GAISMAN MURAL - PROGRESS UPDATE Gaisman Mural (select details) 75%-95% complete across 22 sections Section 1 of 22 Section 6 of 22
6

gaisman mural progress update june 2014 - media.virbcdn.commedia.virbcdn.com/...gaisman_mural_progressupdate...mural Memphis Waltz and rooftop mural Emerging are 95% complete with

Jun 27, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: gaisman mural progress update june 2014 - media.virbcdn.commedia.virbcdn.com/...gaisman_mural_progressupdate...mural Memphis Waltz and rooftop mural Emerging are 95% complete with

GAISMAN MURAL - PROGRESS UPDATE

Gaisman Mural (select details) 75%-95% complete across 22 sections

Section 1 of 22

Section 6 of 22

Page 2: gaisman mural progress update june 2014 - media.virbcdn.commedia.virbcdn.com/...gaisman_mural_progressupdate...mural Memphis Waltz and rooftop mural Emerging are 95% complete with

Section 3 of 22

Section 8 of 22

Page 3: gaisman mural progress update june 2014 - media.virbcdn.commedia.virbcdn.com/...gaisman_mural_progressupdate...mural Memphis Waltz and rooftop mural Emerging are 95% complete with

Middle Layers (prior to detail blending) 75% complete

Section 2 of 22 Section 7 of 22

Section 5 of 22 Section 9 of 22 Section 13of 22

Page 4: gaisman mural progress update june 2014 - media.virbcdn.commedia.virbcdn.com/...gaisman_mural_progressupdate...mural Memphis Waltz and rooftop mural Emerging are 95% complete with

Memphis Waltz section of The Gaisman Mural 90% complete !!

Section 1 of 2 (side mural)

full view (side mural)

Page 5: gaisman mural progress update june 2014 - media.virbcdn.commedia.virbcdn.com/...gaisman_mural_progressupdate...mural Memphis Waltz and rooftop mural Emerging are 95% complete with

!!!!

Emerging (Rooftop Mural) 95% complete !

Section 1 of 1 (rooftop mural)

Process detail curing Polytab after priming in studio

Page 6: gaisman mural progress update june 2014 - media.virbcdn.commedia.virbcdn.com/...gaisman_mural_progressupdate...mural Memphis Waltz and rooftop mural Emerging are 95% complete with

Section 22 of 22 (main mural)

The Gaisman Mural is nearing completion and is almost ready for the installation phase. This has been a comprehensive and exhilarating process. The entire process from the early stages of creating the initial photographs, on through the design phase, and now seeing the final concept in painted form has all been most exciting! The side mural Memphis Waltz and rooftop mural Emerging are 95% complete with final blending to occur after installation. The main mural is 75%-95% complete between the 22 sections with final detail work and blending to occur post installation.

Wall prep is to commence soon.

credits:

Jason Miller, Commissioned Artist and Project Creator / Director

mural team: Jan Hankins, Ross McLean, Eric Bork - Fine Art Painters