Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
ABLI Abraham Lincoln Birthplace National Historic Site
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 51 0.342 $7,609,673 $22,269,302 -
14
2
0
4
2
3
3
0.464
0.005
0.000
0.088
0.494
0.000
0.108
$4,966,200
$1,865
$0
$77,901
$53,963
$0
$22,186
$10,693,903
$394,954
$0
$883,212
$109,295
$603,638
$206,010
20,144
2,856
0
9,435
135
1,360
SF
SF
AC
LF
GPD
GPD
$2,083,055$1,691,834 0.812 9
14 0.109 $795,725 $7,295,235 - -
$461,212
$0
$0
$0
$0
$0
$0
-
$10,134
$471,346
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 1
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
ACAD Acadia National Park
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 715 0.065 $68,250,049 $1,046,956,650 -
205
17
6
137
18
17
84
0.091
0.095
0.007
0.272
0.168
0.051
0.018
$8,766,545
$1,014,125
$165,272
$10,131,389
$1,937,513
$858,321
$11,413,535
$96,044,960
$10,707,320
$23,130,836
$37,242,129
$11,561,662
$16,793,993
$624,770,995
307,318
43,728
360
802,752
136,200
142,100
SF
SF
AC
LF
GPD
GPD
$157,753,775$28,973,323 0.184 175
56 0.072 $4,990,026 $68,950,980 - -
$2,971,186
$286,656
$48,360
$5,729,238
$323,583
$354,038
$3,366,876
-
$3,041,578
$16,121,515
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 2
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
ADAM Adams National Historical Park
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 23 0.006 $273,993 $42,518,497 -
13
0
0
0
0
0
0
0.007
0.000
0.000
0.000
0.000
0.000
0.000
$211,454
$0
$0
$0
$0
$0
$0
$31,263,428
$0
$0
$0
$0
$0
$0
51,168
0
0
0
0
0
SF
SF
AC
LF
GPD
GPD
$0$0 0.000 0
10 0.006 $62,539 $11,255,069 - -
$97,986
$0
$0
$0
$0
$0
$0
-
$0
$97,986
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 3
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
AFBG African Burial Ground National Monument
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 7 0.000 $205 $21,162,552 -
2
0
0
0
0
1
0
0.000
0.000
0.000
0.000
0.000
0.000
0.000
$205
$0
$0
$0
$0
$0
$0
$8,721,937
$0
$0
$0
$0
$64,432
$0
9,204
0
0
0
0
5,000
SF
SF
AC
LF
GPD
GPD
$0$0 0.000 0
4 0.000 $0 $12,376,183 - -
$0
$0
$0
$0
$0
$0
$0
-
$0
$0
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 4
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
AGFO Agate Fossil Beds National Monument
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 36 0.090 $2,186,084 $24,308,090 -
7
5
0
3
1
1
2
0.012
0.076
0.000
0.000
0.000
0.000
0.000
$67,062
$111,773
$0
$0
$0
$0
$0
$5,636,964
$1,465,046
$0
$849,430
$512,205
$2,379,079
$1,628,325
16,676
7,326
0
10,680
6,500
4,000
SF
SF
AC
LF
GPD
GPD
$6,364,943$1,870,596 0.294 7
10 0.025 $136,653 $5,472,097 - -
$0
$78,720
$0
$0
$0
$0
$0
-
$0
$78,720
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 5
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
AKRO Alaska Regional Support Office
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 6 0.000 $0 $29,899,340 -
5
0
0
0
0
0
0
0.000
0.000
0.000
0.000
0.000
0.000
0.000
$0
$0
$0
$0
$0
$0
$0
$29,214,116
$0
$0
$0
$0
$0
$0
107,984
0
0
0
0
0
SF
SF
AC
LF
GPD
GPD
$0$0 0.000 0
1 0.000 $0 $685,224 - -
$0
$0
$0
$0
$0
$0
$0
-
$0
$0
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 6
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
ALAG Alagnak Wild River
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 2 0.000 $0 $505,662 -
1
0
0
0
0
0
0
0.000
0.000
0.000
0.000
0.000
0.000
0.000
$0
$0
$0
$0
$0
$0
$0
$88,035
$0
$0
$0
$0
$0
$0
224
0
0
0
0
0
SF
SF
AC
LF
GPD
GPD
$0$0 0.000 0
1 0.000 $0 $417,627 - -
$0
$0
$0
$0
$0
$0
$0
-
$0
$0
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 7
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
ALFL Alibates Flint Quarries National Monument
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 16 0.014 $1,115,598 $81,384,689 -
4
0
0
1
1
1
4
0.025
0.000
0.000
0.135
0.000
0.010
0.255
$46,100
$0
$0
$25,000
$0
$8,236
$151,040
$1,866,946
