GAUFF CONSULTANTS

Frankfurt, 11/09/12

Page 2: Gauff Consultants Sept 2012

2

GAUFF CONSULTANTS

AGENDA

1. GENERAL

2. ACTIVITIES AND SERVICES

3. PROJECT EXPERIENCES

4. CONTACTS

Page 3: Gauff Consultants Sept 2012

3

H. P. Gauff Ingenieure GmbH & Co.

KG – JBG –

Water Supply, Wastewater Disposal and

Purification, Environment and Renewable

Energies, Roads Engineering, Structural

Engineering, Architecture.

KUG Ingenieure GmbH & Co. KG

Urban and Agricultural Water Supply,

Wastewater Disposal and Purification,

Environment, Roads Engineering,

Tram Systems

SETEC Engineering GmbH & Co. KG

Water Supply, Wastewater Disposal and

Purification, Water Management

MANNS Ingenieure Dr. Manns +

Conrad GmbH

Traffic Engineering, Telematic

Parking

GRE - Gauff Rail Engineering GmbH

Railbound Transportation, Technical

Equipment for Rails, Structural Engineering.

ETC Transport Consultants GmbH

Mobility, Engineering for Core Systems

for Railways, Transport – Roads,

Railbound Transportation

Planungs- und

Betriebsberatungs-GmbH

Public Transport Systems, Driverless

Driving

1. GAUFF CONSULTANTS - GENERAL

COMPANY STRUCTURE

Page 4: Gauff Consultants Sept 2012

4

ADB – Asian Development Bank, Manila

AfDB – African Development Bank, Abidjan

EBRD – European Bank for Reconstruction and

Development, London

EU – European Union, Brussels

IBRD – International Bank for Reconstruction and

Development, Washington

KfW – Kreditanstalt für Wiederaufbau,

Frankfurt/Main

WB – World Bank, Washington D.C.

1. GAUFF CONSULTANTS - GENERAL

REGISTRATIONS

Page 5: Gauff Consultants Sept 2012

5

■ Gauff has been certified since 1996 according to

DIN EN ISO 9001: 2008

■ Gauff owns also quality approvals from

– Siemens

– Deutsche Bahn

1. GAUFF CONSULTANTS - GENERAL

QUALITY MANAGEMENT

Page 6: Gauff Consultants Sept 2012

6

1. GAUFF CONSULTANTS - GENERAL

INTERNATIONAL PRESENCE

▪ Afghanistan ▪ Algeria ▪ Austria ▪ Azerbaijan ▪ Burkina Faso ▪ Cambodia ▪ China ▪ Democratic Rep. of the Congo ▪ Denmark ▪ Ethiopia ▪ Germany ▪ Ghana ▪ Georgia ▪

▪ Hungary ▪ Ivory Coast ▪ Kenya ▪ Libya ▪ Mali ▪ Nigeria ▪ Norway ▪ Poland ▪ Rep. of the Congo ▪ Russia ▪ Serbia ▪ Switzerland ▪ Tanzania ▪ Uganda ▪ USA ▪ Zambia ▪

Long-t presence Performed projects Other countries

Long-term presence Performed projects Other countries

Page 7: Gauff Consultants Sept 2012

7

0

10

20

30

40

50

60

70

80

2007 2008 2009 2010 2011 2012

37%

11% 33%

17%

2%

Germany

Europe

Africa

Asia

America

2012:

41%

5%

44%

8%

2%

Germany

Europe

Africa

Asia

America

2008:

1. GAUFF CONSULTANTS - GENERAL

REVENUES AND GEOGRAPHICAL DISTRIBUTION

Development of Revenues Geographical Distribution

2007-2011, Estimation 2012 (Mio. €)

Page 8: Gauff Consultants Sept 2012

8

1. GAUFF CONSULTANTS - GENERAL

FUNDING SECTORS

46% Donor Organisations

ADB – Asian Development Bank, Manila

AfDB – African Development Bank, Abidjan

EBRD – European Bank for Reconstruction and Development, London

EU – European Union, Brussels

IBRD – International Bank for Reconstruction and Development, Washington

KfW – Kreditanstalt für Wiederaufbau, Frankfurt/Main

WB – World Bank, Washington D.C.

38% Public authority

Federation

Federal state

Municipality

16% Private

46%

38%

16%

Donor Organisations

Public Authority

Private

Page 9: Gauff Consultants Sept 2012

9

1) More than 600 employees

2) Interdisciplinary and comprehensive services

3) Annual performance 2012 more than: 60 MEUR

4) ENR – Records 2012:

