Garden Centre and Hardware & Building Supplies, ENDFIELD 127 COSGROVE ROAD SOUTH STRATHFIELD NSW LANDSCAPE PLAN 31 July 2017 RevC PO BOX 265 SEAFORTH NSW 2092 P: 1300 22 44 55 E: julian@sdstudios.com.au www.sdstudios.com.au DRIP IRRIGATION PERFORMANCE SPECIFICATION All Garden Beds and Planter Boxes are to be provided with a drip irrigation system and two taps with removebale water keys, connected to a pump and the rainwater tank. Design, supply and install a permanent, fully automated drip irrigation system. The system is to cover all new garden areas to the extent shown on the drawings. Water is to be delivered via sub surface drippers and/or drip lines. The system is to be capable of supplying 32mm of water/week over all irrigated areas. It is to be designed to operate for a minimum of 10 years. All lines are to be buried below the finished ground level. Pits are to be set on a 200mm deep bed of gravel. Pit covers are to be level with the soil surface. Avoid seepage onto pavement, buildings or other structures. Include plumbing connection to main, main valve and backflow prevention. Central controller/programmer to be located in a lockable box in nominated location to be approved prior to installation. A dedicated GPO is to be provided for the controller to be plugged into. All work is to be approved by the local regulatory authority. Prepare as installed drawings and commission the system. The Contractor is to submit documents of the design and specification for the irrigation system for approval prior to commencement of work. Equipment is to comply with AS 2698.1 & as 2698.3. Connect to pumps connect to the rainwater tanks. LANDSCAPE MAINTENANCE THE CONTRACTOR SHALL CONTINUOUSLY MAINTAIN ALL AREAS OF THE CONTRACT DURING THE PROGRESS OF THE WORKS. THE CONTRACTOR SHALL COMMENCE AND FULLY IMPLEMENT THE SHORT-TERM MAINTENANCE AND ESTABLISHMENT AFTER PRACTICAL COMPLETION HAS BEEN CONFIRMED. SITE CONTROL: REPORT TO THE PRINCIPAL'S DESIGNATED REPRESENTATIVE ON ARRIVING AT AND BEFORE LEAVING THE SITE. PLANT ESTABLISHMENT PERIOD: THE PERIOD BETWEEN THE DATE OF PRACTICAL COMPLETION AND THE DATE OF FINAL COMPLETION. MAINTENANCE/ ESTABLISHMENT PERIOD: 12 MONTHS. PLANT ESTABLISHMENT: MAINTAIN THE CONTRACT AREA DURING THE PLANT ESTABLISHMENT PERIOD. ENSURE THE GENERAL APPEARANCE AND PRESENTATION OF THE LANDSCAPE AND THE QUALITY OF PLANT MATERIAL AT DATE OF PRACTICAL COMPLETION IS MAINTAINED FOR THE FULL PLANTING ESTABLISHMENT PERIOD. EXISTING PLANT MATERIAL: MAINTAIN EXISTING PLANTING WITHIN THE LANDSCAPE CONTRACT AREA AS SPECIFIED FOR NEW PLANTING. REPLACEMENTS: REPLACE FAILED, DEAD AND/OR DAMAGED PLANTS AT MINIMUM 3 WEEK INTERVALS AS NECESSARY THROUGHOUT THE FULL PLANT ESTABLISHMENT PERIOD. REPORTING: SUBMIT REGULAR REPORTS BY THE LAST FRIDAY OF EACH MONTH SUMMARISING THE GENERAL STATUS OF WORKS. INCLUDE A MAINTENANCE SCHEDULE, A LOG BOOK OF MAINTENANCE ACTIVITY, SOIL TEST RESULTS AS REQUIRED FOR ANY FERTILISING PROGRAMS, AND PLANT REPLACEMENT REQUIREMENTS. WATER RESTRICTIONS: COORDINATE THE WATER SUPPLY AND CONFIRM THE