0 1/2" 1" 2" 1/4" PROJECT NO. FILE NAME DRAWN BY DESIGNED BY ORIGINAL ISSUE DATE CLIENT PROJECT NO. TITLE SHEET PROJECT REVIEWED BY ISG PROJECT # PROJECT INDEX: OWNER: PROJECT ADDRESS: MANAGING OFFICE: THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT. 1/7/2019 12:11:51 PM G1-10 TITLE SHEET, SHEET INDEX, PROJECT GENERAL NOTES 22107 ARCH R18.RVT CCS CCS / JIJ 01/07/2019 CCS BARABOO WISCONSIN 200 22107 G1-10 18-22107 18-22107 BARABOO, WISCONSIN HO-CHUNK GAMING WI DELLS S3214 COUNTY ROAD BD BARABOO, WISCONSIN 53913 PROJECT MANAGER: CASEY STADLER EMAIL: [email protected]HO-CHUNK GAMING WI DELLS KENNETH STONEFISH S3214 COUNTY ROAD BD BARABOO, WI 53913 PHONE 608.356.6210 EXT 2132 HOTEL RENOVATIONS HO-CHUNK GAMING WI DELLS HO-CHUNK GAMING WI DELLS HOTEL RENOVATIONS G1-10 TITLE SHEET, SHEET INDEX, PROJECT GENERAL NOTES PROJECT GENERAL NOTES 1. ALL WORK SHALL CONFORM TO THE CONTRACT DOCUMENTS, WHICH INCLUDE, BUT ARE NOT LIMITED TO, THE OWNER - CONTRACTOR AGREEMENT, THE PROJECT MANUAL (WHICH INCLUDES GENERAL AND SUPPLEMENTARY CONDITIONS AND SPECIFICATIONS), DRAWINGS OF ALL DISCIPLINES AND ALL ADDENDA, MODIFICATIONS AND CLARIFICATIONS ISSUED BY THE ARCHITECT / ENGINEER. 2. CONTRACT DOCUMENTS SHALL BE ISSUED TO ALL SUBCONTRACTORS BY THE GENERAL CONTRACTOR IN COMPLETE SETS IN ORDER TO ACHIEVE THE FULL EXTENT AND COMPLETE COORDINATION OF ALL WORK. CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND CORRELATING QUANTITIES AND DIMENSIONS. 3. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 4. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS. NOTIFY ARCHITECT / ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 5. DETAILS SHOWN ARE INTENDED TO BE INDICATIVE OF THE PROFILES AND TYPE OF DETAILING REQUIRED THROUGHOUT THE WORK. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO DETAILS SHOWN. WHERE SPECIFIC DIMENSIONS, DETAILS OR DESIGN INTENT CANNOT BE DETERMINED, NOTIFY ARCHITECT / ENGINEER BEFORE PROCEEDING WITH THE WORK. 6. ALL MANUFACTURED ARTICLES, MATERIALS AND EQUIPMENT SHALL BE APPLIED, INSTALLED, CONNECTED, ERECTED, CLEANED AND CONDITIONED ACCORDING TO MANUFACTURERS' INSTRUCTIONS. IN CASE OF DISCREPANCIES BETWEEN MANUFACTURERS' INSTRUCTIONS AND THE CONTRACT DOCUMENTS, NOTIFY ARCHITECT / ENGINEER BEFORE PROCEEDING WITH THE WORK. 7. LARGE-SCALE, MORE SPECIFIC DETAILS TAKE PRECEDENCE OVER SMALLER-SCALE, LESS SPECIFIC DETAILS AND INFORMATION. MORE STRINGENT REQUIREMENTS FOR CODE, PRODUCTS AND INSTALLATION TAKE PRECEDENCE OVER LESS STRINGENT REQUIREMENTS. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 8. PROVIDE CONTINUOUS SEALANT AROUND ALL MATERIALS AT EXTERIOR WALL PENETRATIONS. REFER TO SPECIFICATIONS FOR APPROPRIATE SEALANT. 9. ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED FROM EACH OTHER TO AVOID GALVANIC CORROSION. 10. SEAL ALL OPENINGS IN WALLS, FLOORS, CEILINGS, AND ROOFS, AROUND DUCTS, PIPES, VENTS, TRAPS, CONDUIT AND ALL OTHER PENETRATIONS WITH FIRE STOPPING AS SPECIFIED AND REQUIRED BY CODES. 11. PROVIDE TEMPORARY WALLS, ENCLOSURES, DUST SHIELDS AND WALK-OFF MATS AS REQUIRED TO SEPARATE DEMOLITION AND CONSTRUCTION FROM EXISTING BUILDING. 12. PROVIDE BRACING AND SHORING AS REQUIRED TO PROTECT EXISTING STRUCTURE TO REMAIN. PROVIDE SECURE AND WEATHERPROOF ENCLOSURE OF TEMPORARY OPENINGS IN EXTERIOR WALLS. PROTECT ALL BUILDING COMPONENTS FROM DAMAGE DURING DEMOLITION AND CONSTRUCTION. 13. RESTORE ALL EXISTING AREAS AFFECTED BY DEMOLITION AND RELATED NEW CONSTRUCTION TO THEIR ORIGINAL CONDITION, INCLUDING BUT NOT LIMITED TO WALLS, FLOORS, AND CEILINGS AND THEIR ASSOCIATED FINISHES. 14. PROVIDE SOLID WALL BACKING WITH METAL OR FIRE-RETARDANT WOOD BLOCKING BEHIND DOOR HARDWARE SUCH AS WALL STOPS, BUMPERS, HOLD OPENS, ETC. SHEET INDEX SHEET # SHEET TITLE GENERAL G1-10 TITLE SHEET, SHEET INDEX, PROJECT GENERAL NOTES G1-11 MOUNTING HEIGHTS AND STANDARDS, ABBREVIATIONS AND SYMBOLS ARCHITECTURAL A1-01 INTERIOR PARTITION WALL TYPES, PARTITION NOTES A1-11 PARTIAL FIRST FLOOR DEMOLITION PLAN A1-12 PARTIAL FIRST FLOOR DEMOLITION PLAN A1-21 PARTIAL FIRST FLOOR PLAN - SUITES 1223 & 1401 A1-22 PARTIAL FIRST FLOOR PLAN - SUITE 1201, DOOR SCHEDULE A1-31 FIRST FLOOR REFLECTED CEILING PLAN A1-41 FINISH PLANS & SCHEDULES A6-11 INTERIOR ELEVATIONS PLUMBING P1-11 PARTIAL FIRST FLOOR WASTE & VENT DEMO PLAN P1-21 PARTIAL FIRST FLOOR DOMESTIC WATER DEMO PLAN P2-11 PARTIAL FIRST FLOOR WASTE & VENT PLAN P2-21 PARTIAL FIRST FLOOR POTABLE WATER PLUMBING PLAN P4-11 PLUMBING CALLOUTS, SECTIONS, AND ELEVATIONS P6-11 PLUMBING SCHEDULES AND SPECIFICATIONS MECHANICAL M1-11 PARTIAL FIRST FLOOR HVAC DEMO PLAN M2-11 PARTIAL FIRST FLOOR HVAC PLAN M3-11 HVAC CALLOUTS, SECTIONS, AND ELEVATIONS ELECTRICAL E1-11 PARTIAL FIRST FLOOR DEMOLITION PLAN - SUITES 1223 & 1401 E1-12 PARTIAL FIRST FLOOR DEMOLITION PLAN SUITE 1201 E2-11 PARTIAL FIRST FLOOR POWER & SYSTEMS PLAN - SUITES 1223 & 1401 E2-12 PARTIAL FIRST FLOOR POWER & SYSTEMS PLAN - ADA SUITE 1201 E2-21 PARTIAL FIRST FLOOR LIGHTING PLAN - SUITES 1223 & 1401 E2-22 PARTIAL FIRST FLOOR LIGHTING PLAN - SUITE ADA 1201 E3-11 ELECTRICAL SPECIFICATIONS E5-11 POWER PANEL BOARDS AND SCHEDULES 201 MAIN STREET SUITE 1020 LA CROSSE, WI 54601 PHONE: 608.789.2034 LA CROSSE OFFICE REVISION SCHEDULE DATE DESCRIPTION BY
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
ISG PROJECT #
PROJECT INDEX:
OWNER: PROJECT ADDRESS: MANAGING OFFICE:
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:11:51 PM
G1-10
TITLE SHEET,
SHEET INDEX,
PROJECT
GENERAL NOTES
22107 ARCH R18.RVT
CCS
CCS / JIJ
01/07/2019
CCS
BARABOO WISCONSIN
200 22107 G1-10
18-22107
18-22107BARABOO, WISCONSIN
HO-CHUNK GAMING WI DELLSS3214 COUNTY ROAD BDBARABOO, WISCONSIN 53913
HO-CHUNK GAMING WI DELLSKENNETH STONEFISHS3214 COUNTY ROAD BDBARABOO, WI 53913PHONE 608.356.6210EXT 2132
HOTEL
RENOVATIONS
HO-CHUNK
GAMING WI DELLS
HO-CHUNK GAMING WI DELLS HOTEL RENOVATIONS
G1-10 TITLE SHEET, SHEET INDEX, PROJECT GENERAL NOTES
PROJECT GENERAL NOTES1. ALL WORK SHALL CONFORM TO THE CONTRACT DOCUMENTS, WHICH INCLUDE,
BUT ARE NOT LIMITED TO, THE OWNER - CONTRACTOR AGREEMENT, THEPROJECT MANUAL (WHICH INCLUDES GENERAL AND SUPPLEMENTARYCONDITIONS AND SPECIFICATIONS), DRAWINGS OF ALL DISCIPLINES AND ALLADDENDA, MODIFICATIONS AND CLARIFICATIONS ISSUED BY THE ARCHITECT /ENGINEER.
2. CONTRACT DOCUMENTS SHALL BE ISSUED TO ALL SUBCONTRACTORS BY THEGENERAL CONTRACTOR IN COMPLETE SETS IN ORDER TO ACHIEVE THE FULLEXTENT AND COMPLETE COORDINATION OF ALL WORK. CONTRACTOR ISRESPONSIBLE FOR COORDINATING AND CORRELATING QUANTITIES ANDDIMENSIONS.
3. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. NOTIFYARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRINGINFORMATION OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.
4. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS. NOTIFY ARCHITECT /ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRING INFORMATIONOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.
5. DETAILS SHOWN ARE INTENDED TO BE INDICATIVE OF THE PROFILES AND TYPEOF DETAILING REQUIRED THROUGHOUT THE WORK. DETAILS NOT SHOWN ARESIMILAR IN CHARACTER TO DETAILS SHOWN. WHERE SPECIFIC DIMENSIONS,DETAILS OR DESIGN INTENT CANNOT BE DETERMINED, NOTIFY ARCHITECT /ENGINEER BEFORE PROCEEDING WITH THE WORK.
6. ALL MANUFACTURED ARTICLES, MATERIALS AND EQUIPMENT SHALL BE APPLIED,INSTALLED, CONNECTED, ERECTED, CLEANED AND CONDITIONED ACCORDING TOMANUFACTURERS' INSTRUCTIONS. IN CASE OF DISCREPANCIES BETWEENMANUFACTURERS' INSTRUCTIONS AND THE CONTRACT DOCUMENTS, NOTIFYARCHITECT / ENGINEER BEFORE PROCEEDING WITH THE WORK.
7. LARGE-SCALE, MORE SPECIFIC DETAILS TAKE PRECEDENCE OVERSMALLER-SCALE, LESS SPECIFIC DETAILS AND INFORMATION. MORE STRINGENTREQUIREMENTS FOR CODE, PRODUCTS AND INSTALLATION TAKE PRECEDENCEOVER LESS STRINGENT REQUIREMENTS. NOTIFY ARCHITECT/ENGINEER OF ANYDISCREPANCIES OR CONDITIONS REQUIRING INFORMATION OR CLARIFICATIONBEFORE PROCEEDING WITH THE WORK.
8. PROVIDE CONTINUOUS SEALANT AROUND ALL MATERIALS AT EXTERIOR WALLPENETRATIONS. REFER TO SPECIFICATIONS FOR APPROPRIATE SEALANT.
9. ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED FROM EACH OTHERTO AVOID GALVANIC CORROSION.