■ Gauff: Rank 110 in Global Design – Firms

5) Establishments in 29 countries

6) Almost 50 years cross-culture-management

7) Projects carried out in more than 100 countries

1. GAUFF CONSULTANTS - GENERAL

SUMMARY

Page 10: Gauff Consultants Sept 2012

10

2. ACTIVITIES AND SERVICES

Page 11: Gauff Consultants Sept 2012

11

42%

46%

7% 4%

1%

WATER, ENVIRONMENT

TRANSPORTATION

MOBILITY

ENERGY

INDUSTRIAL AND COMMERCIAL BUILDING

18%

46%

32%

2%

2%

CONSULTING SERVICES / STUDIES

PLANNING / DESIGN

SITE SUPERVISION / PROJECT MANAGEMENT

OPERATION & MAINTENANCE / PROCUREMENT

INFORMATION TECHNOLOGY

INTERDISCIPLINARY ACTIVITIES

COMPREHENSIVE SERVICES

2. ACTIVITIES AND SERVICES

Page 12: Gauff Consultants Sept 2012

12

2. ACTIVITIES AND SERVICES

2.1 ACTIVITIES

1) WATER, ENVIRONMENT

2) TRANSPORTATION

3) MOBILITY

4) ENERGY

5) INDUSTRIAL AND COMMERCIAL BUILDING

Page 13: Gauff Consultants Sept 2012

13

2. ACTIVITIES AND SERVICES

2.1.1 ACTIVITIES - WATER, ENVIRONMENT (1)

WATER SUPPLY

■ Recovery

■ Abstraction

■ Treatment

■ Storage

■ Transportation, Transmission

■ Distribution

■ Control Panels

Page 14: Gauff Consultants Sept 2012

14

WASTEWATER DISPOSAL AND PURIFICATION

■ Collection

■ Abstraction

■ Transportation

■ Purification

■ Reuse

■ Control Panels

2. ACTIVITIES AND SERVICES

2.1.1 ACTIVITIES - WATER, ENVIRONMENT (2)

Page 15: Gauff Consultants Sept 2012

15

ENVIRONMENTAL PROTECTION

■ Dumping Grounds for Domestic and Industrial Waste

Material

■ Soil Cleaning

■ Recycling of Waste and Construction Material

■ Protection of Water Bodies and Water Pollution

Control

■ Renovation and Restoration of Water Bodies

2. ACTIVITIES AND SERVICES

2.1.1 ACTIVITIES - WATER, ENVIRONMENT (3)

Page 16: Gauff Consultants Sept 2012

16

ROADS

■ Motorways ■ Highways / Urban, Rural and Federal Roads

■ Structures ■ Traffic Management Systems ■ Park and Ride Facilities ■ Handling Facilities for Combined Transport

■ Traffic Control Systems ■ Capacity Building

■ Emergency Relief

2. ACTIVITIES AND SERVICES

2.1.2 ACTIVITIES - TRANSPORTATION (1)

Page 17: Gauff Consultants Sept 2012

17

RAIL

■ High Speed / Long Distance Rail / Freight Rail

■ Urban Transport / Metros / Light Rail

■ Stations (Underground/Elevated)

■ Handling facilities (Workshop – Depots)

■ Narrow Gauge Railways

■ Industrial Plants and Installations

■ Operation and Maintenance Facilities

■ Marshalling Facilities

2. ACTIVITIES AND SERVICES

2.1.2 ACTIVITIES - TRANSPORTATION (2)

Page 18: Gauff Consultants Sept 2012

18

RAIL

■ Mechanical Signal Towers

■ Electro-Mechanical Signal Towers

■ Relay Stations

■ Electronic Signal Towers

■ Operations Control Centers

■ Telemetry and Telecommand Technology

■ Level Crossings

■ Telecommunication Equipment

2. ACTIVITIES AND SERVICES

2.1.2 ACTIVITIES - TRANSPORTATION (3)

Page 19: Gauff Consultants Sept 2012

19

CORE SYSTEMS

■ Transportation System Engineering

■ Track Work

■ Signalling and Train Control Systems - Driverless and

Conventional (ETCS Level 2)

■ OCS (Overhead Catenary)

■ Rolling Stock and Workshop Equipment

■ Power Supply Systems and Distribution, Third Rail

■ Interlocking and Central Train Control (CTC) Systems

■ Outdoor Signalling Equipment

2. ACTIVITIES AND SERVICES

2.1.3 ACTIVITIES - TRANSPORTATION (4)

Page 20: Gauff Consultants Sept 2012

20

MOBILITY CONSULTANCY

■ Master Planning

■ Transport and Company Strategy

■ Planning of Traffic and Transport Infrastructure

■ Tariffs and Methods of Income Distribution

■ Marketing and Distribution of Tickets

■ Quality and Safety in Passenger Transport

■ Information Technology (IT)

■ Telecommunication and Electronic Equipment

■ Freight Transport and Logistics

2. ACTIVITIES AND SERVICES

2.1.3 ACTIVITIES - MOBILITY

Page 21: Gauff Consultants Sept 2012

21

■ Renewable Energies

■ Hydropower

■ Solar Energy - Photovoltaics

■ Biogas Plants

■ Geothermal Power

■ Waste Utilization for Energy Generation

■ Efficiency Improvement

■ Pipelaying / Reconstruction

2. ACTIVITIES AND SERVICES

2.1.4 ACTIVITIES - ENERGY

Page 22: Gauff Consultants Sept 2012

22

■ Regional Development

■ Land Allocation and Acquisition

■ Establish Rights of Way

■ Building Development

■ Industrial Estates and Buildings

■ Office Buildings, Banks

■ Educational Centers

2. ACTIVITIES AND SERVICES

2.1.5 ACTIVITIES - INDUSTRIAL AND COMMERCIAL BUILDING

Page 23: Gauff Consultants Sept 2012

23

2. ACTIVITIES AND SERVICES

2.2 SERVICES

1) CONSULTING SERVICES / STUDIES

2) PLANNING / DESIGN

3) SITE SUPERVISION / PROJECT MANAGEMENT

4) OPERATION & MAINTENANCE / PROCUREMENT

5) INFORMATION TECHNOLOGY

Page 24: Gauff Consultants Sept 2012

24

■ Technical and Economic Consulting of Investment

Projects as well as Operation and Maintenance

■ Investment Studies

■ Feasibility Studies / Socio-Economic Consulting

■ Compatibility Studies

■ Income Statements / Research

■ Special Services Regarding Technical, Economic and

Financial Requirements

2. ACTIVITIES AND SERVICES

2.2.1 SERVICES - CONSULTING SERVICES / STUDIES

Page 25: Gauff Consultants Sept 2012

25

■ Basic Evaluation

■ Preliminary and Draft Design

■ Approval Planning and Participation in the Official

Approval of Plans

■ Implementation Planning

■ Execution and Evaluation of Tenders

■ Participation in the Awarding of Contracts

2. ACTIVITIES AND SERVICES

2.2.2 SERVICES - PLANNING / DESIGN

Page 26: Gauff Consultants Sept 2012

26

SITE SUPERVISION

■ Execution of Local Site Supervision and Site

Management

■ Acceptance and Handing-Over of the Works

■ Documentation

■ Surveying / Cartography

■ Soil Mechanics, Building Ground, Foundations,

Carrying Capacity Measurements

■ Laboratory Analyses for Earth Moving and Road

Constructions, Water and Wastewater

■ Hydrology, Hydrogeology

2. ACTIVITIES AND SERVICES

2.2.3 SERVICES - SITE SUPERVISION / PROJECT MANAGEMENT (1)

Page 27: Gauff Consultants Sept 2012

27

PROJECT CONTROL

■ Clarification of the Assignment of Tasks and

Preconditions for the Participation in Design and

Execution of Investment Projects

■ Summary and Monitoring of the Investment and

Payment Planning

■ Coordination and Control of the Involved and

Concerned Parties of the Project (under Public and

Private Law)

