Wednesday, November 25, 2015 5:53 PM
To: Ash, Jay (EOHED)
Cc: [email protected]; Ash, Jay (EOHED)
Subject: Re: Klee Call: Project Plum
Given holiday travel plans I have asked the company's tax team to be
available tonight. They can speak at 830pm if you're available. If so, please use the dial in number from earlier today.
Mo Cowan
Sent from my iPhone
On Nov 25, 2015, at 4:43 PM, Ash, Jay (EOHED)
<[email protected]<mailto:[email protected]>> wrote:
Thanks very much. Can we ask you to get a call scheduled with the tax
people for Friday?
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------
From: "Cowan, Mo"
<[email protected]<mailto:[email protected]>>
Date: 11/25/2015 3:10 PM (GMT-05:00)
To: "Klee, Ann (GE, Corporate)" <[email protected]<mailto:[email protected]>>
Cc: [email protected]<mailto:[email protected]>, "Ash, Jay
(EOHED)"
<[email protected]<mailto:[email protected]>>
Subject: Re: Klee Call: Project Plum
We can use this number for the 4pm call:
passcode
Thanks.
Mo Cowan
Sent from my iPhone
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 554/975
> On Nov 25, 2015, at 2:57 PM, Klee, Ann (GE, Corporate)
<[email protected]<mailto:[email protected]>> wrote:
>
> Mo will be joining me and will send around a call in number. Look
forward to hearing your update.
>
> ark
>
> ----- Original Message -----
> From: John Barros [mailto:[email protected]]
> Sent: Wednesday, November 25, 2015 02:52 PM
> To: Klee, Ann (GE, Corporate)
> Subject: Re: Klee Call: Project Plum
>
> Great. 4pm works.
>
> I will conference Jay and call you directly.
>
> Is 203.373.3198 the right number?
>
>> On Wed, Nov 25, 2015 at 2:14 PM, Klee, Ann (GE, Corporate)
> <[email protected]<mailto:[email protected]>> wrote:
>> John,
>>
>> I could do a quick call at 4.
>>
>> ark
>>
>>> On 11/25/15, 2:12 PM, "John Barros"
<[email protected]<mailto:[email protected]>> wrote:
>>>
>>> Ann,
>>>>>> Jay and I have an update for you and need 15mins of your time to give
>>> you a quick update. We're excited about where we are and can use your
>>> feedback before moving forward.
>>>
>>> Please let us know if that would be possible for today. Thank you.
>>>
>>> Best,
>>> John
>>>
>>>
>>>
>>> Sent from my iPhone
>>>
>>>> On Nov 24, 2015, at 8:39 AM, Klee, Ann (GE, Corporate)
>>>> <[email protected]<mailto:[email protected]>> wrote:
>>>>
>>>> Great. Thanks.
>>>>
>>>> Sent from my iPhone
>>>>
>>>>> On Nov 24, 2015, at 8:16 AM, John Barros
<[email protected]<mailto:[email protected]>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 555/975
>>>>> wrote:
>>>>>
>>>>> Good morning Ann,
>>>>>
>>>>> Jay Ash will be joining us on a conference call at 4:30PM if you
have
>>>>> no objections.
>>>>>
>>>>> The following conference call line is available to us:
>>>>>
>>>>> Dial-in Number:
>>>>> Meeting ID:
>>>>>
>>>>> Best,
>>>>> John
>>>>>
>>>>> On Mon, Nov 23, 2015 at 6:38 PM, Kulish, Karen (GE Corporate)
>>>>> <[email protected]<mailto:[email protected]>> wrote:
>>>>>> The best number to reach Ann on tomorrow would be her office #,
which
>>>>>> is
>>>>>> 203.373.3198.
>>>>>>
>>>>>> Thank you!
>>>>>>
>>>>>>
>>>>>>
>>>>>> Karen Kulish
>>>>>>
>>>>>> Executive Assistant to Ann Klee
>>>>>>
>>>>>> Global Operations Environment, Health & Safety
>>>>>>
>>>>>> O: 203 373-2575>>>>>> C: 203 598-1348
>>>>>>
>>>>>>
>>>>>>
>>>>>> General Electric Company
>>>>>>
>>>>>> 3135 Easton Turnpike
>>>>>>
>>>>>> Fairfield, CT 06828
>>>>>>
>>>>>>
>>>>>>
>>>>>> GE Imagination at Work >>>>>>
>>>>>>
>>>>>>
>>>>>> From: John Barros [mailto:[email protected]]
>>>>>> Sent: Monday, November 23, 2015 6:14 PM
>>>>>> To: Klee, Ann (GE, Corporate)
>>>>>> Subject: Re: Project Plum
>>>>>>
>>>>>>
>>>>>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 556/975
>>>>>> Ann,
>>>>>>
>>>>>>
>>>>>>
>>>>>> Tomorrow at 4:30pm would work for me. If that works, I will call
you.
>>>>>>
>>>>>> Sent from my iPhone
>>>>>>
>>>>>>
>>>>>> On Nov 23, 2015, at 6:03 PM, Klee, Ann (GE, Corporate)
>>>>>> <[email protected]<mailto:[email protected]>>
>>>>>> wrote:
>>>>>>
>>>>>> John,
>>>>>>
>>>>>>
>>>>>>
>>>>>> I¹d be happy to talk. Would tomorrow afternoon after 3:30 work for
>>>>>> you?
>>>>>>
>>>>>>
>>>>>>
>>>>>> Thanks.
>>>>>>
>>>>>>
>>>>>>
>>>>>> ark
>>>>>>
>>>>>>
>>>>>>
>>>>>> From: John Barros [mailto:[email protected]]
>>>>>> Sent: Monday, November 23, 2015 12:27 PM
>>>>>> To: Klee, Ann (GE, Corporate)>>>>>> Subject: Project Plum
>>>>>>
>>>>>>
>>>>>>
>>>>>> Ann,
>>>>>>
>>>>>>
>>>>>>
>>>>>> I hope this email finds you well. I know this is a very busy time.
>>>>>>
>>>>>> I would like to have a quick conversation in regards to our letter
to
>>>>>> GE.>>>>>> Please let me know the best time to talk. Thank you.
>>>>>>
>>>>>>
>>>>>>
>>>>>> Best,
>>>>>> John
>>>>>>
>>>>>>
>>>>>>
>>>>>> --
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 557/975
>>>>>>
>>>>>> John Barros
>>>>>> Chief of Economic Development
>>>>>> Office of Mayor Martin J. Walsh
>>>>>> 6th Floor, Room 603
>>>>>> Boston City Hall, Boston MA 02201
>>>>>> t: 617-635-5729
>>>>>>
>>>>>>
https://urldefense.proofpoint.com/v2/url?u=http-3A__www.cityofboston.go
>>>>>>
v&d=CwIFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=8FupxIcsSIFU
>>>>>>
b2LfGqJlIg&m=9TwuY_q8LnotSC3U7o4XjaGnzMEmr7-z7aXEAKUaS7k&s=P95Ib1kdeYIc
>>>>>> B3DQo946Lr-wmpxyA26vVN3DrJKUlfo&e=
>>>>>>
>>>>>>
>>>>>>
>>>>>> SHARE YOUR VISION. SHAPE OUR CITY.
>>>>>>
>>>>>>
>>>>>>
https://urldefense.proofpoint.com/v2/url?u=http-3A__imagine.boston.gov_
>>>>>>
&d=CwIFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=8FupxIcsSIFUb
>>>>>>
2LfGqJlIg&m=9TwuY_q8LnotSC3U7o4XjaGnzMEmr7-z7aXEAKUaS7k&s=QY3F_vR9BMCnX
>>>>>> 1JvooBK2gwKJBqIfgKo-2OVWoKVo3I&e=
>>>>>
>>>>>
>>>>>
>>>>> --
>>>>> John Barros
>>>>> Chief of Economic Development>>>>> Office of Mayor Martin J. Walsh
>>>>> 6th Floor, Room 603
>>>>> Boston City Hall, Boston MA 02201
>>>>> t: 617-635-5729
>>>>>
>>>>>
https://urldefense.proofpoint.com/v2/url?u=http-3A__www.cityofboston.gov
>>>>>
&d=CwIFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=8FupxIcsSIFUb2
>>>>>
LfGqJlIg&m=9TwuY_q8LnotSC3U7o4XjaGnzMEmr7-z7aXEAKUaS7k&s=P95Ib1kdeYIcB3D
>>>>> Qo946Lr-wmpxyA26vVN3DrJKUlfo&e=
>>>>>>>>>> SHARE YOUR VISION. SHAPE OUR CITY.
>>>>>
>>>>>
https://urldefense.proofpoint.com/v2/url?u=http-3A__imagine.boston.gov_&
>>>>>
d=CwIFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=8FupxIcsSIFUb2L
>>>>>
fGqJlIg&m=9TwuY_q8LnotSC3U7o4XjaGnzMEmr7-z7aXEAKUaS7k&s=QY3F_vR9BMCnX1Jv
>>>>> ooBK2gwKJBqIfgKo-2OVWoKVo3I&e=
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 558/975
>
>
> --
> John Barros
> Chief of Economic Development
> Office of Mayor Martin J. Walsh
> 6th Floor, Room 603
> Boston City Hall, Boston MA 02201
> t: 617-635-5729
>
https://urldefense.proofpoint.com/v2/url?u=http-3A__www.cityofboston.gov&d
=CwIFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=8FupxIcsSIFUb2LfGq
JlIg&m=WXORJY0X_Xn66NLZ5PPubmuQFCJTz7eLyDvgcY-tO08&s=kyLIuWixnIWLzdTrvZyIq
RRi5T3f4j1lpiC75MLe0TI&e=
>
> SHARE YOUR VISION. SHAPE OUR CITY.
>
https://urldefense.proofpoint.com/v2/url?u=http-3A__imagine.boston.gov_&d=
CwIFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=8FupxIcsSIFUb2LfGqJ
lIg&m=WXORJY0X_Xn66NLZ5PPubmuQFCJTz7eLyDvgcY-tO08&s=dGDcvl3eNTodCLGzDkCsL-
CfbL025T4R6Uvg6lsvdu8&e=
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 559/975
From: Ash, Jay (EOHED)
To: Lepore, Kristen (ANF); Polito, Karyn (GOV); Conroy, Jim (GOV); Povich, Lon (GOV); Buckley, Timothy (GOV); Kadish, Steven (GOV)
Subject: RE: Land
Date: Monday, November 16, 2015 7:42:00 AM
Yes
I’m in charge of rounding up state opportunities, including authorities. Boston, is in charge of their
lands and private developers.
From:
Sent: Monday, November 16, 2015 7:40 AM
To: Lepore, Kristen (ANF); Polito, Karyn (GOV); Conroy, Jim (GOV); Ash, Jay (EOHED); Povich, Lon
(GOV); Buckley, Timothy (GOV); Kadish, Steven (GOV)
Subject: RE: Land
Jay – are these some of the sites you guys are discussing with the city of Boston concerning GE?
Charlie
From: Lepore, Kristen (ANF)Sent: Friday, November 13, 2015 7:32 PMTo: Polito, Karyn (GOV); Conroy, Jim (GOV); Ash, Jay (EOHED); Povich, Lon (GOV); Buckley, Timothy (GOV); Kadish, Steven (GOV)Subject: Land
I was right. The MCCA has 30 undeveloped acres. See attached map.
Of this, about 17 acres could be developed now:
10 acres - The south parking lot behind BCEC site.
6.8 acres – Across the street where it says remaining land
10 more acres will be available when MassDot moves its testing lab and maintenance facility (land at
the bottom part of the “L”). I need to check with MassDot on the timing of this.
The remaining 2.7 acres is the lawn on D and I want to keep this.
Kristen Lepore
Secretary
Executive Office for Administration and Finance
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 560/975
State House, Room 373
Boston, MA 02133
(617) 727-2040
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 561/975
From: Morse, Elizabeth
To: Lepore, Kristen (ANF); Kennealy, Michael (EOHED); Ash, Jay (EOHED); Kadish, Steven (GOV); Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Povich, Lon (GOV); Garrity, Rob (DOT); Tom Glynn; Doolin, James
Subject: RE: Massport Presentation
Date: Tuesday, December 08, 2015 12:55:55 PM
Attachments: Massport 12 8 15 Deck Final.pdf
Here is the final version. Thanks, Elizabeth
From: Lepore, Kristen (ANF) [mailto:[email protected]]Sent: Tuesday, December 08, 2015 12:53 PMTo: Morse, Elizabeth; Kennealy, Michael (EOHED); Ash, Jay (EOHED); Kadish, Steven (GOV); Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Povich, Lon (GOV); Garrity, Rob (DOT); Glynn, Tom; Doolin, JamesSubject: RE: Massport Presentation
Excellent – esp the marketing piece.
From: Morse, Elizabeth [mailto:[email protected]]Sent: Tuesday, December 08, 2015 10:32 AMTo: Kennealy, Michael (EOHED); Ash, Jay (EOHED); Kadish, Steven (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Povich, Lon (GOV); Garrity, Rob (DOT); Tom Glynn; Doolin, JamesSubject: Massport Presentation
Attached please find a draft presentation from Massport. Please email or call with any edits. Thanks,
Elizabeth
Elizabeth Morse
Chief of Staff
Massachusetts Port Authority
One Harborside Drive, Suite 200S
East Boston, MA 02128
617-568-1007
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 562/975
MassportEconomic Development Partner
December 8, 2015
DRAFT 12/8/15 12:45 pm
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 563/975
Massport Overview
• Quasi-public authority – “a body corporate and politic”
• Governed by a seven member board
• Financially self-sufficient – can “fix, revise, charge andcollect tolls, rates, fees, rentals and charges”
• Operates three business lines• Aviation
• Maritime Operations
• Real Estate
• FY16 budget is $667 million• Logan Airport is 85% of total operating budget
• Maritime business is 10%, all other is 5%
• Massport bond ratings• Moody’s Aa2, S&P AA, Fitch AA
2
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 564/975
Why the Massachusetts Port Authority can assist
1. Massport has a proven track record as a successful
development partner2. Massport has Six development ready parcels in
Boston’s Seaport – “Innovation District”
3. Massport can execute flexible, creative, anddeliverable development opportunities to suit
commercial tenant needs expeditiously
3
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 565/975
uccessful History of Innovative Developments
• Massport is a Proven Development Partner• Since 1996, 5 million square feet of new mixed use, commercial, and
hotel developments were executed by Massport in South Boston• These developments have created $2.4 billion new value for the
Commonwealth and the City of Boston• 11,660 jobs in the Seaport Innovation District have been added as a
result of Massport’s Real Estate development initiatives
• Massport produces these positive results by working withdevelopers to:
• Execute creative and strategic “win- win” Long Term Ground Leases that afinanceable
• A proven track record and ability to Execute a One-Stop Shopping
approach to development• Streamlined Permitting
• 7 million square feet of mixed-use development master plan successfullypermitted for Commonwealth Flats
• Expedited / coordinated review process by the Commonwealth and City ofBoston managed by Massport
4
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 566/975
uccessful History of Innovative Developments in Southoston
1. Fidelity - World Trade Center (1996)
2. Fidelity - Seaport Hotel (1998)
3. Fidelity - East Office Building (2000)
4. Fidelity - West Office Building (2002)
5. John Hancock U.S. Corporate Headquarters (2003
6. Park Lane Seaport Apartments (2006)
7. Boston Waterfront Renaissance Hotel (2008)
8. Liberty Wharf (2011)
9. Waterside Place (2014)
5
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 567/975
Seaport WorldTrade Center
Boston
FidelityInvestments
6
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 568/975
Six pad ready Parcels owned by Massport available inthe Seaport / Innovation District
1. World Trade Center Parcel (WTC Avenue)
2. Parcel D-3
3. Summer Street Parcel
4. Parcel D-2
5. Parcel A-26. Parcel H
7
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 569/975
8
Location Overview of 6 pad ready parcels in the South
Boston Innovation District
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 570/975
9
World Trade Center Parcel • Development site
adjacent to the
Massport’s 1,500 spa
Air Rights Garage (un
design)
• Able to achieve 150,0to 200,000 sf of offic
development
• Parking provided in
adjacent Massport Ai
Rights Garage
• Prominent views ofdowntown
• Adjacent to MBTA Silv
Line station
Air Rights
Garage Site Parcel
D-2
ParcelD-3
Parcel H
Parcel
A-2
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 571/975
Parcel D-3
• 2.8 acre parcel
• Frontage on Summer
D Streets
• Master plan program
allocation of 500,000
650,000 sf
• Suitable for commerc
office use within mixe
use
• Directly across from t
BCEC/Westin Hotel
• Potential for on-site
structured parking
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 572/975
11
3 acre parcel
Summer Street
Frontage
Site capacity of 400,000
sf
Potential for on-site
structured parking
Opportunity to expand
site through acquisition
of U.S. Army property
South BostonTransportation Plan
recommended
extension of E Street to
Summer Street
Summer Street Parce
Summer Street
Parcel D-3
E
S t r e e t
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 573/975
Parcel D-2• 2.1 acre parcel
• Frontage on Summer,
Street and World Trad
Center Avenue
• Subject of RFQ which
issued by Massport onNov. 9 for hotel/mixed
development
• Requirement for mini
250 room hotel
• Opportunity for well i
excess of 150,000 sf ooffice
• Parking provided in
adjacent Massport Air
Rights Garage (under
design)
Air
Rights
Garage
Site
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 574/975
Parcel A-2
13
• 1.2-acre parcel
• Frontage on Congress
Street and World Tra
Center Avenue
• Master plan program
allocation up to 450,0
sf, suitable for
commercial office us
• Adjacent MBTA Silver
WTC Station, with
potential direct
pedestrian connectio
• Available parking in
planned Air Rights Ga
(adjacent with poten
direct pedestrian
connection)
Parcel
D-2
ParcelD-3
Parcel H
Air Rights
Garage Site
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 575/975
Parcel H
14
1.8 acre parcel
Frontage on Congress
Street
Master plan program
allocation up to 500,000
sf, suitable for
commercial office use
Potential for on-site
structured parking
(either below or above
ground)
Adjacent to existingSilver Line Station
Potential air rights
overbuild of Silver Line
Way and T Station
Air Rights
Garage Site
Parcel
A-2
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 576/975
Flexible, creative, deliverable, and financeabledevelopment capabilities
• “Turnkey” development capabilities
• Using a selected private developer,• or through Massport itself
• Tenant Improvements to suit occupiers’ needs included
• Construction costs for parking options or otherinfrastructure needs are available
• Flexible space lease terms are negotiable to produce lowerinitial occupancy costs
• Attractive pre-packaged lease terms are available in partnershipwith Commonwealth / City investments opportunities
• Early lease periods are discountable with gradual adjustments toover a longer lease period
15
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 577/975
Massport Aviation – Logan International Airport
• Minutes from South Boston Innovation District
• Provides access for private aircraft 24/7, including overnight
parking• General Aviation activities operated by Signature Flight
Support (Fixed Based Operator)
• Automobile parking available at Signature
• Helicopter pad and parking at Signature
16
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 578/975
Massport Aviation – Hanscom Airfield
• 13.5 nautical miles from Logan Airport
• Easy, efficient access to and from Downtown
• Readily available sites for permanent hangars for aircraftfleets
• Full services available
• Existing and new construction options
• Will accommodate multiple planes and helicopters
• Home to multiple Fortune 500 corporate fleets
17
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 579/975
oston Logan Has Nonstop International Service to 53 Destinatio
• 13.5 nautical miles from Logan Airport• Easy, efficient access to and from Downtown
• Readily available sites for permanent hangars foraircraft fleets
• Full services available
• Existing and new construction options
• Will accommodate multiple planes and helicopters
18Note: Includes Seasonal Service, Source: OAG & Innovata Schedules
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 580/975
Boston Logan Has Nonstop Domestic Service to 75 Destinations
19Note: Includes Seasonal Service, Source: OAG & Innovata Schedules
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 581/975
Massport Air Cargo
• Air cargo is reported on a calendar year basis by the carriersthemselves
• The YTD December 2014 numbers reflect the full year’s total• Total Cargo & Mail: 585,459,955 lbs.
• Express (FedEX, UPS etc): 334,315,119 lbs.
• Freight (“belly of plane”): 203,877,671 lbs.
• October 2015 YTD is nearly the same (+0.3%) as Calendar2014 October YTD
20
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 582/975
Massport’s Port of Boston
• Multiple public and private maritime assets that provide New England businesseswith connections to the global marketplace.
• Weekly service to North Europe/Latin America, the Mediterranean, and Asia; easyaccess to Logan Airport and interstate highway system.
• Home to New England’s only full service container terminal; serves over 1,600businesses that use it to export and import goods.
• Annual economic impact of $4.6 billion. Record-breaking volume in FY2015 with221,000 twenty foot equivalent units (TEUs) and 13% growth year to date in FY2016.
• Working with state/federal officials to dredge Boston Harbor to prepare for largercontainer vessels; estimated to double volumes.
21
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 583/975
Massachusetts:An Innovation Capital
22
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 584/975
23
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 585/975
24
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 586/975
25
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 587/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 588/975
Appendix
27
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 589/975
Governing Documents
1956 Enabling Act• Quasi-public authority – “a body corporate and politic”• May only borrow for capital construction, not working capital
• Maintain, repair and operate, or extend, enlarge and improve itsbusiness facilities
• Construct or acquire additional facilities
1978 Trust Agreement, 1999 PFC Trust Agreement, and 2011 CFCTrust Agreement
• Massport’s contract with bondholders, includes specific covenants• Defines use of Massport’s generated revenues (funds flow
requirements)• Federal tax regulations restricts the use of bond proceeds
Current Federal Aviation Law• Restricts the use of aviation revenue (revenue diversion)• Regulates the calculation of aeronautical rates and charges• Regulates the collection and use of Passenger Facility Charges (PFCs)
28
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 590/975
From: Morse, Elizabeth
To: Kennealy, Michael (EOHED); Ash, Jay (EOHED); Kadish, Steven (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks (EOHED); Pollack, Stephanie (DOT); Povich, Lon (GOV); Garrity, Rob (DOT); Tom Glynn; Doolin, James
Subject: RE: Massport Presentation
Date: Tuesday, December 08, 2015 1:41:49 PM
Attachments: Massport 12 8 15 Deck v3.pdf
Here is the revised version of the Massport presentation for your review. Please let me know if you have any edits. Thanks, Elizabeth
From: Morse, ElizabethSent: Tuesday, December 08, 2015 10:32 AMTo: Kennealy, Michael (SEA) <[email protected]> ([email protected]); 'Ash, Jay (EOHED)'; 'Kadish, Steven (GOV)'; 'Lepore, Kristen (ANF)'; Sullivan, Jennifer F. (ANF) ([email protected]); Ross, Robert (ANF) ([email protected]); Frazier, Ricks (EOHED) ([email protected]); Pollack, Stephanie (DOT) ([email protected]); Povich, Lon (GOV) ([email protected]); Rob Garrity ([email protected]); Glynn, Tom; Doolin, JamesSubject: Massport Presentation
Attached please find a draft presentation from Massport. Please email or call with any edits. Thanks,
Elizabeth
Elizabeth Morse
Chief of Staff
Massachusetts Port Authority
One Harborside Drive, Suite 200S
East Boston, MA 02128
617-568-1007
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 591/975
MassportEconomic Development Partner
December 8, 2015
DRAFT 12/8/15 12:00 pm
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 592/975
Massport Overview
• Quasi-public authority – “a body corporate and politic”
• Governed by a seven member board
• Financially self-sufficient – can “fix, revise, charge andcollect tolls, rates, fees, rentals and charges”
• Operates three business lines• Aviation
• Maritime Operations
• Real Estate
• FY16 budget is $667 million• Logan Airport is 85% of total operating budget
• Maritime business is 10%, all other is 5%
• Massport bond ratings• Moody’s Aa2, S&P AA, Fitch AA
2
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 593/975
Why the Massachusetts Port Authority can assist
1. Massport has a proven track record as a successful
development partner2. Massport has Six development ready parcels in
Boston’s Seaport – “Innovation District”
3. Massport can execute flexible, creative, anddeliverable development opportunities to suit
commercial tenant needs expeditiously
3
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 594/975
uccessful History of Innovative Developments
• Massport is a Proven Development Partner• Since 1996, 5 million square feet of new mixed use, commercial, and
hotel developments were executed by Massport in South Boston• These developments have created $2.4 billion new value for the
Commonwealth and the City of Boston• 11,660 jobs in the Seaport Innovation District have been added as a
result of Massport’s Real Estate development initiatives
• Massport produces these positive results by working withdevelopers to:
• Execute creative and strategic “win- win” Long Term Ground Leases that afinanceable
• A proven track record and ability to Execute a One-Stop Shopping
approach to development• Streamlined Permitting
• 7 million square feet of mixed-use development master plan successfullypermitted for Commonwealth Flats
• Expedited / coordinated review process by the Commonwealth and City ofBoston managed by Massport
4
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 595/975
uccessful History of Innovative Developments in Southoston
1. Fidelity - World Trade Center (1996)
2. Fidelity - Seaport Hotel (1998)
3. Fidelity - East Office Building (2000)
4. Fidelity - West Office Building (2002)
5. John Hancock U.S. Corporate Headquarters (2003
6. Park Lane Seaport Apartments (2006)
7. Boston Waterfront Renaissance Hotel (2008)
8. Liberty Wharf (2011)
9. Waterside Place (2014)
5
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 596/975
Seaport WorldTrade Center
Boston
FidelityInvestments
6
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 597/975
Six pad ready Parcels owned by Massport available inthe Seaport / Innovation District
1. World Trade Center Parcel (WTC Avenue)
2. Parcel D-3
3. Summer Street Parcel
4. Parcel D-2
5. Parcel A-26. Parcel H
7
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 598/975
8
Location Overview of 6 pad ready parcels in the South
Boston Innovation District
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 599/975
9
World Trade Center Parcel • Development site
adjacent to the
Massport’s 1,500 spa
Air Rights Garage (un
design)
• Able to achieve 150,0to 200,000 sf of offic
development
• Parking provided in
adjacent Massport Ai
Rights Garage
• Prominent views ofdowntown
• Adjacent to MBTA Silv
Line station
Air Rights
Garage Site Parcel
D-2
ParcelD-3
Parcel H
Parcel
A-2
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 600/975
Parcel D-3
• 2.8 acre parcel
• Frontage on Summer
D Streets
• Master plan program
allocation of 500,000
650,000 sf
• Suitable for commerc
office use within mixe
use
• Directly across from t
BCEC/Westin Hotel
• Potential for on-site
structured parking
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 601/975
11
3 acre parcel
Summer Street
Frontage
Site capacity of 400,000
sf
Potential for on-site
structured parking
Opportunity to expand
site through acquisition
of U.S. Army property
South BostonTransportation Plan
recommended
extension of E Street to
Summer Street
Summer Street Parce
Summer Street
Parcel D-3
E
S t r e e t
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 602/975
Parcel D-2• 2.1 acre parcel
• Frontage on Summer,
Street and World Trad
Center Avenue
• Subject of RFQ which
issued by Massport onNov. 9 for hotel/mixed
development
• Requirement for mini
250 room hotel
• Opportunity for well i
excess of 150,000 sf ooffice
• Parking provided in
adjacent Massport Air
Rights Garage (under
design)
Air
Rights
Garage
Site
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 603/975
Parcel A-2
13
• 1.2-acre parcel
• Frontage on Congress
Street and World Tra
Center Avenue
• Master plan program
allocation up to 450,0
sf, suitable for
commercial office us
• Adjacent MBTA Silver
WTC Station, with
potential direct
pedestrian connectio
• Available parking in
planned Air Rights Ga
(adjacent with poten
direct pedestrian
connection)
Parcel
D-2
ParcelD-3
Parcel H
Air Rights
Garage Site
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 604/975
Parcel H
14
1.8 acre parcel
Frontage on Congress
Street
Master plan program
allocation up to 500,000
sf, suitable for
commercial office use
Potential for on-site
structured parking
(either below or above
ground)
Adjacent to existingSilver Line Station
Potential air rights
overbuild of Silver Line
Way and T Station
Air Rights
Garage Site
Parcel
A-2
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 605/975
Flexible, creative, deliverable, and financeabledevelopment capabilities
• “Turnkey” development capabilities
• Using a selected private developer,• or through Massport itself
• Tenant Improvements to suit occupiers’ needs included
• Construction costs for parking options or otherinfrastructure needs are available
• Flexible space lease terms are negotiable to produce lowerinitial occupancy costs
• Attractive pre-packaged lease terms are available in partnershipwith Commonwealth / City investments opportunities
• Early lease periods are discountable with gradual adjustments toover a longer lease period
15
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 606/975
Massport Aviation – Logan International Airport
• Minutes from South Boston Innovation District
• Provides access for private aircraft 24/7, including overnight
parking• General Aviation activities operated by Signature Flight
Support (Fixed Based Operator)
• Automobile parking available at Signature
• Helicopter pad and parking at Signature
16
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 607/975
Massport Aviation – Hanscom Airfield
• 13.5 nautical miles from Logan Airport
• Easy, efficient access to and from Downtown
• Readily available sites for permanent hangars for aircraftfleets
• Full services available
• Existing and new construction options
• Will accommodate multiple planes and helicopters
• Home to multiple Fortune 500 corporate fleets
17
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 608/975
oston Logan Has Nonstop International Service to 53 Destinatio
• 13.5 nautical miles from Logan Airport• Easy, efficient access to and from Downtown
• Readily available sites for permanent hangars foraircraft fleets
• Full services available
• Existing and new construction options
• Will accommodate multiple planes and helicopters
18Note: Includes Seasonal Service, Source: OAG & Innovata Schedules
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 609/975
Boston Logan Has Nonstop Domestic Service to 75 Destinations
19Note: Includes Seasonal Service, Source: OAG & Innovata Schedules
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 610/975
Massport Air Cargo
• Air cargo is reported on a calendar year basis by the carriersthemselves
• The YTD December 2014 numbers reflect the full year’s total• Total Cargo & Mail: 585,459,955 lbs.
• Express (FedEX, UPS etc): 334,315,119 lbs.
• Freight (“belly of plane”): 203,877,671 lbs.
• October 2015 YTD is nearly the same (+0.3%) as Calendar2014 October YTD
20
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 611/975
Massport’s Port of Boston
• Multiple public and private maritime assets that provide New England businesseswith connections to the global marketplace.
• Weekly service to North Europe/Latin America, the Mediterranean, and Asia; easyaccess to Logan Airport and interstate highway system.
• Home to New England’s only full service container terminal; serves over 1,600businesses that use it to export and import goods.
• Annual economic impact of $4.6 billion. Record-breaking volume in FY2015 with221,000 twenty foot equivalent units (TEUs) and 13% growth year to date in FY2016.
• Working with state/federal officials to dredge Boston Harbor to prepare for largercontainer vessels; estimated to double volumes.
21
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 612/975
Massachusetts:An Innovation Capital
22
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 613/975
23
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 614/975
24
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 615/975
25
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 616/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 617/975
Appendix
27
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 618/975
Governing Documents
1956 Enabling Act• Quasi-public authority – “a body corporate and politic”• May only borrow for capital construction, not working capital
• Maintain, repair and operate, or extend, enlarge and improve itsbusiness facilities
• Construct or acquire additional facilities
1978 Trust Agreement, 1999 PFC Trust Agreement, and 2011 CFCTrust Agreement
• Massport’s contract with bondholders, includes specific covenants• Defines use of Massport’s generated revenues (funds flow
requirements)• Federal tax regulations restricts the use of bond proceeds
Current Federal Aviation Law• Restricts the use of aviation revenue (revenue diversion)• Regulates the calculation of aeronautical rates and charges• Regulates the collection and use of Passenger Facility Charges (PFCs)
28
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 619/975
From: Mike Kennealy
To: Ash, Jay (SEA)
Cc: Ash, Jay (SEA)
Subject: Re: Meeting Confirmation, GE Team & Logistics - Massachusetts
Date: Sunday, July 19, 2015 8:23:49 AM
Sec. Lepore? Timely given budget, FAS 109, etc.
Mike Kennealy
On Jul 18, 2015, at 8:49 AM, "Ash, Jay (SEA)" < [email protected]> wrote:
I certainly have one. How about the two of you?
Should we think of the diversity of our team or is three men ok?
Should we bring a legislator?
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: Mike Kennealy <[email protected]>Date: 07/18/2015 7:14 AM (GMT-05:00)To: "Ash, Jay (EOHED)" < [email protected]>Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
On it
From: Ash, Jay (SEA) [mailto:[email protected]]
Sent: Friday, July 17, 2015 5:24 PM
To: Mike Kennealy
Subject: FW: Meeting Confirmation, GE Team & Logistics - Massachusetts
From: Kulish, Karen (GE, Corporate) [mailto:[email protected]]
Sent: Friday, July 17, 2015 3:56 PM
To: Ash, Jay (EOHED)
Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
Hi Jay, I know it’s Friday afternoon but I just wanted to touch base with a nudge re bios for attendees.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 620/975
I just wanted to be sure was on your radar screen for next week … many thanks and have a good weekend! Karen
Karen Kulish
Executive Assistant to Ann KleeGlobal Operations – Environment, Health & Safety
O: 203 373-2575
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
From: Kulish, Karen (GE, Corporate)Sent: Friday, July 10, 2015 4:50 PMTo: [email protected]: Kulish, Karen (GE, Corporate)Subject: Meeting Confirmation, GE Team & Logistics - Massachusetts
Jay,
I am writing to confirm your meeting at our GE offices in Fairfield, CT on July 30 at 1:30
– 3:30. We look forward to seeing you then.
Below are the GE folks who’ll be at the meeting, and their bios are also attached.
Laurie Bevier Sr. Human Resources Manager
Eileen Cavanaugh CFO Corporate/Global Operations
Matt Cribbins VP, Investor Communications
Chris Drumgoole CFO, IT
Ann Klee VP, Global Operations, Environment, Health & Safety
Michelle May Director, Culture Communications
Chris Pereira Chief, Securities & Finance Counsel
Sarah Wills Executive Director, Strategy
We would also request bios be provided for all those who will attend from your side.
The meeting will be held at our GE Guest House, Conference Room “B”, and upon going
through Security and obtaining badges you will be directed to Guest House parking.
If there are any changes, please be sure that you provide to me the names of
EVERYONE who will attend the meeting as I need to clear each individual through GE
Security. Please confirm whether the Governor will attend and, if so, whether you will
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 621/975
be sending a security detail in advance of the visit. We are a secure facility, however,
we do understand that you may want to do this.
Don’t hesitate to contact me with any questions.
Have a good weekend,
Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
O: 203 373-2575
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 622/975
From: Pham, Nam (EOHED)
To: Kennealy, Michael (EOHED); Kirk, Carolyn (EOHED)
Cc: Ash, Jay (EOHED); Nunnelly, Mark E (DOR); Pham, Nam (EOHED); Distefano, Maria (MOBD); Servetnick, Adrian (EOHED)
Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
Date: Thursday, July 30, 2015 8:26:36 AM
Maria and I will meet up in Waltham. See you in CT. Drive safety.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Kennealy, Michael (EOHED)" <[email protected]>Date: 07/30/2015 7:57 AM (GMT-05:00)To: "Kirk, Carolyn (EOHED)" <[email protected]>Cc: "Ash, Jay (EOHED)" <[email protected]>, "Nunnelly, Mark E (DOR)"
<[email protected]>, "Pham, Nam (EOHED)" <[email protected]>, "Distefano, Maria (MOBD)" <[email protected]>, "Servetnick, Adrian (EOHED)" <[email protected]>Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
I think we have 4 cars going down, based on individual plans for travel/calls/work: - Jay/Carolyn/Adrian- Nam/Maria- Mike- Mark Also please see the most recent version of the deck attached - a few edits will happen this morning but this is very close. Re: speaking
roles, expect everyone to be involved/engaged especially in Q&A, but with respect to specific slides here is what Jay and I discussed, by slide number: 1-12 Jay13-15 Mark 16 Carolyn17-18 Mike19-27 Jay28-29 Mike30-32 Carolyn33-34 Jay Please call with questions and I expect we'll have some discussion by phone on the drive down. Mike
From: Kirk, Carolyn (EOHED)Sent: Wednesday, July 29, 2015 8:58 PMTo: Kennealy, Michael (EOHED)Cc: Ash, Jay (EOHED); Nunnelly, Mark E (DOR); Pham, Nam (EOHED); Distefano, Maria (MOBD); Servetnick, Adrian (EOHED)Subject: Re: Meeting Confirmation, GE Team & Logistics - Massachusetts
Perhaps we should gather at 1 Ashburton by 10am.
Sent from my iPhone
On Jul 29, 2015, at 7:02 PM, Kennealy, Michael (EOHED) <[email protected]> wrote:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 623/975
Everybody travelling to Connecticut tomorrow - please see two emails below with
information about our meeting. I have also attached bios for the GE folks as well as
the bios on us that we sent over.
Could folks let me know how they are getting there tomorrow? They wanted to have
some idea of number of cars. Any questions please call my cell phone number below.
See you tomorrow.
Thanks,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108Office: 617-788-3640
Cell: 617-634-4762
-------- Original message --------From: "Kulish, Karen (GE, Corporate)" <[email protected]>Date: 07/21/2015 3:05 PM (GMT-05:00)To: "Ash, Jay (EOHED)" < [email protected]>Cc: "Kulish, Karen (GE, Corporate)" <[email protected]>Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
Jay,
I am writing to reconfirm your meeting with us on Thursday, July 30th from 1:30 – 3:30. The meeting will be held at our GE Guest House, 3135 Easton Turnpike, Fairfield, CT 06828, and upon going through Security and obtaining badges you will be directed to the Guest House and parking. I will be present at the Guest House entry upon the team’s arrival to guide folks to the meeting.
I would also ask that the team contact me when they are approx. 10 mins. out. My cell is
Please let me know if you have any questions.
Thank you,Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 624/975
O: 203 373-2575
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
From: Kulish, Karen (GE, Corporate) [mailto:[email protected]]
Sent: Friday, July 10, 2015 4:50 PM
To: Ash, Jay (EOHED)
Cc: Kulish, Karen (GE, Corporate)
Subject: Meeting Confirmation, GE Team & Logistics - Massachusetts
Jay,
I am writing to confirm your meeting at our GE offices in Fairfield, CT on July 30 at 1:30
– 3:30. We look forward to seeing you then.
Below are the GE folks who’ll be at the meeting, and their bios are also attached.
Laurie Bevier Sr. Human Resources Manager
Eileen Cavanaugh CFO Corporate/Global Operations
Matt Cribbins VP, Investor Communications
Chris Drumgoole CFO, IT
Ann Klee VP, Global Operations, Environment, Health & Safety
Michelle May Director, Culture Communications
Chris Pereira Chief, Securities & Finance Counsel
Sarah Wills Executive Director, Strategy
The meeting will be held at our GE Guest House, Conference Room “B”, and upon going
through Security and obtaining badges you will be directed to Guest House parking.
Don’t hesitate to contact me with any questions.
Have a good weekend,
Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
O: 203 373-2575
C:
General Electric Company
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 625/975
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
<Matthew_G_Cribbins.pdf>
<Laurie Bevier bio.doc>
<Pereira Outside Bio with photo.pdf>
<Cavanaugh bio 2015.doc>
<May Bio 1-2015.doc>
<Wills Bio July 2015.doc>
<CDrumgoole Bio - GE Chief Operating Officer 04102015tr (2).pdf>
<Klee Bio.docx>
<Commonwealth of Massachusetts bios.pdf>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 626/975
From: Kennealy, Michael (EOHED)
To: Kirk, Carolyn (EOHED)
Cc: Ash, Jay (EOHED); Nunnelly, Mark E (DOR); Pham, Nam (EOHED); Distefano, Maria (MOBD); Servetnick, Adrian (EOHED)
Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
Date: Thursday, July 30, 2015 7:57:48 AM
Attachments: Project Project.pptx
I think we have 4 cars going down, based on individual plans for travel/calls/work: - Jay/Carolyn/Adrian- Nam/Maria- Mike- Mark Also please see the most recent version of the deck attached - a few edits will happen this morning but this is very close. Re: speaking roles, expect everyone to be involved/engaged especially in Q&A, but with respect to specific slides here is what Jay and I discussed, by slide number: 1-12 Jay13-15 Mark 16 Carolyn17-18 Mike19-27 Jay28-29 Mike
30-32 Carolyn33-34 Jay Please call with questions and I expect we'll have some discussion by phone on the drive down. Mike
From: Kirk, Carolyn (EOHED)Sent: Wednesday, July 29, 2015 8:58 PMTo: Kennealy, Michael (EOHED)Cc: Ash, Jay (EOHED); Nunnelly, Mark E (DOR); Pham, Nam (EOHED); Distefano, Maria (MOBD); Servetnick, Adrian (EOHED)Subject: Re: Meeting Confirmation, GE Team & Logistics - Massachusetts
Perhaps we should gather at 1 Ashburton by 10am.
Sent from my iPhone
On Jul 29, 2015, at 7:02 PM, Kennealy, Michael (EOHED) <[email protected]> wrote:
Everybody travelling to Connecticut tomorrow - please see two emails below with
information about our meeting. I have also attached bios for the GE folks as well as
the bios on us that we sent over.
Could folks let me know how they are getting there tomorrow? They wanted to have
some idea of number of cars. Any questions please call my cell phone number below.
See you tomorrow.
Thanks,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 627/975
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-------- Original message --------From: "Kulish, Karen (GE, Corporate)" <[email protected]>Date: 07/21/2015 3:05 PM (GMT-05:00)To: "Ash, Jay (EOHED)" < [email protected]>Cc: "Kulish, Karen (GE, Corporate)" <[email protected]>Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
Jay,
I am writing to reconfirm your meeting with us on Thursday, July 30th from 1:30 – 3:30. The meeting will be held at our GE Guest House, 3135 Easton Turnpike, Fairfield, CT 06828, and upon going through Security and obtaining badges you will be directed to the Guest House and parking. I will be present at the Guest House entry upon the team’s arrival to guide folks to the meeting.
I would also ask that the team contact me when they are approx. 10 mins. out. My cell is 2
Please let me know if you have any questions.
Thank you,Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
O: 203 373-2575
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
From: Kulish, Karen (GE, Corporate) [mailto:[email protected]]
Sent: Friday, July 10, 2015 4:50 PM
To: Ash, Jay (EOHED)
Cc: Kulish, Karen (GE, Corporate)
Subject: Meeting Confirmation, GE Team & Logistics - Massachusetts
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 628/975
Jay,
I am writing to confirm your meeting at our GE offices in Fairfield, CT on July 30 at 1:30
– 3:30. We look forward to seeing you then.
Below are the GE folks who’ll be at the meeting, and their bios are also attached.
Laurie Bevier Sr. Human Resources Manager
Eileen Cavanaugh CFO Corporate/Global Operations
Matt Cribbins VP, Investor Communications
Chris Drumgoole CFO, IT
Ann Klee VP, Global Operations, Environment, Health & Safety
Michelle May Director, Culture Communications
Chris Pereira Chief, Securities & Finance Counsel
Sarah Wills Executive Director, Strategy
The meeting will be held at our GE Guest House, Conference Room “B”, and upon going through Security and obtaining badges you will be directed to Guest House parking.
Don’t hesitate to contact me with any questions.
Have a good weekend,
Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
O: 203 373-2575C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
<Matthew_G_Cribbins.pdf>
<Laurie Bevier bio.doc>
<Pereira Outside Bio with photo.pdf>
<Cavanaugh bio 2015.doc>
<May Bio 1-2015.doc>
<Wills Bio July 2015.doc>
<CDrumgoole Bio - GE Chief Operating Officer 04102015tr (2).pdf>
<Klee Bio.docx>
<Commonwealth of Massachusetts bios.pdf>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 629/975
0
Commonwealth of Massachusetts
0
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 630/975
1
Massachusetts - A great place to:
Work - Record job levels, national and international
leadership in high growth sectors, a culture of innovation &
entrepreneurship, strong anchor industries, a highlyfunctioning ecosystem, and ample connections to the world.
Live - Prospering communities, #1 in K-12 public education,
top private high schools and universities, world class health
care, and great culture.
Play - Museums, theatres, history, sports, concerts, beaches,
shopping, restaurants, hiking trails, and festivals & fairs.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 631/975
2
The Massachusetts “Story”
“Establish two great education institutions and wait 200 years!” – Governor Baker.
Jokes aside, Harvard & MIT, and BC, BU, NU, WPI, Holy Cross, Amherst, Williams,
Brandeis, Clark, Bentley, UMASS and the 140 colleges and universities have resulted
in Massachusetts being a highly educated state.
Education, R&D, and technology transfers have enhanced a culture of innovation
and entrepreneurship.
Strong existing companies, with great leadership and local commitment, have been
bolstered by emerging and high growth sectors, often in a big city/small town way.
Technology and Life Sciences have driven Boston and Cambridge economies to be
arguably the most successful and innovative communities.
Success attracts success, and companies, new and old, and residents, are feeding
off of each other and fueling even greater success.
Business, higher ed, institutions, philanthropy, non-profits, residents and
government are collaborating and advancing individual and common aspirations
and achievements.
The political climate is supportive of and helping to lead the state’s continuing
prosperity.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 632/975
3
About Massachusetts
History
Culture
Politics
Business Climate
Population Demographics
Communities
Stability & Growth
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 633/975
4
Political Environment
US Presidents & Recent
Contenders
4 presidents from MA.
Since 1990, the average
Governor’s term has been
5.5 years.
Since 1950, the average
Boston Mayoral term hasbeen 12.8 years.
Great working relationship
between the big three, and
with the Mayor of Boston.
Democratic state with a
history of republican
governors.
Consensus: extended
honeymoon a result of the
triumph of people over
personalities, and policy
over politics.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 634/975
5
About the Governor
Governor Charlie Baker has extensive public
and private sector experience.
• Cabinet secretary 1992 – 1998.
• Overhauled the state social service system.
• Closed a $1 billion deficit while cutting taxes
• Helped implement sweeping education reform.
• CEO of Harvard Pilgrim Health Care 1999 – 2009.
• Transformed a troubled firm in state receivership
into a national leader.
• Values the role of the business community and the
private sector in driving the Commonwealth forward.
• Supported by Lt. Gov. Karyn Polito, a former five-term
state legislator who leads the administration’s
community engagement efforts.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 635/975
6
Political Stability
Governor Baker is committed to bipartisanship, political
cooperation, and problem-solving.
Assembled a cabinet from across the political spectrum.
Engages in regular, open dialogue with legislative leadership.
Secured a transit agency control board, and significant cost-
cutting concessions, from the Democrat-controlled Legislature.
Results-oriented leadership has yielded a 69/10 statewide
favorable/unfavorable rating. Governor is focused on Massachusetts “I am never running for
president.”
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 636/975
7
Fiscal Stability
Closed a $1.8 billion FY16 budget deficit without raising taxes or
fees and, for the first time in four years, without drawing down
the state’s rainy day fund.
The Governor’s budget ensures state spending will grow slower
than tax collections.
The Governor and legislative leadership are committed to
holding the line on taxes.
Rainy day fund balance currently exceeds $1.1 billion.
Most recent general obligation bond ratings:
• Fitch: AA+
• Moody’s: Aa1
• S&P: AA+
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 637/975
8
Executive Office of
Housing and Economic Development
Led by Secretary Jay Ash, who led the city
Chelsea to record economic and job grow
Directs housing, community and businessdevelopment, job creation, consumer
affairs, banking, insurance, and business
regulation efforts in the Commonwealth.
Administers the Commonwealth’s econom
incentive programs.
Oversees quasi-public agencies and otheinitiatives that support business
development efforts in technology, life
sciences, manufacturing, financial service
tourism, and defense.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 638/975
9
Broad Economic Competitiveness Agenda
The Baker-Polito Administration is advancing a multi-facetted
approach to developing regions and communities by:
• Creating strong, vibrant, and capable communities.
• Promoting a culture of innovation and entrepreneurship.
• Enhancing workforce development and talent retention
efforts.
• Supporting key sectors and clusters.
• Creating a pro-growth regulatory and business environment.
• Delivering housing policies that support economic growth.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 639/975
10
MA is the Most Dynamic,
Innovative State
#1 in science & engineering
articles per capita.
#1 in life sciences employment per
capita, and in % of workforce inscience and engineering
occupations.
#1 in technology transfers.
#1 most economically evolved
state, according to the
Information Technology and
Innovation Foundation.
#1 in funding from the National
Institute of Health as % of GDP.
#1 on the Milken Institute State
Technology and Science Index.
#1 in life sciences, according to G
magazine ratings.
#1 in federal expenditures for
academic & non-profit R&D leve
and growth among leading
technology states.
#1 state for overall competitiven
according to the Beacon Hill
Institute at Suffolk University.
#1 in R&D spending as % of GDP
per capita.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 640/975
11
MA is the Most Dynamic,
Innovative State
2nd in venture capital under
management.
2nd in technology patents percapita.
2nd in pre-market
biopharmaceutical
notifications.
4th
in new drug approvals.
2nd highest growth in defens
manufacturing and
instrumentation. Greater Boston ranks 2nd in
technology employment
among major US markets.
Massachusetts medical devi
industry is 2nd largest in the
US.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 641/975
12
Educated Workforce
Bachelor ’s Degree
Attainment
Massachusetts 38.2%
Colorado 35.9%
Maryland 35.7%
Connecticut 35.6%
New Jersey 34.5%
More than 140 colleges and universitie
and the highest concentration of highe
education institutions in the US.
• 10 in top 100.
Half of all Nobel Prize winners in the
United States were educated in
Massachusetts.
#1 in bachelor’s degrees, at 39.4% of
people over 25. #1 state in advanced degrees, at 16.8%
the over 25 population, and 19% of
metro-Boston.
40% of workforce in innovation sector
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 642/975
13
A Clearer Code: Regulatory Review
Governor’s Vision
Promote an ideal regulatory
climate in Massachusetts.
Ensure that there is a clearly
identified need for
governmental intervention.
Ensure the costs of the
regulation do not exceedthe benefits.
Create an efficient,
coherent, and consistent
regulatory framework.
We’ve Done it Before
First-ever comprehensive
regulatory review took placein 1996, led by then-
Secretary Baker of A&F.
Nearly 20% of the
regulations were rescinded
outright, and only 27%
remained unchanged.
3 out of every 4 pages of
regulations were amended
or rescinded.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 643/975
14
Massachusetts Connecticut New York New Jersey
Highest
Business Tax
Climate Index
27 9 2 1
State-Local Tax
Burden as a
Share of State
ncome
10.30% 11.90% 12.60% 12.30%
ersonal
ncome tax rate5.15% 6.70% 8.82% 8.97%
usinessncome tax rate 8% 9% 7.10% 9%
Capital Gains
ax5.20% 6.70% 8.80% 9%
Average
ombined
tate/local sales
ax rate
6.25% 6.35% 8.48% 6.97%
Taxes by the Numbers
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 644/975
15
Taxation: Stable and Business-Friendly
Current Programs
• Personal income tax rate reduction tied to economic growth.
• Department of Revenue is accessible and engaged with the taxpayer community.
• Favorable combined reporting rules for in-state businesses.
• Recent enactment of “market-based” sourcing of all sales (for purposes of income
apportionment) favors in-state businesses.
• Stabilization fund available.
Going Forward
• Recent FAS 109 agreement; looking for solutions that work.
• Reevaluation of the non-income measure and other regulations that maydiscourage investment.
• DOR investments in technology and people focused on improving customer servic
and information access.
• Income tax rate is scheduled to drop to 5.1% in January 2016.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 645/975
16
Incentives & Programs
Economic Development Incentive Program (EDIP)
• Since 2010, EDIP has provided tax credits for 251 expansion and growth projects.
These plan to create 17,716 jobs, retain 47,883 jobs and secure $6.2b in private
investments. EDIP provides for both state and local tax relief.
Research & Development Tax Credit
• Massachusetts offers a tax incentive for research and development investment for
both manufacturers and R&D companies.
Workforce Training Fund
• The Workforce Training Fund is a state fund financed by Massachusetts employers provide applicants with the resources to improve employee skills.
Single Sales Factor
• While many states use a three-factor apportionment formula to determine a
manufacturer’s net income, creating a greater burden for businesses, Massachuset
only uses a single sales factor apportionment formula.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 646/975
17
Other Headquarters
26 Fortune 1000 companies in MA, 24 within 40 miles of Boston
Financial Medical Devices Life Sciences IT/ Communications Other
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 647/975
18
GE in MA (miles from Boston)
Marlborough (31 miles)
North American HQ for life sciences
Westborough (37 miles)
Life Sciences manufacturing
Lynn (11 miles)
Aerospace manufacturing
BostonHealthcare IT solutions
Watertown (9 miles)
Water division
Burlington (16 miles)
Transportation
Billerica (21 miles)
World HQ for Oil & Gas measurement control
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 648/975
19
Key Locations
Boston:
• New England’s economic engine, with areas like the Seaport,
Back Bay, and the Financial District.• Quick airport access and robust public transit infrastructure.