$0
$0
$184,592
$148,071
$850,327
$592,254
5,688
0
0
3,960
1,000
25,000
SF
SF
AC
LF
GPD
GPD
$5,301,334$868,400 0.164 2
3 0.000 $16,822 $72,441,165 - -
$0
$0
$0
$0
$0
$0
$67,967
-
$0
$67,967
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 8
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
ALKA Ala Kahakai National Historic Trail
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 2 0.025 $106,308 $4,204,216 -
0
0
0
2
0
0
0
0.000
0.000
0.000
0.025
0.000
0.000
0.000
$0
$0
$0
$106,308
$0
$0
$0
$0
$0
$0
$4,204,216
$0
$0
$0
0
0
0
14,567
0
0
SF
SF
AC
LF
GPD
GPD
$0$0 0.000 0
0 0.000 $0 $0 - -
$0
$0
$0
$97,495
$0
$0
$0
-
$0
$97,495
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 9
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
ALPO Allegheny Portage Railroad National Historic Site
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 84 0.046 $9,611,084 $209,342,744 -
12
1
0
7
1
0
2
0.086
0.000
0.000
0.338
0.000
0.000
1.092
$3,423,127
$0
$0
$917,428
$0
$0
$136,963
$39,877,369
$313,314
$0
$2,717,763
$495,196
$0
$125,416
38,572
2,275
0
72,657
500
0
SF
SF
AC
LF
GPD
GPD
$8,178,259$3,646,310 0.446 10
51 0.009 $1,487,256 $157,635,427 - -
$449,425
$0
$0
$55,000
$0
$0
$136,963
-
$33,560
$674,948
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 10
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
AMIS Amistad National Recreation Area
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 175 0.104 $7,894,052 $76,221,926 -
59
0
9
10
3
5
17
0.054
0.000
0.057
0.238
0.005
0.004
0.064
$483,927
$0
$118,904
$239,848
$13,020
$17,360
$113,683
$8,885,801
$0
$2,102,154
$1,007,657
$2,621,491
$4,014,139
$1,788,026
42,587
0
79
58,050
20,400
195,380
SF
SF
AC
LF
GPD
GPD
$24,081,774$6,485,922 0.269 31
41 0.013 $421,390 $31,720,884 - -
$4,845
$0
$0
$0
$0
$0
$0
-
$0
$4,845
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 11
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
AMME American Memorial Park
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 46 0.211 $8,888,626 $42,026,820 -
10
0
0
2
0
1
4
0.023
0.000
0.000
0.126
0.000
0.012
0.393
$270,966
$0
$0
$175,491
$0
$24,158
$104,356
$11,931,809
$0
$0
$1,393,416
$0
$2,059,117
$265,734
19,865
0
0
12,006
0
2,000
SF
SF
AC
LF
GPD
GPD
$8,233,636$7,701,523 0.935 17
12 0.034 $612,132 $18,143,109 - -
$52,000
$0
$0
$90,306
$0
$0
$0
-
$17,500
$159,806
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 12
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
ANCH Alaska Public Lands Information Center Anchorage
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 3 0.082 $1,234,863 $15,005,473 -
2
0
0
0
0
0
0
0.039
0.000
0.000
0.000
0.000
0.000
0.000
$274,773
$0
$0
$0
$0
$0
$0
$7,049,165
$0
$0
$0
$0
$0
$0
11,099
0
0
0
0
0
SF
SF
AC
LF
GPD
GPD
$0$0 0.000 0
1 0.121 $960,090 $7,956,308 - -
$0
$0
$0
$0
$0
$0
$0
-
$482,977
$482,977
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 13
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
ANDE Andersonville National Historic Site
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 110 0.058 $11,514,199 $200,074,741 -
12
0
0
1
3
3
5
0.056
0.000
0.000
0.185
0.000
0.000
0.021
$895,297
$0
$0
$32,841
$0
$0
$8,729
$15,910,976
$0
$0
$177,879
$102,022
$184,147
$416,930
23,623
0
0
1,802
6,900
3,345
SF
SF
AC
LF
GPD
GPD
$8,010,332$5,040,353 0.629 22
64 0.032 $5,536,979 $175,272,454 - -
$100,929
$0
$0
$0
$0
$0
$0
-
$327,329
$428,258
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 14
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
ANIA Aniakchak National Monument and Preserve
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 3 0.197 $51,010 $258,378 -
2
0
0
0
0
0
0
0.217
0.000
0.000
0.000
0.000
0.000
0.000
$47,886
$0
$0
$0
$0
$0
$0
$220,399
$0
$0
$0
$0
$0
$0
809
0
0
0
0
0
SF
SF
AC
LF
GPD
GPD
$0$0 0.000 0
1 0.082 $3,124 $37,979 - -
$0
$0
$0
$0
$0
$0
$0
-
$0
$0
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 15
