FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010
37

FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

Mar 26, 2015

Download

Documents

Jacob Cooke
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

FY 2015/16 – 2029/30 Prioritized Project List

METROPLAN ORLANDO Board

September 8, 2010

Page 2: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

FY 2015/16 - 2029/30 Prioritized Project List

• Includes highway, bicycle & pedestrian, & transit projects with unfunded phases in Five Year Work Program/TIP

• To be used in developing FY 2011/12-2015/16 Five Year Work Program

• Five Year Work Program will be used in Five Year Work Program will be used in developing FY developing FY 2011/12-2015/16 TIP TIP

Page 3: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

FY 2015/16 Funding Allocation Estimates

Page 4: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

Highway Projects RankingCriteria

• Ratio of traffic volume to carrying capacity

• Status of right-of-way acquisition

• Functional classification of roadway

Page 5: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

Highway Project Categories

• National Highway System - improvements to I-4

• Surface Transportation Program - improvements to major state road arterials

• Management & Operations - improvements such as computerized signals, modifying intersections, etc.

Page 6: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

FY 2015/16 – 2029/30 Prioritized Project List

National Highway System Projects (no changes)

Page 7: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

#1 I-4/SR 46 Interchange Improvement Unfunded phases: Construction

#2 I-4 Ultimate Configuration - S of Beachline Expy. to SW

of Kirkman Rd. - Unfunded phases: Design/ROW/ Construction

#2 (cont’d) I-4 Ultimate Configuration - SW of Kirkman Rd.

to W of US 441 - Unfunded phases: Remaining ROW/

Construction

#2 (cont’d) I-4/Kirkman Rd. Interchange Improvement Unfunded phases: ROW/Construction

Page 8: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

#2 (cont’d) I-4 Ultimate Configuration - W of US 441to S of Ivanhoe Blvd. - Unfunded phases: Remaining Construction

#2 (cont’d) I-4 Ultimate Configuration - S of Ivanhoe Blvd. to N of Kennedy Blvd. - Unfunded phases: Remaining ROW/

Construction

#2 (cont’d) I-4 Ultimate Configuration - N of Kennedy Blvd. to Orange/Seminole Co. Line - Unfunded phases: Remaining

ROW/Construction

#3 I-4 Ultimate Configuration - Orange/Seminole Co. Line to N of SR 434 - Unfunded phases: Remaining ROW/ Construction

Page 9: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

#3 (cont’d) I-4 Ultimate Configuration - N of SR 434 to Seminole/Volusia Co. Line - Unfunded phases: Design/ ROW/ Construction

#4 I-4 Ultimate Configuration - Orange/Osceola Co. Line to W of Beachline Expy. - Unfunded phases: Design/ ROW/Construction

#5 I-4 Ultimate Configuration - S of Polk/Osceola Co. Line to Orange/Osceola Co. Line - Unfunded phases: Design/ ROW/Construction

Page 10: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

FY 2015/16 – 2029/30 Prioritized Project List

Surface Transportation Program Projects

Page 11: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

#1 US 17/92/SR 436 Flyover Unfunded phases: Remaining

ROW/Construction (was #2)

#2 Sand Lake Rd. - Turkey Lake Rd. to Presidents Dr. - 6 Lane

& John Young Pkwy. Flyover Unfunded phases: Remaining ROW/Construction (was #4)

#3 SR 15 - Lee Vista Blvd. to Conway Rd. - 4 Lane Unfunded phases: Remaining ROW/Construction (was #5)#4 SR 46 - Mellonville Ave. to SR 415 - 4 Lane Unfunded phases: Construction (was #6)

Page 12: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

#5 John Young Pkwy. Extension - Shader Rd. to Edgewater Dr. New 6-Lane Roadway - Unfunded phases: Construction (was #7)

#6 Forest City Rd. - Edgewater Dr. to Maitland Blvd. - 6 Lane Unfunded phases: Design/ROW/Construction (was #8)

#6 John Young Pkwy. - SR 50 to Shader Rd. - 6 Lane

Unfunded phases: Design/ROW/Construction (was #8) #7 US 17/92 - Poinciana Blvd. to Ham Brown Rd. - 4 Lane

Unfunded phases: Construction (was #9)

Page 13: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

#8 SR 434 - I-4 to Rangeline Rd. - 6 Lane Funded through construction with Seminole

County local & TRIP funds. Remains on list in case additional Federal/ State funds become available. (was #10)