• Home to Liberty Mutual, Vertex Pharmaceuticals, Arnold
Advertising, LogMeIn, Putnam Investments, Bain Capital,
Wellington Management, Massachusetts General Hospital.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 649/975
20
Key Locations
Kendall Square, Cambridge:
• The most innovative square mile in the world.
• Home to MIT, Google, Microsoft, Amazon, Twitter, Genzyme,
Biogen, Novartis, the Broad Institute, and HubSpot.
• Current commercial development pipeline exceeds 5 millionsquare feet. Strong and development-ready REIT ownership.
• MIT has announced plans to invest $1.2b, and create nearly 1
million square feet, 740 apartments for a mix of students and
non-students, and increased retail space.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 650/975
21
Key Locations, continued
North Point, Cambridge:
• Emerging mixed-use neighborhood along the Charles River, minutes from Kendall
Square and downtown Boston.
• Located along the new Green Line light rail expansion.• Home to EF Education’s headquarters campus. Fully permitted for up to 2 million
square feet of build-to-suit commercial development.
• Located near North Station, TD Garden, and the Museum of Science.
Alewife, Cambridge:
• Emerging mixed-use
neighborhood with MBTA rail
access, located midwaybetween Kendall Square and
the Route 128 belt.
• Strong and development-read
REIT ownership.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 651/975
22
Key Locations, continued
Assembly Square, Somerville
• Region’s fastest growing neighborhood along the Mystic River.
• 45-acre master-developed project will ultimately encompass 2.8 million square fee
office, 630,000 square feet of retail, and 1,800 apartments.
• Direct MBTA rail and highway access, five minutes from Downtown Boston.
• Future home to Partners Healthcare’s headquarters campus.
• Available commercial space and development-ready pads.
• Future home of Partner’s Health Care administrative offices.
SouthField
• Emerging mixed-use master-
planned community of 1,400 a30 minutes south of Boston.
• Direct commuter rail access, a
close highway access.
• Currently zoned for 2 million
square feet of commercial spa
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 652/975
23
Key Locations, continued
Worcester
• Home to companies including Hanover Insurance and
Siemens.
• Holds UMass Medical School campus, WorcesterPolytechnic Institute and 13 other area colleges.
• Less than an hour drive to Boston. MBTA and regional
public transportation access.
• Commercial development pads available in the ongoing
downtown transformation.
Springfield• Home to MassMutual, Baystate Health, and the TechSpring ehealth incubator, as well a
5 colleges.
• Future home to MGM Springfield casino and CNR Changchun railway vehicles.
• Half-hour drive to Hartford, 90-minute drive to Boston.
• Affordable development sites.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 653/975
24
Boston Logan - Domestic
Boston Logan serves 73 domestic non-stop destinations, including 60 minute flights to
NYC, and 90 minute flights to Washington, DC.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 654/975
25
Boston Logan - International
Boston Logan serves 46 international, non-stop destinations,
including the shortest US flights to Europe.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 655/975
26
Public Transportation
MBTA:
• Stations in 90 cities and
towns across 7 counties.
• Tied for most rail lines in
the US.
• 7th highest ridership per
mile in the US.
• Governor Baker sought
and received authority
for increased controlwhich will lead to
substantial upgrades.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 656/975
27
Transportation Assets
11 Airports (in green).
5 Heliports within 20 miles
of Boston (in purple).
Amtrak lines to 10 states
and DC.
Boston ranked #3 most
walkable large city.
#4 most bicycle friendlystate.
139 Hubway bicycle share
stations in Boston/
Cambridge.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 657/975
28
#1 K-8 Education
#1 state in 4th grade math and reading, and #2 in 4th grade
writing scores.
#1 state in 8th grademath, #1 in 8th
grade reading, and
#3 in 8th grade
writing scores.
Ranked #1 state in
K-12 achievementby Education Week.
MA 8th graders rank #2 in world in science achievement.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 658/975
29
Best High Schools
10 public high
schools (in blue) in
the top 1.5% of US.
7 prep schools (in
green) in the top
20 in US.
3 of the top 10
schools for Ivy
Leagueacceptance.
All within 30 miles
of Boston.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 659/975
30
Culture
Arts
• Home to the Boston
Symphony Orchestra- one of
the premier American
orchestras.
• Museums in Boston and
Worcester house works from
ancient Egypt to Gaugain andPicasso.
Sports:
• Boston sports teams have won
nine championships since 2000.
• Nation’s oldest marathon and
world’s largest regatta.
• Emerging Culture:• Houses 10 breweries & 7
distilleries.
• Lawn on D: an interactive
experimental outdoor space.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 660/975
31
Recreation
55 boating clubs.
400 golf courses, including 4
PGA top 100.
Vacation destinations include
the Cape and Islands, the Nor
Shore, and the Berkshires.
1500+ miles of coastline –
including 1 national seashore
• Cape Cod beaches consistently rated
among nation’s best.
Parks:
• 29 State parks.
• 78 State forests.
• 4 wildlife management areas.
• 1 national park.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 661/975
32
Quality of Life
Forbes ranked
Massachusetts #1 in Quality
of Life in 2014. Best online job market,
according to Georgetown.
Health care
• 2 of the top 6 and hospitals in
the U.S. are in Boston.
• 17 nationally ranked hospitals
in MA.
• Home to the top 5 NIH funded
research hospitals in the US.
Boston ranked the
healthiest city in the US by
NerdWallet and 9th
coolestcity by Forbes.
Fast Company named
Boston one of the top cities
of “Tomorrowland” for
technology innovation in
the Seaport.
Massachusetts ranked the
safest place to live by
WalletHub.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 662/975
33
Closing
Excellent – #1 in the economy, education, and more.
Prosperous – record job, sector, and investment growth.
Stable – in leadership, the economy, and in quality of life.
Happening – established and transforming live & play spaces.
Revolutionary – no place has a higher functioning ecosystem.
Connected – planes, trains, cars, bikes, boats, and feet.
Desirable – influx of investment and people say it all.
Good Will – bipartisan, no hostility, and bonding.
Collaborative – partnerships and networks abound.
Leadership – old and new have track records of success.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 663/975
34
Testimonials
“The Massachusetts economy has become the envy of the nation in large part because
the unique collaborative relationship that exists among employers, the Baker
Administration and the Legislature. These groups don’t agree on every issue, but share
fundamental understanding that a healthy and predictable business climate enables t
private sector to create economic opportunities for the citizens of Massachusetts.” – RLord, Associated Industries of Massachusetts
“No games. No politics. No drama. Just governing, leadership, and getting things don
– JD Chesloff, Massachusetts Business Roundtable
“We know from experience how fortunate the Commonwealth is to have Charlie Bake
its Governor. Charlie has the experience, talent and proven leadership skills to work
effectively with job creators and the Legislature to expand the state’s economy by
championing policies that build on our strengths and address our competitive challenghead on.” – Christopher Anderson, Massachusetts High Tech Council
“Massachusetts is a great place to do business, and one of the primary reasons is the
collaborative relationship between state leaders and our business community. We wo
together on issues, we respond to challenges quickly, and we’re always looking for wa
to promote more growth and more opportunity.” – Jim Rooney, Greater Boston Cham
of Commerce
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 664/975
From: Kennealy, Michael (EOHED)
To: Distefano, Maria (MOBD)
Cc: Pham, Nam (EOHED)
Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
Date: Thursday, July 30, 2015 6:58:32 AM
Thanks Maria. I copied Nam here - could I suggest that you guys ride together? I know that Jay, Carolyn, and Adrian are in one car, you would be another, I am driving on my own as I have a ton of calls to catch up on, and I assume Mark is driving too - that would make 4
cars going down. Is that OK?
From: Distefano, Maria (MOBD)Sent: Wednesday, July 29, 2015 7:44 PMTo: Kennealy, Michael (EOHED)Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
Hi Mike, coming from Rockport, so I need to come south anyway. I’ll meet you all at Ashburton in the morning as I heard you all are carpooling.
Thank you for including me—with my being so new, I know this will be a great learning opportunity for me.
Work cell 617-591-9380Personal cell
Maria
Maria Nigro Di StefanoNortheast Regional Director Massachusetts Office of Business Development121 Loring Avenue, Suite 110Salem, MA 01970
[email protected]/mobd
This communication and any communication incorporated herein, including attachments, may be
subject to public disclosure as a “public record,” as defined by M. G. L. c. 4, § 7, and subject to public
inspection, examination and copying pursuant to M. G. L. c. 66, § 10. Any communication with this
agency whether in response to this communication or otherwise may itself be subject to public
inspection and copying pursuant to M. G. L. c. 66, § 10, unless protected by statutory exemption.
From: Kennealy, Michael (EOHED)
Sent: Wednesday, July 29, 2015 7:02 PM
To: Ash, Jay (EOHED) <[email protected]>; Kirk, Carolyn (EOHED)
<[email protected]>; Nunnelly, Mark E (DOR) <[email protected]>;
Pham, Nam (EOHED) <[email protected]>; Distefano, Maria (MOBD)
<[email protected]>; Servetnick, Adrian (EOHED)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 665/975
Subject: FW: Meeting Confirmation, GE Team & Logistics - Massachusetts
Everybody travelling to Connecticut tomorrow - please see two emails below with information about
our meeting. I have also attached bios for the GE folks as well as the bios on us that we sent over.
Could folks let me know how they are getting there tomorrow? They wanted to have some idea of number of cars. Any questions please call my cell phone number below. See you tomorrow.
Thanks,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-------- Original message --------From: "Kulish, Karen (GE, Corporate)" <[email protected]>Date: 07/21/2015 3:05 PM (GMT-05:00)To: "Ash, Jay (EOHED)" < [email protected]>Cc: "Kulish, Karen (GE, Corporate)" <[email protected]>
Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
Jay,
I am writing to reconfirm your meeting with us on Thursday, July 30th from 1:30 – 3:30. The meeting will be held at our GE Guest House, 3135 Easton Turnpike, Fairfield, CT 06828, and upon going through Security and obtaining badges you will be directed to the Guest House and parking. I will be present at the Guest House entry upon the team’s arrival to guide folks to the meeting.
I would also ask that the team contact me when they are approx. 10 mins. out. My cell is 203-598-1348.
Please let me know if you have any questions.
Thank you,Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 666/975
O: 203 373-2575
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
From: Kulish, Karen (GE, Corporate) [mailto:[email protected]]
Sent: Friday, July 10, 2015 4:50 PM
To: Ash, Jay (EOHED)
Cc: Kulish, Karen (GE, Corporate)
Subject: Meeting Confirmation, GE Team & Logistics - Massachusetts
Jay,
I am writing to confirm your meeting at our GE offices in Fairfield, CT on July 30 at 1:30 – 3:30. We
look forward to seeing you then.
Below are the GE folks who’ll be at the meeting, and their bios are also attached.
Laurie Bevier Sr. Human Resources Manager
Eileen Cavanaugh CFO Corporate/Global Operations
Matt Cribbins VP, Investor Communications
Chris Drumgoole CFO, IT
Ann Klee VP, Global Operations, Environment, Health & Safety
Michelle May Director, Culture Communications
Chris Pereira Chief, Securities & Finance Counsel
Sarah Wills Executive Director, Strategy
The meeting will be held at our GE Guest House, Conference Room “B”, and upon going through
Security and obtaining badges you will be directed to Guest House parking.
Don’t hesitate to contact me with any questions.
Have a good weekend,
Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
O: 203 373-2575
C:
General Electric Company
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 667/975
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 668/975
From: Pham, Nam (EOHED)
To: Kennealy, Michael (EOHED); Ash, Jay (EOHED); Kirk, Carolyn (EOHED); Nunnelly, Mark E (DOR); Pham, Nam (EOHED); Distefano, Maria (MOBD); Servetnick, Adrian (EOHED)
Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
Date: Wednesday, July 29, 2015 10:20:10 PM
I'll be driving
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Kennealy, Michael (EOHED)" <[email protected]>Date: 07/29/2015 7:02 PM (GMT-05:00)To: "Ash, Jay (EOHED)" <[email protected]>, "Kirk, Carolyn (EOHED)" <[email protected]>, "Nunnelly, Mark E (DOR)" <[email protected]>, "Pham, Nam (EOHED)"
<[email protected]>, "Distefano, Maria (MOBD)" <[email protected]>, "Servetnick, Adrian (EOHED)" <[email protected]>Subject: FW: Meeting Confirmation, GE Team & Logistics - Massachusetts
Everybody travelling to Connecticut tomorrow - please see two emails below with information about
our meeting. I have also attached bios for the GE folks as well as the bios on us that we sent over.
Could folks let me know how they are getting there tomorrow? They wanted to have some idea of
number of cars. Any questions please call my cell phone number below. See you tomorrow.
Thanks,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-------- Original message --------From: "Kulish, Karen (GE, Corporate)" <[email protected]>Date: 07/21/2015 3:05 PM (GMT-05:00)To: "Ash, Jay (EOHED)" < [email protected]>Cc: "Kulish, Karen (GE, Corporate)" <[email protected]>Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 669/975
Jay,
I am writing to reconfirm your meeting with us on Thursday, July 30th from 1:30 – 3:30. The meeting will be held at our GE Guest House, 3135 Easton Turnpike, Fairfield, CT 06828, and upon going through Security and obtaining badges you will be directed to the Guest House and parking. I will be present at the Guest House entry upon the team’s arrival to guide folks to the meeting.
I would also ask that the team contact me when they are approx. 10 mins. out. My cell is
Please let me know if you have any questions.
Thank you,Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & SafetyO: 203 373-2575
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
From: Kulish, Karen (GE, Corporate) [mailto:[email protected]]
Sent: Friday, July 10, 2015 4:50 PM
To: Ash, Jay (EOHED)
Cc: Kulish, Karen (GE, Corporate)
Subject: Meeting Confirmation, GE Team & Logistics - Massachusetts
Jay,
I am writing to confirm your meeting at our GE offices in Fairfield, CT on July 30 at 1:30 – 3:30. We
look forward to seeing you then.
Below are the GE folks who’ll be at the meeting, and their bios are also attached.
Laurie Bevier Sr. Human Resources Manager
Eileen Cavanaugh CFO Corporate/Global Operations
Matt Cribbins VP, Investor Communications
Chris Drumgoole CFO, IT
Ann Klee VP, Global Operations, Environment, Health & Safety
Michelle May Director, Culture Communications
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 670/975
Chris Pereira Chief, Securities & Finance Counsel
Sarah Wills Executive Director, Strategy
The meeting will be held at our GE Guest House, Conference Room “B”, and upon going through
Security and obtaining badges you will be directed to Guest House parking.
Don’t hesitate to contact me with any questions.
Have a good weekend,
Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
O: 203 373-2575
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 671/975
From: Ash, Jay (EOHED)
To: Mike Kennealy; Ash, Jay (EOHED)
Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
Date: Saturday, July 18, 2015 8:49:35 AM
I certainly have one. How about the two of you?
Should we think of the diversity of our team or is three men ok?
Should we bring a legislator?
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: Mike Kennealy <[email protected]>
Date: 07/18/2015 7:14 AM (GMT-05:00)To: "Ash, Jay (EOHED)" <[email protected]>Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
On it
From: Ash, Jay (SEA) [mailto:[email protected]]
Sent: Friday, July 17, 2015 5:24 PM
To: Mike Kennealy
Subject: FW: Meeting Confirmation, GE Team & Logistics - Massachusetts
From: Kulish, Karen (GE, Corporate) [mailto:[email protected]]
Sent: Friday, July 17, 2015 3:56 PM
To: Ash, Jay (EOHED)
Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
Hi Jay,
I know it’s Friday afternoon but I just wanted to touch base with a nudge re bios for attendees.I just wanted to be sure was on your radar screen for next week … many thanks and have a good weekend! Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 672/975
O: 203 373-2575
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
From: Kulish, Karen (GE, Corporate)Sent: Friday, July 10, 2015 4:50 PMTo: [email protected]: Kulish, Karen (GE, Corporate)Subject: Meeting Confirmation, GE Team & Logistics - Massachusetts
Jay,
I am writing to confirm your meeting at our GE offices in Fairfield, CT on July 30 at 1:30 – 3:30. We
look forward to seeing you then.
Below are the GE folks who’ll be at the meeting, and their bios are also attached.
Laurie Bevier Sr. Human Resources Manager
Eileen Cavanaugh CFO Corporate/Global Operations
Matt Cribbins VP, Investor Communications
Chris Drumgoole CFO, IT
Ann Klee VP, Global Operations, Environment, Health & Safety
Michelle May Director, Culture Communications
Chris Pereira Chief, Securities & Finance CounselSarah Wills Executive Director, Strategy
We would also request bios be provided for all those who will attend from your side.
The meeting will be held at our GE Guest House, Conference Room “B”, and upon going through
Security and obtaining badges you will be directed to Guest House parking.
If there are any changes, please be sure that you provide to me the names of EVERYONE who will
attend the meeting as I need to clear each individual through GE Security. Please confirm whether
the Governor will attend and, if so, whether you will be sending a security detail in advance of the visit. We are a secure facility, however, we do understand that you may want to do this.
Don’t hesitate to contact me with any questions.
Have a good weekend,
Karen
Karen Kulish
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 673/975
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
O: 203 373-2575
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 674/975
From: Ash, Jay (EOHED)
To: "Mike Kennealy"
Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
Date: Tuesday, July 14, 2015 8:29:00 AM
We’ll talk. In terms of the presentation, you should coordinate with Nam’s assistance, on this one.
From: Mike Kennealy [mailto:[email protected]]
Sent: Tuesday, July 14, 2015 7:49 AM
To: Ash, Jay (EOHED)
Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
Let me think about that Jay – maybe other secretariats? Gov’s office? I guess it depends on agenda
and what their big issues are – have they sent an agenda for the meeting? And is Nam or someone
from MOBD working on a presentation? I’ll get this going if not.
From: Ash, Jay (SEA) [mailto:[email protected]]
Sent: Monday, July 13, 2015 7:21 PM
To: Mike Kennealy
Subject: FW: Meeting Confirmation, GE Team & Logistics - Massachusetts
You’re the one coordinating this. You, me and Nam – anyone else?
From: Kulish, Karen (GE, Corporate) [mailto:[email protected]]
Sent: Friday, July 10, 2015 4:50 PM
To: Ash, Jay (EOHED)
Cc: Kulish, Karen (GE, Corporate)
Subject: Meeting Confirmation, GE Team & Logistics - Massachusetts
Jay,
I am writing to confirm your meeting at our GE offices in Fairfield, CT on July 30 at 1:30 – 3:30. We
look forward to seeing you then.
Below are the GE folks who’ll be at the meeting, and their bios are also attached.
Laurie Bevier Sr. Human Resources Manager
Eileen Cavanaugh CFO Corporate/Global Operations
Matt Cribbins VP, Investor Communications
Chris Drumgoole CFO, IT
Ann Klee VP, Global Operations, Environment, Health & Safety
Michelle May Director, Culture Communications
Chris Pereira Chief, Securities & Finance Counsel
Sarah Wills Executive Director, Strategy
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 675/975
We would also request bios be provided for all those who will attend from your side.
The meeting will be held at our GE Guest House, Conference Room “B”, and upon going through
Security and obtaining badges you will be directed to Guest House parking.
If there are any changes, please be sure that you provide to me the names of EVERYONE who will
attend the meeting as I need to clear each individual through GE Security. Please confirm whether the Governor will attend and, if so, whether you will be sending a security detail in advance of the
visit. We are a secure facility, however, we do understand that you may want to do this.
Don’t hesitate to contact me with any questions.
Have a good weekend,
Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
O: 203 373-2575
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 676/975
From: Ash, Jay (EOHED)
To: "Kulish, Karen (GE, Corporate)"
Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
Date: Monday, July 13, 2015 7:19:00 PM
Awesome!
Joining me so far will be
Mike Kennealy Assistant Secretary for Business Growth
Nam Pham Assistant Secretary for Business Development
From: Kulish, Karen (GE, Corporate) [mailto:[email protected]]
Sent: Friday, July 10, 2015 4:50 PM
To: Ash, Jay (EOHED)
Cc: Kulish, Karen (GE, Corporate)
Subject: Meeting Confirmation, GE Team & Logistics - Massachusetts
Jay,
I am writing to confirm your meeting at our GE offices in Fairfield, CT on July 30 at 1:30 – 3:30. We
look forward to seeing you then.
Below are the GE folks who’ll be at the meeting, and their bios are also attached.
Laurie Bevier Sr. Human Resources Manager
Eileen Cavanaugh CFO Corporate/Global Operations
Matt Cribbins VP, Investor CommunicationsChris Drumgoole CFO, IT
Ann Klee VP, Global Operations, Environment, Health & Safety
Michelle May Director, Culture Communications
Chris Pereira Chief, Securities & Finance Counsel
Sarah Wills Executive Director, Strategy
We would also request bios be provided for all those who will attend from your side.
The meeting will be held at our GE Guest House, Conference Room “B”, and upon going through
Security and obtaining badges you will be directed to Guest House parking.
If there are any changes, please be sure that you provide to me the names of EVERYONE who will
attend the meeting as I need to clear each individual through GE Security. Please confirm whether
the Governor will attend and, if so, whether you will be sending a security detail in advance of the
visit. We are a secure facility, however, we do understand that you may want to do this.
Don’t hesitate to contact me with any questions.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 677/975
Have a good weekend,
Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
O: 203 373-2575
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 678/975
From: Eisenstadt, Amy (GE, Corporate)
To: Kennealy, Michael (EOHED); Roberti, Scott (GE, Corporate)
Cc: Ash, Jay (EOHED); John Barros; Frazier, Ricks (EOHED); Cosco, Jonathan (EOHED)
Subject: RE: Memo on incentives
Date: Monday, November 30, 2015 3:38:42 PM
Thanks, Mike. Got here in just enough time for me to read it before I needed to describe it.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Kennealy, Michael (EOHED) [mailto:[email protected]]Sent: Monday, November 30, 2015 2:56 PMTo: Roberti, Scott (GE, Corporate); Eisenstadt, Amy (GE, Corporate)
Cc: Ash, Jay (EOHED); John Barros; Frazier, Ricks (EOHED); Cosco, Jonathan (EOHED)Subject: Memo on incentives
Scott, Amy,
Please see attached – looking forward to discussing further.
Best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 679/975
From: Kennealy, Michael (EOHED)
To: Frazier, Ricks (EOHED); Ash, Jay (EOHED)
Subject: RE: MLSC
Date: Tuesday, December 08, 2015 9:25:31 AM
We can do a multi-year award. Not open now is their/our decision – they have the appropriation.
I’m more troubled by a huge award that would break precedent, especially when ~80% of the jobs
are not directly life sciences, but obviously we’ll proceed on this if we have to.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Frazier, Ricks (EOHED)
Sent: Tuesday, December 08, 2015 8:49 AM
To: Kennealy, Michael (EOHED) <[email protected]>; Ash, Jay (EOHED)
Subject: RE: MLSC
Ricks
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 08, 2015 8:33 AM
To: Ash, Jay (EOHED); Frazier, Ricks (EOHED)
Subject: MLSC
Please see attached – only 2 companies with awards over $15 MM, only 4 over $5 MM, only 18 over
$2 MM.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 680/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 681/975
From: Kennealy, Michael (EOHED)
To: Eisenstadt, Amy (GE, Corporate)
Subject: RE: need a 2 minute call with you
Date: Monday, December 07, 2015 8:26:00 AM
I have a 9:30 -11am meeting – how about 9:15am? Or 11am.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Monday, December 07, 2015 8:25 AM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: need a 2 minute call with you
I have an 8:30 that may run a little longer than ½ hour – can we do 9:30 to be safe?
Amy Eisenstadt
State Tax CounselGeneral Electric Company
(cell)
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Monday, December 07, 2015 8:22 AMTo: Eisenstadt, Amy (GE, Corporate); [email protected]: RE: need a 2 minute call with you
Amy how about 9am?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 682/975
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Sunday, December 06, 2015 4:17 PM
To: Kennealy, Michael (EOHED) <[email protected]>;
Subject: need a 2 minute call with you
Let me know what works for you. Tomorrow is fine. We’ve ruined enough weekends.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 683/975
From: Kennealy, Michael (EOHED)
To: John Barros
Subject: RE: need a 2 minute call with you
Date: Monday, December 07, 2015 8:22:00 AM
Sure - I can email her now.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: John Barros [mailto:[email protected]]Sent: Monday, December 07, 2015 8:21 AM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: Re: need a 2 minute call with you
Let's suggest a 9am?
On Mon, Dec 7, 2015 at 8:08 AM, Kennealy, Michael (SEA)
<[email protected]> wrote:
> I'm tied up 9:30 -11am but otherwise free - I can email her now and find
> out.
>
> Mike Kennealy
> Assistant Secretary for Business Growth The Commonwealth of > Massachusetts Executive Office of Housing & Economic Development One
> Ashburton Place, Room 2101 Boston, MA 02108
> Office: 617-788-3640
> Cell: 617-634-4762
>
> -----Original Message-----
> From: John Barros [mailto:[email protected]]
> Sent: Monday, December 07, 2015 8:05 AM
> To: Kennealy, Michael (EOHED) <[email protected]>
> Subject: Re: need a 2 minute call with you
>
> Mike,
>
> I can be flexible this morning. What works for you?
>
> On Sun, Dec 6, 2015 at 4:17 PM, Eisenstadt, Amy (GE, Corporate)
> <[email protected]> wrote:
>> Let me know what works for you. Tomorrow is fine. We’ve ruined
>> enough weekends.
>>
>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 684/975
>>
>> Amy Eisenstadt
>>
>> State Tax Counsel
>>
>> General Electric Company
>>
>>
>>
>>
>>
>> (cell)
>>
>>
>
>
>
> --
> John Barros
> Chief of Economic Development
> Office of Mayor Martin J. Walsh
> 6th Floor, Room 603
> Boston City Hall, Boston MA 02201
> t: 617-635-5729
> http://www.cityofboston.gov
>
> SHARE YOUR VISION. SHAPE OUR CITY.
> http://imagine.boston.gov/
--
John Barros
Chief of Economic DevelopmentOffice of Mayor Martin J. Walsh
6th Floor, Room 603
Boston City Hall, Boston MA 02201
t: 617-635-5729
http://www.cityofboston.gov
SHARE YOUR VISION. SHAPE OUR CITY.
http://imagine.boston.gov/
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 685/975
From: Kennealy, Michael (EOHED)
To: John Barros; Eisenstadt, Amy (GE, Corporate)
Subject: RE: need a 2 minute call with you
Date: Monday, December 07, 2015 11:01:00 AM
We're on now
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: John Barros [mailto:[email protected]]Sent: Monday, December 07, 2015 9:24 AM
To: Eisenstadt, Amy (GE, Corporate) <[email protected]>
Cc: Kennealy, Michael (EOHED) <[email protected]>
Subject: Re: need a 2 minute call with you
I have been on the call but assume we will be trying the 11AM time.
On Mon, Dec 7, 2015 at 8:27 AM, Eisenstadt, Amy (GE, Corporate)
<[email protected]> wrote:
> Let’s go with that and hope with the best with 11 as the back up.
>
>
>> Amy Eisenstadt
>
> State Tax Counsel
>
> General Electric Company
>
>
>
> 561 784 0332
>
> 203 232 1496 (cell)
>
>
>
> From: Kennealy, Michael (SEA) [mailto:[email protected]]
> Sent: Monday, December 07, 2015 8:27 AM
> To: Eisenstadt, Amy (GE, Corporate)
>
> Cc: [email protected]
> Subject: RE: need a 2 minute call with you
>
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 686/975
>
> I have a 9:30 -11am meeting – how about 9:15am? Or 11am.
>
>
>
> Mike Kennealy
>
> Assistant Secretary for Business Growth
>
> The Commonwealth of Massachusetts
>
> Executive Office of Housing & Economic Development
>
> One Ashburton Place, Room 2101
>
> Boston, MA 02108
>
> Office: 617-788-3640
>
> Cell: 617-634-4762
>
>
>
>
> From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
> Sent: Monday, December 07, 2015 8:25 AM
> To: Kennealy, Michael (EOHED) <[email protected]>
> Cc: [email protected]
> Subject: RE: need a 2 minute call with you
>
>
>
> I have an 8:30 that may run a little longer than ½ hour – can we do> 9:30 to be safe?
>
>
>
> Amy Eisenstadt
>
> State Tax Counsel
>
> General Electric Company
>
>
>
>>
> (cell)
>
>
>
> From: Kennealy, Michael (SEA) [mailto:[email protected]]
> Sent: Monday, December 07, 2015 8:22 AM
> To: Eisenstadt, Amy (GE, Corporate); [email protected]
> Subject: RE: need a 2 minute call with you
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 687/975
>
>
> Amy how about 9am?
>
>
>
> Mike Kennealy
>
> Assistant Secretary for Business Growth
>
> The Commonwealth of Massachusetts
>
> Executive Office of Housing & Economic Development
>
> One Ashburton Place, Room 2101
>
> Boston, MA 02108
>
> Office: 617-788-3640
>
> Cell: 617-634-4762
>
>
>
>
> From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
> Sent: Sunday, December 06, 2015 4:17 PM
> To: Kennealy, Michael (EOHED) <[email protected]>;
> Subject: need a 2 minute call with you
>
>
>> Let me know what works for you. Tomorrow is fine. We’ve ruined
> enough weekends.
>
>
>
> Amy Eisenstadt
>
> State Tax Counsel
>
> General Electric Company
>
>
>>
>
> (cell)
>
>
--
John Barros
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 688/975
Chief of Economic Development
Office of Mayor Martin J. Walsh
6th Floor, Room 603
Boston City Hall, Boston MA 02201
t: 617-635-5729
http://www.cityofboston.gov
SHARE YOUR VISION. SHAPE OUR CITY.
http://imagine.boston.gov/
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 689/975
From: Kersten, Annamarie (MOBD)
To: Cosco, Jonathan (EOHED)
Cc: Frazier, Ricks (EOHED); Kennealy, Michael (EOHED)
Subject: RE: Plum question
Date: Tuesday, December 01, 2015 11:15:27 AM
Attachments: Calculating the EDIPC for Leased Real Estate.docNEES Cheer Pack EDIP CEP Application - Supplemental - Determination of EDIPC for Operating Lease.xls
There is a way you can value the lease payments to be used as additional private investment. It has
only been done once in the past (because the consultant is the former MOBD Executive Director
and knew about it) and I have one coming to this meeting (same consultant). I am attaching the
unpublished start of a DOR TIR. It has not been completed for some unknown reason. I am
including the Cheerpak spreadsheet where it was used before. The consultant and I worked with
DOR to ensure we were doing it correctly. Ignore the orange highlight in the template. The
consultant was trying to influence what percentage we used. It’s up to EACC not him to decide the
percentage.
AnnamarieKersten
EDIP DirectorMassachusetts Office of Business Development
10 Park Plaza, Suite 3730
Boston, MA 02116
Phone: 617-973-8534
Fax: 617-973-8554
This communication and any communication incorporated herein, including attachments, may be
subject to public disclosure as a “public record,” as defined by M. G. L. c. 4, § 7, and subject to public inspection, examination and copying pursuant to M. G. L. c. 66, § 10. Any communication with this
agency whether in response to this communication or otherwise may itself be subject to public
inspection and copying pursuant to M. G. L. c. 66, § 10, unless protected by statutory exemption.
From: Cosco, Jonathan (EOHED)
Sent: Tuesday, December 01, 2015 11:07 AM
To: Kersten, Annamarie (MOBD)
Cc: Frazier, Ricks (EOHED); Kennealy, Michael (EOHED)
Subject: Plum questionImportance: High
Annamarie – Plum is asking about how the credit works if Plum creates the jobs at a location where
the building is constructed by an unrelated third party and then leased by Plum.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 690/975
___________________________________________
Jonathan M. Cosco
Senior Deputy General Counsel
Executive Office of Housing and Economic Development
Commonwealth of Massachusetts
One Ashburton Place, 21st Floor
Boston, MA 02114
617-788-3628
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 691/975
Calculating the EDIPC for Leased Real Estate
(Draft For Discussion Only)
Sections 21 to 24, inclusive, of chapter 166 of the Acts of 2009 made significant changes to the tax credit
provided in G.L. c. 62, § 6 and G.L. c. 63, § 38N, the economic development incentive program credit,EDIPC (formerly referred to as EOAC, economic opportunity area credit).
The EDIPC provisions were amended to make the credit, to the extent awarded by EACC, available to alessee for qualifying real property leased pursuant to an operating lease. St. 2009, c. 166, §§ 21, 23.Eligibility of the credit for leased real estate applies to projects certified on or after January 1, 2010.
The method used to calculate the credit for leased real estate will be the method set out in Regulation830 CMR 63.38N.1(6) which provides:
(b) Computation of the Credit for lessee. The lessee’s credit for tangiblepersonal property shall be five percent of the lessor’s adjusted basis for federaltax purposes at the beginning o f the taxable year, multiplied by a fraction, the
numerator of which is the number of days of the taxable year during which thelessee leases the tangible personal property and the denominator of which is thenumber of days remaining in the useful lif e of such property at thebeginning of the taxable year. Such useful life is the same as that used by thelessor for depreciation purposes when computing federal income tax liability.The maximum cumulative credit shall not exceed five percent of the lessor’sadjusted basis for federal tax purposes at the beginning of the lease term. Thelessee calculates and claims the credit annually during the term of the lease.
Id. The example below illustrates application of 830 CMR 63.38N.1(6) to leased real property.
Example:
A manufacturing applicant in a Gateway community is proposing a jobs growth project and will lease realproperty for 180 days this year. The landlord’s adjusted basis for federal tax purposes at the beginning ofthe taxable year is $3 million. The building has been depreciated for 29 out of 39 years so there are only10 years of useful life remaining at the beginning of the taxable year.
Assumptions:• The lessor has not previously claimed either an EOAC (EDIPC) or ITC on the property; and• Straight line depreciation method is used.
Adjusted basis at the beginning of the taxable year: $3 millionPeriod leased during current tax year: 180 daysUseful life remaining at the beginning of the taxable year: 3652 daysPotential EDIP-ITC: 10%[1]
($3 million x 10%) x (180 / 3652) = $14,736
The applicant can take a $14,736 EDIPC during the first year of the project.
Calculation for second and third years of the project, respectively (if so awarded by EACC)
[1] Under the amendments to G.L. c. 63, § 38N, the EACC may award a taxpayer of credit from 1% upto 40% of the cost of qualifying property.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 692/975
($2700000 x 10%) x (365/3285) = $30,000
($2400000 x 10%) x (365/2920) = $30,000
Note: The lessor’s adjusted basis at the beginning of the taxable year and the number of days remainingin the useful life of the property at the beginning of the taxable decreases each subsequent year.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 693/975
Pack North America - Determination of EDIPC Credit for Operating Lease of Real Estate
ning Book Value (BV) of the Building and Land (Acquired 2/10/2012) * $7,847,770
ning Book Value (BV) of the Building Only (Acquired 2/10/2012) ** $5,203,072 $5,072,401 $4,898,965 $4,725,529 $4,552,094 $4,378,658 $4,205,222 $4,031,786 $3,858,351 $3,684,915 $3,511,479 $3,338,043 $3,164,608 $2,991,172 $2,817,736
ted Book Value of Leased Portion of Bui lding (BV x 187,500/315,000) $3,097,066 $3,019,286 $2,916,051 $2,812,815 $2,709,580 $2,606,344 $2,503,108 $2,399,873 $2,296,637 $2,193,402 $2,090,166 $1,986,931 $1,883,695 $1,780,460 $1,677,224
s Leasing Building Each Year *** 275 365 365 365 365 365 365 365 365 365 365 365 365 365 365
s Remaining in Depreciable Life of Building Assuming 30 Year Life 10,950 10,675 10,310 9,945 9,580 9,215 8,850 8,485 8,120 7,755 7,390 7,025 6,660 6,295 5,930
ting Lease Tax Credit Basis **** $77,780 $103,236 $103,236 $103,236 $103,236 $103,236 $103,236 $103,236 $103,236 $103,236 $103,236 $103,236 $103,236 $103,236 $103,236 $1,5
ting Lease Tax Credit @ 6% $4,667 $6,194 $6,194 $6,194 $6,194 $6,194 $6,194 $6,194 $6,194 $6,194 $6,194 $6,194 $6,194 $6,194 $6,194 $9
uisition Price of $7,600,000 plus financing and acquisition costs of $247,770. The building was purchased on 2/10/2012 by One United LLC, who will be using the $7,847,770 number as the book value basis for their federal tax returns.
sed on the same percentage breakdown of land (33.7%) and building (66.3%) as the current assessment
perating Lease in year one (2012) begins 4/1/2012. Therefore, there are only 275 days of building lease in year one. All remaining years have a full year (365 days) of building lease.
(Pro-Rated Beginning Book Value of Leased Portion of Building) x (# Days Leasing Building Each Year) / (# Days Remaining in Depreciable Life of Building)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 694/975
From: Kennealy, Michael (EOHED)
To: Kulish, Karen (GE, Corporate)
Subject: RE: Plum: MA Thank you
Date: Wednesday, August 12, 2015 8:38:05 AM
Hi Karen, here is the address:
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Please be in touch at any time if our team can provide additional
information or answer any questions.
Thanks!
Mike
________________________________________
From: Kulish, Karen (GE, Corporate) [[email protected]]
Sent: Tuesday, August 11, 2015 5:58 PMTo: Kennealy, Michael (EOHED)
Cc: Kulish, Karen (GE, Corporate)
Subject: Plum: MA Thank you
Hi Mike,
I have a hard copy of the letter Ann emailed to Secretary Ash and am
writing to ask you to please send the mailing address to me. Sorry for
the delay, as I was out of the office for a couple of days and am just
back in today.
Have a good evening!
Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations - Environment, Health & Safety
O: 203 373-2575
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 695/975
From: [email protected]
To: Crystal Torman; John Barros
Subject: Re: Plum
Date: Monday, November 23, 2015 4:36:17 PM
John, Crystal FYI - Jennifer Sullivan from A&F will join us on the call.
Mike Kennealy
> On Nov 23, 2015, at 2:30 PM, Crystal Torman <[email protected]>
wrote:
>
> Hi all,
>
> Please find conference call information below:
>
> Dial-in Number:
>
> Meeting ID:
>>
> Thanks,
> Crystal
>
>
> Crystal Torman
> Senior Advisor to the Chief
> Mayor's Office of Economic Development
> One City Hall Square, 603
> Boston, MA. 02201
> O: (617) 635-5708
>
>>
> On Mon, Nov 23, 2015 at 2:23 PM, Eisenstadt, Amy (GE, Corporate)
> <[email protected]> wrote:
>> Will you guys call me or send a call in number? Otherwise I can do it
tonight or tomorrow am.
>>
>> Sent from my iPhone
>>
>> On Nov 23, 2015, at 12:11 PM, John Barros
<[email protected]<mailto:[email protected]>> wrote:
>>
>> Amy,
>>
>> Michael and I can make ourselves available tomorrow morning before
10:30AM.
>>
>> Does 9:30AM work for you? If not please suggest a time. Thanks.
>>
>> On Mon, Nov 23, 2015 at 8:25 AM, Eisenstadt, Amy (GE, Corporate)
<[email protected]<mailto:[email protected]>> wrote:
>> Tuesday morning. Name a time other than 11.
>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 696/975
>> Sent from my iPad
>>
>> On Nov 23, 2015, at 8:24 AM, John Barros
<[email protected]<mailto:[email protected]><mailto:john.barros@
boston.gov<mailto:[email protected]>>> wrote:
>>
>> Amy,
>>
>> Michael and I are glad to figure out some time that would work for a
call. Do you mean a call today when you write "tomorrow morning?"
>>
>> Johh
>>
>> On Mon, Nov 23, 2015 at 7:50 AM, Eisenstadt, Amy (GE, Corporate)
<[email protected]<mailto:[email protected]><mailto:amy.eisenstadt
@ge.com<mailto:[email protected]>>> wrote:
>> Thanks for the submission last night. I have reviewed it and the
regulations for the bond program. I have a number of technical questions
about the program and the proposal. Can we do a call tomorrow morning to
discuss?
>>
>> Sent from my iPad
>>
>>
>>
>> --
>> John Barros
>> Chief of Economic Development
>> Office of Mayor Martin J. Walsh
>> 6th Floor, Room 603
>> Boston City Hall, Boston MA 02201
>> t: 617-635-5729<tel:617-635-5729>
>>
http://www.cityofboston.gov<https://urldefense.proofpoint.com/v2/url?u=htt p-3A__www.cityofboston.gov&d=CwMFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrL
rDQYWSI&r=H5UBAcrNVbw8cC-NRciouCFogbdFsBHQaW8Swp0XhoM&m=1uZHClD6TJ9Utqq8My
3GV6rB3HzaVOzBqpzvC34tpjo&s=Yp8Q2FkaDt5VOCPwk7VwK0U6s0RF3AnrXGGa6yjQyZM&e=
><https://urldefense.proofpoint.com/v2/url?u=http-3A__www.cityofboston.gov
&d=CwMFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=H5UBAcrNVbw8cC-N
RciouCFogbdFsBHQaW8Swp0XhoM&m=yeZwLS-2ZvzF_yUvvwNYojMtP8veZ9qUaI_ookgDCKI&
s=cN_PGwsTRHc0I3bRzjbl8vq7xcQF6Aun_D0tRlsohXI&e=>
>>
>> SHARE YOUR VISION. SHAPE OUR CITY.
>>
http://imagine.boston.gov/<https://urldefense.proofpoint.com/v2/url?u=http
-3A__imagine.boston.gov_&d=CwMFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrD
QYWSI&r=H5UBAcrNVbw8cC-NRciouCFogbdFsBHQaW8Swp0XhoM&m=1uZHClD6TJ9Utqq8My3GV6rB3HzaVOzBqpzvC34tpjo&s=P8mngFNGSQ-ikKcF-ksivLmgchQU2UQ_UGwN65Ddnh4&e=><
https://urldefense.proofpoint.com/v2/url?u=http-3A__imagine.boston.gov_&d=
CwMFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrDQYWSI&r=H5UBAcrNVbw8cC-NRci
ouCFogbdFsBHQaW8Swp0XhoM&m=yeZwLS-2ZvzF_yUvvwNYojMtP8veZ9qUaI_ookgDCKI&s=D
EmswgJBMCfMzTbh8Bm7W3VEnXvZMRclqCoEmU7WvjI&e=>
>>
>>
>>
>>
>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 697/975
>> --
>> John Barros
>> Chief of Economic Development
>> Office of Mayor Martin J. Walsh
>> 6th Floor, Room 603
>> Boston City Hall, Boston MA 02201
>> t: 617-635-5729
>>
http://www.cityofboston.gov<https://urldefense.proofpoint.com/v2/url?u=htt
p-3A__www.cityofboston.gov&d=CwMFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrL
rDQYWSI&r=H5UBAcrNVbw8cC-NRciouCFogbdFsBHQaW8Swp0XhoM&m=1uZHClD6TJ9Utqq8My
3GV6rB3HzaVOzBqpzvC34tpjo&s=Yp8Q2FkaDt5VOCPwk7VwK0U6s0RF3AnrXGGa6yjQyZM&e=
>
>>
>> SHARE YOUR VISION. SHAPE OUR CITY.
>>
http://imagine.boston.gov/<https://urldefense.proofpoint.com/v2/url?u=http
-3A__imagine.boston.gov_&d=CwMFaQ&c=IV_clAzoPDE253xZdHuilRgztyh_RiV3wUrLrD
QYWSI&r=H5UBAcrNVbw8cC-NRciouCFogbdFsBHQaW8Swp0XhoM&m=1uZHClD6TJ9Utqq8My3G
V6rB3HzaVOzBqpzvC34tpjo&s=P8mngFNGSQ-ikKcF-ksivLmgchQU2UQ_UGwN65Ddnh4&e=>
>>
>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 698/975
From: Kadish, Steven (GOV)
To: Kelleher, Michael (GOV)
Cc: Weikel, Adam (GOV); Zarrella, Lily (GOV); Ash, Jay (EOHED); Kennealy, Michael (EOHED); Kirk, Carolyn (EOHED)
Subject: Re: Presentation on why Boston!
Date: Wednesday, December 23, 2015 5:49:06 PM
Michael--I just left on your chair some edits from Jen Sullivan. Let's shoot to get this out to
GE tomorrow! Thx. Steve
Sent from my iPhone
On Dec 23, 2015, at 4:25 PM, Kelleher, Michael (GOV) <[email protected]> wrote:
Thanks, Steve.
I will work on these initial additions/suggestions this evening.
Michael
From: Kadish, Steven (GOV)Sent: Wednesday, December 23, 2015 3:55 PMTo: Kelleher, Michael (GOV); Weikel, Adam (GOV); Zarrella, Lily (GOV)Cc: Ash, Jay (EOHED); Kennealy, Michael (EOHED); Kirk, Carolyn (EOHED)Subject: FW: Presentation on why Boston!
Mike: Some quick comments.
Jay, Mike, Carolyn – can you please help out on slide 20?
Thx!
Steve
___________________________
p.13: please add Boston University. I think that they are ranked about the same as
Northeastern.
Yes, will do. BU is #41
p.18: drop the chart at the bottom as the stats presented could be interpreted in a
number of ways.
Will do.
p.19: are there sources for these statements?
Will need to double check sources.
p.20: is slide about who has moved here recently or expanded? That’s how I think it
should be titled. I would add Novartis and its enormous new campus in Cambridge,
the new Vertex facilities in the Seaport along with others who have moved to the
Seaport, Siemens has a major expansion in Walpole, BASF has a major
facility/expansion in Worcester. (Mike Kennealy, Jay Ash, Carolyn – can you please
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 699/975
help out here?)
Will work with Secretary Ash, Mike and Carol
p.21: I would drop the quote from Barry Bluestone.
Done
p.23: Please include Lincoln Labs and add a slide that has some of the centers at
Northeastern, BU, Tufts…especially NU. This may be an additional slide?Will make additional slide and add those organizations
p.26: This is interesting! What do you mean when you indicate GE under the
innovations?
Ok, wasn’t sure this would be a good slide. I tried to tie academic breakthroughs, so I
linked the invention or emerging technology with what line of business then would
have impacted – this is an indirect connection. I can tighten up, if you like the concept.
p.27: Can you provide a statement about destinations to key GE locations in the US
Yes, will do.p.28: Please do the same for the innovation centers you mentioned internationally?
Are there any direct flights to South America???
Yes, will do. I confirmed there are no direct flights from Boston to South America.
From: Kadish, Steven (GOV)Sent: Wednesday, December 23, 2015 3:28 PMTo: ; Ash, Jay (EOHED); Polito, Karyn (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Povich, Lon (GOV); Kennealy, Michael (EOHED); Peyser, Jim (EOE); Reale, Ann (EOE); Tom Glynn; Morse, Elizabeth; [email protected]; Conroy, Jim (GOV); Buckley, Timothy (GOV)
Cc: Kelleher, Michael (GOV); Zarrella, Lily (GOV); Weikel, Adam (GOV)Subject: Presentation on why Boston!
Governor, Lt. Governor and colleagues:
Attached is terrific presentation on Why Boston/The War for Talent as it relates to the
Boston project.
I want to thank those that have provided the source information.
And I want to especially thank our newest member of the Cabinet Relations team –
Michael Keller, along with support from Lily and Adam – to put this presentation
together.
Comments, edits, further additions welcome.
Please share your thoughts with Michael, Adam, Lily and me.
I will share this now with the folks from the City.
Best,
Steve
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 700/975
From: Kelleher, Michael (GOV)Sent: Wednesday, December 23, 2015 12:47 PMTo: Kadish, Steven (GOV)Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)Subject: RE: draft for your review
Steve,
Please see attached for your review a draft slide deck for discussions with GE. You will
find herein 30 slides (25 or so with real content). I am not 100% sure the length of
time that is available but these are the slides I would present as the most compelling
for “why Boston?”
I am around all day if you want to discuss further or have specific edits/suggestions.
Look forward to your feedback.
Thanks,
Michael
From: Kadish, Steven (GOV)Sent: Monday, December 21, 2015 11:18 AMTo: Kelleher, Michael (GOV); Zarrella, Lily (GOV); Weikel, Adam (GOV)Subject: FW: Any idea of timing for War on Talent materials?
Impressive!
And very much on the right track.
More ideas:
<!--[if !supportLists]-->1. <!--[endif]-->Please take a look at the GE website
and other sources to see about themes, and other info that may be relevant. I
am hearing on their ads that GE is your industrial and tech company. For
example, the health group and the energy group (Current) are or will be
locating here. What are the other parts of GE that would find the MA
ecosystem attractive?
<!--[if !supportLists]-->2. <!--[endif]-->I am hearing that Massachusetts is a
leader in robotics and industrial design. Can you find out more and present
how this would be attractive to GE?
<!--[if !supportLists]-->3. <!--[endif]-->There are some more War on Talent
slides that Adam would have.
<!--[if !supportLists]-->4. <!--[endif]-->Can you check on where the top firms
go for their recruitment?
<!--[if !supportLists]-->5. <!--[endif]-->Please develop a list of the various
institutes on health, tech, innovation, engineering, etc. Please check the
university websites. Broad, MIT’s Center for the Brain, etc.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 701/975
Good stuff!
I will provide more feedback, but please keep going.
From: Kelleher, Michael (GOV)Sent: Saturday, December 19, 2015 10:49 PMTo: Kadish, Steven (GOV)Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)
Subject: RE: Any idea of timing for War on Talent materials? Steve,
Attached are some slides Lily and I put together in the last day or so for your review
and comment. I will look into your questions below re: total # of engineers and
scientist going to school in the Boston area. The slides attached do not have that data
but I will dig up tomorrow.
Look forward to your review and guidance,
Michael
From: Kadish, Steven (GOV)Sent: Friday, December 18, 2015 6:28 PMTo: Kelleher, Michael (GOV)Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)Subject: Re: Any idea of timing for War on Talent materials?
If you aren't already, please look at US News and World Report.
Can you also research the # of scientists, engineers who:
-work in the area and a comparative % of the total in the US, World, or whatever makes sense
-were educated in the area
Total # of engineers and scientists going to school in the Boston metro area and
how many graduate each year and what % that may be of the total in the US
More to come!
From: Kadish, Steven (GOV)
Sent: Friday, December 18, 2015 5:00 PMTo: Kelleher, Michael (GOV)
Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)
Subject: Re: Any idea of timing for War on Talent materials?
Great!!
Sent from my iPhone
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 702/975
On Dec 18, 2015, at 4:14 PM, Kelleher, Michael (GOV)
<[email protected]> wrote:
Steve,
Thanks for the additional guidance for the war on talent materials. Lily
and I were able to add a few slides based on previous direction you and
Adam provided. We are going to plow through the list of additional items
(as outlined below, assigned to Lily or myself) and will send you a revised
PPT later this evening/first thing tomorrow for your review and additional
edits.
• list of universities in the top 50 - mk
• list of the top colleges - mk
• Top 10 engineering schools - mk
• Top Schools for Innovation in the United States- mk
• Top schools or departments for the sciences - mk
• # of international students going to school in Boston, what
specialties - mk
• Top academic medical centers - mk
• List of GE locations around the country/world and an indication of
how many of their leaders went to school here – mk
• # of international patients traveling to Boston AMCs to receive care –
mk
• Insert language from innovation one pager that HED put together -
Lily
• List of all the bio tech, IT, pharma, etc firms that have determined to
locate, grow here in the last few years. (Vertex, Shire, Novartis, Pfizer,
Siemens...and all the small firms) - HED
• Locations of all the company's national and international locations
with a map showing flights from Logan - Massport
Thanks,
Michael
-----Original Message-----
From: Kadish, Steven (GOV)Sent: Friday, December 18, 2015 2:53 PM
To: Weikel, Adam (GOV)
Cc: Kelleher, Michael (GOV); Zarrella, Lily (GOV)
Subject: Re: Any idea of timing for War on Talent materials?
Adam, Michael, Lily,
Ok for you to add more slides on the war on talent idea. I am
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 703/975
remembering a pretty rich set of them that we cut back on in later
versions. More to review/include is better now.
Include a list of universities in the top 50? Also a list of the top colleges?
Top 10 engineering schools?
Top schools for innovation?Top schools or departments for the sciences?
# of international students going to school in Boston, and if possible in
what specialties? I remember lists that would show this.
Top academic medical centers?
Include information where the top firms go to recruit talent?
List of GE locations around the country/world and an indication of how
many of their leaders went to school here?
...you get the idea!!
Sent from my iPhone
> On Dec 18, 2015, at 8:29 AM, Weikel, Adam (GOV)
<[email protected]> wrote:
>
> Great!
> I added a few slides overnight and brought Michael into the loop this
morning.
> He will keep building and send us something revised this afternoon. He
is also able to help and edit over the weekend.