WATERING REGIME AGAINST RELEVANT GOVERNMENT LEGISLATION AND RESTRICTIONS AT THE TIME. STAKES AND TIES: REMOVE AT THE END OF THE PLANTING ESTABLISHMENT PERIOD. TEMPORARY FENCES: REMOVE TEMPORARY PROTECTIVE FENCES AT THE END OF THE PLANTING ESTABLISHMENT PERIOD. COMPLIANCE: PLANT ESTABLISHMENT SHALL BE DEEMED COMPLETE, SUBJECT TO THE FOLLOWING: * REPAIRS TO PLANTING MEDIA COMPLETED. * PESTS, DISEASE, OR NUTRIENT DEFICIENCIES OR TOXICITIES ARE NOT EVIDENT. * MULCHED SURFACES HAVE BEEN MAINTAINED IN A WEED FREE AND TIDY CONDITION AND TO THE SPECIFIED DEPTH. * VEGETATION IS ESTABLISHED AND WELL FORMED. * PLANTS HAVE HEALTHY ROOT SYSTEMS. * VEGETATION IS NOT RESTRICTING ESSENTIAL SIGHT LINES AND SIGNAGE. * COLLECTION AND REMOVAL OF LITTER COMPLETED. * REMOVAL OF MULCH FROM DRAINAGE AND ACCESS AREAS COMPLETED. * ALL DEFECTS NOTIFICATIONS HAVE BEEN CLOSED OUT. Planting Schedule Botanical Name Common Name Pot Size Height (m) Quantity TREES Acer palmatum Senkaki Coral Bark Maple 100L 8 3 Cercis siliquastrum Judas tree 75Lt 6 6 Elaeocarpus reticulatus Blueberry Ash 45L 8 30 Farxinus raywoodii Claret Ash 45L 8 1 Magnolia Soulangenea Magnolia 45L 6 3 Magnolia stellata Star Magnolia 45L 6 13 Prunus snofozam Little gem 45L 4 7 Prunus blireana Sweeper Foliage 45L 6 11 Pyrus calleryana Capital Pear 45L 9 14 Zelkova serrata Green Vase 100L 12 12 SHRUBS Callistemon endevour Endevour Bottlebrush 200mm 2 9 Cordyline fruticosa Ti Plant 200mm 1 80 Cordyline Red Sensation Red Sensation 200mm 1.5 37 Doryanthes excelsa Gymea Lilly 200mm 1.2 53 Gardenia augusta Gardenia 200mm 1 29 Murraya paniculata Orange Jassmine 200mm 2 10 Photinia robusta Photinia 200mm 1.5 115 Raphiolepis 'Oriental Pearl' Oriental Pearl 200mm 1 36 Viburnum odoratissimum Sweet Viburnum 200mm 2 116 GROUNDCOVERS/ACCENTS Acacia cognata Limelight Acacia 150mm 0.6 90 Ajuga reptans Carpet Bugle 150mm 0.2 180 Alcantarea purpurea Silver Plum 150mm 1 40 Angiozanthus sp Red kangoroo Paw 150mm 0.6 12 Agapanthus africanus African Lilly 150mm 0.6 130 Arthropodium cirratum Renga Lilly 150mm 0.6 130 Baekea virgata nana Dwarf Heath Myrtle 150mm 0.8 150 Banksia spinulosa Birthday Candles 150mm 0.5 110 Bergenia x schmitdtii Bergenia 150mm 0.5 90 Clivia minata Clivia 150mm 0.6 300 Dianella caerullea Flax Lilly 150mm 0.6 130 Dichondra silver falls Silver Falls Kidney Weed 150mm 0.2 250 Hemerocallis stella Daylilly 150mm 0.8 20 Liriope muscari Turf Lilly Royale Purple 150mm 0.5 100 Lomandra hystrix Slender Mat Rush 150mm 0.5 500 Lomandra Tanika Fine Leafed Mat Rush 150mm 0.5 500 Myoporum parvivolium Yareena Creeping Boobiala 150mm 0.5 100 Philodendron 'Xanadu' Xanadu 150mm 1 90 Viola hederacea Native Violet 150mm 0.1 50
4
Embed
Garden Centre and Hardware & Building Supplies, ENDFIELD
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Garden Centre and Hardware &Building Supplies, ENDFIELD127 COSGROVE ROAD SOUTHSTRATHFIELD NSW
All Garden Beds and Planter Boxes are to be provided with a drip irrigation system and two taps with removebale water keys, connected to a pump and the rainwater tank.