10. SEAL ALL OPENINGS IN WALLS, FLOORS, CEILINGS, AND ROOFS, AROUND DUCTS,PIPES, VENTS, TRAPS, CONDUIT AND ALL OTHER PENETRATIONS WITH FIRESTOPPING AS SPECIFIED AND REQUIRED BY CODES.
11. PROVIDE TEMPORARY WALLS, ENCLOSURES, DUST SHIELDS AND WALK-OFF MATSAS REQUIRED TO SEPARATE DEMOLITION AND CONSTRUCTION FROM EXISTINGBUILDING.
12. PROVIDE BRACING AND SHORING AS REQUIRED TO PROTECT EXISTINGSTRUCTURE TO REMAIN. PROVIDE SECURE AND WEATHERPROOF ENCLOSURE OFTEMPORARY OPENINGS IN EXTERIOR WALLS. PROTECT ALL BUILDINGCOMPONENTS FROM DAMAGE DURING DEMOLITION AND CONSTRUCTION.
13. RESTORE ALL EXISTING AREAS AFFECTED BY DEMOLITION AND RELATED NEWCONSTRUCTION TO THEIR ORIGINAL CONDITION, INCLUDING BUT NOT LIMITED TOWALLS, FLOORS, AND CEILINGS AND THEIR ASSOCIATED FINISHES.
14. PROVIDE SOLID WALL BACKING WITH METAL OR FIRE-RETARDANT WOODBLOCKING BEHIND DOOR HARDWARE SUCH AS WALL STOPS, BUMPERS, HOLDOPENS, ETC.
SHEET INDEXSHEET # SHEET TITLE
GENERAL
G1-10 TITLE SHEET, SHEET INDEX, PROJECT GENERAL NOTES
G1-11 MOUNTING HEIGHTS AND STANDARDS, ABBREVIATIONS AND SYMBOLS
3. IN ALL WET AREAS SUCH AS SHOWERS AND TUBS, INSTALL CEMENT-BASED BACKER BEHIND AREAS SCHEDULED TO RECEIVE TILE FINISH.
4. ON ALL RESTROOM W ALLS AND OTHER AREAS SCHEDULED TO RECEIVE FRP OR TILE FINISH, PROVIDE A MINIMUM OF MOISTURE-RESISTANT GYPSUM BOARD.
5. ALL PARTITIONS CONTAINING PLUMBING OR HAVING AN EXTERIOR FACE SHALL BE INSULATED.
6. WHERE GYPSUM BOARD EXTENDS TO UNDERSIDE OF STRUCTURE ABOVE, STOP GYPSUM BOARD 1/2" BELOW LINE OF STRUCTURE AND SEAL AS REQUIRED.
7. REFERENCE FLOOR FINISH PLANS AND WALL FINISH PLANS FOR ADDITIONAL FINISHES NOT INDICATED ON PARTITION TYPES.
8. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR LOCATIONS OF WALL PENETRATIONS. SEAL ALL OPENINGS WITH ACOUSTICAL SEALANT.
9. PROVIDE FIRE-TREATED WOOD OR STEEL BACKING FOR ALL WALL-MOUNTED FINISH CARPENTRY, ARCHITECTURAL WOODWORK, TOILET PARTITIONS, ACCESSORIES AND OTHER SIMILAR ITEMS.
FIRE-RATED PARTITION NOTES:
1. ALL PARTITIONS NOTED TO BE FIRE-RESISTANCE RATED SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE REFERENCED FIRE RESISTANCE TEST.
2. FIRE-RATED PARTITIONS SHALL BE CONSTRUCTED BEFORE NON-RATED PARTITIONS.
3. ALL FIRE-RATED PARTITIONS TO EXTEND FROM TOP OF UNFINISHED FLOOR TO UNDERSIDE OF STRUCTURE ABOVE. SEAL TOP, BOTTOM AND ALL PENETRATIONS W ITH FIRE-RATED SEALANT.
4. ALL PENETRATIONS IN FIRE-RATED PARTITIONS SHALL BE SEALED WITH MATERIALS, SEALANTS AND/OR ASSEMBLIES WHICH MAINTAIN THE FIRE-RESISTANCE RATING OF THE PARTITION.
GENERAL INTERIOR PARTITION NOTES:
WALL TYPESTUD
DESIGNATIONSPACING KEY NOTES
100Z125-30
16"
PLAN TOP / BOTTOM
150Z125-30
16"
200Z125-30
16"
250Z125-30
16"
088F250-30
16"
150F250-30
16"
K1
K2
K3
K4
K5
K6
METAL ZEES (Z) OR HAT (F) CHANNELS; REFER TO WALL TYPE
5/8" TYPE X GYPSUM BOARD
STRUCTURE ABOVE
1/2
"
ADJACENT WALL
1. INCLUDE FIBERGLASS SOUND INSULATION.
2. PROVIDE FIRE-RATED SEALANT AT WALL BASE, TOP AND AROUND ALL PENETRATIONS.
3. REFER TO 2012 IBC TABLE 722.3.2 (OR 2009 IBC TABLE 721.3.2 IF APPLICABLE FOR THE AREA OF CONSTRUCTION) FOR CALCULATED FIRE-RESISTANCE RATING.
4. SPECIAL 8" BLOCK WITH 1.75" MIN. FACE SHELL THICKNESS.
5. REFER TO MANUFACTURER'S SPECIFICATIONS FOR STANDARD CONNECTION DETAILS, SPECIFIC R-VALUE AND ADDITIONAL INFORMATION.
6. REFER TO SPECIFICATIONS FOR SPECIFIC WALL PANEL FACE FINISH AND PROFILE.
7. INCLUDE ACOUSTIC SEALANT AT WALL BASE AND TOP TERMINATION, BOTH SIDES OF WALL.
INTERIOR PARTITION KEY NOTES:
NOT ALL KEY NOTES APPLY TO PROJECT. VERIFY WITH SPECIFIC WALL TYPE.
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
19 SAWCUT AND DEMOLISH CONCRETE FLOOR SLAB ASREQUIRED FOR BELOW SLAB PLUMBING SCOPE OF WORK.REFER TO MECHANICAL DOCUMENTS.
21 REMOVE / SALVAGE / REINSTALL ACOUSTICAL CEILING TILES(ACT) AS REQUIRED FOR ABOVE CEILING MEP SCOPE OFWORK. REFER TO MECHANICAL AND ELECTRICALDOCUMENTS.
22 BY OWNER - DEMOLISH ALL ELECTRICAL FIXTURES. REFERTO ELECTRICAL DOCUMENTS.
23 BY OWNER - DEMOLISH ALL HVAC GRILLES. REFER TOMECHANICAL DOCUMENTS.
REVISION SCHEDULE
DATE DESCRIPTION BY
WALL LEGEND
EXISTING CONSTRUCTION TO REMAIN
NEW CONSTRUCTION
1401.2
LIVING
1403
DOUBLE
QUEEN
A1-22
3
1401.5
KITCHEN
1401.3
1/2 BATH 1401.4
CLOSET
1401.7
BEDROOM
1401.8
BATHROOM
1401.1
ENTRANCE
1401.6
OFFICE
A1-22
2
NOT IN SCOPE
NOT IN SCOPE
1221
KING
186
CORRIDOR
190
CORRIDOR
193
CORRIDOR
199
ELEVATOR
LOBBY
184
STORAGE
185
STORAGE
1223.7
BEDROOM
1223.8
BATHROOM
A1-22
3
SIM
1223E
1223D
1223B
1223C
1401B
1401C
1401E
1401D
1401A
1401FEXIST
EXIST1223F
1223A
1223.2
LIVING
1223.1
ENTRANCE
1223.6
OFFICE
1223.5
KITCHEN
1223.3
1/2 BATH
1223.4
CLOSET
A1-22
2
SIM
38
B1
30
30A
3030A
TYP
TYP
NOTE: ALL KEYNOTES FROM KING 1308 APPLY.
NOTE: ALL KEYNOTES AND ELEVATIONS FROM
SUITE 1401 APPLY.
B1
A6-117
A6-11
9
A6-11
8
A6-11
11
10
41
41
41
21
TYP
CORNER-TO-
CORNER
13
12
12
21
21
43
43
44
44
45
45 45
45
45
46 46
N
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:11:39 PM
A1-21
PARTIAL FIRST
FLOOR PLAN -
SUITES 1223 &
1401
22107 ARCH R18.RVT
CCS
CCS / JIJ
01/07/2019
CCS
BARABOO WISCONSIN
400 22107 A1-21
18-22107
HOTEL
RENOVATIONS
HO-CHUNK
GAMING WI DELLS
A1-21 PARTIAL FIRST FLOOR PLAN - SUITES 1223 & 1401
KEYNOTE LEGEND12 BY OWNER - DEMOLISH GYPSUM BOARD AT HORIZONTAL AND VERTICAL
FACES OF SOFFIT AND/OR CEILING. EXISTING FRAMING TO REMAIN.
13 EXISTING STRUCTURAL COLUMN TO REMAIN.
21 REMOVE / SALVAGE / REINSTALL ACOUSTICAL CEILING TILES (ACT) ASREQUIRED FOR ABOVE CEILING MEP SCOPE OF WORK. REFER TOMECHANICAL AND ELECTRICAL DOCUMENTS.
30 BASE BID: NEW FURNITURE / FIXTURES / EQUIPMENT / WALL-MOUNTEDTELEVISIONS FURNISHED AND INSTALLED BY GC.
30A ALTERNATE A-1: NEW FURNITURE / FIXTURES / EQUIPMENT / WALL-MOUNTEDTELEVISIONS FURNISHED BY OWNER AND INSTALLED BY GC.
38 NEW GYPSUM BOARD AND STUD FRAMED SOFFIT AND/OR CEILING SYSTEM.
41 NEW 5/8" TYPE X GYPSUM BOARD APPLIED TO EXISTING WALL FRAMINGUNLESS NOTED OTHERWISE ON PLAN WITH WALL TYPE TAGS. REFER TODEMOLITION PLANS AND KEYNOTE #7 FOR EXTENTS. FIELD VERIFY EXISTINGCONDITIONS.
43 REMOVE, REFINISH, AND REINSTALL EXISTING WINDOW SILLS. SEE WOODWINDOW SILLS IN MISC. SCHEDULE FOR REFINISHING INFORMATION.
45 NEW WALL SCONCE MATCHING EXISTING RELOCATED WALL SCONCES.COORDINATE FINAL LOCATION WITH OWNER.
46 NEW FLOOR MOUNTED DOOR STOP. SEE MISC. SCHEDULE FOR MOREINFORMATION.
1/4" = 1'-0"1PARTIAL FIRST FLOOR PLAN - SUITES 1223 & 1401
NOTE: SUITES 1201 AND 1401 ARE SIMILAR WITH EXCEPTION OF ADA 1201.8 MASTER BATH.