■ Planning Update Continuous Information Flow to the

Client

2. ACTIVITIES AND SERVICES

2.2.3 SERVICES - SITE SUPERVISION / PROJECT MANAGEMENT (2)

Page 28: Gauff Consultants Sept 2012

28

PROJECT MANAGEMENT

■ Fiduciary Taking over of the Constructor’s Function

■ Participation in Project Development including Public

Relations

■ Participation in Securing the Financing for the

Investment Plan

■ Controlling

■ Technical and Economical Business Activities

(Contract Management) of Project Financed

Investments

2. ACTIVITIES AND SERVICES

2.2.3 SERVICES - SITE SUPERVISION / PROJECT MANAGEMENT (3)

Page 29: Gauff Consultants Sept 2012

29

OPERATION & MAINTENANCE

■ Statutes

■ Analysis of Operations

■ Staff Training

■ Maintenance and Repair Management

■ Rehabilitation Concepts

■ Optimization of Accountancy / Controlling

■ Investment Planning

■ Evaluation and Charging of Fees

2. ACTIVITIES AND SERVICES

2.2.4 SERVICES - OPERATION & MAINTENANCE / PROCUREMENT (1)

Page 30: Gauff Consultants Sept 2012

30

PROCUREMENT

■ Preparation of the Investment

■ Inspection and Approval, Operation, Participation

■ Evaluation of Proposals, Comparison of Services,

Investment Costs Optimization, Contract Awarding

■ Tendering and Coordination of the Supply and Service

Procedures as well as of the Funds

■ Inspection and Approval at the Plant / On-Site

■ Documentation

■ Checking of Accounts and Issuance of Payment

Documents

2. ACTIVITIES AND SERVICES

2.2.4 SERVICES - OPERATION & MAINTENANCE / PROCUREMENT (2)

Page 31: Gauff Consultants Sept 2012

31

■ Consulting and Conceptual Design

■ System Design and System Procurement

■ Local Appraisal (Surveying, CCTV Inspection, Aerial

Survey)

■ Collection of Data (Scanning and Digitalization)

■ Training

■ Professional and System Compatible Assistance

■ Delivery of Turnkey Systems

2. ACTIVITIES AND SERVICES

2.2.5 SERVICES - INFORMATION TECHNOLOGY

Page 32: Gauff Consultants Sept 2012

32

3. PROJECT EXPERIENCES

Page 33: Gauff Consultants Sept 2012

33

We know how to handle:

■ Water

■ Transportation

■ Mobility

■ Energy

■ Industrial and Commercial Building

■ Project Management

3. PROJECT EXPERIENCES

Page 34: Gauff Consultants Sept 2012

34

REFERENCES

WATER

Germany

Irrigation of the Northern Vorderpfalz ■ Client: Water and Soil Association for the Irrigation of Vorderpfalz

■ Project Value: 87 million EUR

■ Main Pumping Station (6.2 m³/s),

■ Intermediate Pumping (2.3 m³/s) with a Storage Tank (40,000 m³)

■ 30 km Main Feeder Pipelines (1000 – 2000 mm)

■ 13.000 ha agricultural area are connected to the irrigation

■ 90% of all installations are planned and monitored by Gauff

3. PROJECT EXPERIENCES

3.1 WATER - WATER SUPPLY (1)

Page 35: Gauff Consultants Sept 2012

35

REFERENCES

WATER

Venezuela

Metropolitan Water Supply Caracas System Tuy IV

■ Client: Ministry of Environment and Renewable Resources

■ Project Value: 50 million USD

■ 21 km Pipeline (1700 – 3000 mm)

■ Pumping station Taguaza (8 m³/sec), Fajardo (4 m³/sec)

■ General Design, Detail Design for Electro-Mechanical

Engineering and Civil Works, Procurement Services for

Equipment and Materials, Technical Assistance to the Client in

Management, Administration and Supervision of Works.