>
>
>
> -----Original Message-----
> From: Kadish, Steven (GOV)
> Sent: Friday, December 18, 2015 6:46 AM
> To: Weikel, Adam (GOV)
> Subject: Re: Any idea of timing for War on Talent materials?
>
> Not a problem!
> We may have more time and I will let you know.
> Please think if this is something to assign to Michael. It may be good to
see what he can do with something like this!!
>
> Sent from my iPhone
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 704/975
>
>> On Dec 17, 2015, at 9:55 PM, Weikel, Adam (GOV)
<[email protected]> wrote:
>>
>> Thanks Steve. Good to hear we have a little more time.
>>
>> I know this is an important assignment and I feel guilty responding with an excuse. I'm usually all over these kinds of assignments, but we are
driving to North Carolina on Saturday/Sunday for a week with the family.
>> I can find a couple more hours to work on it Friday but I just don't think
I can do any major work by Monday.
>>
>> I will review the info from Sec Ash to see what I can incorporate and I'll
try to add a couple more slides to fill-in the story.
>>
>> I hope this isn't a huge problem.
>> -Adam>>
>>
>> -----Original Message-----
>> From: Kadish, Steven (GOV)
>> Sent: Thursday, December 17, 2015 6:19 PM
>> To: Weikel, Adam (GOV)
>> Subject: RE: Any idea of timing for War on Talent materials?
>>
>> Wow!
>> This is terrific!
>>
>> We just got the word that rather than making a decision this week,
that they will not make a decision until mid-January.
>> So both the good and bad news is that we have more time.
>>
>> With this in mind, what further would you do by Monday?
>>
>> -----Original Message-----
>> From: Weikel, Adam (GOV)
>> Sent: Thursday, December 17, 2015 5:50 PM
>> To: Kadish, Steven (GOV)
>> Subject: RE: Any idea of timing for War on Talent materials?
>>
>> I'm sorry it is so late.
>> We only had a 20 min break midday and 10 minutes in the afternoon.
>> Attached is what I came up with
>>
>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 705/975
>>
>>
>> -----Original Message-----
>> From: Kadish, Steven (GOV)
>> Sent: Thursday, December 17, 2015 3:38 PM
>> To: Weikel, Adam (GOV)
>> Subject: Any idea of timing for War on Talent materials?>>
>> Thx.
>>
>> Sent from my iPhone
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 706/975
From: Kennealy, Michael (EOHED)
To: Kelleher, Michael (GOV)
Cc: Kadish, Steven (GOV); Weikel, Adam (GOV); Zarrella, Lily (GOV); Ash, Jay (EOHED); Kirk, Carolyn (EOHED)
Subject: Re: Presentation on why Boston!
Date: Wednesday, December 23, 2015 4:31:15 PM
On slide 20 would also add:
IBM digital healthShireGE Health (if this fits thematically for a presentation to them)
Mike Kennealy
On Dec 23, 2015, at 4:25 PM, Kelleher, Michael (GOV) <[email protected]> wrote:
Thanks, Steve.
I will work on these initial additions/suggestions this evening.
Michael
From: Kadish, Steven (GOV)Sent: Wednesday, December 23, 2015 3:55 PMTo: Kelleher, Michael (GOV); Weikel, Adam (GOV); Zarrella, Lily (GOV)Cc: Ash, Jay (EOHED); Kennealy, Michael (EOHED); Kirk, Carolyn (EOHED)Subject: FW: Presentation on why Boston!
Mike: Some quick comments.
Jay, Mike, Carolyn – can you please help out on slide 20?
Thx!
Steve
___________________________
p.13: please add Boston University. I think that they are ranked about the same as
Northeastern.
Yes, will do. BU is #41
p.18: drop the chart at the bottom as the stats presented could be interpreted in a number of ways.
Will do.
p.19: are there sources for these statements?
Will need to double check sources.
p.20: is slide about who has moved here recently or expanded? That’s how I think it
should be titled. I would add Novartis and its enormous new campus in Cambridge,
the new Vertex facilities in the Seaport along with others who have moved to the
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 707/975
Seaport, Siemens has a major expansion in Walpole, BASF has a major
facility/expansion in Worcester. (Mike Kennealy, Jay Ash, Carolyn – can you please
help out here?)
Will work with Secretary Ash, Mike and Carol
p.21: I would drop the quote from Barry Bluestone.
Donep.23: Please include Lincoln Labs and add a slide that has some of the centers at
Northeastern, BU, Tufts…especially NU. This may be an additional slide?
Will make additional slide and add those organizations
p.26: This is interesting! What do you mean when you indicate GE under the
innovations?
Ok, wasn’t sure this would be a good slide. I tried to tie academic breakthroughs, so I
linked the invention or emerging technology with what line of business then would
have impacted – this is an indirect connection. I can tighten up, if you like the concept.
p.27: Can you provide a statement about destinations to key GE locations in the US
Yes, will do.
p.28: Please do the same for the innovation centers you mentioned internationally?
Are there any direct flights to South America???
Yes, will do. I confirmed there are no direct flights from Boston to South America.
From: Kadish, Steven (GOV)Sent: Wednesday, December 23, 2015 3:28 PMTo: Ash, Jay (EOHED); Polito, Karyn (GOV); Lepore, Kristen (ANF); Sullivan,
Jennifer F. (ANF); Povich, Lon (GOV); Kennealy, Michael (EOHED); Peyser, Jim (EOE); Reale, Ann (EOE); Tom Glynn; Morse, Elizabeth; [email protected]; Conroy, Jim (GOV); Buckley, Timothy (GOV)Cc: Kelleher, Michael (GOV); Zarrella, Lily (GOV); Weikel, Adam (GOV)Subject: Presentation on why Boston!
Governor, Lt. Governor and colleagues:
Attached is terrific presentation on Why Boston/The War for Talent as it relates to the
Boston project.
I want to thank those that have provided the source information.
And I want to especially thank our newest member of the Cabinet Relations team –
Michael Keller, along with support from Lily and Adam – to put this presentation
together.
Comments, edits, further additions welcome.
Please share your thoughts with Michael, Adam, Lily and me.
I will share this now with the folks from the City.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 708/975
Best,
Steve
From: Kelleher, Michael (GOV)Sent: Wednesday, December 23, 2015 12:47 PMTo: Kadish, Steven (GOV)Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)
Subject: RE: draft for your review Steve,
Please see attached for your review a draft slide deck for discussions with GE. You will
find herein 30 slides (25 or so with real content). I am not 100% sure the length of
time that is available but these are the slides I would present as the most compelling
for “why Boston?”
I am around all day if you want to discuss further or have specific edits/suggestions.
Look forward to your feedback.
Thanks,
Michael
From: Kadish, Steven (GOV)Sent: Monday, December 21, 2015 11:18 AMTo: Kelleher, Michael (GOV); Zarrella, Lily (GOV); Weikel, Adam (GOV)Subject: FW: Any idea of timing for War on Talent materials?
Impressive!
And very much on the right track.
More ideas:
<!--[if !supportLists]-->1. <!--[endif]-->Please take a look at the GE website
and other sources to see about themes, and other info that may be relevant. I
am hearing on their ads that GE is your industrial and tech company. For
example, the health group and the energy group (Current) are or will be
locating here. What are the other parts of GE that would find the MA
ecosystem attractive?
<!--[if !supportLists]-->2. <!--[endif]-->I am hearing that Massachusetts is a
leader in robotics and industrial design. Can you find out more and present
how this would be attractive to GE?
<!--[if !supportLists]-->3. <!--[endif]-->There are some more War on Talent
slides that Adam would have.
<!--[if !supportLists]-->4. <!--[endif]-->Can you check on where the top firms
go for their recruitment?
<!--[if !supportLists]-->5. <!--[endif]-->Please develop a list of the various
institutes on health, tech, innovation, engineering, etc. Please check the
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 709/975
university websites. Broad, MIT’s Center for the Brain, etc.
Good stuff!
I will provide more feedback, but please keep going.
From: Kelleher, Michael (GOV)
Sent: Saturday, December 19, 2015 10:49 PMTo: Kadish, Steven (GOV)Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)Subject: RE: Any idea of timing for War on Talent materials?
Steve,
Attached are some slides Lily and I put together in the last day or so for your review
and comment. I will look into your questions below re: total # of engineers and
scientist going to school in the Boston area. The slides attached do not have that data
but I will dig up tomorrow.
Look forward to your review and guidance,
Michael
From: Kadish, Steven (GOV)Sent: Friday, December 18, 2015 6:28 PMTo: Kelleher, Michael (GOV)Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)Subject: Re: Any idea of timing for War on Talent materials?
If you aren't already, please look at US News and World Report.
Can you also research the # of scientists, engineers who:
-work in the area and a comparative % of the total in the US, World, or whatever
makes sense
-were educated in the area
Total # of engineers and scientists going to school in the Boston metro area and
how many graduate each year and what % that may be of the total in the US
More to come!
From: Kadish, Steven (GOV)
Sent: Friday, December 18, 2015 5:00 PM
To: Kelleher, Michael (GOV)
Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)
Subject: Re: Any idea of timing for War on Talent materials?
Great!!
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 710/975
Sent from my iPhone
On Dec 18, 2015, at 4:14 PM, Kelleher, Michael (GOV)
<[email protected]> wrote:
Steve,
Thanks for the additional guidance for the war on talent materials. Lily
and I were able to add a few slides based on previous direction you and
Adam provided. We are going to plow through the list of additional items
(as outlined below, assigned to Lily or myself) and will send you a revised
PPT later this evening/first thing tomorrow for your review and additional
edits.
• list of universities in the top 50 - mk
• list of the top colleges - mk
• Top 10 engineering schools - mk
• Top Schools for Innovation in the United States- mk
• Top schools or departments for the sciences - mk
• # of international students going to school in Boston, what
specialties - mk
• Top academic medical centers - mk
• List of GE locations around the country/world and an indication of
how many of their leaders went to school here – mk
• # of international patients traveling to Boston AMCs to receive care –
mk
• Insert language from innovation one pager that HED put together -
Lily
• List of all the bio tech, IT, pharma, etc firms that have determined to
locate, grow here in the last few years. (Vertex, Shire, Novartis, Pfizer,
Siemens...and all the small firms) - HED
• Locations of all the company's national and international locations
with a map showing flights from Logan - Massport
Thanks,
Michael
-----Original Message-----
From: Kadish, Steven (GOV)
Sent: Friday, December 18, 2015 2:53 PM
To: Weikel, Adam (GOV)
Cc: Kelleher, Michael (GOV); Zarrella, Lily (GOV)
Subject: Re: Any idea of timing for War on Talent materials?
Adam, Michael, Lily,
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 711/975
Ok for you to add more slides on the war on talent idea. I am
remembering a pretty rich set of them that we cut back on in later
versions. More to review/include is better now.
Include a list of universities in the top 50? Also a list of the top colleges?
Top 10 engineering schools?
Top schools for innovation?
Top schools or departments for the sciences?
# of international students going to school in Boston, and if possible in
what specialties? I remember lists that would show this.
Top academic medical centers?
Include information where the top firms go to recruit talent?
List of GE locations around the country/world and an indication of how
many of their leaders went to school here?
...you get the idea!!
Sent from my iPhone
> On Dec 18, 2015, at 8:29 AM, Weikel, Adam (GOV)
<[email protected]> wrote:
>
> Great!
> I added a few slides overnight and brought Michael into the loop this
morning.
> He will keep building and send us something revised this afternoon. He
is also able to help and edit over the weekend.
>
>
>
> -----Original Message-----
> From: Kadish, Steven (GOV)
> Sent: Friday, December 18, 2015 6:46 AM
> To: Weikel, Adam (GOV)
> Subject: Re: Any idea of timing for War on Talent materials?
>
> Not a problem!
> We may have more time and I will let you know.
> Please think if this is something to assign to Michael. It may be good to
see what he can do with something like this!!
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 712/975
>
> Sent from my iPhone
>
>> On Dec 17, 2015, at 9:55 PM, Weikel, Adam (GOV)
<[email protected]> wrote:
>>
>> Thanks Steve. Good to hear we have a little more time.>>
>> I know this is an important assignment and I feel guilty responding with
an excuse. I'm usually all over these kinds of assignments, but we are
driving to North Carolina on Saturday/Sunday for a week with the family.
>> I can find a couple more hours to work on it Friday but I just don't think
I can do any major work by Monday.
>>
>> I will review the info from Sec Ash to see what I can incorporate and I'll
try to add a couple more slides to fill-in the story.
>>>> I hope this isn't a huge problem.
>> -Adam
>>
>>
>> -----Original Message-----
>> From: Kadish, Steven (GOV)
>> Sent: Thursday, December 17, 2015 6:19 PM
>> To: Weikel, Adam (GOV)
>> Subject: RE: Any idea of timing for War on Talent materials?
>>
>> Wow!
>> This is terrific!
>>
>> We just got the word that rather than making a decision this week,
that they will not make a decision until mid-January.
>> So both the good and bad news is that we have more time.
>>
>> With this in mind, what further would you do by Monday?
>>
>> -----Original Message-----
>> From: Weikel, Adam (GOV)
>> Sent: Thursday, December 17, 2015 5:50 PM
>> To: Kadish, Steven (GOV)
>> Subject: RE: Any idea of timing for War on Talent materials?
>>
>> I'm sorry it is so late.
>> We only had a 20 min break midday and 10 minutes in the afternoon.
>> Attached is what I came up with
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 713/975
>>
>>
>>
>>
>> -----Original Message-----
>> From: Kadish, Steven (GOV)
>> Sent: Thursday, December 17, 2015 3:38 PM>> To: Weikel, Adam (GOV)
>> Subject: Any idea of timing for War on Talent materials?
>>
>> Thx.
>>
>> Sent from my iPhone
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 714/975
From: Ash, Jay (EOHED)
To: Kadish, Steven (GOV); Kelleher, Michael (GOV); Weikel, Adam (GOV); Zarrella, Lily (GOV)
Cc: Kennealy, Michael (EOHED); Kirk, Carolyn (EOHED)
Subject: RE: Presentation on why Boston!
Date: Wednesday, December 23, 2015 4:17:00 PM
AstraZeneca
In continuing to build on our commitment to collaborate through meaningful partnerships to drive scientific progress forward, AstraZeneca was joined by Massachusetts officials last week (early this past fall) to officially launch the Gatehouse Park BioHub in Waltham, MA. The Gatehouse Park BioHub will be one of the largest and most dynamic life-science research biohubs in the region, with more than 700 scientists and research and development (R&D) experts on-site by the end of 2015. Six companies are sharing the facilities, with two more expected to join before the end of the year. Mike will send more. Siemens has committed but not be finalized (could comment that there is a
commitment for a 700 person, $325m expansion just south of Boston in the life sciences.)
From: Kadish, Steven (GOV)
Sent: Wednesday, December 23, 2015 3:55 PM
To: Kelleher, Michael (GOV); Weikel, Adam (GOV); Zarrella, Lily (GOV)
Cc: Ash, Jay (EOHED); Kennealy, Michael (EOHED); Kirk, Carolyn (EOHED)
Subject: FW: Presentation on why Boston!
Mike: Some quick comments.
Jay, Mike, Carolyn – can you please help out on slide 20?
Thx!
Steve
___________________________
p.13: please add Boston University. I think that they are ranked about the same as Northeastern.
p.18: drop the chart at the bottom as the stats presented could be interpreted in a number of ways.
p.19: are there sources for these statements?
p.20: is slide about who has moved here recently or expanded? That’s how I think it should be
titled. I would add Novartis and its enormous new campus in Cambridge, the new Vertex facilities in
the Seaport along with others who have moved to the Seaport, Siemens has a major expansion in
Walpole, BASF has a major facility/expansion in Worcester. (Mike Kennealy, Jay Ash, Carolyn – can
you please help out here?)
p.21: I would drop the quote from Barry Bluestone.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 715/975
p.23: Please include Lincoln Labs and add a slide that has some of the centers at Northeastern, BU,
Tufts…especially NU. This may be an additional slide?
p.26: This is interesting! What do you mean when you indicate GE under the innovations?
p.27: Can you provide a statement about destinations to key GE locations in the US
p.28: Please do the same for the innovation centers you mentioned internationally? Are there any
direct flights to South America???
From: Kadish, Steven (GOV)Sent: Wednesday, December 23, 2015 3:28 PMTo: ; Ash, Jay (EOHED); Polito, Karyn (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Povich, Lon (GOV); Kennealy, Michael (EOHED); Peyser, Jim (EOE); Reale, Ann (EOE); Tom Glynn; Morse, Elizabeth; [email protected]; Conroy, Jim (GOV); Buckley, Timothy (GOV)Cc: Kelleher, Michael (GOV); Zarrella, Lily (GOV); Weikel, Adam (GOV)Subject: Presentation on why Boston!
Governor, Lt. Governor and colleagues:
Attached is terrific presentation on Why Boston/The War for Talent as it relates to the Boston
project.
I want to thank those that have provided the source information.
And I want to especially thank our newest member of the Cabinet Relations team – Michael Keller,
along with support from Lily and Adam – to put this presentation together.
Comments, edits, further additions welcome.
Please share your thoughts with Michael, Adam, Lily and me.
I will share this now with the folks from the City.
Best,
Steve
From: Kelleher, Michael (GOV)Sent: Wednesday, December 23, 2015 12:47 PMTo: Kadish, Steven (GOV)Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)Subject: RE: draft for your review
Steve,
Please see attached for your review a draft slide deck for discussions with GE. You will find herein 30
slides (25 or so with real content). I am not 100% sure the length of time that is available but these
are the slides I would present as the most compelling for “why Boston?”
I am around all day if you want to discuss further or have specific edits/suggestions.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 716/975
Look forward to your feedback.
Thanks,
Michael
From: Kadish, Steven (GOV)
Sent: Monday, December 21, 2015 11:18 AMTo: Kelleher, Michael (GOV); Zarrella, Lily (GOV); Weikel, Adam (GOV)Subject: FW: Any idea of timing for War on Talent materials?
Impressive!
And very much on the right track.
More ideas:
1. Please take a look at the GE website and other sources to see about themes, and other info
that may be relevant. I am hearing on their ads that GE is your industrial and tech
company. For example, the health group and the energy group (Current) are or will be
locating here. What are the other parts of GE that would find the MA ecosystem attractive?2. I am hearing that Massachusetts is a leader in robotics and industrial design. Can you find
out more and present how this would be attractive to GE?
3. There are some more War on Talent slides that Adam would have.
4. Can you check on where the top firms go for their recruitment?
5. Please develop a list of the various institutes on health, tech, innovation, engineering, etc.
Please check the university websites. Broad, MIT’s Center for the Brain, etc.
Good stuff!
I will provide more feedback, but please keep going.
From: Kelleher, Michael (GOV)Sent: Saturday, December 19, 2015 10:49 PMTo: Kadish, Steven (GOV)Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)Subject: RE: Any idea of timing for War on Talent materials?
Steve,
Attached are some slides Lily and I put together in the last day or so for your review and comment. I
will look into your questions below re: total # of engineers and scientist going to school in the
Boston area. The slides attached do not have that data but I will dig up tomorrow.
Look forward to your review and guidance,
Michael
From: Kadish, Steven (GOV)Sent: Friday, December 18, 2015 6:28 PMTo: Kelleher, Michael (GOV)Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)Subject: Re: Any idea of timing for War on Talent materials?
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 717/975
If you aren't already, please look at US News and World Report.
Can you also research the # of scientists, engineers who:
-work in the area and a comparative % of the total in the US, World, or whatever makes sense
-were educated in the area
Total # of engineers and scientists going to school in the Boston metro area and how many
graduate each year and what % that may be of the total in the US
More to come!
From: Kadish, Steven (GOV)
Sent: Friday, December 18, 2015 5:00 PM
To: Kelleher, Michael (GOV)
Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)
Subject: Re: Any idea of timing for War on Talent materials?
Great!!
Sent from my iPhone
On Dec 18, 2015, at 4:14 PM, Kelleher, Michael (GOV)
<[email protected]> wrote:
Steve,
Thanks for the additional guidance for the war on talent materials. Lily and I were able
to add a few slides based on previous direction you and Adam provided. We are going
to plow through the list of additional items (as outlined below, assigned to Lily or
myself) and will send you a revised PPT later this evening/first thing tomorrow for your
review and additional edits.
• list of universities in the top 50 - mk
• list of the top colleges - mk
• Top 10 engineering schools - mk
• Top Schools for Innovation in the United States- mk
• Top schools or departments for the sciences - mk
• # of international students going to school in Boston, what specialties - mk
• Top academic medical centers -mk
• List of GE locations around the country/world and an indication of how many of
their leaders went to school here – mk
• # of international patients traveling to Boston AMCs to receive care – mk
• Insert language from innovation one pager that HED put together - Lily
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 718/975
• List of all the bio tech, IT, pharma, etc firms that have determined to locate, grow
here in the last few years. (Vertex, Shire, Novartis, Pfizer, Siemens...and all the small
firms) - HED
• Locations of all the company's national and international locations with a map
showing flights from Logan - Massport
Thanks,Michael
-----Original Message-----
From: Kadish, Steven (GOV)
Sent: Friday, December 18, 2015 2:53 PM
To: Weikel, Adam (GOV)
Cc: Kelleher, Michael (GOV); Zarrella, Lily (GOV)
Subject: Re: Any idea of timing for War on Talent materials?
Adam, Michael, Lily,
Ok for you to add more slides on the war on talent idea. I am remembering a pretty
rich set of them that we cut back on in later versions. More to review/include is better
now.
Include a list of universities in the top 50? Also a list of the top colleges?
Top 10 engineering schools?
Top schools for innovation?
Top schools or departments for the sciences?
# of international students going to school in Boston, and if possible in what
specialties? I remember lists that would show this.
Top academic medical centers?
Include information where the top firms go to recruit talent?
List of GE locations around the country/world and an indication of how many of their
leaders went to school here?
...you get the idea!!
Sent from my iPhone
> On Dec 18, 2015, at 8:29 AM, Weikel, Adam (GOV)
<[email protected]> wrote:
>
> Great!
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 719/975
> I added a few slides overnight and brought Michael into the loop this morning.
> He will keep building and send us something revised this afternoon. He is also able to
help and edit over the weekend.
>
>
>
> -----Original Message-----> From: Kadish, Steven (GOV)
> Sent: Friday, December 18, 2015 6:46 AM
> To: Weikel, Adam (GOV)
> Subject: Re: Any idea of timing for War on Talent materials?
>
> Not a problem!
> We may have more time and I will let you know.
> Please think if this is something to assign to Michael. It may be good to see what he
can do with something like this!!
>> Sent from my iPhone
>
>> On Dec 17, 2015, at 9:55 PM, Weikel, Adam (GOV)
<[email protected]> wrote:
>>
>> Thanks Steve. Good to hear we have a little more time.
>>
>> I know this is an important assignment and I feel guilty responding with an excuse.
I'm usually all over these kinds of assignments, but we are driving to North Carolina on
Saturday/Sunday for a week with the family.
>> I can find a couple more hours to work on it Friday but I just don't think I can do any
major work by Monday.
>>
>> I will review the info from Sec Ash to see what I can incorporate and I'll try to add a
couple more slides to fill-in the story.
>>
>> I hope this isn't a huge problem.
>> -Adam
>>
>>
>> -----Original Message-----
>> From: Kadish, Steven (GOV)
>> Sent: Thursday, December 17, 2015 6:19 PM
>> To: Weikel, Adam (GOV)
>> Subject: RE: Any idea of timing for War on Talent materials?
>>
>> Wow!
>> This is terrific!
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 720/975
>>
>> We just got the word that rather than making a decision this week, that they will not
make a decision until mid-January.
>> So both the good and bad news is that we have more time.
>>
>> With this in mind, what further would you do by Monday?
>>>> -----Original Message-----
>> From: Weikel, Adam (GOV)
>> Sent: Thursday, December 17, 2015 5:50 PM
>> To: Kadish, Steven (GOV)
>> Subject: RE: Any idea of timing for War on Talent materials?
>>
>> I'm sorry it is so late.
>> We only had a 20 min break midday and 10 minutes in the afternoon.
>> Attached is what I came up with
>>>>
>>
>>
>> -----Original Message-----
>> From: Kadish, Steven (GOV)
>> Sent: Thursday, December 17, 2015 3:38 PM
>> To: Weikel, Adam (GOV)
>> Subject: Any idea of timing for War on Talent materials?
>>
>> Thx.
>>
>> Sent from my iPhone
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 721/975
From:
To: Kadish, Steven (GOV)
Cc: Ash, Jay (EOHED); Polito, Karyn (GOV); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Povich, Lon (GOV); Kennealy, Michael (EOHED); Peyser, Jim (EOE); Reale, Ann (EOE); Tom Glynn; Morse, Elizabeth; [email protected]; Conroy, Jim (GOV); Buckley, Timothy (GOV); Kelleher, Michael (GOV); Zarrella, Lily (GOV); Weikel, Adam (GOV)
Subject: Re: Presentation on why Boston!
Date: Thursday, December 24, 2015 11:34:46 AM
This is a great piece of work. Needs a highlight page or two up front -
tons of really great facts imbedded in the whole thing.
Sent from my iPhone
> On Dec 23, 2015, at 3:27 PM, Kadish, Steven (GOV)
<[email protected]> wrote:
>
> Governor, Lt. Governor and colleagues:
>
> Attached is terrific presentation on Why Boston/The War for Talent as it
relates to the Boston project.> I want to thank those that have provided the source information.
> And I want to especially thank our newest member of the Cabinet
Relations team – Michael Keller, along with support from Lily and Adam –
to put this presentation together.
>
> Comments, edits, further additions welcome.
> Please share your thoughts with Michael, Adam, Lily and me.
>
> I will share this now with the folks from the City.
>
> Best,
> Steve
>
> From: Kelleher, Michael (GOV)
> Sent: Wednesday, December 23, 2015 12:47 PM
> To: Kadish, Steven (GOV)
> Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)
> Subject: RE: draft for your review
>
> Steve,
>
> Please see attached for your review a draft slide deck for discussions
with GE. You will find herein 30 slides (25 or so with real content). I
am not 100% sure the length of time that is available but these are the
slides I would present as the most compelling for “why Boston?”
>
> I am around all day if you want to discuss further or have specific
edits/suggestions.
>
> Look forward to your feedback.
>
> Thanks,
> Michael
>
> From: Kadish, Steven (GOV)
GOV Email
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 722/975
> Sent: Monday, December 21, 2015 11:18 AM
> To: Kelleher, Michael (GOV); Zarrella, Lily (GOV); Weikel, Adam (GOV)
> Subject: FW: Any idea of timing for War on Talent materials?
>
> Impressive!
> And very much on the right track.
>
> More ideas:
>
> 1. Please take a look at the GE website and other sources to see
about themes, and other info that may be relevant. I am hearing on their
ads that GE is your industrial and tech company. For example, the health
group and the energy group (Current) are or will be locating here. What
are the other parts of GE that would find the MA ecosystem attractive?
>
> 2. I am hearing that Massachusetts is a leader in robotics and
industrial design. Can you find out more and present how this would be
attractive to GE?
>
> 3. There are some more War on Talent slides that Adam would have.
>
> 4. Can you check on where the top firms go for their recruitment?
>
> 5. Please develop a list of the various institutes on health,
tech, innovation, engineering, etc. Please check the university websites.
Broad, MIT’s Center for the Brain, etc.
>
> Good stuff!
> I will provide more feedback, but please keep going.
>
> From: Kelleher, Michael (GOV)
> Sent: Saturday, December 19, 2015 10:49 PM
> To: Kadish, Steven (GOV)
> Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)> Subject: RE: Any idea of timing for War on Talent materials?
>
> Steve,
>
> Attached are some slides Lily and I put together in the last day or so
for your review and comment. I will look into your questions below re:
total # of engineers and scientist going to school in the Boston area.
The slides attached do not have that data but I will dig up tomorrow.
>
> Look forward to your review and guidance,
> Michael
>
> From: Kadish, Steven (GOV)> Sent: Friday, December 18, 2015 6:28 PM
> To: Kelleher, Michael (GOV)
> Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)
> Subject: Re: Any idea of timing for War on Talent materials?
>
>
> If you aren't already, please look at US News and World Report.
>
>
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 723/975
> Can you also research the # of scientists, engineers who:
>
> -work in the area and a comparative % of the total in the US, World, or
whatever makes sense
>
> -were educated in the area
>
>
>
> Total # of engineers and scientists going to school in the Boston metro
area and how many graduate each year and what % that may be of the total
in the US
>
>
>
> More to come!
>
> ________________________________
> From: Kadish, Steven (GOV)
> Sent: Friday, December 18, 2015 5:00 PM
> To: Kelleher, Michael (GOV)
> Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)
> Subject: Re: Any idea of timing for War on Talent materials?
>
> Great!!
>
> Sent from my iPhone
>
> On Dec 18, 2015, at 4:14 PM, Kelleher, Michael (GOV)
<[email protected]<mailto:[email protected]
ate.MA.US>> wrote:
> Steve,
>
> Thanks for the additional guidance for the war on talent materials.Lily and I were able to add a few slides based on previous direction you
and Adam provided. We are going to plow through the list of additional
items (as outlined below, assigned to Lily or myself) and will send you a
revised PPT later this evening/first thing tomorrow for your review and
additional edits.
>
> • list of universities in the top 50 - mk
> • list of the top colleges - mk
> • Top 10 engineering schools - mk
> • Top Schools for Innovation in the United States- mk
> • Top schools or departments for the sciences - mk
> • # of international students going to school in Boston, what
specialties - mk > • Top academic medical centers - mk
> • List of GE locations around the country/world and an indication
of how many of their leaders went to school here – mk
> • # of international patients traveling to Boston AMCs to receive
care – mk
> • Insert language from innovation one pager that HED put together
- Lily
> • List of all the bio tech, IT, pharma, etc firms that have
determined to locate, grow here in the last few years. (Vertex, Shire,
Novartis, Pfizer, Siemens...and all the small firms) - HED
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 724/975
> • Locations of all the company's national and international
locations with a map showing flights from Logan - Massport
>
> Thanks,
> Michael
>
> -----Original Message-----
> From: Kadish, Steven (GOV)
> Sent: Friday, December 18, 2015 2:53 PM
> To: Weikel, Adam (GOV)
> Cc: Kelleher, Michael (GOV); Zarrella, Lily (GOV)
> Subject: Re: Any idea of timing for War on Talent materials?
>
> Adam, Michael, Lily,
>
> Ok for you to add more slides on the war on talent idea. I am
remembering a pretty rich set of them that we cut back on in later
versions. More to review/include is better now.
>
> Include a list of universities in the top 50? Also a list of the top
colleges?
>
> Top 10 engineering schools?
> Top schools for innovation?
> Top schools or departments for the sciences?
> # of international students going to school in Boston, and if possible
in what specialties? I remember lists that would show this.
>
> Top academic medical centers?
>
> Include information where the top firms go to recruit talent?
>
> List of GE locations around the country/world and an indication of how
many of their leaders went to school here?>
> ...you get the idea!!
>
> Sent from my iPhone
>
>> On Dec 18, 2015, at 8:29 AM, Weikel, Adam (GOV)
<[email protected]<mailto:[email protected]>
> wrote:
>>
>> Great!
>> I added a few slides overnight and brought Michael into the loop this
morning.
>> He will keep building and send us something revised this afternoon. Heis also able to help and edit over the weekend.
>>
>>
>>
>> -----Original Message-----
>> From: Kadish, Steven (GOV)
>> Sent: Friday, December 18, 2015 6:46 AM
>> To: Weikel, Adam (GOV)
>> Subject: Re: Any idea of timing for War on Talent materials?
>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 725/975
>> Not a problem!
>> We may have more time and I will let you know.
>> Please think if this is something to assign to Michael. It may be good
to see what he can do with something like this!!
>>
>> Sent from my iPhone
>>
>>> On Dec 17, 2015, at 9:55 PM, Weikel, Adam (GOV)
<[email protected]<mailto:[email protected]>
> wrote:
>>>
>>> Thanks Steve. Good to hear we have a little more time.
>>>
>>> I know this is an important assignment and I feel guilty responding
with an excuse. I'm usually all over these kinds of assignments, but we
are driving to North Carolina on Saturday/Sunday for a week with the
family.
>>> I can find a couple more hours to work on it Friday but I just don't
think I can do any major work by Monday.
>>>
>>> I will review the info from Sec Ash to see what I can incorporate and
I'll try to add a couple more slides to fill-in the story.
>>>
>>> I hope this isn't a huge problem.
>>> -Adam
>>>
>>>
>>> -----Original Message-----
>>> From: Kadish, Steven (GOV)
>>> Sent: Thursday, December 17, 2015 6:19 PM
>>> To: Weikel, Adam (GOV)
>>> Subject: RE: Any idea of timing for War on Talent materials?
>>>
>>> Wow!>>> This is terrific!
>>>
>>> We just got the word that rather than making a decision this week,
that they will not make a decision until mid-January.
>>> So both the good and bad news is that we have more time.
>>>
>>> With this in mind, what further would you do by Monday?
>>>
>>> -----Original Message-----
>>> From: Weikel, Adam (GOV)
>>> Sent: Thursday, December 17, 2015 5:50 PM
>>> To: Kadish, Steven (GOV)
>>> Subject: RE: Any idea of timing for War on Talent materials?>>>
>>> I'm sorry it is so late.
>>> We only had a 20 min break midday and 10 minutes in the afternoon.
>>> Attached is what I came up with
>>>
>>>
>>>
>>>
>>> -----Original Message-----
>>> From: Kadish, Steven (GOV)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 726/975
>>> Sent: Thursday, December 17, 2015 3:38 PM
>>> To: Weikel, Adam (GOV)
>>> Subject: Any idea of timing for War on Talent materials?
>>>
>>> Thx.
>>>
>>> Sent from my iPhone
>
> <MA talent_slides draft1.pptx>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 727/975
From: Ash, Jay (EOHED)
To: Kennealy, Michael (EOHED); Kelleher, Michael (GOV)
Cc: Kadish, Steven (GOV); Weikel, Adam (GOV); Kirk, Carolyn (EOHED)
Subject: RE: Presentation on why Boston!
Date: Wednesday, December 23, 2015 11:47:45 PM
IBM a biggie - good catch!
________________________________________
From: Kennealy, Michael (EOHED)
Sent: Wednesday, December 23, 2015 4:31 PM
To: Kelleher, Michael (GOV)
Cc: Kadish, Steven (GOV); Weikel, Adam (GOV); Zarrella, Lily (GOV); Ash,
Jay (EOHED); Kirk, Carolyn (EOHED)
Subject: Re: Presentation on why Boston!
On slide 20 would also add:
IBM digital health
Shire
GE Health (if this fits thematically for a presentation to them)
Mike Kennealy
On Dec 23, 2015, at 4:25 PM, Kelleher, Michael (GOV)
<[email protected]<mailto:[email protected]
ate.MA.US>> wrote:
Thanks, Steve.
I will work on these initial additions/suggestions this evening.
Michael
From: Kadish, Steven (GOV)
Sent: Wednesday, December 23, 2015 3:55 PM
To: Kelleher, Michael (GOV); Weikel, Adam (GOV); Zarrella, Lily (GOV)
Cc: Ash, Jay (EOHED); Kennealy, Michael (EOHED); Kirk, Carolyn (EOHED)
Subject: FW: Presentation on why Boston!
Mike: Some quick comments.
Jay, Mike, Carolyn – can you please help out on slide 20?
Thx!
Steve
___________________________
p.13: please add Boston University. I think that they are ranked about
the same as Northeastern.
Yes, will do. BU is #41
p.18: drop the chart at the bottom as the stats presented could be
interpreted in a number of ways.
Will do.
p.19: are there sources for these statements?
Will need to double check sources.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 728/975
p.20: is slide about who has moved here recently or expanded? That’s how
I think it should be titled. I would add Novartis and its enormous new
campus in Cambridge, the new Vertex facilities in the Seaport along with
others who have moved to the Seaport, Siemens has a major expansion in
Walpole, BASF has a major facility/expansion in Worcester. (Mike
Kennealy, Jay Ash, Carolyn – can you please help out here?)
Will work with Secretary Ash, Mike and Carol
p.21: I would drop the quote from Barry Bluestone.
Done
p.23: Please include Lincoln Labs and add a slide that has some of the
centers at Northeastern, BU, Tufts…especially NU. This may be an
additional slide?
Will make additional slide and add those organizations
p.26: This is interesting! What do you mean when you indicate GE under
the innovations?
Ok, wasn’t sure this would be a good slide. I tried to tie academic
breakthroughs, so I linked the invention or emerging technology with what
line of business then would have impacted – this is an indirect
connection. I can tighten up, if you like the concept.
p.27: Can you provide a statement about destinations to key GE locations
in the US
Yes, will do.
p.28: Please do the same for the innovation centers you mentioned
internationally? Are there any direct flights to South America???
Yes, will do. I confirmed there are no direct flights from Boston to
South America.
From: Kadish, Steven (GOV)
Sent: Wednesday, December 23, 2015 3:28 PM
To: ; Ash, Jay (EOHED); Polito, Karyn (GOV); Lepore, Kristen (ANF);Sullivan, Jennifer F. (ANF); Povich, Lon (GOV); Kennealy, Michael (EOHED);
Peyser, Jim (EOE); Reale, Ann (EOE); Tom Glynn; Morse, Elizabeth;
[email protected]<mailto:[email protected]>; Conroy, Jim (GOV);
Buckley, Timothy (GOV)
Cc: Kelleher, Michael (GOV); Zarrella, Lily (GOV); Weikel, Adam (GOV)
Subject: Presentation on why Boston!
Governor, Lt. Governor and colleagues:
Attached is terrific presentation on Why Boston/The War for Talent as it
relates to the Boston project.
I want to thank those that have provided the source information.
And I want to especially thank our newest member of the Cabinet Relationsteam – Michael Keller, along with support from Lily and Adam – to put this
presentation together.
Comments, edits, further additions welcome.
Please share your thoughts with Michael, Adam, Lily and me.
I will share this now with the folks from the City.
Best,
Steve
GOV Email
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 729/975
From: Kelleher, Michael (GOV)
Sent: Wednesday, December 23, 2015 12:47 PM
To: Kadish, Steven (GOV)
Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)
Subject: RE: draft for your review
Steve,
Please see attached for your review a draft slide deck for discussions
with GE. You will find herein 30 slides (25 or so with real content). I
am not 100% sure the length of time that is available but these are the
slides I would present as the most compelling for “why Boston?”
I am around all day if you want to discuss further or have specific
edits/suggestions.
Look forward to your feedback.
Thanks,
Michael
From: Kadish, Steven (GOV)
Sent: Monday, December 21, 2015 11:18 AM
To: Kelleher, Michael (GOV); Zarrella, Lily (GOV); Weikel, Adam (GOV)
Subject: FW: Any idea of timing for War on Talent materials?
Impressive!
And very much on the right track.
More ideas:
1. Please take a look at the GE website and other sources to see
about themes, and other info that may be relevant. I am hearing on their ads that GE is your industrial and tech company. For example, the health
group and the energy group (Current) are or will be locating here. What
are the other parts of GE that would find the MA ecosystem attractive?
2. I am hearing that Massachusetts is a leader in robotics and
industrial design. Can you find out more and present how this would be
attractive to GE?
3. There are some more War on Talent slides that Adam would have.
4. Can you check on where the top firms go for their recruitment?
5. Please develop a list of the various institutes on health, tech,innovation, engineering, etc. Please check the university websites.
Broad, MIT’s Center for the Brain, etc.
Good stuff!
I will provide more feedback, but please keep going.
From: Kelleher, Michael (GOV)
Sent: Saturday, December 19, 2015 10:49 PM
To: Kadish, Steven (GOV)
Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 730/975
Subject: RE: Any idea of timing for War on Talent materials?
Steve,
Attached are some slides Lily and I put together in the last day or so for
your review and comment. I will look into your questions below re: total
# of engineers and scientist going to school in the Boston area. The
slides attached do not have that data but I will dig up tomorrow.
Look forward to your review and guidance,
Michael
From: Kadish, Steven (GOV)
Sent: Friday, December 18, 2015 6:28 PM
To: Kelleher, Michael (GOV)
Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)
Subject: Re: Any idea of timing for War on Talent materials?
If you aren't already, please look at US News and World Report.
Can you also research the # of scientists, engineers who:
-work in the area and a comparative % of the total in the US, World, or
whatever makes sense
-were educated in the area
Total # of engineers and scientists going to school in the Boston metro
area and how many graduate each year and what % that may be of the totalin the US
More to come!
________________________________
From: Kadish, Steven (GOV)
Sent: Friday, December 18, 2015 5:00 PM
To: Kelleher, Michael (GOV)
Cc: Zarrella, Lily (GOV); Weikel, Adam (GOV)
Subject: Re: Any idea of timing for War on Talent materials?
Great!!
Sent from my iPhone
On Dec 18, 2015, at 4:14 PM, Kelleher, Michael (GOV)
<[email protected]<mailto:[email protected]
ate.MA.US>> wrote:
Steve,
Thanks for the additional guidance for the war on talent materials. Lily
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 731/975
and I were able to add a few slides based on previous direction you and
Adam provided. We are going to plow through the list of additional items
(as outlined below, assigned to Lily or myself) and will send you a
revised PPT later this evening/first thing tomorrow for your review and
additional edits.
• list of universities in the top 50 - mk
• list of the top colleges - mk
• Top 10 engineering schools - mk
• Top Schools for Innovation in the United States- mk
• Top schools or departments for the sciences - mk
• # of international students going to school in Boston, what
specialties - mk
• Top academic medical centers - mk
• List of GE locations around the country/world and an indication of
how many of their leaders went to school here – mk
• # of international patients traveling to Boston AMCs to receive
care – mk
• Insert language from innovation one pager that HED put together -
Lily
• List of all the bio tech, IT, pharma, etc firms that have
determined to locate, grow here in the last few years. (Vertex, Shire,
Novartis, Pfizer, Siemens...and all the small firms) - HED
• Locations of all the company's national and international
locations with a map showing flights from Logan - Massport
Thanks,
Michael
-----Original Message-----
From: Kadish, Steven (GOV)
Sent: Friday, December 18, 2015 2:53 PM
To: Weikel, Adam (GOV)
Cc: Kelleher, Michael (GOV); Zarrella, Lily (GOV)Subject: Re: Any idea of timing for War on Talent materials?
Adam, Michael, Lily,
Ok for you to add more slides on the war on talent idea. I am remembering
a pretty rich set of them that we cut back on in later versions. More to
review/include is better now.
Include a list of universities in the top 50? Also a list of the top
colleges?
Top 10 engineering schools?
Top schools for innovation?Top schools or departments for the sciences?
# of international students going to school in Boston, and if possible in
what specialties? I remember lists that would show this.
Top academic medical centers?
Include information where the top firms go to recruit talent?
List of GE locations around the country/world and an indication of how
many of their leaders went to school here?
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 732/975
...you get the idea!!
Sent from my iPhone
> On Dec 18, 2015, at 8:29 AM, Weikel, Adam (GOV)
<[email protected]<mailto:[email protected]>
> wrote:
>
> Great!
> I added a few slides overnight and brought Michael into the loop this
morning.
> He will keep building and send us something revised this afternoon. He
is also able to help and edit over the weekend.
>
>
>
> -----Original Message-----
> From: Kadish, Steven (GOV)
> Sent: Friday, December 18, 2015 6:46 AM
> To: Weikel, Adam (GOV)
> Subject: Re: Any idea of timing for War on Talent materials?
>
> Not a problem!
> We may have more time and I will let you know.
> Please think if this is something to assign to Michael. It may be good
to see what he can do with something like this!!
>
> Sent from my iPhone
>
>> On Dec 17, 2015, at 9:55 PM, Weikel, Adam (GOV)
<[email protected]<mailto:[email protected]>
> wrote:
>>>> Thanks Steve. Good to hear we have a little more time.
>>
>> I know this is an important assignment and I feel guilty responding
with an excuse. I'm usually all over these kinds of assignments, but we
are driving to North Carolina on Saturday/Sunday for a week with the
family.
>> I can find a couple more hours to work on it Friday but I just don't
think I can do any major work by Monday.
>>
>> I will review the info from Sec Ash to see what I can incorporate and
I'll try to add a couple more slides to fill-in the story.
>>
>> I hope this isn't a huge problem.>> -Adam
>>
>>
>> -----Original Message-----
>> From: Kadish, Steven (GOV)
>> Sent: Thursday, December 17, 2015 6:19 PM
>> To: Weikel, Adam (GOV)
>> Subject: RE: Any idea of timing for War on Talent materials?
>>
>> Wow!
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 733/975
>> This is terrific!
>>
>> We just got the word that rather than making a decision this week, that
they will not make a decision until mid-January.
>> So both the good and bad news is that we have more time.
>>
>> With this in mind, what further would you do by Monday?
>>
>> -----Original Message-----
>> From: Weikel, Adam (GOV)
>> Sent: Thursday, December 17, 2015 5:50 PM
>> To: Kadish, Steven (GOV)
>> Subject: RE: Any idea of timing for War on Talent materials?
>>
>> I'm sorry it is so late.
>> We only had a 20 min break midday and 10 minutes in the afternoon.
>> Attached is what I came up with
>>
>>
>>
>>
>> -----Original Message-----
>> From: Kadish, Steven (GOV)
>> Sent: Thursday, December 17, 2015 3:38 PM
>> To: Weikel, Adam (GOV)
>> Subject: Any idea of timing for War on Talent materials?
>>
>> Thx.
>>
>> Sent from my iPhone
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 734/975
From: Ash, Jay (EOHED)
To: Frazier, Ricks (EOHED); Ash, Jay (EOHED); Kadish, Steven (GOV); Daniel Koh; John Barros; Sullivan, Jennifer F. (ANF); Povich, Lon (GOV); [email protected]
Subject: RE: Private Grid 1
Date: Thursday, December 24, 2015 12:09:41 PM
Good thx. I'll review tomorrow. What's your availability Tuesday? Merry Merry. 60
degrees and the sun just came out here!
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Frazier, Ricks (EOHED)" <[email protected]>Date: 12/24/2015 10:47 AM (GMT-05:00)To: "Ash, Jay (EOHED)" <[email protected]>, "Kadish, Steven (GOV)" <[email protected]>, Daniel Koh <[email protected]>, John
Barros <[email protected]>, "Sullivan, Jennifer F. (ANF)" <[email protected]>, "Povich, Lon (GOV)" <[email protected]>, [email protected]: RE: Private Grid 1
Jay
Ricks
-----Original Message-----
From: Ash, Jay (EOHED)
Sent: Wednesday, December 23, 2015 11:40 PM
To: Kadish, Steven (GOV); Daniel Koh; John Barros; Frazier, Ricks (EOHED); Sullivan, Jennifer F. (ANF);
Povich, Lon (GOV); [email protected]
Subject: Private Grid 1
Folks, this is really tedious, with so many potential variations on each scenario. Nonetheless, here is a first draft
responding to the three basics of the scenarios. I think it encompasses everything, but need to sleep on it now. Feel
free to pick it apart!
Shared with a limited circulation. Chiefs should decided if they want to expand the loop now, or wait until the
smaller group has had at it.
Should we do a call at 8 to discuss what we are saying to them at 9?
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 735/975
From: Povich, Lon (GOV)
To: Frazier, Ricks (EOHED)
Subject: RE: Private Grid 1
Date: Thursday, December 24, 2015 10:56:58 AM
Ricks,
Please give me a quick call. Cell ) or office, below, until noon.
Thanks.
Lon F. Povich
Governor’s Chief Legal Counsel
State House, Room 271
Boston, MA 02133
(617) 725-4082
-----Original Message-----
From: Frazier, Ricks (EOHED)Sent: Thursday, December 24, 2015 10:48 AM
To: Ash, Jay (EOHED); Kadish, Steven (GOV); Daniel Koh; John Barros; Sullivan, Jennifer F. (ANF); Povich, Lon
(GOV); [email protected]
Subject: RE: Private Grid 1
Jay
Ricks
-----Original Message-----
From: Ash, Jay (EOHED)
Sent: Wednesday, December 23, 2015 11:40 PM
To: Kadish, Steven (GOV); Daniel Koh; John Barros; Frazier, Ricks (EOHED); Sullivan, Jennifer F. (ANF);
Povich, Lon (GOV); [email protected]
Subject: Private Grid 1
Folks, this is really tedious, with so many potential variations on each scenario. Nonetheless, here is a first draft
responding to the three basics of the scenarios. I think it encompasses everything, but need to sleep on it now. Feel
free to pick it apart!
Shared with a limited circulation. Chiefs should decided if they want to expand the loop now, or wait until the
smaller group has had at it.
Should we do a call at 8 to discuss what we are saying to them at 9?
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 736/975
From: Povich, Lon (GOV)
To: Frazier, Ricks (EOHED); Ash, Jay (EOHED); Kadish, Steven (GOV); Daniel Koh; John Barros; Sullivan, Jennifer F. (ANF); [email protected]
Subject: RE: Private Grid 1
Date: Thursday, December 24, 2015 10:56:26 AM
Question to the team:
Thanks.
Lon F. Povich
Governor’s Chief Legal Counsel
State House, Room 271
Boston, MA 02133
(617) 725-4082
-----Original Message-----
From: Frazier, Ricks (EOHED)
Sent: Thursday, December 24, 2015 10:48 AMTo: Ash, Jay (EOHED); Kadish, Steven (GOV); Daniel Koh; John Barros; Sullivan, Jennifer F. (ANF); Povich, Lon
(GOV); [email protected]
Subject: RE: Private Grid 1
Jay
Ricks
-----Original Message-----
From: Ash, Jay (EOHED)
Sent: Wednesday, December 23, 2015 11:40 PM
To: Kadish, Steven (GOV); Daniel Koh; John Barros; Frazier, Ricks (EOHED); Sullivan, Jennifer F. (ANF);
Povich, Lon (GOV); [email protected]
Subject: Private Grid 1
Folks, this is really tedious, with so many potential variations on each scenario. Nonetheless, here is a first draft
responding to the three basics of the scenarios. I think it encompasses everything, but need to sleep on it now. Feel
free to pick it apart!
Shared with a limited circulation. Chiefs should decided if they want to expand the loop now, or wait until the smaller group has had at it.
Should we do a call at 8 to discuss what we are saying to them at 9?
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 737/975
From: Povich, Lon (GOV)
To: Ash, Jay (EOHED)
Subject: RE: Private Grid 1
Date: Thursday, December 24, 2015 7:36:45 AM
Ok thanks.
Lon F. Povich
Governor’s Chief Legal Counsel
State House, Room 271
Boston, MA 02133
(617) 725-4082
From: Ash, Jay (EOHED)Sent: Thursday, December 24, 2015 7:27 AMTo: Povich, Lon (GOV); Ash, Jay (EOHED)Subject: RE: Private Grid 1
Yes. Don't see a call 8n number yet for that. The 9 is w GE.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Povich, Lon (GOV)" <[email protected]>Date: 12/24/2015 6:42 AM (GMT-05:00)To: "Ash, Jay (EOHED)" < [email protected]>Subject: Re: Private Grid 1
Is there a call at 9 too?
Sent from my iPhone
On Dec 24, 2015, at 6:33 AM, Ash, Jay (EOHED) < [email protected]> wrote:
830 it is. Steve or John, can you send around a call in number?
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 738/975
From: "Povich, Lon (GOV)" <[email protected]>Date: 12/24/2015 6:10 AM (GMT-05:00)To: John Barros < [email protected]>Cc: "Frazier, Ricks (EOHED)" <[email protected]>, "Kennealy, Michael (EOHED)" <[email protected]>, Daniel Koh <[email protected]>, "Ash, Jay (EOHED)" < [email protected]>, "Kadish, Steven (GOV)"
<[email protected]>, "Sullivan, Jennifer F. (ANF)" <[email protected]>Subject: Re: Private Grid 1
Steve and Jen and I have another call at 8. Could we do 830?
Sent from my iPhone
On Dec 24, 2015, at 5:55 AM, John Barros < [email protected]> wrote:
8am is good.
On Thu, Dec 24, 2015 at 12:56 AM, Frazier, Ricks (EOHED) <[email protected]> wrote:Fine
Sent from my iPhone
On Dec 23, 2015, at 11:25 PM, Kennealy, Michael (EOHED) <[email protected]> wrote:
Works for me too
Mike Kennealy
On Dec 23, 2015, at 11:42 PM, Daniel Koh <[email protected]> wrote:
8 AM works for me. On Wed, Dec 23, 2015 at 11:39 PM, Ash, Jay (EOHED) < [email protected]> wrote:Folks, this is really tedious, with so many
potential variations on each scenario. Nonetheless, here is a first draft responding to the three basics of the scenarios. I think it encompasses everything, but need to sleep on it now. Feel free to pick it apart!
Shared with a limited circulation. Chiefs should decided if they want to expand the loop now, or wait until the smaller group has had at it.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 739/975
Should we do a call at 8 to discuss what we are saying to them at 9?