REVISION SCHEDULE
DATE DESCRIPTION BY
1201.2
LIVING
1203
DOUBLE
QUEEN
196
STORAGE
3131
3030A
38
38
38
38
A1-22
4
A1-22
2
A6-117A6-11
11
10
A6-11
8
A6-11
9
1201.7
BEDROOM
1201.1
ENTRANCE
1201.3
1/2 BATH1201.4
CLOSET
1201.5
KITCHEN
1223.6
OFFICE
1201.8
ADA
BATHROOM
1201A
1201FEXIST
1201C
1201D
1201E
1201B
B1
193
CORRIDOR
194
CORRIDORTYP
TYP
41
41
41
B3 B3
B3B3
21
TYP
CORNER-TO-
CORNER
30
30A
21
WALL LEGEND
EXISTING CONSTRUCTION TO REMAIN
NEW CONSTRUCTION
1' - 6" 1' - 6"
EQ
EQ
135.0
0°
90.00°
6' -
9"
±
4' - 0"
5' -
6"
3' - 11" ±
ALIGNFINISH
FACE
3' - 0" CLE
AR
1' - 4" ±
3' - 0"
2' -
2"
90.00°
A6-11
12
13
1201.3
1/2 BATH
1201.4
CLOSET
196
STORAGE
11
" ±
1201B
1201C
32
32A3
A3A3
A3
B3
B3
A6-11
13
13
4140
40
TP MR1
162
1' - 6" 1' - 6"
ALIGN FINISH
FACE
9"
2' -
9 3
/4"
±6
' -
4"
3' -
0"
4 1
/4"
1' - 3" 2' - 10" 1' - 3"
2' -
6"
2' -
3"
1401.8
BATHROOM
B3
A3
B3
A3
B3
B3
1401E
39
33
3' - 0" CLEAR
32
A6-11
1
2
3
A6-11 4
5
6
40
41
ALIGN FINISH FACEAT EACH SIDE, TYP
TP
MR2
MR3
MR4
5' - 0" CLEAR
4' -
8"
CL
EA
R
1' - 6"
5' - 0" CLEAR 3' - 10"
4 1
/4"
3' -
0"
CL
EA
R6
' -
4"
2' -
9 3
/4"
±9
"
1' - 3" 2' - 10" 1' - 3"
A6-11
1
2
A6-11
5
46
3
1201.8
ADA
BATHROOM
1201E
39
B3
A3
B3
B3
B3
MIN
2"
CLE
AR
3236
36 TYP
41
40
ALIGN FINISH FACEAT EACH SIDE, TYP
GB1
GB3
GB1
GB2
MR3
MR2
MR4
TP
SHS
FLFLUSH
DOOR TYPES
1METAL FRAME
FRAME TYPES
2"
WIDTH
DOOR 2"
2"
DO
OR
HE
IGH
T
4METAL
COMMUNICATING FRAME
2"
WIDTH
DOOR 2"
2"
DO
OR
HE
IGH
T
N
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:11:42 PM
A1-22
PARTIAL FIRST
FLOOR PLAN -
SUITE 1201, DOOR
SCHEDULE
22107 ARCH R18.RVT
CCS
CCS / JIJ
01/07/2019
CCS
BARABOO WISCONSIN
400 22107 A1-22
18-22107
HOTEL
RENOVATIONS
HO-CHUNK
GAMING WI DELLS
A1-22 PARTIAL FIRST FLOOR PLAN - SUITE 1201, DOOR SCHEDULE
1/4" = 1'-0"1PARTIAL FIRST FLOOR PLAN - ADA SUITE 1201
NOTE: SUITES 1201 AND 1401 ARE SIMILAR WITH EXCEPTION OF ADA 1201.8 MASTER BATH.3/8" = 1'-0"2TYPICAL ENLARGED 1/2 BATH PLAN
3/8" = 1'-0"3ENLARGED RESTROOM PLAN
3/8" = 1'-0"4ENLARGED ADA BATHROOM PLAN
DOOR SCHEDULE
MARK ROOM NAME WIDTH HEIGHTDOORTYPE DOOR MATERIAL
FRAMETYPE FRAME MATERIAL LATCH FUNCTION
HDWGROUP
FIRERATING
NEW OREXISTING COMMENTS
1201A ENTRANCE 5' - 0" 7' - 0" FL WOOD 1 HOLLOW METAL Existing 4 Existing PAINT ALL SURFACES OF DOOR AND FRAME EXCEPTSURFACES EXPOSED TO CORRIDOR WITH DOOR IN CLOSEDPOSITION.
1201B 1/2 BATH 3' - 0" 7' - 0" FL WOOD 1 HOLLOW METAL PRIVACY LOCKSET 1 New Construction
1201C CLOSET 2' - 6" 7' - 0" FL WOOD 1 HOLLOW METAL PASSAGE LATCHSET 2 New Construction
1201D BEDROOM 3' - 0" 7' - 0" FL WOOD 1 HOLLOW METAL PASSAGE LATCHSET 3 60 MIN New Construction
1201E ADA BATHROOM 3' - 0" 7' - 0" FL WOOD 1 HOLLOW METAL PRIVACY LOCKSET 1 New Construction
1201F LIVING 3' - 0" 7' - 0" FL WOOD 4 HOLLOW METAL Existing - 60 MIN Existing PAINT ALL SURFACES OF DOOR AND FRAME EXPOSED TOSUITE WITH DOOR IN CLOSED POSITION.
1223A ENTRANCE 5' - 0" 7' - 0" FL WOOD 1 HOLLOW METAL Existing 4 Existing PAINT ALL SURFACES OF DOOR AND FRAME EXCEPTSURFACES EXPOSED TO CORRIDOR WITH DOOR IN CLOSEDPOSITION.
1223B 1/2 BATH 3' - 0" 7' - 0" FL WOOD 1 HOLLOW METAL PRIVACY LOCKSET 1 New Construction
1223C CLOSET 2' - 6" 7' - 0" FL WOOD 1 HOLLOW METAL PASSAGE LATCHSET 2 New Construction
1223D BEDROOM 3' - 0" 7' - 0" FL WOOD 1 HOLLOW METAL PASSAGE LATCHSET 3 60 MIN New Construction
1223E BATHROOM 3' - 0" 7' - 0" FL WOOD 1 HOLLOW METAL PRIVACY LOCKSET 1 New Construction
1223F LIVING 3' - 0" 7' - 0" FL WOOD 4 HOLLOW METAL Existing - 60 MIN Existing PAINT ALL SURFACES OF DOOR AND FRAME EXPOSED TOSUITE WITH DOOR IN CLOSED POSITION.
1401A ENTRANCE 5' - 0" 7' - 0" FL WOOD 1 HOLLOW METAL Existing 4 Existing PAINT ALL SURFACES OF DOOR AND FRAME EXCEPTSURFACES EXPOSED TO CORRIDOR WITH DOOR IN CLOSEDPOSITION.
1401B 1/2 BATH 3' - 0" 7' - 0" FL WOOD 1 HOLLOW METAL PRIVACY LOCKSET 1 New Construction
1401C CLOSET 2' - 6" 7' - 0" FL WOOD 1 HOLLOW METAL PASSAGE LATCHSET 2 New Construction
1401D BEDROOM 3' - 0" 7' - 0" FL WOOD 1 HOLLOW METAL PASSAGE LATCHSET 3 60 MIN New Construction
1401E BATHROOM 3' - 0" 7' - 0" FL WOOD 1 HOLLOW METAL PRIVACY LOCKSET 1 New Construction
1401F LIVING 3' - 0" 7' - 0" FL WOOD 4 HOLLOW METAL Existing - 60 MIN Existing PAINT ALL SURFACES OF DOOR AND FRAME EXPOSED TOSUITE WITH DOOR IN CLOSED POSITION.
(ACT) AS REQUIRED FOR ABOVE CEILING MEP SCOPE OFWORK. REFER TO MECHANICAL AND ELECTRICALDOCUMENTS.
30 BASE BID: NEW FURNITURE / FIXTURES / EQUIPMENT /WALL-MOUNTED TELEVISIONS FURNISHED AND INSTALLEDBY GC.
30A ALTERNATE A-1: NEW FURNITURE / FIXTURES / EQUIPMENT /WALL-MOUNTED TELEVISIONS FURNISHED BY OWNER ANDINSTALLED BY GC.
31 NEW CASEWORK AND COUNTERTOP. REFER TOELEVATIONS AND DETAILS.
32 NEW PLUMBING FIXTURE. REFER TO MECHANICALDOCUMENTS.
33 NEW LAVATORY AND COUNTERTOP. REFER TO ELEVATIONSAND DETAILS.
36 NEW GRAB BARS. REFER TO ELEVATIONS AND DETAILS.
38 NEW GYPSUM BOARD AND STUD FRAMED SOFFIT AND/ORCEILING SYSTEM.
39 INFILL EXISTING FIRE-RATED OPENING W/ NEW GYSPUMBOARD AND STUD FRAMED ASSEMBLY TO MATCH ADJACENTFIRE RATING. WALLCOVERING AND WALL BASE SHALLMATCH EXISTING. FIELD VERIFY EXISTING CONDITIONS.
40 PATCH CONCRETE FLOOR SLAB-ON-GRADE W/ NEWCONCRETE SLAB TO MATCH EXISTING. PATCH EXTENTSVARY AND MUST BE COORDINATED WITH PLUMBING SCOPEOF WORK. REFER TO MECHANICAL DOCUMENTS. FIELDVERIFY EXISTING CONDITIONS. ASSUME EXISTING SLAB IS 4"CONCRETE W/ #3 BARS @ 18" OC MAX OVER COMPACTEDGRANULAR BASE. SLOPE SHOWER FLOOR DOWN TOCENTER DRAIN AT 1/4" PER 12".
41 NEW 5/8" TYPE X GYPSUM BOARD APPLIED TO EXISTINGWALL FRAMING UNLESS NOTED OTHERWISE ON PLAN WITHWALL TYPE TAGS. REFER TO DEMOLITION PLANS ANDKEYNOTE #7 FOR EXTENTS. FIELD VERIFY EXISTINGCONDITIONS.
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:11:44 PM
A1-31
FIRST FLOOR
REFLECTED
CEILING PLAN
22107 ARCH R18.RVT
CCS
CCS / JIJ
01/07/2019
CCS
BARABOO WISCONSIN
400 22107 A1-31
18-22107
HOTEL
RENOVATIONS
HO-CHUNK
GAMING WI DELLS
A1-31 FIRST FLOOR REFLECTED CEILING PLAN
1/4" = 1'-0"1PARTIAL FIRST FLOOR REFLECTED CEILING PLAN - SUITE 1223 & 1401
NOTE: SUITES 1201 AND 1401 SIMILAR
3" = 1'-0"2FAUX BEAM DETAIL
REVISION SCHEDULE
DATE DESCRIPTION BY
INDICATES LOCATION OF CORNER GUARDS
CDS CATALOG NUMBER FROM NORTH AMERICAN ARCHITECTURAL WOODWORK STANDARDS (NAAWS)
(IF "M" IS INCLUDED SEE NOTE BELOW FOR DESCRIPTION OF MODIFICATION)
NOMINAL DEPTH
NOMINAL HEIGHT
NOMINAL WIDTH
DESCRIPTION OF MODIFICATION FROM CDS CATALOG
CDSD#W#
H#
MODIFICATIONS
W
B
1401.2
LIVING
PNT-1
B-1
W
B
1401.5
KITCHEN
PNT-1
B-2
W
B
1401.3
1/2 BATH
PNT-1
B-3
W
B
1401.4
CLOSET
PNT-1
B-1
W
B
1401.7
BEDROOM
PNT-1
B-1
W
B
1401.8
BATHROOM
T-4
B-3
W
B
1401.1
ENTRANCE
PNT-1
B-2
W
B
1401.6
OFFICE
PNT-1
B-1
ALIGN
ALIG
N
4' -
7"
F T-2
F T-3
F T-1
F T-3
A6-11
1
2
3
A6-117
8
A6-11
9
A6-11
10
11
A6-11
1213
1313
CG-1
SS-1
PNT-3
PNT-3
PNT-3
PNT-3
SS-1
PNT-3
A6-11 4
5
6
T-6
TR-1
TR-1
TR-1
PNT-1 ALL WALLS OF COLUMN
F CPT-1
F CPT-3
F CPT-2
ALIGN CARPET PATTERN AT
CORNER
TR-1
1' -
0"
2' -
0"
3' -
0"
1' -
0"
2' -
0"
1' -
0"
3' -
0"
3' -
0"
2' -
0"
2' -
0"
1' -
0"
3' -
0"
3' -
0"
3' -
0"
1' -
0"
2' -
0"
2' -
0"
1' -
0"
1' -
9"+
-1
' -
9"+
-
2' -
0"
2' -
5"+
-
CG-1
CG-3TYP
CG-2 CG-2
PNT-3PLA
M-1
4' -
5"
2' - 1"
5' -
3"
2' - 0"
SS-2
2' -
4"+-
N
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:11:47 PM
A1-41
FINISH PLANS &
SCHEDULES
22107 ARCH R18.RVT
CCS
CCS / JIJ
01/07/2019
CCS
BARABOO WISCONSIN
400 22107 A1-41
18-22107
HOTEL
RENOVATIONS
HO-CHUNK
GAMING WI DELLS
A1-41 FINISH PLANS & SCHEDULES
PROJECT FINISH NOTES1. SOME SPECIFIED PRODUCTS AND FINISHES MAY HAVE SUBSTANTIAL LEAD
TIMES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PLACING ORDERS IN AMANNER TO ENSURE THEIR TIMELY ARRIVAL. THE CONTRACTOR SHALL BERESPONSBILE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANYRESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELYMANNER.
2. ALL FINISH WORK SHALL BE PERFORMED IN COMPLIANCE WITH DRAWINGSAND SPECIFICATIONS, SHOP DRAWINGS, SAMPLES, AND PRODUCT DATASHALL BE SUBMITTED TO THE ARCHITECT FOR THEIR REVIEW PRIOR TOBEGINNING WORK.