3. PROJECT EXPERIENCES

3.1 WATER - WATER SUPPLY (2)

Page 36: Gauff Consultants Sept 2012

36

Azerbaijan

Second National Water Supply and Sanitation

Program

■ Client: State Amelioration and Water Management Co., Baku

■ Project Value: 210 million EUR

■ For 16 Rayons with an average population of 40,000 each

■ Project covers urgent water infrastructure investments such as

rehabilitation and new construction of water abstraction, treatment

and distribution facilities as well as sewerage networks and waste

water treatment plants

■ Feasibility study and tender documents

■ Construction supervision

3. PROJECT EXPERIENCES

3.1 WATER - WATER SUPPLY (3)

Page 37: Gauff Consultants Sept 2012

37

Germany

South-Western Main Sewage Collector 2,

Nuremberg

■ Client: City of Nuremberg, Civil Engineering Department

■ Project Value: 26 million EUR

■ Construction necessary since existing south-western collector ,

draining the south-western part of Nuremberg and carrying over

the districts Katzwang, Reichelsdorf, Eibach, Stein and

Gebersdorf to the sewage plant, is overloaded

■ By means of construction, sewerage system of this region is

rehabilitated hydraulically

■ All rain overflow stayed open in order to guarantee the protection

of the Rednitz river and the water protection area of the town

■ Services provided by Gauff included preliminary and final design

and cost determination

3. PROJECT EXPERIENCES

3.1 WATER - WASTEWATER (1)

Page 38: Gauff Consultants Sept 2012

38

Turkey

Isparta Wastewater Treatment Plant Initial Operation

and Management Support

■ Client: Municipality of Isparta

■ Project Value: 240 thousand EUR

■ Connected population 362,100 P.E.; average dry weather flow

Qd=37,872 m3/d; peak dry weather flow Qh=2,746 m3/h; total daily

BOD5-Load Bd=19,546 kg/d, TSS-Load BTKN=25,337 kg/d

■ Phase I: Development of operation concept, assistance in staffing

and basic staff training, assistance in procurement of operation

equipment, preparation of work plan and procedure documents

■ Phase II: Introduction of managerial/administrative and

operation/environmental procedures, introduction of customized in-

house training, provision of complementary training and support,

finalization of the division’s work plan and in-house training

program

3. PROJECT EXPERIENCES

3.1 WATER - WASTEWATER (2)

Page 39: Gauff Consultants Sept 2012

39

Venezuela

Wastewater Treatment Plant Puerto La Cruz

■ Client: Ministry of Environment and Natural Resources (MARN),

Republic of Venezuela

■ Project Value: 100 million USD

■ Design of the new wastewater treatment plant for the Municipality

of Puerto La Cruz. Mechanical and biological treatment plant

designed for UASB-process (Upflow anaerobic sludge blanket).

■ Pre-Feasibility Study and Master Plan, Planning, Design,

Technical Assistance, Procurement, Tender Documents for

Supply of Plant and Equipment, Assistance in Supervision of

Works and Installation of Equipment.

3. PROJECT EXPERIENCES

3.1 WATER - WASTEWATER (3)

Page 40: Gauff Consultants Sept 2012

40

Germany

Six Line Extension of the A3 Federal Motorway

■ Client: Road direction Northern Bayern, Nuremberg

■ Project value: 174 million EUR

■ Federal motorway Würzburg – Heidingsfeld, component of Federal

Transport Network Plan

■ Enlargement of existing four lane cross-section

■ Extension also includes new design of drainage facilities,

construction of noise protection facilities and several large

structures (e.g. viaduct Heidingsfeld, Katzenberg tunnel)

■ Special measures necessary because of pipeline route in a water

protection area

■ Elaboration of basis for entire draft design

3. PROJECT EXPERIENCES

3.2 TRANSPORTATION - ROAD (1)

Page 41: Gauff Consultants Sept 2012

41

Germany

Six Line Extension of the A8 Federal Motorway

■ Client: Road direction Baden-Württemberg (Regierungspräsidium)

■ Project value: 113.5 million EUR

■ Motorway Karlsruhe - Pforzheim-West

■ 6 km motorway to be enlarged

■ New route definition necessary in order to meet current guidelines

■ Measurement, transportation system design

■ Noise control study, zoning documents

■ Building planning ,implementation planning

3. PROJECT EXPERIENCES

3.2 TRANSPORTATION - ROAD (2)

Page 42: Gauff Consultants Sept 2012

42

Cambodia

Open Program of Rural Rehabilitation and

Complementary Infrastructure Measures (TRIP IV)

■ Client: MRD - Ministry of Rural Development / KfW funding

■ Project value: 2.13 million EUR (overall project value)

■ Expansion of previous Tertiary Road Improvement Program for

promotion of pro-poor and sustainable rural growth

■ Implementation: selection procedures for rehabilitation, planning,

tender documentation, assistance in tendering, site supervision,

maintenance management, socio-economic and environmental

studies, assistance to the employer and construction supervision.

■ Training: rural road management systems, organizational re-

structuring and further education of staff, development of road

management units, on-the-job-training for management,

councils and coordination of maintenance procedures

3. PROJECT EXPERIENCES

3.2 TRANSPORTATION - ROAD (3)

Page 43: Gauff Consultants Sept 2012

43

Germany, Bavaria

New Construction / Rehabilitation Line Nuremberg

- Ingolstadt - Munich, Section Ingolstadt - Munich

■ Client: DB ProjektBau GmbH

■ Project Value: 180 million EUR

■ Corridor Nuremberg - Munich newly developed and extended

with a design speed of 330 km/h

■ All design services for the complete rail engineering equipment

(electrification, telecommunication, four electronic signal towers)

provided for the 77 km long section between Ingolstadt and

Munich

■ Adaption of existing track plan signal towers to the electronic

signal towers

■ Complete operational design including all technologic procedures

required to “construct under operation”

3. PROJECT EXPERIENCES

3.2 TRANSPORTATION - RAIL (1)

Page 44: Gauff Consultants Sept 2012

44

China

Passenger Dedicated High-Speed Line Beijing-

Tianjin Intercity Line Site Supervision at the 2nd

Supervision Section

■ Client: Beijing – Tianjin Intercity Railway Co., Ltd.

■ Project Value: 40 million USD

■ Subgrade (CFG piles, Drilled Piles, Soil Improvement)

■ Bridges (Prefabricated Girders 32 m, Balance Cantilever Bridges

up to 60+128+60 m Span)

■ Turnouts (System Rheda 2000 and first modified)