--
Daniel Arrigg KohChief of Staff City of Boston
--John BarrosChief of Economic DevelopmentOffice of Mayor Martin J. Walsh
6th Floor, Room 603Boston City Hall, Boston MA 02201t: 617-635-5729http://www.cityofboston.gov SHARE YOUR VISION. SHAPE OUR CITY.
http://imagine.boston.gov/
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 740/975
From: John Barros
To: Gaquin, Daniel
Cc: Kadish, Steven (GOV); Eugene O"Flaherty; Povich, Lon (GOV); Frazier, Ricks (EOHED); Ash, Jay (EOHED); Daniel Koh; Sullivan, Jennifer F. (ANF); Kennealy, Michael (EOHED); Cowan, Mo; Tom Glynn; Elizabeth Morse; Pollack, Stephanie (DOT); Garrity, Rob (DOT); Englander, John (DOT); Fichter, Katherine (DOT)
Subject: Re: Private Grid 1
Date: Tuesday, December 29, 2015 7:50:11 AM
From the City we will have the following individuals join us:
Renee LaFevre, BRA General Counsel
Heather Campisano, BRA Chief of Staff
Jose Gonzalez, Senior Assistant Corporation Counsel
Sent from my iPhone
> On Dec 28, 2015, at 3:10 PM, Gaquin, Daniel <[email protected]> wrote:
>
> Time and location is as follows:
>
> 11 am - 1 pm tomorrow, 12/29 at ML, One Financial, 38th Floor.
>
> Dial in is 877-434-2303;6173481874#
>
> -----Original Message-----
> From: Kadish, Steven (GOV) [mailto:[email protected]]
> Sent: Monday, December 28, 2015 2:26 PM
> To: Eugene O'Flaherty
> Cc: Gaquin, Daniel; Povich, Lon (GOV); Frazier, Ricks (EOHED); Ash, Jay (EOHED); Daniel Koh; John Barros;
Sullivan, Jennifer F. (ANF); Kennealy, Michael (EOHED); Cowan, Mo; Tom Glynn; Elizabeth Morse; Pollack,
Stephanie (DOT); Garrity, Rob (DOT); Englander, John (DOT); Fichter, Katherine (DOT)
> Subject: Re: Private Grid 1
>
> Can we be sure that Rene or someone else from the BRA is there?
>
> Also Massport--is it Katie?
>
> Also at MassDOT -- could this be Kate F or John or someone else?
>
> Lon or Jay -- can you please confirm the time and location and call-in?
>
> Thx.
>
> Sent from my iPhone
>>> On Dec 28, 2015, at 1:38 PM, Eugene O'Flaherty <[email protected]> wrote:
>>
>> The City will have an Attorney available.
>>
>> Gene
>>
>> Sent from my iPhone
>>
>>> On Dec 28, 2015, at 1:37 PM, Gaquin, Daniel <[email protected]> wrote:
>>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 741/975
>>> Anytime between 10 and 2 tomorrow is best for me and I can make other times work if needed.
>>>
>>> I'll suggest 11.
>>>
>>> Daniel O. Gaquin | Member
>>> Co-Chair, Real Estate Department
>>> Mintz, Levin, Cohn, Ferris, Glovsky and Popeo, P.C.
>>> One Financial Center | Boston, MA 02111
>>> Direct: +1.617.348.1874 | Fax: +1.617.542.2241
>>> E-mail: [email protected]
>>> Web: www.mintz.com
>>>
>>>
>>>
>>>
>>> -----Original Message-----
>>> From: Povich, Lon (GOV) [mailto:[email protected]]
>>> Sent: Monday, December 28, 2015 1:18 PM
>>> To: Frazier, Ricks (EOHED); Eugene L. O'Flaherty
>>> Cc: Ash, Jay (EOHED); Kadish, Steven (GOV); Daniel Koh; John Barros;
>>> Sullivan, Jennifer F. (ANF); [email protected]; Gaquin,
>>> Daniel; Cowan, Mo
>>> Subject: Re: Private Grid 1
>>>
>>>
>>> All,
>>>
>>> It would be great, if the appropriate lawyers from the city and state could join with Dan at Mintz tomorrow to
discuss the approvals necessary for the current plan. As I understand it, Jen and Jay are available and Ricks can join
by phone. It will be great if we could identify the most knowledgeable lawyers for the city and set a time.
Unfortunately, I am on vacation in California and may be able to join by phone, depending on the time, but will not
be there in person.
>>>
>>> Just to get the ball rolling, Dan when would be a good time for you,>>> and let's see if the others can meet then. Thanks
>>>
>>> Lon
>>> Sent from my iPhone
>>>
>>>> On Dec 24, 2015, at 7:47 AM, Frazier, Ricks (EOHED) <[email protected]> wrote:
>>>>
>>>> Jay
>>>>
>>>>
>>>>
>>>> Ricks
>>>>
>>>> -----Original Message-----
>>>> From: Ash, Jay (EOHED)
>>>> Sent: Wednesday, December 23, 2015 11:40 PM
>>>> To: Kadish, Steven (GOV); Daniel Koh; John Barros; Frazier, Ricks
>>>> (EOHED); Sullivan, Jennifer F. (ANF); Povich, Lon (GOV);
>>>> [email protected]
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 742/975
>>>> Subject: Private Grid 1
>>>>
>>>> Folks, this is really tedious, with so many potential variations on each scenario. Nonetheless, here is a first
draft responding to the three basics of the scenarios. I think it encompasses everything, but need to sleep on it now.
Feel free to pick it apart!
>>>>
>>>> Shared with a limited circulation. Chiefs should decided if they want to expand the loop now, or wait until
the smaller group has had at it.
>>>>
>>>> Should we do a call at 8 to discuss what we are saying to them at 9?
>>>> <Private Options Grid.docx>
>>>
>>>
>>>
>>> STATEMENT OF CONFIDENTIALITY:
>>> The information contained in this electronic message and any
>>> attachments to this message are intended for the exclusive use of the
>>> addressee(s) and may contain confidential or privileged information.
>>> If you are not the intended recipient, or the person responsible for
>>> delivering the e-mail to the intended recipient, be advised you have
>>> received this message in error and that any use, dissemination,
>>> forwarding, printing, or copying is strictly prohibited. Please
>>> notify Mintz, Levin, Cohn, Ferris, Glovsky and Popeo immediately at
>>> either (617) 542-6000 or at [email protected], and destroy all
>>> copies of this message and any attachments. You will be reimbursed
>>> for reasonable costs incurred in notifying us.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 743/975
From: Gaquin, Daniel
To: Povich, Lon (GOV); Henry Luthin; Ash, Jay (EOHED); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED)
Cc: Daniel Koh; Eugene O"Flaherty; Jose Gonzalez; Porter, Jeff
Subject: RE: Private Grid 1
Date: Monday, December 28, 2015 2:11:47 PM
11 am – 1 pm tomorrow, 12/29 at ML, 38 th Floor.
Dial in is
Please let me know who will be attending in person for the security list.
Thanks,
Dan
Daniel O. Gaquin | Member
Co-Chair, Real Estate Department
Mintz, Levin, Cohn, Ferris, Glovsky and Popeo, P.C.
One Financial Center | Boston, MA 02111
Direct: +1.617.348.1874 | Fax: +1.617.542.2241E-mail: [email protected]
Web: www.mintz.com
From: Povich, Lon (GOV) [mailto:[email protected]]Sent: Monday, December 28, 2015 2:05 PMTo: Henry Luthin; Ash, Jay (EOHED); Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED); Gaquin, DanielCc: Daniel Koh; Eugene O'Flaherty; Jose GonzalezSubject: Re: Private Grid 1
Dan will host. Dan please let folks know the location and dial in. Thanks all
Sent from my iPhone
On Dec 28, 2015, at 11:00 AM, Henry Luthin <[email protected]> wrote:
Hello Lon, Senior Assistant Corporation Counsel Jose Gonzalez will attend the meeting tomorrow. Could you forward him and me the particulars?
Many thanks. Henry
Henry C. LuthinFirst Assistant Corporation CounselCity of Boston Law DepartmentCity Hall, Room 615Boston, MA 02201
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 744/975
617.635.4024 (o)617.594.1645 (c)
STATEMENT OF CONFIDENTIALITY:The information contained in this electronic message and any attachmentsto this message are intended for the exclusive use of the addressee(s)and may contain confidential or privileged information. If you are notthe intended recipient, or the person responsible for delivering thee-mail to the intended recipient, be advised you have received thismessage in error and that any use, dissemination, forwarding, printing,or copying is strictly prohibited. Please notify Mintz, Levin, Cohn,Ferris, Glovsky and Popeo immediately at either (617) 542-6000 or [email protected], and destroy all copies of this message and anyattachments. You will be reimbursed for reasonable costs incurred innotifying us.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 745/975
From: Kennealy, Michael (EOHED)
To: Ash, Jay (EOHED)
Subject: RE: Project Plum - MA
Date: Thursday, July 23, 2015 11:39:00 AM
Emailed her yesterday to say she’d have bios today – I now have all that I needed and will send.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Ash, Jay (EOHED)
Sent: Thursday, July 23, 2015 11:37 AM
To: Kennealy, Michael (EOHED)
Subject: FW: Project Plum - MA
From: Kulish, Karen (GE, Corporate) [mailto:[email protected]]
Sent: Thursday, July 23, 2015 11:32 AM
To: Ash, Jay (EOHED)
Cc: Kennealy, Michael (EOHED)
Subject: Project Plum - MA
Good morning,
Thanks for this info. Of course I will need all names (and bios) ahead of time to clear through our GE
Security so all can enter the campus. The request is for bios by COB today please.
Regarding AV, I asked our AV support to provide me some information regarding our system. He
writes:
The systems in the Guest House are of older technology. They have been modified to allow
for newer computer equipment to display on the room projector. There is a room PC
connected to an overhead LCD projector. The room PC will allow the insertion of thumb
drives if content is delivered that way. However, the system will not allow you to save from
a GE computer. There are three (3) VGA computer input connections with audio in the
table. We can provide a display port to VGA adapter to connect to laptops to accommodate
higher resolution digital outputs. The AV system will scale resolutions down to
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 746/975
accommodate the ability to project. There are table top audio teleconference phone pods
that supply telephony. There is also cable TV.
Also, we will one of our AV people available in the conference room at the start of the meeting for
any assistance that is required.
Please let me know if you have additional questions.
Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
O: 203 373-2575
C:
From: Klee, Ann (GE, Corporate)Sent: Thursday, July 23, 2015 11:25 AMTo: Kulish, Karen (GE, Corporate)Subject: FW: Project Plum
fyi
From: Ash, Jay (SEA) [mailto:[email protected]]Sent: Thursday, July 23, 2015 11:16 AMTo: Klee, Ann (GE, Corporate); Ash, Jay (SEA)Subject: RE: Project Plum
Thx Ann. Only state govt officials. We'll be bringing a deck and would be pleased to have
AV available for its projection. Light refreshments are fine. Under $50 is our threshold. I'd say 5 people at this point.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Klee, Ann (GE, Corporate)" <[email protected]>Date: 07/23/2015 9:56 AM (GMT-05:00)To: "Ash, Jay (EOHED)" < [email protected]>Subject: Project Plum
Jay,
A couple of items as we prepare for our meeting next week.
First, if you’re planning to include non-government people (e.g., business leaders) with you next
week to help present for Massachusetts, please make sure that they have signed an NDA. I am
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 747/975
attaching a version that is tailored for non-government individuals. Thanks.
Also please let me know if you have any special AV or IT needs for your presentation.
Finally, we are planning to provide beverages and light refreshments for you and members of your
delegation. We are sensitive that some states have strict policies that govern the provision of food
and beverage to government officials, so please let us know how we can best accommodate you.
Thanks again for your attention to the NDA. Please let me know if you have any questions.
Look forward to seeing you next week.
ark
Ann R. Klee
Vice President
Global Operations – Environment, Health & Safety
GE
3135 Easton Turnpike
Fairfield, CT 06824
203-373-3198 (o)
(m)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 748/975
From: Kennealy, Michael (EOHED)
To: Kulish, Karen (GE, Corporate)
Subject: RE: Project Plum - MA
Date: Thursday, July 23, 2015 4:31:00 PM
Hi Karen, please see our bios below. I am also going to try to reach you shortly with a question or
two about the meeting – thanks.
Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
Secretary Jay Ash
Jay Ash serves as the Secretary of Housing and Economic Development for the Commonwealth of
Massachusetts. Secretary Ash is responsible for directing and executing Governor Charlie Baker’s
agenda on housing and community development, job creation, business development, consumer
affairs, and business regulation. He previously served as the city manager in his native Chelsea, a
position he held from 2000 to 2014. In Chelsea, Secretary Ash’s leadership produced both economic
expansion and fiscal stability. He grew the city’s housing stock by over ten percent, expanded its commercial base with two dozen major projects, led all Gateway Cities with a 15% increase in new
employment, developed 10 new parks, secured five credit rating increases, and won two All-
America City designations for Chelsea. Secretary Ash has led statewide initiatives on health
insurance, youth violence, transportation infrastructure and expanded gaming in Massachusetts.
He previously served as co-founder and vice-chair of the Metropolitan Mayors Coalition, as past
president of the Metropolitan Area Planning Council, as a board member of the public policy think
tank MassINC, the staff director to the Massachusetts House Majority Leader, and as an elected
trustee of his alma mater, Clark University.
Deputy Secretary Carolyn KirkCarolyn A. Kirk joined the Baker-Polito Administration in January of 2015 and serves as the Deputy
Secretary of the Executive Office of Housing and Economic Development. In this position, Kirk leads
operational management and shares policy responsibility for the Executive Office of Housing and
Economic Development, the Office of Consumer Affairs and Business Regulation, the Department of
Housing and Community Development, the Mass. Office of Business Development and its ancillary
agencies of Mass. Travel and Tourism, the Mass. Marketing Partnership, and the Mass. Office of
International Trade and Investment. In addition, Kirk is responsible for economic planning and
growth in the Maritime economic sector, oversees the MassWorks grant program, and provides
direct support to the Lieutenant Governor’s office on a number of initiatives. Prior to her
appointment with the Baker/Polito administration, in 2007 Kirk was the first woman popularly
elected as Mayor of the City of Gloucester. Kirk went on to win three subsequent general municipal
elections, never lost a ward or a precinct in any of her contests, and served as Mayor for seven
years. Kirk’s administration invested over $100 million in infrastructure thus laying the groundwork
for future economic growth. The first-ever business class hotel is under construction in the city in a
long sought after waterfront location adjacent to downtown. A new $40 million elementary school,
the first one to be built since World War II and which Kirk led the effort on for seven years, is also
under construction in the city. Mayor Kirk’s professional career spans over 25 years. She is a long-
time management consultant and her clients have included many of the Top 20 banks in the US,
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 749/975
along with Fortune 500 companies. She and her husband Bill Kirk have two children, Sam, 17 and
Baylee, 14. Both are enrolled in Gloucester Public Schools. A graduate of the Boston College class
of 1984, Mayor Kirk was born and raised in Clinton, NY and moved to Massachusetts to attend
college. She moved to Gloucester in 1988 where she still resides, and was drawn to the diversity
and beauty of the city.
Assistant Secretary Mike KennealyMike Kennealy is the Assistant Secretary for Business Growth for the Commonwealth of
Massachusetts in the Executive Office of Housing & Economic Development. Mike joined the Baker-
Polito Administration in March 2015 and brings two decades of experience working with the
management teams of growing companies. He joined Spectrum Equity in 1997 and was a Managing
Director of the firm until early 2013. Founded in 1994 with offices in Boston and San Francisco,
Spectrum is a leading growth private equity firm that provides capital and strategic support to its
portfolio companies. During Mike’s more than 15 years at the firm, Spectrum grew from $360
million in assets under management to $4.7 billion and invested in nearly 100 high growth
information services, digital media, software, and Internet companies. After retiring from
Spectrum, he spent two years as Special Advisor to the Receiver at Lawrence Public Schools. There he worked with the state-appointed superintendent/receiver on strategic and financial initiatives to
support the turnaround plan and developed and managed relationships with non-profit partners,
philanthropic funders, and the municipal government. Earlier in his career, Mike was an Associate at
TA Associates, a Boston-based private equity firm. Mike, his wife, and three children live in
Lexington, where he has served on the Town’s finance committee and a variety of non-profit
boards. He has been a member of the Board of Trustees of St. John’s Prep in Danvers, MA since
2009 and is Vice Chairman of the Board. Mike received an AB magna cum Laude, Phi Beta Kappa,
with High Honors in Government from Dartmouth College and an MBA from Harvard Business
School.
Assistant Secretary Nam Pham
Nam recently joined the Baker-Polito Administration as the Assistant Secretary of Business
Development which oversees the Mass. Office of Business Development, Mass. Office of Travel and
Tourism, Mass. Film Office and Mass. Office of International Trade & Investment. Previously Nam
was the CEO of Vietnamese American Initiative for Development (VietAID). Nam has been a
commercial banker for more than 20 years in both lending and credit for premier community banks
and large commercial banks. From 1994 to 2000 Nam served as Commissioner of Massachusetts
Office for Refugees and Immigrants, and Deputy Director of the Massachusetts Office of
International Trade & Investment. Nam earned his BS degree in Business Administration from the
University of Minnesota’s Carlson School of Management, and MPA in Political Economy from
Harvard’s Kennedy School of Government.
Regional Director Maria Nigro DiStefano
Maria Nigro DiStefano joined the Baker-Polito Administration in June as the new Northeast Regional
Director for the Massachusetts Office of Business Development (MOBD). MOBD is the state’s one-
stop source for businesses seeking to relocate to Massachusetts or to expand their current
operations here. It provides businesses with information on site locations, workforce availability,
funding and financing and tax incentives. Prior to joining the Administration, she worked for Boston
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 750/975
Main Streets as a Neighborhood Business Manager where she oversaw the development and
implementation of business strategies and provided technical assistance to local Main Streets
managers and volunteers. She graduated cum laude from Salem State College and earned a BA in
Political Science & Sociology, and she lives with her husband and two children in Rockport.
Mike KennealyAssistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Kulish, Karen (GE, Corporate) [mailto:[email protected]]Sent: Thursday, July 23, 2015 11:32 AM
To: Ash, Jay (EOHED)
Cc: Kennealy, Michael (EOHED)
Subject: Project Plum - MA
Good morning,
Thanks for this info. Of course I will need all names (and bios) ahead of time to clear through our GE
Security so all can enter the campus. The request is for bios by COB today please.
Regarding AV, I asked our AV support to provide me some information regarding our system. He
writes:
The systems in the Guest House are of older technology. They have been modified to allow
for newer computer equipment to display on the room projector. There is a room PC
connected to an overhead LCD projector. The room PC will allow the insertion of thumb
drives if content is delivered that way. However, the system will not allow you to save from
a GE computer. There are three (3) VGA computer input connections with audio in the
table. We can provide a display port to VGA adapter to connect to laptops to accommodate
higher resolution digital outputs. The AV system will scale resolutions down to
accommodate the ability to project. There are table top audio teleconference phone pods
that supply telephony. There is also cable TV.
Also, we will one of our AV people available in the conference room at the start of the meeting for
any assistance that is required.
Please let me know if you have additional questions.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 751/975
Karen
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
O: 203 373-2575
C:
From: Klee, Ann (GE, Corporate)Sent: Thursday, July 23, 2015 11:25 AMTo: Kulish, Karen (GE, Corporate)Subject: FW: Project Plum
fyi
From: Ash, Jay (SEA) [mailto:[email protected]]Sent: Thursday, July 23, 2015 11:16 AMTo: Klee, Ann (GE, Corporate); Ash, Jay (SEA)Subject: RE: Project Plum
Thx Ann. Only state govt officials. We'll be bringing a deck and would be pleased to have AV available for its projection. Light refreshments are fine. Under $50 is our threshold. I'd say 5 people at this point.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------
From: "Klee, Ann (GE, Corporate)" <[email protected]>Date: 07/23/2015 9:56 AM (GMT-05:00)To: "Ash, Jay (EOHED)" < [email protected]>Subject: Project Plum
Jay,
A couple of items as we prepare for our meeting next week.
First, if you’re planning to include non-government people (e.g., business leaders) with you next
week to help present for Massachusetts, please make sure that they have signed an NDA. I am
attaching a version that is tailored for non-government individuals. Thanks.
Also please let me know if you have any special AV or IT needs for your presentation.
Finally, we are planning to provide beverages and light refreshments for you and members of your
delegation. We are sensitive that some states have strict policies that govern the provision of food
and beverage to government officials, so please let us know how we can best accommodate you.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 752/975
Thanks again for your attention to the NDA. Please let me know if you have any questions.
Look forward to seeing you next week.
ark
Ann R. KleeVice President
Global Operations – Environment, Health & Safety
GE
3135 Easton Turnpike
Fairfield, CT 06824
203-373-3198 (o)
(m)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 753/975
From: Ash, Jay (EOHED)
To: Klee, Ann (GE, Corporate); Ash, Jay (EOHED)
Subject: RE: Project Plum -- Site visit
Date: Thursday, August 27, 2015 1:59:20 PM
Looking forward to it. Be back in morning with our logistics contact.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Klee, Ann (GE, Corporate)" <[email protected]>Date: 08/27/2015 1:41 PM (GMT-05:00)To: "Ash, Jay (EOHED)" <[email protected]>Subject: Project Plum -- Site visit
Jay,
I wanted to follow up on the scheduling of our visit to Boston and surrounding area. At this point,
we’re looking at September 15 and hope that works on your end. Our key point of contact for the
planning and logistics of the visit will be Brent Woodruff from CBRE, who works closely with us on
these kinds of projects.
If you could let me know who your point of contact will be, Brent will reach out to her/him and begin
the planning process, including potential sites that we would want to see and any other agenda
items. The plan is to cover everything in a day.
Many thanks.
Best,
ark
Ann R. Klee
Vice President
Global Operations – Environment, Health & Safety
GE
3135 Easton Turnpike
Fairfield, CT 06824
203-373-3198 (o)
(m)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 754/975
From: Kennealy, Michael (EOHED)
To: Ash, Jay (EOHED)
Cc: Pham, Nam (EOHED)
Subject: RE: Project Plum -- Site visit
Date: Monday, August 31, 2015 9:44:56 PM
Good. I spoke with Nam (copied here) about this today and he agreed Peter was the right guy.
From: Ash, Jay (EOHED)Sent: Monday, August 31, 2015 7:10 PMTo: Klee, Ann (GE, Corporate)Cc: Kennealy, Michael (EOHED); Pham, Nam (EOHED); Milano, Peter (MOBD)Subject: RE: Project Plum -- Site visit
Hi, Ann. Our top guy will be on the case, Peter Milano. Email is above. Others copied will also
participate in getting ready.
Peter Milano
Senior Regional Director
Massachusetts Office of Business Development(978) 970-1193
360 Merrimack Street
Building 5
Lawrence, MA 01843
-------- Original message --------From: "Klee, Ann (GE, Corporate)" <[email protected]>Date: 08/27/2015 1:41 PM (GMT-05:00)To: "Ash, Jay (EOHED)" < [email protected]>Subject: Project Plum -- Site visit
Jay,
I wanted to follow up on the scheduling of our visit to Boston and surrounding area. At this point,
we’re looking at September 15 and hope that works on your end. Our key point of contact for the
planning and logistics of the visit will be Brent Woodruff from CBRE, who works closely with us on
these kinds of projects.
If you could let me know who your point of contact will be, Brent will reach out to her/him and begin
the planning process, including potential sites that we would want to see and any other agenda items. The plan is to cover everything in a day.
Many thanks.
Best,
ark
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 755/975
Ann R. Klee
Vice President
Global Operations – Environment, Health & Safety
GE
3135 Easton Turnpike
Fairfield, CT 06824203-373-3198 (o)
(m)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 756/975
From: Frazier, Ricks (EOHED)
To: Kennealy, Michael (EOHED)
Subject: RE: Project Plum Boston Office Locations Booklet - Extended_v1_r1.pdf
Date: Tuesday, December 01, 2015 8:45:00 AM
Mike
I just had a couple of thoughts from the call this AM.
I’ll be driving for a chunk of the day, but Jonathan and Erica should be able to answer MassWorks
questions. If you do need me, my cell is 617 872 8017 and I’ll check e-mail regularly when I’m not
actually on the highway. I should be back by mid-afternoon.
Ricks
From: Kennealy, Michael (EOHED)
Sent: Monday, November 30, 2015 8:01 PM
To: Kadish, Steven (GOV); Ash, Jay (EOHED); Lepore, Kristen (ANF); Pollack, Stephanie (DOT); Garrity,
Rob (DOT); Povich, Lon (GOV); Elizabeth Morse; Tom Glynn; Buckley, Timothy (GOV); Conroy, Jim
(GOV); Sullivan, Jennifer F. (ANF); jdoolin; Ross, Robert (ANF); Cosco, Jonathan (EOHED); Frazier,
Ricks (EOHED)
Subject: FW: Project Plum Boston Office Locations Booklet - Extended_v1_r1.pdf
Please see the link below to access the document that the City has prepared for sites. This is an
update to the package sent last week. It is currently missing one of the Massport sites and the
Convention Center sites which can be added tomorrow. I have a few other edits to this which I will
pass along and please let me know of others. Letter to follow later tonight (still have not received
from City).
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of MassachusettsExecutive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: John Barros (via Google Drive) [mailto:[email protected]]
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 757/975
Sent: Monday, November 30, 2015 7:22 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: Project Plum Boston Office Locations Booklet - Extended_v1_r1.pdf
John Barros has shared the following PDF:
Project Plum Boston Office Locations Booklet - Extended_v1_r1.pdf
Please confirm when you receive this.Open
This email grants access to this item. Only forward it to people you trust.
Google Drive: Have all your files within reach from any device.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 758/975
From: Kennealy, Michael (EOHED)
To: Doolin, James
Subject: RE: Project Plum
Date: Monday, December 07, 2015 12:56:00 PM
Sorry – I think ~15-20 years but want to keep as operating not capital lease so not go out too far, but
I assume with an option after that.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Doolin, James [mailto:[email protected]]
Sent: Monday, December 07, 2015 12:55 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: Project Plum
Sorry, I wasn’t asking about the ground lease. I wanted to know how many years they are committed
to as a tenant in a building??
James P. Doolin
Chief Development OfficerMassachusetts Port Authority
O 617-568-3102
C 617-594-5953
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Monday, December 07, 2015 12:52 PMTo: Doolin, JamesSubject: RE: Project Plum
Until recently, they have only said “long term” but I did hear 99 years today on a call with their tax folks. I thought at least for now the language you sent was very helpful, but are there parameters
or restrictions on term with Massport that we should be aware of?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 759/975
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Doolin, James [mailto:[email protected]]Sent: Monday, December 07, 2015 12:29 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: Project Plum
Importance: High
Mike – was is the length of lease term that Plum is expecting / willing to commit to?
James P. Doolin
Chief Development Officer
Massachusetts Port Authority
O 617-568-3102
C 617-594-5953
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Monday, December 07, 2015 12:05 PMTo: Doolin, JamesCc: Morse, Elizabeth; McDonald, Catherine; DeTour, MicheleSubject: RE: Project Plum
Thanks!
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Doolin, James [mailto:[email protected]]
Sent: Monday, December 07, 2015 11:46 AM
To: Kennealy, Michael (EOHED) <[email protected]>
Cc: Morse, Elizabeth <[email protected]>; McDonald, Catherine
<[email protected]>; DeTour, Michele <[email protected]>
Subject: RE: Project Plum
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 760/975
Mike – here’s one memo that incorporates our ground lease statement and our procurement
statement. Jim
James P. Doolin
Chief Development Officer
Massachusetts Port Authority
O 617-568-3102
C 617-594-5953
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Monday, December 07, 2015 10:25 AMTo: Doolin, JamesSubject: Re: Project Plum
Jim can I get this incorporated in the memo sent earlier.
Mike Kennealy
On Dec 7, 2015, at 9:58 AM, Doolin, James <[email protected]> wrote:
Mike – here’s our language on the ground lease as requested. Jim
James P. Doolin
Chief Development Officer
Massachusetts Port Authority
O 617-568-3102
C 617-594-5953
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Monday, December 07, 2015 8:19 AMTo: Doolin, JamesSubject: RE: Project Plum
Will come back to you likely later today on this Jim. More urgent is the lease language
we talked about – coming over this morning?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 761/975
From: Doolin, James [mailto:[email protected]]
Sent: Sunday, December 06, 2015 9:44 AM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: Project Plum
Mike – yes we do have folks that can do some graphic layout type production. We can look at once we have the pieces to see if possible (I assume its close of business
Monday?) Jim
James P. Doolin
Chief Development Officer
Massachusetts Port Authority
O 617-568-3102
C 617-594-5953
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Saturday, December 05, 2015 8:17 PMTo: Doolin, JamesSubject: Fwd: Project Plum
Jim, suggestion from Sec Lepore that Massport has a marketing dept that could help
package/present whatever we come up with - thoughts?
Mike Kennealy
Begin forwarded message:
From: "Kennealy, Michael (EOHED)"
Date: December 5, 2015 at 8:14:01 PM EST
To: "Kennealy, Michael (EOHED)"
<[email protected]>, "Garrity, Rob (DOT)"
<[email protected]>, "Doolin, James"
<[email protected]>, "Sullivan, Jennifer F. (ANF)"
<[email protected]>, "Frazier, Ricks (EOHED)"
<[email protected]>, "Kreuter, Erica (EOHED)"
Cc: "Ash, Jay (EOHED)" < [email protected]>, "Lepore,
Kristen (ANF)" <[email protected]>
Subject: Re: Project Plum
Same number tomorrow please 10am Jay, Mike, Ricks, Erica, others if
interested and available. Whole group to reconvene when Jen has
feedback from outside counsel.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 762/975
Mike Kennealy
On Dec 5, 2015, at 8:08 AM, Kennealy, Michael (EOHED)
<[email protected]> wrote:
It looks like we have folks available for a call at 4:30pm today.
Please use this number:
access code .
Looking forward to speaking then and discussing ideas from the group.
Mike
From: Kennealy, Michael (EOHED)Sent: Friday, December 04, 2015 6:23 PMTo: Jennifer F. Sullivan (ANF)
([email protected]); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks (EOHED); Kreuter, Erica (EOHED)Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)Subject: Project Plum
I am emailing a group of people that I hope can work as a
team this weekend and into Monday to advance the Project
Plum work. As you know, we presented a proposal to Plum
that relies heavily on I-Cubed and Massworks funding, and
we also suggested some sites. The good news from today is
that we are very much in the game here, and the company
will be visiting Boston on Wednesday to look at sites, with a
significant internal meeting in about 10 days. (Note – not
clear yet what involvement they want from us on
Wednesday, possibly none though of course we are
pushing).
As Steve and Sec. Lepore and I just discussed, we think our
mission at this point is to make this proposed infrastructure
funding more tangible for them – how could these dollars
be used to the direct benefit of their project? Said
differently, our ~$100 MM dollar proposal was $80 MM I-
Cubed/MassWorks and $20 MM local property tax
incentives; they know how to value the $20 MM but are
unsure how to value the $80 MM, and we need this
proposal to look a lot closer to $100 MM than $20 MM,
especially in the face of competition offering incentives that
are much easier to value.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 763/975
To that end, there are two deliverables that we would like to
send to the company by noon on Monday:
1. A list/discussion of historical examples of I-Cubed
and MassWorks projects. I have attached a draft
memo from Erica and the language that Jen
provided for our letter. What other examples can we provide, and in what level of detail, specifically
ones that are as analogous as possible to their
project?
2. Specific examples of how I-Cubed and MassWorks
could be deployed at the MCCA and Massport sites.
I have attached information about those sites. No
site or building has been ruled out, but initial
guidance from Plum’s location advisor was to focus
on the sites vs. the buildings.
Could I ask the following:
1. Could folks start giving consideration to #1 and #2
above and develop specific ideas.
2. Could you please also suggest (if applicable) others
from your organization that could help in this effort.
3. Can we all get on a call tomorrow at 4:30pm to
discuss.
On the call tomorrow, I would like to review what we think
the deliverables should look like and discuss specific
examples. We can then decide what other needs we may
have, and plan the work over Sunday and into Monday.
I hope all of that makes sense and, as always, please call with
questions. Please respond as soon as you can with respect
to your availability tomorrow at 4:30pm.
All the best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 764/975
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
<ground lease terms statement.docx>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 765/975
From: Kadish, Steven (GOV)
To: Ash, Jay (EOHED)
Cc: Kennealy, Michael (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF)
Subject: Re: Project Plum
Date: Sunday, December 06, 2015 11:53:39 AM
How fast can we move from questions to facts and tools and their
application?
Or maybe we are already doing so?
We need to have something solid by tomorrow morning. I am hoping to see
drafts of the 3 deliverables by sometime this evening:
1. What we can do on some proposed Seaport locations
2. Examples of what has been done with the tools we are proposing
3. What can we offer at the existing Plum sites and for Connect
Let's please stay focused on the deliverables.
Thx.
Steve
Sent from my iPhone
> On Dec 6, 2015, at 11:45 AM, Ash, Jay (EOHED)<[email protected]> wrote:
>
> From today's call - MassWorks is most flexible, allowing for private
expenditures that are in the cause of economic development - thus,
utilizing the MassWorks/EDIP option is more flexible and direct than
utilizing some form of I-Cubed. I am working up a list of
questions/points about the policy issues around utilizing more MassWorks,
maybe as much as $70-80m, for the direct subsidy of building a building.
Simple and effective. Will share the questions tonight.
> ________________________________________
> From: Kadish, Steven (GOV)
> Sent: Sunday, December 06, 2015 8:03 AM
> To: Kennealy, Michael (EOHED)> Cc: Lepore, Kristen (ANF); Ash, Jay (EOHED)
> Subject: Re: Project Plum
>
> Thanks for the info.
> I'll be on the road then, so I'm iffy about joining.
> In any case, look forward to an update.
>
> Sent from my iPhone
>
> On Dec 6, 2015, at 7:47 AM, Kennealy, Michael (EOHED)
<[email protected]<mailto:[email protected]
ate.MA.US>> wrote:
>
> 10am. Just sent info.
>
> Mike Kennealy
>
> On Dec 6, 2015, at 7:21 AM, Kadish, Steven (GOV)
<[email protected]<mailto:[email protected]
.US>> wrote:
>
> Please let me know when today's call is and I will try to join you.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 766/975
>
> Sent from my iPhone
>
> On Dec 5, 2015, at 8:19 PM, Kennealy, Michael (EOHED)
<[email protected]<mailto:[email protected]
ate.MA.US>> wrote:
>
> Discussed in concept on call and just emailed Jim D.
>> Mike Kennealy
>
> On Dec 5, 2015, at 6:48 PM, Lepore, Kristen (ANF)
<[email protected]<mailto:[email protected].
MA.US>> wrote:
>
> Did you ask massport to help with the marketing materials? They have a
marketing department. I asked Jen to make that request.
>
> Sent from my iPhone
>
> On Dec 5, 2015, at 6:26 PM, Kennealy, Michael (EOHED)
<[email protected]<mailto:[email protected]
ate.ma.us>> wrote:
>
> Steve, it was a productive call discussing the various ways
I-Cubed/MassWorks could be utilized to their benefit on our sites while
maintaining public benefit and other statute requirements. Jay, Ricks and
I are speaking tomorrow AM in more detail re: MassWorks and Jen needs to
consult outside counsel on some I-Cubed matters. Will reconvene larger
group after Jen has what she needs. Goal is to develop very specific
scenarios on use of funds on our sites. Jay is back and was on call and
may have more to add.
>
> Mike Kennealy>
> On Dec 5, 2015, at 2:26 PM, Kadish, Steven (GOV)
<[email protected]<mailto:[email protected]
.US>> wrote:
>
> Not sure that I will be able to make, but I would like an update.
>
> Will you be scheduling a call tomorrow?
> I can do after 5 pm.
>
> Sent from my iPhone
>
> On Dec 5, 2015, at 11:01 AM, Kennealy, Michael (EOHED)<[email protected]<mailto:[email protected]
ate.MA.US>> wrote:
>
> Call info
>
> Mike Kennealy
>
> Begin forwarded message:
>
> From: "Kennealy, Michael (EOHED)"
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 767/975
<[email protected]<mailto:[email protected]
ate.MA.US>>
> Date: December 5, 2015 at 8:07:26 AM EST
> To: "Kennealy, Michael (EOHED)"
<[email protected]<mailto:[email protected]
ate.MA.US>>, "Sullivan, Jennifer F. (ANF)"
<[email protected]<mailto:Jennifer.F.Sullivan@MassM
ail.State.MA.US>>, "Doolin, James"
<[email protected]<mailto:[email protected]>>, "Garrity, Rob (DOT)"<[email protected]<mailto:[email protected]>>,
"Frazier, Ricks (EOHED)"
<[email protected]<mailto:[email protected]
.US>>, "Kreuter, Erica (EOHED)"
<[email protected]<mailto:[email protected]
.US>>
> Cc: "Ash, Jay (EOHED)"
<[email protected]<mailto:[email protected]>>,
"Lepore, Kristen (ANF)"
<[email protected]<mailto:[email protected].
MA.US>>
> Subject: RE: Project Plum
>
> It looks like we have folks available for a call at 4:30pm today.
Please use this number:
>
> access code .
>
> Looking forward to speaking then and discussing ideas from the group.
>
> Mike
>
> ________________________________
> From: Kennealy, Michael (EOHED)
> Sent: Friday, December 04, 2015 6:23 PM> To: Jennifer F. Sullivan (ANF)
([email protected]<mailto:Jennifer.F.Sullivan@MassM
ail.State.MA.US>); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks
(EOHED); Kreuter, Erica (EOHED)
> Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)
> Subject: Project Plum
>
> I am emailing a group of people that I hope can work as a team this
weekend and into Monday to advance the Project Plum work. As you know, we
presented a proposal to Plum that relies heavily on I-Cubed and Massworks
funding, and we also suggested some sites. The good news from today is
that we are very much in the game here, and the company will be visiting
Boston on Wednesday to look at sites, with a significant internal meetingin about 10 days. (Note – not clear yet what involvement they want from
us on Wednesday, possibly none though of course we are pushing).
>
> As Steve and Sec. Lepore and I just discussed, we think our mission at
this point is to make this proposed infrastructure funding more tangible
for them – how could these dollars be used to the direct benefit of their
project? Said differently, our ~$100 MM dollar proposal was $80 MM
I-Cubed/MassWorks and $20 MM local property tax incentives; they know how
to value the $20 MM but are unsure how to value the $80 MM, and we need
this proposal to look a lot closer to $100 MM than $20 MM, especially in
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 768/975
the face of competition offering incentives that are much easier to value.
>
> To that end, there are two deliverables that we would like to send to
the company by noon on Monday:
>
>
> 1. A list/discussion of historical examples of I-Cubed and
MassWorks projects. I have attached a draft memo from Erica and the
language that Jen provided for our letter. What other examples can we provide, and in what level of detail, specifically ones that are as
analogous as possible to their project?
>
>
> 2. Specific examples of how I-Cubed and MassWorks could be
deployed at the MCCA and Massport sites. I have attached information
about those sites. No site or building has been ruled out, but initial
guidance from Plum’s location advisor was to focus on the sites vs. the
buildings.
>
> Could I ask the following:
>
>
> 1. Could folks start giving consideration to #1 and #2 above and
develop specific ideas.
>
>
> 2. Could you please also suggest (if applicable) others from your
organization that could help in this effort.
>
>
> 3. Can we all get on a call tomorrow at 4:30pm to discuss.
>
> On the call tomorrow, I would like to review what we think the
deliverables should look like and discuss specific examples. We can thendecide what other needs we may have, and plan the work over Sunday and
into Monday.
>
> I hope all of that makes sense and, as always, please call with
questions. Please respond as soon as you can with respect to your
availability tomorrow at 4:30pm.
>
> All the best,
> Mike
>
> Mike Kennealy
> Assistant Secretary for Business Growth
> The Commonwealth of Massachusetts> Executive Office of Housing & Economic Development
> One Ashburton Place, Room 2101
> Boston, MA 02108
> Office: 617-788-3640
> Cell: 617-634-4762
> [email protected]<mailto:[email protected]>
>
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 769/975
From: Doolin, James
To: Kennealy, Michael (SEA)
Cc: Morse, Elizabeth; McDonald, Catherine; DeTour, Michele
Subject: RE: Project Plum
Date: Monday, December 07, 2015 11:46:01 AM
Attachments: Ground Lease Process Memo JPD updates 12 7 15.doc
Mike – here’s one memo that incorporates our ground lease statement and our procurement
statement. Jim
James P. Doolin
Chief Development Officer
Massachusetts Port Authority
O 617-568-3102
C 617-594-5953
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Monday, December 07, 2015 10:25 AMTo: Doolin, JamesSubject: Re: Project Plum
Jim can I get this incorporated in the memo sent earlier.
Mike Kennealy
On Dec 7, 2015, at 9:58 AM, Doolin, James <[email protected]> wrote:
Mike – here’s our language on the ground lease as requested. Jim
James P. Doolin
Chief Development Officer
Massachusetts Port Authority
O 617-568-3102
C 617-594-5953
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Monday, December 07, 2015 8:19 AM
To: Doolin, JamesSubject: RE: Project Plum
Will come back to you likely later today on this Jim. More urgent is the lease language
we talked about – coming over this morning?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 770/975
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Doolin, James [mailto:[email protected]]
Sent: Sunday, December 06, 2015 9:44 AM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: Project Plum
Mike – yes we do have folks that can do some graphic layout type production. We can
look at once we have the pieces to see if possible (I assume its close of business
Monday?) Jim
James P. DoolinChief Development Officer
Massachusetts Port Authority
O 617-568-3102
C 617-594-5953
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Saturday, December 05, 2015 8:17 PMTo: Doolin, JamesSubject: Fwd: Project Plum
Jim, suggestion from Sec Lepore that Massport has a marketing dept that could help
package/present whatever we come up with - thoughts?
Mike Kennealy
Begin forwarded message:
From: "Kennealy, Michael (EOHED)"
Date: December 5, 2015 at 8:14:01 PM EST
To: "Kennealy, Michael (EOHED)"
<[email protected]>, "Garrity, Rob (DOT)"
<[email protected]>, "Doolin, James"
<[email protected]>, "Sullivan, Jennifer F. (ANF)"
<[email protected]>, "Frazier, Ricks (EOHED)"
<[email protected]>, "Kreuter, Erica (EOHED)"
Cc: "Ash, Jay (EOHED)" < [email protected]>, "Lepore,
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 771/975
Kristen (ANF)" <[email protected]>
Subject: Re: Project Plum
Same number tomorrow please 10am Jay, Mike, Ricks, Erica, others if
interested and available. Whole group to reconvene when Jen has
feedback from outside counsel.
Mike Kennealy
On Dec 5, 2015, at 8:08 AM, Kennealy, Michael (EOHED)
<[email protected]> wrote:
It looks like we have folks available for a call at 4:30pm today.Please use this number:
access code .
Looking forward to speaking then and discussing ideas from the
group.
Mike
From: Kennealy, Michael (EOHED)Sent: Friday, December 04, 2015 6:23 PMTo: Jennifer F. Sullivan (ANF) ([email protected]); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks (EOHED); Kreuter, Erica (EOHED)Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)Subject: Project Plum
I am emailing a group of people that I hope can work as a
team this weekend and into Monday to advance the Project
Plum work. As you know, we presented a proposal to Plum
that relies heavily on I-Cubed and Massworks funding, and
we also suggested some sites. The good news from today is
that we are very much in the game here, and the company
will be visiting Boston on Wednesday to look at sites, with a
significant internal meeting in about 10 days. (Note – not
clear yet what involvement they want from us on
Wednesday, possibly none though of course we are pushing).
As Steve and Sec. Lepore and I just discussed, we think our
mission at this point is to make this proposed infrastructure
funding more tangible for them – how could these dollars
be used to the direct benefit of their project? Said
differently, our ~$100 MM dollar proposal was $80 MM I-
Cubed/MassWorks and $20 MM local property tax
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 772/975
incentives; they know how to value the $20 MM but are
unsure how to value the $80 MM, and we need this
proposal to look a lot closer to $100 MM than $20 MM,
especially in the face of competition offering incentives that
are much easier to value.
To that end, there are two deliverables that we would like to send to the company by noon on Monday:
1. A list/discussion of historical examples of I-Cubed
and MassWorks projects. I have attached a draft
memo from Erica and the language that Jen
provided for our letter. What other examples can
we provide, and in what level of detail, specifically
ones that are as analogous as possible to their
project?
2. Specific examples of how I-Cubed and MassWorks
could be deployed at the MCCA and Massport sites.
I have attached information about those sites. No
site or building has been ruled out, but initial
guidance from Plum’s location advisor was to focus
on the sites vs. the buildings.
Could I ask the following:
1. Could folks start giving consideration to #1 and #2
above and develop specific ideas.
2. Could you please also suggest (if applicable) others
from your organization that could help in this effort.
3. Can we all get on a call tomorrow at 4:30pm to
discuss.
On the call tomorrow, I would like to review what we think
the deliverables should look like and discuss specific
examples. We can then decide what other needs we may
have, and plan the work over Sunday and into Monday.
I hope all of that makes sense and, as always, please call with
questions. Please respond as soon as you can with respect
to your availability tomorrow at 4:30pm.
All the best,
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 773/975
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
<ground lease terms statement.docx>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 774/975
TO: Elizabeth Morse, Chief of Staff
FROM: James Doolin, Chief Development Officer, Catherine McDonald, Acting Chief
Legal Counsel and Michele DeTour, Deputy Chief Legal Counsel
SUBJECT: Massport’s Ground Lease Process Regarding Massport Parcels A-2, H, D-2 and
D-3 and WTC Avenue Parcel
DATE: December 7, 2015
Massachusetts Port Authority (Massport) Ground Lease
As part of its mission to be an economic engine for the Commonwealth and New England and to
further a shared civic vision of creating a new and vibrant part of the City of Boston, the
Massport property within the South Boston Waterfront has been developed to include a mix of
commercial, residential and maritime related uses. Massport has made significant investments in
roadways, utilities infrastructure and public open space.
Within the commercial / residential area clustered around Seaport Boulevard, Congress Street,
Summer Street and D Street, Fidelity, John Hancock and a host of other major companies have
made major investments and have a strong corporate employment presence. In addition, two firstclass apartment buildings have been built with additional units on the near term horizon. Two 4-
star hotels are immediately available in the Seaport Hotel and the Boston Waterfront
Renaissance Hotel. There is also a destination restaurant cluster centered around Liberty Wharf.
These projects which are all on Massport land and many others in the South Boston Waterfront
have established the area nationally as a highly desirable location for real estate investment.
On Massport property projects have been undertaken by private third party developers / investors
under long term ground leases. Long term ground leases present the opportunity to be creative in
how the ground rent terms for rent are structured over time. In order to stimulate project
execution and based upon the asset type and the realities of the market conditions, Massport has previously structured rent payments for certain projects that delay or reduce payments in the
early years of the lease while still achieving fair market value for land through a combination of
fixed rent and participating rent. For Project Plum, Massport would expect to work closely and
creatively with the development entity to establish terms that facilitate project execution while
meeting fair market value for the long term ground lease.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 775/975
2
In response to a request from Michael Kennealy to prepare a memorandum similar to
MassDOT’s District Six Headquarters Memo dated November 30, 2015, we have prepared thefollowing summary of pertinent issues related to Massport’s ground leasing process for internal
discussion (and if desired to form the basis of the memorandum to Michael Kennealy).
• Massport’s long-standing practice, as a public agency, is to solicit bids for thedevelopment and direct long term lease of its property, although not specifically required
by statute to engage in a competitive bid process. (When Massport did not engage in a
competitive bid process for a Seaport development parcel, the State Auditor stated in a2002 Independent State Auditors Report that “there are no circumstances that we can
envision where a public agency such as Massport, could justify awarding a no-bid real
estate development contract”.)
• At a minimum, Massport would, in accordance with its Trust Agreement (furtherdescribed below) and its public mission, determine the property’s fair market value. A
fair market value determination may not relieve Massport of a competitive bid obligationin the eyes of independent state oversight agencies and/or other interested parties. (A fairmarket value determination did not persuade the State Auditor in 2002.)
• Massport’s Enabling Act, Chapter 456 of the Acts of 1956, as amended, provides that
Massport may lease its Port Properties (Parcels A-2, H, D-2 and D-3 and WTC Avenue
Parcel are considered Port Properties under the Enabling Act) if Massport’s Board
determines that the property is no longer needed for its original maritime/industrial use.
• Massport’s Trust Agreement dated as of August 1, 1978, as supplemented and amended, between the Authority and U.S. Bank, National Association, as trustee, governs
Massport’s relationship with its bondholders and generally provides that Massport willnot enter into any contract or take any action that might impair or diminish the rights ofthe trustee or the bondholders. This section may need to be further reviewed based on the
specific terms of the proposed transaction, however, evidence of fair market value is
generally sufficient to satisfy this constraint.
• In order to comply with the grant assurances included in each federal grant agreement
under the Airport Improvement Program, Massport requires its tenants to limit the height
of structures constructed on Massportproperty so as not to constitute an obstruction to airnavigation under 14 CFR Part 77. (See Grant Assurance No. 21 – Compatible Land Use.)
•
Any long term lease is subject to the approval of Massport’s board.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 776/975
From: [email protected]
To: Doolin, James
Subject: Re: Project Plum
Date: Sunday, December 06, 2015 9:50:52 AM
Ok thanks
Mike Kennealy
On Dec 6, 2015, at 9:44 AM, Doolin, James <[email protected]> wrote:
Mike – yes we do have folks that can do some graphic layout type production. We can
look at once we have the pieces to see if possible (I assume its close of business
Monday?) Jim
James P. Doolin
Chief Development Officer
Massachusetts Port Authority
O 617-568-3102
C 617-594-5953
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Saturday, December 05, 2015 8:17 PMTo: Doolin, JamesSubject: Fwd: Project Plum
Jim, suggestion from Sec Lepore that Massport has a marketing dept that could help
package/present whatever we come up with - thoughts?
Mike Kennealy
Begin forwarded message:
From: "Kennealy, Michael (EOHED)"
Date: December 5, 2015 at 8:14:01 PM EST
To: "Kennealy, Michael (EOHED)"
<[email protected]>, "Garrity, Rob (DOT)" <[email protected]>, "Doolin, James"
<[email protected]>, "Sullivan, Jennifer F. (ANF)"
<[email protected]>, "Frazier, Ricks (EOHED)"
<[email protected]>, "Kreuter, Erica (EOHED)"
Cc: "Ash, Jay (EOHED)" < [email protected]>, "Lepore,
Kristen (ANF)" <[email protected]>
Subject: Re: Project Plum
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 777/975
Same number tomorrow please 10am Jay, Mike, Ricks, Erica, others if
interested and available. Whole group to reconvene when Jen has
feedback from outside counsel.
Mike Kennealy
On Dec 5, 2015, at 8:08 AM, Kennealy, Michael (EOHED)
<[email protected]> wrote:
It looks like we have folks available for a call at 4:30pm today.Please use this number:
access code .
Looking forward to speaking then and discussing ideas from the group.
Mike
From: Kennealy, Michael (EOHED)Sent: Friday, December 04, 2015 6:23 PMTo: Jennifer F. Sullivan (ANF) ([email protected]); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks (EOHED); Kreuter, Erica (EOHED)Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)Subject: Project Plum
I am emailing a group of people that I hope can work as a
team this weekend and into Monday to advance the Project Plum work. As you know, we presented a proposal to Plum
that relies heavily on I-Cubed and Massworks funding, and
we also suggested some sites. The good news from today is
that we are very much in the game here, and the company
will be visiting Boston on Wednesday to look at sites, with a
significant internal meeting in about 10 days. (Note – not
clear yet what involvement they want from us on
Wednesday, possibly none though of course we are
pushing).
As Steve and Sec. Lepore and I just discussed, we think our
mission at this point is to make this proposed infrastructure
funding more tangible for them – how could these dollars
be used to the direct benefit of their project? Said
differently, our ~$100 MM dollar proposal was $80 MM I-
Cubed/MassWorks and $20 MM local property tax
incentives; they know how to value the $20 MM but are
unsure how to value the $80 MM, and we need this
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 778/975
proposal to look a lot closer to $100 MM than $20 MM,
especially in the face of competition offering incentives that
are much easier to value.
To that end, there are two deliverables that we would like to
send to the company by noon on Monday:
1. A list/discussion of historical examples of I-Cubed
and MassWorks projects. I have attached a draft
memo from Erica and the language that Jen
provided for our letter. What other examples can
we provide, and in what level of detail, specifically
ones that are as analogous as possible to their
project?