3. WOOD DOORS, FRAMES, BASE MOLDING TO BE FILLED, STAINED, SEALED ANDSHOP FINISHED TO MATCH ARCHITECT'S SAMPLE. WORK SHOULD BEPERFORMED IN A DUST FREE ENVIRONMENT.
4. UNLESS OTHERWISE INDICATED, PROVIDE PRODUCTS OF QUALITY SPEFCIFIEDBY AWI/AWMAC/WI ARCHITECTURAL WOODWORK STANDARDS FOR CUSTOMGRADE.
5. INSTALL FIRE TREATED BLOCKING AS REQUIRED IN ALL PARTITIONS TORECEIVE COUNTERS, SHELVING, MARKERBOARDS, ETC.
6. ALL UPPER CABINETS TO BE 14" OUTSIDE DIMENSION, UNLESS NOTEDOTHERWISE.
7. ALL EXPOSED ENDS OF CABINETS TO HAVE FINISHED END PANELS.
8. VERIFY GROMMET LOCATIONS WITH OWNER.
9. IN-WALL OR WALL SUPPORT BRACKETS TO BE PAINTED TO MATCH WALLFINISH, UNLESS NOTED OTHERWISE.
10. TELEVISIONS TO BE SUPPLIED BY OWNER AND INSTALLED BY CONTRACTOR;REFER TO ELEC DOCUMENTS FOR MOUNTING HEIGHTS.
11. APPLIANCES PROVIDED BY OWNER, INSTALLED BY CONTRACTOR.
12. ALL WALLS TO RECEIVE PNT-1 & B-1, UNLESS NOTED OTHERWISE.
13. EXTEND ALL FLOORING UNDER FURNITURE, DESKS AND COUNTERS, UNLESSNOTED OTHERWISE. EXTEND ONLY TILE FLOORING UNDER CASEWORK,UNLESS NOTED OTHERWISE.
14. ALL TRANSITIONS TO BE CENTERED UNDER DOOR IN CLOSED POSITION,UNLESS NOTED OTHERWISE.
15. ALL CARPET-TO-CARPET TRANSITIONS TO BE ADHERED SEAMS, UNLESSNOTED OTHERWISE.
16. REFER TO THE INSTALLATION SYMBOL FOR FLOORING INSTALLATIONDIRECTION.
17. HATCH PATTERNS ON FLOOR FINISH PLAN INDICATE LOCATIONS OFDIFFERENT FLOORING TYPES.
18. CARPET INSTALLATION SHALL USE LOCK RELEASE GLUE, UNLESS NOTEDOTHERWISE.
19 PLUMBING AND CASEWORK FAMILIES HAVE BEEN REMOVED FROM FINISHPLAN VIEW FOR CLARITY. REFER TO THE RESPECTIVE PLANS & DOCUMENTSFOR PLUMBING AND CASEWORK CRITERIA.
20 REFER TO ARCHITECTURAL WOODWORK STANDARDS CDS (CABINET DESIGNSERIES) FOR ADDITIONAL INFORMATION REGARDING CABINET DESIGNATIONS.
CEILING FINISH SCHEDULEMARK MATERIAL TYPE MANUFACTURER MODEL SIZE COLOR GRID COMMENTS
GYP. BD. GYPSUM BOARD - TYPE X 5/8" UNO
PNT-2 PAINT SHERWIN WILLIAMS FLAT CEILING PAINT TOQUE WHITESW7003
CORNER GUARD SCHEDULEMARK MATERIAL TYPE MANUFACTURER MODEL SIZE COLOR COMMENTS
CG-1 RIGID VINYL INPRO TEXTUREDTAPE-ON, .08"
90 DEGREE BULLNOSE CASTLE0256
SEE FINISH PLAN-MATCHES PNT-4;INSTALL ABOVE WALL BASE
CG-2 RIGID VINYL INPRO TEXTUREDTAPE-ON, .08"
90 DEGREE BULLNOSE CABERNET0241
SEE FINISH PLAN-MATCHES PNT-3;INSTALL ABOVE WALL BASE
CG-3 RIGID VINYL INPRO TEXTUREDTAPE-ON, .08"
90 DEGREE BULLNOSE SLATE 0237 SEE FINISH PLAN-MATCHES PNT-1;INSTALL ABOVE WALL BASE
FLOOR FINISH SCHEDULE
MARK MATERIAL TYPE MANUFACTURERSERIES /PATTERN SIZE COLOR INSTALLATION COMMENTS
WALL SCONCE, TYP; REFER TO ELECTRICAL DOCUMENTS; COORDINATE FINAL LOCATION WITH OW NER
5' - 0"
SS-2
(2'-1
0"
AD
A)
3' -
6"
(2'-1
0"
AD
A)
3' -
0"
2' -
0"
PENDANT LIGHT; REFER TO ELECTRICAL DOCUMENTS
PNT-4
PNT-4 PNT-3
B-1 B-2
6' - 0"
T-8
T-7
ELECTRIC FIREPLACE, REFER TO MISC. SCHEDULE
TILE TO CONTINUE UNDER EQUIPMENT, TYP
TV MONITOR BY OWNER
FIREPLACE MANTLE, REFER TO MISC. SCHEDULE
FAUX BEAM, TYP
PNT-5
ADJACENT SIDES OF FIREPLACE TO RECEIVE T-8 FLOOR TO CEILING, TYP
TR-1 AT OUSIDE CORNERS, TYP
PNT-4 PNT-4
B-1
B-1
2' - 6"
6' -
0"
3' -
1"
REMOVE, REFINISH WITH STN-1 AND
REINSTALL WOOD WINDOW SILLS, TYP
RELOCATED WALL SCONCE, TYP;
COORDINATE FINAL LOCATION W ITH
OWNER
4' -
1"
1' -
0"
6' -
8"
PNT-5
B-3
T-4
B-3
T-4
T-5
TR-1
PNT-11' - 0"
TR-1
GRAB BARS -ADA BATH
ONLY
2' - 0"T-5
SS-1
(2'-1
0"
AD
A)
3' -
0"
4"
B.S
.
B-2
PNT-3 PNT-3
B-2
PNT-4 PNT-5
WALL SCONCE, TYP;REFER TO ELECTRICAL
DOCUMENTS; COORDINATE FINAL
LOCATION WITH OWNER
B-3
T-4
T-5
TR-1
PNT-1
GRAB BARS -ADA BATH ONLY
4' -
0"
6"
GB1
4"
B.S
.
3' -
0"
SS-1
(2'-10
" A
DA
)
3' -
0"
T-4
B-3
MR1
1' -
2"
CUSTOM BATHROOM VANITY; SEE MISC. SCHEDULE
B-3
PNT-1
T-4
TR-1
4' -
0"
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:11:51 PM
A6-11
INTERIOR
ELEVATIONS
22107 ARCH R18.RVT
CCS
CCS / JIJ
01/07/2019
CCS
BARABOO WISCONSIN
400 22107 A6-11
18-22107
HOTEL
RENOVATIONS
HO-CHUNK
GAMING WI DELLS
A6-11 INTERIOR ELEVATIONS
1/4" = 1'-0"1BATHROOM
1/4" = 1'-0"2BATHROOM
1/4" = 1'-0"10KITCHEN
1/4" = 1'-0"4SHOW ER
1/4" = 1'-0"5SHOW ER
1/4" = 1'-0"11KITCHEN
1/4" = 1'-0"9SUITE
1/4" = 1'-0"7FIREPLACE
1/4" = 1'-0"6SHOW ER
1/4" = 1'-0"8ENTRANCE
1/4" = 1'-0"3BATHROOM
1/4" = 1'-0"121/2 BATH
1/4" = 1'-0"13TYPICAL 1/2 BATH W ALL TILE PATTERN
REVISION SCHEDULE
DATE DESCRIPTION BY
BEDROOM
1401.7
LIVING RM
1401.2
DOUBLE QUEEN
1403
BEDROOM
1223.7
LIVING RM
1223.2
WC-XLAV-X
SH-X
SK-X
WC-X
LAV-XFD-X
WC-X
LAV-XFD-X
SK-X
LAV-X
WC-X
1
2
3
1
1
5
FD-X
6
5
16
1
2
1 3
44
4
4
2"ø S
S
2"ø
C
LW
2"ø SS
4"ø
S
S
2"ø
2"ø
4"ø SS
3"ø SS
4"ø SS
2"ø SS
4"ø S
S
4"ø
S
S
4"ø
2"ø S
S
3"ø S
S
4"ø SS
WCO-X
SS
CL
W
RD
CLW CLW
SS
CL
WC
LW
SS
SS
SS
RD
SS
SS
CLW
1. ALL DUCTWORK, PIPING, EQUIPMENT, ETC. INDICATED ON PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION DOCUMENTS AND FIELD VERIFICATION OF THE EXISTING BUILDING. FIELD VERIFY ALL EXISTING CONDITIONS.
2. SUITES 1201 AND 1401 ARE SIMILAR W ITH EXCEPTION OF ADA 1201.8 MASTER BATH.
SHEET NOTES
N
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:47:34 PM
P1-11
PARTIAL FIRST
FLOOR WASTE &
VENT DEMO PLAN
22107 Mech R18.RVT
NAP
NAP
01/07/2019
RKD
BARABOO WISCONSIN
600 22107 P1-11
18-22107
HOTEL
RENOVATIONS
HO-CHUNK
GAMING WI DELLS
P1-11 PARTIAL FIRST FLOOR WASTE & VENT DEMO PLAN
1/4" = 1'-0"1PARTIAL FIRST FLOOR W ASTE & VENT DEMO PLAN - SUITES 1223 & 1401
KEYNOTE LEGEND1 DEMO SINK / LAV AND WASTE AND VENT LINES NEEDED FOR
REMODEL.
2 DEMO SHOWER / TUB. CAP FLOOR DRAIN BELOW FINISHEDFLOOR, ABANDON WASTE PIPING, AND PATCH CONCRETEFLOOR GOOD AS NEW. DEMO AND CAP VENT PIPING ASREQUIERED.
3 DEMO WATER CLOSET.
4 DEMO SANITARY PIPING AS NEEDED FOR NEWCONNECTIONS.
5 DEMO WATER CLOSET AND ASSOCIATED WASTE AND VENTLINES REQUIRED FOR REMODEL.
6 DEMO SHOWER AND ASSOCIATED WASTE AND VENT PIPINGREQUIRED FOR REMODEL.
REVISION SCHEDULE
DATE DESCRIPTION BY
WC-X
LAV-X
SH-X
SK-X
WC-X
LAV-X
SH-X
SK-X
SH-X
LAV-XWC-X
LAV-X
WC-X
SH-X
10
12
11
10
11
103
11
12
10
10
11
10
3
1"ø CW
1"ø HW
1"ø HW
1"ø CW
HWC
HW
CW
CW
HW
HW
C
CW
HW
HWC
1. ALL DUCTWORK, PIPING, EQUIPMENT, ETC. INDICATED ON PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION DOCUMENTS AND FIELD VERIFICATION OF THE EXISTING BUILDING. FIELD VERIFY ALL EXISTING CONDITIONS.
2. SUITES 1201 AND 1401 ARE SIMILAR W ITH EXCEPTION OF ADA 1201.8 MASTER BATH.
SHEET NOTES
N
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:47:37 PM
P1-21
PARTIAL FIRST
FLOOR DOMESTIC
WATER DEMO
PLAN
22107 Mech R18.RVT
NAP
NAP
12/05/18
RKD
BARABOO WISCONSIN
600 22107 P1-21
18-22107
HOTEL
RENOVATIONS
HO-CHUNK
GAMING WI DELLS
P1-21 PARTIAL FIRST FLOOR DOMESTIC WATER DEMO PLAN
1/4" = 1'-0"1PARTIAL FIRST FLOOR DOMESTIC W ATER DEMO PLAN - SUITES 1223 & 1401
KEYNOTE LEGEND3 DEMO WATER CLOSET.