■ Telecommunication and Signaling

■ Power Supply and Electrification, Depot Construction

■ System Integration and Interface, Management

3. PROJECT EXPERIENCES

3.2 TRANSPORTATION - RAIL (2)

Page 45: Gauff Consultants Sept 2012

45

Hungary

Technical Assistance MAV

■ Client: Hungarian State Railways Company

■ Project Value: 450 million EUR

■ Rehabilitation of railway sections with ISPA Grant: Austrian border -

Budapest - Romanian border, sections Hegyeshalom - Győr-

Budapest and Vecsés-Cegléd Szolnok; Slovenian border -

Budapest - Ukrainian border, section Zalalövő – Zalaegerszeg –

Boba

■ Review of tender documentation, cost-benefit analysis, assistance

to the employer, support to the engineer, training of local staff on

FIDIC books, construction supervision, training

■ Design of power supply, signalling and track work

■ ”Guideline for Presentation” of tender documents, assistance

during tendering and contracting, procurement and

claim management

3. PROJECT EXPERIENCES

3.2 TRANSPORTATION - RAIL (3)

Page 46: Gauff Consultants Sept 2012

46

Germany

Research Project to Develop Management

Systems for Airport Security in the context of

Civil Security

■ Client: German Federal Ministry of Research and Education

■ Project value: 4 million EUR

■ Evaluation of security requirements in the interaction of public

transport, rail and air transport

■ Feasibility study for the possible implementation of security

standards in air transport into other modes of transport

■ Participation in the development of modern concepts for the

security at airports

3. PROJECT EXPERIENCES

3.3 MOBILITY (1)

Page 47: Gauff Consultants Sept 2012

47

Libya

Traffic and Transport Master Plan Tripoli

■ Client: Libyan Ministry of Infrastructure Planning & Housing

Development

■ Project value: 3.58 million Euro [€]

■ Master plan for traffic & transport and communications (Traffic

& Transport Master Plan) for the Tripoli Metropolitan Area till

2030

■ Provision of a set of working tools for the responsible regional

departments that allows them to define the basic structure

and the necessary phases of development of the strategic

planning of transport infrastructure and to identify methods to

control urban growth and traffic volumes

■ Development of transport model based on the German

software “VISUM”

■ Training of staff for regional planning

3. PROJECT EXPERIENCES

3.3 MOBILITY (2)

Page 48: Gauff Consultants Sept 2012

48

Guatemala

Master Plan for the Development of the National

Transport System

■ Client: Ministry of Telecommunication, Transport and Urban

Development of Guatemala

■ Project value: 0.5 million EUR

■ Elaboration of the master plan for the development of the

national transport system in Guatemala

■ Determination of the future transport policy for all modes of

transport

■ Preparation of proposals for legislative and organizational

measures, as well as for investments in the transport system

to ensure the participation of the private sector

■ Forecast for the volume of necessary vehicle fleet in

connection with socio-economic parameters.

3. PROJECT EXPERIENCES

3.3 MOBILITY (3)

Page 49: Gauff Consultants Sept 2012

49

Saudi Arabia, Ad-Dammam Region

Dammam Comprehensive Transportation Study

■ Client: Client: Saudi Ministry of Municipalities and Rural Affairs /

Government of the Ad-Dammam Region

■ Value: 1.9 million EUR

■ Development of a Traffic & Transport Master Plan for the

corresponding infrastructure and connections in the Ad-Dammam

region up to 2023

■ Provision of a set of working tools to the responsible regional

departments in the planning administrations that allows them to

define the basic structure and the necessary phases of

development of the strategic planning of transport infrastructure

and to identify methods to control urban growth and traffic volumes

■ Development of the traffic & transport model based on the U.S.

software “TransCAD”

■ Training of staff for regional planning.

