GULFDRILL 9 Well Intervention & Warebarge
GULFDRILL 9
Well Intervention & Warebarge
Contents
Page
1. Concept 3
2. Specifications Sheet 4
3. GA Drawings 6
4. Photographs 11
5. Contracts Summary 27
Cairn Energy – 2004/2005 Dubai Petroleum Company -2006 Cairn Energy – 2006/2007
2
“GULFDRILL 9”
The Ultimate Well Intervention & Warebarge Concept
In 2004, Moment um laun ched its newly converted Of fsh ore Drilling Support Barg e ( warebar ge) “GULF DRILL 9”. The wareb arge conc ept will fill many gaps of limited sto rage& acco mmodat ion requirements for drilling and production operations in wate r depth s up to 500 feet .
“GULFDRI LL 9 ” provides:
Pipe & Cas ing st orage Cement, Bar ite & Mud st orage Sack s torage Chemicals sto rage Drill & P otable Wat er st orage Fuel st orage
“GULFDRI LL 9 ” is also equipped with:
2 Off shore Cr anes 100 Man a ccommodation fac ility Liquid mud mixing, sto rage & t rans fer sys temSafet y & Securit y compliance wit h ABS, SOLAS and ISPS cer tification
With the above capa bilities, “GULFDRI LL 9” is a ver y cost eff icient solution for supporting drilling & workover , production and cons truction operations. Moreover , it can also assist in placing coil tubing and workover tools i. e. snubbing units on jackets and platfo rms. The same will result in tremen dous savings of time and money while cut ting down the number of repeat ed supply boat trips and conse quently enhance s the quick acc ess to all type s of drilling supplies and consumables in t he field without the ne ed t o supply f rom a sh ore base d facility.
3
SPECIFICATIONS
BARGE PARTICULARS
Vessel Type OFFSHORE BARGE
Design Robray
Unit Flag Panama
Unit Classification ABS (Maltese Cross) A1 Barge New Certificates 2004
ISPS Certified
Built By Robin Shipyard (Pte) Ltd, Singapore
Last Dry Dock September 2004
Year of Build 1981 (Refurbished 2004)
Water Depth 400 ft. (expandable to 500 ft.)
HULL PARTICULARS
Length 284ft
Width 60ft
Depth 28ft
Draft 16ft
Gross Tonnage 4,170 LT
Nett Tonnage 2,410 LT
Towing Displacement 6,430 LT
Towing Draft 14ft
Heliport 76ft x74ft (Designed for Sikorsky S-61N Helicopter)
CAPACITIES
Drill Water 7,570 Bbls / 1188 MT
Dirty Lube Oil 55 Bbls / 8 MT
Fuel Oil 6,326 Bbls / 875 MT
Potable Water 2,869 Bbls / 456 MT
Lube Oil 79 Bbls / 11 MT
Mud Pit Storage 3,500 Bbls / 547 Cu M
Bulk Storage 5,145 Cu Ft. (Cement); and 5,145 Cu Ft. (Barite) Total
10,290 Cu Ft (291 Cu. M)
Sack Storage 7,300 sacks
Variable Load 4,500 MT approx.
POWER SYSTEM
Engines 2 Nos. D399 Caterpillar, 1350 Hp Each
Generators 2 Nos. Kato Generators
Emergency Generator 1 No. D3408 Caterpillar with SR4 Generator 355 Hp
MOORING SYSTEM ( 8 - POINT MOORING SYSTEM )
Winches SKAGIT Electric Winches, Model DMW 150
4 Nos, Double Drum
Winch Line Capacity 1000 M of 2” Diameter Wire Rope *
Brake Capacity 300,000 lbs (136 MT) on first layer
Fair Leads SKAGIT Model DWF-30 Deck mounted
Anchors Type – FLIPPER DELTA, 6 x 7 tons; 1 x 5 tons
*Present Status 8 @ 2,200 Ft of 2” Wire
Fender 2 Nos -Yokohama (2.4M Dia x 4.0M Long)
TOWING REQUIRME NTS
Tug Required 5000 Hp Tug Boat with 50MT Bollard Pull
Towing Speed 7 Knots
DESIGNED DECK LOADING & SIZES
Main Deck 540 lbs/sq.ft. & 2,650 sq.ft.
Pipe Rack Deck 218 lbs/sq.ft. & 8,930 sq.ft.
Rev.2
Contd. 4
LIFTING EQUIPMENT - CRANES
Main Crane FAVCO 20/10K,
160ft Boom, 55 MMT@ 10.3 M
Powered by Caterpillar 3408TA Engine.
Deck Crane Pyramid 50K Marine Hydraulic
100ft Boom, 10.3.1 MT @ 7.6 M
Powered by Caterpillar 3306T Engine.