Design, supply and install a permanent, fully automated drip irrigation system. The system is to cover all new garden areas to the extent shown on the drawings. Water is to be delivered via sub surface drippers and/or drip lines. The system is to be capable of supplying 32mm of water/week over all irrigated areas. It is to be designed to operate for a minimum of 10 years. All lines are to be buried below the finished ground level. Pits are to be set on a 200mm deep bed of gravel. Pit covers are to be level with the soil surface. Avoid seepage onto pavement, buildings or other structures. Include plumbing connection to main, main valve and backflow prevention. Central controller/programmer to be located in a lockable box in nominated location to be approved prior to installation. A dedicated GPO is to be provided for the controller to be plugged into. All work is to be approved by the local regulatory authority. Prepare as installed drawings and commission the system.The Contractor is to submit documents of the design and specification for the irrigation system for approval prior to commencement of work.Equipment is to comply with AS 2698.1 & as 2698.3.
Connect to pumps connect to the rainwater tanks.
LANDSCAPE MAINTENANCE
THE CONTRACTOR SHALL CONTINUOUSLY MAINTAIN ALL AREAS OF THE CONTRACT DURING THE PROGRESS OF THE WORKS. THE CONTRACTOR SHALL COMMENCE AND FULLY IMPLEMENT THE SHORT-TERM MAINTENANCE AND ESTABLISHMENT AFTER PRACTICAL COMPLETION HAS BEEN CONFIRMED.SITE CONTROL: REPORT TO THE PRINCIPAL'S DESIGNATED REPRESENTATIVE ON ARRIVING AT AND BEFORE LEAVING THE SITE.PLANT ESTABLISHMENT PERIOD: THE PERIOD BETWEEN THE DATE OF PRACTICAL COMPLETION AND THE DATE OF FINAL COMPLETION.MAINTENANCE/ ESTABLISHMENT PERIOD: 12 MONTHS.
PLANT ESTABLISHMENT: MAINTAIN THE CONTRACT AREA DURING THE PLANT ESTABLISHMENT PERIOD. ENSURE THE GENERAL APPEARANCE AND PRESENTATION OF THE LANDSCAPE AND THE QUALITY OF PLANT MATERIAL AT DATE OF PRACTICAL COMPLETION IS MAINTAINED FOR THE FULL PLANTING ESTABLISHMENT PERIOD.EXISTING PLANT MATERIAL: MAINTAIN EXISTING PLANTING WITHIN THE LANDSCAPE CONTRACT AREA AS SPECIFIED FOR NEW PLANTING.REPLACEMENTS: REPLACE FAILED, DEAD AND/OR DAMAGED PLANTS AT MINIMUM 3 WEEK INTERVALS AS NECESSARY THROUGHOUT THE FULL PLANT ESTABLISHMENT PERIOD.REPORTING: SUBMIT REGULAR REPORTS BY THE LAST FRIDAY OF EACH MONTH SUMMARISING THE GENERAL STATUS OF WORKS. INCLUDE A MAINTENANCE SCHEDULE, A LOG BOOK OF MAINTENANCE ACTIVITY, SOIL TEST RESULTS AS REQUIRED FOR ANY FERTILISING PROGRAMS, AND PLANT REPLACEMENT REQUIREMENTS.WATER RESTRICTIONS: COORDINATE THE WATER SUPPLY AND CONFIRM THE WATERING REGIME AGAINST RELEVANT GOVERNMENT LEGISLATION AND RESTRICTIONS AT THE TIME.STAKES AND TIES: REMOVE AT THE END OF THE PLANTING ESTABLISHMENT PERIOD.TEMPORARY FENCES: REMOVE TEMPORARY PROTECTIVE FENCES AT THE END OF THE PLANTING ESTABLISHMENT PERIOD.COMPLIANCE: PLANT ESTABLISHMENT SHALL BE DEEMED COMPLETE, SUBJECT TO THE FOLLOWING:* REPAIRS TO PLANTING MEDIA COMPLETED.* PESTS, DISEASE, OR NUTRIENT DEFICIENCIES OR TOXICITIES ARE NOT EVIDENT.* MULCHED SURFACES HAVE BEEN MAINTAINED IN A WEED FREE AND TIDY CONDITION AND TO THE SPECIFIED DEPTH.* VEGETATION IS ESTABLISHED AND WELL FORMED.* PLANTS HAVE HEALTHY ROOT SYSTEMS.* VEGETATION IS NOT RESTRICTING ESSENTIAL SIGHT LINES AND SIGNAGE.* COLLECTION AND REMOVAL OF LITTER COMPLETED.* REMOVAL OF MULCH FROM DRAINAGE AND ACCESS AREAS COMPLETED.* ALL DEFECTS NOTIFICATIONS HAVE BEEN CLOSED OUT.