King Fahad Dist دهف كلملا ةيحاض

Al Naseem مامدلا-ميسنلا

KFUPM نارهظلا برغ

Badr ردب

Al Mataar راطملا

Teebh ةبيط

Uhod دحأ

Al Seef فيسلا

Al Manar مامدلا-رانملا

Al shooalah ةلعشلا

Hajer رجه

Al Amwaj جاومألا

Al Marjan ةيزيزعلا-ناجرملا

Awgam ماجوألا

Al Nawras سرونلا

Al Sheraa عارشلا

Al Fysalyah ةيلصيفلا

Mynaa Al Malek Abdual Aziz زيزعلا دبع كلملا ءانيم

Al Aqiq ةيزيزعلا-قيقعلا

Al Nada ىدنلا

Al Tahlyah ةيلحتلا

Al Lo'a Lo'a ةيزيزعلا-ؤلؤللا

Al Fanar رانفلا

Al Noor مامدلا-رونلا

Al Thoqbah ةبقثلا

Al Zahraa ءارهزلا

Al Sawari ةيزيزعلا-ىراوصلا

Al- Rajaa ءاجرلا

Al Forsaan ناسرفلا

Al Senayah مامدلا-ةيعانصلا

Al Sadafah مامدلا-ةفدصلا

Al Ulya ايلعلا

Al Nozhah ةهزنلا

Eshbilia ايليبشأ

Al Dabab بابضلا

Al Husam ماسحلا

Al Hazm مزحلا

Al Doohah Al Jnubyah ةيبونجلا ةحودلا

Al Kawthar ةيزيزعلا-رثوكلا

Al Tawon نواعتلا

Al Jesser رسجلا

Al Amanah ةنامألاAl Safa مامدلا-افصلا

Al Kurnich شينروكلا

Abo Maan نعم وبأ

Al Shefaa ءافشلا

Al Jameah ةعماجلا

Al Khodaryah ةيرضخلا

Al Trajji نارهظلا-ىجرتلا

Anak كنع

Al Naserah ةرصانلا

Al Bsateen نيتاسبلا

Ibn Syna ءانيس نبا

Qurtobah ربخلا-ةبطرق

Al Aqrabyah ةيبرقعلا

Al Khaldyah Al Shmalyah ةيلامشلا ةيدلاخلا

Al Atheer ريثألا

Al Ryan نايرلا

Al Maha اهملا

Al Rawdah مامدلا-ةضورلا

Al Yaqoot توقايلا

Al Sahel لحاسلا

Al Khaldyah Al Jnubyah ةيبونجلا ةيدلاخلا

Al Khozama ةيزيزعلا-ىمازخلا

Al Nahdah مامدلا-ةضهنلا

Al Rakah Al Jnubyah ةيبونجلا ةكارلا

Al Anood دونعلا

Al Anwar راونألا

Al Hammraa ربخلا-ءارمحلا

Al Shael ليعشلا

KFUPM نداعملاو لورتبلل دهف كلملا ةعماج

Al Redah اضرلا

Al Mohammadyah ةيدمحملا

Al Jalawyah ةيولجلا

Al Wahah مامدلا-ةحاولا

Al Aziziah ةيزيزعلا

Al Mashtel لتشملا

Al Fayhaa مامدلا-ءاحيفلا

Al Marjan فيطقلا-ناجرملا

Al Shateea Al Sharky ىقرشلا ئطاشلا

Al Manakh خانملا

Al Shateea ئطاشلا

Rwaihah ةحيورلا

KFUH ةيعماجلا لصيف كلملا ةنيدم

Al Reef فيرلا

Hazm مزح

Al Naseef فيصنلا

Al Badeeah ةعيدبلا

Al Shahbaa ءابهشلا

Al mazroyah ةيعورزملا

Al Hamraa مامدلا-ءارمحلا

Al Shateea Al Gharby ىبرغلا ئطاشلا

Al Buhayrah ةريحبلا

Al Melaha ةحالملا

Al Orubah ةبورعلا

Al Murykebat تابكيرملا

Al Bawadi ىداوبلا

Al Andalus ربخلا-سلدنألا

Al Khur روخلا

Al Rakah Al Shamalyah ةيلامشلا ةكارلا

Ghurnatah مامدلا-ةطانرغ

Al Muntazah مامدلا-هزتنملا

Al Jawhrah ربخلا-ةرهوجلا

Al Huda ادهلا

Al Khobar Al Jnubyah ةيبونجلا ربخلا

Al Jamayeen مامدلا-نييعماجلا

Al Khobar Al Shamalyah ةيلامشلا ربخلا

Al Rawdah فيطقلا-ةضورلا

Diridi ىديردلا

Al Adamah ةمادعلا

Al Qadesyah ةيسداقلا

Al Etsalat تالاصتالا

Al Eskan ربخلا-ناكسإلا

Al Huseen نيسحلا

Al Manteqah Al Senayah 1 ىلوألا ةيعانصلا ةقطنملا

Al Zohoor مامدلا-روهزلا

Al Sadafah تورات-ةفدصلا

Al Kawthar تاهيس-رثوكلا

Al Badyah ةيدابلا

Al Raiah ةيارلا

Al Hezam Al Thahaby ىبهذلا مازحلا

Al Yarmouk كومريلا

Al Mjediah ةيديجملا

Al Qadeeh حيدقلا

Al Nabiah ةيبانلا

Al Gash شجلا

Al Aamal لمعلا

Al Gashlah ةلشقلا

Al Rawabi ربخلا-ىباورلا

Al Fateh حتفلا

Al Eskan كنع-ناكسإلا

Al Salam مامدلا-مالسلا

Al Tubeshy ىشيبطلا

Al Badeea عيدبلا

Al Naseryah ةيرصانلا

Al Danah Al Shmalyah ةيلامشلا ةنادلا

Al Rabiyiah ةيعيبرلا

Al Doohah Al Shamalyah ةيلامشلا ةحودلا

Ghurnatah تاهيس-ةطانرغ

Al Ferdaus مامدلا-سودرفلا

Madynat Al Umal ربخلا-لامعلا ةنيدم

Al Bandryah ةيردنبلا

Qurtobah تاهيس-ةبطرق

Al Khaleej مامدلا-جيلخلا

Al Wahah فيطقلا-ةحاولا