2. Specific examples of how I-Cubed and MassWorks
could be deployed at the MCCA and Massport sites.I have attached information about those sites. No
site or building has been ruled out, but initial
guidance from Plum’s location advisor was to focus
on the sites vs. the buildings.
Could I ask the following:
1. Could folks start giving consideration to #1 and #2
above and develop specific ideas.
2. Could you please also suggest (if applicable) others
from your organization that could help in this effort.
3. Can we all get on a call tomorrow at 4:30pm to
discuss.
On the call tomorrow, I would like to review what we think
the deliverables should look like and discuss specific
examples. We can then decide what other needs we may
have, and plan the work over Sunday and into Monday.
I hope all of that makes sense and, as always, please call with
questions. Please respond as soon as you can with respect
to your availability tomorrow at 4:30pm.
All the best,
Mike
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 779/975
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 780/975
From: Ash, Jay (EOHED)
To: Lepore, Kristen (ANF)
Subject: RE: Project Plum
Date: Sunday, December 06, 2015 9:37:03 PM
Next steps and needs.
________________________________________ From: Lepore, Kristen (ANF)
Sent: Sunday, December 06, 2015 9:35 PM
To: Ash, Jay (EOHED)
Cc: Kadish, Steven (GOV); Kennealy, Michael (EOHED)
Subject: Re: Project Plum
More what?
Sent from my iPhone
> On Dec 6, 2015, at 9:34 PM, Ash, Jay (EOHED)
<[email protected]> wrote:
>> Yes, Steve and I talked. More soon.
> ________________________________________
> From: Lepore, Kristen (ANF)
> Sent: Sunday, December 06, 2015 9:33 PM
> To: Kadish, Steven (GOV)
> Cc: Ash, Jay (EOHED); Kennealy, Michael (EOHED)
> Subject: Re: Project Plum
>
> Did you connect?
>
> Sent from my iPhone
>
>> On Dec 6, 2015, at 12:50 PM, Kadish, Steven (GOV)<[email protected]> wrote:
>>
>> Should/can we do a call tonight?
>> Thx.
>>
>> Sent from my iPhone
>>
>>> On Dec 6, 2015, at 11:53 AM, Lepore, Kristen (ANF)
<[email protected]> wrote:
>>>
>>> We need to get the tax exempt question answered.
>>>
>>> Sent from my iPhone
>>>
>>>> On Dec 6, 2015, at 11:45 AM, Ash, Jay (EOHED)
<[email protected]> wrote:
>>>>
>>>> From today's call - MassWorks is most flexible, allowing for private
expenditures that are in the cause of economic development - thus,
utilizing the MassWorks/EDIP option is more flexible and direct than
utilizing some form of I-Cubed. I am working up a list of
questions/points about the policy issues around utilizing more MassWorks,
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 781/975
maybe as much as $70-80m, for the direct subsidy of building a building.
Simple and effective. Will share the questions tonight.
>>>> ________________________________________
>>>> From: Kadish, Steven (GOV)
>>>> Sent: Sunday, December 06, 2015 8:03 AM
>>>> To: Kennealy, Michael (EOHED)
>>>> Cc: Lepore, Kristen (ANF); Ash, Jay (EOHED)
>>>> Subject: Re: Project Plum
>>>>>>>> Thanks for the info.
>>>> I'll be on the road then, so I'm iffy about joining.
>>>> In any case, look forward to an update.
>>>>
>>>> Sent from my iPhone
>>>>
>>>> On Dec 6, 2015, at 7:47 AM, Kennealy, Michael (EOHED)
<[email protected]<mailto:[email protected]
ate.MA.US>> wrote:
>>>>
>>>> 10am. Just sent info.
>>>>
>>>> Mike Kennealy
>>>>
>>>> On Dec 6, 2015, at 7:21 AM, Kadish, Steven (GOV)
<[email protected]<mailto:[email protected]
.US>> wrote:
>>>>
>>>> Please let me know when today's call is and I will try to join you.
>>>>
>>>> Sent from my iPhone
>>>>
>>>> On Dec 5, 2015, at 8:19 PM, Kennealy, Michael (EOHED)
<[email protected]<mailto:[email protected]
ate.MA.US>> wrote:>>>>
>>>> Discussed in concept on call and just emailed Jim D.
>>>>
>>>> Mike Kennealy
>>>>
>>>> On Dec 5, 2015, at 6:48 PM, Lepore, Kristen (ANF)
<[email protected]<mailto:[email protected].
MA.US>> wrote:
>>>>
>>>> Did you ask massport to help with the marketing materials? They have
a marketing department. I asked Jen to make that request.
>>>>
>>>> Sent from my iPhone>>>>
>>>> On Dec 5, 2015, at 6:26 PM, Kennealy, Michael (EOHED)
<[email protected]<mailto:[email protected]
ate.ma.us>> wrote:
>>>>
>>>> Steve, it was a productive call discussing the various ways
I-Cubed/MassWorks could be utilized to their benefit on our sites while
maintaining public benefit and other statute requirements. Jay, Ricks and
I are speaking tomorrow AM in more detail re: MassWorks and Jen needs to
consult outside counsel on some I-Cubed matters. Will reconvene larger
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 782/975
group after Jen has what she needs. Goal is to develop very specific
scenarios on use of funds on our sites. Jay is back and was on call and
may have more to add.
>>>>
>>>> Mike Kennealy
>>>>
>>>> On Dec 5, 2015, at 2:26 PM, Kadish, Steven (GOV)
<[email protected]<mailto:[email protected]
.US>> wrote:>>>>
>>>> Not sure that I will be able to make, but I would like an update.
>>>>
>>>> Will you be scheduling a call tomorrow?
>>>> I can do after 5 pm.
>>>>
>>>> Sent from my iPhone
>>>>
>>>> On Dec 5, 2015, at 11:01 AM, Kennealy, Michael (EOHED)
<[email protected]<mailto:[email protected]
ate.MA.US>> wrote:
>>>>
>>>> Call info
>>>>
>>>> Mike Kennealy
>>>>
>>>> Begin forwarded message:
>>>>
>>>> From: "Kennealy, Michael (EOHED)"
<[email protected]<mailto:[email protected]
ate.MA.US>>
>>>> Date: December 5, 2015 at 8:07:26 AM EST
>>>> To: "Kennealy, Michael (EOHED)"
<[email protected]<mailto:[email protected]
ate.MA.US>>, "Sullivan, Jennifer F. (ANF)"<[email protected]<mailto:Jennifer.F.Sullivan@MassM
ail.State.MA.US>>, "Doolin, James"
<[email protected]<mailto:[email protected]>>, "Garrity, Rob (DOT)"
<[email protected]<mailto:[email protected]>>,
"Frazier, Ricks (EOHED)"
<[email protected]<mailto:[email protected]
.US>>, "Kreuter, Erica (EOHED)"
<[email protected]<mailto:[email protected]
.US>>
>>>> Cc: "Ash, Jay (EOHED)"
<[email protected]<mailto:[email protected]>>,
"Lepore, Kristen (ANF)"
<[email protected]<mailto:[email protected]>>
>>>> Subject: RE: Project Plum
>>>>
>>>> It looks like we have folks available for a call at 4:30pm today.
Please use this number:
>>>>
>>>> access code .
>>>>
>>>> Looking forward to speaking then and discussing ideas from the group.
>>>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 783/975
>>>> Mike
>>>>
>>>> ________________________________
>>>> From: Kennealy, Michael (EOHED)
>>>> Sent: Friday, December 04, 2015 6:23 PM
>>>> To: Jennifer F. Sullivan (ANF)
([email protected]<mailto:Jennifer.F.Sullivan@MassM
ail.State.MA.US>); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks
(EOHED); Kreuter, Erica (EOHED)>>>> Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)
>>>> Subject: Project Plum
>>>>
>>>> I am emailing a group of people that I hope can work as a team this
weekend and into Monday to advance the Project Plum work. As you know, we
presented a proposal to Plum that relies heavily on I-Cubed and Massworks
funding, and we also suggested some sites. The good news from today is
that we are very much in the game here, and the company will be visiting
Boston on Wednesday to look at sites, with a significant internal meeting
in about 10 days. (Note – not clear yet what involvement they want from
us on Wednesday, possibly none though of course we are pushing).
>>>>
>>>> As Steve and Sec. Lepore and I just discussed, we think our mission
at this point is to make this proposed infrastructure funding more
tangible for them – how could these dollars be used to the direct benefit
of their project? Said differently, our ~$100 MM dollar proposal was $80
MM I-Cubed/MassWorks and $20 MM local property tax incentives; they know
how to value the $20 MM but are unsure how to value the $80 MM, and we
need this proposal to look a lot closer to $100 MM than $20 MM, especially
in the face of competition offering incentives that are much easier to
value.
>>>>
>>>> To that end, there are two deliverables that we would like to send to
the company by noon on Monday:
>>>>>>>>
>>>> 1. A list/discussion of historical examples of I-Cubed and
MassWorks projects. I have attached a draft memo from Erica and the
language that Jen provided for our letter. What other examples can we
provide, and in what level of detail, specifically ones that are as
analogous as possible to their project?
>>>>
>>>>
>>>> 2. Specific examples of how I-Cubed and MassWorks could be
deployed at the MCCA and Massport sites. I have attached information
about those sites. No site or building has been ruled out, but initial
guidance from Plum’s location advisor was to focus on the sites vs. the
buildings.>>>>
>>>> Could I ask the following:
>>>>
>>>>
>>>> 1. Could folks start giving consideration to #1 and #2 above
and develop specific ideas.
>>>>
>>>>
>>>> 2. Could you please also suggest (if applicable) others from
your organization that could help in this effort.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 784/975
>>>>
>>>>
>>>> 3. Can we all get on a call tomorrow at 4:30pm to discuss.
>>>>
>>>> On the call tomorrow, I would like to review what we think the
deliverables should look like and discuss specific examples. We can then
decide what other needs we may have, and plan the work over Sunday and
into Monday.
>>>>>>>> I hope all of that makes sense and, as always, please call with
questions. Please respond as soon as you can with respect to your
availability tomorrow at 4:30pm.
>>>>
>>>> All the best,
>>>> Mike
>>>>
>>>> Mike Kennealy
>>>> Assistant Secretary for Business Growth
>>>> The Commonwealth of Massachusetts
>>>> Executive Office of Housing & Economic Development
>>>> One Ashburton Place, Room 2101
>>>> Boston, MA 02108
>>>> Office: 617-788-3640
>>>> Cell: 617-634-4762
>>>> [email protected]<mailto:[email protected]>
>>>>
>>>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 785/975
From: Kadish, Steven (GOV)
To: Kennealy, Michael (EOHED)
Cc: Lepore, Kristen (ANF); Ash, Jay (EOHED)
Subject: Re: Project Plum
Date: Sunday, December 06, 2015 8:03:33 AM
Thanks for the info.I'll be on the road then, so I'm iffy about joining.In any case, look forward to an update.
Sent from my iPhone
On Dec 6, 2015, at 7:47 AM, Kennealy, Michael (EOHED) <[email protected]> wrote:
10am. Just sent info.
Mike Kennealy
On Dec 6, 2015, at 7:21 AM, Kadish, Steven (GOV) <[email protected]> wrote:
Please let me know when today's call is and I will try to join you.
Sent from my iPhone
On Dec 5, 2015, at 8:19 PM, Kennealy, Michael (EOHED) <[email protected]> wrote:
Discussed in concept on call and just emailed Jim D.
Mike Kennealy
On Dec 5, 2015, at 6:48 PM, Lepore, Kristen (ANF) <[email protected]> wrote:
Did you ask massport to help with the marketing materials? They have a marketing department. I asked Jen to make that request.
Sent from my iPhone
On Dec 5, 2015, at 6:26 PM, Kennealy, Michael (EOHED) <[email protected]> wrote:
Steve, it was a productive call
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 786/975
discussing the various ways I-Cubed/MassWorks could be utilized to their benefit on our sites while maintaining public benefit and other statute requirements. Jay, Ricks and I are speaking tomorrow AM in more detail re:
MassWorks and Jen needs to consult outside counsel on some I-Cubed matters. Will reconvene larger group after Jen has what she needs. Goal is to develop very specific scenarios on use of funds on our sites. Jay is back and was on call and may have more to add.
Mike Kennealy
On Dec 5, 2015, at 2:26 PM,
Kadish, Steven (GOV) <[email protected]> wrote:
Not sure that I will be able to make, but I would like an update.
Will you be scheduling a call tomorrow?I can do after 5 pm.
Sent from my iPhone
On Dec 5, 2015, at 11:01 AM, Kennealy, Michael (EOHED) <[email protected]> wrote:
Call info
Mike Kennealy
Begin forwarded message:
From:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 787/975
"Kennealy, Michael (EOHED)" <[email protected]>
Date: December
5, 2015 at 8:07:26 AM EST
To: "Kennealy, Michael (EOHED)" <[email protected]>,
"Sullivan, Jennifer F. (ANF)" <[email protected]>, "Doolin, James" <[email protected]>, "Garrity, Rob (DOT)"
<[email protected]>, "Frazier, Ricks (EOHED)" <[email protected]>, "Kreuter, Erica (EOHED)" <[email protected]>
Cc: "Ash,
Jay (EOHED)" < [email protected]>, "Lepore, Kristen (ANF)" <[email protected]>
Subject:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 788/975
RE: Project
Plum
It looks
like we have folks available
for a call at 4:30pm today.
Please use this number:
.
Looking forward to speaking then and discussing ideas
from the group.
Mike
From: Kennealy, Michael (EOHED)
Sent:
Friday, December 04, 2015 6:23 PM
To: Jennifer F. Sullivan (ANF)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 789/975
([email protected]); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks
(EOHED); Kreuter, Erica (EOHED)
Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)
Subject: Project Plum
I
am
emailing
a
group
of
people
that
I hope
can
work
as
a
team
this
weekend
and
into
Monday
to
advance
the
Project
Plum
work.
As
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 790/975
you
know,
we
presented
a
proposal
to Plum
that
relies
heavily
on
I-
Cubed
and
Massworks
funding,
and we
also
suggested
some
sites.
The
good
news
from
today
is
that
we
are
very
much
in
the
game
here,
and the
company
will
be
visiting
Boston
on
Wednesday
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 791/975
to
look
at
sites,
with
a
significant internal
meeting
in
about
10
days.
(Note
–
not
clear
yet what
involvement
they
want
from
us
on
Wednesday,
possibly
none
though
of
course
we
are
pushing).
As
Steve
and
Sec. Lepore
and
I
just
discussed,
we
think
our
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 792/975
mission
at
this
point
is
to
make this
proposed
infrastructure
funding
more
tangible
for
them
–
how
could these
dollars
be
used
to
the
direct
benefit
of
their
project?
Said
differently,
our
~$100
MM
dollar
proposal
was
$80
MM I-
Cubed/MassWorks
and
$20
MM
local
property
tax
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 793/975
incentives;
they
know
how
to
value
the $20
MM
but
are
unsure
how
to
value
the
$80
MM, and
we
need
this
proposal
to
look
a
lot
closer
to
$100
MM
than
$20
MM,
especially
in
the
face
of competition
offering
incentives
that
are
much
easier
to
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 794/975
value.
To
that
end,
there
are two
deliverables
that
we
would
like
to
send
to
the
company by
noon
on
Monday:
1.
A
list/discussion
of
historical examples
of
I-
Cubed
and
MassWorks
projects.
I
have
attached
a
draft
memo
from
Erica
and
the
language
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 795/975
that
Jen
provided
for
our
letter.
What other
examples
can
we
provide,
and
in
what
level
of
detail, specifically
ones
that
are
as
analogous
as
possible
to
their
project?
2.
Specific
examples
of
how
I-
Cubed
and
MassWorks
could
be
deployed
at
the
MCCA
and
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 796/975
Massport
sites.
I
have
attached
information
about those
sites.
No
site
or
building
has
been
ruled
out,
but initial
guidance
from
Plum’s
location
advisor
was
to
focus
on
the
sites
vs.
the
buildings.
Could
I
ask
the
following:
1.
Could
folks
start
giving
consideration
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 797/975
to
#1
and
#2
above
and
develop specific
ideas.
2.
Could
you
please
also
suggest
(if applicable)
others
from
your
organization
that
could
help
in
this
effort.
3.
Can
we
all
get
on
a
call
tomorrow at
4:30pm
to
discuss.
On
the
call
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 798/975
tomorrow,
I
would
like
to
review
what we
think
the
deliverables
should
look
like
and
discuss
specific
examples.We
can
then
decide
what
other
needs
we
may
have,
and
plan
the
work
over
Sunday
and
into
Monday.
I hope
all
of
that
makes
sense
and,
as
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 799/975
always,
please
call
with
questions.
Please
respond as
soon
as
you
can
with
respect
to
your
availability
tomorrow at
4:30pm.
All
the
best,
Mike
Mike
Kennealy
Assistant
Secretary
for
Business
Growth
The
Commonwealth
of
Massachusetts
Executive
Office of
Housing
&
Economic
Development
One
Ashburton
Place,
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 800/975
Room
2101
Boston,
MA
02108
Office:
617-788-
3640
Cell:
617-
634-
4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 801/975
From: Kennealy, Michael (EOHED)
To: Kadish, Steven (GOV)
Cc: Lepore, Kristen (ANF); Ash, Jay (EOHED)
Subject: Re: Project Plum
Date: Sunday, December 06, 2015 7:47:52 AM
10am. Just sent info.
Mike Kennealy
On Dec 6, 2015, at 7:21 AM, Kadish, Steven (GOV) <[email protected]> wrote:
Please let me know when today's call is and I will try to join you.
Sent from my iPhone
On Dec 5, 2015, at 8:19 PM, Kennealy, Michael (EOHED)
<[email protected]> wrote:
Discussed in concept on call and just emailed Jim D.
Mike Kennealy
On Dec 5, 2015, at 6:48 PM, Lepore, Kristen (ANF) <[email protected]> wrote:
Did you ask massport to help with the marketing materials? They have a marketing department. I asked Jen to make that request.
Sent from my iPhone
On Dec 5, 2015, at 6:26 PM, Kennealy, Michael (EOHED) <[email protected]> wrote:
Steve, it was a productive call discussing the various ways I-Cubed/MassWorks could be utilized to their benefit on our sites while maintaining public benefit and other statute requirements. Jay, Ricks and I are speaking tomorrow AM in more detail re: MassWorks and Jen needs to consult outside counsel on some I-Cubed matters. Will reconvene larger group after Jen has what she needs. Goal is to develop very
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 802/975
specific scenarios on use of funds on our sites. Jay is back and was on call and may have more to add.
Mike Kennealy
On Dec 5, 2015, at 2:26 PM, Kadish, Steven
(GOV) <[email protected]> wrote:
Not sure that I will be able to make, but I would like an update.
Will you be scheduling a call tomorrow?
I can do after 5 pm.
Sent from my iPhone
On Dec 5, 2015, at 11:01 AM, Kennealy, Michael (EOHED) <[email protected]> wrote:
Call info
Mike Kennealy
Begin forwarded message:
From:
"Kennealy, Michael (EOHED)" <[email protected]>
Date:
December 5, 2015 at 8:07:26 AM ESTTo:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 803/975
"Kennealy, Michael (EOHED)" <[email protected]>, "Sullivan, Jennifer F.
(ANF)" <[email protected]>, "Doolin, James" <[email protected]>, "Garrity, Rob (DOT)" <[email protected]>, "Frazier, Ricks
(EOHED)" <[email protected]>, "Kreuter, Erica (EOHED)" <[email protected]>
Cc:
"Ash, Jay (EOHED)"
< [email protected]>, "Lepore, Kristen (ANF)" <[email protected]>
Subject:
RE: Project
Plum
It looks like we have folks available for a call at 4:30pm today.Please use this number:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 804/975
.
Looking forward to
speaking then and discussing ideas from the group.
Mike
From:
Kennealy, Michael (EOHED)
Sent: Friday, December 04, 2015 6:23 PMTo: Jennifer F. Sullivan (ANF) ([email protected]); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks (EOHED); Kreuter, Erica
(EOHED)
Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)Subject: Project
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 805/975
Plum
I am
emailing
a
group
of
people
that I
hope
can
work
as a
team
this
weekend
and
into Monday
to
advance
the
Project
Plum
work.
As you
know,
we presented
a
proposal
to
Plum
that
relies
heavily
on I-
Cubed and
Massworks
funding,
and we
also
suggested
some
sites.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 806/975
The
good
news
from
today
is that
we are very
much
in the
game
here,
and
the
company
will be
visiting Boston
on
Wednesday
to look
at
sites,
with a
significant
internal
meeting
in
about
10
days.
(Note
– not
clear
yet
what
involvement
they
want
from
us on
Wednesday,
possibly
none
though
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 807/975
of
course
we are
pushing).
As
Steve and
Sec.
Lepore
and I
just
discussed,
we
think
our
mission at this
point is
to
make
this
proposed
infrastructure
funding
more
tangible
for
them –
how
could
these
dollars
be
used
to the
direct
benefit
of their
project?
Said
differently,
our
~$100
MM
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 808/975
dollar
proposal
was
$80
MM I-
Cubed/MassWorks
and $20
MM
local
property
tax
incentives;
they
know
how to
value the
$20
MM
but are
unsure
how to
value
the
$80
MM,
and we
need
this
proposal
to look
a lot
closer
to
$100
MM
than
$20
MM,
especially
in the
face of
competition
offering
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 809/975
incentives
that
are
much
easier
to
value.
To that
end,
there
are
two
deliverables
that
we
would like to
send
to the
company
by
noon
on
Monday:
1.
A
list/discussion
of
historical
examples
of
I-
Cubed
and
MassWorks projects.
I
have
attached
a
draft
memo
from
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 810/975
Erica
and
the
language
that
Jen
provided for
our
letter.
What
other
examples
can
we
provide,
and in
what
level
of
detail,
specifically
ones
that
are
as
analogous
as
possible
to
their
project?
2.
Specific
examples of
how
I-
Cubed
and
MassWorks
could
be
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 811/975
deployed
at
the
MCCA
and
Massport
sites.I
have
attached
information
about
those
sites.
No
site
or building
has
been
ruled
out,
but
initial
guidance
from
Plum’s
location
advisor
was
to
focus
on
the
sites
vs.
the
buildings.
Could I
ask the
following:
1.
Could
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 812/975
folks
start
giving
consideration
to
#1
and #2
above
and
develop
specific
ideas.
2.
Could
you please
also
suggest
(if
applicable)
others
from
your
organization
that could
help
in
this
effort.
3.
Can
we
all
get
on
a
call
tomorrow
at
4:30pm
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 813/975
to
discuss.
On the
call
tomorrow,
I would like to
review
what
we
think
the
deliverables
should
look
like and
discuss
specific
examples.
We
can
then
decide
what
other
needs
we
may
have,
and
plan
the
work
over
Sunday
and
into
Monday.
I hope
all of
that
makes
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 814/975
sense
and, as
always,
please
call
with
questions.Please
respond
as
soon
as you
can
with
respect
to your
availability tomorrow
at
4:30pm.
All the
best,
Mike
Mike
Kennealy
Assistant
Secretary
for
Business
Growth
The
Commonwealth
of
Massachusetts
Executive
Office
of
Housing
&
Economic
Development
One
Ashburton
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 815/975
Place,
Room
2101
Boston,
MA
02108
Office:617-
788-
3640
Cell:
617-
634-
4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 816/975
From: Ash, Jay (EOHED)
To: Kadish, Steven (GOV); Lepore, Kristen (ANF)
Cc: Kennealy, Michael (EOHED)
Subject: RE: Project Plum
Date: Sunday, December 06, 2015 2:54:27 PM
Steve and I will talk, and then we'll figure out if we need a phone call.
________________________________________
From: Kadish, Steven (GOV)
Sent: Sunday, December 06, 2015 12:50 PM
To: Lepore, Kristen (ANF)
Cc: Ash, Jay (EOHED); Kennealy, Michael (EOHED)
Subject: Re: Project Plum
Should/can we do a call tonight?
Thx.
Sent from my iPhone
> On Dec 6, 2015, at 11:53 AM, Lepore, Kristen (ANF)<[email protected]> wrote:
>
> We need to get the tax exempt question answered.
>
> Sent from my iPhone
>
>> On Dec 6, 2015, at 11:45 AM, Ash, Jay (EOHED)
<[email protected]> wrote:
>>
>> From today's call - MassWorks is most flexible, allowing for private
expenditures that are in the cause of economic development - thus,
utilizing the MassWorks/EDIP option is more flexible and direct than
utilizing some form of I-Cubed. I am working up a list of questions/points about the policy issues around utilizing more MassWorks,
maybe as much as $70-80m, for the direct subsidy of building a building.
Simple and effective. Will share the questions tonight.
>> ________________________________________
>> From: Kadish, Steven (GOV)
>> Sent: Sunday, December 06, 2015 8:03 AM
>> To: Kennealy, Michael (EOHED)
>> Cc: Lepore, Kristen (ANF); Ash, Jay (EOHED)
>> Subject: Re: Project Plum
>>
>> Thanks for the info.
>> I'll be on the road then, so I'm iffy about joining.
>> In any case, look forward to an update.
>>
>> Sent from my iPhone
>>
>> On Dec 6, 2015, at 7:47 AM, Kennealy, Michael (EOHED)
<[email protected]<mailto:[email protected]
ate.MA.US>> wrote:
>>
>> 10am. Just sent info.
>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 817/975
>> Mike Kennealy
>>
>> On Dec 6, 2015, at 7:21 AM, Kadish, Steven (GOV)
<[email protected]<mailto:[email protected]
.US>> wrote:
>>
>> Please let me know when today's call is and I will try to join you.
>>
>> Sent from my iPhone>>
>> On Dec 5, 2015, at 8:19 PM, Kennealy, Michael (EOHED)
<[email protected]<mailto:[email protected]
ate.MA.US>> wrote:
>>
>> Discussed in concept on call and just emailed Jim D.
>>
>> Mike Kennealy
>>
>> On Dec 5, 2015, at 6:48 PM, Lepore, Kristen (ANF)
<[email protected]<mailto:[email protected].
MA.US>> wrote:
>>
>> Did you ask massport to help with the marketing materials? They have a
marketing department. I asked Jen to make that request.
>>
>> Sent from my iPhone
>>
>> On Dec 5, 2015, at 6:26 PM, Kennealy, Michael (EOHED)
<[email protected]<mailto:[email protected]
ate.ma.us>> wrote:
>>
>> Steve, it was a productive call discussing the various ways
I-Cubed/MassWorks could be utilized to their benefit on our sites while
maintaining public benefit and other statute requirements. Jay, Ricks andI are speaking tomorrow AM in more detail re: MassWorks and Jen needs to
consult outside counsel on some I-Cubed matters. Will reconvene larger
group after Jen has what she needs. Goal is to develop very specific
scenarios on use of funds on our sites. Jay is back and was on call and
may have more to add.
>>
>> Mike Kennealy
>>
>> On Dec 5, 2015, at 2:26 PM, Kadish, Steven (GOV)
<[email protected]<mailto:[email protected]
.US>> wrote:
>>
>> Not sure that I will be able to make, but I would like an update.>>
>> Will you be scheduling a call tomorrow?
>> I can do after 5 pm.
>>
>> Sent from my iPhone
>>
>> On Dec 5, 2015, at 11:01 AM, Kennealy, Michael (EOHED)
<[email protected]<mailto:[email protected]
ate.MA.US>> wrote:
>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 818/975
>> Call info
>>
>> Mike Kennealy
>>
>> Begin forwarded message:
>>
>> From: "Kennealy, Michael (EOHED)"
<[email protected]<mailto:[email protected]
ate.MA.US>>>> Date: December 5, 2015 at 8:07:26 AM EST
>> To: "Kennealy, Michael (EOHED)"
<[email protected]<mailto:[email protected]
ate.MA.US>>, "Sullivan, Jennifer F. (ANF)"
<[email protected]<mailto:Jennifer.F.Sullivan@MassM
ail.State.MA.US>>, "Doolin, James"
<[email protected]<mailto:[email protected]>>, "Garrity, Rob (DOT)"
<[email protected]<mailto:[email protected]>>,
"Frazier, Ricks (EOHED)"
<[email protected]<mailto:[email protected]
.US>>, "Kreuter, Erica (EOHED)"
<[email protected]<mailto:[email protected]
.US>>
>> Cc: "Ash, Jay (EOHED)"
<[email protected]<mailto:[email protected]>>,
"Lepore, Kristen (ANF)"
<[email protected]<mailto:[email protected].
MA.US>>
>> Subject: RE: Project Plum
>>
>> It looks like we have folks available for a call at 4:30pm today.
Please use this number:
>>
>> access code
>>>> Looking forward to speaking then and discussing ideas from the group.
>>
>> Mike
>>
>> ________________________________
>> From: Kennealy, Michael (EOHED)
>> Sent: Friday, December 04, 2015 6:23 PM
>> To: Jennifer F. Sullivan (ANF)
([email protected]<mailto:Jennifer.F.Sullivan@MassM
ail.State.MA.US>); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks
(EOHED); Kreuter, Erica (EOHED)
>> Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)
>> Subject: Project Plum>>
>> I am emailing a group of people that I hope can work as a team this
weekend and into Monday to advance the Project Plum work. As you know, we
presented a proposal to Plum that relies heavily on I-Cubed and Massworks
funding, and we also suggested some sites. The good news from today is
that we are very much in the game here, and the company will be visiting
Boston on Wednesday to look at sites, with a significant internal meeting
in about 10 days. (Note – not clear yet what involvement they want from
us on Wednesday, possibly none though of course we are pushing).
>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 819/975
>> As Steve and Sec. Lepore and I just discussed, we think our mission at
this point is to make this proposed infrastructure funding more tangible
for them – how could these dollars be used to the direct benefit of their
project? Said differently, our ~$100 MM dollar proposal was $80 MM
I-Cubed/MassWorks and $20 MM local property tax incentives; they know how
to value the $20 MM but are unsure how to value the $80 MM, and we need
this proposal to look a lot closer to $100 MM than $20 MM, especially in
the face of competition offering incentives that are much easier to value.
>>>> To that end, there are two deliverables that we would like to send to
the company by noon on Monday:
>>
>>
>> 1. A list/discussion of historical examples of I-Cubed and
MassWorks projects. I have attached a draft memo from Erica and the
language that Jen provided for our letter. What other examples can we
provide, and in what level of detail, specifically ones that are as
analogous as possible to their project?
>>
>>
>> 2. Specific examples of how I-Cubed and MassWorks could be
deployed at the MCCA and Massport sites. I have attached information
about those sites. No site or building has been ruled out, but initial
guidance from Plum’s location advisor was to focus on the sites vs. the
buildings.
>>
>> Could I ask the following:
>>
>>
>> 1. Could folks start giving consideration to #1 and #2 above and
develop specific ideas.
>>
>>
>> 2. Could you please also suggest (if applicable) others from your organization that could help in this effort.
>>
>>
>> 3. Can we all get on a call tomorrow at 4:30pm to discuss.
>>
>> On the call tomorrow, I would like to review what we think the
deliverables should look like and discuss specific examples. We can then
decide what other needs we may have, and plan the work over Sunday and
into Monday.
>>
>> I hope all of that makes sense and, as always, please call with
questions. Please respond as soon as you can with respect to your
availability tomorrow at 4:30pm.>>
>> All the best,
>> Mike
>>
>> Mike Kennealy
>> Assistant Secretary for Business Growth
>> The Commonwealth of Massachusetts
>> Executive Office of Housing & Economic Development
>> One Ashburton Place, Room 2101
>> Boston, MA 02108
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 820/975
>> Office: 617-788-3640
>> Cell: 617-634-4762
>> [email protected]<mailto:[email protected]>
>>
>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 821/975
From: Kennealy, Michael (EOHED)
To: Kennealy, Michael (EOHED); Garrity, Rob (DOT); Doolin, James; Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED); Kreuter, Erica (EOHED)
Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF); Kadish, Steven (GOV)
Subject: Re: Project Plum
Date: Sunday, December 06, 2015 7:47:20 AM
If you are joining the 10am please use this number instead (previous number can only accommodate limited number of callers)
Mike Kennealy
On Dec 5, 2015, at 8:14 PM, Kennealy, Michael (EOHED) <[email protected]> wrote:
Same number tomorrow please 10am Jay, Mike, Ricks, Erica, others if interested and available. Whole group to reconvene when Jen has feedback from outside counsel.
Mike Kennealy
On Dec 5, 2015, at 8:08 AM, Kennealy, Michael (EOHED) <[email protected]> wrote:
It looks like we have folks available for a call at 4:30pm today. Please use this number:
access code .
Looking forward to speaking then and discussing ideas from the group.
Mike
From: Kennealy, Michael (EOHED)Sent: Friday, December 04, 2015 6:23 PMTo: Jennifer F. Sullivan (ANF) ([email protected]); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks (EOHED); Kreuter, Erica (EOHED)Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)
Subject: Project Plum
I am emailing a group of people that I hope can work as a team this
weekend and into Monday to advance the Project Plum work. As you
know, we presented a proposal to Plum that relies heavily on I-Cubed and
Massworks funding, and we also suggested some sites. The good news
from today is that we are very much in the game here, and the company
will be visiting Boston on Wednesday to look at sites, with a significant
internal meeting in about 10 days. (Note – not clear yet what
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 822/975
involvement they want from us on Wednesday, possibly none though of
course we are pushing).
As Steve and Sec. Lepore and I just discussed, we think our mission at this
point is to make this proposed infrastructure funding more tangible for
them – how could these dollars be used to the direct benefit of their
project? Said differently, our ~$100 MM dollar proposal was $80 MM I-Cubed/MassWorks and $20 MM local property tax incentives; they know
how to value the $20 MM but are unsure how to value the $80 MM, and
we need this proposal to look a lot closer to $100 MM than $20 MM,
especially in the face of competition offering incentives that are much
easier to value.
To that end, there are two deliverables that we would like to send to the
company by noon on Monday:
1. A list/discussion of historical examples of I-Cubed and MassWorks projects. I have attached a draft memo from Erica and the
language that Jen provided for our letter. What other examples
can we provide, and in what level of detail, specifically ones that
are as analogous as possible to their project?
2. Specific examples of how I-Cubed and MassWorks could be
deployed at the MCCA and Massport sites. I have attached
information about those sites. No site or building has been ruled
out, but initial guidance from Plum’s location advisor was to focus
on the sites vs. the buildings.
Could I ask the following:
1. Could folks start giving consideration to #1 and #2 above and
develop specific ideas.
2. Could you please also suggest (if applicable) others from your
organization that could help in this effort.
3. Can we all get on a call tomorrow at 4:30pm to discuss.
On the call tomorrow, I would like to review what we think the
deliverables should look like and discuss specific examples. We can then
decide what other needs we may have, and plan the work over Sunday
and into Monday.
I hope all of that makes sense and, as always, please call with questions.
Please respond as soon as you can with respect to your availability
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 823/975
tomorrow at 4:30pm.
All the best,
Mike
Mike Kennealy
Assistant Secretary for Business GrowthThe Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 824/975
From: Kadish, Steven (GOV)
To: Kennealy, Michael (EOHED)
Cc: Lepore, Kristen (ANF); Ash, Jay (EOHED)
Subject: Re: Project Plum
Date: Sunday, December 06, 2015 7:21:21 AM
Please let me know when today's call is and I will try to join you.
Sent from my iPhone
On Dec 5, 2015, at 8:19 PM, Kennealy, Michael (EOHED) <[email protected]> wrote:
Discussed in concept on call and just emailed Jim D.
Mike Kennealy
On Dec 5, 2015, at 6:48 PM, Lepore, Kristen (ANF)
<[email protected]> wrote:
Did you ask massport to help with the marketing materials? They have a marketing department. I asked Jen to make that request.
Sent from my iPhone
On Dec 5, 2015, at 6:26 PM, Kennealy, Michael (EOHED) <[email protected]> wrote:
Steve, it was a productive call discussing the various ways I-Cubed/MassWorks could be utilized to their benefit on our sites while maintaining public benefit and other statute requirements. Jay, Ricks and I are speaking tomorrow AM in more detail re: MassWorks and Jen needs to consult outside counsel on some I-Cubed matters. Will reconvene larger group after Jen has what she needs. Goal is to develop very specific scenarios on use of funds on our sites. Jay is back and was on call and may have more to add.
Mike Kennealy
On Dec 5, 2015, at 2:26 PM, Kadish, Steven (GOV) <[email protected]> wrote:
Not sure that I will be able to make, but I would like an update.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 825/975
Will you be scheduling a call tomorrow?I can do after 5 pm.
Sent from my iPhone
On Dec 5, 2015, at 11:01 AM, Kennealy, Michael (EOHED)
<[email protected]> wrote:
Call info
Mike Kennealy
Begin forwarded message:
From: "Kennealy, Michael (EOHED)" <[email protected]>
Date: December 5, 2015 at 8:07:26 AM ESTTo: "Kennealy, Michael (EOHED)" <[email protected]>,
"Sullivan, Jennifer F. (ANF)" <[email protected]>, "Doolin, James" <[email protected]>, "Garrity, Rob (DOT)" <[email protected]>, "Frazier, Ricks (EOHED)" <[email protected]>,
"Kreuter, Erica (EOHED)" <[email protected]>
Cc: "Ash, Jay (EOHED)" < [email protected]>, "Lepore, Kristen (ANF)"
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 826/975
Subject: RE:
Project Plum
It looks like we have folks available for a call at 4:30pm today. Please use this number:
Looking forward to speaking then and discussing ideas from the group.
Mike
From: Kennealy, Michael (EOHED)Sent: Friday, December 04, 2015 6:23 PMTo: Jennifer F. Sullivan (ANF) ([email protected]); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks (EOHED); Kreuter, Erica (EOHED)Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)Subject: Project Plum
I am emailing a
group of people that
I hope can work as a
team this weekend
and into Monday to
advance the Project
Plum work. As you
know, we presented
a proposal to Plum
that relies heavily
on I-Cubed and
Massworks funding,
and we also
suggested some
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 827/975
sites. The good
news from today is
that we are very
much in the game
here, and the
company will be
visiting Boston on Wednesday to look
at sites, with a
significant internal
meeting in about 10
days. (Note – not
clear yet what
involvement they
want from us on
Wednesday,
possibly none though of course we
are pushing).
As Steve and Sec.
Lepore and I just
discussed, we think
our mission at this
point is to make this
proposed
infrastructure
funding more
tangible for them –
how could these
dollars be used to
the direct benefit of
their project? Said
differently, our
~$100 MM dollar
proposal was $80
MM I-
Cubed/MassWorks
and $20 MM local
property tax
incentives; they
know how to value
the $20 MM but are
unsure how to value
the $80 MM, and
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 828/975
we need this
proposal to look a
lot closer to $100
MM than $20 MM,
especially in the
face of competition
offering incentives that are much easier
to value.
To that end, there
are two deliverables
that we would like
to send to the
company by noon
on Monday:
1. A
list/discussion
of historical
examples of
I-Cubed and
MassWorks
projects. I
have
attached a
draft memo
from Erica
and the
language
that Jen
provided for
our letter.
What other
examples
can we
provide, and
in what level
of detail,
specifically
ones that
are as
analogous
as possible
to their
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 829/975
project?
2. Specific
examples of
how I-Cubed
and
MassWorks could be
deployed at
the MCCA
and
Massport
sites. I have
attached
information
about those
sites. No site or
building has
been ruled
out, but
initial
guidance
from Plum’s
location
advisor was
to focus on
the sites vs.
the
buildings.
Could I ask the
following:
1. Could folks
start giving
consideration
to #1 and #2
above and
develop
specific
ideas.
2. Could you
please also
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 830/975
suggest (if
applicable)
others from
your
organization
that could
help in this effort.
3. Can we all
get on a call
tomorrow at
4:30pm to
discuss.
On the call
tomorrow, I would like to review what
we think the
deliverables should
look like and discuss
specific examples.
We can then decide
what other needs
we may have, and
plan the work over
Sunday and into
Monday.
I hope all of that
makes sense and, as
always, please call
with questions.
Please respond as
soon as you can
with respect to your
availability
tomorrow at
4:30pm.
All the best,
Mike
Mike Kennealy
Assistant Secretary
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 831/975
for Business Growth
The Commonwealth
of Massachusetts
Executive Office of
Housing & Economic
Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-
3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 832/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 833/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 834/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 835/975
From: [email protected]
To: Kreuter, Erica (EOHED)
Cc: Frazier, Ricks (EOHED)
Subject: Re: Project Plum
Date: Saturday, December 05, 2015 8:25:33 PM
Thanks! Nothing needed in advance.
Mike Kennealy
On Dec 5, 2015, at 8:23 PM, Kreuter, Erica (EOHED) <[email protected]> wrote:
Yes. I will be on the call tomorrow. Sorry I missed today's call, let me know if there is anything you need from me in advance of tomorrow's call.
Thanks
Erica Kreuter
Director, MassWorks Infrastructure Program
Executive Office of Housing & Economic Development
One Ashburton Place, Suite 2101 | Boston, MA 02108
Office: (617)788-3631 | Email:[email protected]
www.mass.gov/mpro | @massworks
On Dec 5, 2015, at 8:21 PM, "Kennealy, Michael (EOHED)" <[email protected]> wrote:
No problem. Can you join 10am tomorrow
Mike Kennealy
On Dec 5, 2015, at 5:02 PM, Kreuter, Erica (EOHED) <[email protected]> wrote:
Mike,
I tried joining the conference line, but I was not able to
join because the line had been maxed out.
Thanks,
Erica
Erica Kreuter
Director, MassWorks Infrastructure Program
Executive Office of Housing & Economic Development
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 836/975
One Ashburton Place, Suite 2101 | Boston, MA 02108
Office: (617)788-3631 | Email:[email protected]
www.mass.gov/mpro | @massworks
On Dec 5, 2015, at 8:08 AM, "Kennealy, Michael (EOHED)" <[email protected]> wrote:
It looks like we have folks available for a call at 4:30pm today.Please use this number:
access code .
Looking forward to speaking then and discussing ideas from the group.
Mike
From: Kennealy, Michael (EOHED)Sent: Friday, December 04, 2015 6:23 PMTo: Jennifer F. Sullivan (ANF) ([email protected]); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks (EOHED); Kreuter, Erica (EOHED)Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)Subject: Project Plum
I am emailing a group of people that I hope can
work as a team this weekend and into Monday
to advance the Project Plum work. As you
know, we presented a proposal to Plum that relies heavily on I-Cubed and Massworks
funding, and we also suggested some sites.
The good news from today is that we are very
much in the game here, and the company will
be visiting Boston on Wednesday to look at
sites, with a significant internal meeting in
about 10 days. (Note – not clear yet what
involvement they want from us on
Wednesday, possibly none though of course
we are pushing).
As Steve and Sec. Lepore and I just discussed,
we think our mission at this point is to make
this proposed infrastructure funding more
tangible for them – how could these dollars be
used to the direct benefit of their project?
Said differently, our ~$100 MM dollar proposal
was $80 MM I-Cubed/MassWorks and $20
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 837/975
MM local property tax incentives; they know
how to value the $20 MM but are unsure how
to value the $80 MM, and we need this
proposal to look a lot closer to $100 MM than
$20 MM, especially in the face of competition
offering incentives that are much easier to
value.
To that end, there are two deliverables that we
would like to send to the company by noon on
Monday:
1. A list/discussion of historical examples
of I-Cubed and MassWorks projects. I
have attached a draft memo from
Erica and the language that Jen
provided for our letter. What other examples can we provide, and in what
level of detail, specifically ones that are
as analogous as possible to their
project?
2. Specific examples of how I-Cubed and
MassWorks could be deployed at the
MCCA and Massport sites. I have
attached information about those
sites. No site or building has been
ruled out, but initial guidance from
Plum’s location advisor was to focus on
the sites vs. the buildings.
Could I ask the following:
1. Could folks start giving consideration
to #1 and #2 above and develop
specific ideas.
2. Could you please also suggest (if
applicable) others from your
organization that could help in this
effort.
3. Can we all get on a call tomorrow at
4:30pm to discuss.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 838/975
On the call tomorrow, I would like to review
what we think the deliverables should look like
and discuss specific examples. We can then
decide what other needs we may have, and
plan the work over Sunday and into Monday.
I hope all of that makes sense and, as always, please call with questions. Please respond as
soon as you can with respect to your
availability tomorrow at 4:30pm.
All the best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of MassachusettsExecutive Office of Housing & Economic
Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 839/975
From: Kennealy, Michael (EOHED)
To: Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED); Ross, Robert (ANF)
Cc: Povich, Lon (GOV); Cosco, Jonathan (EOHED); Lepore, Kristen (ANF)
Subject: RE: Project Plum
Date: Monday, November 30, 2015 1:09:00 PM
Sure
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Sullivan, Jennifer F. (ANF)
Sent: Monday, November 30, 2015 1:08 PM
To: Kennealy, Michael (EOHED) <[email protected]>; Frazier, Ricks (EOHED)
<[email protected]>; Ross, Robert (ANF) <[email protected]>
Cc: Povich, Lon (GOV) <[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Lepore, Kristen (ANF)
Subject: RE: Project Plum
Can we get on a call now?
From: Kennealy, Michael (EOHED)Sent: Monday, November 30, 2015 1:03 PMTo: Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED); Ross, Robert (ANF)Cc: Povich, Lon (GOV); Cosco, Jonathan (EOHED); Lepore, Kristen (ANF)Subject: RE: Project Plum
We are increasing the MassWorks number to $40 million.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 840/975
From: Sullivan, Jennifer F. (ANF)
Sent: Monday, November 30, 2015 12:54 PM
To: Frazier, Ricks (EOHED) <[email protected]>; Ross, Robert (ANF)
Cc: Povich, Lon (GOV) <[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Kennealy, Michael (EOHED)
<[email protected]>; Lepore, Kristen (ANF) <[email protected]>
Subject: RE: Project Plum
•
Tax credits under the Economic Development Incentive Program (“EDIP”) up to
ten percent of the qualifying investment in a certified project [orapproximately
$20-30million], to be available over a period of five years. [where does the 5 year
limit come from?]
• Up to $32M in grants under the MassWorks program. [Is this $32M an estimate
of how much qualifying infrastructure they would need? Could it be increased if
expended over a period of years, if cap were available to do so?]
• A local tax incentive with a value of $20M over multiple years.
From: Frazier, Ricks (EOHED)Sent: Monday, November 30, 2015 10:59 AMTo: Ross, Robert (ANF); Sullivan, Jennifer F. (ANF)
Cc: Povich, Lon (GOV); Cosco, Jonathan (EOHED); Kennealy, Michael (EOHED); Lepore, Kristen (ANF)Subject: Project Plum
Bob and Jennifer
Thank you for your assistance.
Ricks
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 841/975
From: Kennealy, Michael (EOHED)
To: Sullivan, Jennifer F. (ANF); Frazier, Ricks (EOHED); Ross, Robert (ANF)
Cc: Povich, Lon (GOV); Cosco, Jonathan (EOHED); Lepore, Kristen (ANF)
Subject: RE: Project Plum
Date: Monday, November 30, 2015 11:49:00 AM
Attachments: Plum memo Nov 30.docx
FYI – this is the format I suggest using for the cover memo. We would therefore be submitting 3
items today:
-
This memo, with language from the City and language from DEP inserted when available; I
am adding MassWorks language now. Awaiting guidance from BRA now on construction
cost/sf; this will drive the calculation of the likely EDIP award which I will then express on a
per job basis too.
- Ricks’ memo
- Application materials and other info on IBM and Liberty Mutual
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Sullivan, Jennifer F. (ANF)
Sent: Monday, November 30, 2015 11:03 AM
To: Frazier, Ricks (EOHED) <[email protected]>; Ross, Robert (ANF)
Cc: Povich, Lon (GOV) <[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Kennealy, Michael (EOHED)
<[email protected]>; Lepore, Kristen (ANF)
Subject: RE: Project Plum
Thanks, I am reviewing now.
From: Frazier, Ricks (EOHED)Sent: Monday, November 30, 2015 10:59 AMTo: Ross, Robert (ANF); Sullivan, Jennifer F. (ANF)Cc: Povich, Lon (GOV); Cosco, Jonathan (EOHED); Kennealy, Michael (EOHED); Lepore, Kristen (ANF)Subject: Project Plum
Bob and Jennifer
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 842/975
Thank you for your assistance.
Ricks
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 843/975
MEMORANDUM
TO: Amy Eisenstadt, State Tax Counsel, General Electric Company
FROM: Mike Kennealy, Assistant Secretary for Business Growth, Commonwealth of
Massachusetts
John Barros, Chief of Economic Development, City of Boston
DATE: November 30, 2015
RE: Project Plum State and City tax incentives
Amy, we are pleased to provide to you today the following:
-
Summary of anticipated incentives (below)
- Memo summarizing statutory authority, application process, and other information with
respect to State incentive programs.
- Application materials, minutes, and resolutions for the IBM and Liberty Mutual EDIP
awards.
We will make a full submission of our proposal to Ann Klee tomorrow including suggested sites
and other benefits. As currently contemplated, our incentive package would include the
following:
Economic Development Incentive Program (EDIP) tax incentives
MassWorks funding
Local property tax abatement
Environmental remediation funds
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 844/975
I-Cubed
The State and City are still prepared to invest $50 million through the State’s Infrastructure
Investment Incentive (I-Cubed) program for construction of a parking facility and the
foundation for a high rise above the garage as detailed in our proposal dated November 21.
Note – based on statutory restrictions we would utilize either I-Cubed or a combination of EDIP
and MassWorks.
The total incentive package we are proposing therefore is $ ___ to $ ___
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 845/975
From: Kennealy, Michael (EOHED)
To: Pham, Nam (EOHED); Cosco, Jonathan (EOHED); Frazier, Ricks (EOHED)
Cc: Cosco, Jonathan (EOHED); Milano, Peter (MOBD)
Subject: RE: Project Plum
Date: Monday, November 30, 2015 8:46:00 AM
Nam,
- We don’t need the budget
- We really need the information on Liberty Mutual and IBM ASAP
- Whatever can be refundable will be refundable; there will be no special legislation
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Pham, Nam (EOHED)
Sent: Monday, November 30, 2015 8:12 AM
To: Cosco, Jonathan (EOHED) <[email protected]>; Frazier, Ricks (EOHED) <[email protected]>;
Kennealy, Michael (EOHED) <[email protected]>
Cc: Pham, Nam (EOHED) <[email protected]>; Cosco, Jonathan (EOHED) <[email protected]>
Subject: RE: Project Plum
I have asked Anamarie to review our existing projections of EDIP awards to determine what we may have available. In the past, there was one year that the Secretary gave more than the cap. So if needs be, there is precedent.
In short, we can do it, just not much refundable.
A special legislation would make more possible.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Cosco, Jonathan (SEA)" < [email protected]>Date: 11/29/2015 5:04 PM (GMT-05:00)To: "Frazier, Ricks (EOHED)" <[email protected]>, "Kennealy, Michael (EOHED)" <[email protected]>Cc: "Pham, Nam (EOHED)" <[email protected]>, "Cosco, Jonathan (EOHED)" <[email protected]>Subject: RE: Project Plum
Thanks Ricks. I assume you will send this to Lon and whomever else needs to see it this evening? Or if you want
me to forward it please let me know.
Jon ________________________________________
From: Frazier, Ricks (EOHED)
Sent: Sunday, November 29, 2015 3:15 PM
To: Cosco, Jonathan (EOHED); Kennealy, Michael (EOHED)
Cc: '[email protected]'
Subject: RE: Project Plum
Jon
Ricks
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 846/975
From: Cosco, Jonathan (EOHED)
Sent: Sunday, November 29, 2015 1:46 PM
To: Kennealy, Michael (EOHED); Frazier, Ricks (EOHED)
Cc: '[email protected]'; Cosco, Jonathan (EOHED)
Subject: RE: Project Plum
Here is a first draft.
Haven’t even had a chance to read
through yet for typos.
___________________________________________
Jonathan M. Cosco
Senior Deputy General Counsel
Executive Office of Housing and Economic Development
Commonwealth of Massachusetts
One Ashburton Place, 21st Floor
Boston, MA 02114
617-788-3628
[email protected]<mailto:[email protected]>
From: Cosco, Jonathan (EOHED)
Sent: Sunday, November 29, 2015 11:38 AM
To: Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Milano, Peter (MOBD)
Cc: '[email protected]'
Subject: RE: Project Plum
___________________________________________
Jonathan M. Cosco
Senior Deputy General Counsel
Executive Office of Housing and Economic Development
Commonwealth of Massachusetts
One Ashburton Place, 21st Floor
Boston, MA 02114
617-788-3628
[email protected]<mailto:[email protected]>
From: Kennealy, Michael (EOHED)
Sent: Sunday, November 29, 2015 7:59 AM
To: Frazier, Ricks (EOHED); Milano, Peter (MOBD); Cosco, Jonathan (EOHED); Servetnick, Adrian (EOHED)
Cc: '[email protected]'
Subject: RE: Project Plum
Forgot to attach document - here it is.