10 DEMO SINK / LAV AND DOMESTIC WATER LINES NEEDED FORREMODEL.
11 DEMO SHOWER AND DOMESTIC WATER LINES NEEDED FORREMODEL.
12 DEMO WATER CLOSET AND DOMESTIC WATER LINES NEEDEDFOR REMODEL.
REVISION SCHEDULE
DATE DESCRIPTION BY
BEDROOM
1401.7
LIVING RM
1401.2
DOUBLE QUEEN
1403
KING
1221
LIVING RM
1223.2
BEDROOM
1223.7
STORAGE
184
STORAGE
185
ELEVATOR LOBBY-2
199-2
CORRIDOR-2
186-2
CORRIDOR-2
190-2
WC-20
L-21
SK-1
L-21 L-21
FD-1
WC-20
WCO-1
L-21 L-21
WC-20
FD-1
SK-1
L-21
WC-20
2021
20
21 21
21
21
21
21
21 21
20
20 20
1 1/2"ø V
2"ø SS
2"ø S
S
1313
13
13
13
13
2"ø V
4"ø SS
2"ø SS
4"ø SS
BATHROOM
1401.8
1/2 BATH
1401.3
4"ø SS
2"ø SS
4"ø SS
2"ø SS
1 1/2"ø SS
WCO-1
SS
CLW
RD
RD
SS
CLW
SS
CL
WC
LW
SS
1. ALL DUCTWORK, PIPING, EQUIPMENT, ETC. INDICATED ON PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION DOCUMENTS AND FIELD VERIFICATION OF THE EXISTING BUILDING. FIELD VERIFY ALL EXISTING CONDITIONS.
2. SUITES 1201 AND 1401 ARE SIMILAR W ITH EXCEPTION OF ADA 1201.8 MASTER BATH.
SHEET NOTES
N
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:47:39 PM
P2-11
PARTIAL FIRST
FLOOR WASTE &
VENT PLAN
22107 Mech R18.RVT
NAP
NAP
MM/DD/YYYY
RKD
BARABOO WISCONSIN
600 22107 P2-11
18-22107
HOTEL
RENOVATIONS
HO-CHUNK
GAMING WI DELLS
P2-11 PARTIAL FIRST FLOOR WASTE & VENT PLAN
1/4" = 1'-0"1PARTIAL FIRST FLOOR W ASTE & VENT PLAN - SUITES 1223 & 1401
KEYNOTE LEGEND13 EXISTING TO NEW CONNECTION. (TYP.)
20 INSTALL NEW PLUMBING FIXTURE. REUSE EXISTINGCONNECTIONS SERVING THE AREA.
21 INSTALL NEW PLUMBING FIXTURE(S). ROUTE PIPING ASSHOWN TO NEW LOCATION.
REVISION SCHEDULE
DATE DESCRIPTION BY
DOUBLE QUEEN
1403
CORRIDOR-2
186-2
ELEVATOR LOBBY-2
199-2
STORAGE
184
LIVING RM
1223.2
KING
1221
BEDROOM
1223.7
BEDROOM
1401.7
LIVING RM
1401.2
STORAGE
185
SK-1
L-21
WC-20
L-21 L-21
SH-1
WC-20
SH-1
WC-20
L-21L-21
SK-1
L-21
WC-20
1/2
"ø
HW
1/2
"ø
CW
1/2
"ø
HW
1/2
"ø
CW
1"ø CW
1"ø HW
1313
1313
3/4"ø CW
3/4"ø HW
1/2"ø HW
1/2"ø CW
1/2"ø CW
1/2"ø HW
20
21
20
21
21
1"ø CW
1"ø HW
1/2
"ø
CW
1/2
"ø
HW
1/2
"ø
CW
1/2
"ø
HW
3/4"ø CW
3/4"ø HW
1313
21
21
21
21
20
21
20
BATHROOM
1401.8
1/2 BATH
1401.3
HWC
HW
CW
CW
HW
HW
C
HWC
HW
CW
HW
C
HW
CW
1. ALL DUCTWORK, PIPING, EQUIPMENT, ETC. INDICATED ON PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION DOCUMENTS AND FIELD VERIFICATION OF THE EXISTING BUILDING. FIELD VERIFY ALL EXISTING CONDITIONS.
2. SUITES 1201 AND 1401 ARE SIMILAR W ITH EXCEPTION OF ADA 1201.8 MASTER BATH.
SHEET NOTES
N
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:47:43 PM
P2-21
PARTIAL FIRST
FLOOR POTABLE
WATER PLUMBING
PLAN
22107 Mech R18.RVT
NAP
NAP
MM/DD/YYYY
RKD
BARABOO WISCONSIN
600 22107 P2-21
18-22107
HOTEL
RENOVATIONS
HO-CHUNK
GAMING WI DELLS
P2-21 PARTIAL FIRST FLOOR POTABLE WATER PLUMBING PLAN
1/4" = 1'-0"1PARTIAL FIRST FLOOR DOMESTIC W ATER PLAN - SUITES 1223 & 1401
KEYNOTE LEGEND13 EXISTING TO NEW CONNECTION. (TYP.)
20 INSTALL NEW PLUMBING FIXTURE. REUSE EXISTINGCONNECTIONS SERVING THE AREA.
21 INSTALL NEW PLUMBING FIXTURE(S). ROUTE PIPING ASSHOWN TO NEW LOCATION.
REVISION SCHEDULE
DATE DESCRIPTION BY
1. ALL DUCTWORK, PIPING, EQUIPMENT, ETC. INDICATED ON PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION DOCUMENTS AND FIELD VERIFICATION OF THE EXISTING BUILDING. FIELD VERIFY ALL EXISTING CONDITIONS.
2. SUITES 1201 AND 1401 ARE SIMILAR W ITH EXCEPTION OF ADA 1201.8 MASTER BATH.
SHEET NOTES
3 1
2
LAV-XWC-X
FD-1
CLW
1/2 BATH
1201.3
LIVING
1201.2
WC-20
20
1 1/2"ø V
2"ø SS
L-21
21
CLW
CL
W
SH-X
11
WC-X LAV-X
103
HW
C
CW
HW
L-21WC-20
20 21
1/2 BATH
1201.3
LIVING
1201.2
1/2"ø CW
1/2"ø HW
HW
C
CW
HW
WC-X
LAV-XFD-X
4"ø SS
4"ø
S
S
1
5
6
2"ø
2"ø
44
WCO-1
L-21 L-21
WC-20
FD-1
1313
21
21
21 21
4"ø SS
4"ø SS
2"ø V
ADA BATHROOM
1201.8
LAV-X
WC-X
SH-X
10
12
11
1"ø CW
1"ø HW
1"ø CW
1"ø HW
1/2
"ø
CW
1/2
"ø
HW
1/2
"ø
CW
1/2
"ø
HW
3/4"ø CW
3/4"ø HW
L-21 L-21
21
21
21 SH-1
WC-20ADA BATHROOM
1201.8
FD-1
WC-20
L-21
L-21
WCO-1
4"ø SS
4"ø SS
2"ø SS
2"ø V
4"ø SS
4"ø SS CLW
SS
1313
13
13
13
L-21
L-21
SH-1
WC-20
1"ø HW
1"ø CW
1/2"ø HW
1/2"ø CW
1/2"ø CW
1/2"ø HW
3/4"ø CW
3/4"ø HW
3/4"ø CW
CW
HW
HWC
13
13
L-21WC-20
2"ø SS
2
2"ø SS
2"ø SS
2021
FD-XCLW
4"ø SS
1313
SS CLW
CLWSS
WC-20
L-21
1/2"ø HW1/2"ø CW
1313
2021
3/4"ø CW
HWC HWCW
N
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:47:50 PM
P4-11
PLUMBING
CALLOUTS,
SECTIONS, AND
ELEVATIONS
22107 Mech R18.RVT
NAP
NAP
MM/DD/YYYY
RKD
BARABOO WISCONSIN
600 22107 P4-11
18-22107
HOTEL
RENOVATIONS
HO-CHUNK
GAMING WI DELLS
P4-11 PLUMBING CALLOUTS, SECTIONS, AND ELEVATIONS
KEYNOTE LEGEND1 DEMO SINK / LAV AND WASTE AND VENT LINES NEEDED FOR
REMODEL.
2 DEMO SHOWER / TUB. CAP FLOOR DRAIN BELOW FINISHEDFLOOR, ABANDON WASTE PIPING, AND PATCH CONCRETEFLOOR GOOD AS NEW. DEMO AND CAP VENT PIPING ASREQUIERED.
3 DEMO WATER CLOSET.
4 DEMO SANITARY PIPING AS NEEDED FOR NEWCONNECTIONS.
5 DEMO WATER CLOSET AND ASSOCIATED WASTE AND VENTLINES REQUIRED FOR REMODEL.
6 DEMO SHOWER AND ASSOCIATED WASTE AND VENT PIPINGREQUIRED FOR REMODEL.
10 DEMO SINK / LAV AND DOMESTIC WATER LINES NEEDED FORREMODEL.
11 DEMO SHOWER AND DOMESTIC WATER LINES NEEDED FORREMODEL.
12 DEMO WATER CLOSET AND DOMESTIC WATER LINES NEEDEDFOR REMODEL.
13 EXISTING TO NEW CONNECTION. (TYP.)
20 INSTALL NEW PLUMBING FIXTURE. REUSE EXISTINGCONNECTIONS SERVING THE AREA.
21 INSTALL NEW PLUMBING FIXTURE(S). ROUTE PIPING ASSHOWN TO NEW LOCATION.
1/4" = 1'-0"1
PARTIAL FIRST FLOORW ASTE & VENT DEMO PLAN - SUITE 1201
1/4" = 1'-0"5
PARTIAL FIRST FLOORW ASTE & VENT PLAN - SUITE 1201
1/4" = 1'-0"2
PARTIAL FIRST FLOORDOMESTIC W ATER DEMO PLAN - SUITE 2101
1/4" = 1'-0"6
PARTIAL FIRST FLOORDOMESTIC W ATER PLAN - SUITE 1201
1/4" = 1'-0"3
FIRST FLOORW ASTE & VENT DEMO PLAN - ADA BATHROOM
1/4" = 1'-0"7
FIRST FLOORW ASTE & VENT PLAN - ADA BATHROOM
1/4" = 1'-0"4
FIRST FLOORDOMESTIC W ATER DEMO PLAN - ADA BATHROOM
1/4" = 1'-0"8
FIRST FLOORDOMESTIC W ATER PLAN - ADA BATHROOM
NOT TO SCALE9
TYPICAL SUITE BATHROOMISOMETRIC - DRAIN, W ASTE , AND VENT
NOT TO SCALE10
TYPICAL SUITE BATHROOMISOMETRIC - DOMESTIC W ATER
NOT TO SCALE11
TYPICAL SUITE 1/2 BATHROOMISOMETRIC - DRAIN, W ASTE , AND VENT
NOT TO SCALE12
TYPICAL SUITE 1/2 BATHROOMISOMETRIC - DOMESTIC W ATER
REVISION SCHEDULE
DATE DESCRIPTION BY
N
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:47:51 PM
P6-11
PLUMBING
SCHEDULES AND
SPECIFICATIONS
22107 Mech R18.RVT
NAP
NAP
MM/DD/YYYY
RKD
BARABOO WISCONSIN
600 22107 P6-11
18-22107
HOTEL
RENOVATIONS
HO-CHUNK
GAMING WI DELLS
P6-11 PLUMBING SCHEDULES AND SPECIFICATIONS
NOTES:
1 PROVIDE AND INSTALL UNIT FOR FINISHED FLOOR, ROUND NICKEL BRONZE TOP
2 FLOOR DRAINS SHALL BE SIZED PER PLANS
3 PROVIDE AND INSTALL UNIT WITH NICKEL BRONZE STRAINER
4 PROVIDE AND INSTALL WITH 16 GAUGE P-TRAP, ANGLE STOPS WITH LOOSE KEY HANDLES (PFXCAC32CLK), AND REINFORCED FLEXIBLE CONNECTORS (PFX146322)
5 PROVIDE RITE-TEMP PRESSURE-BALANCING VALVE (K-304-KS)
6 PROVIDE AND INSTALL AWAKEN G110 DELUXE HANDSHOWER KIT K-99242 IN ADA BATHROOM WITH K-98350 WALL MOUNT SUPPLY ELBOW, AND K-9660 PERSONA VACUUM BREAKER
7 PROVIDE AND INSTALL WITH ELKAY LK99 DRAIN, P-TRAP (PFPTB403), AND ANGLE STOPS WITH LOOSE KEY HANDLES (PFXCAC32CLKL12)
8 PROVIDE AND INSTALL OPTIONAL 9" SWING SPOUT, THREE HOLE PUNCH WITH 8" CENTERS AND ADA DECK MOUNT HANDLE
9 PROVIDE BEMIS COMMERCIAL HEAVY DUTY PLASTIC SEAT (1950), CHURCH 9500C OR EQUIVALENT.
1. ALL DUCTWORK, PIPING, EQUIPMENT, ETC. INDICATED ON PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION DOCUMENTS AND FIELD VERIFICATION OF THE EXISTING BUILDING. FIELD VERIFY ALL EXISTING CONDITIONS.