Al Senayah فيطقلا-ةيعانصلاAl Jamaeah ةيعمجلا

Al naqa ىقنلا

Al Gadeer ريدغلا

Al Muntazah تاهيس-هزتنملا

Al Narjes فيطقلا-سجرنلا

Al Hezam Al Akhdar رضخألا مازحلا

Tohamah ةماهت

Al Danah ةرونت سأر-ةنادلا

Al Senayah تاهيس-ةيعانصلاAl Zohoor تاهيس-روهزلا

Al Fayhaa ةرونت سأر-ءاحيفلا

Al Khaleej تاهيس-جيلخلا

Al Taf فطلا

Al Madynah Al Ryadyah ةيضايرلا ةنيدملا

Al Nakheel مامدلا-ليخنلا

Al Marrwah ةورملا

Al Badr ردبلا

Al Andalus تورات-سلدنألا

Al Muntazah ةرونت سأر-هزتنملا

Al Thoraiah ايرثلا

Al Aqiq كنع-قيقعلا

Al Khozama فيطقلا-ىمازخلا

Al Toba ىبوتلا

Al Raihan ناحيرلا

Al Naseem تاهيس-ميسنلا

Al Mostawda'at تاعدوتسملا ةقطنم

Al Deerah تاهيس-ةريدلا

Senayat Al Thoqbah ةبقثلا ةيعانص

Al Bahr كنع-رحبلا

Al Sooq قوسلا

Al Jawhrah مامدلا-ةرهوجلا

Al Jamayeen تورات-نييعماجلا

Al Yamamah ةماميلا

Al Bostan ربخلا-ناتسبلا

Al Sawari تورات-ىراوصلا

Al Moroj جورملا

Al Khamesah ةسماخلا

Al Danah Al Jnubyah ةيبونجلا ةنادلا

Al Jarodiah ةيدوراجلا

Al Bahara ىراحبلا

Dareen نيراد

Al Awamiah ةيماوعلا

Al Dawaser رساودلا

Al Rabwah ةوبرلا

Mohammed Ben Mas'ood دوعسم نب دمحم

Madynat Al Umal مامدلا-لامعلا ةنيدم

Al Shorook قورشلا

Al Narjes تورات-سجرنلا

Al Jawhrah تورات-ةرهوجلا

Al Qazzazz زازقلا

Al Lo'a Lo'a تورات-ؤلؤللا

Qurtobah ةرونت سأر-ةبطرق

Ibn Khuldoon نودلخ نبا

Al Andalus ةرونت سأر-سلدنألا

Sanabess سبانس

Al Salam تاهيس-مالسلا

Al Bahr فيطقلا-رحبلا

Al Remal لامرلا

Om Al Hamam مامحلا مأ

Al Manar ىوفص-رانملا

Al Nahdah تاهيس-ةضهنلا

Om Al Sahek كهاسلا مأ

Al Noor تاهيس-رونلا

Al Jawaher رهاوجلا

Al Amammrah ةرمامعلا

Al Raba'a ةعبارلا

Al Rawdah ةرونت سأر-ةضورلاAl Zohoor ةرونت سأر-روهزلا

Al Khowailidiah ةيدليوخلاAl Ezdehar راهدزالا

Al Eskan مامدلا-ناكسإلا

Al Bostan ةرونت سأر-ناتسبلا

Al Khassab باصخلا

Al Zomorrod فيطقلا-درمزلا

Al Jabal لبجلا

Al Safa ىوفص-افصلا

Al Bostan كنع-ناتسبلا

Hallet Maheesh شيحم ةلح

Al Khatrashiah ةيشرتخلا

Senayat Al Fouzyah ةيزاوفلا ةيعانص

Al Taqseem ميسقتلا

Al Zor روزلا

E"0'03°94

E"0'63°94

E"0'63°94

E"0'24°94

E"0'24°94

E"0'84°94

E"0'84°94

E"0'45°94

E"0'45°94

E"0'0°05

E"0'0°05

E"0'6°05

E"0'6°05

E"0'21°05

E"0'21°05

N"0'0°62

N"0'0°62

N"0'6°62

N"0'6°62

N"0'21°62

N"0'21°62

N"0'81°62

N"0'81°62

N"0'42°62

N"0'42°62

N"0'03°62

N"0'03°62

N"0'63°62

N"0'63°62

N"0'24°62

N"0'24°62

N"0'84°62

N"0'84°62

E"0'03°94

ى عرب يج ال ل خ ال

اض ري يق- ال ق ى أب إل

ساء ى االح إل

اض ري ى ال إل

ية ناع ص يل ال ب ج ى ال إل

ة و حـدري ى اب ــ إل

يـــل ب ج ى ال ـــ إل

د كة حدي س محطة

ى دول هد ال لك ف م مطار ال

ى قاف ز ث مرك

تماعــــى إج

د كة حدي س محطة

ز عزي بد ال لك ع م ناء ال ي م

ـة عــ جــــام

صل ي لك ف م ال

فى ش ت س م

هد لك ف م ال

ز خدمى ـرك ـم

ترح ق يمى م ل إق

ترح ق ناعى م ص

صة ص تخ سواق م ا

ـة عـ جــــام

هد لك ف م ال

ة جوي قاعدة ال ال

ية ثان ية ال ناع ص ال

نورة ناء رأس ت ي م

اروت رة ت جزي

ناطق م

ية ياح س

يزة مم

اء كهرب محطة ال

ترحة ق جامعة م

ية ناع ص نة مدي

ـة ترحــــــ ق م

نورة رأس ت

يف قط ال

نك ع

ترحة ق ر م قاب م

ـة ع جـام

ترحة ق م

ضى ا تاد ري س ا

تـــرح ق مـــ

يهات س

ز خدمات مرك

ية كوم خدمات ح

ية ل ب ق ت س محجوزات م

ات فاي ن مرمى ال

ـــــى إل

ن بحري ال

فــوى ص

o

>

>سة درا يد ال قة ق نط م

شاطئ

قمر صف ال ن

ة زي عزي ال

محور خدمات

ترحة ق م ضى ال عماالت األرا ت س لــــى - ا ك ي ه مخطط ال لوحة: ال سم ال كـــــل:ا ش ــــــم ال رق