________________________________
From: Frazier, Ricks (EOHED)
Sent: Saturday, November 28, 2015 7:53 PM
To: Milano, Peter (MOBD); Kennealy, Michael (EOHED); Cosco, Jonathan (EOHED); Servetnick, Adrian (EOHED)
Cc: '[email protected]'
Subject: RE: Project Plum
PRIVILEGED ATTORNEY-CLIENT COMMUNICATION
Mike -- I
Ricks
From: Milano, Peter (MOBD)
Sent: Saturday, November 28, 2015 5:43 PM
To: Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Cosco, Jonathan (EOHED); Servetnick, Adrian (EOHED)
Cc: '[email protected]'
Subject: RE: Project Plum
Hi all,
Mike, you have summed the call up well. I may be simply rephrasing a few items, but they asked additionally:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 847/975
* Can Massworks be used for building renovations to publically owned building?
* What if they choose a privately owned building? How will this affect incentive offer?
* Co. seeking a MOU prior to application process for EDIP and Massworks.
* We need to provide the Liberty Mutual and IBM deals for their review. (I do believe the EDIP team can provide this info Monday morning.) I will be sure to
gather this info.
Regards,
Peter
Peter Milano
Senior Director, Business Development
Massachusetts Office of Business Development
(978) 970-1193
360 Merrimack Street
Building 5
Lawrence, MA 01843
www.mass.gov/mobd<https://urldefense.proofpoint.com/v2/url?u=http-
3A__www.mass.gov_mobd&d=BQMFAw&c=wgu6hzw1MOrcVMSMqu8IcS59mhBvl1Fc7tKn_Em0PVg&r=Yuk4lmTMoPibjekLWCuQqezcVefoEgXmdWWA-
8DeSYI&m=9CSSqQXeHq44CDtozlaS0Pt2WwgJnIfyjxb0VjkL04c&s=FGuVe0QV5bTJjIF2NWtcMHweGkIa7C1iL0SY8rGege8&e=>
This communication and any communication incorporated herein, including attachments, may be subject to public disclosure as a “public record,” as defined by
M. G. L. c. 4, § 7, and subject to public inspection, examination and copying pursuant to M. G. L. c. 66, § 10. Any communication with this agency whether in
response to this communication or otherwise may itself be subject to public inspection and copying pursuant to M. G. L. c. 66, § 10, unless protected by statutory
exemption.
From: Kennealy, Michael (EOHED)
Sent: Saturday, November 28, 2015 5:30 PM
To: Frazier, Ricks (EOHED) <[email protected]<mailto:[email protected]>>; Cosco, Jonathan (EOHED)
<[email protected]<mailto:[email protected]>>; Milano, Peter (MOBD)
< [email protected]<mailto:[email protected]>>; Servetnick, Adrian (EOHED)
<[email protected]<mailto:[email protected]>>
Subject: Project Plum
Folks,
As Jon and Peter know from our call yesterday, we are facing an urgent and close deadline on Project Plum. We will need to pull all materials together for our
offer by 12pm on Monday. There are a number of components of the offer, but the items most relevant for the folks on this email relate to EDIP and MassWorks.
Specifically what we need are:
1. The language of the statute of each program or a summary thereof (Ricks, Jon).
u
- Confirmation of what portion of the award can be refundable. My understanding is that we could by statute do $1 MM of a JCP and $5 MM of EEP, and then for
an award of $9.6 MM per year for 5 years, this would mean $3.6 MM would not be refundable.
- Confirmation that we can do the up to $32 MM in MassWorks that we are offering, and
- Application process and requirements for each of EDIP and MassWorks This is all available on the MOBD and MW websites.
- For MassWorks, and this will likely be in the statute,
2. What was in the public record for the Liberty Mutual deal which we discussed as an example. I think we should provide:
- Press releases - Peter has sent me Boston's but we need anything from HED (Adrian)
- Application (Jon has already asked Ann Marie to pull - can she do this early enough on Monday? Can anybody reach her this weekend?)
- EACC minutes (Jon has already asked Ann Marie to pull - can she do this early enough on Monday? Can anybody reach her this weekend?)
- Anything else in the public domain (Adrian)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 848/975
With respect to the “public record”, most of the documentation related to these projects are “public records” whether previously released or not. The question will
be what you can find in the time available as opposed to what is “public”.
Jon and Peter - please let me know if I have overlooked anything from our call yesterday.
If folks could let me know very soon when all of this could be ready that would be much appreciated - I
have a call with the Governor's office and various Secretaries tomorrow at noon; I have said that we would be responsible for this info and would like to be able to
provide an update then.
Thanks,
Mike
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 849/975
From: Kennealy, Michael (EOHED)
To: Kennealy, Michael (EOHED); Cosco, Jonathan (EOHED); Frazier, Ricks (EOHED)
Subject: RE: Project Plum
Date: Sunday, November 29, 2015 1:46:44 PM
I'm on
________________________________________
From: Kennealy, Michael (EOHED)
Sent: Sunday, November 29, 2015 1:37 PM
To: Cosco, Jonathan (EOHED); Frazier, Ricks (EOHED)
Subject: RE: Project Plum
Can we dial back in here at 1:45pm?
access code
________________________________________
From: Cosco, Jonathan (EOHED)
Sent: Sunday, November 29, 2015 1:27 PMTo: Frazier, Ricks (EOHED); Kennealy, Michael (EOHED)
Subject: RE: Project Plum
Can we round up again quickly?
-----Original Message-----
From: Frazier, Ricks (EOHED)
Sent: Sunday, November 29, 2015 11:50 AM
To: Kennealy, Michael (EOHED)
Cc: Cosco, Jonathan (EOHED)Subject: Re: Project Plum
Ok
Sent from my iPhone
> On Nov 29, 2015, at 10:46 AM, Kennealy, Michael (EOHED)
<[email protected]> wrote:
>
> Number below
> PIN
>
> This is with Kadish, Cabinet.
>
> ________________________________________
> From: Cosco, Jonathan (EOHED)
> Sent: Sunday, November 29, 2015 11:44 AM
> To: Kennealy, Michael (EOHED); Frazier, Ricks (EOHED)
> Subject: RE: Project Plum
>
> Yes, same call-in info or a different line?
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 850/975
>
> -----Original Message-----
> From: Kennealy, Michael (EOHED)
> Sent: Sunday, November 29, 2015 11:36 AM
> To: Cosco, Jonathan (EOHED); Frazier, Ricks (EOHED)
> Subject: RE: Project Plum
>
> Guys, can one or both of you join the 12pm call?
>> PIN
>
> ________________________________________
> From: Cosco, Jonathan (EOHED)
> Sent: Saturday, November 28, 2015 9:22 PM
> To: Kennealy, Michael (EOHED); Frazier, Ricks (EOHED)
> Subject: RE: Project Plum
>
> Mike, I have been out of town but back this evening. I'll be coming
into the office tomorrow AM
>
> Jon
> ________________________________________
> From: Kennealy, Michael (EOHED)
> Sent: Saturday, November 28, 2015 5:30 PM
> To: Frazier, Ricks (EOHED); Cosco, Jonathan (EOHED); Milano, Peter
(MOBD); Servetnick, Adrian (EOHED)
> Subject: Project Plum
>
> Folks,
>
> As Jon and Peter know from our call yesterday, we are facing an urgentand close deadline on Project Plum. We will need to pull all materials
together for our offer by 12pm on Monday. There are a number of
components of the offer, but the items most relevant for the folks on this
email relate to EDIP and MassWorks. Specifically what we need are:
>
> 1. The language of the statute of each program or a summary thereof
(Ricks, Jon).
> - Confirmation of what portion of the award can be refundable. My
understanding is that we could by statute do $1 MM of a JCP and $5 MM of EEP, and then for an award of $9.6 MM per year for 5 years, this would
mean $3.6 MM would not be refundable.
> - Confirmation that we can do the up to $32 MM in MassWorks that we are
offering, and .
> - Application process and requirements for each of EDIP and MassWorks
> - For MassWorks, and this will likely be in the statute,
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 851/975
>
> 2. What was in the public record for the Liberty Mutual deal which we
discussed as an example. I think we should provide:
> - Press releases - Peter has sent me Boston's but we need anything fromHED (Adrian)
> - Application (Jon has already asked Ann Marie to pull - can she do this
early enough on Monday? Can anybody reach her this weekend?)
> - EACC minutes (Jon has already asked Ann Marie to pull - can she do
this early enough on Monday? Can anybody reach her this weekend?)
> - Anything else in the public domain (Adrian)
>
> Jon and Peter - please let me know if I have overlooked anything from
our call yesterday.
If folks could let me know very soon when all of this could be
ready that would be much appreciated - I have a call with the Governor's
office and various Secretaries tomorrow at noon; I have said that we would
be responsible for this info and would like to be able to provide an
update then.
>
> Thanks,
> Mike
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 852/975
From: [email protected]
To: Kadish, Steven (GOV)
Cc: Lepore, Kristen (ANF)
Subject: Re: Project Plum
Date: Saturday, December 05, 2015 3:03:12 PM
Yes but not sure when yet. Will send you update later.
Mike Kennealy
On Dec 5, 2015, at 2:26 PM, Kadish, Steven (GOV) <[email protected]> wrote:
Not sure that I will be able to make, but I would like an update.
Will you be scheduling a call tomorrow?I can do after 5 pm.
Sent from my iPhone
On Dec 5, 2015, at 11:01 AM, Kennealy, Michael (EOHED) <[email protected]> wrote:
Call info
Mike Kennealy
Begin forwarded message:
From: "Kennealy, Michael (EOHED)" <[email protected]>Date: December 5, 2015 at 8:07:26 AM ESTTo: "Kennealy, Michael (EOHED)" <[email protected]>, "Sullivan, Jennifer F. (ANF)" <[email protected]>, "Doolin, James" <[email protected]>, "Garrity, Rob (DOT)" <[email protected]>, "Frazier, Ricks (EOHED)" <[email protected]>, "Kreuter, Erica (EOHED)" <[email protected]>Cc: "Ash, Jay (EOHED)" < [email protected]>, "Lepore, Kristen (ANF)" <[email protected]>Subject: RE: Project Plum
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 853/975
It looks like we have folks available for a call at 4:30pm today. Please use this number:
access code .
Looking forward to speaking then and discussing ideas from the group.
Mike
From: Kennealy, Michael (EOHED)Sent: Friday, December 04, 2015 6:23 PMTo: Jennifer F. Sullivan (ANF) ([email protected]); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks (EOHED); Kreuter, Erica (EOHED)Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)Subject: Project Plum
I am emailing a group of people that I hope can work as a
team this weekend and into Monday to advance the Project Plum work. As you know, we presented a proposal to Plum
that relies heavily on I-Cubed and Massworks funding, and
we also suggested some sites. The good news from today is
that we are very much in the game here, and the company
will be visiting Boston on Wednesday to look at sites, with a
significant internal meeting in about 10 days. (Note – not
clear yet what involvement they want from us on
Wednesday, possibly none though of course we are
pushing).
As Steve and Sec. Lepore and I just discussed, we think our
mission at this point is to make this proposed infrastructure
funding more tangible for them – how could these dollars
be used to the direct benefit of their project? Said
differently, our ~$100 MM dollar proposal was $80 MM I-
Cubed/MassWorks and $20 MM local property tax
incentives; they know how to value the $20 MM but are
unsure how to value the $80 MM, and we need this
proposal to look a lot closer to $100 MM than $20 MM,
especially in the face of competition offering incentives that
are much easier to value.
To that end, there are two deliverables that we would like to
send to the company by noon on Monday:
1. A list/discussion of historical examples of I-Cubed
and MassWorks projects. I have attached a draft
memo from Erica and the language that Jen
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 854/975
provided for our letter. What other examples can
we provide, and in what level of detail, specifically
ones that are as analogous as possible to their
project?
2. Specific examples of how I-Cubed and MassWorks
could be deployed at the MCCA and Massport sites.I have attached information about those sites. No
site or building has been ruled out, but initial
guidance from Plum’s location advisor was to focus
on the sites vs. the buildings.
Could I ask the following:
1. Could folks start giving consideration to #1 and #2
above and develop specific ideas.
2. Could you please also suggest (if applicable) others
from your organization that could help in this effort.
3. Can we all get on a call tomorrow at 4:30pm to
discuss.
On the call tomorrow, I would like to review what we think
the deliverables should look like and discuss specific
examples. We can then decide what other needs we may
have, and plan the work over Sunday and into Monday.
I hope all of that makes sense and, as always, please call with
questions. Please respond as soon as you can with respect
to your availability tomorrow at 4:30pm.
All the best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 855/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 856/975
From: Kennealy, Michael (EOHED)
To: Cosco, Jonathan (EOHED); Frazier, Ricks (EOHED)
Subject: RE: Project Plum
Date: Sunday, November 29, 2015 11:45:49 AM
Number below
PIN
This is with Kadish, Cabinet.
________________________________________
From: Cosco, Jonathan (EOHED)
Sent: Sunday, November 29, 2015 11:44 AM
To: Kennealy, Michael (EOHED); Frazier, Ricks (EOHED)
Subject: RE: Project Plum
Yes, same call-in info or a different line?
-----Original Message-----From: Kennealy, Michael (EOHED)
Sent: Sunday, November 29, 2015 11:36 AM
To: Cosco, Jonathan (EOHED); Frazier, Ricks (EOHED)
Subject: RE: Project Plum
Guys, can one or both of you join the 12pm call?
PIN
________________________________________
From: Cosco, Jonathan (EOHED)
Sent: Saturday, November 28, 2015 9:22 PM
To: Kennealy, Michael (EOHED); Frazier, Ricks (EOHED)Subject: RE: Project Plum
Mike, I have been out of town but back this evening. I'll be coming into
the office tomorrow AM
Jon
________________________________________
From: Kennealy, Michael (EOHED)
Sent: Saturday, November 28, 2015 5:30 PM
To: Frazier, Ricks (EOHED); Cosco, Jonathan (EOHED); Milano, Peter (MOBD);
Servetnick, Adrian (EOHED)
Subject: Project Plum
Folks,
As Jon and Peter know from our call yesterday, we are facing an urgent and
close deadline on Project Plum. We will need to pull all materials
together for our offer by 12pm on Monday. There are a number of
components of the offer, but the items most relevant for the folks on this
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 857/975
email relate to EDIP and MassWorks. Specifically what we need are:
1. The language of the statute of each program or a summary thereof
(Ricks, Jon).
- Confirmation of what portion of the award can be refundable. Myunderstanding is that we could by statute do $1 MM of a JCP and $5 MM of
EEP, and then for an award of $9.6 MM per year for 5 years, this would
mean $3.6 MM would not be refundable.
- Confirmation that we can do the up to $32 MM in MassWorks that we are
offering, and .
- Application process and requirements for each of EDIP and MassWorks
- For MassWorks, and this will likely be in the statute,
2. What was in the public record for the Liberty Mutual deal which we
discussed as an example. I think we should provide:
- Press releases - Peter has sent me Boston's but we need anything from
HED (Adrian)
- Application (Jon has already asked Ann Marie to pull - can she do this
early enough on Monday? Can anybody reach her this weekend?)
- EACC minutes (Jon has already asked Ann Marie to pull - can she do this
early enough on Monday? Can anybody reach her this weekend?)- Anything else in the public domain (Adrian)
Jon and Peter - please let me know if I have overlooked anything from our
call yesterday.
If folks could let me know very soon when all of this could be
ready that would be much appreciated - I have a call with the Governor's
office and various Secretaries tomorrow at noon; I have said that we would
be responsible for this info and would like to be able to provide an
update then.
Thanks,
Mike
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 858/975
From: Kennealy, Michael (EOHED)
To: Frazier, Ricks (EOHED); Milano, Peter (MOBD); Cosco, Jonathan (EOHED); Servetnick, Adrian (EOHED)
Cc: "[email protected]"
Subject: RE: Project Plum
Date: Sunday, November 29, 2015 8:00:04 AM
Attachments: Project Plum - Chart of Second Offer.docx
Forgot to attach document - here it is.
From: Frazier, Ricks (EOHED)Sent: Saturday, November 28, 2015 7:53 PMTo: Milano, Peter (MOBD); Kennealy, Michael (EOHED); Cosco, Jonathan (EOHED); Servetnick, Adrian (EOHED)Cc: '[email protected]'Subject: RE: Project Plum
PRIVILEGED ATTORNEY-CLIENT COMMUNICATION
Ricks
From: Milano, Peter (MOBD)
Sent: Saturday, November 28, 2015 5:43 PM
To: Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Cosco, Jonathan (EOHED); Servetnick, Adrian
(EOHED)Cc: '[email protected]'
Subject: RE: Project Plum
Hi all,
Mike, you have summed the call up well. I may be simply rephrasing a few items, but
they asked additionally:
Can Massworks be used for building renovations to publically owned building?
What if they choose a privately owned building? How will this affect incentive
offer?
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 859/975
Co. seeking a MOU prior to application process for EDIP and Massworks.
We need to provide the Liberty Mutual and IBM deals for their review. (I do
believe the EDIP team can provide this info Monday morning.) I will be sure to
gather this info.
Regards,
Peter
Peter MilanoSenior Director, Business Development
Massachusetts Office of Business Development
(978) 970-1193
360 Merrimack Street
Building 5
Lawrence, MA 01843
www.mass.gov/mobd
This communication and any communication incorporated herein, including attachments, may be subject to public
disclosure as a “public record,” as defined by M. G. L. c. 4, § 7, and subject to public inspection, examination and
copying pursuant to M. G. L. c. 66, § 10. Any communication with this agency whether in response to this
communication or otherwise may itself be subject to public inspection and copying pursuant to M. G. L. c. 66, § 10,
unless protected by statutory exemption.
From: Kennealy, Michael (EOHED)
Sent: Saturday, November 28, 2015 5:30 PM
To: Frazier, Ricks (EOHED) <[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Milano, Peter (MOBD)
<[email protected]>; Servetnick, Adrian (EOHED)
<[email protected]>Subject: Project Plum
Folks,
As Jon and Peter know from our call yesterday, we are facing an urgent and close deadline on Project Plum. We will need to pull all materials together for our offer by 12pm on Monday. There are a number of components of the offer, but the items most relevant for the folks on this email relate to EDIP and MassWorks. Specifically what we need are:
1. The language of the statute of each program or a summary thereof (Ricks, Jon).
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 860/975
- Confirmation of what portion of the award can be refundable. My understanding is that we could by statute do $1 MM of a JCP and $5 MM of EEP, and then for an award of $9.6 MM per year for 5 years,
this would mean $3.6 MM would not be refundable.
, - Confirmation that we can do the up to $32 MM in MassWorks that we are offering, and
- Application process and requirements for each of EDIP and MassWorks
- For MassWorks, and this will likely be in the statute,
2. What was in the public record for the Liberty Mutual deal which we discussed as an example. I think we should provide:- Press releases - Peter has sent me Boston's but we need anything from HED (Adrian)- Application (Jon has already asked Ann Marie to pull - can she do this early enough on Monday? Can anybody reach her this weekend?)- EACC minutes (Jon has already asked Ann Marie to pull - can she do this early enough on Monday?Can anybody reach her this weekend?)
- Anything else in the public domain (Adrian)
Jon and Peter - please let me know if I have overlooked anything from our call yesterday.
If folks could let me know very soon when all of this could be ready that would be much appreciated - I have a call with the Governor's office and various Secretaries tomorrow at noon; I have said that we would be responsible for this info and would like to be able to provide an update then.
Thanks,Mike
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 861/975
Program Benefit Assumptions/Comments
City property tax relief Up to $20m at $1m per year (20
year benefit)
Assumes a ___,000 s.f. building
State Investment Tax Credit Up to $48m at $9.6m per year
(5 year benefit)
Assumes a payroll of $130m
Massworks Infrastructure Grant Up to $32m in 1 year or splitinto 2 (up to a 2 year benefit) Provides for publicinfrastructure costs on a
reimbursement basis
State Training Fund $1m – the maximum award –
one time
Routine application process
Permitting Ombudsman No cost to GE Combination of City and State
officials to facilitate permitting
Concierge Services No cost to GE City and State partnership to
provide assistance on a range of
employee needs, like RMV
services.
Ferry Service Assistance TBD based upon site selection.
Funding may be secured
through Ferry Boat Discretionary
Grant Program.
Corporate Jet Services To be negotiated with Massport Massport has pledged
assistance, preferring for jets to
be based at Hanscom and
shuttled to Logan Airport, but is
willing to consider all services at
Logan Airport.
Boston Home Center “Live
Where You Work”Program
Provides what? Description
Innovation Center City to provide space at whatcost? Mass Life Science Center
or other to provide capital
funding at approximately $5m.
John determining ifMassChallenge might run the
space. This would be a “outside
the box” benefit to have a fully
fit out innovation space for GE
to operate. MLSC or other
grants could be used for the
capital funding.
Site 1 – Boston’s Court Street –
160k s.f. building in the heart of
downtown.
Free Rent for ___ years MassWorks would be utilized to
offset improvement costs.
Would City charge no propertytaxes or is it the City’s intential
to assess the building and issue
a tax bill?
Site 2 – MA DOT District 6 –
adjacent to South Station on
Kneeland Street – 104k s.f. with
___% rent for ___ years MassWorks would be utilized to
offset improvement costs.
Presumably, City would assess
the building and charge
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 862/975
sufficient land for additional
space.
property taxes, but that should
be confirmed.
Site 3 – multiple Convention
Center properties
___% land lease for____ years MassWorks would need to be
confirmed to support
construction of a new building.
Presumably, City would assess
the building and charge
property taxes, but that should
be confirmed.
Site 4 – multiple Massport sites ___% land lease for____ years MassWorks would need to be
confirmed to support
construction of a new building.
Presumably, City would assess
the building and charge
property taxes, but that should
be confirmed. Each of the sites
has hundreds of thousands of
additional build-out potential.Massport may wish to lease an
entire site and have the
developer build the GE building,
which could help reduce the
cost of the land lease.
Site 5 – City’s 6 Tide Street – it’s
snow farm.
____% land lease for ___years MassWorks would need to be
confirmed to support
construction of a new building.
Presumably, City would assess
the building and charge
property taxes, but that shouldbe confirmed.
Site 6 – Private development or
building purchase by GE on a
site they prefer.
A review of how MassWorks
would provide assistance would
be required.
The above could be provided to GE upon filling in all the blanks. John is in charge with Mike to provide
support. John should provide Mike with final draft and Mike be in touch with Steve for the Gov’s
signoff.
Questions/Comments:
1. Blanks should be filled in so that GE has a full picture of the various offers. (John is the
point/Mike provides support)
2. John is updating sites and getting them to GE. GE recognizes a need to narrow down sites, but it
is unrealistic for them to pick one without a significant vetting.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 863/975
3. What is City’s intention regarding property taxes if a public site is selected, especially if the site
selected is the City’s building on Court Street? Ordinarily, a public site with a private tenant
would be assessed property tax. Would be acceptable either way, taxing or not, and, as noted
below, not taxing it could be a deal closer. (John)
4. Can MassWorks funding be utilized for public building fit-out/renovations? (Mike)
5.
How could MassWorks provide financial benefit on private new construction? For example,
could it be used to purchase the land and then lease the land back to the private developer?
(Mike)
6.
What are the heliport options for each of the sites? (John)
7.
Fill in the blanks on State & Quasi lease expectations and determine what a typical value is for
the full lease so that the benefit of the reduction can be calculated for/by GE. (Steve should
ask the question of Elizabeth at Massport and for the MA DOT building should determine with
a consult with Stephanie, Kristen could be responsible for Mass Convention – provide Mike
with comments so he can communicate with John)
8.
John/Mike, you should contact Brent at CBRE to help determine the value of the land,
buildings and benefits. CBRE should be able to provide very good estimates on such matters
as the value of land leases and the cost of office space.
9. Contact MassChallenge to develop a proposal on the Innovation Center (John). For the benefit
of others, we are thinking of offering up an Innovation Center as a benefit for their use, using
City space and State funding to support it. The success of such a space depends on its
management, so John will have an informal discussion with the MassChallenge people about
doing so.
10. John/Mike, get a tax call with GE to review the benefits.
11. Thoughts on State ITC benefit. No way could we provide entire ITC in one year. Typically it is a
tax credit a company receives on their income. In this case, it could be a “refundable credit”
which means that it would actually be a cash benefit.
12. Thoughts on the State MassWorks benefit. MassWorks need to be spent in the year it is
designated. It is possible, if construction/renovations spans two fiscal years that we would
prefer to make a multi-year award to not eat up all of our funding in one particular year. It is a
reimbursement and has not “refundable credit” option. I am assuming we can use it to repair a
public building, and I believe it can be granted to both a city or a state agency. Not as clear how
we get the benefit to the company if a private entity is building them a building.
13. Check with former Massport exec to figure if there are any agency benefits that might be
brought to the package (Kristen).
14. Deal Closers could include up to $25m in state environmental dollars to help clean-up and put
into productive use GE sites in Lynn or elsewhere, and/or City tax dollars might be totally
forgiven in City or State buildings (and maybe more MassWorks dollars could go into the
building renovations in return).
15. In my absence, Mike is our lead, with Carolyn providing support. I will check in with Mike
directly each morning and in afternoon, connections permitting. Anyone needing me should
communicate need and issues to Mike. Steve should have final say on anything from our end.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 864/975
From: Klee, Ann (GE, Corporate)
To: "[email protected]"
Subject: Re: Project Plum
Date: Saturday, October 31, 2015 10:13:48 AM
Since neither the Pats nor the Redskins are playing tomorrow, how about 2?
From: Ash, Jay (SEA) [mailto:[email protected]]Sent: Saturday, October 31, 2015 09:54 AMTo: Klee, Ann (GE, Corporate)Subject: RE: Project Plum
Pick the time.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Klee, Ann (GE, Corporate)" <[email protected]>Date: 10/31/2015 9:14 AM (GMT-05:00)To: "Ash, Jay (EOHED)" <[email protected]>Subject: Re: Project Plum
That would be great. Could you do something tomorrow afternoon any time?
Sent from my iPhone
> On Oct 31, 2015, at 8:33 AM, Ash, Jay (SEA) <[email protected]> wrote:
>
> Want to do something over this weekend?
> ________________________________________
> From: Klee, Ann (GE, Corporate) [[email protected]]
> Sent: Friday, October 30, 2015 3:23 PM
> To: Ash, Jay (EOHED)
> Subject: Project Plum
>
> Jay – Would you have time for a quick call? Thanks.
>
> ark
>
> Ann R. Klee
> Vice President
> Global Operations – Environment, Health & Safety
>
> GE
> 3135 Easton Turnpike
> Fairfield, CT 06824
> 203-373-3198 (o)
> 2 (m)
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 865/975
From: Kennealy, Michael (EOHED)
To: Frazier, Ricks (EOHED); Milano, Peter (MOBD); Cosco, Jonathan (EOHED); Servetnick, Adrian (EOHED)
Subject: RE: Project Plum
Date: Sunday, November 29, 2015 7:43:13 AM
Let's use this for a 10am call - access code and I have attached a memo from Jay that summarizes what we are thinking;
based on that, if work can start before 10am all the better. At this point, I am very concerned about refundable vs. non-refundable per my comment below. Speak with you all at 10am, and thank you for your attention to this important project. Mike
PRIVILEGED ATTORNEY-CLIENT COMMUNICATION
Mike --
Ricks
From: Milano, Peter (MOBD)
Sent: Saturday, November 28, 2015 5:43 PM
To: Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Cosco, Jonathan (EOHED); Servetnick, Adrian (EOHED)
Cc: '[email protected]'
Subject: RE: Project Plum
Hi all,
Mike, you have summed the call up well. I may be simply rephrasing a few items, but
they asked additionally:
Can Massworks be used for building renovations to publically owned building?
What if they choose a privately owned building? How will this affect incentive
offer?
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 866/975
Co. seeking a MOU prior to application process for EDIP and Massworks.
We need to provide the Liberty Mutual and IBM deals for their review. (I do
believe the EDIP team can provide this info Monday morning.) I will be sure to
gather this info.
Regards,
Peter
Peter Milano
Senior Director, Business Development
Massachusetts Office of Business Development
(978) 970-1193
360 Merrimack Street
Building 5
Lawrence, MA 01843
www.mass.gov/mobd
This communication and any communication incorporated herein, including attachments, may be subject to public
disclosure as a “public record,” as defined by M. G. L. c. 4, § 7, and subject to public inspection, examination and
copying pursuant to M. G. L. c. 66, § 10. Any communication with this agency whether in response to this
communication or otherwise may itself be subject to public inspection and copying pursuant to M. G. L. c. 66, § 10,
unless protected by statutory exemption.
From: Kennealy, Michael (EOHED)
Sent: Saturday, November 28, 2015 5:30 PMTo: Frazier, Ricks (EOHED) <[email protected]>; Cosco, Jonathan (EOHED)
<[email protected]>; Milano, Peter (MOBD)
<[email protected]>; Servetnick, Adrian (EOHED)
Subject: Project Plum
Folks,
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 867/975
As Jon and Peter know from our call yesterday, we are facing an urgent and close deadline on Project Plum. We will need to pull all materials together for our offer by 12pm on Monday. There are a number of components of the offer, but the items most relevant for the folks on this email relate to EDIP and MassWorks. Specifically what we need are: 1. The language of the statute of each program or a summary thereof (Ricks, Jon).
-
- Confirmation of what portion of the award can be refundable. My understanding is that we could by statute do $1 MM of a JCP and $5 MM of EEP, and then for an award of $9.6 MM per year for 5 years, this would mean $3.6 MM would not be refundable.
- Confirmation that we can do the up to $32 MM in MassWorks that we are offering, and
- Application process and requirements for each of EDIP and MassWorks
- For MassWorks, and this will likely be in the statute, what is considered public infrastructure.
2. What was in the public record for the Liberty Mutual deal which we discussed as an example. I think
we should provide:- Press releases - Peter has sent me Boston's but we need anything from HED (Adrian)- Application (Jon has already asked Ann Marie to pull - can she do this early enough on Monday? Can anybody reach her this weekend?)- EACC minutes (Jon has already asked Ann Marie to pull - can she do this early enough on Monday?Can anybody reach her this weekend?)
- Anything else in the public domain (Adrian)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 868/975
Jon and Peter - please let me know if I have overlooked anything from our call yesterday.
If folks could let me know very soon when all of this could be ready that would be much appreciated - I have a call with the Governor's office and various Secretaries tomorrow at noon; I
have said that we would be responsible for this info and would like to be able to provide an update then. Thanks,Mike
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 869/975
From: Ash, Jay (EOHED)
To: Klee, Ann (GE, Corporate)
Subject: RE: Project Plum
Date: Saturday, November 28, 2015 1:58:36 PM
Heard you are looking at sites this week in Boston. (Kind of) Sorry I won't see you, I'm getting on a cruise ship now. I've been and will attempt to stay in contact with Mike Kennealy
from my office on our re-stated proposal. I'm excited about it and appreciative of the opportunity to share it. In particular, I'm excited about the Boston School Department on Court Street. I'll look forward to hearing what you think. Cheers from the Caribbean!
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Klee, Ann (GE, Corporate)" <[email protected]>Date: 11/01/2015 12:44 PM (GMT-04:00)To: "Ash, Jay (EOHED)" <[email protected]>
Subject: Re: Project Plum
Can we move to 3 by any chance? What's best # to reach you? Thanks.
Sent from my iPhone
On Oct 31, 2015, at 12:11 PM, Ash, Jay (SEA) <[email protected]<mailto:[email protected]>> wrote:
Lol and confirmed
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------
From: "Klee, Ann (GE, Corporate)" <[email protected]<mailto:[email protected]>>
Date: 10/31/2015 10:57 AM (GMT-05:00)
To: "Ash, Jay (EOHED)" <[email protected]<mailto:[email protected]>>
Subject: Re: Project Plum
I'd say don't count your chickens, but I fear you may be right . . . Talk to you tomorrow.
Sent from my iPhone
> On Oct 31, 2015, at 10:36 AM, Ash, Jay (SEA) <[email protected]<mailto:[email protected]>> wrote:
>
> Great - looking forward to it.
>
> Yes, too bad there's no Pats game tomorrow - it makes the wait for 8-0 all that much longer ;)!
> ________________________________________
> From: Klee, Ann (GE, Corporate) [[email protected]<mailto:[email protected]>]
> Sent: Saturday, October 31, 2015 10:13 AM
> To: Ash, Jay (EOHED)
> Subject: Re: Project Plum
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 870/975
> Since neither the Pats nor the Redskins are playing tomorrow, how about 2?
>
> From: Ash, Jay (SEA) [mailto:[email protected]]
> Sent: Saturday, October 31, 2015 09:54 AM
> To: Klee, Ann (GE, Corporate)
> Subject: RE: Project Plum
>
> Pick the time.
>
>
>
> Sent from my Verizon Wireless 4G LTE smartphone
>
>
> -------- Original message --------
> From: "Klee, Ann (GE, Corporate)" <[email protected]<mailto:[email protected]>>
> Date: 10/31/2015 9:14 AM (GMT-05:00)
> To: "Ash, Jay (EOHED)" <[email protected]<mailto:[email protected]>>
> Subject: Re: Project Plum
>
> That would be great. Could you do something tomorrow afternoon any time?
>
> Sent from my iPhone
>
>> On Oct 31, 2015, at 8:33 AM, Ash, Jay (SEA) <[email protected]<mailto:[email protected]>> wrote:
>>
>> Want to do something over this weekend?
>> ________________________________________
>> From: Klee, Ann (GE, Corporate) [[email protected]<mailto:[email protected]>]
>> Sent: Friday, October 30, 2015 3:23 PM
>> To: Ash, Jay (EOHED)
>> Subject: Project Plum
>>
>> Jay – Would you have time for a quick call? Thanks.>>
>> ark
>>
>> Ann R. Klee
>> Vice President
>> Global Operations – Environment, Health & Safety
>>
>> GE
>> 3135 Easton Turnpike
>> Fairfield, CT 06824
>> 203-373-3198 (o)
>> (m)
>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 871/975
From: Kennealy, Michael (EOHED)
To: Eisenstadt, Amy (GE, Corporate)
Subject: RE: Project Plum
Date: Wednesday, November 11, 2015 11:22:25 AM
Hi Amy, best times for me there are 12 - 3pm on 11/16 or before 11:30am on 11/18. And of course if you'd like to speak this week just let me know, thanks.
Mike
From: Eisenstadt, Amy (GE, Corporate) [[email protected]]Sent: Tuesday, November 10, 2015 3:37 PMTo: Kennealy, Michael (EOHED)Subject: FW: Project Plum
Any of the times listed for John work for you?
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Crystal Torman [mailto:[email protected]]Sent: Tuesday, November 10, 2015 3:33 PMTo: Eisenstadt, Amy (GE, Corporate)Cc: John Barros; Lauren Jones; [email protected]: Re: Project Plum
Hi Amy,
John is happy to make himself available any time on the 16th, 17th, and the morning of the 18th. Though he'll be traveling the afternoon of the 18th-20th. A call during that time may be a bit more difficult to coordinate, but not impossible. Glad to be as flexible as possible.
Please let me know if I can be of further assistance.
Warmly,Crystal
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 872/975
From: Kennealy, Michael (EOHED)
To: Eisenstadt, Amy (GE, Corporate)
Subject: RE: Project Plum
Date: Tuesday, November 10, 2015 2:24:00 PM
Hi Amy, how would tomorrow work for a call? Please let me know some times if that works. Joint
call is fine if that’s what you’d prefer. Looking forward to speaking!
Best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108Office: 617-788-3640
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Monday, November 09, 2015 4:35 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: Project Plum
Hi, Mike. Ann Klee gave me your name to contact for a preliminary discussion of project parameters. Do you have any time the next couple of days for a call?
Also, I am going to reach out to the City of Boston contact. Would you be OK with doing a joint
State/City call?
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 873/975
From: Ash, Jay (EOHED)
To: Klee, Ann (GE, Corporate)
Subject: RE: Project Plum
Date: Sunday, November 01, 2015 1:37:37 PM
yes
________________________________________
From: Klee, Ann (GE, Corporate) [[email protected]]
Sent: Sunday, November 01, 2015 11:44 AM
To: Ash, Jay (EOHED)
Subject: Re: Project Plum
Can we move to 3 by any chance? What's best # to reach you? Thanks.
Sent from my iPhone
On Oct 31, 2015, at 12:11 PM, Ash, Jay (SEA)
<[email protected]<mailto:[email protected]>> wrote:
Lol and confirmed
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------
From: "Klee, Ann (GE, Corporate)"
<[email protected]<mailto:[email protected]>>
Date: 10/31/2015 10:57 AM (GMT-05:00)
To: "Ash, Jay (EOHED)"<[email protected]<mailto:[email protected]>>
Subject: Re: Project Plum
I'd say don't count your chickens, but I fear you may be right . . . Talk
to you tomorrow.
Sent from my iPhone
> On Oct 31, 2015, at 10:36 AM, Ash, Jay (SEA)
<[email protected]<mailto:[email protected]>> wrote:
>
> Great - looking forward to it.
>
> Yes, too bad there's no Pats game tomorrow - it makes the wait for 8-0
all that much longer ;)!
> ________________________________________
> From: Klee, Ann (GE, Corporate)
[[email protected]<mailto:[email protected]>]
> Sent: Saturday, October 31, 2015 10:13 AM
> To: Ash, Jay (EOHED)
> Subject: Re: Project Plum
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 874/975
> Since neither the Pats nor the Redskins are playing tomorrow, how about
2?
>
> From: Ash, Jay (SEA) [mailto:[email protected]]
> Sent: Saturday, October 31, 2015 09:54 AM
> To: Klee, Ann (GE, Corporate)
> Subject: RE: Project Plum
>
> Pick the time.
>
>
>
> Sent from my Verizon Wireless 4G LTE smartphone
>
>
> -------- Original message --------
> From: "Klee, Ann (GE, Corporate)"
<[email protected]<mailto:[email protected]>>
> Date: 10/31/2015 9:14 AM (GMT-05:00)
> To: "Ash, Jay (EOHED)"
<[email protected]<mailto:[email protected]>>
> Subject: Re: Project Plum
>
> That would be great. Could you do something tomorrow afternoon any time?
>
> Sent from my iPhone
>
>> On Oct 31, 2015, at 8:33 AM, Ash, Jay (SEA)
<[email protected]<mailto:[email protected]>> wrote:
>>
>> Want to do something over this weekend?
>> ________________________________________
>> From: Klee, Ann (GE, Corporate)
[[email protected]<mailto:[email protected]>]>> Sent: Friday, October 30, 2015 3:23 PM
>> To: Ash, Jay (EOHED)
>> Subject: Project Plum
>>
>> Jay – Would you have time for a quick call? Thanks.
>>
>> ark
>>
>> Ann R. Klee
>> Vice President
>> Global Operations – Environment, Health & Safety
>>
>> GE>> 3135 Easton Turnpike
>> Fairfield, CT 06824
>> 203-373-3198 (o)
>> (m)
>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 875/975
From: Ash, Jay (EOHED)
To: Klee, Ann (GE, Corporate)
Subject: RE: Project Plum
Date: Saturday, October 31, 2015 12:11:42 PM
Lol and confirmed
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Klee, Ann (GE, Corporate)" <[email protected]>Date: 10/31/2015 10:57 AM (GMT-05:00)To: "Ash, Jay (EOHED)" <[email protected]>Subject: Re: Project Plum
I'd say don't count your chickens, but I fear you may be right . . . Talk to you tomorrow.
Sent from my iPhone
> On Oct 31, 2015, at 10:36 AM, Ash, Jay (SEA) <[email protected]> wrote:
>
> Great - looking forward to it.
>
> Yes, too bad there's no Pats game tomorrow - it makes the wait for 8-0 all that much longer ;)!
> ________________________________________
> From: Klee, Ann (GE, Corporate) [[email protected]]
> Sent: Saturday, October 31, 2015 10:13 AM
> To: Ash, Jay (EOHED)
> Subject: Re: Project Plum>
> Since neither the Pats nor the Redskins are playing tomorrow, how about 2?
>
> From: Ash, Jay (SEA) [mailto:[email protected]]
> Sent: Saturday, October 31, 2015 09:54 AM
> To: Klee, Ann (GE, Corporate)
> Subject: RE: Project Plum
>
> Pick the time.
>
>
>
> Sent from my Verizon Wireless 4G LTE smartphone>
>
> -------- Original message --------
> From: "Klee, Ann (GE, Corporate)" <[email protected]>
> Date: 10/31/2015 9:14 AM (GMT-05:00)
> To: "Ash, Jay (EOHED)" <[email protected]>
> Subject: Re: Project Plum
>
> That would be great. Could you do something tomorrow afternoon any time?
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 876/975
> Sent from my iPhone
>
>> On Oct 31, 2015, at 8:33 AM, Ash, Jay (SEA) <[email protected]> wrote:
>>
>> Want to do something over this weekend?
>> ________________________________________
>> From: Klee, Ann (GE, Corporate) [[email protected]]
>> Sent: Friday, October 30, 2015 3:23 PM
>> To: Ash, Jay (EOHED)>> Subject: Project Plum
>>
>> Jay – Would you have time for a quick call? Thanks.
>>
>> ark
>>
>> Ann R. Klee
>> Vice President
>> Global Operations – Environment, Health & Safety
>>
>> GE
>> 3135 Easton Turnpike
>> Fairfield, CT 06824
>> 203-373-3198 (o)
>> (m)
>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 877/975
From: Kennealy, Michael (EOHED)
To: Milano, Peter (MOBD)
Subject: RE: Project Plum
Date: Friday, September 25, 2015 2:26:00 PM
Great news – thanks Peter!
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Milano, Peter (MOBD)
Sent: Friday, September 25, 2015 9:07 AM
To: Ash, Jay (EOHED); '[email protected]'; Kennealy, Michael (EOHED)
Subject: Project Plum
Jay, and all,
I just got off the phone with Jim McGaugh. Here is what he had to tell me regarding
Project Plum:
• Joe Tucci met with Jeffrey Immelt a day or two after our meeting with the
project team. Immelt said that going into their tour their largest concern was
housing costs, but that concern was completely covered by us on our tour.
This issue is completely addressed.
•
The Committee has tours planned for Chicago and Atlanta, but there will not
be the type of engagement there was in Boston. In fact, they are actually
pulling in local executives from those areas to attend the tours.
•
We have “won the emotional battle” … now we need to discuss price in the
next month or so.
•
As for packaging of the potential incentives, Project Plum has not accepted
their MLSC award. As such, two things may be able to happen here.
o
1st, these ~500 jobs can be used with any potential Project Plum award
o 2nd, any potential award may actually include MLSC award (s)
• Project executives would like to meet with us regarding MLSC. They are not
happy with a) the award they received from MLSC and b) their treatment from
MLSC
• Apparently the Wall Street Journal published an article yesterday that was not
very good for Chicago. Jim said this was not a coincidence.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 878/975
I told Jim we would work to schedule a meeting in the next couple weeks with him and the Marlborough based executive regarding the MLSC issue.
Regards,
Peter
Peter Milano
Senior Regional Director
Massachusetts Office of Business Development
(978) 970-1193
360 Merrimack Street
Building 5
Lawrence, MA 01843
www.mass.gov/mobd
This communication and any communication incorporated herein, including attachments, may be subject to public
disclosure as a “public record,” as defined by M. G. L. c. 4, § 7, and subject to public inspection, examination and
copying pursuant to M. G. L. c. 66, § 10. Any communication with this agency whether in response to this
communication or otherwise may itself be subject to public inspection and copying pursuant to M. G. L. c. 66, § 10,
unless protected by statutory exemption.
Exe mp ti
Exemption GExemption GExemption G
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 879/975
From: Frazier, Ricks (EOHED)
To: "Meyers, Steven (GE, Corporate)"
Subject: RE: Project Plum
Date: Monday, July 20, 2015 6:11:00 PM
Attachments: State4 NDA Final.docxState4 NDA Redline.docx
Steve
Attached is a clean copy and a redline against the prior draft. I'll work on signatures on my end tomorrow.
Ricks
-----Original Message-----
From: Meyers, Steven (GE, Corporate) [mailto:[email protected]]
Sent: Monday, July 20, 2015 5:25 PM
To: Frazier, Ricks (EOHED)
Subject: Re: Project Plum
Great. All set. If you email me clean, execution copy I will get it signed and back to you. Thanks!!
Sent from my iPhone
On Jul 20, 2015, at 4:53 PM, Frazier, Ricks (SEA) <[email protected]<mailto:[email protected]>>
wrote:
Steve
We can agree to your proposed language. Anything else?
Ricks
From: Meyers, Steven (GE, Corporate) [mailto:[email protected]]Sent: Monday, July 20, 2015 10:17 AM
To: Frazier, Ricks (EOHED)
Subject: RE: Project Plum
How about:
The Agencies shall reasonably coordinate with the Company, on the decision to issue any and the timing and
content of any press release or public announcement or statement with respect to the transactions contemplated in
connection with the Project, and shall not make such press release or public announcement without undertaking
such coordination and considering the Company’s comments, if any, on the decision to issue a press release, the
text of such press release or announcement.
From: Meyers, Steven (GE, Corporate)
Sent: Monday, July 20, 2015 8:24 AM
To: 'Frazier, Ricks (SEA)'
Subject: RE: Project Plum
Great. Question regarding press releases: can we include some language that gives us a bit more comfort that you
will not issue press releases without our consent? It is key to our process that we maintain confidential the
discussions as they are progressing, which is why we include not only the “no press release w/o consent provision”
but also the provision that indicates that the fact of our discussions is itself considered confidential info. Thanks for
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 880/975
your thoughts.
The Agencies shall reasonably coordinate with the Company, on both the timing and content, of any press release or
public announcement or statement with respect to the transactions contemplated in connection with the Project, and
shall not make such press release or public announcement without undertaking such coordination and considering
the Company’s comments, if any, on the text of such press release or announcement
From: Frazier, Ricks (SEA) [mailto:[email protected]]
Sent: Monday, July 20, 2015 8:11 AM
To: Meyers, Steven (GE, Corporate)
Subject: RE: Project Plum
I agree that it reads that way. As a practical matter, if you apply for benefits, a different exemption would apply that
covers the deliberative process up to the point where a decision is made regarding the application.
Ricks
From: Meyers, Steven (GE, Corporate) [mailto:[email protected]]
Sent: Monday, July 20, 2015 7:58 AM
To: Frazier, Ricks (EOHED)
Subject: RE: Project Plum
Thanks. The way it reads to me is that only at such time as we formally apply for benefits does the info that we
submit (and info that we previously submitted with respect to the project) become subject to the Public Records
Law (i.e. not exempt). Correct?
From: Frazier, Ricks (SEA) [mailto:[email protected]]
Sent: Saturday, July 18, 2015 2:19 PM
To: Meyers, Steven (GE, Corporate)
Subject: Re: Project Plum
The exemption to the Public Records Law that authorizes MA agencies to enter NDAs has an exception to the effect
that any documents submitted as part if an application for state benefits are not exempt. So we are drawing a
distinction between this discussion and any application that may follow.
The second part, referring to info that may be required in the future, comes from monitoring obligations related to
certain types of our incentive tax credits.
Sent from my iPhone
On Jul 18, 2015, at 10:39 AM, "Meyers, Steven (GE, Corporate)"
<[email protected]<mailto:[email protected]>> wrote:
First glance looks fine, with a question regarding the following provision. Is there a legal requirement that drives it?
Notwithstanding any other provision of this Agreement, if the Company desires to apply for benefits from the
Commonwealth in connection with the Project, the Company understands it will be required to submit additional information pertaining to the Project, and if it receives such tax credits or other benefits, the Company may be
required to report information pertaining to the construction and operation of the Project. Notwithstanding any
other provision of this Agreement, information provided by the Company in connection with such an application
and reporting, even if previously constituting Confidential Information under this Agreement, shall not be subject to
this Agreement.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 881/975
From: Frazier, Ricks (SEA) [mailto:[email protected]]
Sent: Friday, July 17, 2015 6:02 PM
To: Meyers, Steven (GE, Corporate)
Subject: RE: Project Plum
Steve
Here are our thoughts on the document. I’ll be around all next week, so hopefully we can finalize it and get on to
substantive discussions.
Ricks
From: Meyers, Steven (GE, Corporate) [mailto:[email protected]]
Sent: Wednesday, July 15, 2015 2:56 PM
To: Frazier, Ricks (EOHED)
Subject: RE: Project Plum
Good speaking with you Ricks. I am attaching the draft/form NDA as we discussed. Thanks in advance for your
comments.
From: Ash, Jay (SEA) [mailto:[email protected]]
Sent: Monday, July 13, 2015 7:27 PM
To: Meyers, Steven (GE, Corporate)
Cc: Frazier, Ricks (SEA)
Subject: RE: Project Plum
Yes, sorry, was in and out last week on a quasi-vacation!
I’ve attached Ricks Frazier to this email. Ricks is our general counsel and will work with you on this. He’ll follow
up soon.
Thanks,
Jay
From: Meyers, Steven (GE, Corporate) [mailto:[email protected]]
Sent: Friday, July 10, 2015 3:10 PM
To: Ash, Jay (EOHED)
Subject: RE: Project Plum
Hello Jay, just following up to see if there is a good time for us to discuss the NDA and begin the process.
From: Klee, Ann (GE, Corporate)
Sent: Monday, July 06, 2015 7:54 PM
To: [email protected]<mailto:[email protected]>Cc: Meyers, Steven (GE, Corporate)
Subject: Project Plum
Jay,
Following up on our conversation, we would like to invite the Commonwealth of Massachusetts to come to
Fairfield, CT at end of July to engage in a discussion about the potential relocation of the GE headquarters to the
Boston area. As we discussed, I appreciate your including a representative from the City on your team.
This is a significant decision for GE. While we want to move expeditiously, we also want to be thoughtful in our
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 882/975
process and are considering a number of factors including business and political climate, impact on our employees,
financial incentives, recruitment, quality of life and several other issues of importance.
Our exploratory team has done some initial due diligence/screening. We are now in our second phase where we are
inviting a small group of States to come in and engage in a more detailed discussion.
We will be scheduling those discussions for July 28-30 and later this week will send you a list of issues/questions
that we would like you to address, but also want you to feel free to present whatever information that you think
would be relevant to our decision. The meeting will be set for 2 hours. The members of the GE exploratory team
will participate in the meeting.
It is very important to us that these discussions, and even the fact that we are engaged in discussions with New York
remain confidential. As is customary, we will ask that you sign an NDA which is attached. Steve Meyers on our
team will be available to discuss any questions related to the NDA. He can be reached at
[email protected]<mailto:[email protected]> ; 203-373-3030.
I will be your GE point of contact on the exploratory team. My contact information is 203-373-3198,
[email protected]<mailto:[email protected]>. I will send the template of issues that we would like you to address
within the next day and am also available any time to answer any questions you may have. Additionally, Karen
Kulish will be reaching out to schedule the meeting and will assist with logistics. Karen’s contact info is,
[email protected]<mailto:[email protected]> and 203-373-2575. If you would give me your scheduler’s
contact information, Karen can reach out and work through the details.
We appreciate Governor Baker’s interest in having GE relocate to Massachusetts and look forward to our meeting at
the end of July.
<image001.png>
Ann R. Klee
Vice President
Global Operations – Environment, Health & Safety
GE3135 Easton Turnpike
Fairfield, CT 06824
203-373-3198 (o)
(m)Exemption
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 883/975
CONFIDENTIALITY AGREEMENT
This Confidentiality Agreement (this “Agreement”) is entered into this ___ day of July,
2015, by the Executive Office of Housing and Economic Development and the Office of
Business Development (the “Agencies”), both instrumentalities of the Commonwealth ofMassachusetts (the “Commonwealth”) for the benefit of Project Plum, with General Electric
Company a New York corporation (the “Company”).
RECITALS
WHEREAS, the Company may voluntarily provide information of a non-public nature for use by
the Agencies and their agents, employees and representatives (collectively, “Representatives”) inconnection with discussions regarding the potential location of Company’s international
headquarters in the State (the “Project”); and
WHEREAS, in the course of its discussions with the Company relating to the Project, theAgencies may receive certain private and confidential proprietary information provided for
discussion concerning the Project from or about the Company, including but not limited to
investment information, project plans and requirements, technical and business informationregarding business operations and affairs, financial data, sales and marketing information,
specifications, drawings, sketches, data, documentation, correspondence or any other private or
proprietary ideas or information (“Confidential Information”); and
WHEREAS, the parties desire to establish terms governing the disclosures of Confidential
Information that will be made by the Company to the Agencies;
NOW, THEREFORE, in consideration of the covenants set forth herein and other good and
valuable consideration, the receipt and sufficiency of which are hereby acknowledged, andintending to be legally bound, the parties agree as follows:
The Agencies shall, with respect to any Confidential Information (a) hold the Confidential
Information in strict confidence using at least the same care and caution it affords its ownconfidential information, but in no case less than a reasonable degree of care; (b) take any and all
steps which may be necessary and reasonable to protect the Confidential Information; (c) use the
Confidential Information only in connection with the Project; (d) reproduce the ConfidentialInformation only to the extent necessary in connection with the Project; and (e) restrict
disclosure of the Confidential Information only to Representatives whose duties justify the need
to know the Confidential Information in connection with the Project and who are advised as tothe confidential and proprietary nature of the Confidential Information and are required to
comply with the provisions of this Agreement. The obligations of the Agencies to maintain the
confidentiality of the Confidential Information it has received under this Agreement shall
continue for a period of one (1) year from the date of receipt of such Confidential Information.