2. SUITES 1201 AND 1401 ARE SIMILAR W ITH EXCEPTION OF ADA 1201.8 MASTER BATH.
SHEET NOTES
N
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 2:09:11 PM
M1-11
PARTIAL FIRST
FLOOR HVAC
DEMO PLAN
22107 Mech R18.RVT
NAP
NAP
12/05/18
RKD
BARABOO WISCONSIN
650 22107 M1-11
18-22107
HOTEL
RENOVATIONS
HO-CHUNK
GAMING WI DELLS
M1-11 PARTIAL FIRST FLOOR HVAC DEMO PLAN
1/4" = 1'-0"1PARTIAL FIRST FLOOR HVAC DEMO PLAN - SUITES 1223 & 1401
KEYNOTE LEGEND30 DEMO 8x8 SUPPLY GRILLE
31 DEMO 8X8 SUPPLY GRILLE AND ASSOCIATED DUCTWORKBACK TO VTAC.
32 DEMO VTAC 20x12 SUPPLY GRILL
33 DEMO 8x8 EXHAUST GRILLE
REVISION SCHEDULE
DATE DESCRIPTION BY
LIVING RM
1401.2
LIVING RM
1223.2
BEDROOM
1223.7
DOUBLE QUEEN
1403
BEDROOM
1401.7
35
37
36
36
37
37
36
36
37
35
1. ALL DUCTWORK, PIPING, EQUIPMENT, ETC. INDICATED ON PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION DOCUMENTS AND FIELD VERIFICATION OF THE EXISTING BUILDING. FIELD VERIFY ALL EXISTING CONDITIONS.
2. SUITES 1201 AND 1401 ARE SIMILAR W ITH EXCEPTION OF ADA 1201.8 MASTER BATH.
SHEET NOTES
N
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 2:09:12 PM
M2-11
PARTIAL FIRST
FLOOR HVAC
PLAN
22107 Mech R18.RVT
NAP
NAP
MM/DD/YYYY
RKD
BARABOO WISCONSIN
650 22107 M2-11
18-22107
HOTEL
RENOVATIONS
HO-CHUNK
GAMING WI DELLS
M2-11 PARTIAL FIRST FLOOR HVAC PLAN
1/4" = 1'-0"1PARTIAL FIRST FLOOR HVAC PLAN - SUITES 1223 & 1401
KEYNOTE LEGEND35 PROVIDE NEW NAILOR SUPPLY GRILLE 61DV-0. MATCH
EXISTING SIZE. RELOCATE DUCTWORK AS NEEDED.
36 PROVIDE NEW TITUS 300-RS SUPPLY GRILLE. MATCHEXISTING SIZE.
37 PROVIDE NEW NAILOR 5145H-0 EXHAUST GRILL. MATCHEXISTING SIZE.
REVISION SCHEDULE
DATE DESCRIPTION BY
1. ALL DUCTWORK, PIPING, EQUIPMENT, ETC. INDICATED ON PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION DOCUMENTS AND FIELD VERIFICATION OF THE EXISTING BUILDING. FIELD VERIFY ALL EXISTING CONDITIONS.
2. SUITES 1201 AND 1401 ARE SIMILAR W ITH EXCEPTION OF ADA 1201.8 MASTER BATH.
SHEET NOTES
32
31
33
ADA BATHROOM
1201.8
36
37
N
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 2:09:13 PM
M3-11
HVAC CALLOUTS,
SECTIONS, AND
ELEVATIONS
22107 Mech R18.RVT
NAP
NAP
MM/DD/YYYY
RKD
BARABOO WISCONSIN
650 22107 M3-11
18-22107
HOTEL
RENOVATIONS
HO-CHUNK
GAMING WI DELLS
M3-11 HVAC CALLOUTS, SECTIONS, AND ELEVATIONS
KEYNOTE LEGEND31 DEMO 8X8 SUPPLY GRILLE AND ASSOCIATED DUCTWORK
BACK TO VTAC.
32 DEMO VTAC 20x12 SUPPLY GRILL
33 DEMO 8x8 EXHAUST GRILLE
36 PROVIDE NEW TITUS 300-RS SUPPLY GRILLE. MATCHEXISTING SIZE.
37 PROVIDE NEW NAILOR 5145H-0 EXHAUST GRILL. MATCHEXISTING SIZE.
1/4" = 1'-0"1
FIRST FLOORHVAC DEMO PLAN - ADA BATHROOM
1/4" = 1'-0"2
FIRST FLOORHVAC PLAN - ADA BATHROOM
REVISION SCHEDULE
DATE DESCRIPTION BY
US
B
S
S
S
S
F
F
US
B
LIVING
1401.2
BEDROOM
1401.7
DOUBLE QUEEN
1403
ENTRANCE
1401.1
1/2 BATH
1401.3
KITCHEN
1401.5
BATHROOM
1401.8
LIVING
1223.2
KITCHEN
1223.5
OFFICE
1223.6
1/2 BATH
1223.3 ENTRANCE
1223.1
KING
1221
BEDROOM
1223.7
BATHROOM
1223.8
OVER COUNTER
LIGHTING
BATH
CONTROLS
LARGE
COVE LIGHT
16
16
21
N
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 11:49:56 AM
E1-11
PARTIAL FIRST
FLOOR
DEMOLITION PLAN
- SUITES 1223 &
1401
22107 ELEC R18.RVT
SMG
CAJ
01/07/2019
CAJ
BARABOO WI
700 22107 E1-11
18-22107
HOTEL
RENOVATONS
HO-CHUNK
GAMING WI DELLS
E1-11 PARTIAL FIRST FLOOR DEMOLITION PLAN - SUITES 1223 & 1401
ELECTRICAL KEYNOTE...
KEY KEYNOTE TEXT
16 FIRE ALARM DEVICES AND OR
RECEPTACLE TO BE REMOVED AND
RELOCATED. SEE POWER/SYSTEMS
SHEET FOR LOCATION.
21 REMOVE AND RE-INSTALL FIXTURES
NEAR FIREPLACE. SEE LIGHTING SHEET
FOR FURTHER DIRECTION.
SHEET NOTES
1. ALL EXISTING ELECTRICAL EQUIPMENT
INDICATED ON PLANS ARE BASED ON
INFORMATION FROM CONSTRUCTION
DOCUMENTS AND FIELD OBSERVATION OF THE
EXISTING BUILDING.
2. "EX" = INDICATES EXISTING DEVICE TO
REMAIN.
3. ALL ELECTRICAL FIXTURES WILL BE REMOVED
AND CAPPED OFF WITH WIRE NUTS AND TAPED.
WITH EXCEPTION TO FIRE SAFETY OR FIRE
STROBE WIRING, THOSE WILL REMAIN IN PLACE.
REVISION SCHEDULE
DATE DESCRIPTION BY
US
B
FS
S
LIVING
1201.2
BEDROOM
1201.7
ADA BATHROOM
1201.8
KITCHEN
1201.5
ENTRANCE
1201.1
DOUBLE QUEEN
1203
STORAGE
196
1/2 BATH
1201.3
OFFICE
1223.6
LARGE COVE
LIGHT
OVER COUNTER
LIGHTS
BATH
CONTROLS
16
LARGE
COVE
LIGHT
16
N
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:36:38 PM
E1-12
PARTIAL FIRST
FLOOR
DEMOLITION PLAN
SUITE 1201
22107 ELEC R18.RVT
SMG
CAJ
01/07/2019
CAJ
BARABOO WI
700 22107 E1-12
18-22107
HOTEL
RENOVATONS
HO-CHUNK
GAMING WI DELLS
E1-12 PARTIAL FIRST FLOOR DEMOLITION PLAN SUITE 1201
ELECTRICAL KEYNOTE...
KEY KEYNOTE TEXT
16 FIRE ALARM DEVICES AND OR
RECEPTACLE TO BE REMOVED AND
RELOCATED. SEE POWER/SYSTEMS
SHEET FOR LOCATION.
1/4" = 1'-0"1
PARTIAL FIRST FLOOR DEMOLITION PLAN SUITE 1201
REVISION SCHEDULE
DATE DESCRIPTION BY
GFI
GFI
GFI
GFI
GF
I
GF
I
USB
USB
GFI
USB
SF
FS
S
F
F
S
1/2 BATH
1401.3
KITCHEN
1401.5
BATHROOM
1401.8
DOUBLE QUEEN
1403
BEDROOM
1223.7
LIVING
1223.2
KING
1221
1/2 BATH
1223.3
KITCHEN
1223.5
OFFICE
1223.6
BATHROOM
1223.8
EXEX EX
EX EX
EX EXEX
EX EX
EX EX
EX EX
EX
STORAGE
185
STORAGE
184
ENTRANCE
1401.1
CORRIDOR
186
CORRIDOR
190
CLOSET
1223.4
ELEVATOR LOBBY
199
ENTRANCE
1223.1
LIVING
1401.2
BEDROOM
1401.7
EX
EX
CLOSET
1401.4
42"
1
42"
1
72"
72"
2
TV
HLP-11B-10
HLP-11A-25
17
HLP-11A-17
HLP-11A-15
HLP-12A-18
HLP-12A-16
17
HLP-12A-20
N
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:38:20 PM
E2-11
PARTIAL FIRST
FLOOR POWER &
SYSTEMS PLAN -
SUITES 1223 &
1401
22107 ELEC R18.RVT
SMG
CAJ
01/07/2019
CAJ
BARABOO WI
700 22107 E2-11
18-22107
HOTEL
RENOVATONS
HO-CHUNK
GAMING WI DELLS
E2-11 PARTIAL FIRST FLOOR POWER & SYSTEMS PLAN - SUITES 1223 & 1401
1/4" = 1'-0"1
PARTIAL FIRST FLOOR POW ER & SYSTEMS PLAN - SUITES 1223 & 1401
ELECTRICAL KEYNOTE...
KEY KEYNOTE TEXT
1 REPLACE EXISTING DUPLEX
RECEPTACLE WITH USB RECEPTACLE
PROVIDE BY E.C. RE-USE EXISTING
CIRCUIT.
2 RECEPTACLE DEDICATED FOR
FIREPLACE.
17 MAINTAIN EXISTING CIRCUITING IN THIS
ROOM.
SHEET NOTES
1. ALL EXISTING ELECTRICAL EQUIPMENT
INDICATED ON PLANS ARE BASED ON
INFORMATION FROM CONSTRUCTION
DOCUMENTS AND FIELD OBSERVATION OF THE
EXISTING BUILDING.
2. "EX" = INDICATES EXISTING DEVICE TO
REMAIN.
3. ALL ELECTRICAL FIXTURES WILL BE REMOVED
AND CAPPED OFF WITH WIRE NUTS AND TAPED.
WITH EXCEPTION TO FIRE SAFETY OR FIRE
STROBE WIRING, THOSE WILL REMAIN IN PLACE.
NOTE: SUITES 1201 AND 1401 ARE SIMILAR WITH EXCEPTION OF ADA 1201.8 MASTER BATH.
REVISION SCHEDULE
DATE DESCRIPTION BY
USB
US
B
GFI
GFI
GF
I
F
F
SF
F
S
STORAGE
196
DOUBLE QUEEN
1203
CLOSET
1201.4
BEDROOM
1201.7
ENTRANCE
1201.1
KITCHEN
1201.5
1/2 BATH
1201.3
ADA BATHROOM
1201.8
OFFICE
1223.6
LIVING
1201.2
72"
72"
2
TV
42"
EX EX
EXEX
EX
EX EX EX
1
EX
18
17
HLP-13A-28
HLP-13A-30
HLP-13A-1
19
N
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:40:06 PM
E2-12
PARTIAL FIRST
FLOOR POWER &
SYSTEMS PLAN -
ADA SUITE 1201
22107 ELEC R18.RVT
SMG
CAJ
01/07/2019
CAJ
BARABOO WI
700 22107 E2-12
18-22107
HOTEL
RENOVATONS
HO-CHUNK
GAMING WI DELLS
E2-12 PARTIAL FIRST FLOOR POWER & SYSTEMS PLAN - ADA SUITE 1201
ELECTRICAL KEYNOTE...