Planting Schedule Botanical Name Common Name Pot Size Height (m) QuantityTREESAcer palmatum Senkaki Coral Bark Maple 100L 8 3Cercis siliquastrum Judas tree 75Lt 6 6Elaeocarpus reticulatus Blueberry Ash 45L 8 30Farxinus raywoodii Claret Ash 45L 8 1Magnolia Soulangenea Magnolia 45L 6 3Magnolia stellata Star Magnolia 45L 6 13Prunus snofozam Little gem 45L 4 7Prunus blireana Sweeper Foliage 45L 6 11Pyrus calleryana Capital Pear 45L 9 14Zelkova serrata Green Vase 100L 12 12
NOTESGENERAL NOTESAll work to be carried out in accordance with the Building Code of Australia, all Local and State Government Ordinances, relevant Australian Standards, Local Authorities Regulations and all other relevant Authorities concerned. All structural work and site drainage to be subject to Engineer's details or certification where required by Council. This shall include r.c. slabs and footings, r.c. and steel beams & columns, wind bracing to AS 1170 and AS4055, anchor rods or bolts, tie downs, fixings etc., driveway slabs and drainage to Council's satisfaction. All timbers to be in accordance with SAA Timber Structure Code AS1720 and SAA Timber Framing Code AS 1684. All work to be carried out in a professional and workman- shiplike manner according to the plans and specification.NOTEDo not scale off the drawings unless otherwise stated and use figured dimensions in preference. All dimensions are to be checked and verified on site before the commencement of any work, all dimensions and levels are subject to final survey and set-outNo responsibility will be accepted by Sitedesign for any variations in design, builder's method of construction or materials used, deviation from specification without permission or accepted work practices resulting in inferior construction. Locate and protect all services prior to construction.COPYRIGHT CLAUSEThis drawing and design is the property of Sitedesign and should not be reproduced either in part or whole without the written consent of this firm.
landscape architects // construction // maintenance // irrigationcreating gardens to live in and enjoy
Garden Centre & Hardware & Building Supplies, ENDFIELD
15-830LP011:500 @A1
FOR DEVELOPMENT APPLICATION ONLY
SITE LANDSCAPE PLAN127 COSGROVE ROAD STRATHFIELD NSW
17.03.16
A/3
A/3 31.07.17 ISSUE FOR APPROVAL
plan view
STAGGERED PATTERN TO
QUANITIES AS PER PLANTING PLAN
CONTAINERISED PLANT
AS PER PLANTING SCHEDULE
IMPORTED TOPSOIL AS SPECIFIED
GARDEN BED PLANTING
CONTAINERISED PLANT
AS PER PLANTING SCHEDULE
INSTALL 75MM DEPTH MULCH AS
SPECIFIED . NO MULCH WITHIN
50MM FROM BASE OF PLANT STEM