The Agencies hereby acknowledge and agree that (a) the term “Confidential Information” as
used herein also includes: (i) the fact that the Confidential Information has been made available
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 884/975
to the Agencies; (ii) the fact that the Agencies are discussing the Project with the Company; and
(iii) any of the terms, conditions or other facts with respect to the Project or other related
transactions, including the status thereof; and (b) any Confidential Information supplied by theCompany prior to the execution of this Agreement shall be subject to the same treatment as the
Confidential Information made available after the execution of this Agreement.
The Agencies acknowledge that the Company agrees to provide the Confidential Information
voluntarily upon the Agencies’ promise to maintain its confidentiality and status as exempt from
disclosure to the extent authorized by applicable law, as determined by the Agencies in their sole
discretion, including state and federal Freedom of Information Acts, Open Door Law, PublicRecords Law and other related local, state, and federal laws and ordinances that may be
applicable.
The obligations with respect to the Confidential Information under this Agreement shall not
apply to any Confidential Information which (a) is in the public domain (provided that such
information has not or does not come into the public domain as the result of a disclosure by the
Agencies); (b) is received by the Agencies on a non-confidential basis from a source other thanthe Company (provided that such source is not bound by a confidentiality agreement with the
Company or another party); or (c) is required to be disclosed by operation of law, including but
not limited to pursuant to the State and Federal Freedom of Information Acts (provided that, promptly following receipt of a legal request and prior to making such disclosure, the Agencies
have notified the Company of such request so that the Company may take action to safeguard its
interests, and seek to preserve the confidentiality of the Confidential Information). The Agenciesshall reasonably cooperate with such efforts by the Company but shall retain discretion to
determine the scope and applicability of any exemption under the Public Records Law or other
applicable law requiring the disclosure or Confidential Information.
The Agencies shall reasonably coordinate with the Company, on the decision to issue, timing and
content, of any press release or public announcement or statement with respect to thetransactions contemplated in connection with the Project, and shall not make such press release
or public announcement without undertaking such coordination and considering the Company’s
comments, if any, on the decision to issue a press release or announcement and the text of such
press release or announcement.
The disclosure of Confidential Information shall not be construed to grant to the Agencies any
license, ownership or other proprietary interest in the Confidential Information. The Agenciesagree that they do not acquire any title, ownership, or other intellectual property right or license
in or to the Confidential Information by virtue of such disclosure, and all Confidential
Information (including tangible copies and computerized or electronic versions and summariesthereof) shall remain the property of the Company.
Notwithstanding any other provision of this Agreement, if the Company desires to apply for
benefits from the Commonwealth in connection with the Project, the Company understands itwill be required to submit additional information pertaining to the Project, and if it receives such
tax credits or other benefits, the Company may be required to report information pertaining to the
construction and operation of the Project. Notwithstanding any other provision of this
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 885/975
Agreement, information provided by the Company in connection with such an application and
reporting, even if previously constituting Confidential Information under this Agreement, shall
not be subject to this Agreement.
Nothing in this Agreement will impose any obligation upon any Party to enter into any
discussions or negotiations with respect to the Project, or to take any other action not expresslyagreed to herein.
Within ten (10) days following the receipt of a written request, the Agencies shall deliver to the
Company all tangible materials containing or embodying the Confidential Information receivedfrom the Company along with any copies, reproductions, and summaries thereof, together with a
certificate executed by the Agencies certifying that all such materials in the Agencies’ possession
that are not public records have been delivered to the Company. That portion of the ConfidentialInformation which has been incorporated into analyses, compilations, comparisons, studies or
other documents prepared by the Agencies or their Representatives shall be held by the Agencies
and kept confidential as provided in this Agreement and shall not be used for any reason other
than in connection with the Project or shall be destroyed.
In the event any legal action is required to enforce this Agreement, each party shall bear its
representative attorney’s fees and costs.
The Agencies agree that their obligations hereunder are necessary and reasonable to protect the
Company and expressly agrees that monetary damages might be inadequate to compensate theCompany for any breach of any covenant or agreement set forth herein. The Agencies agree and
acknowledge that any such violation or threatened violation may cause irreparable injury to the
Company and that, if deemed appropriate by the court presiding over the matter, the Company(in addition to any other rights and remedies that may be available at law or in equity) may be
entitled to seek injunctive relief against the threatened breach of this Agreement or the
continuation of any such breach.
This Agreement shall be governed and interpreted under the laws of the Commonwealth of
Massachusetts, without regard to its choice of law provisions.
Neither party shall assign this Agreement without the prior written approval of the other party.
This Agreement constitutes the entire understanding between the parties hereto as to ConfidentialInformation and merges all prior discussions between them relating thereto. No amendment or
modification of this Agreement shall be valid or binding on the parties unless made in writing
and signed on behalf of each of the parties by their respective duly authorized officers orrepresentatives.
This Agreement may be executed by facsimile signature in any number of counterparts, all of
which taken together shall constitute one in the same instrument.
No failure or delay by either party in exercising any right, power or privilege hereunder shall
operate as a waiver thereof, nor shall any single or partial exercise thereof preclude any other or
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 886/975
further exercise thereof or the exercise of any other right, power or privilege hereunder.
IN WITNESS WHEREOF, the parties have executed and delivered this ConfidentialityAgreement effective as of the date first written above.
Executive Office of Housing and EconomicDevelopment General Electric Company
By: _________________________________
By: _________________________________
Name: Name: Ann R. Klee
Title:
Office of Business Development
By: _________________________________ Name:
Title:
Title: Vice President, Global Operations –
Environment, Health and Safety
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 887/975
CONFIDENTIALITY AGREEMENT
This Confidentiality Agreement (this “Agreement”) is entered into this ___ day of July,
_________, 2015___ , by the Executive Office of Housing and Economic Development and the
Office of Business Development (the “Agencies”), both instrumentalities of the Commonwealthof Massachusetts (the “Commonwealth”) for the benefit of Project Plum, with General Electric
Company a New York corporation (the “Company”).
RECITALS
WHEREAS, the Company may voluntarily provide information of a non-public nature for use by
the Agencies and their agents, employees and representatives (collectively, “Representatives”) inconnection with discussions regarding the potential location of Company’s international
headquarters in the State (the “Project”); and
WHEREAS, in the course of its discussions with the Company relating to the Project, theAgencies may receive certain private and confidential proprietary information provided for
discussion concerning the Project from or about the Company, including but not limited to
investment information, project plans and requirements, technical and business informationregarding business operations and affairs, financial data, sales and marketing information,
specifications, drawings, sketches, data, documentation, correspondence or any other private or
proprietary ideas or information (“Confidential Information”); and
WHEREAS, the parties desire to establish terms governing the disclosures of Confidential
Information that will be made by the Company to the Agencies;
NOW, THEREFORE, in consideration of the covenants set forth herein and other good and
valuable consideration, the receipt and sufficiency of which are hereby acknowledged, andintending to be legally bound, the parties agree as follows:
The Agencies shall, with respect to any Confidential Information (a) hold the Confidential
Information in strict confidence using at least the same care and caution it affords its ownconfidential information, but in no case less than a reasonable degree of care; (b) take any and all
steps which may be necessary and reasonable to protect the Confidential Information; (c) use the
Confidential Information only in connection with the Project; (d) reproduce the ConfidentialInformation only to the extent necessary in connection with the Project; and (e) restrict
disclosure of the Confidential Information only to Representatives whose duties justify the need
to know the Confidential Information in connection with the Project and who are advised as tothe confidential and proprietary nature of the Confidential Information and are required to
comply with the provisions of this Agreement. The obligations of the Agencies to maintain the
confidentiality of the Confidential Information it has received under this Agreement shall
continue for a period of one (1) year from the date of receipt of such Confidential Information.
The Agencies hereby acknowledge and agree that (a) the term “Confidential Information” as
used herein also includes: (i) the fact that the Confidential Information has been made available
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 888/975
to the Agencies; (ii) the fact that the Agencies are discussing the Project with the Company; and
(iii) any of the terms, conditions or other facts with respect to the Project or other related
transactions, including the status thereof; and (b) any Confidential Information supplied by theCompany prior to the execution of this Agreement shall be subject to the same treatment as the
Confidential Information made available after the execution of this Agreement.
The Agencies acknowledge that the Company agrees to provide the Confidential Information
voluntarily upon the Agencies’ promise to maintain its confidentiality and status as exempt from
disclosure to the extent authorized by applicable law, as determined by the Agencies in their sole
discretion, including state and federal Freedom of Information Acts, Open Door Law, PublicRecords Law and other related local, state, and federal laws and ordinances that may be
applicable.
The obligations with respect to the Confidential Information under this Agreement shall not
apply to any Confidential Information which (a) is in the public domain (provided that such
information has not or does not come into the public domain as the result of a disclosure by the
Agencies); (b) is received by the Agencies on a non-confidential basis from a source other thanthe Company (provided that such source is not bound by a confidentiality agreement with the
Company or another party); or (c) is required to be disclosed by operation of law, including but
not limited to pursuant to the State and Federal Freedom of Information Acts (provided that, promptly following receipt of a legal request and prior to making such disclosure, the Agencies
have notified the Company of such request so that the Company may take action to safeguard its
interests, and seek to preserve the confidentiality of the Confidential Information). The Agenciesshall reasonably cooperate with such efforts by the Company but shall retain discretion to
determine the scope and applicability of any exemption under the Public Records Law or other
applicable law requiring the disclosure or Confidential Information.
The Agencies shall reasonably coordinate with the Company, on both the decision to issue,
timing and content, of any press release or public announcement or statement with respect to thetransactions contemplated in connection with the Project, and shall not make such press release
or public announcement without undertaking such coordination and considering the Company’s
comments, if any, on the decision to issue a press release or announcement and the text of such
press release or announcement.
The disclosure of Confidential Information shall not be construed to grant to the Agencies any
license, ownership or other proprietary interest in the Confidential Information. The Agenciesagree that they do not acquire any title, ownership, or other intellectual property right or license
in or to the Confidential Information by virtue of such disclosure, and all Confidential
Information (including tangible copies and computerized or electronic versions and summariesthereof) shall remain the property of the Company.
Notwithstanding any other provision of this Agreement, if the Company desires to apply for
benefits from the Commonwealth in connection with the Project, the Company understands itwill be required to submit additional information pertaining to the Project, and if it receives such
tax credits or other benefits, the Company may be required to report information pertaining to the
construction and operation of the Project. Notwithstanding any other provision of this
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 889/975
Agreement, information provided by the Company in connection with such an application and
reporting, even if previously constituting Confidential Information under this Agreement, shall
not be subject to this Agreement.
Nothing in this Agreement will impose any obligation upon any Party to enter into any
discussions or negotiations with respect to the Project, or to take any other action not expresslyagreed to herein.
Within ten (10) days following the receipt of a written request, the Agencies shall deliver to theCompany all tangible materials containing or embodying the Confidential Information received
from the Company along with any copies, reproductions, and summaries thereof, together with a
certificate executed by the Agencies certifying that all such materials in the Agencies’ possessionthat are not public records have been delivered to the Company. That portion of the Confidential
Information which has been incorporated into analyses, compilations, comparisons, studies or
other documents prepared by the Agencies or their Representatives shall be held by the Agencies
and kept confidential as provided in this Agreement and shall not be used for any reason otherthan in connection with the Project or shall be destroyed.
In the event any legal action is required to enforce this Agreement, each party shall bear itsrepresentative attorney’s fees and costs.
The Agencies agree that their obligations hereunder are necessary and reasonable to protect theCompany and expressly agrees that monetary damages might be inadequate to compensate the
Company for any breach of any covenant or agreement set forth herein. The Agencies agree and
acknowledge that any such violation or threatened violation may cause irreparable injury to theCompany and that, if deemed appropriate by the court presiding over the matter, the Company
(in addition to any other rights and remedies that may be available at law or in equity) may be
entitled to seek injunctive relief against the threatened breach of this Agreement or thecontinuation of any such breach.
This Agreement shall be governed and interpreted under the laws of the Commonwealth of
Massachusetts, without regard to its choice of law provisions.
Neither party shall assign this Agreement without the prior written approval of the other party.
This Agreement constitutes the entire understanding between the parties hereto as to Confidential
Information and merges all prior discussions between them relating thereto. No amendment or
modification of this Agreement shall be valid or binding on the parties unless made in writingand signed on behalf of each of the parties by their respective duly authorized officers or
representatives.
This Agreement may be executed by facsimile signature in any number of counterparts, all ofwhich taken together shall constitute one in the same instrument.
No failure or delay by either party in exercising any right, power or privilege hereunder shall
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 890/975
operate as a waiver thereof, nor shall any single or partial exercise thereof preclude any other or
further exercise thereof or the exercise of any other right, power or privilege hereunder.
IN WITNESS WHEREOF, the parties have executed and delivered this Confidentiality
Agreement effective as of the date first written above.
Executive Office of Housing and Economic
Development
General Electric Company
By: _________________________________By: _________________________________
Name: Name: Ann R. Klee
Title:
Office of Business Development
By: _________________________________
Name:
Title:
Title: Vice President, Global Operations –Environment, Health and Safety
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 891/975
From: Kennealy, Michael (EOHED)
To: Nunnelly, Mark E.
Subject: RE: Project Plum: MA Thank you
Date: Monday, September 14, 2015 12:10:00 PM
And yes, it is exciting! Big tour with them tomorrow. Good lineup for
dinner including appearance by the Gov and Mayor and others.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kennealy, Michael (EOHED)Sent: Monday, September 14, 2015 12:10 PM
To: 'Nunnelly, Mark E.'
Subject: RE: Project Plum: MA Thank you
6:30pm at Tresca in North End 233 Hanover St.
Mike Kennealy
Assistant Secretary for Business Growth The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Nunnelly, Mark E. [mailto:[email protected]]
Sent: Sunday, September 13, 2015 11:34 PM
To: Kennealy, Michael (EOHED)
Subject: Re: Project Plum: MA Thank you
Terrific news that this is progressing!
I unfortunately have a dinner tomorrow night already schedule...I'm going
to see in the morning how difficult to change.
Assume in back bay 6pish?
Exciting
Mark
Mark Nunnelly, Commissioner
Department of Revenue
Special Advisor to the Governor for
Innovation Competitiveness
Tel: (617)626-2201
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 892/975
Fax:(617)626-2299
----- Original Message -----
From: Kennealy, Michael (EOHED)
[mailto:[email protected]]
Sent: Friday, September 11, 2015 11:24 AM
To: Nunnelly, Mark E.
Subject: RE: Project Plum: MA Thank you
Hi Mark, the Project Plum folks are coming to Boston next week - would you
be interested in joining us for dinner on Monday?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Nunnelly, Mark E. [mailto:[email protected]]
Sent: Friday, August 07, 2015 2:46 PM
To: Kennealy, Michael (EOHED); Ash, Jay (EOHED); Kirk, Carolyn (EOHED);
Pham, Nam (EOHED); Distefano, Maria (MOBD); Servetnick, Adrian (EOHED)
Cc: McMorrow, Paul (EOHED)
Subject: RE: Project Plum: MA Thank you
Go get em!
-----Original Message-----
From: Kennealy, Michael (SEA)
[mailto:[email protected]]Sent: Friday, August 07, 2015 2:36 PM
To: Ash, Jay (SEA); Kirk, Carolyn (SEA); Nunnelly, Mark E.; Pham, Nam
(SEA); Distefano, Maria G (SEA); Servetnick, Adrian (SEA)
Cc: McMorrow, Paul (SEA)
Subject: FW: Project Plum: MA Thank you
FYI - nice note from the folks we met last week. We have a letter and
materials going out to them today to say thanks and to answer some of
their questions. Will keep you all posted.
Best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kulish, Karen (GE, Corporate) [mailto:[email protected]]
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 893/975
Sent: Thursday, August 06, 2015 4:12 PM
To: Kennealy, Michael (EOHED)
Subject: Project Plum: MA Thank you
Mike,
Please find attached a thank you letter from Ann Klee to the team. Thank
you for your assistance in forwarding to the others.
Karen Kulish
Executive Assistant to Ann Klee
Global Operations - Environment, Health & Safety
O: 203 373-2575
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
**********************************************************************
This email and any files transmitted with it are confidential and
intended solely for the use of the individual or entity to whom they
are addressed. If you have received this email in error please notify the
system manager at postmaster at dor.state.ma.us.
**********************************************************************
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 894/975
From: Kennealy, Michael (EOHED)
To: Kulish, Karen (GE, Corporate)
Subject: RE: Project Plum: MA Thank you
Date: Wednesday, August 12, 2015 8:59:20 AM
Hi Karen, here are the email addresses for our team - thanks!
Jay Ash - [email protected]
Carolyn Kirk - [email protected]
Mark Nunnelly - [email protected]
Mike Kennealy - [email protected]
Nam Pham - [email protected]
Maria DiStefano - [email protected]
Adrian Servetnick - [email protected]
________________________________________
From: Kulish, Karen (GE, Corporate) [[email protected]]
Sent: Friday, August 07, 2015 3:07 PM
To: Kennealy, Michael (EOHED)
Subject: Re: Project Plum: MA Thank you
Sure then I'll have it for another time. Thanks!
Sent from my iPhone
> On Aug 7, 2015, at 2:27 PM, Kennealy, Michael (SEA)
<[email protected]> wrote:
>
> Thank you Karen! I will forward to others, though please let me know
if, per your email earlier yesterday, you would still like everybody's
email address.
>
> All the best,
> Mike>
>
> Mike Kennealy
> Assistant Secretary for Business Growth
> The Commonwealth of Massachusetts
> Executive Office of Housing & Economic Development
> One Ashburton Place, Room 2101
> Boston, MA 02108
> Office: 617-788-3640
> Cell: 617-634-4762
>
> -----Original Message-----
> From: Kulish, Karen (GE, Corporate) [mailto:[email protected]]
> Sent: Thursday, August 06, 2015 4:12 PM
> To: Kennealy, Michael (EOHED)
> Subject: Project Plum: MA Thank you
>
> Mike,
>
> Please find attached a thank you letter from Ann Klee to the team.
Thank you for your assistance in forwarding to the others.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 895/975
>
>
> Karen Kulish
> Executive Assistant to Ann Klee
> Global Operations - Environment, Health & Safety
> O: 203 373-2575
> C:
>
> General Electric Company
> 3135 Easton Turnpike
> Fairfield, CT 06828
>
> GE Imagination at Work
>
>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 896/975
From: Kennealy, Michael (EOHED)
To: Kulish, Karen (GE, Corporate)
Subject: RE: Project Plum: MA Thank you
Date: Friday, August 07, 2015 2:27:00 PM
Thank you Karen! I will forward to others, though please let me know if,
per your email earlier yesterday, you would still like everybody's emailaddress.
All the best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640Cell: 617-634-4762
-----Original Message-----
From: Kulish, Karen (GE, Corporate) [mailto:[email protected]]
Sent: Thursday, August 06, 2015 4:12 PM
To: Kennealy, Michael (EOHED)
Subject: Project Plum: MA Thank you
Mike,
Please find attached a thank you letter from Ann Klee to the team. Thank
you for your assistance in forwarding to the others.
Karen Kulish
Executive Assistant to Ann Klee
Global Operations - Environment, Health & Safety
O: 203 373-2575
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 897/975
From: Kennealy, Michael (EOHED)
To: Nunnelly, Mark E.
Subject: RE: Project Plum: MA Thank you
Date: Monday, September 14, 2015 2:02:00 PM
Will do - thanks!
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Nunnelly, Mark E. [mailto:[email protected]]
Sent: Monday, September 14, 2015 1:40 PMTo: Kennealy, Michael (EOHED)
Subject: RE: Project Plum: MA Thank you
Mike
I tried to rearrange, but does look like it will work.
Good luck. This would be a home run.
Let me know if there is anything else I can do.
men
-----Original Message-----
From: Kennealy, Michael (EOHED)
[mailto:[email protected]]
Sent: Monday, September 14, 2015 12:11 PM
To: Nunnelly, Mark E.
Subject: RE: Project Plum: MA Thank you
And yes, it is exciting! Big tour with them tomorrow. Good lineup for
dinner including appearance by the Gov and Mayor and others.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Monday, September 14, 2015 12:10 PM
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 898/975
To: 'Nunnelly, Mark E.'
Subject: RE: Project Plum: MA Thank you
6:30pm at Tresca in North End 233 Hanover St.
Mike Kennealy
Assistant Secretary for Business Growth The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Nunnelly, Mark E. [mailto:[email protected]]
Sent: Sunday, September 13, 2015 11:34 PM
To: Kennealy, Michael (EOHED)
Subject: Re: Project Plum: MA Thank you
Terrific news that this is progressing!
I unfortunately have a dinner tomorrow night already schedule...I'm going
to see in the morning how difficult to change.
Assume in back bay 6pish?
Exciting
Mark
Mark Nunnelly, Commissioner
Department of Revenue
Special Advisor to the Governor for
Innovation Competitiveness
Tel: (617)626-2201Fax:(617)626-2299
----- Original Message -----
From: Kennealy, Michael (EOHED)
[mailto:[email protected]]
Sent: Friday, September 11, 2015 11:24 AM
To: Nunnelly, Mark E.
Subject: RE: Project Plum: MA Thank you
Hi Mark, the Project Plum folks are coming to Boston next week - would you
be interested in joining us for dinner on Monday?
Mike KennealyAssistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Nunnelly, Mark E. [mailto:[email protected]]
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 899/975
Sent: Friday, August 07, 2015 2:46 PM
To: Kennealy, Michael (EOHED); Ash, Jay (EOHED); Kirk, Carolyn (EOHED);
Pham, Nam (EOHED); Distefano, Maria (MOBD); Servetnick, Adrian (EOHED)
Cc: McMorrow, Paul (EOHED)
Subject: RE: Project Plum: MA Thank you
Go get em!
-----Original Message-----
From: Kennealy, Michael (SEA)
[mailto:[email protected]]
Sent: Friday, August 07, 2015 2:36 PM
To: Ash, Jay (SEA); Kirk, Carolyn (SEA); Nunnelly, Mark E.; Pham, Nam
(SEA); Distefano, Maria G (SEA); Servetnick, Adrian (SEA)
Cc: McMorrow, Paul (SEA)
Subject: FW: Project Plum: MA Thank you
FYI - nice note from the folks we met last week. We have a letter and
materials going out to them today to say thanks and to answer some of
their questions. Will keep you all posted.
Best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kulish, Karen (GE, Corporate) [mailto:[email protected]]Sent: Thursday, August 06, 2015 4:12 PM
To: Kennealy, Michael (EOHED)
Subject: Project Plum: MA Thank you
Mike,
Please find attached a thank you letter from Ann Klee to the team. Thank
you for your assistance in forwarding to the others.
Karen Kulish
Executive Assistant to Ann Klee
Global Operations - Environment, Health & SafetyO: 203 373-2575
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 900/975
**********************************************************************
This email and any files transmitted with it are confidential and
intended solely for the use of the individual or entity to whom they
are addressed. If you have received this email in error please notify the
system manager at postmaster at dor.state.ma.us.
**********************************************************************
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 901/975
From: Kennealy, Michael (EOHED)
To: Doolin, James
Cc: Morse, Elizabeth; McDonald, Catherine; DeTour, Michele
Subject: RE: Project Plum
Date: Monday, December 07, 2015 2:24:00 PM
Anything in here that we shouldn’t send to the company? The thought is to forward this on when it
is ready.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Doolin, James [mailto:[email protected]]
Sent: Monday, December 07, 2015 11:46 AM
To: Kennealy, Michael (EOHED) <[email protected]>
Cc: Morse, Elizabeth <[email protected]>; McDonald, Catherine
<[email protected]>; DeTour, Michele <[email protected]>
Subject: RE: Project Plum
Mike – here’s one memo that incorporates our ground lease statement and our procurement
statement. Jim
James P. Doolin
Chief Development Officer
Massachusetts Port Authority
O 617-568-3102
C 617-594-5953
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Monday, December 07, 2015 10:25 AM
To: Doolin, JamesSubject: Re: Project Plum
Jim can I get this incorporated in the memo sent earlier.
Mike Kennealy
On Dec 7, 2015, at 9:58 AM, Doolin, James <[email protected]> wrote:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 902/975
Mike – here’s our language on the ground lease as requested. Jim
James P. Doolin
Chief Development Officer
Massachusetts Port Authority
O 617-568-3102C 617-594-5953
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Monday, December 07, 2015 8:19 AMTo: Doolin, JamesSubject: RE: Project Plum
Will come back to you likely later today on this Jim. More urgent is the lease language
we talked about – coming over this morning?
Mike KennealyAssistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Doolin, James [mailto:[email protected]]Sent: Sunday, December 06, 2015 9:44 AM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: Project Plum
Mike – yes we do have folks that can do some graphic layout type production. We can
look at once we have the pieces to see if possible (I assume its close of business
Monday?) Jim
James P. Doolin
Chief Development OfficerMassachusetts Port Authority
O 617-568-3102
C 617-594-5953
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Saturday, December 05, 2015 8:17 PMTo: Doolin, James
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 903/975
Subject: Fwd: Project Plum
Jim, suggestion from Sec Lepore that Massport has a marketing dept that could help
package/present whatever we come up with - thoughts?
Mike Kennealy
Begin forwarded message:
From: "Kennealy, Michael (EOHED)"
Date: December 5, 2015 at 8:14:01 PM EST
To: "Kennealy, Michael (EOHED)"
<[email protected]>, "Garrity, Rob (DOT)"
<[email protected]>, "Doolin, James"
<[email protected]>, "Sullivan, Jennifer F. (ANF)"
<[email protected]>, "Frazier, Ricks (EOHED)"
<[email protected]>, "Kreuter, Erica (EOHED)"
Cc: "Ash, Jay (EOHED)" < [email protected]>, "Lepore,
Kristen (ANF)" <[email protected]>
Subject: Re: Project Plum
Same number tomorrow please 10am Jay, Mike, Ricks, Erica, others if
interested and available. Whole group to reconvene when Jen has
feedback from outside counsel.
Mike Kennealy
On Dec 5, 2015, at 8:08 AM, Kennealy, Michael (EOHED)
<[email protected]> wrote:
It looks like we have folks available for a call at 4:30pm today.Please use this number:
access code
Looking forward to speaking then and discussing ideas from the group.
Mike
From: Kennealy, Michael (EOHED)Sent: Friday, December 04, 2015 6:23 PMTo: Jennifer F. Sullivan (ANF) ([email protected]); Doolin, James; Garrity, Rob (DOT); Frazier, Ricks (EOHED); Kreuter, Erica (EOHED)Cc: Ash, Jay (EOHED); Lepore, Kristen (ANF)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 904/975
Subject: Project Plum
I am emailing a group of people that I hope can work as a
team this weekend and into Monday to advance the Project
Plum work. As you know, we presented a proposal to Plum
that relies heavily on I-Cubed and Massworks funding, and
we also suggested some sites. The good news from today is
that we are very much in the game here, and the company
will be visiting Boston on Wednesday to look at sites, with a
significant internal meeting in about 10 days. (Note – not
clear yet what involvement they want from us on
Wednesday, possibly none though of course we are
pushing).
As Steve and Sec. Lepore and I just discussed, we think our
mission at this point is to make this proposed infrastructure
funding more tangible for them – how could these dollars
be used to the direct benefit of their project? Said
differently, our ~$100 MM dollar proposal was $80 MM I-
Cubed/MassWorks and $20 MM local property tax
incentives; they know how to value the $20 MM but are
unsure how to value the $80 MM, and we need this
proposal to look a lot closer to $100 MM than $20 MM,
especially in the face of competition offering incentives that
are much easier to value.
To that end, there are two deliverables that we would like to
send to the company by noon on Monday:
1. A list/discussion of historical examples of I-Cubed
and MassWorks projects. I have attached a draft
memo from Erica and the language that Jen
provided for our letter. What other examples can
we provide, and in what level of detail, specifically
ones that are as analogous as possible to their
project?
2. Specific examples of how I-Cubed and MassWorks could be deployed at the MCCA and Massport sites.
I have attached information about those sites. No
site or building has been ruled out, but initial
guidance from Plum’s location advisor was to focus
on the sites vs. the buildings.
Could I ask the following:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 905/975
1. Could folks start giving consideration to #1 and #2
above and develop specific ideas.
2. Could you please also suggest (if applicable) others
from your organization that could help in this effort.
3. Can we all get on a call tomorrow at 4:30pm to discuss.
On the call tomorrow, I would like to review what we think
the deliverables should look like and discuss specific
examples. We can then decide what other needs we may
have, and plan the work over Sunday and into Monday.
I hope all of that makes sense and, as always, please call with
questions. Please respond as soon as you can with respect
to your availability tomorrow at 4:30pm.
All the best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
<ground lease terms statement.docx>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 906/975
From: Kennealy, Michael (EOHED)
To: Woodruff, Brent (GE Global Operations, consultant); Eisenstadt, Amy (GE, Corporate); Klee, Ann (GE, Corporate); Cowan, Mo
Cc: John Barros; Woodruff, Brent @ Atlanta Peachtree; Morse, Elizabeth; jdoolin; Jennifer F. Sullivan (ANF) ([email protected]); Frazier, Ricks (EOHED)
Subject: RE: Proposal from Boston
Date: Tuesday, December 08, 2015 3:46:00 PM
Great, let’s do 5pm today. I have copied some of my colleagues from the state who will join and John (and I believe someone else) from the City will join too. Just please let us know the dial in
number. Looking forward to speaking, thanks.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640Cell: 617-634-4762
From: Woodruff, Brent (GE Global Operations, consultant) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 3:27 PM
To: Eisenstadt, Amy (GE, Corporate) <[email protected]>; Klee, Ann (GE, Corporate)
<[email protected]>; Kennealy, Michael (EOHED) <[email protected]>;
Cowan, Mo <[email protected]>
Cc: John Barros <[email protected]>; Woodruff, Brent @ Atlanta Peachtree
([email protected]) <[email protected]>Subject: RE: Proposal from Boston
I am good for a call at 5 pm.
Brent Woodruff
404.504.5962
From: Eisenstadt, Amy (GE, Corporate)
Sent: Tuesday, December 08, 2015 3:26 PM
To: Klee, Ann (GE, Corporate) <[email protected]>; Kennealy, Michael (SEA) <[email protected]>; Cowan, Mo <[email protected]>
Cc: John Barros < [email protected]>; Woodruff, Brent (GE Global Operations, consultant)
Subject: RE: Proposal from Boston
Yes – for the general questions, let’s keep trying for 5 tonight.
A call with Brent will be fine. I know his schedule is quite tight so I am leaving it to him.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 907/975
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Klee, Ann (GE, Corporate)Sent: Tuesday, December 08, 2015 3:24 PMTo: Kennealy, Michael (SEA); Cowan, MoCc: John Barros; Eisenstadt, Amy (GE, Corporate); Woodruff, Brent (GE Global Operations, consultant)Subject: RE: Proposal from Boston
I’ll defer to Amy and Brent on the time; I’m assuming a call will be fine. Thanks Mike.
From: Kennealy, Michael (SEA) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 3:23 PMTo: Klee, Ann (GE, Corporate); Cowan, MoCc: John Barros; Eisenstadt, Amy (GE, Corporate)Subject: RE: Proposal from Boston
Thank you Ann –what would be a good time to meet?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Klee, Ann (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 3:20 PM
To: Kennealy, Michael (EOHED) <[email protected]>; Cowan, Mo
Cc: John Barros < [email protected]>; Eisenstadt, Amy (GE, Corporate) <[email protected]>
Subject: RE: Proposal from Boston
Thanks Mike. Our team has been reviewing the revised package and I know they will reach out to
your team if they haven’t done so already (which knowing them, I suspect they have). In the
meantime, it would be very helpful if we could set up a meeting as soon as possible between your
team (especially the Massport folks) and our CBRE partner, Brent Consultant, so that we can better
understand the Massport development piece. That’s obviously critical to the value of the overall
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 908/975
package and we need to be able to present the terms of the Boston proposal to our senior
leadership tomorrow COB.
Thanks for your help in making that happen.
ark
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Tuesday, December 08, 2015 1:27 PMTo: Klee, Ann (GE, Corporate); Cowan, MoCc: John BarrosSubject: RE: Proposal from Boston
Apologies – small typo corrected now (“hangar”). Please see attached.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of MassachusettsExecutive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 08, 2015 1:15 PM
To: Ann R. Klee ([email protected]) <[email protected]>; 'Cowan, Mo' <[email protected]>
Cc: 'John Barros' < [email protected]>
Subject: Proposal from Boston
Ann, Mo,
Please see the attached documents – we look forward to discussing.
All the best,
Mike
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 909/975
Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 910/975
From: Ash, Jay (EOHED)
To: Kadish, Steven (GOV)
Subject: RE: Re: GE / Jobs Plan
Date: Monday, December 21, 2015 7:42:00 AM
Info is consistent with what I am hearing. Yes, contacts would be helpful.
MTC is exactly the right place. We’ve been using them to do so and developing out the agenda and
relationship (need to talk about proposed 9C cuts to MTC which would greatly reduce their ability to
do so – I have a meeting request into Kristen Lepore for this purpose).
From:
Sent: Monday, December 21, 2015 7:39 AM
To: Kadish, Steven (GOV); Ash, Jay (EOHED)
Subject: Re: GE / Jobs Plan
Steve & Jay --
GE...
I had conversation last week with Israel Ruiz, who is the Provost at MIT. He said he could call Susan Hochberg - former President of MIT and Board member at GE - if that would be helpful to us. I said it would be, so he did. His thoughts coming out of that phone call are as follows... Key General Points Boston, MA is very much part of the finalist list per board meeting two weeks ago. Decision will be made very soon. List not disclosedThe decision is not going to be just financial. Logistics and innovation ecosystem very important.Gov. Cuomo is throwing everything on the table to sweeten the dealJeff’s style much closer to Governor Baker Key suggestion: Gov. Baker needs to engage very soon (ideally in person) with
Jeff
Key messages to be delivered
An exciting vision for Boston and the Commonwealth that is distinctive and beyond just life sciences that everybody knows. A future where bold ideas and disruptive technologies are invented.
- GE should not only be part of this future, but help us shape it together - GE’s transformation as a company (industrial internet) wants to be where things happen and the future is invented and they can shape it.- GE is no longer a financial company (no point being located in NY). A few GE
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 911/975
divisions have already declared MA to be their place.- Ask Jeff directly, what it would take for GE to be part of this exciting future? Sharing key data with Jeff
When people go around and meet top scientific or engineering people in the US and
around the world, more than 50% are from Boston and more than 2/3 have been educated in the greater Boston area (had no source for this).
-
Share the list of current direct international destinations from Logan, especially to South America and the East. List any upcoming ones.
------------------ He then suggested to me that I put the above into a powerpoint or a letter, and visit with Jeff Immelt sometime in early / mid - January.
In response to this, I called Bob White at Bain and asked him if he had data / a pitch deck / analytics in his shop on all of the above. Bob said he would check - but also said if we hadn't reached out to the folks at Harvard Business School to talk about their partnership in Allston with the Harvard Engineering School - and potentially MIT - we should, because he thinks that build out could be very interesting to GE. I agreed - and plan to reach out to the Dean of HBS today. I also reached out to Larry Renfro, the CEO of Optum ($80 billion division of United Healthcare), who lives in MA and has put a lot of money into building out their footprint here. He will get us whatever we need on why they are investing so heavily here, and told me they work very closely with GE on a number of projects.
Steve - I am going to have you serve as project manager for this briefing document, and will be connecting you with Bob and Larry. Let's try to have a draft of this ready by 1/4/16. Jobs Plan...
Here are my thoughts on the Jobs Plan: 1 - the regional clusters notion is less about what's in the actual bill, and more about how we would choose to use it if / when the legislature passes it. I think we should treat the what we put where question as an administrative decision, explain that what we are asking the legislature for are the tools to build out regional clusters, and not try to tie that idea directly into the legislation. 2 - the elements of this should be broad & flexible enough that they can be used strategically, and not necessarily targeted to a narrowly defined vertical. Who knows which one(s) will emerge over time as the ones we should make shared investments in.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 912/975
3 – I would suggest the themes should be all about public / private partnerships and capacity building - sector building or human capital building. That said, I would line it up like this...
Skill Building -- Matching Capital Equipment Grants for Career & Technical Schools ($50-100 MM)
-- The Authority for these schools to create pathways to associate degrees and maybe apprenticeship programs. Community Building -- MassWorks ($350-500 MM)-- Site Assembly / State Land ($50-70 MM)-- TDI / Gateway Cities ($50-70 MM) – in my mind, this should all be public / private
partnerships and separated in some way from the other 3 categories-- Brownfields ($30-50 MM) Sector Development -- Mass. Tech Collaborative ($100 MM)-- Life Sciences Center ($100 MM)-- NNMI ($75-100 MM) Past that - let the legislature add the nooks and crannies that they like to add. Keep our proposal clean and simple, and let it rip. We can include Cyber, Robotics and
Advanced Manufacturing as potential sectors for development in the MTC stuff, and digital health and medical devices and big data can all be part of either the life sciences stuff or the MTC stuff. I do not think we should create another quasi - and would ask you Jay if MTC - vs. some other vehicle - is the right place to process innovative ideas we could partner with others on in the cyber, digital health, robotics and other stuff.
All for now. Charlie
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 913/975
From: Kersten, Annamarie (MOBD)
To: Cosco, Jonathan (EOHED); Pham, Nam (EOHED); Milano, Peter (MOBD)
Cc: Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Giovino, Joey (MOBD)
Subject: RE: Requested Materials
Date: Monday, November 30, 2015 10:26:28 AM
See below.
AnnamarieKersten
EDIP Director
Massachusetts Office of Business Development
10 Park Plaza, Suite 3730
Boston, MA 02116
Phone: 617-973-8534
Fax: 617-973-8554
This communication and any communication incorporated herein, including attachments, may be
subject to public disclosure as a “public record,” as defined by M. G. L. c. 4, § 7, and subject to public
inspection, examination and copying pursuant to M. G. L. c. 66, § 10. Any communication with this
agency whether in response to this communication or otherwise may itself be subject to public
inspection and copying pursuant to M. G. L. c. 66, § 10, unless protected by statutory exemption.
From: Cosco, Jonathan (EOHED)
Sent: Monday, November 30, 2015 9:34 AM
To: Kersten, Annamarie (MOBD); Pham, Nam (EOHED); Milano, Peter (MOBD)Cc: Kennealy, Michael (EOHED); Frazier, Ricks (EOHED)
Subject: RE: Requested Materials
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 914/975
Thank you!
___________________________________________Jonathan M. Cosco
Senior Deputy General Counsel
Executive Office of Housing and Economic Development
Commonwealth of Massachusetts
One Ashburton Place, 21st Floor
Boston, MA 02114
617-788-3628
From: Kersten, Annamarie (MOBD)
Sent: Monday, November 30, 2015 9:31 AM
To: Cosco, Jonathan (EOHED); Kennealy, Michael (EOHED); Pham, Nam (EOHED); Milano, Peter
(MOBD)
Subject: Requested Materials
Joey is searching the files too. So far, we’ve found the following.
AnnamarieKersten
EDIP Director
Massachusetts Office of Business Development
10 Park Plaza, Suite 3730Boston, MA 02116
Phone: 617-973-8534
Fax: 617-973-8554
This communication and any communication incorporated herein, including attachments, may be
subject to public disclosure as a “public record,” as defined by M. G. L. c. 4, § 7, and subject to public
inspection, examination and copying pursuant to M. G. L. c. 66, § 10. Any communication with this
agency whether in response to this communication or otherwise may itself be subject to public inspection and copying pursuant to M. G. L. c. 66, § 10, unless protected by statutory exemption.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 915/975
From: Kennealy, Michael (EOHED)
To: Kadish, Steven (GOV)
Subject: RE: Revised letter, Steve"s edits at 12:10 pm
Date: Tuesday, December 08, 2015 12:44:00 PM
Attachments: Project Plum Dec 8.sk.noon.docx MJK.docx
With the following edits attached - .
Barros signed off. Waiting for Jen's edits and final Massport deck.
Propose to send letter and deck to Ann and Mo then forward to group.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 08, 2015 12:28 PM
To: Kadish, Steven (GOV) <[email protected]>
Subject: RE: Revised letter, Steve's edits at 12:10 pm
Steve, this looks great - a few edits I propose to make:
- I checked in with Lon
- Innovation Center - just a few words to refer back to 12/1 proposal- paragraph 5 - should it be "staff in the office of the . . . "
I will make whatever edits Jen has to your version and send back.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kadish, Steven (GOV)
Sent: Tuesday, December 08, 2015 12:12 PM
To: Kennealy, Michael (EOHED) <[email protected]>;
Ash, Jay (EOHED) <[email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Sullivan, Jennifer F. (ANF)
<[email protected]>; Ross, Robert (ANF)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 916/975
<[email protected]>; Frazier, Ricks (EOHED)
<[email protected]>; Pollack, Stephanie (DOT)
<[email protected]>; Tom Glynn <[email protected]>;
Elizabeth Morse <[email protected]>; jdoolin <[email protected]>;
Povich, Lon (GOV) <[email protected]>; Garrity, Rob (DOT)
Subject: RE: Revised letter, Steve's edits at 12:10 pm
Please take a look at the attached.
Mike -- please send to John Barros.
All comments back to Mike Kennealy not later than 12:30 pm.
Thx.
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 08, 2015 10:59 AM
To: Ash, Jay (EOHED); Kadish, Steven (GOV); Lepore, Kristen (ANF);
Sullivan, Jennifer F. (ANF); Ross, Robert (ANF); Frazier, Ricks (EOHED);
Pollack, Stephanie (DOT); Tom Glynn; Elizabeth Morse; jdoolin; Povich, Lon
(GOV); Garrity, Rob (DOT)
Subject: RE: Revised letter
New letter attached
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 08, 2015 9:42 AM
To: Ash, Jay (EOHED) <[email protected]>; Kadish, Steven (GOV)
<[email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Sullivan, Jennifer F. (ANF)
<[email protected]>; Ross, Robert (ANF)
<[email protected]>; Frazier, Ricks (EOHED)<[email protected]>; Pollack, Stephanie (DOT)
<[email protected]>; Tom Glynn <[email protected]>;
'Elizabeth Morse' <[email protected]>; 'jdoolin' <[email protected]>;
Povich, Lon (GOV) <[email protected]>; Garrity, Rob (DOT)
Subject: RE: Revised letter
Thoughts on letter and process:
- Section 1 will change based on which scenario we are pursuing.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 917/975
- Other sections remain the same regardless of scenario, though MLSC (and
Current) might move up.
- Need City to review; question is when. "Massport as partner" needs to
be approved by them (still have City-owned sites in the mix).
- Propose we send this with the Massport presentation. Question now on
whether to include MassWorks memo (attached) regardless of which scenario
we are pursuing.
- Specific information needs/questions:
1. Have we described Massport/role appropriately 2. Is the helipad
public 3. Need language on TMA 4. What we can do with Current 5.
Regardless of scenario, do we throw in some MLSC money.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Kennealy, Michael (EOHED)
Sent: Tuesday, December 08, 2015 9:22 AM
To: Ash, Jay (EOHED) <[email protected]>; Kadish, Steven (GOV)
<[email protected]>; Lepore, Kristen (ANF)
<[email protected]>; Sullivan, Jennifer F. (ANF)
<[email protected]>; Ross, Robert (ANF)
<[email protected]>; Frazier, Ricks (EOHED)
<[email protected]>; Pollack, Stephanie (DOT)
<[email protected]>; Tom Glynn <[email protected]>;
Elizabeth Morse <[email protected]>; jdoolin <[email protected]>;
Povich, Lon (GOV) <[email protected]>; Garrity, Rob (DOT)<[email protected]>
Subject: Revised letter
Please see attached. Working on scenarios #2 and #3. Information needs
are highlighted. Please send me edits directly or call vs. marking up
document given number of parties reviewing. The writing still a little
rough - working on that too.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development One Ashburton Place,
Room 2101 Boston, MA 02108Office: 617-788-3640
Cell: 617-634-4762
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 918/975
1
December 8, 2015
Ann R. Klee
Vice President
Corporate Environment, Health and Safety
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
Dear Ms. Klee,
We are pleased to provide some additional thoughts on a partnership between General Electric,
the Commonwealth and the City. We again have endeavored to listen to your feedback and
accordingly have strengthened our proposal and added some additional elements:
1. Public support for your headquarters through a partnership with Massport: Our
December 1 proposal contemplated up to $80 million in public infrastructure improvements
financed by the state. We now propose that Massport be your development partner,
construct a building on a Massport site and, by discounting the construction cost by $80M,
arrive at substantial lease savings for GE. Massport also proposes to build a parkingstructure nearby, allowing GE the benefit of proximate parking. Further, Massport has
previously structured lease payments for certain projects that delay or reduce payments in
the early years of the lease while still achieving fair market value overall, and they expect to
work closely and creatively with you.
Massport has a mission to promote economic development and a record of success in
developing its extensive real estate portfolio (including in the Seaport District). Massport
has great experience working with City and state officials, federal regulators and private
parties and in dealing with security and public safety concerns. Attached please see the
specific sites and other information related to this Massport opportunity.
2. Corporate Jets and Helicopters: We understand the importance of immediate access to
your corporate fleet. We now propose:
Parking of one executive jet and one helicopter at Logan Airport for 24/7 access.
A hanger for executive aircraft at Hanscom Airport, with on-call service to Logan.
State financed construction of a new public helipad in Boston (one-site has FAA
approval; other site options can be reviewed.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 919/975
2
3. Innovation Center – a premier talent pipeline: As presented on December 1, we propose
a $5M investment to launch an Innovation Center in your building or another location with
MassChallenge, an internationally renowned start-up accelerator. To advance this potential,
we propose to invite participation from Harvard, MIT, Northeastern, the UMass schools and
others, bringing together the best of our public and private universities and research
institutions. This partnership would allow you to collaborate with, and recruit, the world’smost talented students, engineers, scientists, programmers, MDs, and entrepreneurs.
4. Local property tax incentive: Same $20M as proposed before.
5. Coordinated Permi tting: Coordinated and streamlined permitting process by City and state
authorities and a permitting Ombudsman to assist in addressing any permitting issues. We
will dedicate staff in the office of the Secretary of Administration and Finance, supported by
the Governor’s Office. A similar dedication of staff will be provided by the Boston
Redevelopment Authority, supported by the Mayor’s Office.
6. GE’s Current: We are prepared to support the launch of your Current business here in
Boston with a grant of $5-10M over two years.
7. Improvements to Local Transportation:
Investment of public funds to purchase new vehicles and provide additional service to
the GE headquarters site as part of the Seaport Transportation Management Association
Up to $50 million of improvements through our I-Cubed program, including streetscapes,
water taxi, parking, utilities, public safety features and other public infrastructure
Up to $125 million in City and state financed improvements to streets, transit, bridges
and bikeways.
8. Workforce Training Fund: Same $1M as proposed before.
9. Concierge and housing service: As discussed in our December 1 proposal, a Concierge
team will be dedicated to easing the transition for GE and your employees, including home
buying assistance with Boston Home Center and Mass Housing.
We believe we are presenting to you the premier ecosystem to grow your business, an
exceptional place to live, substantial public investment in your project, and other amenities that
will make it as easy as possible for GE and your employees to move to and live in Boston. We
look forward to your response.
Sincerely,
Charles D. Baker Martin J. Walsh
Governor Mayor of Boston
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 920/975
From: Kennealy, Michael (EOHED)
To: Povich, Lon (GOV)
Subject: RE: Revised letter
Date: Tuesday, December 08, 2015 12:44:00 PM
Great thanks
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
-----Original Message-----
From: Povich, Lon (GOV)Sent: Tuesday, December 08, 2015 12:43 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: Re: Revised letter
Sent from my iPhone
> On Dec 8, 2015, at 12:27 PM, Kennealy, Michael (EOHED)
<[email protected]> wrote:
>
>
>
> Mike Kennealy
> Assistant Secretary for Business Growth The Commonwealth of
> Massachusetts Executive Office of Housing & Economic Development One
> Ashburton Place, Room 2101 Boston, MA 02108
> Office: 617-788-3640
> Cell: 617-634-4762
>
>
> -----Original Message-----
> From: Povich, Lon (GOV)
> Sent: Tuesday, December 08, 2015 12:07 PM
> To: Kennealy, Michael (EOHED) <[email protected]>
> Subject: Re: Revised letter
>
>
>
> Sent from my iPhone
>
>> On Dec 8, 2015, at 11:53 AM, Kennealy, Michael (EOHED)
<[email protected]> wrote:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 921/975
>>
>>
. Steve making some edits and hopefully final
product going out by 12:30pm.
>>
>> Mike Kennealy
>> Assistant Secretary for Business Growth The Commonwealth of
>> Massachusetts Executive Office of Housing & Economic Development One
>> Ashburton Place, Room 2101 Boston, MA 02108
>> Office: 617-788-3640
>> Cell: 617-634-4762
>>
>>
>> -----Original Message-----
>> From: Kennealy, Michael (EOHED)
>> Sent: Tuesday, December 08, 2015 10:59 AM
>> To: Ash, Jay (EOHED) <[email protected]>; Kadish, Steven
>> (GOV) <[email protected]>; Lepore, Kristen (ANF)
>> <[email protected]>; Sullivan, Jennifer F. (ANF)
>> <[email protected]>; Ross, Robert (ANF)
>> <[email protected]>; Frazier, Ricks (EOHED)
>> <[email protected]>; Pollack, Stephanie (DOT)
>> <[email protected]>; Tom Glynn <[email protected]>;
>> 'Elizabeth Morse' <[email protected]>; 'jdoolin'
>> <[email protected]>; Povich, Lon (GOV)
>> <[email protected]>; Garrity, Rob (DOT)
>> <[email protected]>
>> Subject: RE: Revised letter
>>
>> New letter attached
>>
>>
>>>> Mike Kennealy
>> Assistant Secretary for Business Growth The Commonwealth of
>> Massachusetts Executive Office of Housing & Economic Development One
>> Ashburton Place, Room 2101 Boston, MA 02108
>> Office: 617-788-3640
>> Cell: 617-634-4762
>>
>>
>> -----Original Message-----
>> From: Kennealy, Michael (EOHED)
>> Sent: Tuesday, December 08, 2015 9:42 AM
>> To: Ash, Jay (EOHED) <[email protected]>; Kadish, Steven>> (GOV) <[email protected]>; Lepore, Kristen (ANF)
>> <[email protected]>; Sullivan, Jennifer F. (ANF)
>> <[email protected]>; Ross, Robert (ANF)
>> <[email protected]>; Frazier, Ricks (EOHED)
>> <[email protected]>; Pollack, Stephanie (DOT)
>> <[email protected]>; Tom Glynn <[email protected]>;
>> 'Elizabeth Morse' <[email protected]>; 'jdoolin'
>> <[email protected]>; Povich, Lon (GOV)
>> <[email protected]>; Garrity, Rob (DOT)
>> <[email protected]>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 922/975
>> Subject: RE: Revised letter
>>
>> Thoughts on letter and process:
>>
>> - Section 1 will change based on which scenario we are pursuing.
>> - Other sections remain the same regardless of scenario, though MLSC
(and Current) might move up.
>> - Need City to review; question is when. "Massport as partner" needs
to be approved by them (still have City-owned sites in the mix).
>> - Propose we send this with the Massport presentation. Question now on
whether to include MassWorks memo (attached) regardless of which scenario
we are pursuing.
>> - Specific information needs/questions:
>>
>> 1. Have we described Massport/role appropriately 2. Is the helipad
public 3. Need language on TMA 4. What we can do with Current 5.
Regardless of scenario, do we throw in some MLSC money.