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
ANJO Andrew Johnson National Historic Site
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 32 0.016 $579,277 $35,590,440 -
10
0
0
0
0
0
0
0.036
0.000
0.000
0.000
0.000
0.000
0.000
$315,929
$0
$0
$0
$0
$0
$0
$8,827,407
$0
$0
$0
$0
$0
$0
12,667
0
0
0
0
0
SF
SF
AC
LF
GPD
GPD
$897,150$0 0.000 7
15 0.010 $263,348 $25,865,884 - -
$133,883
$0
$0
$0
$0
$0
$0
-
$0
$133,883
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 16
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
ANTI Antietam National Battlefield
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 204 0.027 $5,335,094 $196,160,302 -
68
1
0
11
0
0
9
0.034
0.000
0.000
0.013
0.000
0.000
0.000
$2,444,847
$0
$0
$39,646
$0
$0
$0
$72,494,496
$324,232
$0
$3,012,205
$0
$0
$1,663,517
166,318
1,920
0
78,479
0
0
SF
SF
AC
LF
GPD
GPD
$18,281,355$1,147,500 0.063 33
82 0.017 $1,703,101 $100,384,498 - -
$1,854,651
$0
$0
$39,646
$0
$0
$0
-
$1,449,095
$3,343,391
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 17
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
APCO Appomattox Court House National Historical Park
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 85 0.040 $1,892,228 $47,430,447 -
37
2
0
1
1
0
10
0.036
0.080
0.000
0.035
0.000
0.000
0.040
$1,076,282
$91,319
$0
$17,877
$0
$0
$30,909
$30,122,517
$1,144,981
$0
$514,254
$386,275
$0
$769,842
56,868
7,077
0
24,400
500
0
SF
SF
AC
LF
GPD
GPD
$5,582,898$639,817 0.115 12
22 0.004 $36,024 $8,909,680 - -
$203,967
$0
$0
$0
$0
$0
$0
-
$0
$203,967
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 18
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
APIS Apostle Islands National Lakeshore
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 289 0.065 $8,803,453 $135,270,051 -
117
15
17
13
8
10
4
0.063
0.034
0.136
0.070
0.001
0.129
0.000
$2,997,131
$1,065,965
$91,058
$400,974
$2,343
$269,953
$0
$47,671,822
$31,149,804
$668,226
$5,709,710
$1,584,341
$2,086,132
$231,307
53,365
29,321
4
307,032
3,850
9,500
SF
SF
AC
LF
GPD
GPD
$3,864,794$1,193,607 0.309 11
94 0.066 $2,782,423 $42,303,916 - -
$1,623,627
$375,092
$37,785
$344,674
$2,343
$205,056
$0
-
$2,503,447
$5,092,023
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 19
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
APPA Appalachian National Scenic Trail
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 1,016 0.108 $14,961,149 $138,741,549 -
635
0
13
82
0
4
184
0.003
0.000
0.000
0.168
0.000
0.000
0.004
$86,044
$0
$0
$14,829,584
$0
$0
$28,350
$28,484,118
$0
$180,199
$88,532,225
$0
$202,710
$6,955,130
129,865
0
6
11,506,704
0
40
SF
SF
AC
LF
GPD
GPD
$829,957$0 0.000 16
82 0.001 $17,171 $13,557,211 - -
$4,500
$0
$0
$163,273
$0
$0
$21,000
-
$5,671
$194,444
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 20
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
ARCH Arches National Park
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 156 0.248 $19,886,459 $80,115,216 -
32
7
1
24
7
3
7
0.038
0.082
0.016
0.236
0.005
0.146
0.170
$491,208
$137,187
$22,358
$1,241,961
$4,537
$391,439
$1,041,067
$13,057,619
$1,673,683
$1,409,602
$5,268,663
$973,627
$2,685,160
$6,137,316
31,847
9,979
52
123,026
43,500
90,800
SF
SF
AC
LF
GPD
GPD
$46,026,419$16,178,500 0.352 52
23 0.131 $378,201 $2,883,127 - -
$80,470
$0
$11,378
$313,289
$0
$0
$710,013
-
$249,452
$1,364,601
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 21
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
ARPO Arkansas Post National Memorial
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 50 0.038 $2,730,766 $71,126,367 -
9
2
0
7
1
1
1
0.015
0.041
0.000
0.114
0.155
0.094
0.000
$56,264
$18,975
$0
$130,507
$494,809
$176,262
$0
$3,847,501
$465,187
$0
$1,146,639
$3,190,631
$1,879,683
$20,256
10,436
3,532
0
16,528
755
881
SF
SF
AC
LF
GPD
GPD
$3,231,163$862,710 0.267 9
20 0.017 $991,239 $57,345,306 - -