#8 (cont’d) SR 434 - Rangeline Rd. to CR 427 - 6 Lane

Unfunded phases: Design/ROW/Construction (was #10)

#9 SR 436/Red Bug Lake Rd. Flyover Funded through construction with Seminole

County local funds & TRIP funds. Remains on list in case additional Federal/State funds become available. (was #11)

Page 14: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

#10 US 192 - Aeronautical Blvd. to Budinger/Columbia Ave. -

6 Lane - Unfunded phases: Construction (was #12)

#10 (cont’d) US 192 - Eastern Ave. to CR 532/Nova Rd. -

6 Lane - Unfunded phases: Construction (was #12)

#11 Hoagland Blvd - US 17/92 to 5th St. - 4 Lane/Realignment Unfunded phases: ROW/Construction (was #13)

#12 Silver Star Rd. - Dillard St. to Western Expy. - 4 Lane

Unfunded phases: Design/ROW/Construction (was #14)

Page 15: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

#13 SR 415 - SR 46 to Seminole/Volusia Co. Line - 4 Lane

Unfunded phases: ROW/Construction (was #15)

#14 Maitland Blvd. - Maitland Concourse Pkwy. to Maitland Ave. - 6 Lane - Unfunded phases: PD&E/Design/ Construction (was #16)

#15 SR 426 - Pine Ave. to Lockwood Blvd. - 4 Lane (TRIP)

Unfunded phases: ROW/Construction (was #17)

#16 SR 50 - E Old Cheney Hwy. to SR 520 - 6 Lane

Unfunded phases: Design/ROW/Construction (was #18)

Page 16: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

#17 US 17/92 - Norfolk Ave. to Monroe St. - Improve Median &

Intersections/Extend Lee Rd. from US 17/92 to Denning Dr. Unfunded phases: Design/ROW/Construction (was #19)

#18 SR 46 - SR 415 to CR 426 - 4 Lane Unfunded phases: Design/ROW/Construction (was #20)

#18 SR 46 - CR 426 to Seminole/Volusia Co. Line - 4 Lane Unfunded phases: PD&E/Design/ROW/Construction

(was #20)

#19 John Young Pkwy. - Pleasant Hill Rd. to Portage St. - 6 Lane

Unfunded phases: Design/ROW/Construction (was #21)

Page 17: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

FY 2015/16 – 2029/30 Prioritized Project List

Management & Operations Projects

(Prioritized)

Page 18: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.
Page 19: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

#3 Install & Expand Seminole Co. ATMS Phase 2 Unfunded phases: Design/Construction (was #4)

#4 Install & Expand Orange Co. ATMS Project 1 Unfunded phases: Design/Construction (was #5)

#5 Improve US 17/92/Pleasant Hill Rd. Intersection Unfunded phases: Design/Construction (was #6)

#6 Expand/Upgrade Orlando Regional Computerized Signal System Sub-phase 1

Unfunded phases: Design/Construction (was #7)

#7 Expand Osceola Co. ATMS Year 4 Unfunded phases: Design/Construction

(was #8)

Page 20: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

• Orange Ave. - Gatlin Ave. to Holden Ave. - Intersection Enhancement - Unfunded phases: Construction

• Robinson St. - Hughey Ave. to Garland Ave. Improve Capacity - Unfunded phase: ROW/Construction

• International Dr. - Oak Ridge Rd. to Sand Lake Rd. CMS Improvements - Unfunded phases: Construction

Management & Operations Projects (Non-Prioritized)

Page 21: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

• Install & Expand Orange Co. ATMS Projects 2-6

Unfunded phases: Design/Construction

• Expand/Upgrade Orlando Regional Computerized Signal System Sub-phases 2-7 - Unfunded phases: Design/ Construction

• Expand Osceola Co. ATMS Year 5Unfunded phases: Design/Construction

Page 22: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

FY 2015/16 – 2029/30 Prioritized Project List

Bicycle & Pedestrian Projects

Page 23: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

Bicycle & Pedestrian Projects Ranking Criteria

•Expected facility usage

•Direct connection to transit

•Inclusion in local government bicycle and pedestrian plans

•Linkage with other bicycle and pedestrian facilities

Page 24: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

#1 Riverwalk Phase II - French Ave. to Zoo Entrance Unfunded phases: Design/Construction