RIP SUBGRADE 150MM TO PROMOTE DRAINAGE AND IMPROVE PLANT GROWTH
38 x 38 x 1800 Hardwood stakesas specified
50mm wide hessian ties
75mm mulch as specified
form shallow dish drain to base of plant
excavate planting hole 200mmdeeper and 600mm wider than pot size
backfilled planting mix to be finished
flush with surrounding soil levels
rip subgrade 150mm
TREE PLANTING
Timber Edge Detail (L)
(L)
(L)
(L)
POND
RO
OF
25.9
1
SIGN SIGNTELSTRA
POLE
GRATE
SIGN
SIGN
POLE
POLE
SIGN
SIGN
GAS
SIGNGASCONC
LID
TRAFFICLIGHT
GAS
STEELSTRUCTURE
RIDGE 30.36
RIDGE 30.35
GUTTER 25.72
RIDGE 25.05
GUTTER 23.24
ROOF 25.71
GU
TTE
R 2
3.53
GU
TTE
R23
.32
GUTTER24.45
GUTTER 25.75
GUTTER 25.69
STOPVALVE
STOPVALVE
AW
NIN
G
MARKER
GASMARKER
UNDERPASS(L)
(L)
(L)
(L)
POND
RO
OF
25.9
1
SIGN SIGNTELSTRA
POLE
GRATE
SIGN
SIGN
POLE
POLE
SIGN
SIGN
GAS
SIGNGASCONC
LID
TRAFFICLIGHT
GAS
STEELSTRUCTURE
RIDGE 30.36
RIDGE 30.35
GUTTER 25.72
RIDGE 25.05
GUTTER 23.24
ROOF 25.71
GU
TTE
R 2
3.53
GU
TTE
R23
.32
GUTTER24.45
GUTTER 25.75
GUTTER 25.69
STOPVALVE
STOPVALVE
AW
NIN
G
MARKER
GASMARKER
UNDERPASS(L)
(L)
(L)
(L)
POND
RO
OF
25.9
1
SIGN SIGNTELSTRA
POLE
GRATE
SIGN
SIGN
POLE
POLE
SIGN
SIGN
GAS
SIGNGASCONC
LID
TRAFFICLIGHT
GAS
STEELSTRUCTURE
RIDGE 30.36
RIDGE 30.35
GUTTER 25.72
RIDGE 25.05
GUTTER 23.24
ROOF 25.71
GU
TTE
R 2
3.53
GU
TTE
R23
.32
GUTTER24.45
GUTTER 25.75
GUTTER 25.69
STOPVALVE
STOPVALVE
AW
NIN
G
MARKER
GASMARKER
UNDERPASS(L)
(L)
(L)
(L)
POND
RO
OF
25.9
1
SIGN SIGNTELSTRA
POLE
GRATE
SIGN
SIGN
POLE
POLE
SIGN
SIGN
GAS
SIGNGASCONC
LID
TRAFFICLIGHT
GAS
STEELSTRUCTURE
RIDGE 30.36
RIDGE 30.35
GUTTER 25.72
RIDGE 25.05
GUTTER 23.24
ROOF 25.71
GU
TTE
R 2
3.53
GU
TTE
R23
.32
GUTTER24.45
GUTTER 25.75
GUTTER 25.69
STOPVALVE
STOPVALVE
AW
NIN
G
MARKER
GASMARKER
UNDERPASS(L)
(L)
(L)
(L)
POND
RO
OF
25.9
1
SIGN SIGNTELSTRA
POLE
GRATE
SIGN
SIGN
POLE
POLE
SIGN
SIGN
GAS
SIGNGASCONC
LID
TRAFFICLIGHT
GAS
STEELSTRUCTURE
RIDGE 30.36
RIDGE 30.35
GUTTER 25.72
RIDGE 25.05
GUTTER 23.24
ROOF 25.71
GU
TTE
R 2
3.53
GU
TTE
R23
.32
GUTTER24.45
GUTTER 25.75
GUTTER 25.69
STOPVALVE
STOPVALVE
AW
NIN
G
MARKER
GASMARKER
UNDERPASS
206 SpacesPROPOSED CAR PARK
(L)
(L)
(L)
(L)
POND
RO
OF
25.9
1
SIGN SIGNTELSTRA
POLE
GRATE
SIGN
SIGN
POLE
POLE
SIGN
SIGN
GAS
SIGNGASCONC
LID
TRAFFICLIGHT
GAS
STEELSTRUCTURE
RIDGE 30.36
RIDGE 30.35
GUTTER 25.72
RIDGE 25.05
GUTTER 23.24
ROOF 25.71
GU
TTE
R 2
3.53
GU
TTE
R23
.32
GUTTER24.45
GUTTER 25.75
GUTTER 25.69
STOPVALVE
STOPVALVE
AW
NIN
G
MARKER
GASMARKER
UNDERPASS
26.07
26.07
25.73
25.72
26.02
26.09
22.05
21.53
21.53 21.
19
21.16
21.40
21.54
20.89
20.80
20.922
6.03
26.08
25.74
26.05
25.74
20.73
20.79
20.77
21.08
20.77 20.
