Top Banner
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness of Pump and Plunger by Transient Multi-Phase Flow Simulation
44

Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Mar 31, 2015

Download

Documents

Jameson Lane
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Gas Well Deliquification WorkshopSheraton Hotel, Denver, Colorado

February 17 – 20, 2013

Kees Veeken – Shell (NAM)

Rahel Yusuf – SPT Group

Model the Effectiveness of Pump and Plunger by Transient Multi-Phase Flow Simulation

Page 2: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

2

Contents

• Objectives

• Transient Vs Steady State

• Pump modeling

• Plunger modeling

Page 3: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

3

Objectives

• How much back pressure is introduced by the flowing wet gas column in the presence of a pump that removes liquids from the bottom of the well ?

– The outcome determines the effectiveness of a pump and defines the best ways of operating a pump

• What is the effectiveness of a plunger that travels up to the subsurface safety valve but does not cover the short distance between subsurface safety valve and wellhead ?

– The outcome determines the requirement for a second plunger to dewater the top section

Page 4: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

4

Transient Vs Steady State• Pump intake pressure sits in between too high steady

state VLP and too low dry gas VLP

– How effective is downhole separation?

– How steady is production and how much gas will enter pump ?

• Plunger action is transient in nature

– Will slug of liquid be able to bridge “gap” ?

10

20

30

40

50

60

70

0 50 100 150 200 250 300

FBH

P (b

ara)

Gas Rate (e3 m3/d)

Modified Gray Gray Beggs & Brill Petex 4 SRTCA

FTHP=20 barg

Page 5: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

5

Pump Modeling Parameters

• 5.5” tubing + 5” liner down to 3040 m

• Pump on 1.5” CCT @ 3020 m

• Inflow across 2770-3040 m with 3% below pump

• Darcy inflow A=80 bara/(e3m3/d)

• Reservoir Pres=35-55-65-75 bara

• WGR=23-7, CGR=10 m3/e6m3

• Wellhead pressure = 9 bara

Constant mass pump rate for liquid and gas i.e. keeps pumping in case of gas ingress

GasLiquidPower

Page 6: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

6

OLGA Liquid Loading Point

5

15

25

35

45

55

65

75

0 10 20 30 40 50 60 70 80

FBH

P (b

ara)

Gas Rate (e3 m3/d)

IPR – Pres=69 baraLL – OLGA Qmin=58e3 m3/d

VLP – Modified GrayVLP - Gray

VLP – Cullender-Smith

Page 7: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

7

Pres=55 bara – No PumpingGas rate (e3 m3/d)

Pressure @ pump intake (bara)Holdup @ pump intake (-)

Liquid in wellbore (m3)

Page 8: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

8

Pres=55 bara – Pumping @ 1 m3/d

Gas rate (e3 m3/d)Pressure @ pump intake (bara)

Holdup @ pump intake (-)Liquid in wellbore (m3)

• Stable holdup @ pump intake: gassy liquid (8 Sm3/d gas)

Page 9: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

9

Pres=55 bara – Pumping @ 1 m3/d

Significant holdupacross bulk of wellbore

Page 10: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

10

Pres=55 bara – Pumping @ 1 m3/d

Liquid holdup increasespump intake pressure

Page 11: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

11

Pres=55 bara – Pumping @ 2 m3/d

• Oscillating holdup @ pump intake: gassy liquid or gas

Gas rate (e3 m3/d)Pressure @ pump intake (bara)

Holdup @ pump intake (-)Liquid in wellbore (m3)

Page 12: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

12

Pres=55 bara – Pumping @ 2 m3/d

Holdup is sluggingup and down wellbore

Page 13: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

13

Pres=55 bara – Pumping @ 2 m3/d

Pump intake pressureoscillates

Page 14: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

14

Pres=65 bara – Pumping @ 2 m3/d

• Oscillating holdup @ pump intake: gassy liquid or gas

Gas rate (e3 m3/d)Pressure @ pump intake (bara)

Holdup @ pump intake (-)Liquid in wellbore (m3)

Page 15: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

15

Pumping Operating Points

2

1

4 21.5

1

0.5

0.51

0

5

15

25

35

45

55

65

75

0 10 20 30 40 50 60 70 80

FBH

P (b

ara)

Gas Rate (e3 m3/d)

IPR – Pres=75/65/55/35 baraVLP – Modified Gray

VLP – GrayVLP – CS (dry & wet)

OLGA – Pumping (m3/d) & LL

Page 16: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

16

Pumping Summary

• Back pressure due to liquid holdup is unavoidable

• Magnitude increases as Q increases– Insignificant at low enough Q but significant at higher Q as

downhole separation becomes less effective

– Back pressure does not increase with higher WGR!

