x Any deviation from these drawings must be communicated in writing to and reviewed by your local GE Healthcare Installation Project Manager prior to making changes. x Make arrangements for any rigging, special handling, or facility modifications that must be made to deliver the equipment to the installation site. If desired, your local GE Healthcare Installation Project Manager can supply a reference list of rigging contractors. x New construction requires the following; 1. Secure area for equipment, analysis, 4. Restrooms. x Provide for refuse removal and disposal (e.g. crates, cartons, packing) 2. Power for drills and other test equipment, 3. Capability for image x Contact a radiation physicist or consultant to specify radiation containment requirements. CT Site Planning GE Healthcare Customer Site Readiness Requirements Drawing Index A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the preIS manual will result in incomplete documentation required for site design and preparation. Pre Installation documents for GE Healthcare products can be accessed on the web at: www.gehealthcare.com/siteplanning These sheets are a document set and should not be separated. Electrical information and references are contained on all sheets. GE Equipment Delivery Requirements The items on the GE Healthcare Site Readiness Checklist are REQUIRED to facilitate equipment delivery to the IS site. Equipment will not be delivered if these requirements are not satisfied. * REQUIRED REFERENCE * Pre Installation Manual These equipment IS drawings indicate the placement and interconnection of the listed equipment components. These drawings are not construction or site preparation drawings. Customer remains ultimately responsible for preparing the site to accommodate the IS and operation of such equipment in compliance with GE Healthcare's written specifications and all applicable federal, state, and/or local requirements.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Any deviation from these drawings must be communicated in writing toand reviewed by your local GE Healthcare Installation Project Managerprior to making changes.
Make arrangements for any rigging, special handling, or facilitymodifications that must be made to deliver the equipment to theinstallation site. If desired, your local GE Healthcare Installation ProjectManager can supply a reference list of rigging contractors.
New construction requires the following; 1. Secure area for equipment,
analysis, 4. Restrooms.
Provide for refuse removal and disposal (e.g. crates, cartons, packing)
2. Power for drills and other test equipment, 3. Capability for image
Contact a radiation physicist or consultant to specify radiationcontainment requirements.
CT Site Planning
GE HealthcareCustomer Site Readiness
RequirementsDrawing Index
A mandatory component of this drawing set is the GE HealthcarePre Installation manual. Failure to reference the preISmanual will result in incomplete documentation required forsite design and preparation.
Pre Installation documents for GE Healthcare products can beaccessed on the web at:
www.gehealthcare.com/siteplanning
These sheets are a document set and should not be separated.Electrical information and references are contained on all sheets.
GE Equipment DeliveryRequirements
The items on the GE Healthcare Site Readiness Checklist are REQUIRED to facilitate equipmentdelivery to the IS site. Equipment will not be delivered if these requirements are not satisfied.
* REQUIRED REFERENCE *
Pre Installation Manual
These equipment IS drawings indicate the placement and interconnection of the listed equipment components. These drawings are not construction or site preparation drawings. Customer remains ultimatelyresponsible for preparing the site to accommodate the IS and operation of such equipment in compliance with GE Healthcare's writtenspecifications and all applicable federal, state, and/or local requirements.
g B7864PZ / P5064PS / E4502F Three Phase, 14.4 kVA UPS & Interface Kit
Applications The B7864PZ / P5064PS / E4502F optional Partial System Uninterruptible Power Supply (UPS) has been specifically designed to coordinate with GE Healthcare CT & PET/CT scanners. The use of an optional Partial System UPS provides significant productivity benefits to the user. In the event of a power outage, a partial system UPS provides continuous back-up power to the scanner host and control computers, thus assuring no loss of usable scan data. In addition, critical circuits in the gantry and table remain powered which facilitate the safe removal of the patient from the scanner. If power is restored within the battery hold-up time, the operator can continue scanner operations without the need to reboot the system. When longer power outages are anticipated, the UPS provides time for the operator to safely remove the patient and complete an orderly shutdown of the system software. The UPS provides clean, reliable, constant voltage power to the scanner electronics. It protects the system’s sensitive electronic components from damaging power anomalies such as high frequency noise transients and over voltage & under voltage conditions. Utilizing a UPS improves user productivity, system reliability, reduces service costs, and increases system uptime. Benefits • Maintains system electronics and allows critical scanner
operations to continue for >10 minutes (typical) after loss of power.
• Prevents loss of data. • Provides clean constant voltage power. • Protects electronics from under voltage, brownouts, line
sags, over voltage or transients. • System electronics unaffected by periodic emergency
generator testing or automatic transfer switch operation. • System electronics protected from utility power factor
capacitor switching spikes and ring waves. • System electronics protected from utility re-closer
operations common during thunderstorms. • Regulates output voltage to meet and exceed system
electronics requirements. • Allows time for an orderly system shutdown in the event
of an extended power outage. • Reduces maintenance costs. • Increases system uptime. • Suitable for engine generator applications. • Suitable for mobile applications (with the addition of
mobile kit B7864MK).
Features • True double-conversion, on-line technology provides
reliable operation & uninterrupted glitch free power. • Automatic voltage and frequency selection eases
startup, i.e., 50 or 60 Hz compatible. • Integral Static Bypass switch means zero transfer time. • Integral Manual Bypass switch facilitates continued
scanner operation while UPS is being serviced. • Single input connection utilized for both UPS input and
monitors / indicates battery health and improves battery service life.
• Graphical Display & Lighted Indicators for: • UPS power on and utility power on. • UPS on battery. • UPS in bypass mode. • Overload, over temperature, alarm and service
Specifications Rating: 14.4 kVA Operating Temperature: 10-40°C Input Voltage Range: Three-phase; 102-132V / ph Humidity: 20-80% RH Input Frequency Range: 45-65 Hz
Non-condensing Input Power Factor: >95% typ. Audible noise (Norm Mode): <60 dBA @ 1 meter Output Frequency: 50 or 60 Hz, auto-sensing Voltage Regulation: <3% steady-state for all
conditions of line and load Voltage Distortion: <5% THD UPS Width: 12 inches ( 305 mm ) Overload Capacity: 110% for 10 min. UPS Depth: 32 inches ( 813 mm ) 125% for 1 min. UPS Height: 49 inches ( 1245 mm ) 149% for 5 Sec. UPS Weight: 620 lbs ( 277 kg ) Efficiency: >90% typ. FL Heat Dissipation: 5122 BTU/Hr typ. @ 11.5 KVA Battery backup time: >10 minutes typ. Note – Mobile applications require the addition of kit, B7864MK for secure mounting of UPS to floor.