>>
>> Mike Kennealy
>> Assistant Secretary for Business Growth The Commonwealth of
>> Massachusetts Executive Office of Housing & Economic Development One
>> Ashburton Place, Room 2101 Boston, MA 02108
>> Office: 617-788-3640
>> Cell: 617-634-4762
>>
>> -----Original Message-----
>> From: Kennealy, Michael (EOHED)
>> Sent: Tuesday, December 08, 2015 9:22 AM
>> To: Ash, Jay (EOHED) <[email protected]>; Kadish, Steven
>> (GOV) <[email protected]>; Lepore, Kristen (ANF)
>> <[email protected]>; Sullivan, Jennifer F. (ANF)
>> <[email protected]>; Ross, Robert (ANF)
>> <[email protected]>; Frazier, Ricks (EOHED)>> <[email protected]>; Pollack, Stephanie (DOT)
>> <[email protected]>; Tom Glynn <[email protected]>;
>> Elizabeth Morse <[email protected]>; jdoolin
>> <[email protected]>; Povich, Lon (GOV)
>> <[email protected]>; Garrity, Rob
>> (DOT) <[email protected]>
>> Subject: Revised letter
>>
>> Please see attached. Working on scenarios #2 and #3. Information
needs are highlighted. Please send me edits directly or call vs. marking
up document given number of parties reviewing. The writing still a little
rough - working on that too.
>>>> Mike Kennealy
>> Assistant Secretary for Business Growth The Commonwealth of
>> Massachusetts Executive Office of Housing & Economic Development One
>> Ashburton Place, Room 2101 Boston, MA 02108
>> Office: 617-788-3640
>> Cell: 617-634-4762
>>
>>
>>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 923/975
>> <Project Plum Dec 8 2.docx>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 924/975
From: Kennealy, Michael (EOHED)
To: Mcgaugh, James (GE Corporate)
Subject: RE: Revised Package
Date: Tuesday, December 08, 2015 8:04:00 AM
Yes, thanks.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Mcgaugh, James (GE Corporate) [mailto:[email protected]]
Sent: Tuesday, December 08, 2015 8:01 AM
To: Kennealy, Michael (EOHED) <[email protected]>
Subject: RE: Revised Package
Mike, thanks. As I’m sure you heard yesterday, time is of the essence. Thanks for your help. Jim
From: Kennealy, Michael (SEA) [mailto:[email protected]]Sent: Tuesday, December 08, 2015 7:56 AMTo: Eisenstadt, Amy (GE, Corporate)Cc: Roberti, Scott (GE, Corporate); Mcgaugh, James (GE Corporate)
Subject: RE: Revised Package
Hi Amy, we are going to send over some additional thoughts by noon or 1pm. If time permits, I will
call you to discuss. I hope that works, thanks.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108Office: 617-788-3640
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Monday, December 07, 2015 6:40 PM
To: Kennealy, Michael (EOHED) <[email protected]>
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 925/975
Cc: Roberti, Scott (GE, Corporate) <[email protected]>; Mcgaugh, James (GE Corporate)
Subject: Revised Package
I heard from Ann that a revised package would be sent sometime before noon tomorrow. I am
going to suggest we do a call in the morning before it’s officially approved for submission. This
would give you an opportunity for feedback in case some adjustments would make sense, as well as assist in keeping within the time constraints we are all working under.
I’m open most of the morning. Please let me know what works for you.
Thanks.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 926/975
From: Ash, Jay (EOHED)
To: Kennealy, Michael (EOHED)
Subject: RE: Revised Package
Date: Monday, December 07, 2015 6:50:00 PM
I’d do the call with her. There is enough back and forth with a number of reps in our State House
meeting today that the generalities of the proposal is known by them anyway.
From: Kennealy, Michael (EOHED)
Sent: Monday, December 07, 2015 6:45 PM
To: Ash, Jay (EOHED)
Subject: Fwd: Revised Package
Will call you to discuss response.
Mike Kennealy
Begin forwarded message:
From: "Eisenstadt, Amy (GE, Corporate)" <[email protected]>
Date: December 7, 2015 at 6:39:44 PM EST
To: "Kennealy, Michael (EOHED)" <[email protected]>
Cc: "Roberti, Scott (GE, Corporate)" <[email protected]>, "Mcgaugh, James (GE
Corporate)" < [email protected]>
Subject: Revised Package
I heard from Ann that a revised package would be sent sometime before noon
tomorrow. I am going to suggest we do a call in the morning before it’s officially approved for submission. This would give you an opportunity for feedback in case
some adjustments would make sense, as well as assist in keeping within the time
constraints we are all working under.
I’m open most of the morning. Please let me know what works for you.
Thanks.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 927/975
From: Kennealy, Michael (EOHED)
To: Eisenstadt, Amy (GE, Corporate)
Cc: Roberti, Scott (GE, Corporate); Mcgaugh, James (GE Corporate)
Subject: RE: Revised Package
Date: Tuesday, December 08, 2015 10:24:00 AM
Amy, just tried to reach you – could you call me?
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Monday, December 07, 2015 6:40 PM
To: Kennealy, Michael (EOHED) <[email protected]>
Cc: Roberti, Scott (GE, Corporate) <[email protected]>; Mcgaugh, James (GE Corporate)
Subject: Revised Package
I heard from Ann that a revised package would be sent sometime before noon tomorrow. I am
going to suggest we do a call in the morning before it’s officially approved for submission. This
would give you an opportunity for feedback in case some adjustments would make sense, as well as assist in keeping within the time constraints we are all working under.
I’m open most of the morning. Please let me know what works for you.
Thanks.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 928/975
From: Ash, Jay (EOHED)
To: Klee, Ann (GE, Corporate); Ash, Jay (EOHED)
Bcc: Kennealy, Michael (EOHED)
Subject: RE: schools
Date: Friday, January 15, 2016 7:07:14 AM
Good morning! We're happy out. In our internal discussions, Mintz agreed in offered to be the
point on this. Or do you want to have Matt do so. On my end, Mike will be the guy. Also, feel free to call on anything. If you have a list of things, let me know if you want to speak. I'd like to do that type of work over the phone for now.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Klee, Ann (GE, Corporate)" <[email protected]>Date: 01/14/2016 8:50 AM (GMT-05:00)To: "Ash, Jay (EOHED)" <[email protected]>Subject: schools
Jay – Now that the decision has been made, some of our senior executives are starting to look at
private schools for their kids. Is there someone in the State who can help with introductions to the
private schools in the area? Matt Cribbins (who you’ll remember was on the exploratory team and
was a HUGE Boston advocate) is heading up next week. Would be great to get some help, a point of
contact, etc. to get his kids into school in the fall. Thanks.
ark
Ann R. Klee
Vice President
Global Operations – Environment, Health & Safety
GE
3135 Easton Turnpike
Fairfield, CT 06824
203-373-3198 (o)
(m)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 929/975
From:
To: Ash, Jay (EOHED)
Cc: Pollack, Stephanie (DOT)
Subject: Re: Southfield
Date: Thursday, August 13, 2015 10:03:51 AM
Great - the Ledger said something about a road project?
Sent from my iPhone
On Aug 13, 2015, at 10:00 AM, Ash, Jay (EOHED) < [email protected]> wrote:
We are all in on this project. We have been very aggressive. I have spent considerable time as has staff on it. We included Southfield in our discussion with GE, for example. Stephanie is being very helpful on the infrastructure side. The developer, the house majority leader, and the towns are all pleased with our efforts.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From:Date: 08/13/2015 9:57 AM (GMT-05:00)To: "Pollack, Stephanie (DOT)" <[email protected]>, "Ash, Jay (EOHED)" < [email protected]>
Subject: Southfield
Got asked about this project when I was at the Quincy Patriot Ledger yesterday. Any thoughts or
updates?
Sent from my iPhone
GOV E-mail
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 930/975
From:
To: Pollack, Stephanie (DOT)
Cc: Ash, Jay (EOHED)
Subject: Re: Southfield
Date: Thursday, August 13, 2015 10:10:29 AM
Thanks.
Sent from my iPhone
On Aug 13, 2015, at 10:09 AM, Pollack, Stephanie (DOT) <[email protected]> wrote:
The “road” is an extension of an East West Parkway that the previous Administration
started to connect Route 3 on the east side of the base and Route 18 on the west side.
It does not currently connect to Route 18 because DOT was doing work on Route 18
that precluded that work. Route 18 is now done and we are working with the new
developer to finish the east-west connection by extending an existing road, Trotter Road, to make a full east-west connection. Money was included in our FY16 capital
budget for this project. Only hangup is the developer wants to do it as a design-build
project and we were not planning to use that methodology, which is usually only for
bigger/more expensive project (there is a statutory minimum on project cost for DOT
authority to use design-build and this project as a stand alone is below it). At the
request of the new developer, legal is now looking at whether we can amend the
contract for the East West Parkway project (which was design-build) to tag this piece
on.
Stephanie
From: Sent: Thursday, August 13, 2015 10:04 AMTo: Ash, Jay (EOHED)Cc: Pollack, Stephanie (DOT)Subject: Re: Southfield
Great - the Ledger said something about a road project?
Sent from my iPhone
On Aug 13, 2015, at 10:00 AM, Ash, Jay (EOHED) < [email protected]> wrote:
We are all in on this project. We have been very aggressive. I have spent considerable time as has staff on it. We included Southfield in our discussion with GE, for example. Stephanie is being very helpful on the infrastructure side. The developer, the house majority leader, and the towns are all pleased with our efforts.
GOV EmailGOV Email
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 931/975
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From:Date: 08/13/2015 9:57 AM (GMT-05:00)
To: "Pollack, Stephanie (DOT)" <[email protected]>, "Ash, Jay (EOHED)" < [email protected]>Subject: Southfield
Got asked about this project when I was at the Quincy Patriot Ledger yesterday. Any
thoughts or updates?
Sent from my iPhone
GOV E-mail
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 932/975
From: Pollack, Stephanie (DOT)
To: Ash, Jay (SEA)
Subject: RE: Southfield
Date: Wednesday, August 26, 2015 11:01:52 AM
I will look into it but we weren’t carrying $5 million, we were only carrying about $2 million.
Stephanie
From: Ash, Jay (SEA) [mailto:[email protected]]Sent: Wednesday, August 26, 2015 9:13 AMTo: Pollack, Stephanie (DOT)Subject: RE: Southfield
I spoke with the developer about the roadway coming in at $9.8m (if I have the right number). He
suspects that included utility work, which is not required by them and will be located elsewhere on
site. He says the 25% drawings carried with it a $5.2m price tag, which was consistent with the
original estimate of $5m plus $1m in contingency. Is it possible that he is right and if we peel back
the utilities from your bid we get back down to the $5m range?
From: Pollack, Stephanie (DOT) [mailto:[email protected]]
Sent: Thursday, August 13, 2015 10:10 AM
To: Ash, Jay (EOHED)
Subject: RE: Southfield
The “road” is an extension of an East West Parkway that the previous Administration started to
connect Route 3 on the east side of the base and Route 18 on the west side. It does not currently
connect to Route 18 because DOT was doing work on Route 18 that precluded that work. Route 18
is now done and we are working with the new developer to finish the east-west connection by extending an existing road, Trotter Road, to make a full east-west connection. Money was included
in our FY16 capital budget for this project. Only hangup is the developer wants to do it as a design-
build project and we were not planning to use that methodology, which is usually only for
bigger/more expensive project (there is a statutory minimum on project cost for DOT authority to
use design-build and this project as a stand alone is below it). At the request of the new developer,
legal is now looking at whether we can amend the contract for the East West Parkway project
(which was design-build) to tag this piece on.
Stephanie
From: Sent: Thursday, August 13, 2015 10:04 AMTo: Ash, Jay (EOHED)Cc: Pollack, Stephanie (DOT)Subject: Re: Southfield
Great - the Ledger said something about a road project?
Sent from my iPhone
GOV Email
GOV Email
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 933/975
On Aug 13, 2015, at 10:00 AM, Ash, Jay (EOHED) < [email protected]> wrote:
We are all in on this project. We have been very aggressive. I have spent considerable time as has staff on it. We included Southfield in our discussion with GE, for example. Stephanie is being very helpful on the infrastructure side.
The developer, the house majority leader, and the towns are all pleased with our efforts.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From:Date: 08/13/2015 9:57 AM (GMT-05:00)To: "Pollack, Stephanie (DOT)" <[email protected]>, "Ash, Jay
(EOHED)" < [email protected]>Subject: Southfield
Got asked about this project when I was at the Quincy Patriot Ledger yesterday. Any thoughts or
updates?
Sent from my iPhone
GOV E-mail
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 934/975
From: Cosco, Jonathan (EOHED)
To: Frazier, Ricks (EOHED)
Subject: RE: Time for a quick call today?
Date: Tuesday, December 01, 2015 4:14:46 PM
___________________________________________
Jonathan M. Cosco
Senior Deputy General Counsel
Executive Office of Housing and Economic Development
Commonwealth of Massachusetts
One Ashburton Place, 21st Floor
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 935/975
Boston, MA 02114
617-788-3628
From: Frazier, Ricks (EOHED)
Sent: Tuesday, December 01, 2015 4:11 PM
To: Eisenstadt, Amy (GE, Corporate)
Cc: Cosco, Jonathan (EOHED)
Subject: RE: Time for a quick call today?
Amy
Sorry I disappeared this morning. For some reason cell coverage and even email disappeared
entirely.
We are still tracking down details on the EDIP lease issue, but have confirmed that a lessee is eligible
for EDIP credits, although the schedule for actually taking them may be an extended one. DOR still
owes us an answer on that question, but they would definitely be available to you as a lessee.
When we hear more we’ll get back to you.
Ricks
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 01, 2015 9:04 AM
To: Frazier, Ricks (EOHED)
Cc: Cosco, Jonathan (EOHED)
Subject: RE: Time for a quick call today?
Works for me. Should I send in a call-in number or do you want to call me?
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Frazier, Ricks (EOHED) [mailto:[email protected]]Sent: Tuesday, December 01, 2015 9:03 AMTo: Eisenstadt, Amy (GE, Corporate)Cc: Cosco, Jonathan (EOHED)Subject: Re: Time for a quick call today?
Can it be later this morning? Say around 11?
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 936/975
Sent from my iPhone
On Dec 1, 2015, at 8:53 AM, Eisenstadt, Amy (GE, Corporate) <[email protected]> wrote:
I have two technical questions.
Amy EisenstadtState Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 937/975
From: Eisenstadt, Amy (GE, Corporate)
To: Frazier, Ricks (EOHED)
Cc: Cosco, Jonathan (EOHED)
Subject: RE: Time for a quick call today?
Date: Tuesday, December 01, 2015 4:13:22 PM
Thanks – could you please provide citations to the authority for the lease payments being qualified
expenditures as well as how the credit is calculated and taken?
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Frazier, Ricks (EOHED) [mailto:[email protected]]Sent: Tuesday, December 01, 2015 4:11 PMTo: Eisenstadt, Amy (GE, Corporate)Cc: Cosco, Jonathan (EOHED)Subject: RE: Time for a quick call today?
Amy
Sorry I disappeared this morning. For some reason cell coverage and even email disappeared
entirely.
We are still tracking down details on the EDIP lease issue, but have confirmed that a lessee is eligible
for EDIP credits, although the schedule for actually taking them may be an extended one. DOR still
owes us an answer on that question, but they would definitely be available to you as a lessee.
When we hear more we’ll get back to you.
Ricks
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 01, 2015 9:04 AM
To: Frazier, Ricks (EOHED)
Cc: Cosco, Jonathan (EOHED)
Subject: RE: Time for a quick call today?
Works for me. Should I send in a call-in number or do you want to call me?
Amy Eisenstadt
State Tax Counsel
General Electric Company
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 938/975
(cell)
From: Frazier, Ricks (EOHED) [mailto:[email protected]]Sent: Tuesday, December 01, 2015 9:03 AMTo: Eisenstadt, Amy (GE, Corporate)Cc: Cosco, Jonathan (EOHED)
Subject: Re: Time for a quick call today?
Can it be later this morning? Say around 11?
Sent from my iPhone
On Dec 1, 2015, at 8:53 AM, Eisenstadt, Amy (GE, Corporate) <[email protected]> wrote:
I have two technical questions.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 939/975
From: Frazier, Ricks (EOHED)
To: "Eisenstadt, Amy (GE, Corporate)"
Cc: Cosco, Jonathan (EOHED)
Subject: RE: Time for a quick call today?
Date: Thursday, December 03, 2015 5:50:00 PM
Amy
I discussed further with DOR and here is how the lessor credit would work in the fact pattern you
inquired about.
EDIP under G.L. c. 63, s. 38N, would be available to a lessee of real property, as specified in that
statute, in a certified project. The regulations are out of date with respect to real property lessees,
but the statutory change was recognized in Technical Information Release 10-1 (See section III F of
that TIR.) The TIR spells out that the calculation of the credit in the case of a real estate lease would
use the same methodology as previously existed for tangible personal property. So by virtue of the
TIR, the methodology in 830 CMR 63.38N.1(6)(b) would apply to a real estate lease as well as to a
lease of tangible property. The practical effect of this would be to make the credit available to the lessee over the term of the lease, prorated based on the useful life of the property and the lessor’s
cost or other basis in the property.
The EDIP is not available to a lessor of real or tangible property by virtue of the express language in
G.L. c. 63, s. 31A(b). This provision is in the ITC statute, on which the EDIP is based.
The section of the EDIP regulation that you inquired about is a regulatory provision that provided
some relief from the 31A(b) statutory preclusion of leasing structures in the particular case of real
estate leases between commonly owned entities. It is, of course, common for a business to own
real property in one legal entity which leases the property to an affiliated operating company.
Given the common ownership, the frequent use of the structure for non-tax purposes, and the fact
that prior law did not allow a lessee of real property to take a credit, the regulation exercised
administrative discretion by disregarding such leases and allowing the acquiring entity/owner to
take the EDIP credit, notwithstanding the lease to an affiliate. This provision would still be valid to
the extent that it applies to the facts of any particular project. But our understanding is that the
project now under discussion would involve a lease between unrelated parties, which would make
the provision inapplicable.
While I hope this answers your question, I would add that collectively we can only think of one
instance where an applicant for EDIP credits used this provision, so it’s not something that we’ve
had a lot of opportunities to work with and analyze different scenarios.
Obviously, if you have any further questions, please don’t hesitate to ask.
Ricks
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Thursday, December 03, 2015 8:36 AM
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 940/975
To: Frazier, Ricks (EOHED)
Cc: Cosco, Jonathan (EOHED)
Subject: RE: Time for a quick call today?
Any update?
Amy EisenstadtState Tax Counsel
General Electric Company
(cell)
From: Frazier, Ricks (EOHED) [mailto:[email protected]]Sent: Tuesday, December 01, 2015 7:48 PMTo: Eisenstadt, Amy (GE, Corporate)Cc: Cosco, Jonathan (EOHED)
Subject: Re: Time for a quick call today?
That's how I read it, but the question of related entities still seemed to be of interest to the experts,
so I don't want to speak for them.
Sent from my iPhone
On Dec 1, 2015, at 7:45 PM, Eisenstadt, Amy (GE, Corporate) <[email protected]> wrote:
This would not be our fact pattern – but this part of the regulation seems to limit the
lessee credit to the fact pattern.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Frazier, Ricks (EOHED) [mailto:[email protected]]Sent: Tuesday, December 01, 2015 7:44 PM
To: Eisenstadt, Amy (GE, Corporate)Cc: Cosco, Jonathan (EOHED)Subject: RE: Time for a quick call today?
I think we’re going to have to run this one past DOR. We did not discuss this scenario
and I would defer to their views.
Ricks
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 941/975
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 01, 2015 7:07 PM
To: Frazier, Ricks (EOHED)
Cc: Cosco, Jonathan (EOHED)
Subject: RE: Time for a quick call today?
Are you saying this part of the regulation doesn’t apply? How the calculation works, perhaps with an example, for leased real property would be greatly appreciated.
(b) Lessor. The credit is generally not available to the lessor of eligible property. However, the credit
is available to a lessor for eligible property, other than tangible personal property, leased to a lessee
provided the relationship between the lessor and the lessee is:
1. an individual and a corporation if such individual owns, directly or indirectly, 100 percent of the
outstanding stock in the corporation;
2. a corporation and a partnership if the same persons own, directly or indirectly, 100 percent of the
outstanding stock in the corporation and 100 percent of the capital interest or profit interest in the
partnership;
3. a corporation and another corporation if the same persons own, directly or indirectly, 100 percent
of the outstanding stock in each corporation;
4. the fiduciary of the trust that holds the leased property and the sole grantor of the trust;
5. the fiduciary of the trust that holds the leased property and the fiduciary of another trust if the
same person is the sole grantor of both trusts;
6. the fiduciary of the trust that holds the leased property and the sole beneficiary of such property;
7. the fiduciary of the trust that holds the leased property and a corporation if the trust, the sole
grantor of the trust, or the sole beneficiary of the trust owns, directly or indirectly, 100 percent of the
outstanding stock in the corporation.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 942/975
From: Frazier, Ricks (EOHED) [mailto:[email protected]]Sent: Tuesday, December 01, 2015 4:57 PMTo: Eisenstadt, Amy (GE, Corporate)Cc: Cosco, Jonathan (EOHED)Subject: FW: Time for a quick call today?
Amy
Here is the language and links to other relevant materials. What we are waiting for
from DOR is whether there is another regulation relating to useful life of real property
that might apply here. Our working assumption is that these are the applicable rules,
but they are checking to make sure we have not missed anything.
Ricks
From: Cosco, Jonathan (EOHED)
Sent: Tuesday, December 01, 2015 4:15 PM
To: Frazier, Ricks (EOHED)Subject: RE: Time for a quick call today?
Here’s the statutory language:
“A corporation subject to tax under this chapter that participates in a certified project,
as defined in sections 3A and 3F of chapter 23A, may take a credit against the excise
imposed by this chapter to the extent authorized by the economic assistance
coordinating council established by section 3B of said chapter 23A, in an amount not
to exceed 50 per cent of such liability in a taxable year; provided, however, that the 50
per cent limitation shall not apply if the credit is refundable under subsection (b): (i)
for certified expansion projects and certified enhanced expansion projects, as defined
in said sections 3A and 3F of said chapter 23A, an amount up to 10 per cent; (ii) for
certified manufacturing retention projects, as defined in said sections 3A and 3F of said
chapter 23A, an amount up to 40 per cent of the cost of any property that would
qualify for the credit allowed by section 31A if the property were purchased by a
manufacturing corporation or a business corporation engaged primarily in research
and development and is used exclusively in a certified project, as defined in said
sections 3A and 3F of said chapter 23A; and, (iii) for certified job creation projects, as
defined in said sections 3A and 3F of said chapter 23A, an amount up to $1,000 per job
created, or up to $5,000 per job created in a gateway municipality as defined by
section 3A of chapter 23A or within a city or town whose average seasonally adjusted
unemployment rate, as reported by the executive office of labor and workforce
development, is higher than the average seasonally adjusted unemployment rate of
the commonwealth; provided, however, that the total award per project shall be no
more than $1,000,000; and further provided that a credit under this clause (iii) shall be
allowed only for the year subsequent to that in which the jobs are created. A lessee
may be eligible for a credit under this subsection for real property leased under an
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 943/975
operating lease.”
M.G.L. c. 63, sec. 38N(a) (emphasis added). M.G.L. c. 62, sec. 6(g) has similar language.
The current regulation, 830 CMR 63.38N.1(6)(b), still provides that the credit is not
available for real property, but that has obviously been superseded by statutory
revision in 2009. However, DOR Technical Information Release 10-1 confirms that “the
rules used to calculate the credit for leased real estate will be the same rules used to calculate the credit for leased tangible personal property set out in Regulation 830
CMR 63.38N.1(6)(b).” Here’s a link to the regulation
http://www.mass.gov/dor/businesses/help-and-resources/legal-library/regulations/63-
00-taxation-of-corporations/830-cmr-6338n1-economic-opportunity-area-credit.html
and to the TIR http://www.mass.gov/dor/businesses/help-and-resources/legal-
library/tirs/tirs-by-years/2010-releases/tir-10-1-economic-development-incentive.html
___________________________________________
Jonathan M. Cosco
Senior Deputy General Counsel
Executive Office of Housing and Economic Development
Commonwealth of Massachusetts
One Ashburton Place, 21st Floor
Boston, MA 02114
617-788-3628
From: Frazier, Ricks (EOHED)
Sent: Tuesday, December 01, 2015 4:11 PMTo: Eisenstadt, Amy (GE, Corporate)
Cc: Cosco, Jonathan (EOHED)
Subject: RE: Time for a quick call today?
Amy
Sorry I disappeared this morning. For some reason cell coverage and even email
disappeared entirely.
We are still tracking down details on the EDIP lease issue, but have confirmed that a
lessee is eligible for EDIP credits, although the schedule for actually taking them may
be an extended one. DOR still owes us an answer on that question, but they would
definitely be available to you as a lessee.
When we hear more we’ll get back to you.
Ricks
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 944/975
From: Eisenstadt, Amy (GE, Corporate) [mailto:[email protected]]
Sent: Tuesday, December 01, 2015 9:04 AM
To: Frazier, Ricks (EOHED)
Cc: Cosco, Jonathan (EOHED)
Subject: RE: Time for a quick call today?
Works for me. Should I send in a call-in number or do you want to call me?
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
From: Frazier, Ricks (EOHED) [mailto:[email protected]]Sent: Tuesday, December 01, 2015 9:03 AMTo: Eisenstadt, Amy (GE, Corporate)Cc: Cosco, Jonathan (EOHED)Subject: Re: Time for a quick call today?
Can it be later this morning? Say around 11?
Sent from my iPhone
On Dec 1, 2015, at 8:53 AM, Eisenstadt, Amy (GE, Corporate)
<[email protected]> wrote:
I have two technical questions.
Amy Eisenstadt
State Tax Counsel
General Electric Company
(cell)
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 945/975
From: [email protected]
To: Eisenstadt, Amy (GE, Corporate)
Subject: Re: Tomorrow
Date: Tuesday, December 08, 2015 7:19:16 PM
Great, thanks.
Mike Kennealy
> On Dec 8, 2015, at 7:16 PM, Eisenstadt, Amy (GE, Corporate)
<[email protected]> wrote:
>
> Ok. I'll set up a number so Jim can join
>
> Sent from my iPhone
>
>> On Dec 8, 2015, at 7:06 PM, Kennealy, Michael (SEA)
<[email protected]> wrote:
>>
>> How about 11am?>>
>> ________________________________________
>> From: Eisenstadt, Amy (GE, Corporate) [[email protected]]
>> Sent: Tuesday, December 08, 2015 6:00 PM
>> To: Kennealy, Michael (EOHED)
>> Subject: RE: Tomorrow
>>
>> Let's do it sometime after your 10:30. McGaugh and I both show open
until 3.
>>
>> Amy Eisenstadt
>> State Tax Counsel
>> General Electric Company>>
>>
>> (cell)
>>
>> -----Original Message-----
>> From: Kennealy, Michael (SEA) [mailto:[email protected]]
>> Sent: Tuesday, December 08, 2015 5:59 PM
>> To: Eisenstadt, Amy (GE, Corporate)
>> Subject: Tomorrow
>>
>> Amy, I have an 830 - 1030am meeting so either before or after that
best, or if need be I could step out of meeting.
>>
>> Mike Kennealy
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 946/975
From: Kennealy, Michael (EOHED)
To: Kulish, Karen (GE, Corporate)
Subject: RE: Tomorrow"s Visit
Date: Wednesday, July 29, 2015 6:17:00 PM
Sure! I will let our team know.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640
Cell: 617-634-4762
From: Kulish, Karen (GE, Corporate) [mailto:[email protected]]
Sent: Wednesday, July 29, 2015 4:44 PM
To: Kennealy, Michael (EOHED)
Subject: Tomorrow's Visit
For tomorrow’s visit, may I ask your team to call my cell phone when they are 10 or 15 mins. out?Many thanks … Karen
(* We get funky cell service from time to time but I do check the phone frequently for missed calls or voicemail so if I do not answer please leave a brief voicemail)
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
O: 203 373-2575
C:
General Electric Company
3135 Easton Turnpike
Fairfield, CT 06828
GE Imagination at Work
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 947/975
From: Kennealy, Michael (EOHED)
To: Kulish, Karen (GE, Corporate)
Subject: RE: Tomorrow"s Visit
Date: Wednesday, July 29, 2015 6:52:00 PM
Attachments: Commonwealth of Massachusetts bios.pdf
Karen, one other item – attached are the bios again in one document. Content is exactly the same,
but thought it might be more convenient to have in one document. Very much looking forward to our visit tomorrow, and you have my cell phone number below if you need to reach me for any
reason.
Mike Kennealy
Assistant Secretary for Business Growth
The Commonwealth of Massachusetts
Executive Office of Housing & Economic Development
One Ashburton Place, Room 2101
Boston, MA 02108
Office: 617-788-3640Cell: 617-634-4762
From: Kulish, Karen (GE, Corporate) [mailto:[email protected]]
Sent: Wednesday, July 29, 2015 4:44 PM
To: Kennealy, Michael (EOHED)
Subject: Tomorrow's Visit
For tomorrow’s visit, may I ask your team to call my cell phone when they are 10 or 15 mins. out?Many thanks … Karen
(* We get funky cell service from time to time but I do check the phone frequently for missed calls or voicemail so if I do not answer please leave a brief voicemail)
Karen Kulish
Executive Assistant to Ann Klee
Global Operations – Environment, Health & Safety
O: 203 373-2575
C:
General Electric Company
3135 Easton TurnpikeFairfield, CT 06828
GE Imagination at Work
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 948/975
COMMONWEALTH OF MASSACHUSETTS
Executive Office of Housing & Economic Development
Secretary Jay Ash
Jay Ash serves as the Secretary of Housing and Economic Development for the Commonwealth of
Massachusetts. Secretary Ash is responsible for directing and executing Governor Charlie Baker’s agenda
on housing and community development, job creation, business development, consumer affairs, and
business regulation. He previously served as the city manager in his native Chelsea, a position he held
from 2000 to 2014. In Chelsea, Secretary Ash’s leadership produced both economic expansion and fiscal
stability. He grew the city’s housing stock by over ten percent, expanded its commercial base with twodozen major projects, led all Gateway Cities with a 15% increase in new employment, developed 10 new
parks, secured five credit rating increases, and won two All-America City designations for Chelsea.
Secretary Ash has led statewide initiatives on health insurance, youth violence, transportation
infrastructure and expanded gaming in Massachusetts. He previously served as co-founder and vice-
chair of the Metropolitan Mayors Coalition, as past president of the Metropolitan Area Planning Council,
as a board member of the public policy think tank MassINC, the staff director to the Massachusetts
House Majority Leader, and as an elected trustee of his alma mater, Clark University.
Deputy Secretary Carolyn Kirk
Carolyn A. Kirk joined the Baker-Polito Administration in January of 2015 and serves as the Deputy
Secretary of the Executive Office of Housing and Economic Development. In this position, Kirk leadsoperational management and shares policy responsibility for the Executive Office of Housing and
Economic Development, the Office of Consumer Affairs and Business Regulation, the Department of
Housing and Community Development, the Mass. Office of Business Development and its ancillary
agencies of Mass. Travel and Tourism, the Mass. Marketing Partnership, and the Mass. Office of
International Trade and Investment. In addition, Kirk is responsible for economic planning and growth in
the Maritime economic sector, oversees the MassWorks grant program, and provides direct support to
the Lieutenant Governor’s office on a number of initiatives. Prior to her appointment with the
Baker/Polito administration, in 2007 Kirk was the first woman popularly elected as Mayor of the City of
Gloucester. Kirk went on to win three subsequent general municipal elections, never lost a ward or a
precinct in any of her contests, and served as Mayor for seven years. Kirk’s administration invested
over $100 million in infrastructure thus laying the groundwork for future economic growth. The first-
ever business class hotel is under construction in the city in a long sought after waterfront location
adjacent to downtown. A new $40 million elementary school, the first one to be built since World War
II and which Kirk led the effort on for seven years, is also under construction in the city. Mayor Kirk’s
professional career spans over 25 years. She is a long-time management consultant and her clients have
included many of the Top 20 banks in the US, along with Fortune 500 companies. She and her husband
Bill Kirk have two children, Sam, 17 and Baylee, 14. Both are enrolled in Gloucester Public Schools. A
graduate of the Boston College class of 1984, Mayor Kirk was born and raised in Clinton, NY and moved
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 949/975
to Massachusetts to attend college. She moved to Gloucester in 1988 where she still resides, and was
drawn to the diversity and beauty of the city.
Assistant Secretary Mike Kennealy
Mike Kennealy is the Assistant Secretary for Business Growth for the Commonwealth of Massachusetts
in the Executive Office of Housing & Economic Development. Mike joined the Baker-Polito
Administration in March 2015 and brings two decades of experience working with the management
teams of growing companies. He joined Spectrum Equity in 1997 and was a Managing Director of the
firm until early 2013. Founded in 1994 with offices in Boston and San Francisco, Spectrum is a leading
growth private equity firm that provides capital and strategic support to its portfolio companies. During
Mike’s more than 15 years at the firm, Spectrum grew from $360 million in assets under management to
$4.7 billion and invested in nearly 100 high growth information services, digital media, software, and
Internet companies. After retiring from Spectrum, he spent two years as Special Advisor to the Receiver
at Lawrence Public Schools. There he worked with the state-appointed superintendent/receiver on
strategic and financial initiatives to support the turnaround plan and developed and managed
relationships with non-profit partners, philanthropic funders, and the municipal government. Earlier in
his career, Mike was an Associate at TA Associates, a Boston-based private equity firm. Mike, his wife,
and three children live in Lexington, where he has served on the Town’s finance committee and a varietyof non-profit boards. He has been a member of the Board of Trustees of St. John’s Prep in Danvers, MA
since 2009 and is Vice Chairman of the Board. Mike received an AB magna cum Laude, Phi Beta Kappa,
with High Honors in Government from Dartmouth College and an MBA from Harvard Business School.
Assistant Secretary Nam Pham
Nam recently joined the Baker-Polito Administration as the Assistant Secretary of Business Development
which oversees the Mass. Office of Business Development, Mass. Office of Travel and Tourism, Mass.
Film Office and Mass. Office of International Trade & Investment. Previously Nam was the CEO of
Vietnamese American Initiative for Development (VietAID). Nam has been a commercial banker for
more than 20 years in both lending and credit for premier community banks and large commercial
banks. From 1994 to 2000 Nam served as Commissioner of Massachusetts Office for Refugees andImmigrants, and Deputy Director of the Massachusetts Office of International Trade & Investment. Nam
earned his BS degree in Business Administration from the University of Minnesota’s Carlson School of
Management, and MPA in Political Economy from Harvard’s Kennedy School of Government.
Regional Director Maria Nigro DiStefano
Maria Nigro DiStefano joined the Baker-Polito Administration in June as the new Northeast Regional
Director for the Massachusetts Office of Business Development (MOBD). MOBD is the state’s one-stop
source for businesses seeking to relocate to Massachusetts or to expand their current operations
here. It provides businesses with information on site locations, workforce availability, funding and
financing and tax incentives. Prior to joining the Administration, she worked for Boston Main Streets as
a Neighborhood Business Manager where she oversaw the development and implementation of
business strategies and provided technical assistance to local Main Streets managers and
volunteers. She graduated cum laude from Salem State College and earned a BA in Political Science &
Sociology, and she lives with her husband and two children in Rockport.
Program and Communications Coordinator Adrian Servetnick
Adrian Servetnick serves as the Program and Communications Coordinator for the Executive Office of
Housing and Economic Development. He is responsible for data analysis and research, as well as
receiving and responding to press inquiries across EOHED. Adrian received a Bachelor of Arts degree in
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 950/975
Political Science from the University of Washington, Seattle, and previously worked as an intern with
Representative Derek Kilmer (D-WA), and with the House Armed Services Committee.
Massachusetts Department of Revenue
Commissioner Mark Nunnelly
Mark Nunnelly serves as Commissioner of the Department of Revenue. He is responsible for overseeing
nearly 2,000 DOR employees in offices across the state who work in tax administration, child support
enforcement and local services for cities and towns. He was appointed on March 30, 2015.
Commissioner Nunnelly, who also serves as Special Advisor to Governor Baker for Technology and
Innovation Competitiveness, brings a track record of building organizations and growing companies in
Massachusetts and across the country. Commissioner Nunnelly joined Bain Capital, one of the world’s
foremost private investment firms, in 1989 as a Managing Director. He held a number of leadership roles
as part of the firm’s growth and global expansion and worked extensively in the business services and
technology industries. Prior to joining Bain Capital, the Commissioner was a Partner at the consulting
firm Bain & Company, working in the US, Asian and European strategy practices. Previously, he worked
at Procter & Gamble in product management. Additionally, Commissioner Nunnelly founded, and had
operating responsibility for, several entrepreneurial ventures. He has been deeply involved in a numberof Massachusetts and national philanthropic efforts, with a particular focus on children and national
service. Commissioner Nunnelly received an MBA with Distinction from Harvard Business School and an
AB from Centre College.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 951/975
From: Frazier, Ricks (EOHED)
To: Ash, Jay (EOHED)
Cc: Kennealy, Michael (EOHED)
Subject: RE: Update on further questions
Date: Monday, December 14, 2015 12:28:03 PM
Jay
I
Ricks
From: Ash, Jay (EOHED)
Sent: Monday, December 14, 2015 10:26 AM
To: [email protected]; Kadish, Steven (GOV)
Cc: Frazier, Ricks (EOHED); Kennealy, Michael (EOHED)
Subject: Update on further questions
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 952/975
Circulating their questions and the working draft of a response. John and I have talked. John will
review all and propose changes where necessary.
Updates
1. What are the “employment tax benefits” through the Mass Life Science Center”? – specifically
a. What is the program? i. MLSC offers a tax credit program to expand life sciences-related
employment opportunities, promote health-related innovations and stimulate research and development, manufacturing and commercialization in the life sciences in MA. GE Health has recently secured a MLSC award.The new application would include both health division future employment
growth and the GE corporate positions. Upon approval of the MLSC Board, GE would receive a tax credit. We are open discussing it as a refundable tax credit.
b. What is the statutory authority supporting eligibility?c. How was the $40m calculated?
i. The $40m proposal represents the largest award ever to be made from the program. Its calculation is based on up to 100 GE Health jobs and up to
600 corporate jobs be located in MA over the next five years. The award would be made for FY’18-FY’20 receipt.2. What are the State “energy efficiency contributions” – explanation of the program, eligibility
requirements, potential benefits, dollar level of support?3. Property tax abatement – what is the term and expected percentage?
i. The property tax abatement term is assumed to be ____ years and the percentage of relief is expected to be _____%. The City is interested in both job creation and the value of the building to be constructed. The assumption has been 600 jobs and 150,000 s.f. of building, although the calculation as to value is dependent on many other variables. Thus, the actual value of the tax abatement will be dependent on the final project to be built, and whether it is on private or public land.
4. What are the issues surround building a parking structure near a privately owned lot, ie is it just availability of land/permitting?
i. Among the issues on a parking structure is the availability of land, the ability to secure permitting and the mix of public or private parking that would be included in the structure. The State is willing to engage in a discussion about a grant for the structure through either the MassWorks or I-Cubed program. Available funding would be requested through the normal application process. A typical MassWorks award for parking structure would be $5m-$10m. The I-Cubed program could make an award of up to $50m for a garage, dependent upon job growth numbers that are in excess of 600 (the 600 already being used to calculate other incentives being offered and thus not available to leverage this I-Cubed opportunity).
Jay Ash, Secretary
Executive Office of
Housing and Economic Development
(v) 617-788-3626
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 953/975
From: Ash, Jay (EOHED)
To: Povich, Lon (GOV)
Subject: RE: We are still working on it
Date: Monday, July 27, 2015 7:54:32 PM
Yes I agree. Thx for being part of the team.
Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message --------From: "Povich, Lon (GOV)" <[email protected]>Date: 07/27/2015 2:19 PM (GMT-05:00)To: "Ash, Jay (EOHED)" <[email protected]>Subject: RE: We are still working on it
Ok, Good luck.
Lon
Lon F. Povich
Governor’s Chief Legal Counsel
State House, Room 271
Boston, MA 02133(617) 725-4082
From: Ash, Jay (EOHED)Sent: Friday, July 24, 2015 6:34 PMTo: Povich, Lon (GOV)Subject: RE: We are still working on it
Thx. We’re working on it. Have a team of 6 going down, including Mark Nunnelly and me. Here’s
the outline of our deck we’ll be presenting.
1. Opening Argument2. About Massachusetts3. About the Gov
a. Biz/public serviceb. Most popular governor in country and politician in statec. About LG
4. About Political Stabilitya. Current relationships have produced whatb. Average time for a Gov and a Mayor of Boston
5. Budget in Generala. $1.8b in cuts without tax increases and use of rainy day fund
6. HED and the Quasis7. ED Agenda
Attorney-Client Communication
Attorney-Client Communication
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 954/975
8. Business Climate9. Fortune 1000 companies10. Recent wins/Current candidates11. Ecosystem12. Higher Ed13. Testimonials14. Workforce15. Existing GE relations
16. Incentives17. Taxation
18. Locationsa. Bostonb. Cambridgec. Somervilled. Worcestere. Springfieldf. Southfield
19. Proximity to major centers20. Airlines21. Trains22. Public Transportation23. Other
a. Heliport
b. Private plans 24. Boston/Culture25. Education26. Greater Boston communities27. General Quality of Life
28. Closing Arguments Work/Live/Play29. FAS 109
Non
Responsive
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 955/975
Non Responsive Materials
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 956/975
From: John Barros
To: Kadish, Steven (GOV)
Cc: Ash, Jay (EOHED); Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Tom Glynn; Morse, Elizabeth; [email protected]; Pollack, Stephanie (DOT); Garrity, Rob (DOT); Povich, Lon (GOV); Zarrella, Lily (GOV); Daniel Koh
Subject: Re: We have some homework to do on the Boston project
Date: Saturday, December 12, 2015 9:17:39 AM
Here is summary information on Parcels N and P that will be helpful for the conference call:
The one thing we will need to clear up is which Parcel N they are referring to because there is one in the BMIP and a different one located at Seaport Square. I assume the one located at Seaport Square but I will provide context for both so we can discuss all possibilities.
Parcels N and P (Seaport Square)
Its important to note the Parcels N and P are privately owned by WS Development. The Parcels sit side by side on the South Side of Seaport square along Summer Street.
A PDA was approved for Seaport Square in 2010. Office is not a currently an allowable use. PDA amendments require a BRA
Board vote.
Per the PDA docs, Parcel N is 348,000 GSF, 80-120'street wall height, overall height is 240'
Parcel P is 418,000 GSF, street wall heights of 42-90' and 270' max height
WS Development purchased Seaport Square in 2015. The Boston Globe reported in Oct 2015 that it was sold for $359
million and "It’s one of the priciest land deals ever in Boston. And at 2.8 million square
feet of permitted space over 10 blocks, it’s among the biggest developments in the
city.
Parcel N (BRA/EDIC)
The Parcel N, Boston Marine Industrial Park has a street address of 25 Fid Kennedy Avenue. It is located across 88 Black Flacon the Massport building we discussed earlier. It is owned by the BRA and designated to Cannistraro--HVAC company. They plan to renovate the building, starting construction Q1 2016.
Chapter 91 forbidden uses include general office. This would need an amendment.
Parcel N contains approximately 141,425 square feet of land improved by a two story structure with gross building area of approximately 160,000 square feet. The existing structure is currently vacant.
East of 25 Fid Kennedy Avenue is the EDIC owned facility known as 3 Dolphin Way. 3 Dolphin Way consists of 148,150 square feet also owned by BRA.
On Fri, Dec 11, 2015 at 7:50 PM, Kadish, Steven (GOV) <[email protected]> wrote:
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 957/975
Colleagues:
We have some homework to do. Our deliverable is due by 7 pm Sunday evening.
I have set up a phone call for tomorrow/Saturday at 10 am.
While the entity remains very interested in 2 different MassPort parcels (A2, D2), we have also been asked to follow up on 2 hypotheticals described below.
For each, the entity would be looking at what the incentive option package could be from the state/city.
We need to think about how to apply the tools that we have.
We should assume the same parameters in terms of
--total square feet (250,000 – 300,000),
--lease of at least 20 years, 150 parking spaces on-site, and
--300 spaces nearby.
1. Existing Office Building
a. MassPort gains control of the building (purchase, lease?) and entity is lessee
b. Building remains in private control and entity is lessee
c. Entity owns building
2. Other sites: Do we know the status of parcels N or P in the Seaport? If it were possible to gain control, then:
a. MassPort gains control of the site(purchase, lease, land swap?), develops the building, and entity is lessee
b. Site remains in private control, building is developed privately, and entity is lessee
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 958/975
c. Entity gains control of the site and builds building
d. Entity gains control of the site, MassPort builds building, and entity is lessee
e. Other?
Sec Ash, Mike K – can you please begin to frame what tools would work in each of the alternatives?
I look forward to our discussion.
Thanks, in advance, for your good work!
Steve
--
John BarrosChief of Economic DevelopmentOffice of Mayor Martin J. Walsh6th Floor, Room 603Boston City Hall, Boston MA 02201t: 617-635-5729http://www.cityofboston.gov
SHARE YOUR VISION. SHAPE OUR CITY.
http://imagine.boston.gov/
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 959/975
From: Frazier, Ricks (EOHED)
To: Kennealy, Michael (EOHED)
Cc: Ash, Jay (EOHED)
Subject: Re: We have some homework to do on the Boston project
Date: Saturday, December 12, 2015 9:52:43 AM
Mike
Sent from my iPhone
On Dec 12, 2015, at 5:59 AM, Kennealy, Michaelh (EOHED) <[email protected]> wrote:
Jay, Ricks, Steve called last night and suggested that some thoughts be sent to the group ahead of the 10am call - Jay did you say you were working on something or should I send? Mostly tied up before 10am (we're up in Kennebunkport) but could send something high level. Initial thoughts/questions I had on scenarios below:
1a - say that we're still good for $120 MM, but very different lease since we had to buy the property? 1b, 1c - no idea what we could do here. We wouldn't own the building, no capex so no EDIP 2 - I don't know sites N or P - just texted Barros. 2a - Massport acquiring a parcel through a swap shouldn't change our offer at all. Really need Massport to weigh in on this, and everything else. 2b-d - EDIP could be used here, 10% of capex. Reminder on Liberty Mutual deal - $353 MM capex, $22.5 MM EDIP, 600 jobs. Other thought - MLSC. By statute can only do $25 MM per year in tax credits. Would we say $5-10 MM per year for 5 years to plug any holes in a new proposal? Question -
Could always use MassWorks or I-Cubed particularly for garage. Tools:$120 MM in development (note - assuming $120 MM cap and floor on whatever we do)MassWorks/I-CubedEDIPMLSCLocalOther? Mike
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 960/975
From: Kadish, Steven (GOV)Sent: Friday, December 11, 2015 7:50 PMTo: Ash, Jay (EOHED); Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Lepore, Kristen (ANF); Sullivan, Jennifer F. (ANF); Tom Glynn; Morse, Elizabeth; [email protected]; Pollack, Stephanie (DOT); Garrity, Rob (DOT); Povich, Lon (GOV); [email protected]: Zarrella, Lily (GOV)Subject: We have some homework to do on the Boston project
Colleagues:
We have some homework to do. Our deliverable is due by 7 pm Sunday evening.
I have set up a phone call for tomorrow/Saturday at 10 am.
While the entity remains very interested in 2 different MassPort parcels (A2, D2), we
have also been asked to follow up on 2 hypotheticals described below.
For each, the entity would be looking at what the incentive option package could be
from the state/city.
We need to think about how to apply the tools that we have.
We should assume the same parameters in terms of
--total square feet (250,000 – 300,000),
--lease of at least 20 years, 150 parking spaces on-site, and
--300 spaces nearby.
1. Existing Office Building
a. MassPort gains control of the building (purchase, lease?) and entity is
lessee
b. Building remains in private control and entity is lessee
c. Entity owns building
2. Other sites: Do we know the status of parcels N or P in the Seaport? If it were
possible to gain control, then:
a. MassPort gains control of the site(purchase, lease, land swap?),
develops the building, and entity is lessee
b. Site remains in private control, building is developed privately, and
entity is lessee
c. Entity gains control of the site and builds buildingd. Entity gains control of the site, MassPort builds building, and entity is
lessee
e. Other?
Sec Ash, Mike K – can you please begin to frame what tools would work in each of the
alternatives?
I look forward to our discussion.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 961/975
Thanks, in advance, for your good work!
Steve
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 962/975
From: Kadish, Steven (GOV)
To: Polito, Karyn (GOV); Lepore, Kristen (ANF); Ash, Jay (EOHED); Pollack, Stephanie (DOT); Tom Glynn; Povich, Lon (GOV); Buckley, Timothy (GOV); Conroy, Jim (GOV); Conroy, Jim (GOV); Sullivan, Jennifer F. (ANF); Morse, Elizabeth; Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Garrity, Rob (DOT)
Cc: Zarrella, Lily (GOV); Wehrs, Brianna (GOV)
Subject: Signed GE Headquarters Relocation Term Sheet
Date: Friday, January 15, 2016 8:09:25 AM
Attachments: GE Headquarters Relocation Terms.Jan13.2016.pdf
For our records.
Attached is a PDF version.
A signed original will also be provided.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 963/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 964/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 965/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 966/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 967/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 968/975
From: Kadish, Steven (GOV)
To: Polito, Karyn (GOV); Lepore, Kristen (ANF); Ash, Jay (EOHED); Pollack, Stephanie (DOT); Tom Glynn; Povich, Lon (GOV); Buckley, Timothy (GOV); Conroy, Jim (GOV); Conroy, Jim (GOV); Sullivan, Jennifer F. (ANF); Morse, Elizabeth; Kennealy, Michael (EOHED); Frazier, Ricks (EOHED); Garrity, Rob (DOT)
Cc: Zarrella, Lily (GOV); Wehrs, Brianna (GOV)
Subject: Signed GE Headquarters Relocation Term Sheet
Date: Friday, January 15, 2016 8:09:25 AM
Attachments: GE Headquarters Relocation Terms.Jan13.2016.pdf
For our records.
Attached is a PDF version.
A signed original will also be provided.
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 969/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 970/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 971/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 972/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 973/975
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 974/975
From: Saia, Susan (EOHED)
To: Ash, Jay (EOHED)
Subject: Telephone call with GE"s lead team member Ann Klee
Date: Thursday, June 18, 2015 9:53:52 AM
Jay,
You received a call from Ann Klee, she is the team leader for GE. She would like to speak with
you regarding GE’s potential move. She may be reached at the following numbers: 203-373-
3198 (office) or (cell).
8/17/2019 General Electric/Massachusetts Redacted Documents
http://slidepdf.com/reader/full/general-electricmassachusetts-redacted-documents 975/975
From: Distefano, Maria (MOBD)
To: Kennealy, Michael (EOHED); Kirk, Carolyn (EOHED)
Cc: Ash, Jay (EOHED); Nunnelly, Mark E (DOR); Pham, Nam (EOHED); Distefano, Maria (MOBD); Servetnick, Adrian (EOHED)
Subject: Top 50 public schools Boston Mag
Date: Thursday, July 30, 2015 4:28:32 PM
All, this is a link to the 2014 sortable list of Boston Magazine top 50 public schools
http://www.bostonmagazine.com/best-public-schools-boston-2014-chart/
Thanks again for including me today,Maria
Sent from my Verizon Wireless 4G LTE smartphone. Please excuse brevity and typos
-------- Original message --------From: "Kennealy, Michael (EOHED)" <[email protected]>
Date: 07/30/2015 7:57 AM (GMT-05:00)To: "Kirk, Carolyn (EOHED)" <[email protected]>Cc: "Ash, Jay (EOHED)" <[email protected]>, "Nunnelly, Mark E (DOR)" <[email protected]>, "Pham, Nam (EOHED)" <[email protected]>, "Distefano, Maria (MOBD)" <[email protected]>, "Servetnick, Adrian (EOHED)" <[email protected]>Subject: RE: Meeting Confirmation, GE Team & Logistics - Massachusetts
I think we have 4 cars going down, based on individual plans for travel/calls/work: - Jay/Carolyn/Adrian- Nam/Maria- Mike- Mark Also please see the most recent version of the deck attached - a few edits will happen this morning but this is very close. Re: speaking roles, expect everyone to be involved/engaged especially in Q&A, but with respect to specific slides here is what Jay and I discussed, by slide number: 1-12 Jay13-15 Mark 16 Carolyn17-18 Mike19-27 Jay28-29 Mike30-32 Carolyn33-34 Jay Please call with questions and I expect we'll have some discussion by phone on the drive down. Mike
From: Kirk, Carolyn (EOHED)Sent: Wednesday, July 29, 2015 8:58 PMTo: Kennealy, Michael (EOHED)Cc: Ash, Jay (EOHED); Nunnelly, Mark E (DOR); Pham, Nam (EOHED); Distefano, Maria (MOBD); Servetnick, Adrian (EOHED)Subject: Re: Meeting Confirmation, GE Team & Logistics - Massachusetts
Perhaps we should gather at 1 Ashburton by 10am.