– Production penalty increases as inflow improves!

• Gas ingress into pump depends on pump rate and location of pump intake relative to inflow profile – Pump off triggers slugging and large gas ingress

Further explore influence of pump location, liner size and deviation on back pressure and gas ingress

Page 17: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

17

Plunger Modeling Parameters

• 3.5” tubing to 1169 m, 5”x4.5” liner to 1310 m

• Plunger between “launch” @ 1145 m and “trap” @ 0-330 m (SSSV @ 102 m)

• Inflow @ 1310 m, A=5.2 bara/(e3m3/d)

• Pres=12-18 bara, WGR=10-88 m3/e6m3, CGR=0 m3/e6m3

• Wellhead pressure = 8 bara

• 3.5” tubing plunger weight = 7.5 kg, zero leakage, SV or 3 bara BPV

• 9 plunger cycles 2 hr flow, 1 hr shut-in

17

Tu

bin

gW

ellb

ore

PL

Trap

LaunchSV

Page 18: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

18

Field – No Plunger, Close to LL

THP (barg)Gas Rate (Nm3/d)

• 1 hr flow, 0.5 hr shut-inWYK4-FI-4-32-1

26013

NM3/D

WYK4-PI-4-32-1

7.8435

BARG

WYK4-TI-4-32-1

15.807

DEG.C

WYK4-FI-4-32-1.INT

18995

NM3/D

CALCULATED FLOW

FLOWLINE TO WELLHEAD PRESSURE

TEMPERATURE

CALCULATED FLOW

26/05/2012 00:00:0025/05/2012 00:00:00 24.00 hours

WYK-32

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

1.E+05

0

20

0

100

-50000

50000

FTHP (bara)Gas Rate (Nm3/d)

Page 19: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

19

Field – Plunger 11 hrs ON, 1 hr OFF

THP (barg)Gas Rate (Nm3/d)

• 1 hr flow, 0.5 hr shut-inWYK4-FI-4-32-1

14926

NM3/D

WYK4-PI-4-32-1

6.9256

BARG

WYK4-TI-4-32-1

20.681

DEG.C

WYK4-FI-4-32-1.INT

6514.1

NM3/D

CALCULATED FLOW

FLOWLINE TO WELLHEAD PRESSURE

TEMPERATURE

CALCULATED FLOW

14/06/2012 18:00:0014/06/2012 15:00:00 3.00 hours

WYK-32

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

1.E+05

0

20

0

100

-50000

50000TT~20 min (excessive)

VEL~52 m/min (170 ft/min)ON period too long

FTHP (bara)Gas Rate (Nm3/d)

Page 20: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

20

Field – Plunger 2 hrs ON, 1 hr OFF

THP (barg)Gas Rate (Nm3/d)

• 1 hr flow, 0.5 hr shut-inWYK4-FI-4-32-1

0.0000

NM3/D

WYK4-PI-4-32-1

10.965

BARG

WYK4-TI-4-32-1

15.695

DEG.C

WYK4-FI-4-32-1.INT

13692

NM3/D

CALCULATED FLOW

FLOWLINE TO WELLHEAD PRESSURE

TEMPERATURE

CALCULATED FLOW

28/06/2012 00:00:0027/06/2012 21:00:00 3.00 hours

WYK-32

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

1.E+05

0

20

0

100

-50000

50000TT~5 min

VEL~209 m/min (690 ft/min)

FTHP (bara)Gas Rate (Nm3/d)

Page 21: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

21

WGR=88 m3/e6m3, Pres=17.516.5bara

Gas rate (Sm3/d)Cumulative Liquid (m3)

Liquid in tubing (m3)Liquid in wellbore (m3)

Qmin=29e3m3/d @ Pres=16.9bara

Page 22: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

22

8

9

10

11

12

13

14

15

16

17

18

0 5 10 15 20 25 30 35 40

FBH

P (b

ara)