67
20.50
20.39
20.44
20.49
20.39
20.18
20.14
26.09
26.09
25.75
25.77
26.09
25.96
25.73
26.09
26.10
19.87
19.63
19.46
19.21
19.15
19.27
19.60
19.41
19.77
21.74
21.43
21.46
20.99
21.01
25.76
26.09
26.09
25.72 25.74
26.08
26.07
25.76
25.74
26.08
26.11
26.10
25.77
20.41
20.41
20.43
20.41
20.69
20.73
22.04
22.04
21.74
21.74
20.90
20.94
20.84
20.70
20.89
20.88
20.91
20.95
20.58
20.55
20.56
20.57
20.15
20.18 19.47
30.66
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
CO*
GROUND
GROUND
GROUND
GROUND
GROUND
GROUND
GROUND
GROUNDGROUND
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
GROUNDGROUND
GROUND
GROUND
GROUND
GROUND
GROUND
GROUNDGROUND
GROUND
GROUND
GROUND
GROUND
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
GROUND
GROUND
GROUND
GROUND
GROUND
GROUND
GROUND
GROUND
GROUND
TOP CONC
TOP CONC
TOP CONC
TOP CONC
TOP CONC
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
TOP CONC
TOP CONC
TOP CONC
TOP CONC
TOP CONC
TOP CONC
TOP CONC
TOP CONC
TOP CONC
TOP CONC
GROUND
GROUND
GROUND
GROUND
GROUND
GROUND
GROUNDGROUND
GROUNDGROUND
GROUND
GROUND GROUND
GROUND
GROUND
U/S B
EAM
(L)
(L)
(L)
(L)
POND
RO
OF
25.9
1
SIGN SIGNTELSTRA
POLE
GRATE
SIGN
SIGN
POLE
POLE
SIGN
SIGN
GAS
SIGNGASCONC
LID
TRAFFICLIGHT
GAS
STEELSTRUCTURE
RIDGE 30.36
RIDGE 30.35
GUTTER 25.72
RIDGE 25.05
ROOF 25.71
GU
TTE
R 2
3.53
GU
TTE
R23
.32
GUTTER24.45
GUTTER 25.79
GUTTER 25.75
GUTTER 25.69
STOPVALVE
STOPVALVE
AW
NIN
G
MARKER
GASMARKER
GAS
UNDERPASS(L)
(L)
(L)
(L)
POND
RO
OF
25.9
1
SIGN SIGNTELSTRA
POLELINTEL
GRATE
SIGN
SIGN
POLE
POLE
SIGN
SIGN
CONCLID
POLEGAS
GASMARKER
SIGNGASCONC
LID
TRAFFICLIGHT
GAS
STEELSTRUCTURE
RIDGE 30.31 RIDGE 30.36
RIDGE 30.35RIDGE 30.36
GUTTER 25.71GUTTER 25.72
RIDGE 25.05
RIDGE 28.92
ROOF 25.71
GU
TTE
R 2
3.53
GU
TTE
R23
.32
GUTTER 23.28GUTTER
24.45
GUTTER 25.75
GAS
GAS
STOPVALVE
STOPVALVE
AWNING
AW
NIN
G
GASMARKER
GASMARKER
MARKER
GASMARKER
UNDERPASS
5653m2
GARDEN CENTREENTRY
140m2CAFE
SERVICE CORRIDOR
RL.22.00
RL.18.92
70m2
RL.22.00
LOADINGDOCK
BULK BAG STORAGE AREA
28m2KITCHEN
GATE
ENTRY/EXIT
KIDSPLAY AREA
OUTDOOR NURSERY[Indicative layout only]
125m2
1750m2
SITE BOUNDARY
SITE BOUNDARY
RL.21.40
AMENITIES
RL.21.50245m2
RL.21.75
GARDEN CENTRE / HARDWARE AND BUILDING SUPPLIES
RL.21.50
FLORIST50m2
COSGROVE ROAD
PUNCHBOW
L ROAD
PAVILLION50m2
TEA
LARGE OUTDOOR PRODUCT STORAGE ZONE
GATE
65m2
17m2
RL.19.00
RL.20.25
RL.20.50RL.22.00 RL.20.85RL.21.05
RL.22.00
RL.21.75 RL.21.50
Water Tanks
RL.15.65
RE
TAIN
EM
ER
GE
NC
Y
AC
CE
SS
TO
INTE
RM
OD
AL S
ITE
RL.16.10
RL.20.40
RL.19.60
RL.20.00
RL.20.40
Water Tanks
LPLPLPLPLPLPLPLP LP
LP
RE
2 ZO
NIN
G
RE
2 ZO
NIN
G :
10m
OFF
SE
T
ROAD
RL.20.50
ROAD
MEDIAN STRIP ON ZONE BOUNDARY
45m2SHED
ACCESS
CUSTOMER VEHICLEWAITING BAY
LP
RL.21.35
WASTE STORAGE AREA
BA
LE P
RE
SS
CA
RD
BO
AR
D
CA
RD
BO
AR
D
LAN
DF
ILL
CARDBOARDLANDFILL
ORGANICS
LAN
DF
ILL
MIX
ED
R/C
WASTE STORAGE AREA
WASTE STORAGE AREA
COOLROOMCONCRETE
TANK
RL.20.20
OUTDOORDINING
SIGNAGE
Train
AREA 1 AREA 2
LEGEND :
BOUNDARY
Building Area