KEY KEYNOTE TEXT
1 REPLACE EXISTING DUPLEX
RECEPTACLE WITH USB RECEPTACLE
PROVIDE BY E.C. RE-USE EXISTING
CIRCUIT.
2 RECEPTACLE DEDICATED FOR
FIREPLACE.
17 MAINTAIN EXISTING CIRCUITING IN THIS
ROOM.
18 UTILIZE EXISTING CIRCUIT FROM
DEMO'D WHIRLPOOL TUB FOR NEW
FIREPLACE POWER.
19 UTILIZE EXISTING USB RECEPTACLE
FROM BATHROOM DEMOLITION. TIE
INTO EXISTING CIRCUIT WITHIN THIS
ROOM.
1/4" = 1'-0"1
PARTIAL FIRST FLOOR POW ER & SYSTEMS PLAN - ADA SUITE 1201
SHEET NOTES
1. ALL EXISTING ELECTRICAL EQUIPMENT
INDICATED ON PLANS ARE BASED ON
INFORMATION FROM CONSTRUCTION
DOCUMENTS AND FIELD OBSERVATION OF THE
EXISTING BUILDING.
2. "EX" = INDICATES EXISTING DEVICE TO
REMAIN.
3. ALL ELECTRICAL FIXTURES WILL BE REMOVED
AND CAPPED OFF WITH WIRE NUTS AND TAPED.
WITH EXCEPTION TO FIRE SAFETY OR FIRE
STROBE WIRING, THOSE WILL REMAIN IN PLACE.
NOTE: SUITES 1201 AND 1401 ARE SIMILAR WITH EXCEPTION OF ADA 1201.8 MASTER BATH.
REVISION SCHEDULE
DATE DESCRIPTION BY
3
D
D
3
J
EX
EX
EX
BEDROOM
1401.7
LIVING
1401.2
1/2 BATH
1401.3
KITCHEN
1401.5
OFFICE
1401.6
DOUBLE QUEEN
1403
ENTRANCE
1401.1
CORRIDOR
186
BEDROOM
1223.7
BATHROOM
1223.8
LIVING
1223.2
KITCHEN
1223.5
ENTRANCE
1223.1
1/2 BATH
1223.3
CLOSET
1223.4
OFFICE
1223.6
KING
1221
EX
B1
C
B2
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1 B1
B1B1
B1B1
B1 B1
C C C C
C C C C
C C C C
C C C
CC
C
C
C
C
CLOSET
1401.4
3
5
HLP-11A-15
20
20
HLP-11A-1
HLP-11A-2
EX
EX
F
D
D
D
F
F
F
F
66"AFF
66"AFF
80"AFF
80"AFF
80"AFF
66"AFF
80"AFF
80"AFF
23
B1
N
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:41:13 PM
E2-21
PARTIAL FIRST
FLOOR LIGHTING
PLAN - SUITES
1223 & 1401
Author
Designer
01/07/2019
Checker
BARABOO WI
700 22107 E2-21
18-22107
HOTEL
RENOVATONS
HO-CHUNK
GAMING WI DELLS
E2-21 PARTIAL FIRST FLOOR LIGHTING PLAN - SUITES 1223 & 1401
1/4" = 1'-0"1PARTIAL FIRST FLOOR LIGHTING PLAN - SUITES 1223 & 1401
ELECTRICAL KEYNOTE...
KEY KEYNOTE TEXT
3 PROVIDE AND INSTALL JUNCTION BOX,CONDUIT AND WIRING FOR MIRRORLIGHT, (120V, 54W). COORDINATE WITHOWNER FOR FURTHER INSTRUCTION.
5 LIGHTING LAYOUT TO BE THE SAME ASSUITE 1401 BUT MIRRORED. RE-USECIRCUIT HLP-12A-18 FOR LIGHTING INTHIS SPACE.
20 FURNISH & INSTALL DIMMER/3-WAYSWITCH.
23 INSTALL EXISTING SCONCES REMOVEDFROM RESTROOM AT THIS LOCATION.
SHEET NOTES
1. ALL EXISTING ELECTRICAL EQUIPMENT INDICATED ON PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION DOCUMENTS AND FIELD OBSERVATION OF THE EXISTING BUILDING.
2. "EX" = INDICATES EXISTING DEVICE TO REMAIN.
3. ALL ELECTRICAL FIXTURES WILL BE REMOVED AND CAPPED OFF WITH WIRE NUTS AND TAPED. WITH EXCEPTION TO FIRE SAFETY OR FIRE STROBE WIRING, THOSE WILL REMAIN IN PLACE.
REVISION SCHEDULE
DATE DESCRIPTION BY
LIVING
1201.2
BEDROOM
1201.7
ADA BATHROOM
1201.8
OFFICE
1223.6
KITCHEN
1201.5
1/2 BATH
1201.3
DOUBLE QUEEN
1203
ENTRANCE
1201.1
CLOSET
1201.4
STORAGE
196
EX
EX EX
4
N
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:42:13 PM
E2-22
PARTIAL FIRST
FLOOR LIGHTING
PLAN - SUITE ADA
1201
Author
Designer
01/07/2019
Checker
BARABOO WI
700 22107 E2-22
18-22107
HOTEL
RENOVATONS
HO-CHUNK
GAMING WI DELLS
E2-22 PARTIAL FIRST FLOOR LIGHTING PLAN - SUITE ADA 1201
ELECTRICAL KEYNOTE...
KEY KEYNOTE TEXT
4 LIGHTING LAYOUT TO BE THE SAME ASSUITE 1401. RE-USE CIRCUIT HLP-13A-30FOR LIGHTING IN THIS SPACE.
1/4" = 1'-0"1PARTIAL FIRST FLOOR LIGHTING PLAN - ADA SUITE 1201
SHEET NOTES
1. ALL EXISTING ELECTRICAL EQUIPMENT INDICATED ON PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION DOCUMENTS AND FIELD OBSERVATION OF THE EXISTING BUILDING.
2. "EX" = INDICATES EXISTING DEVICE TO REMAIN.
3. ALL ELECTRICAL FIXTURES WILL BE REMOVED AND CAPPED OFF WITH WIRE NUTS AND TAPED. WITH EXCEPTION TO FIRE SAFETY OR FIRE STROBE WIRING, THOSE WILL REMAIN IN PLACE.
REVISION SCHEDULE
DATE DESCRIPTION BY
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:48:36 PM
E3-11
ELECTRICAL
SPECIFICATIONS
22107 ELEC R18.RVT
CAJ
CAJ
01/07/2019
CAJ
BARABOO WI
700 22107 E3-11
18-22107
HOTEL
RENOVATONS
HO-CHUNK
GAMING WI DELLS
E3-11 ELECTRICAL SPECIFICATIONS
ELECTRICAL SPECIFICATIONS
1. BASIC ELECTRICAL REQUIREMENTSA. The Electrical Contract Installation shall include a complete Electrical Installation of inside utilities for the building. All conduit, fixtures and equipment herein specified, mentioned or shown on Drawings, shall be furnished and installed in
place, connected up and ready for normal operation except for such items as are specifically mentioned to be furnished by others.B. The Electrical Installation shall meet all applicable local, state and federal codes and standards. All permits necessary for a complete electrical installation shall be paid for by this Contractor.C. Except in those municipalities which provide state-approved electrical inspection, all installation of electrical equipment wiring shall be inspected by the State Board of Electricity. Allowance shall be made in the bid and contract for the cost
of such inspection.D. Furnish products listed by Underwriters Laboratories, Inc. or other testing firm acceptable to authority having jurisdiction.E. This Contractor shall coordinate his work with other Contractors on this job. Any conflict which cannot be resolved shall be settled by the Architect/Engineer.F. Field verification of scale dimensions on plans is directed since actual locations, distances and levels will be governed by actual field conditions.G. The Contractors shall check architectural, structural, plumbing, heating, ventilating and electrical plans to avert possible installation conflicts. Should drastic changes from original plans be necessary to resolve such conflicts this Contractor
shall notify the Architect/Engineer and secure written approval and agreement on necessary adjustments before the installation is started.H. This Contractor shall be responsible for the proper installation and working of everything in this contract and shall guarantee to remedy free of charge any defects in workmanship and materials that may appear to give or gives rise to
trouble of any kind for a period of one year from date of final substantial completion.2. MINOR ELECTRICAL DEMOLITION
A. Demolition drawings are based on casual field observation and existing record documents.B. Verify that abandoned wiring and equipment serve only abandoned facilities.C. Provide temporary wiring and connections to maintain existing systems in service during construction. When work must be performed on energized equipment or circuits, use personnel experienced in such operations.D. Existing Electrical Service: Maintain existing system in service until new system is complete and ready for service. Disable system only to make switchovers and connections. Minimize outage duration.
1. Obtain permission from Owner at least 24 hours before partially or completely disabling system.2. Make temporary connections to maintain service in areas adjacent to work area.
E. Existing Fire Alarm System: Maintain existing system in service until new system is accepted. Disable system only to make switchovers and connections. Minimize outage duration.1. Notify Owner before partially or completely disabling system.2. Notify local fire service.3. Make notifications at least 24 hours in advance.4. Make temporary connections to maintain service in areas adjacent to work area.
F. Disconnect abandoned outlets and remove devices. Remove abandoned outlets if conduit servicing them is abandoned and removed. Provide blank cover for abandoned outlets that are not removed.G. Disconnect and remove abandoned luminaires. Remove brackets, stems, hangers, and other accessories.H. Maintain access to existing electrical installations that remain active. Modify installation or provide access panel as appropriate.
3. LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLESA. Do not use conductors and cables for applications other than as permitted by NFPA 70 and product listing.B. Provide single conductor building wire installed in suitable raceway unless otherwise indicated, permitted, or required.C. Nonmetallic-sheathed cable, underground feeder and branch-circuit cable, service entrance cable, and armored cable is not permitted.D. Metal-clad cable is permitted only as follows:
1. Where concealed above accessible ceilings for final connections from junction boxes to luminaires.2. Where concealed in hollow stud walls, above accessible ceilings, and under raised floors for branch circuits up to 20 A.
E. Provide copper conductors only. Aluminum conductors are not acceptable for this project. Conductor sizes indicated are based on copper.F. Provide copper conductors except where aluminum conductors are specifically indicated or permitted for substitution. Conductor sizes indicated are based on copper unless specifically indicated as aluminum. Conductors designated with
the abbreviation "AL" indicate aluminum.G. Minimum Conductor Size:
A. Branch Circuits: 12 AWG.1. Exceptions:
a. 20 A, 120 V circuits longer than 75 feet (23 m): 10 AWG, for voltage drop.b. 20 A, 120 V circuits longer than 150 feet (46 m): 8 AWG, for voltage drop.
H. Maintain separation of Class 1, Class 2, and Class 3 remote-control, signaling, and power-limited circuits in accordance with NFPA 70.I. Common Neutrals: Unless otherwise indicated, sharing of neutral/grounded conductors among single phase branch circuits of different phases installed in the same raceway is not permitted. Provide dedicated neutral/grounded conductor
for each individual branch circuit.4. CONDUIT
A. Unless otherwise indicated and where not otherwise restricted, use the conduit types indicated for the specified applications. Where more than one listed application applies, [implies all applications are acceptable]. Where conduit type for a particular application is not specified, use galvanized steel rigid metal conduit.
B. Concealed Within Masonry Walls: Use galvanized steel rigid metal conduit, intermediate metal conduit (IMC), or electrical metallic tubing (EMT).C. Concealed Within Hollow Stud Walls: Use galvanized steel rigid metal conduit, intermediate metal conduit (IMC), or electrical metallic tubing (EMT).D. Concealed Above Accessible Ceilings: Use galvanized steel rigid metal conduit, intermediate metal conduit (IMC), or electrical metallic tubing (EMT).E. Interior, Damp or Wet Locations: Use galvanized steel rigid metal conduit or intermediate metal conduit (IMC).F. Exposed, Interior, Not Subject to Physical Damage: Use galvanized steel rigid metal conduit, intermediate metal conduit (IMC), or electrical metallic tubing (EMT).G. Exposed, Interior, Subject to Physical Damage: Use galvanized steel rigid metal conduit or intermediate metal conduit (IMC).H. Minimum Conduit Size, Unless Otherwise Indicated:
1. Branch Circuits: 1/2 inch (16 mm) trade size.2. Branch Circuit Homeruns: 3/4 inch (21 mm) trade size.3. Underground, Interior: 3/4 inch (21 mm) trade size.4. Underground, Exterior: 1 inch (27 mm) trade size.