$0
$13,416
$0
$120,492
$493,468
$0
$0
-
$862,791
$1,490,166
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 22
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
ASIS Assateague Island NS
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 224 0.104 $24,515,662 $235,266,626 -
87
5
9
12
7
5
21
0.075
0.115
0.148
0.167
0.032
0.024
0.065
$3,087,284
$189,604
$626,005
$667,681
$52,958
$291,248
$797,582
$40,915,369
$1,641,641
$4,229,301
$3,992,229
$1,645,537
$12,296,031
$12,349,710
126,068
14,016
95
26,552
31,500
92,600
SF
SF
AC
LF
GPD
GPD
$60,885,083$14,800,486 0.243 43
35 0.041 $4,002,813 $97,311,725 - -
$651,308
$9,987
$235,802
$359,005
$0
$0
$564,762
-
$1,536,840
$3,357,704
Unpaved Roads† :
Water Systems:
Waste Water Systems:
Trails:
Campgrounds:
Housing*:
Buildings:
Paved Roads‡: - -
- -
Figures in the table above represent a snapshot of the NPS
Facility Management Software System (FMSS) data as of the end of
the fiscal
year.
* Housing is defined as buildings that are associated with the
NPS Employee Housing Program/DOI Quarters Program, including
support
buildings (e.g., detached garages, shower and laundry
facilities, storage).
† Unpaved Roads includes unpaved parking areas and unpaved
roadways.
‡ Paved Roads includes bridges, tunnels, paved parking areas and
paved roadways.
§ All Other assets include utility systems, dams, constructed
waterways, marinas, aviation systems, railroads, ships,
monuments,
fortifications, towers, interpretive media and
amphitheaters.
FCI (Facility Condition Index) - A measure of a facility’s
relative condition at a particular point in time. The FCI rating is
a ratio of the cost
of repair of the assets deficiencies divided by the current
replacement value for the asset.
CSDM (Critical Systems Deferred Maintenance) - The cost of
critical or serious deferred maintenance located in critical
asset
components. This figure is currently unavailable for the paved
roads category.
DM (Deferred Maintenance) - The cost of maintenance that was not
performed when it should have been or was scheduled to be and
which, therefore, is put off or delayed.
CRV (Current Replacement Value) - The current replacement value
represents the standard industry costs and engineering estimates
of
materials, supplies and labor required to replace a facility at
its existing size and functional capability. The CRV is estimated
in alignment
with federal requirements and industry standards and is used in
calculating the FCI. However, it is important to note that the
results of this
calculation alone do not suggest that the NPS plans to replace
an asset or set of assets within the portfolio.
Qty (Quantity) and UM (Unit of Measure) - Quantity and unit of
measure are used together to describe the quantity. In the unit
of
measure column, SF= square footage, AC= acres, LF= linear feet,
GPD= gallons per day, and MI= miles. These are the industry
standard
units of measure for each asset type and are consistently used
across the federal government.
Please note that the parameters used to calculate the data in
the report above do not match the Federal Real Property Profile
(FRPP)
parameters or the Federal Accounting Standards Advisory Board
(FASAB) parameters. Therefore, the inventory counts, FCI, CSDM,
DM,
CRV and QTY data elements will not match those reported to the
FRPP or FASAB
Page: 23
-
Facility Management Software System Data as of September 30,
2015
NPS Asset Inventory Summary - By Park
AZRU Aztec Ruins National Monument
Number of
Asset
Locations
UM Qty CRV DM CSDMFCI
-
All Other§ :
TOTAL: 76 0.121 $6,606,322 $54,523,724 -
11
0
0
10
4
3
11
0.197
0.000
0.000
0.001
0.253
0.000
0.237
$1,407,503
$0
$0
$971
$305,537
$76
$45,494
$7,158,631
$0
$0
$691,721
$1,206,490
$543,154
$191,751
23,541
0
0
15,056
1,007,000
1,371,700
SF
SF
AC
LF
GPD
GPD
$1,546,196$488,909 0.316 10
27 0.101 $4,357,830 $43,185,781 - -