As Selected Paver
Retaining Wall
A/2 17.03.16 ISSUE FOR APPROVAL
(L)
(L)
TELSTRA
POLE
GRATE
SIGN
SIGN
POLE
SIGN
SIGN
GAS
SIGNGASCONC
LID
TRAFFICLIGHT
GAS
STEELSTRUCTURE
GUTTER 25.72
GUTTER 25.69
MARKER
GASMARKER
UNDER
(L)
(L)
TELSTRA
POLE
GRATE
SIGN
SIGN
POLE
SIGN
SIGN
GAS
SIGNGASCONC
LID
TRAFFICLIGHT
GAS
STEELSTRUCTURE
GUTTER 25.72
GUTTER 25.69
MARKER
GASMARKER
UNDER
(L)
(L)
TELSTRA
POLE
GRATE
SIGN
SIGN
POLE
SIGN
SIGN
GAS
SIGNGASCONC
LID
TRAFFICLIGHT
GAS
STEELSTRUCTURE
GUTTER 25.72
GUTTER 25.69
MARKER
GASMARKER
UNDER
(L)
(L)
TELSTRA
POLE
GRATE
SIGN
SIGN
POLE
SIGN
SIGN
GAS
SIGNGASCONC
LID
TRAFFICLIGHT
GAS
STEELSTRUCTURE
GUTTER 25.72
GUTTER 25.69
MARKER
GASMARKER
UNDER
(L)
(L)
TELSTRA
POLE
GRATE
SIGN
SIGN
POLE
SIGN
SIGN
GAS
SIGNGASCONC
LID
TRAFFICLIGHT
GAS
STEELSTRUCTURE
GUTTER 25.72
GUTTER 25.69
MARKER
GASMARKER
UNDER
206 SpacesPROPOSED CAR PARK
(L)
(L)
TELSTRA
POLE
GRATE
SIGN
SIGN
POLE
SIGN
SIGN
GAS
SIGNGASCONC
LID
TRAFFICLIGHT
GAS
STEELSTRUCTURE
GUTTER 25.72
GUTTER 25.69
MARKER
GASMARKER
UNDER
26.07
26.07
25.7325.72
26.02
26.09
22.05
21.53
21.53 21
.19
21.16
21.40
21.54
20.89
20.80
20.92
26.03
26.08
25.74
26.05
25.74
20.73
20.79
20.77
21.08
20.77 20
.67
20.50
20.39
20.44
20.49
20.39
26.09
26.09
25.75
25.77
21.74
21.43
21.46
20.99
21.01
25.76
26.09
26.09
25.72 25.74
26.08
26.07
25.76
25.74
26.08
26.11
26.10
25.77
20.41
20.6920.73
22.04
22.04
21.74
21.74
20.90
20.94
20.84
20.70
20.89
20.88
20.91
20.95
20.58
20.55
20.56
20.57
20.15
20.18
30.66
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
CO*
GROUND
GROUND
GROUND
GROUND
GROUND
GROUND
GROUND
GROUND
GROUND
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
GROUNDGROUND
GROUND
GROUND
GROUND
GROUND
GROUND
GROUNDGROUND
GROUND
GROUND
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
TOP CONC
TOP CONC
TOP CONC
TOP CONC
TOP CONC
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
U/S TRUSS
TOP CONC
TOP CONC
TOP CONC
TOP CONC
TOP CONC
TOP CONC
TOP CONC
GROUND
GROUND
GROUND
GROUND
GROUND
GROUND
GROUNDGROUND
GROUNDGROUND
GROUND
GROUND GROUND
GROUND
U/S BEAM
(L)
(L)
TELSTRA
POLE
GRATE
SIGN
SIGN
POLE
SIGN
SIGN
GAS
SIGNGASCONC
LID
TRAFFICLIGHT
GAS
STEELSTRUCTURE
GUTTER 25.72
GUTTER 25.69
MARKER
GASMARKER
GAS
UNDER
(L)
(L)
TELSTRA
POLELINTEL
GRATE
SIGN
SIGN
POLE
SIGN
SIGN
CONCLID
POLEGAS
GASMARKER
SIGNGASCONC
LID
TRAFFICLIGHT
GAS
STEELSTRUCTURE
RIDGE 30.31
RIDGE 30.36
GUTTER 25.72
GASMARKER
GASMARKER
MARKER
GASMARKER
UNDER
5653m2
GARDEN CENTREENTRY
140m2CAFE
RL.22.0070m2
RL.22.00
28m2KITCHEN
GATE
KIDSPLAY AREA
OUTDOOR NURSERY[Indicative layout only]
125m2
1750m2
SITE BOUNDARY
RL.21.40
AMENITIES RL.21.75
GARDEN CENTRE / HARDWARE AND BUILDING SUPPLIES
RL.21.50
FLORIST50m2
PAVILLION50m2
TEA
LARGE OUTDOOR PRODUCT STORAGE ZONE
GATE
65m2
17m2
RL.22.00
RL.22.00
RL.21.75 RL.21.50
Water Tanks
Water Tanks
LPLPLPLPLP
RL.21.35
CARDBOARDLANDFILL
ORGANICS
LAN
DFI
LLM
IXED
R/C
WASTE STORAGE AREA
CONCRETETANK
OUTDOORDINING
Train
AMENDMENTS -