I. Provide independent support from building structure. Do not provide support from piping, ductwork, or other systems.J. Where rigid polyvinyl (PVC) conduit is provided, transition to galvanized steel rigid metal conduit where emerging from underground.K. Telecommunications Conduit:
1. Provide 3/4" empty conduit with proper mud ring or box stubbed up into corridor ceiling space for all voice, data, and television locations.5. IDENTIFICATION FOR ELECTRICAL SYSTEMS
A. Use identification nameplate to identify each piece of electrical distribution and control equipment and associated sections, compartments, and components.B. Use identification nameplate at each piece of service equipment to identify the available fault current and the date calculations were performed.C. Arc Flash Hazard Warning Labels: Use warning labels to identify arc flash hazards for electrical equipment, such as switchboards, panelboards, industrial control panels, meter socket enclosures, and motor control centers that are likely to
require examination, adjustment, servicing, or maintenance while energized.D. Use identification label or engraved wallplate to identify serving branch circuit for all receptacles.
6. WIRING DEVICESA. For single receptacles installed on an individual branch circuit, provide receptacle with ampere rating not less than that of the branch circuit.B. Provide weather resistant GFI receptacles with specified weatherproof covers for all receptacles installed outdoors or in damp or wet locations.C. All W iring Devices: [light almond] with [light almond] nylon wall plate unless otherwise indicated.D. Standard Wall Switches: Industrial specification grade, 20 A, 120/277 V with standard toggle type switch actuator and maintained contacts; single pole single throw, double pole single throw, three way, or four way as indicated on the
drawings.E. Standard Convenience Receptacles: Industrial specification grade, 20A, 125V, NEMA 5-20R; single or duplex as indicated on the drawings.F. Mounting Heights: Unless otherwise indicated, as follows:
1. Wall Switches: 46 inches above finished floor to center of box.2. Receptacles: 20 inches above finished floor to center of box or 6 inches (150 mm) above counter.
G. Unless otherwise indicated, GFI receptacles may be connected to provide feed-through protection to downstream devices. Label such devices to indicate they are protected by upstream GFI protection.7. ENCLOSED SWITCHES
A. Source Limitations: Furnish enclosed switches and associated components produced by the same manufacturer as the other electrical distribution equipment used for this project and obtained from a single supplier.B. Description: Quick-make, quick-break, enclosed safety switches complying with NEMA KS 1, type HD (heavy duty), and listed and labeled as complying with UL 98; ratings, configurations, and features as indicated on the drawings.C. Horsepower Rating: Suitable for connected load.
8. INTERIOR LIGHTINGA. Any deviation from what is called out in the Light Fixture Schedule requires prior approval from the Engineer.
1. Provide Cut Sheets and Photometrics.B. Unless otherwise indicated, provide complete luminaires including drivers, lenses and other components required to position, energize and protect the lamp and distribute the light.C. Luminaires Recessed in Insulated Ceilings: Listed and labeled as IC-rated, suitable for direct contact with insulation and combustible materials.D. Do not use ceiling support system to bear weight of luminaires unless ceiling support system is certified as suitable to do so.E. Install accessories furnished with each luminaire.
REVISION SCHEDULE
DATE DESCRIPTION BY
ELECTRICAL SYMBOLS LEGEND
RECEPTACLES SWITCHES
SIMPLEX
DUPLEX
ISOLATED GROUND
TAMPER RESISTANT
WEATHER PROOF W/GFI
GROUND FAULT INTERRUPT
HIGH VOLTAGE
SPLIT WIRE
DOUBLE DUPLEX
220 VOLT
SPECIAL PURPOSE
SINGLE POLE
DOUBLE POLE
3-WAY
4-WAY
EMERGENCY
FAN
KEY OPERATED
LOW VOLTAGE
PILOT LIGHT
TIMER
CIRCUIT BREAKER
DIMMER
MOMENTARY CONTACT
OCCUPANCY SENSOR-WALL
OCCUPANCY SENSOR-CLG
PHOTO CELL
MISC. POWER SYMBOLS
DISCONNECT
CLOCK
ELECT. CONTROLLED VALVE
FUSESTAT
HAND DRYER
HAIR DRYER
HEATER
JUNCTION BOX
MOTOR
RELAY
SOLENOID VALVE
MOTOR STARTER
FIRE PROTECTION SYSTEM
FIRE ALARM CONTROL PANEL
FIRE ALARM ANNUNCIATOR PNL
SMOKE DETECTOR
HEAT DETECTOR
HORN STROBE
HORN ONLY
STROBE ONLY (C FOR CLG MTD)
SPKR STROBE (C FOR CLG MTD)
EXTERIOR HORN W/ STROBE
MINI HORN
ANSUL TIE
SPRINKLER TAMPER SWITCH
SPRINKLER FLOW SWITCH
WALL SPEAKER - FIRE
CEILING SPEAKER - FIRE
MAGNETIC DOOR HOLDER
MANUAL PULL STATION
NURSE CALL SYSTEM
NURSE CONTROL PANEL
DOME LIGHT
DUTY STATION
COMMUNICATIONS
DATA JACK
TELEVISION JACK
SPEAKER - CEILING
SPEAKER - WALL
SECURITY
DOOR ALARM ANNUNCIATOR
ADA DOOR OPERATOR
CAMERA
CARD READER - ELECTRONIC
DOOR SECURITY MONITOR
KEY CARD PAD
PUSH BUTTON
ELECTRICAL PANELS
FLUSH MOUNT PANELBOARD
SURFACE MT PANELBOARD
PHONE SYSTEMIG
TR
W P
GFI
2
3
4
E
F
K
LV
P
T
CB
D
MC
OS
PC
C
F
D
H
H
J
R
FACP
FAAP
F
S
F
M
A
TS
FS
W S
S
F
ND
T
S
FA
F
S
P
SEC
DAA
P1
PHONE
ADDRESSABLE INPUT MODULEAIM
AREA OF RESCUE-CALLR
TELEPHONE JACK
DATA/VOICE JACK
COUNTERTOP RECEPTACLECTR
ILLUMINATED HANDLE H
MOTORM
SPEED CONTROLLER SC
SPRING WOUND TIMERW
WEATHER PROOFW P
MOTOR WITH DISCONNECT
3-BUTTON SWITCH
THERMOSTATT
B BELL
BUZZER
FLOOR DATA JACK
INTERCOMIC
M MICROPHONE
SPEAKER/CLOCK
TIME CLOCKTC
V
FAN
ABORT SWITCH
ADDRESSABLE OUTPUT MOD.AOM
CBELL-CHIME
EOLD END OF LINE RESISTOR
N
Z ZONE LIGHT
NCP
STAFF STATION SS
NURSE/TOILET STATION N
CR
ELECTRIC LOCKDL
K
SECURITY ALARM HORN
OS
SD DUCT-TYPE SMOKE DETECTOR
COMBINATION STARTER & DISCCEILING MOUNTED RECPT
FLOOR BOX RECEPTACLE
USB CHARGING STATION
COMBO RECEPTACLE / USBUSB
OCC SENSOR-POWER PACKPP
P1
CEILING MOUNTED SP RECPT
FIRE/SMOKE DAMPERF/S
SMOKE DAMPERS
WIRELESS ACCESS POINTW iFi
CONTROLLED RECEPTACLECR
ACS ACCESS CONTROLLED DOOR
FUSED DISCONNECT
C
S C
CONTINUED CIRCUIT RUN
01
/2"
1"
2"
1/4
"
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
SHEET
PROJECT
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, INC. AND MAY NOT BE USED, COPIED OR DUPLICATED WITHOUT PRIOR WRITTEN CONSENT.
1/7/2019 12:47:32 PM
E5-11
POWER PANEL
BOARDS AND
SCHEDULES
22107 ELEC R18.RVT
SMG
CAJ
01/07/2019
CAJ
BARABOO WI
700 22107 E5-11
18-22107
HOTEL
RENOVATONS
HO-CHUNK
GAMING WI DELLS
E5-11 POWER PANEL BOARDS AND SCHEDULES
1/8" = 1'-0"1ELECTRICAL SYMBOLS LEGEND
LIGHT FIXTURE SCHEDULE
TYPE DESCRIPTION MANUFACTURER MODEL LAMP TYPE COMMENTS
B1 6" LED DOWN LIGHT EATON PORTFOLIO LD6B10D010 EU6B10208030 6LBMMW1 LED GYPSUIM CEILING DOWN LIGHT
B2 6" LED DOWN LIGHT - WETLOCATION
EATON PORTFOLIO LD6B10D010 EU6B10208030 6LBMMW1 LGSKT6IP66 LED SHOWER LIGHT
C 4" LED DOWN LIGHT EATON PORTFOLIO SMD4R6930WH LED LIVING AREA BEAM LIGHT FIXTURE
D PENDANT FIXTURE TECH LIGHTING 700 MP K Z-LEDS930 LED MOUNT 66" A.F.F.
F EXISTING SCONCES LED RE-USED SCONCES OR OWNERS CHOICE
Legend:
Total Amps: 20 A 24 A 2 A
Total Load: 2096 VA 2548 VA 180 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 RM. 1401 EX. MASTER... 20 A 1 0 28
25 RM. 1401 FIREPLACE... 20 A 1 180 26
23 24
21 22
19 20
17 RM. 1401 REFRIGERATOR 20 A 1 180 18
15 RM. 1401... 20 A 1 2548 16
13 14
11 12
9 10
7 8
5 6
3 4
1 LIGHTING ROOM 1401 KITCH. 20 A 1 1624 300 1 20 A LIGHTING 1401 BATHROOM 2
CKT Circuit Description Trip Pole A B C Pole Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 225 A
Mounting: Recessed Wires: 4 Mains Rating: 225 A
Supply From: Phases: 3 Mains Type:
Location: Space 6 Volts: 120/208 Wye A.I.C. Rating:
Existing Panel: HLP-11A
Legend:
Total Amps: 5 A 2 A 8 A
Total Load: 540 VA 180 VA 900 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 28
25 26
23 24
21 22
19 540 1 20 A GFCI RECEPTACLES RM. 1223 20
17 900 1 20 A RECEPT.-LIVING&DINING R... 18
15 180 1 20 A REFRIG. RECEPT RM. 1223 16
13 14
11 12
9 EX. MASTER RM. 1223 20 A 1 0 10
7 8
5 6
3 4
1 2
CKT Circuit Description Trip Pole A B C Pole Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 225 A
Mounting: Recessed Wires: 4 Mains Rating: 225 A
Supply From: Phases: 3 Mains Type:
Location: Volts: 120/208 Wye A.I.C. Rating:
Existing Panel: HLP-12A
Legend:
Total Amps: 5 A 2 A 9 A
Total Load: 540 VA 180 VA 1080 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 1080 1 20 A RECEPT. LIV.&DINING RM.... 30
27 180 1 20 A REFRIG. RECEPT. RM. 1201 28
25 0 1 20 A EX. MASTER BEDROOM 1201 26
23 24
21 22
19 20
17 18
15 16
13 14
11 12
9 10
7 8
5 6
3 4
1 GFCI RECEPTACLES RM. 1201 20 A 1 540 2
CKT Circuit Description Trip Pole A B C Pole Trip Circuit Description CKT
Notes:
Enclosure: Type 1 MCB Rating: 225 A
Mounting: Recessed Wires: 4 Mains Rating: 225 A
Supply From: Phases: 3 Mains Type:
Location: Space 6 Volts: 120/208 Wye A.I.C. Rating:
Existing Panel: HLP-13AROOM ###
Legend:
Total Amps: 0 A 5 A 0 A
Total Load: 0 VA 540 VA 0 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 28
25 26
23 24
21 22
19 20
17 18
15 16
13 14
11 12
9 540 1 20 A RM. 1401 GFCI RECEPT. 10
7 8
5 6
3 4
1 2
CKT Circuit Description Trip Pole A B C Pole Trip Circuit Description CKT