Air Hoist INGERSOLL RAND Air Hoist 1-BOW and 1-STERN
Fork Lifts 1 Electric @ 3 tons
1 Hand operated @ 3.5 tons
PUMPS
Fuel Oil Purifier De Laval MAB-104
Diesel Oil Transfer 1 No, Mission 3 x 2 x 13 Magnum Pump
Drill Water 2 Nos, Mission 3 x 2 x 13 Centrifugal Pumps
Engine Cooling 2 Nos, Mission 8 x 6 x 14 Centrifugal Pumps
Fire, Bilge & Ballast 2 Nos, Mission 4 x 3 x 13 Centrifugal Pumps
Sea Water Booster 1 No, Mision 3 x 2 x 13 Magnum Pump
Emergency Fire 1 No, Mission 4 x 3 x 13 Centrifugal Pump
Sewage 2 Nos, PACO 50-49511 Centrifugal Pumps
SAFETY EQUIPMENT
Liferafts 8 Nos, 25 men capacity life rafts
Marine Safety Fully compliant with ABS requirements
Fire Fighting including Helideck Foam Fully compliant with ABS requirements
Fire & Smoke Alarm System The CAMCO system is installed extensively throughout the
barge. Audio & Visual alarms located at all strategic zones.
Medical Fully equipped 1 - Bed hospital
Emergency Lighting Fully compliant with ABS requirements
Navigation Lights In Accordance with SOLAS & ABS requirements
Rescue Boat 1 on Poop Deck
ACCOMMODATION
1 Men Room 10 Room (Single Bunk Beds, Lockers & adjoining Toilets
2 Men Room 42 Rooms (Double Bunk Beds, Lockers & adjoining Toilets)
4 Men Room 4 Rooms (Double Bunk Beds, Lockers & adjoining Toilets)
Galley & Mess 1 fully equipped galleys with separate messing facility
Recreation 1 Large well equipped facilities
TOTAL BEDS 100 Man Accommodation
WATER MAKER
WATER MAKER Make : Corodex, Output - 30 tons/day
EQUIPMENT:
Air Compressor 1 HP SSR37 I.R., 300 cfm @ 125 psig each
1 No, Sulliar, 480 cfm @ 40 psig each
Air-Conditioning Designed for max. Outside temp of 45 deg C
Rev - 2
5
Drawings
1. Side Profile
2. Main Deck
3. Inner Bottom
4. Accommodation
5. Crane Radius
6. Deck Area
6
NO
TIC
E O
F C
ON
FID
EN
TIA
LIT
Y
GU
LFD
RIL
L 9
GE
NE
RA
L A
RR
AN
GE
ME
NT
PIP
E R
AC
K &
MA
IN D
EC
K P
LAN
MOMEN
TUM
ENGI
NEE
RIN
G
GU
LFD
RIL
L 9
BA
GU
LFD
RIL
L 9
TO
P P
LAN
VIE
W
SID
E P
RO
FILE
MA
IN D
EC
K (
FRE
EB
OA
RD
)
PIP
E R
AC
K D
EC
K L
EV
EL
PIP
E R
AC
K &
MA
IN D
EC
K P
LAN
GE
NE
RA
L A
RR
AN
GE
ME
NT
ENGI
NEE
RIN
G
NO
TIC
E O
F C
ON
FID
EN
TIA
LIT
Y
GU
LFD
RIL
L 9
MOMEN
TUM
EMER
GENC
Y GE
NERA
TOR
AHU
RADIOROOM
ROOM
TOOLPUSHEROFFICE
CAP BOSS OFFICE
SICK BAY
STOR
E
1-MAN
BARGE MASTER OFFICE
1-MAN
STOR
E
2-MAN
1-MANDN
1-MAN
UP
1-MAN
1-MAN 1-MAN
1-MAN
1-MAN
1-MAN
BO
TT
OM
DE
CK
LE
VE
L
INN
ER
BO
TT
OM
PLA
N
ENGI
NEE
RIN
GMOMEN
TUM
GE
NE
RA
L A
RR
AN
GE
ME
NT
GU
LFD
RIL
L 9
NO
TIC
E O
F C
ON
FID
EN
TIA
LIT
Y
MA
IN D
EC
K L
EV
EL
PIP
E R
AC
K D
EC
K L
EV
EL
AC
CO
MM
OD
AT
ION
LA
YO
UT
GE
NE
RA
L A
RR
AN
GE
ME
NT
ENGI
NEE
RIN
G
NO
TIC
E O
F C
ON
FID
EN
TIA
LIT
Y
GU
LFD
RIL
L 9
MOMEN
TUM
EMER
G GE
N.