#2 Shingle Creek Trail Ph. 2-5 - Conroy Rd. to Sand Lake Rd. & US 192 to Osceola Pkwy. Unfunded phases: Design/Construction (was #3)#3 Cady Way Trail Extension - Magnolia Ave.

to Gurtler St. Unfunded phases: Construction (was #5)#4 Oviedo Town Gateway Sidewalk - Mitchell Hammock Rd. to Lindsay Ln. - Unfunded phases: Design/Construction (was #6)

Page 25: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

#5 Orlando Southeast Trail - Medical City Area Unfunded phases: Design/Construction (was #10)

#6 Lake Jessup Ave. Sidewalks - Mitchell Hammock Rd. to Artesia St. - Unfunded phases: Design/Construction (was #11) #7 Orlando Primary Bike Route Plan - Unfunded phases: Construction (was #12)

#8 Toho-Valencia Path from Oak St. to Valencia CC Unfunded phases: Design/Construction (was #14)

Page 26: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

#9 Orange Blossom Tr. from Gore St. to Church St. - Upgrade Sidewalks - Unfunded phases: Design/Construction (was #16) #10 Central Ave. from MLK Blvd. to Donegan Ave. - Bike & Ped Improvements - Unfunded phases: Design/ Construction (was #17)#11 St. Andrews Trail from Cady Way Trail to Aloma Ave. Unfunded phases: Design/Construction (was #18)#12 West Orange Trail Phase 4 - Rock Springs Rd. to Kelly Park Rd. - Unfunded phases: Design/Construction (was #19)

Page 27: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

#13 Pine Ave. Sidewalks in Oviedo - Unfunded phases: Design/Construction (was #20)

#14 LYNX System-wide Bicycle Parking - Unfunded phases: Design/Construction (new project)

#15 Maitland & Eatonville Bicycle Wayfinding - Unfunded phases: Design/Construction (new project)

#16 Orlando Main Street District Plans - Unfunded phases: Design/Construction (new project)

Page 28: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

#17 Downtown Kissimmee Streetscape - Unfunded phases: Design/Construction (new project)

#18 Edgewater Drive Streetscape - Unfunded phases: Design/Construction (new project)

#19 OBT Pedestrian Enhancements Ph. 2 - Unfunded phases: Design/Construction (new project)

No Priority # I-4 Pedestrian Bridge over Lake Ivanhoe Unfunded phase: Construction

Page 29: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

Proposed Funding Cap Policy for Bike & Ped Projects

Adopted by BPAC – July 2010:

Any new or future bike & ped project costing over $4 million must be divided into phases, with a cost of not more than $4 million per phase.

Page 30: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

FY 2015/16 – 2029/30 Prioritized Project ListMajor Transit Projects

Page 31: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

Transit Projects Ranking Criteria

• Basic services and programs• Service development projects• Capital for bus

replacement/repair/maintenance• Customer amenities• Capital for non-basic service• Systems development (ITS, other technologies)• Studies (DEIS, etc.)

Page 32: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

Proposed Change to SU TransitFunding Policy

METROPLAN ORLANDO’s current policy for SU transit funds - must be used for new buses and/or bus shelters.

Plans & Programs Subcommittee is recommending including general capital expenditures along with new buses and/or bus shelters.

Page 33: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

• Operating Assistance

• SunRail

• Purchase 56 buses & 40 commuter vans

•Purchase buses for service expansion resulting from Comprehensive Operational Analysis

•Purchase SunRail support buses

•Downtown Orlando Bus Rapid Transit system expansion

Page 34: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

• Transit Centers/Super Stops

• Kissimmee Intermodal Center

• ITS Enhanced Circulator/FlexBus Engineering/Construction

• Innovation Way/Lake Nona/Medical City Corridor LRT - Engineering/initial construction

• Orange Blossom Express - Commuter Rail from Downtown Orlando to Lake County - Alternative Analysis (new project)

Page 35: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

• Alternative Analysis Studies for I-4, SR 50, US 441 & US 192 Corridors

• International Drive Area Transit Corridor System Study

• International Drive Area Intermodal Station

• LRT from Beachline Expy. to Central Pkwy. - Construction • Fourth Operating and Maintenance Base

Page 36: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.

FY 2015/16-2019/30Prioritized Project List

Recommended for approval by:

• CAC – 8/25/10

• BPAC – 8/25/10

• TTC – 8/27/10

• MAC – 9/2/10

Page 37: FY 2015/16 – 2029/30 Prioritized Project List METROPLAN ORLANDO Board September 8, 2010.