Page 1: G2p Hall Infrastructure Alan Gavalya May 2011. Overall g2p Target on Pivot in Hall A.

G2p Hall Infrastructure

Alan Gavalya

May 2011

Page 2: G2p Hall Infrastructure Alan Gavalya May 2011. Overall g2p Target on Pivot in Hall A.

Overall g2p Target on Pivot in Hall A

Page 3: G2p Hall Infrastructure Alan Gavalya May 2011. Overall g2p Target on Pivot in Hall A.

Target Upstream Raised 9cm Septum In

Page 4: G2p Hall Infrastructure Alan Gavalya May 2011. Overall g2p Target on Pivot in Hall A.

Target Upstream Septum In

Page 5: G2p Hall Infrastructure Alan Gavalya May 2011. Overall g2p Target on Pivot in Hall A.

Target on Pivot Septum Out

Page 6: G2p Hall Infrastructure Alan Gavalya May 2011. Overall g2p Target on Pivot in Hall A.

Dump with Removable Cartridge

Lead Shielding

Removable Cartridge Fabricated by UVA

Page 7: G2p Hall Infrastructure Alan Gavalya May 2011. Overall g2p Target on Pivot in Hall A.

Sieve Slits Added

Sieve Slit AssembliesFabricated by UVATungsten Dump

Page 8: G2p Hall Infrastructure Alan Gavalya May 2011. Overall g2p Target on Pivot in Hall A.

Cooling Lines with BeO Viewer

Cooling Plates

BeO Beam Viewer

Page 9: G2p Hall Infrastructure Alan Gavalya May 2011. Overall g2p Target on Pivot in Hall A.

Dump Mount with Camera + Light

Adjustment Cartridges Fabricated byTel Aviv Univ

Light W/ CameraHe Enclosure

Dump Mount

Page 10: G2p Hall Infrastructure Alan Gavalya May 2011. Overall g2p Target on Pivot in Hall A.

Weldment on Pivot

Dump Support Plate with Carriage Fabricated by Rutgers

Page 11: G2p Hall Infrastructure Alan Gavalya May 2011. Overall g2p Target on Pivot in Hall A.

Septum Magnet

Guard Shield

Page 12: G2p Hall Infrastructure Alan Gavalya May 2011. Overall g2p Target on Pivot in Hall A.

Septum Magnet

Coils Added

Manifolds for coil cooling installed

Beam line to Dump will be Welded in Situ

Page 13: G2p Hall Infrastructure Alan Gavalya May 2011. Overall g2p Target on Pivot in Hall A.

Adding Target

Beam 0 degree

Beam 20 degree

Beam 90 degree

Page 14: G2p Hall Infrastructure Alan Gavalya May 2011. Overall g2p Target on Pivot in Hall A.

Cartridge Vertically Extracted

Cartridge Extraction Device

Removable Cartridge Extracted from Dump

Page 15: G2p Hall Infrastructure Alan Gavalya May 2011. Overall g2p Target on Pivot in Hall A.

Moved Upstream for Clearance

Rails Permit Cartridge to be Moved 3.5” Upstream

Page 16: G2p Hall Infrastructure Alan Gavalya May 2011. Overall g2p Target on Pivot in Hall A.

Cartridge Fully Extracted

Rails Permit Cartridge to be Moved 36”off Beam Line

Page 17: G2p Hall Infrastructure Alan Gavalya May 2011. Overall g2p Target on Pivot in Hall A.

Remaining Design Items• Camera/Light Mount• Lead Shield/Top Plate Details• Cooling Lines for Low Power Dump• He Bags (Upstream and Downstream connections)• Means to Elevate Target Position 9cm above Beam line• Revise Low Power Dump to Accept Beams with Target in

Raised position.