NOTESGENERAL NOTESAll work to be carried out in accordance with the Building Code of Australia, all Local and State Government Ordinances, relevant Australian Standards, Local Authorities Regulations and all other relevant Authorities concerned. All structural work and site drainage to be subject to Engineer's details or certification where required by Council. This shall include r.c. slabs and footings, r.c. and steel beams & columns, wind bracing to AS 1170 and AS4055, anchor rods or bolts, tie downs, fixings etc., driveway slabs and drainage to Council's satisfaction. All timbers to be in accordance with SAA Timber Structure Code AS1720 and SAA Timber Framing Code AS 1684. All work to be carried out in a professional and workman- shiplike manner according to the plans and specification.NOTEDo not scale off the drawings unless otherwise stated and use figured dimensions in preference. All dimensions are to be checked and verified on site before the commencement of any work, all dimensions and levels are subject to final survey and set-outNo responsibility will be accepted by Sitedesign for any variations in design, builder's method of construction or materials used, deviation from specification without permission or accepted work practices resulting in inferior construction. Locate and protect all services prior to construction.COPYRIGHT CLAUSEThis drawing and design is the property of Sitedesign and should not be reproduced either in part or whole without the written consent of this firm.
NOTESGENERAL NOTESAll work to be carried out in accordance with the Building Code of Australia, all Local and State Government Ordinances, relevant Australian Standards, Local Authorities Regulations and all other relevant Authorities concerned. All structural work and site drainage to be subject to Engineer's details or certification where required by Council. This shall include r.c. slabs and footings, r.c. and steel beams & columns, wind bracing to AS 1170 and AS4055, anchor rods or bolts, tie downs, fixings etc., driveway slabs and drainage to Council's satisfaction. All timbers to be in accordance with SAA Timber Structure Code AS1720 and SAA Timber Framing Code AS 1684. All work to be carried out in a professional and workman- shiplike manner according to the plans and specification.NOTEDo not scale off the drawings unless otherwise stated and use figured dimensions in preference. All dimensions are to be checked and verified on site before the commencement of any work, all dimensions and levels are subject to final survey and set-outNo responsibility will be accepted by Sitedesign for any variations in design, builder's method of construction or materials used, deviation from specification without permission or accepted work practices resulting in inferior construction. Locate and protect all services prior to construction.COPYRIGHT CLAUSEThis drawing and design is the property of Sitedesign and should not be reproduced either in part or whole without the written consent of this firm.