Gas Rate (e3 m3/d)

OLGA Liquid Loading Points

IPR – Pres=14.3-16.9 baraVLP – Modified Gray WGR=10-88 m3/e6m3

OLGA LL Points WGR=10-88 m3/e6m3

Page 23: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

23

WGR=88, Pres=15, Trap @0, BPV (#8)

THP (bara)Gas rate (Sm3/d)

Liquid in Tubing (m3)Liquid in Wellbore (m3)Plunger Velocity (m/s)Plunger Position (m)

TT~6.5 minVEL~161 m/min

(530 ft/min)

Page 24: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

24

WGR=88, Pres=15, Trap @0, SV, 23.9 hr

Holdup Tubing (-)Pressure Tubing (bara)

Holdup Wellbore (-)Pressure Wellbore (bara)

Page 25: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

25

WGR=88, Pres=15, Trap @0, SV, 24.05 hr

Holdup Tubing (-)Pressure Tubing (bara)

Holdup Wellbore (-)Pressure Wellbore (bara)

Page 26: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

26

WGR=88, Pres=15, Trap @0, SV, 24.1 hr

Holdup Tubing (-)Pressure Tubing (bara)

Holdup Wellbore (-)Pressure Wellbore (bara)

Page 27: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

27

WGR=88, Pres=15, Trap @0, SV, 24.15 hr

Holdup Tubing (-)Pressure Tubing (bara)

Holdup Wellbore (-)Pressure Wellbore (bara)

Page 28: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

28

WGR=88, Pres=15, Trap @0, SV, 25.9 hrs

Holdup Tubing (-)Pressure Tubing (bara)

Holdup Wellbore (-)Pressure Wellbore (bara)

Holdup Tubing (-)Pressure Tubing (bara)

Holdup Wellbore (-)Pressure Wellbore (bara)

Page 29: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

29

WGR=88, Pres=15, Trap @0, SV, 26.05 hr

Holdup Tubing (-)Pressure Tubing (bara)

Holdup Wellbore (-)Pressure Wellbore (bara)

Page 30: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

30

WGR=88, Pres=15, Trap @0, SV, 26.1 hr

Holdup Tubing (-)Pressure Tubing (bara)

Holdup Wellbore (-)Pressure Wellbore (bara)

Page 31: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

31

WGR=88, Pres=15, Trap @0, BPV (#8)

THP (bara)Gas rate (Sm3/d)

Liquid in Tubing (m3)Liquid in Wellbore (m3)Plunger Velocity (m/s)Plunger Position (m)

TT~6.5 minVEL~161 m/min

(530 ft/min)

Page 32: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

32

WGR=10, Pres=15, Trap @0, SV

THP (bara)Gas rate (Sm3/d)

Cumulative Liquid (m3)Liquid in Tubing (m3)

Liquid in Wellbore (m3)

Page 33: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

33

WGR=10, Pres=15, Trap @0, SV (#8)

THP (bara)Gas rate (Sm3/d)

Liquid in Tubing (m3)Liquid in Wellbore (m3)Plunger Velocity (m/s)Plunger Position (m)

TT~3.0 minVEL~350 m/min

(1150 ft/min)

Page 34: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

34

WGR=10, Pres=14, Trap @0, SV (#8)

THP (bara)Gas rate (Sm3/d)

Liquid in Tubing (m3)Liquid in Wellbore (m3)Plunger Velocity (m/s)Plunger Position (m)

TT~3.3 minVEL~320 m/min

(1050 ft/min)

Page 35: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

35

WGR=10, Pres=13, Trap @0, SV (#8)

THP (bara)Gas rate (Sm3/d)

Liquid in Tubing (m3)Liquid in Wellbore (m3)Plunger Velocity (m/s)Plunger Position (m)

TT~4 minVEL~260 m/min

(850 ft/min)

Page 36: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

36

WGR=10, Pres=12, Trap @0, SV (#4)

THP (bara)Gas rate (Sm3/d)

Liquid in Tubing (m3)Liquid in Wellbore (m3)Plunger Velocity (m/s)Plunger Position (m)

TT~5 minVEL~209 m/min

(690 ft/min)

Page 37: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

37

WGR=88, Pres=15, Trap @0, BPV

THP (bara)Gas rate (Sm3/d)

