2015/4/22 1 Gelagar (Girder Beam) Analisis Struktur II Dr.Eng. Achfas Zacoeb, ST., MT. Jurusan Teknik Sipil Fakultas Teknik Universitas Brawijaya
2015/4/22
1
Gelagar (Girder Beam)
Analisis Struktur II
Dr.Eng. Achfas Zacoeb, ST., MT. Jurusan Teknik Sipil Fakultas Teknik Universitas Brawijaya
2015/4/22
2
2015/4/22
3
2015/4/22
4
2015/4/22
5
Contoh Soal
1. Hanya mengalami rotasi
2. Mengalami rotasi dan translasi
2015/4/22
6
Cara 1. Hanya mengalami rotasi
2015/4/22
7
3
2
73,122
09,146
EI
1
88,188
19,288
46,012,0
12,043,0
EI
1
ASD FC
1
FFF
2015/4/22
8
4
3
239
423
61
123
300
300
0
73,122
EI
1
00,150,0
50,000,1EI
300
300A
3M
2015/4/22
9
2015/4/22
10
Cara 2. Mengalami rotasi dan translasi
4
3
2
1
20,136,060,036,0
36,014,036,014,0
60,036,020,136,0
36,014,036,014,0
EIS 1M
2015/4/22
11
8
7
5
3
2
1
6
4
00,138,038,000050,00
38,019,019,000038,00
38,019,030,011,00005,033,0
0011,025,036,014,033,003,0
00036,020,136,0060,0
00014,036,014,0036,0
5,038,005,033,00033,267,0
0033,003,060,036,067,053,2
EIS J
SFF SFR
SRF SRR
2015/4/22
12
2015/4/22
13
2015/4/22
14