Page 1: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Garrison Oak Garrison Oak Technical ParkTechnical Park

Economic UpdateEconomic Update

June 26, 2015June 26, 2015

Page 2: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Garrison Oak Site Plan Garrison Oak Site Plan

Page 3: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Property DetailsProperty Details

• Location: White Oak Rd. Adjacent to DE RT. 1

• Zoning: Industrial Park Manufacturing (IPM2) Acreage: 389 +/- contiguous acres

• Environmental : Phase I & limited Phase II have been completed and show that

the property has no environmental issues

• Abatement: Both the City of Dover & Kent County have economic tax abatement programs available

Page 4: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Property Details (2)Property Details (2)• Utilities

– Water: 16-inch water main to service entire park 1.5 million gallon water tank completion late 2015– Sewer: 16” line with new pump station in the park – Gas: Future: 4” gas line to service all lots within Garrison

Tract summer 2015 completion date 16” gas line to service Lot 7 for combined cycle power

plant completed

Page 5: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Property Details (3)Property Details (3)• Utilities

– Storm Water Management: To manage water quantity completion date spring 2015

– Electric: 69KV loop is located on White Oak Road. This loop is connected to Dover’s new Cartanza 230KV/600MW Primary Substation

Page 6: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

1.5 Million Gallon Water Tower1.5 Million Gallon Water Tower

Page 7: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

16“ Gas Field16“ Gas Field

Page 8: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Infrastructure ProgressInfrastructure Progress

Page 9: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Completed ProjectsCompleted Projects

Page 10: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Dover Sun ParkDover Sun Park

• Project Details– 10 Megawatts of renewable energy– 34,258 trackable solar panels– Provide electricity for up to 1300 homes– City of Dover purchases all power and 15% of

the renewable energy credits– Created 150 construction jobs, 80% of which

were Delaware jobs

Page 11: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Dover Sun ParkDover Sun Park

Page 12: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Garrison Energy CenterGarrison Energy Center

• Combined cycle power plant–Lot 7

Page 13: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Project Design Utilizes Efficient and Reliable Project Design Utilizes Efficient and Reliable TechnologyTechnology

• Nominal up to 618 MW dual-fueled combined cycle facility

• Constructed in two phases, each nominally 309 MW

• Each phase is 1x1:– One combustion turbine with a HRSG and

one steam turbine– Natural gas-fired duct burners on the HRSGs

Page 14: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Garrison Energy CenterGarrison Energy Center……

Page 15: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Garrison Energy CenterGarrison Energy Center

Page 16: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Uzin UtzUzin Utz

• Dry mortar manufacturing facility–Lot 12

Page 17: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Project DetailsProject Details

Uzin Utz – Lot 12• International Flooring Manufacturer with

headquarters in Ulm, Germany• Construction of 50,000 sq. ft. manufacturing

facility completed June 2015• Future expansion phase II to 86,000 sq. ft.

by 2017• Manufacturing self-leveling underlayment • Initial Projection 25-30 jobs

Page 18: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Uzin UtzUzin Utz

Page 19: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Uzin Utz Mixing TowerUzin Utz Mixing Tower

Page 20: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Future ProjectsFuture Projects

• Lot 13 –To be purchased by a security

technology company for manufacturing and corporate headquarters.

–Construction to start January 2016

Page 21: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

ROUTE 13 REDEVELOPMENTROUTE 13 REDEVELOPMENT

• Multiple developers have taken advantage of commercial redevelopment incentives– Building Permit Waivers

– Impact Fee Waivers

– 10-year Tax Abatement on Improvements

Page 22: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Former WalMart Former WalMart

Page 23: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Former Office MaxFormer Office Max

Page 24: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Former Uno’sFormer Uno’s

Page 25: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Former Dover LithoFormer Dover Litho

Page 26: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Former K-MartFormer K-Mart

Page 27: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Former Metro MarketFormer Metro Market

Page 28: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Blue Hen Corporate CenterBlue Hen Corporate Center

Page 29: Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.

Blue Hen Corporate CenterBlue Hen Corporate Center