DS-72 Essential equipment designed for best practice Boltight bolt tensioners are designed for critical casing bolting on GE Frames 9FA; 9FB; 7FA; 7FB and 6FA Gas Turbines. These high load tools feature positive piston stop and automatic piston retraction for efficient and easy operation. The equipment provides effective and reliable nut release during turbine dis-assembly, and speedy and accurate re-tightening during turbine assembly. The tools are supplied as a complete package along with hydraulic hoses, air or electric driven pump and spares to suit each gas turbine frame. Equipment operation Suitable for use by local labour with minimal training, the tools locate on the studs and are linked by hydraulic hoses to the pump. During dis-assembly of the turbine, the tools are pressurised until the nuts can be released. During turbine assembly, the tools are pressurised to a set figure to achieve the required load/stretch in the studs. 3 For GE GT Casing Bolting 3 Fast and reliable 3 Accurate and repeatable 3 Training available 3 Site support 3 Complete package 3 On-site for outage duration GE Gas Turbines - Hydraulic Bolt Tensioning
1

GE Gas Turbines - Hydraulic Bolt Tensioning - Boltightboltight.com/.../DS-72-GE-Gas-Turbines---Hydraulic-Bolt-Tensioning.pdfpump and spares to suit each gas turbine frame. ... 3 Training

Mar 15, 2018

Download

Documents

dinhngoc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: GE Gas Turbines - Hydraulic Bolt Tensioning - Boltightboltight.com/.../DS-72-GE-Gas-Turbines---Hydraulic-Bolt-Tensioning.pdfpump and spares to suit each gas turbine frame. ... 3 Training

DS-72

Essential equipment designed for best practiceBoltight bolt tensioners are designed for critical casing bolting on GE Frames 9FA; 9FB; 7FA; 7FB and 6FA Gas Turbines.

These high load tools feature positive piston stop and automatic piston retraction for efficient and easy operation.

The equipment provides effective and reliable nut release during turbine dis-assembly, and speedy and accurate re-tightening during turbine assembly.

The tools are supplied as a complete package along with hydraulic hoses, air or electric driven pump and spares to suit each gas turbine frame.

Equipment operationSuitable for use by local labour with minimal training, the tools locate on the studs and are linked by hydraulic hoses to the pump. During dis-assembly of the turbine, the tools are pressurised until the nuts can be released. During turbine assembly, the tools are pressurised to a set figure to achieve the required load/stretch in the studs. 3 For GE GT Casing Bolting

3 Fast and reliable

3 Accurate and repeatable

3 Training available

3 Site support

3 Complete package

3 On-site for outage duration

GE Gas Turbines - Hydraulic Bolt Tensioning