Cumulative Liquid (m3)Liquid in Tubing (m3)

Liquid in Wellbore (m3)

Page 38: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

38

WGR=88, Pres=15, Trap @50, SV

THP (bara)Gas rate (Sm3/d)

Cumulative Liquid (m3)Liquid in Tubing (m3)

Liquid in Wellbore (m3)

Page 39: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

39

WGR=88, Pres=15, Trap @102, SV

THP (bara)Gas rate (Sm3/d)

Cumulative Liquid (m3)Liquid in Tubing (m3)

Liquid in Wellbore (m3)

Page 40: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

40

WGR=88, Pres=15, Trap @330, SV

THP (bara)Gas rate (Sm3/d)

Cumulative Liquid (m3)Liquid in Tubing (m3)

Liquid in Wellbore (m3)

Page 41: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

41

8

9

10

11

12

13

14

15

16

17

18

0 5 10 15 20 25 30 35 40

FBH

P (b

ara)

Gas Rate (e3 m3/d)

With Plunger – Operating Points

IPR – Pres=14.3-16.9 baraVLP – CS WGR=11-88 m3/e6m3

– LL WGR=11-88 m3/e6m3

O – WGR=11, Trap=0 – WGR=88, Trap=0

– WGR=88, Trap=102

Page 42: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

42

Plunger Summary

• Transient multi-phase flow model produces credible results and provides insight into influence of well parameters on plunger performance

• Plunger needs to travel to top of tubing to deliver maximum value i.e. liquid slug cannot bridge large “gap”

• Plunger introduces back pressure proportional to WGR which can limit applicability in prolific wells– Gas production during upward travel must deliver minimum

plunger velocity and will diminish as slug size increases

Further explore influence of plunger launch position, wellbore (plus annulus) volume, inflow performance and plunger ON/OFF schedule

Page 43: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

43

Copyright

Rights to this presentation are owned by the company(ies) and/or author(s) listed on the title page. By submitting this presentation to the Gas Well Deliquification Workshop, they grant to the Workshop, the Artificial Lift Research and Development Council (ALRDC), and the Southwestern Petroleum Short Course (SWPSC), rights to:

– Display the presentation at the Workshop.– Place it on the www.alrdc.com web site, with access to the site to be

as directed by the Workshop Steering Committee.– Place it on a CD for distribution and/or sale as directed by the

Workshop Steering Committee.

Other use of this presentation is prohibited without the expressed written permission of the author(s). The owner company(ies) and/or author(s) may publish this material in other journals or magazines if they refer to the Gas Well Deliquification Workshop where it was first presented.

Page 44: Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Kees Veeken – Shell (NAM) Rahel Yusuf – SPT Group Model the Effectiveness.

Feb. 17 – 20, 2013 2013 Gas Well Deliquification Workshop Denver, Colorado

44

Disclaimer

The following disclaimer shall be included as the last page of a Technical Presentation or Continuing Education Course. A similar disclaimer is included on the front page of the Gas Well Deliquification Web Site.

The Artificial Lift Research and Development Council and its officers and trustees, and the Gas Well Deliquification Workshop Steering Committee members, and their supporting organizations and companies (here-in-after referred to as the Sponsoring Organizations), and the author(s) of this Technical Presentation or Continuing Education Training Course and their company(ies), provide this presentation and/or training material at the Gas Well Deliquification Workshop "as is" without any warranty of any kind, express or implied, as to the accuracy of the information or the products or services referred to by any presenter (in so far as such warranties may be excluded under any relevant law) and these members and their companies will not be liable for unlawful actions and any losses or damage that may result from use of any presentation as a consequence of any inaccuracies in, or any omission from, the information which therein may be contained.

The views, opinions, and conclusions expressed in these presentations and/or training materials are those of the author and not necessarily those of the Sponsoring Organizations. The author is solely responsible for the content of the materials.

The Sponsoring Organizations cannot and do not warrant the accuracy of these documents beyond the source documents, although we do make every attempt to work from authoritative sources. The Sponsoring Organizations provide these presentations and/or training materials as a service. The Sponsoring Organizations make no representations or warranties, express or implied, with respect to the presentations and/or training materials, or any part thereof, including any warrantees of title, non-infringement of copyright or patent rights of others, merchantability, or fitness or suitability for any purpose.