بدالهادى شركة عزمي ع ضامن ت

بد ي ع م بدهللا ال وع

ية س ند ه شارات ال ت س ال ل

ز سون ار شركة ب و

ية م عال كرهوف ال رن ب

كرمة م مكة ال

شمال ال

®¸

ترح ق سى م ي ضرى رئ ق ح طري

ـــد حـدي ـة ال كـــ س خطــوط ال

غـــــاز ترول و ال ب سارات ال م

ـة ترحـــــ ق م د ال حدي كة ال س ال

ترح ق وى م ان ضرى ث ق ح طري

ـــــئ مطـــــارات و مــــوان > o

0 2 4 6 81

م ك

ـة يــــــــــــ نم ت حــــــــــــد ال

جارة زخدمات ت مراك

ية يم ل واعمال إق

جارة زخدمات ت مراك

ية يم ل واعمال إق

ـة ترحــ ق ـة م ي كوم خـدمـات ح

ى زراعــــــــــــى نـــــــــ ك س

مة ائ ز خدمات ق سـواق ومراك ا

تــــرح ق يمــى م ل ســــــوق إق

نـــــــــــــــــــــــــــى ك ســـــ

ـة مــ ائ ـة ق يـــ يم ل ـات إق خــدـم

ية يم ل جارة واعمال إق زخدمات ت مراك

ـة يــ ل ــات مح ز خــدـم ــراك ـم

ـة ترحـ ق ـة م يـــ يم ل خـدمات إق

ـة ترحــ ق ــد م ـة حدي ك س ـة محطـ

تمد ع ـوى م ان ضـرى ث ق ح طـري

تمد سى مع ي ضرى رئ ق ح طـري

تــرح ق يمــــــى م ل ق إق طـــري

يب ومحجوزات ارمكو اب أحرام أالن

ـة ســـــ درا يــــد ال ـة ق قــــ نط م

يمــــــــى ل ـــق إق طــــــــــــري

ســــــى ي ضرى رئ ق ح طــــري

ــــوى ـــان ضـرى ث ق ح طــــري

ـة يـــــــــــ تــ ح ـة ت يــــــــــــــــ ن ب

تودعــــــــات س مخـــــــــازن وم

ناء ي لم عارض وخدمات ل قة م نط م

ـة تــرحــــــــــــــــــــ ق ورش مـــ

ترحة ق ية م ناع ص ناطق دن وم ـم

ـة ترحــــــــــ ق م بـــــــــــرة ال ق م ال

ـــــــات فــــــــاي ن ى ال ـــرمــــــ ـم

ـة مــــــــــــــــ ائ بـــــــــــــــرة ق ق م

نـــاعــــي ص جــــــاري ثمـار ت ت س ا

ـة يـــــــــــــ ع ي ب ـة ط يــــــ محم

ـة مـ ائ ـة ق يـ ناع ص نـاطق دن وم ـم

تـرح ق تماعـى م ى إج قاف ـز ث مرك

ـة يـــــــــ يـاح س ـة شطــــــــــ ان

ضـــــــــراء نــــاطــــــــق خ م

يهــى رف ى ت يـــاح س ثمــــار ت س إ

يـــــزة ـة مم يــ ياح س نـــاطق م

ـة ترحــ ق ـة م يـ ض ا ـات ري خــدـم

ـة مــ ائ ـة ق يــــ نــاطـــق زراع م

ـة صـــــ تخــــدمــــات خـــا س إ

ـة يـــ نم ت ل ضــى محجــوزة ل ارا

ة عودي س ية ال عرب كة ال ل مم ال

ة قروي ة وال لدي ب ئون ال ش وزارة ال

ية ل مح مخططات ال شروع اعداد ال م

دمام ضرة ال مدن حا ية ل ل ي ص ف ت وال

نورة يف ورأس ت قط تي ال ظ ومحاف

ية شرق قة ال نط م ة ال أمان

ع شاري م ير وال عم ت ة ال ال وك

ي عمران يط ال تخط ل عامة ل االدارة ال

3. PROJECT EXPERIENCES

3.3 MOBILITY (4)

Page 50: Gauff Consultants Sept 2012

50

Tanzania

Kikuletwa/Tosamaganga

■ Client: Government of the Republic of Tanzania

■ Project Value: 7.5 million USD

■ Kikuletwa: 2 crossflow turbines, 8,750 MW annual power output

after rehabilitation

■ Tosamaganga: 1 crossflow turbine, 11,000 MW annual power

output after rehabilitation

■ Rehabilitation of civil works, hydraulic steel structures, hoist

equipment, mechanical and electrical equipment. Business

model: Concession (20-25 years), PPA. During concession time

Gauff would perform construction & supply, setting into

operation and operation & maintenance.

Iringa •

3. PROJECT EXPERIENCES

3.4 ENERGY - HYDROELECTRIC POWER

Page 51: Gauff Consultants Sept 2012

51

Germany

Reconstruction and Rebuild of the Terminal

Building at the Nuremberg Airport

■ Client: Flughafen Nürnberg GmbH

■ Project Value: 21.5 million EUR

■ Project control for the new build and reconstruction of the

terminal building

■ Summarization of existing planning and awarding information

■ Involvement at performance of obligations from the contract

■ Proposal evaluation from a technical-economical point of view

■ Participation on awarding negotiations until contract signature

■ Recording and updating of financial and accounting information

3. PROJECT EXPERIENCES

3.5 INDUSTRIAL AND COMMERCIAL BUILDING (1)

Page 52: Gauff Consultants Sept 2012

52

Germany

Harbor Nuremberg - Roth

■ Client: Hafen Nürnberg - Roth GmbH

■ Project Value: 25 million EUR

■ New development of a tri-modal handling facility for the tri-modal

traffic by water, wail and road

■ Schedule handling capacity: 300,000 containers/year

■ Master planning for rail tracks, roads and traffic areas, associated

control and safety technology and all other construction elements

■ Construction supervision and site management

■ Civil engineering structures, rail tracks, roads and traffic areas,

control and safety technology, machine technology, energy, water

supply and waste water disposal

3. PROJECT EXPERIENCES

3.5 INDUSTRIAL AND COMMERCIAL BUILDING (2)

Page 53: Gauff Consultants Sept 2012

53

Hungary

Central European International Bank Budapest

■ Client: CIB Hungária AG

■ Project Value: 13 million EUR

■ The Central European International Bank AG (CIB) opened a

local subsidiary company in Hungary in 1988

■ Due to the increase of employees the centralization and the new

development of the building, including extension possibilities on

an area of 8,500 m2 were necessary.

■ Services provided by Gauff included project management, master

planning, construction engineering, overall monitoring, planning

and design of support structures (underground storeys)

3. PROJECT EXPERIENCES

3.5 INDUSTRIAL AND COMMERCIAL BUILDING (3)

Page 54: Gauff Consultants Sept 2012

54

Germany

Central Project Management Berlin

■ Client: DB ProjektBau GmbH

■ Project value: approx. 24 billion EUR

■ Technical Project Management

■ Interface and Contract Management

■ Schedule Control

3. PROJECT EXPERIENCES

3.6 PROJECT MANAGEMENT (1)

Page 55: Gauff Consultants Sept 2012

55

Germany

Development Design for the Former Herzo, Base of

the US-Army in Herzogenaurach

■ GEV Grundstücksgesellschaft Herzogenaurach mbH & Co. KG,

adidas-Salomon AG

■ Project Value: 27 million EUR

■ Involvement in feasibility studies, development design for traffic

facilities

■ Rain water and foul water supply, water supply, gas/district heat,

electricity, street lighting, IT and telecommunication

■ Tendering, construction supervision, site management and local

construction supervision

3. PROJECT EXPERIENCES

3.6 PROJECT MANAGEMENT (2)

Page 56: Gauff Consultants Sept 2012

56

4. CONTACTS

Page 57: Gauff Consultants Sept 2012

57

H.P. Gauff Ingenieure GmbH & Co. KG -JBG-

Berner Straße 45

60437 Frankfurt am Main

Telefon: +49 69 5 00 08-0

Telefax: +49 69 5 00 08-111

Email: [email protected]

4. CONTACTS

Page 58: Gauff Consultants Sept 2012

58

Thank you for your attention