Top Banner
GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013
19

GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.

Dec 26, 2015

Download

Documents

Ashley Lane
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.

GDOT

Maintenance OverviewEric C. Pitts, P.E.

State Maintenance EngineerJune 28, 2013

Page 2: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.

Current Roadways Maintained

•18,100 centerline miles on the State Route System•47,648 Lane Miles

Page 3: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.
Page 4: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.

1955

Page 5: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.

South from 14th Street in 1953South from 14th Street in 1953

Page 6: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.

South from 14th Street in 2004South from 14th Street in 2004

Page 7: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.

Identifying Maintenance Needs

• Pavement Condition Evaluation System (PACES)

• Daytime Inspection• Night Inspection• Drainage Inspection• Bridge Inspection• Visual Observation and Reported deficiency

Page 8: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.

Pavements - Target Condition Levels

•Maintain interstates with 50,000 or greater ADT at a PACES Rating of 80 or more•Maintain all other interstates at a PACES Rating of 75 or more•Maintain multi-lane non interstate routes with an ADT of 25,000 or greater at a PACES Rating of 75 or more•Maintain other routes at a PACES Rating of 70 or more

Page 9: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.

Life Cycle of a Road

DesignConstructionInitial DeteriorationVisible DeteriorationDisintegration and Failure

Page 10: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.

Treatment for Initial Deterioration

Page 11: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.

Visible Deterioration

Page 12: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.

Treatment for Visual Deterioration

Page 13: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.

Disintegration and Failure

Page 14: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.

Treatment for Disintegration and Failure

Page 15: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.
Page 16: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.

Target Condition Levels

• Guardrail repairs Interstate repairs to be made within 2 days of notification, divided highways repairs within 5 days and others within 1 month. •Drainage Maintenance 75% of drainage structures are to be maintained with an inspection score of 70 or higher.•Mowing – Interstates mowed 3 times yearly, non – interstates mowed 2 times yearly (all mowable areas)

Page 17: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.

Guardrail Repair

Page 18: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.

Bridges - Target Condition Levels

•Maintain bridges such that they can carry all legal loads•Maintain bridges such that the decks are in fair condition, or better

Page 19: GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.

Bridge Maintenance