ROOM
DN
UP
INN
ER
BO
TT
OM
DE
CK
LE
VE
L"0
" D
EC
K L
EV
EL
BE
D C
AP
AC
ITY
1 M
AN
x 1
0 R
OO
MS
= 1
0 B
ED
S2
MA
N x
42
RO
OM
S =
84
BE
DS
4 M
AN
x 4
RO
OM
S =
16
BE
DS
TO
TA
L =
110
BE
DS
GU
LFD
RIL
L 9
GE
NE
RA
L A
RR
AN
GE
ME
NT
CR
AN
E R
AD
IUS
LA
YO
UT
MOMEN
TUM
NO
TIC
E O
F C
ON
FID
EN
TIA
LIT
Y
GU
LFD
RIL
L 9
ENGI
NEE
RIN
G
LOA
D R
AT
ING
IN
SH
OR
T T
ON
S
NO
TE
:
SA
FE W
OR
KIN
G L
OA
D C
HA
RT
FA
VC
O 2
0/10
K S
/NO
598
WIT
H 1
60 F
TB
OO
M L
EN
GT
H
RA
DIU
S I
N F
EE
T1.
5° L
IST
DY
NA
MIC
FA
CT
OR
1.6
LBS
TO
NS
37.4
1102
0055
.1
59.5
1190
049
.2
60.1
1201
0057
.0
53.1
1062
0065
.0
46.5
9300
073
.8
41.3
8265
082
.0
33.4
6685
098
.4
27.8
5555
011
4.8
160.
0
147.
6
131.
2
3130
0
3920
0
4695
0
15.7
19.6
23.5
GU
LFD
RIL
L 9
MA
IN D
EC
K L
EV
EL
SA
CK
ST
OR
E
NO
TIC
E O
F C
ON
FID
EN
TIA
LIT
Y
POOP DECK
PIP
E R
AC
K D
EC
K
PIP
E D
EC
K A
RE
A
`O' DECK AREA
DE
CK
AR
EA
& L
OA
DIN
G S
IZE
GE
NE
RA
L A
RR
AN
GE
ME
NT
ENGI
NEE
RIN
G
GU
LFD
RIL
L 9
MOMEN
TUM
MA
XIM
UM
DE
CK
LO
AD
ING
PIP
E D
EC
K -
218
lb/s
qft
MA
IN D
EC
K -
540
lb/s
qft
OT
HE
R D
EC
K -
218
lb/s
qft
2850
SQ
FT
390 SQFT
AREA - 1400SQFT
5500
SQ
FT
INN
ER
BO
TT
OM
PLA
N
ST
OR
AG
E
1000
SQ
FT
NOTICE OF CONFIDENTIALITY
CRANE BOOM
MOMENTUM
GULFDRILL 9
ENGINEERING
POSITION-A
POSITION-B
POSITION-C
CRANE CAPACITY (APPROX.)CAPACITY
38
RADIUS
55.1
89 40.5
160 15.7
POSITION-A
POSITION-B
POSITION-C
HEIGHT FROM
179'-0"
156'-6"
77'-0"
M.W.LTONSFTACCESS LAYOUT (STBD)
PIPE DECK – Area: 5500 sqft (Deck loading: 218 lbs/sqft)
15
PIPE DECK – Area: 5500 sqft (Deck loading: 218 lbs/sqft)
16
PUMP ROOM DECK – Area: 1000 sqft (Deck loading: 218 lbs/sqft)
17
POOP DECK – Area: 1400 sqft (Deck loading: 218 lbs/sqft)
18
SACK STORAGE DECK – Area: 2850 sqft (Deck loading: 540 lbs/sqft)
19
SACK STORAGE DECK – Area : 2850 sqft (Deck loading: 540 lbs/sqft)
20
‘0’ LEVEL DECK – Area: 500 sqft (Deck loading: 540 lbs/sqft)
21
AIR COMPRESSOR
22
ANCHOR WINCH & WINCH CONTROL
23
ENGINES & GENERATORS (CATERPILLAR D-399)
24
MUD MIXING
FAVCO CRANE 25
WATER MAKER (Output Capacity 30 tons / day)
26
DRILLING SUPPORT CONTRACT – 2004 / 2005
Contract Duration – Nov 2004 to May 2005
Location – Sangu Field, Chittagong, Bangladesh
27
WELL INTERVENTION CONTRACT - 2006
Contract Duration – April 2006 to Oct 2006
Location – Fateh Field, Dubai, United Arab Emirates
28
WELL INTERVENTION CONTRACT - 2006
Contract Duration – April 2006 to Oct 2006
Location – Fateh Field, Dubai, United Arab Emirates
29
DRILLING SUPPORT CONTRACT – 2006 / 2007
Contract Duration – Nov 2006 to May 2007
Location – Sangu Field, Chittagong, Bangladesh
30